1 Fjordforbindelsen Frederikssund Tolling Scheme NETLIPSE Meeting 20 th November Munich

2 Who we are Morten Weigand Business Manager Henrik Vincentsen Project Director

3 Fjordforbindelsen Frederikssund Facts and figures 10 km Dual Carriageway (90 km/h Speed limit) 2x2 lanes without emergency lanes 1,4 km High Bridge and 11 minor structures Budget: DKK 2,0 billion (approx. 275 mio.) Expected opening: late 2019.

4 Fjordforbindelsen Frederikssund Today s presentation The Project Project overview Construction of the High Bridge Free Flow Tolling The Business set-up Board Dual role (DRD as business manager vs. DRD as an agency) Financing

5 Project Overview

6 Eastern section Marbæk

7 High Bridge

8 Tørslev Hage Aeriel view Tørslev Hage

9 Western section Grade separated junction

10 High Bridge Construction sequence

11 Construction Sequence Pile casting

12 Construction Sequence Cofferdam

13 Construction Sequence Pile cap

14 Construction Sequence Piers

15 Construction Sequence Superstructure

16 Construction Sequence Finish and traffic

17 Tolling System Tørslev

18 Tolling System Free Flow System Entrepriserne Estimated rates*: Vehicle <3,5 t = 14 kr. Vehicle >3,5 t = 41 kr. No vehicle >3,5t allowed Crown Prins Frederiks bridge * cf. Construction act

19 Fjordforbindelsen Frederikssund Traffic Control Measures Crown Prins Frederiks Bridge J. F. Willumsens Vej Construction Act 2, stk. 2. The Danish Road Directorate may, in accordance with section 92 of the Traffic Act and after negotiation with the Municipality of Frederikssund and with the consent of the police, make provision for traffic control measures on Crown Prince Frederiks Bridge and J. F. Willumsens Vej and on those referred to in section 1 1, cf. Annex 1 of the Act, which affects road use and facilities in order to reduce the traffic driving through.

20 The set up: Fjordforbindelsen Frederikssund

21 Indepedent Public Company Fjordforbindelsen Frederikssund The legal basis for the project is the construction law The company was established 27 th November 2015 and is 100 % owned by the State Company responsibilities: 1) construct the Fjord Link 2) finance the project (partly) 3) collect payment by establishing, operating and maintaining a tolling scheme The only employees are the 5 board members

22 The role of the Danish Road Directorate The Danish Road Directorate (DRD) is by law appointed to be the business manager Carries out the daily management and administration (paid at cost) Great experience in planning, construction and maintenance of roads but a novice when it comes to tolling, herein handling paying customers Therefore use of expert consultants and market consultations DRD has a dual role

23 The business case Finance and pay back of loans Overall Project Budget Contribution from the Danish Government The rest to be funded by the company EUR 270 million EUR 90 million (EUR 180 million) Loans: Approx. EUR 110 million have been borrowed (state guarantee) All loans are to be paid back within 40 years Estimated toll fee rates Cars under 3500 kg Vehicles over 3500 kg Estimated traffic: EUR 2 EUR vehicles pr. day Herof approx. 10% heavy vehicles

24 Tolling Approach Market involvement Procurement

25 The frame for the tolling services This is the first time we procure a free-flow tolling system We have a limited budget low running cost Lack of economies of scale only one free-flow tolling system The factor of time 13 months mobilisation before start of operations We want to make use of already existing competencies in the market Our cost and risk indexation showed that Tolling as a service would be preferable compared to the alternatives

26 The aims for a successful first generation contract We want an efficient, highly economical and user friendly tolling scheme The governing idea for creating this is to drive the compliance of registration of users The construction law sets out that all users not registered with an electronical tag will have to be charged an administration fee.

27 2 market consultations to ensure openness Preliminary Market Consultation Published a background note where three models was described along with a questionnaire The aim was to qualify the financial conditions and the procurement model Gave the basis for going tolling as a service Second Market Consultation Asked the market for feedback on our preliminary tender material Wanted to create relations and to ensure that the market gets together in solid joint ventures if needed

28 A successful first generation contract Collaboration and aligned aims and measures as the road to success 100 % remittance as the aim and administration fee is paid to the Employer Operator to recover all debts a matter of reputation 6 years of operation + option for years A high percentage of fixed payments

29 Procurement strategy and process Competitive dialogue (expects 2 rounds) with 5 operators; Ensure the most market-conforming tender material/proportionate degree of freedom clarify the technical, legal and financial solutions the market can offer minimizing the complexity of the project and clarify risks ensure the needs and requirements can be fulfilled within an acceptable financial framework Tender fee - per round and for submission of a compliant tender Published 7th November 2017 PQ Notification Christmas 2017 Dialogue rounds Spring 2018 Award of Contract August 2018

30 Still in progress Development of own operating organisation Set the pricing structure/administration fees Further develop the communications strategy Investigating the possibility to carry out withholding of wages for toll evaders.

