ASIAN DEVELOPMENT BANK TAR:UZB 36498

Size: px
Start display at page:

Download "ASIAN DEVELOPMENT BANK TAR:UZB 36498"

Transcription

1 ASIAN DEVELOPMENT BANK TAR:UZB TECHNICAL ASSISTANCE TO THE REPUBLIC OF UZBEKISTAN FOR DEVELOPMENT OF THE CAPITAL MARKET July 2003

2 CURRENCY EQUIVALENTS (as of 30 June 2003) Currency Unit sum SUM1.00 = $ $1.00 = SUM * *Official exchange rate ABBREVIATIONS ADB Asian Development Bank Carthills Carthill Asset Management Company CCFSM Center on Coordination Functioning of the Securities Market GKI GOS Kom Imushestvo (State Property Committee) IOSCO International Organization of Securities Commissions JSC joint stock company NBU National Bank of Uzbekistan OTC over-the-counter SOE state-owned enterprise TOR terms of reference TA technical assistance UZSE Uzbekistan Stock Exchange NOTE In this report, $ refers to US dollars. This report was prepared by D. Kertzman, Financial Sector Specialist, Governance, Finance and Trade Division, ECRD.

3 I. INTRODUCTION 1. The Government of Uzbekistan requested Asian Development Bank (ADB) assistance to strengthen the institutional framework to support capital market development. A Fact-Finding Mission visited Tashkent from 10 to 22 February 2003 and reached an understanding with the Government on the objectives, scope, cost, financing, and implementation arrangements for the technical assistance (TA). 1 The TA logical framework is given in Appendix 1. II. ISSUES 2. Capital Market. Although the Government has begun to establish a two-tiered financial system for private enterprises, due to ongoing government control of the banking sector and difficulties in accessing the capital market by private enterprises, scarce domestic funds are often not allocated to the most productive uses. For larger enterprises, the nonconvertibility of the local currency makes raising capital overseas, and foreign investment, problematic. 3. The capital market has been used primarily by the State Property Committee (GOS Kom Imushestvo or GKI) to raise funds for smaller and medium state-owned enterprises (SOEs) that have been corporatized by allowing them to sell noncontrolling state shares through initial public offerings. Currently there are 4,700 joint stock companies (JSCs), of which approximately 3,000 were originally SOEs. Of the former SOEs, 794 are currently traded on the C List of the Uzbekistan Stock Exchange (UZSE), the list designated for privatized enterprises that meet certain requirements, 2 although all former SOEs are eligible for trading on the exchange and the over-the-counter (OTC) market. 4. Based on high listing standards, 3 only six companies, four of which are banks, are listed on the A list of the UZSE. Although B list requirements are lower, no companies have qualified for it. Less than 1% of secondary trading in listed shares takes place on a formal OTC market, Elsis Savdo, which is controlled by the National Bank of Uzbekistan (NBU). Most secondary trading of listed shares (approximately 81%) takes place on an unregulated informal secondary OTC curb market. 4 Based in part on poor corporate governance practices, there is limited interest in investing in privatized enterprises, including those that have been listed, resulting in limited trading liquidity. Transaction costs on the UZSE are high (ranging between 3.7 and 5.7%) but have come down in recent years due to competition from the curb market. Significant decisions taken by the UZSE are subject to Center on Coordination Functioning of the Securities Market (CCFSM) oversight, and the UZSE does not appear to act independently. Most securities market participants appear to be affiliated with the banking sector. 5. Recent regulatory changes that removed previous restrictions on the size of corporate bond issues have enabled larger domestic enterprises to raise needed funds through the domestic corporate bond market. An international syndicate that includes 19 local and foreign banks, Carthill Asset Management Company (Carthills), and one other nonbank financial institution has been formed to underwrite corporate debt. This syndicate began to develop a secondary corporate bond market in April of 2002 and has thus far organized nine corporate bond issues issues worth SUM5.67 billion, including a recent bond issue of SUM600 million with a maturity of 2 years and a coupon rate of 28% involving a large cosmetics manufacturing 1 The TA first appeared in ADB Business Opportunities on 11 March Paid in capital of SUM200 million, SUM300 million total assets, 500 shareholders, one-year profitability. Slightly different requirements apply to banks. 3 Paid in capital of SUM1 billion, SUM1.5 billion total assets, 2000 shareholders, 3 years profitability, etc. Slightly different requirements apply to banks. 4 In 2002, trading on the curb market was more than SUM20 billion, compared with SUM4.6 billion for the UZSE and SUM600,000 for the organized OTC market.