31 Thank you for your attention! Contact info Morten Weigand: Henrik Vincentsen:

Corrections and additions: Bidders are hereby notified of the following corrections and additions to the tender documents for the abovementioned

Corrections and additions: Bidders are hereby notified of the following corrections and additions to the tender documents for the abovementioned Date 26 March 2018 Contact Morten Weigand Mail mwe@vd.dk Phone +45 7244 3059 Document 17/16490-27 Page 1/10 To the Bidders Questions/answer - Corrigenda 5 Fjordforbindelsen Frederikssund Tolling Scheme

More information

Czech D4 Highway PPP Project

Czech D4 Highway PPP Project The Ministry of Transport of the Czech Republic has begun to prepare a tender for a concession for the construction and operation of the D4 Highway using a PPP model. The D4 Highway PPP project consists

More information

PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor

PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor I I.1) Name: PUBLIC PARTNER PUBLIC PARTNER NAME, ADDRESS AND CONTACT Javno preduzeće Autoputevi

More information

North-South Road Corridor Investment Program. Republic of Armenia

North-South Road Corridor Investment Program. Republic of Armenia North-South Road Corridor Investment Program Republic of Armenia Poti (Black Sea) Georgia Armenia Iran Bandar Abbas (Persian Gulf) www.northsouth.am North-South Road Corridor Investment Program Brief Introduction

More information

Copenhagen Stock Exchange Decisions and Statements

Copenhagen Stock Exchange Decisions and Statements Copenhagen Stock Exchange Decisions and Statements in 2006 JANUARY... 2 The time for publication of changed expectations... 2 FEBRUARY... 3 1. Information in the press... 3 2. Publication by mistake...

More information

Doing Business in Denmark

Doing Business in Denmark This document describes some of the key commercial and taxation factors that are relevant on setting up a business in Denmark. Prepared by Addere Revision 2 Doing Business in Denmark Background Country

More information

(a) by December 31, 2015 and upon submission of a payment request by the Trustee, fifty million Danish Kroner (DKK 50,000,000); and

(a) by December 31, 2015 and upon submission of a payment request by the Trustee, fifty million Danish Kroner (DKK 50,000,000); and Denmark Amendment to the Trust Ftmd Contribution Agreement among the Green Climate Fund, the International Bank for Reconstruction and Development and.the Kilrgdom of Denmark concerning the Green Climate

More information

HUR Traffic Division March 2003 Annex 6 page 1

HUR Traffic Division March 2003 Annex 6 page 1 HUR Traffic Division March 2003 Annex 6 page 1 Annex 6 Payment and adjustment of rates etc 1. Payment The agreed tender sum, broken down by the agreed fixed costs and bus and operations related costs,

More information

Interim financial report for the period 1 October June 2016

Interim financial report for the period 1 October June 2016 1/12 Nasdaq Copenhagen A/S P.O. Box 1040 1007 København K 29 August 2016 Ref.: JSZ/tms Today, the Board of Directors of Per Aarsleff Holding A/S has discussed and approved the interim financial report

More information

Answer: Under the new guidelines, the DBA will still be able to pre-approve development projects between foreign suppliers and Danish companies.

Answer: Under the new guidelines, the DBA will still be able to pre-approve development projects between foreign suppliers and Danish companies. 8 April 2015 FAQ new guidelines for industrial co-operation Question 1: What is the impact of the new guidelines on current industrial cooperation contracts between foreign suppliers and the Danish Business

More information

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS 29/03/2012 COCOF_12-0047-02-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DIRECTORATE-GENERAL EMPLOYMENT, SOCIAL AFFAIRS and EQUAL OPPORTUNITIES GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER

More information

Chapter 2: Fit and Proper Criteria, Notification and Assessment

Chapter 2: Fit and Proper Criteria, Notification and Assessment Chapter 2: Fit and Proper Criteria, Notification and Assessment 2.1 Introduction 2.1.1 In terms of article 8(1)(e) of the Act, the competent authority shall not issue an authorisation unless it is satisfied

More information

Different incentive structures in tender and contract set-ups. NETLIPSE Network Meeting Bratislava, 9 April 2018

Different incentive structures in tender and contract set-ups. NETLIPSE Network Meeting Bratislava, 9 April 2018 Different incentive structures in tender and contract set-ups NETLIPSE Network Meeting Bratislava, 9 April 2018 Aim of today s session Structure the experience of the NETLIPSE Network Meeting participants

More information

Overview of Municipal Asset Management Planning Regulation (O. Reg. 588/17)

Overview of Municipal Asset Management Planning Regulation (O. Reg. 588/17) Overview of Municipal Asset Management Planning Regulation (O. Reg. 588/17) ROMA conference 2018 January 23, 2018 Overview In December 2017, the province passed an asset management planning regulation

More information

City Policy & Procedure

City Policy & Procedure City Policy & Procedure Subject: PUBLIC-PRIVATE PARTNERSHIP (P3) POLICY Policy Number: #1011 Effective: September 3rd, 2014 Purpose: The City of Brandon Public-Private Partnership (P3) Policy intends to

More information

PPP for European Road Projects

PPP for European Road Projects Ways to Successful Preparation and Financing 1st European Road Congress 24-26 November 2004 Lisbon Congress Centre Dipl.-Ing. Wilfried Rammler Rosario Victoria Bridge, Argentina 1 HOCHTIEF...worldwide

More information

ANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY

ANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY ANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY Source: General suggestions by Ian G. Heggie, UK Highways Agency example from Mel Quinn and Tanzania example from

More information

Interim Financial Report 1 October to 31 March Investor relations presentation H1

Interim Financial Report 1 October to 31 March Investor relations presentation H1 Interim Financial Report 1 October 20015 to 31 March 2016 Investor relations presentation H1 H1 2 Aarsleff Group 2015/2016 H1 Contents Aarsleff Group 2015/2016 H1 3 Revenue Results and EBIT Solvency ratio,

More information

Government Policy Statement on land transport 2018 release for public engagement

Government Policy Statement on land transport 2018 release for public engagement In Confidence Office of the Minister of Transport Chair, Cabinet Economic Development Committee Government Policy Statement on land transport 2018 release for public engagement Proposal 1. This paper seeks

More information

EBRD Business and Procurement Opportunities Business Outreach Workshop on Procurement Foreign Trade Chamber of B&H

EBRD Business and Procurement Opportunities Business Outreach Workshop on Procurement Foreign Trade Chamber of B&H 14/04/2016 EBRD Business and Procurement Opportunities Business Outreach Workshop on Procurement Foreign Trade Chamber of B&H Sarajevo, 18 April 2016 Veljko Sikirica Associate Director, Procurement Policy

More information

Economic Assessment of a Fixed Link across the Fehmarn Belt

Economic Assessment of a Fixed Link across the Fehmarn Belt Danish Ministry of Transport Economic Assessment of a Fixed Link across the Fehmarn Belt Summary Report March 2004 in cooperation with Danish Ministry of Transport Economic Assessment of a Fixed Link across

More information

Q PRESENTATION 13 JULY 2018

Q PRESENTATION 13 JULY 2018 Q2 2018 PRESENTATION 13 JULY 2018 Group Highlights Q2 2018 Strong growth in revenue and improved operating profit despite challenges in Danish subsidiary. Excellent performance in Norway, Sweden, Finland

More information

FINANCIAL INFORMATION NOTE. Preliminary estimates of cost and revenue projections for the REM project (Réseau électrique métropolitain)

FINANCIAL INFORMATION NOTE. Preliminary estimates of cost and revenue projections for the REM project (Réseau électrique métropolitain) FINANCIAL INFORMATION NOTE Preliminary estimates of cost and revenue projections for the REM project (Réseau électrique métropolitain) January 2017 This document presents estimates of cost and revenue

More information

Questions and answers

Questions and answers Questions and answers Here you can find answers to questions the DEA receives continually. The questions are divided into different categories. Even though some of the questions may be relevant for more

More information

Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs

Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs www.pwc.com Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs November 2016 Jan Brazda, (Head of PPP in CEE) Agenda 1 Key highlights of the D4/R7 PPP project 2 EU financial instruments 3

More information

CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP. Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa

CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP. Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa OVERVIEW Project Overview Business Case & Benefits Procurement

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

Contents. 1. Introduction Objective Scope NN Group strategy and principles 3

Contents. 1. Introduction Objective Scope NN Group strategy and principles 3 Group Tax Charter Contents 1. Introduction 3 1.1 Objective 3 1.2 Scope 3 1.3 NN Group strategy and principles 3 2. Group Tax function department 4 2.1 Mission 4 2.2 Vision 4 2.3 Values, behaviours and

More information

Presentation at Civitas Forum

Presentation at Civitas Forum 12/10/2017 1 Presentation at Civitas Forum Kim Kreilgaard Head of EIB Group Office in Portugal 28th September at Torres Vedras European Investment Bank Group 12/10/2017 2 Largest multilateral lender and

More information

Ministry of Foreign Affairs of Denmark. Concept Note Danida Business Finance Project Development Facility

Ministry of Foreign Affairs of Denmark. Concept Note Danida Business Finance Project Development Facility Ministry of Foreign Affairs of Denmark Danida Concept Note Danida Business Finance Project Development Facility 5 May 2017 File No.: 2017-8006 1. CONTEXT... 3 2. PRESENTATION OF THE PROGRAMME... 5 3. MANAGEMENT

More information

PLEASE READ ALL SPECIFICATIONS AND REQUIREMENTS OF THIS BID CAREFULLY AS CHANGES, ADDITIONS OR DELETIONS TO THIS BID MAY HAVE BEEN MADE.