4 2 company (Pillada-Vostok). The lead underwriter was a local private bank, Business Bank, and the manager of both issues was Carthills. Purchasers and underwriters of corporate debt are generally institutions affiliated with the issuers, including banks. Systemic and investor protection concerns have been raised based on these affiliations, inadequacy of financial disclosure, and the absence of an independent and credible credit rating agency. 6. Capital Market Regulator. CCFSM was created by presidential decree in March of 1996 under GKI, and replaced the State Commission on Securities established under the Ministry of Finance in The General Director of CCFSM is also a Deputy Chairman of GKI. GKI s role as the largest shareholder and seller of shares in the market, while overseeing CCFSM, raises significant conflict of interest concerns In 1998, CCFSM became a full member of the International Organization of Securities Commissions (IOSCO), a private organization that promotes adoption of international best practice standards of securities regulation among its members. Pursuant to IOSCO membership requirements, CCFSM recently conducted a self-assessment of its compliance with IOSCO principles and identified, among others, the following gaps that need to be addressed: (i) methodology for providing clear and comprehensive interpretations of laws and regulations to the public; (ii) professional staff training; (iii) development of self-regulating organizations (role and regulations); (iv) development of investigation and surveillance techniques; (v) coordination with NBU on regulation of bank securities activities; (vi) disclosure requirements for issuers, including collective investment schemes, accounting requirements, and effective sanctions for noncompliance; and (vii) protection of minority shareholder rights. With respect to compliance with the IOSCO principle on the operational independence of the regulator, CCFSM has not committed to the timing for full implementation. 8. CCFSM has 32 staff at its central office in Tashkent and 88 staff in 14 regional offices. The Department of Professional Participants (six central office staff and regional staff) oversees approximately 350 professional participants in the capital market, including market institutions (exchange, organized OTC market, depository, etc.) and securities intermediaries, including enforcement-related duties. Another department (five central office staff and regional staff) oversees regulation of JSCs to ensure compliance with the Joint Stock Company Law and related decrees and regulations. 9. Corporate Governance Reforms. Recently, the Government has taken measures to promote better corporate governance. In January 2003, the Government issued a decree On Increasing the Role and Significance of the Private Sector of the Economy 6 that incorporates many recommendations proposed by ADB, 7 including removal of the preferential powers of state trustees and managers who represent shares owned by the Government to veto supervisory board decisions, 8 and professionalization of their role. This decree also requires (i) GKI to sell state shareholdings in JSCs of 25% or less through the stock market in Note one of the components of ADB Technical Assistance to Uzbekistan for Enterprise Restructuring and Corporate Governance. Manila. is to develop proposals to create an independent securities market regulator to address conflict of interest concerns. 6 Presidential decree No. UP-3202, 24 January ADB Technical Assistance to Uzbekistan for Corporate Governance and Reform Program. Manila. See also footnote State trustees of JSCs represent the Government s share in the statutory capital of an enterprise that is in excess of 25%, while a trust manager is authorized to hold the state s shareholdings when it is 25% or less. Trustees and managers serve on the supervisory council without election by shareholders at the general meeting of shareholders. Under cabinet of ministers resolution 361, regardless of the amount of capital held by the Government, the state trustee or trust manager representative has de facto approval powers over actions of the supervisory council (veto right).

5 2004, 9 (ii) shareholder approval of the chairman of the board s employment contract, (iii) the board of directors to develop an annual business plan based on profitability and dividend targets to be approved by shareholders, (iv) submission of a report on the results of this plan quarterly to the supervisory board and the linking of payment of executive directors and the supervisory board chairman to financial performance, and (v) prohibits employees from becoming members of the supervisory board. 10 To help effectively implement this Decree and develop institutional capacity to promote capital market development, the CCFSM requested technical assistance from the ADB. Except for World Bank assistance in helping the CCFSM develop a computerized consolidated disclosure system, the Government is not receiving any TA from other donors in this area. 10. Legal and Regulatory Framework. Securities legislation consists of six laws, presidential decrees, resolutions of the cabinet of ministers, and procedures and instructions. CCFSM is currently working on amendments to five of these laws to address a number of issues, including the recording of beneficial ownership of shares and restrictions on the activities of securities market intermediaries Operations and Strategy of ADB and Other Aid Agencies. In 2000, ADB provided TA to GKI to promote corporate governance reforms at the enterprise level for privatized firms and new enterprises. 12 The TA included (i) a review of the adequacy of the policy, legal, and regulatory framework for corporate governance and an assessment of corporate governance practices; (ii) development of a suitable framework for efficient management of the Government s shares in enterprises; and (iii) capacity building to enhance supervision and regulation of enterprises. The consultant s final report contained a number of recommendations, including (i) clarification of disclosure requirements for enterprises making a public offering and for public companies, (ii) clarification of the supervisory council s role to approve and remove management, (iii) removal of the power of state trustees and trust managers to veto supervisory council decisions, and (iv) the need to transform CCFSM into an independent market regulator. 12. ADB is currently supporting the Government in the restructuring and liquidation of SOEs within the broader framework of reforms of corporate governance and enterprise restructuring. A new TA was approved in December of that, among others, is focused on helping the Government draft and implement changes in the current legal framework to establish an independent securities regulator, enhance CCFSM enforcement powers, consolidate regulation of the securities market into one umbrella law, and evaluate self-regulation by the UZSE. The current TA, which is focused on capacity building of CCFSM, promotion of international best practice standards, and capital market development, will complement the above-referenced related assistance. 3 9 GKI continues to own 25% or less in 2,068 JSCs. 10 On 13 February 2003, the President of the Republic of Uzbekistan issued an order On the Measures of Execution of Decree UP-3202 (Order P-1708) to establish a special commission to improve management of privatized enterprises. The order, among others, reiterates the need of JSCs to hold general shareholder meetings no later than April 2003 to ensure conformance with the decree. 11 The Law on Securities and Stock Exchanges (adopted in 1993 and amended five times), the Law on Joint Stock Companies and Protection of Shareholder Rights (adopted in 1996), the Law on Securities Market Functioning Mechanisms (adopted in 1996), the Law on Activity of Depositories in the Securities Market (adopted in 1998), and the Law on Protection of the Rights of Investors in the Securities Market (adopted in 2001). This list does not include implementing regulations, which may be in the process of being drafted and/or amended. 12 ADB Technical Assistance to Uzbekistan for Corporate Governance Reform Program. Manila. 13 ADB Technical Assistance to Uzbekistan for Enterprise Restructuring and Corporate Governance. Manila.