PLEASE READ ALL SPECIFICATIONS AND REQUIREMENTS OF THIS BID CAREFULLY AS CHANGES, ADDITIONS OR DELETIONS TO THIS BID MAY HAVE BEEN MADE. ATTENTION BIDDERS: PLEASE READ ALL SPECIFICATIONS AND REQUIREMENTS OF THIS BID CAREFULLY AS CHANGES, ADDITIONS OR DELETIONS TO THIS BID MAY HAVE BEEN MADE. Please note that the vendor selected by the bid

More information

Executive Order on remuneration policies and remuneration in insurance undertakings and insurance holding undertakings1)

Executive Order on remuneration policies and remuneration in insurance undertakings and insurance holding undertakings1) EO no 1583 of 13/12/2016 (Applicable) Printout date: 26 October 2017 Ministry: Ministry of Industry, Business and Financial Affairs Journal number: Ministry of Industry, Business and Financial Affairs,

More information

TABLE OF CONTENTS. Management s review. Management statement and auditors report. Group accounts and annual accounts 1 january 31 december 2014

TABLE OF CONTENTS. Management s review. Management statement and auditors report. Group accounts and annual accounts 1 january 31 december 2014 ARKIL HOLDING A/S ANNUAL REPORT 2014 TABLE OF CONTENTS Management s review About Arkil 3 Main figures and key ratios for the group 4 The year at a glance 5 Preface 6 Targets, strategy and expectations

More information

Establishment and running of an Offshore Competence Centre

Establishment and running of an Offshore Competence Centre 1 Brazil delegation, June 10th 2005 Establishment and running of an Offshore Competence Centre Morten Madsen, Esbjerg Denmark's 5th biggest city 82,000 inhabitants Port to the North Sea - the center of

More information

PROUD TO BE PART ROUTE 21-24

PROUD TO BE PART ROUTE 21-24 PROUD TO BE PART ROUTE 21-24 ROute 21-24 1 summary Type of Contract: Design, Construct, Finance, Operate and Transfer Tender: International Procurement Variable: Availability Payment + Shadow Toll Estimated

More information

Management Compensation Framework

Management Compensation Framework Reference Job #6 Manager, Highway Design & Traffic Engineering MINISTRY Transportation MANAGEMENT ROLE: 2 DIVISION: Highway Operations ROLE PROFILE A BRANCH: Engineering Services, South Coast Region POSITION

More information

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations December 2017 1 1. THE CONTRACTING AUTHORITY... 4 2. REGULATION

More information

GENERAL RULE - TRANSFER OF EQUIPMENT TO ANOTHER HUMANITARIAN AID ACTION FUNDED BY ECHO

GENERAL RULE - TRANSFER OF EQUIPMENT TO ANOTHER HUMANITARIAN AID ACTION FUNDED BY ECHO 11. CLOSING THE ACTION Closing of the action is a very important phase and it should be carefully managed. The action must be completed by the end of the implementation period specified in the Specific

More information

Contract Administration Final Exam

Contract Administration Final Exam Contract Administration Final Exam 1. You want to solicit bids for a one year contract for concrete to support your roadway construction work. At this time, prices are fluctuating due to high demand and

More information

TERMS OF TENDER 04/EU/2018/RS

TERMS OF TENDER 04/EU/2018/RS TERMS OF TENDER 04/EU/2018/RS REGARDING PURCHASE AND DELIVERY OF TWO (2) REACHSTACKERS (RS) 1. GENERAL PROVISIONS 1.1 Tender organiser The organiser of this tender (the "Tender") regarding purchase and

More information

A N N O U N C E S P U B L I C I N V I T A T I O N. FOR PARTICIPATION IN ESTABLISHING ECONOMIC COOPERATION FUNDS (ECFs)

A N N O U N C E S P U B L I C I N V I T A T I O N. FOR PARTICIPATION IN ESTABLISHING ECONOMIC COOPERATION FUNDS (ECFs) GOVERNMENT OF THE REPUBLIC OF CROATIA MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP 10000 Zagreb, Ulica grada Vukovara 78 Zagreb, 23 February 2010 Pursuant to the Decision of the Government of the

More information

Danish Tax News. 1. Introduction. 2. Public Property Value Assessment. Nordic Tax Journal 2014:1. Inge Langhave Jeppsen

Danish Tax News. 1. Introduction. 2. Public Property Value Assessment. Nordic Tax Journal 2014:1. Inge Langhave Jeppsen DOI: 10.1515/ntaxj-2014-0015 Danish Tax News Nordic Tax Journal 2014:1 Professor WSR Inge Langhave Jeppesen Department of Law, University of Southern Denmark 1. Introduction Jonas Dahl, of the Socialist

More information

1. The auditing is to be conducted by a chartered or registered accountant appointed by the competent body of the organisation.

1. The auditing is to be conducted by a chartered or registered accountant appointed by the competent body of the organisation. Updated May 2018 DPOD Administrative Guidelines Audit Instructions concerning the performance of audits in connection with the administration of grant funds from mini-programmes applicable to single projects

More information

Pre-Qualification Questionnaire (PQQ)

Pre-Qualification Questionnaire (PQQ) June 4, 2015 Pre-Qualification Questionnaire (PQQ) for New offshore Wind Tenders in Denmark Kriegers Flak Side 1 Table of contents 1. INTRODUCTION... 4 SECTION I... 5 2. QUESTION SET A: ORGANISATION AND

More information

Mental Health Foundation. Employee Expenses Policy

Mental Health Foundation. Employee Expenses Policy Mental Health Foundation Employee Expenses Policy Mental Health Foundation Employee Expenses Policy The Foundation recognises that staff will incur expenses on its behalf; it is the Foundation s policy

More information

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS Ancillary services to be delivered in Denmark. Tender conditions 1/49 Energinet.dk Tonne Kjærsvej 65 DK-7000 Fredericia +45 70 10 22 44 info@energinet.dk VAT no. 28 98 06 71 Date: 30. august 2017 Author:

More information

Highway & Transportation Authority (HTA)

Highway & Transportation Authority (HTA) Highway & Transportation Authority (HTA) Rubén A. Hernández Gregorat, PE, MEM Executive Director Jorge Junquera Chief Financial Officer R E S T O R I N G G R O W T H T H R O U G H F I S C A L R E S P O

More information

RESURFACING WATER STREET & FALLS LANE

RESURFACING WATER STREET & FALLS LANE TOWN OF SHELBURNE REQUEST FOR TENDERS RESURFACING WATER STREET & FALLS LANE 2018 Town of Shelburne P.O. Box 670 168 Water St Shelburne, NS B0T 1W0 Closing Date: August 9 th, 2018 1. INFORMATION TO BIDDERS

More information

LIDC Danish National Report. For the LIDC Congress in Prague October National Rapporteur: Sune Troels Poulsen

LIDC Danish National Report. For the LIDC Congress in Prague October National Rapporteur: Sune Troels Poulsen LIDC 2012 Danish National Report For the LIDC Congress in Prague 11-13 October 2012 National Rapporteur: Sune Troels Poulsen Question A: SMEs and competition rules - Should small and medium enterprises

More information

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide. Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University

More information

BEST EXECUTION AND ORDER ALLOCATION POLICY FOR INVESTERINGSFORVALTNINGSSELSKABET SEBINVEST A/S PURPOSE 1

BEST EXECUTION AND ORDER ALLOCATION POLICY FOR INVESTERINGSFORVALTNINGSSELSKABET SEBINVEST A/S PURPOSE 1 BEST EXECUTION AND ORDER ALLOCATION POLICY FOR INVESTERINGSFORVALTNINGSSELSKABET SEBINVEST A/S PURPOSE 1 This Best Execution and Order Allocation Policy (the Policy ) implements the requirements under

More information

Blending EU grants with PPPs in the next financial perspective ( ) François Gaudet 25 th October, Zagreb

Blending EU grants with PPPs in the next financial perspective ( ) François Gaudet 25 th October, Zagreb Blending EU grants with PPPs in the next financial perspective (2014-2020) François Gaudet 25 th October, Zagreb Structure of the presentation The principles and challenges of blending PPP with EU Funds

More information

THE DANISH CLIMATE INVESTMENT FUND. Torben Huss, Executive Vice President

THE DANISH CLIMATE INVESTMENT FUND. Torben Huss, Executive Vice President THE DANISH CLIMATE INVESTMENT FUND Torben Huss, Executive Vice President WHAT IS KIF? Public Private Partnership Operates on commercial terms Provides risk capital for climate investments and climate-related

More information

LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna

LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna October I992 Transport No. RD-12 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK Michele Cyna Delays in the completion

More information

Public Private Partnerships, The Rules Oranjestad February 18, Paul Swanenvleugel

Public Private Partnerships, The Rules Oranjestad February 18, Paul Swanenvleugel Public Private Partnerships, The Rules Oranjestad Paul Swanenvleugel Paul Swanenvleugel Director PricewaterhouseCoopers Advisory N.V. P.O.Box 9616 1006 GC Amsterdam The Netherlands Ph: +31 88 792 32 19

More information

PRESENTATION OF THE BUDGET DIRECTORATE OF THE MINISTRY OF FINANCE REPUBLIC OF SLOVENIA

PRESENTATION OF THE BUDGET DIRECTORATE OF THE MINISTRY OF FINANCE REPUBLIC OF SLOVENIA PRESENTATION OF THE BUDGET DIRECTORATE OF THE MINISTRY OF FINANCE REPUBLIC OF SLOVENIA Alenka Bratušek, M.A. Director General - In three and half ours you can drive from one side to the other side by car.

More information

Grain Operations Webinar Series

Grain Operations Webinar Series Grain Operations Webinar Series Webinar 2 Budgeting and Capital Project Management for Grain Operations Supervisors Presenter: Jim Voigt President JFV Solutions, Inc. Mt Zion, IL Objectives Define budgeting

More information

Interim report. 1 May January 2018 THE URGE TO EXPLORE SPACE

Interim report. 1 May January 2018 THE URGE TO EXPLORE SPACE Interim report 1 May 2017-31 January 2018 THE URGE TO EXPLORE SPACE egetæpper a/s Industrivej Nord 25, 7400 Herning Tel. no.: +45 97 11 88 11 Fax no.: +45 97 11 95 80 www.egecarpets.com e-mail: ege@ege.dk

More information

May 2018 Basis for Conclusions: APES 310 Client Monies

May 2018 Basis for Conclusions: APES 310 Client Monies May 2018 Basis for Conclusions: APES 310 Client Monies Prepared by the Technical Staff of the Accounting Professional & Ethical Standards Board BASIS FOR CONCLUSIONS: Revised APES 310 Client Monies (2018)

More information

The development of offshore wind - The case of Denmark

The development of offshore wind - The case of Denmark 9 February 2017 The development of offshore wind - The case of Denmark Camilla Holbech, Deputy Manager Danish Wind Industry Association Zooming in on the Danish wind industry More than 30,000 employees

More information

Audit and Finance Committee Mandate VIA Rail Canada Inc.

Audit and Finance Committee Mandate VIA Rail Canada Inc. Audit and Finance Committee Mandate VIA Rail Canada Inc. 1. PURPOSE The Board of Directors has delegated to the Audit & Finance Committee the responsibility for oversight and monitoring of the following:

More information

INVESTMENT SERVICES RULES FOR PROFESSIONAL INVESTOR FUNDS

INVESTMENT SERVICES RULES FOR PROFESSIONAL INVESTOR FUNDS INVESTMENT SERVICES RULES FOR PROFESSIONAL INVESTOR FUNDS PART B: STANDARD LICENCE CONDITIONS Part APPLICABILITY OF REGULATION (EU) NO 345/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL OF 17 APRIL

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION REGULATION (EU) / of XXX amending Regulation (EU) No 651/2014 declaring certain categories of aid compatible with the internal market in

More information

ECONOMIC EFFICIENCY ARRIVING SAFELY TOGETHER

ECONOMIC EFFICIENCY ARRIVING SAFELY TOGETHER ASFINAG finances its operations responsibly: entirely through revenue generated from tolls and the sale of toll stickers. With its investments of almost a billion euros a year, ASFINAG plays a key role

More information

The FiBAN Syndication Process. A Process Description

The FiBAN Syndication Process. A Process Description The FiBAN Syndication Process A Process Description Purpose The purpose of this process description is to be a tool for the lead investor as well as other investors joining a syndicate. The idea is to

More information

Discretionary Portfolio Management

Discretionary Portfolio Management www.handelsbanken.com/assetmanagement Discretionary Portfolio Management Customised Portfolio Solutions Handelsbanken provides discretionary asset management solutions to meet your needs. As a discretionary

More information

ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers

ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers N Questions Answers Topics 1 Could you clarify the implication of the names indicated in the proposal (PI, authorised rep.,

More information

Tender Document. Restricted Procedure. Real-Time Evaluation of Danish Support to Sustainable Coastal Fisheries in Myanmar

Tender Document. Restricted Procedure. Real-Time Evaluation of Danish Support to Sustainable Coastal Fisheries in Myanmar Tender Document Restricted Procedure Real-Time Evaluation of Danish Support to Sustainable Coastal Fisheries in Myanmar Reference File Number: 2016-9276 June 2016 Tender for Real-Time Evaluation of Danish

More information

Final statement. The complainant: 3F. ctr. The subject of the complaint: Greenpeas Enterprise ApS

Final statement. The complainant: 3F. ctr. The subject of the complaint: Greenpeas Enterprise ApS August 14, 2014 The complainant: 3F ctr. Final statement The subject of the complaint: Greenpeas Enterprise ApS The Mediation and Complaints-Handling Institution for Responsible Business Conduct (NCP)

More information

Investment Plan for Europe

Investment Plan for Europe Investment Plan for Europe Giorgio Chiarion Casoni Head of Unit Financing of climate change, infrastructure policies and Euratom European Commission DG Economic and Financial Affairs Luxembourg, 5 March

More information

in Developing Countries in FY2010 Access Road in Republic of Indonesia SUMMARY March 2011

in Developing Countries in FY2010 Access Road in Republic of Indonesia SUMMARY March 2011 Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2010 Study on the PPP Project Formulation of Tanjung Priok Access Road in Republic of Indonesia SUMMARY March 2011 第 1 章

More information

BUCHAREST BRASOV MOTORWAY COMARNIC-BRASOV (CRISTIAN) SECTION

BUCHAREST BRASOV MOTORWAY COMARNIC-BRASOV (CRISTIAN) SECTION GOVERNMENT OF ROMANIA DEPARTMENT FOR INFRASTRUCTURE PROJECTS AND FOREIGN INVESTMENT BUCHAREST BRASOV MOTORWAY COMARNIC-BRASOV (CRISTIAN) SECTION Concession Project Sheet 1 1. PROJECT NAME Bucharest Brasov

More information

DANMARKS NATIONALBANK ASSESSMENT OF KRONOS

DANMARKS NATIONALBANK ASSESSMENT OF KRONOS DANMARKS NATIONALBANK ASSESSMENT OF KRONOS DANMARKS NATIONALBANK ASSESSMENT OF KRONOS ASSESSMENT OF KRONOS Text may be copied from this publication cost-free provided that Danmarks Nationalbank is specifically

More information

Summary: County Administrative Boards emergency preparedness

Summary: County Administrative Boards emergency preparedness DATE: 2 0 O C T O B E R 2 0 1 5 Summary: County Administrative Boards emergency preparedness The Swedish National Audit Office has audited the work of the County Administrative Boards concerning civil

More information

2 nd Danube Financing Dialogue - Challenges and opportunities of financing SME investment projects in the Danube Region

2 nd Danube Financing Dialogue - Challenges and opportunities of financing SME investment projects in the Danube Region 2 nd Danube Financing Dialogue - Challenges and opportunities of financing SME investment projects in the Danube Region Klaus Michal, Senior Account Manager Kommunalkredit Austria AG 24.01.2012 INFRA BANKING

More information

Support for the construction of airport infrastructure (investment aid); Support for the operation of airport infrastructure (operating aid); and

Support for the construction of airport infrastructure (investment aid); Support for the operation of airport infrastructure (operating aid); and INFRASTRUCTURE ANALYTICAL GRID N 2 1 CONSTRUCTION OF AIRPORT INFRASTRUCTURES Disclaimer: The contents seek to reflect the current rules and decisional practice and do not prejudge possible developments

More information

Milestone Potash Project. November 2018

Milestone Potash Project. November 2018 Milestone Potash Project November 2018 Western Potash Milestones May 2008 Western Potash IPO on TSX Venture Dec 2012 Completed Feasibility Study on 2.8 million tons capacity Milestone project July 2011

More information

Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2

Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2 CA-01-04-2018 Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2 in scope of the LIFE project Baltic pilot cases on reduction

More information

Interim Financial Report 1 October to 31 December 2016 Investor relations presentation Q1

Interim Financial Report 1 October to 31 December 2016 Investor relations presentation Q1 Interim Financial Report 1 October to 31 December 2016 Investor relations presentation Q1 Q1 2 Aarsleff Group 2016/2017 Q1 Contents Aarsleff Group 2016/17 Q1 3 Group Revenue Results Investments, solvency

More information

Denmark. WTS Global Country TP Guide Last Update: December Legal Basis. 2. Master File (MF) Yes

Denmark. WTS Global Country TP Guide Last Update: December Legal Basis. 2. Master File (MF) Yes Denmark WTS Global Country TP Guide Last Update: December 2017 1. Legal Basis Is there a legal requirement to prepare TP documentation? Since when does a TP documentation requirement exist in your country?

More information

Municipality of the District of Chester

Municipality of the District of Chester Municipality of the District of Chester Procurement Policy (P-04) Purpose and Objectives Low and High Value Procurement Directives Alternative Procurement Tender Types Submitting Bid Responses Bid Openings

More information

Proposed Revision to the UK Stewardship Code Annex A - Revised UK Stewardship Code

Proposed Revision to the UK Stewardship Code Annex A - Revised UK Stewardship Code Consultation Financial Reporting Council January 2019 Proposed Revision to the UK Stewardship Code Annex A - Revised UK Stewardship Code The FRC s mission is to promote transparency and integrity in business

More information

INVESTMENT SERVICES RULES FOR PROFESSIONAL INVESTOR FUNDS

INVESTMENT SERVICES RULES FOR PROFESSIONAL INVESTOR FUNDS INVESTMENT SERVICES RULES FOR PROFESSIONAL INVESTOR FUNDS PART B: STANDARD LICENCE CONDITIONS Part B II: Professional Investor Funds targeting Qualifying Investors APPLICABILITY OF REGULATION (EU) NO 345/2013

More information

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency The Finnish Transport Agency is a multidisciplinary expert organisation specialising in transport.

More information

A Norwegian System for Tradable GHG Permits - Background and Challenges

A Norwegian System for Tradable GHG Permits - Background and Challenges A Norwegian System for Tradable GHG Permits - Background and Challenges Presentation at OECD/IEA Annex I Expert Group meeting, 15-16 March 1999. By Peer Stiansen, Adviser, Ministry of Environment and Member

More information

Munich Re Green Tech Solutions Forum on Business Models for Energy Efficient Public Lighting

Munich Re Green Tech Solutions Forum on Business Models for Energy Efficient Public Lighting Image: used under license from shutterstock.com Munich Re Green Tech Solutions Forum on Business Models for Energy Efficient Public Lighting Álvaro Núñez, Dr. Sebastian Scholz June 1, 2016 Agenda 1. Munich

More information

Finalising Surveys for the Baltic Motorways of the Sea

Finalising Surveys for the Baltic Motorways of the Sea Finalising Surveys for the Baltic Motorways of the Sea Project Leader: Benjamin Hell Hydrographic Office, Swedish Maritime Administration 0 Area 0 10 20 30 40 50 60 70 80 90 100 0 1000 2000 3000 4000 5000

More information

PPP Projects in the Slovak Republic. Bratislava, JUDr. Ján Azud

PPP Projects in the Slovak Republic. Bratislava, JUDr. Ján Azud PPP Projects in the Slovak Republic Bratislava, 24. 11. 2010 JUDr. Ján Azud Who we are Ružička Csekes law firm has been present on the market since 1992 A member of CMS Alliance asocciated with Cameron

More information

Scheme of Delegation for Stage 1 PCC Transfer. Review Date: Stage 2 transfer/november 2015

Scheme of Delegation for Stage 1 PCC Transfer. Review Date: Stage 2 transfer/november 2015 Type of Document: Scheme of Delegation for Stage 1 PCC Transfer Version: 1.0 Registered Owner: Author: Police Authority Treasurer Charlotte Radford Effective Date: 22 November 2012 Review Date: Stage 2

More information

CHAIR AND MEMBERS CORPORATE SERVICES COMMITTEE MEETING ON DECEMBER 13, 2016

CHAIR AND MEMBERS CORPORATE SERVICES COMMITTEE MEETING ON DECEMBER 13, 2016 TO: CHAIR AND MEMBERS CORPORATE SERVICES COMMITTEE MEETING ON DECEMBER 13, 2016 FROM: MARTIN HAYWARD MANAGING DIRECTOR, CORPORATE SERVICES AND CITY TREASURER, CHIEF FINANCIAL OFFICER SUBJECT: REQUEST FOR

More information

RBS Pension Trustee Limited Responsible Ownership Policy

RBS Pension Trustee Limited Responsible Ownership Policy RBS Pension Trustee Limited Responsible Ownership Policy Background RBS Pension Trustee Limited (the Trustee ) is the trustee of The Royal Bank of Scotland Group Pension Fund (the Fund ). The Trustee believes

More information

7. Public-private partnership (PPP) schemes Gerry Murphy

7. Public-private partnership (PPP) schemes Gerry Murphy 7. Public-private partnership (PPP) schemes Gerry Murphy National routes and proposed PPP schemes (National Roads Authority) As the National Development Plan 2000 2006 (NDP 2000) evolves, the traditional

More information

Legal Provisions in Procurement PUBLIC PROCUREMENT AND ASSET DISPOSAL ACT, 2015

Legal Provisions in Procurement PUBLIC PROCUREMENT AND ASSET DISPOSAL ACT, 2015 Legal Provisions in Procurement PUBLIC PROCUREMENT AND ASSET DISPOSAL ACT, 2015 By: QS Maureen Njeri kinyanjuimnjeri@gmail.com 13 th June, 2017 Bomas of Kenya, Nairobi. OUTLINE Introduction Guiding principles

More information

POLICIES AND PROCEDURES FOR THE ISSUANCE OF PORT HUENEME FILMING AND STILL PHOTOGRAPHY PERMITS

POLICIES AND PROCEDURES FOR THE ISSUANCE OF PORT HUENEME FILMING AND STILL PHOTOGRAPHY PERMITS POLICIES AND PROCEDURES FOR THE ISSUANCE OF PORT HUENEME FILMING AND STILL PHOTOGRAPHY PERMITS The guidelines and information contained herein is taken from the Port Hueneme's Municipal Ordinance and City

More information

TEXTS ADOPTED Provisional edition. P8_TA-PROV(2017)0165 Discharge 2015: European Chemicals Agency (ECHA)

TEXTS ADOPTED Provisional edition. P8_TA-PROV(2017)0165 Discharge 2015: European Chemicals Agency (ECHA) European Parliament 204-209 TEXTS ADOPTED Provisional edition P8_TA-PROV(207)065 Discharge 205: European Chemicals Agency (ECHA). European Parliament decision of 27 April 207 on discharge in respect of

More information

Authorised Officer is any officer permitted by an Appropriate Officer to authorise orders and contracts as per clause 2.5.

Authorised Officer is any officer permitted by an Appropriate Officer to authorise orders and contracts as per clause 2.5. PART 3G Contracts Standing Orders 2018/19 Definitions Aggregation is the combining together of the total contract valuespend from separate contracts where they meet a single requirement for works, goods

More information

ITEM 5(c) MKDP Quarterly Update June Executive Summary

ITEM 5(c) MKDP Quarterly Update June Executive Summary ITEM 5(c) MKDP Quarterly Update June 2018 Executive Summary Milton Keynes Development Partnership (MKDP) is an independent legal entity wholly owned and accountable to Milton Keynes Council. The publication

More information

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project SR 520 BRIDGE Investment Grade Traffic and Revenue Study Update SR 520 Bridge and the Eastside plus West Approach Bridge Project February 16, 2017 Photographs Courtesy of WSDOT Table of Contents Executive

More information

Freedom of Establishment and Freedom to provide Services by a Maltese Insurance Undertaking and a Maltese Reinsurance Undertaking

Freedom of Establishment and Freedom to provide Services by a Maltese Insurance Undertaking and a Maltese Reinsurance Undertaking Freedom of Establishment and Freedom to provide Services by a Maltese Insurance 1. Introduction 1.1 This Chapter applies to a Maltese insurance undertaking and a Maltese reinsurance undertaking seeking

More information

TERMS OF TENDER 16/EU/2017/eRTG

TERMS OF TENDER 16/EU/2017/eRTG TERMS OF TENDER 16/EU/2017/eRTG REGARDING PURCHASE AND DELIVERY OF FIVE RUBBER TIRE GANTRY CRANES 1 1. GENERAL PROVISIONS 1.1 Tender organiser The organiser of this tender (the "Tender") regarding purchase

More information