6 4 III. THE TECHNICAL ASSISTANCE A. Purpose and Output 13. The TA will facilitate development of an orderly, fair, and efficient capital market. The TA will (i) support incorporation of international best practice standards into the current legal and regulatory framework, and (ii) enhance the capacity of CCFSM to develop and regulate the capital market. B. Methodology and Key Activities 14. The TA will perform the following tasks: (i) (ii) (iii) (iv) Legislative Framework. Review and recommend changes in the current legal and regulatory framework for compliance with IOSCO principles governing the regulation of issuers (including SOEs), collective investment schemes, market intermediaries (including banks), and secondary market, and provide related training of CCFSM staff on such principles. Corporate Bond Market. Review and assess the current institutional framework for corporate bond market development, including the role of CCFSM and NBU; identify impediments to the development of the primary and secondary market; work with CCFSM and key decision makers to develop a strategy and timetable to address such impediments; and provide related training to enhance CCFSM s regulatory capacity in this area. Secondary Equity Market. Review the current institutional and policy framework for secondary trading of equity securities; identify impediments to the development of the secondary market; work with CCFSM and key decision makers to develop recommendations to address such impediments; and provide related training to enhance CCFSM s regulatory capacity in this area. Corporate Governance. Review the status of proposals to implement the new presidential decree, identify key implementation issues, and work with CCFSM staff to develop recommendations to address these issues. (v) Enforcement. Review current disclosure requirements; procedures for monitoring compliance, detecting violations/irregularities, and sanctioning; the role of CCFSM; the accountability of market participants (UZSE, market intermediaries, auditors, lawyers); and identify gaps therein (legal framework and enforcement) and work with CCFSM to develop an effective strategy to address these gaps. C. Cost and Financing 15. The estimated total cost of the TA is $290,000 equivalent, including a foreign exchange cost of $175,000 and a local currency cost of $115,000 equivalent. The foreign exchange cost of $175,000 and local currency costs of $25,000 equivalent will be financed on a grant basis by ADB s TA funding program. The Government will contribute $90,000 equivalent in kind for office space, counterpart staff, transportation, and other services. Details of the cost estimate are provided in Appendix 2.

7 5 D. Implementation Arrangements 16. CCFSM will be the Executing Agency and will provide the necessary office support, counterpart staff, transportation, and other services to the consultants. Implementation of the TA is scheduled to begin in September 2003 and end in July ADB will review and monitor the implementation of the TA through missions and consultants reports. 17. The TA may be tendered separately to international firms or to individuals in accordance with ADB s Guidelines on the Use of Consultants and other arrangements satisfactory to ADB on the engagement of domestic consultants. If firms are recruited, the consultants will be selected and recruited using a biodata technical proposal, using the quality and cost-based selection method. A team of six individual consultants three international and three domestic will be assembled by ADB to implement the TA for a total of 14 person- months. The three international consultants will include a team leader/capital market regulatory expert (2 personmonths), a corporate bond market expert (1 person-month), and a secondary equity market development expert (1 person-month). The terms of reference for the consultants are in Appendix 3. The TA will support training, seminars, and workshops, which will be done by the consultants in close coordination with CCFSM and ADB. Equipment will be procured by consultants in accordance with arrangements acceptable to ADB. 18. The TA is expected to begin in September 2003 and will be implemented over a period of 11 months, finishing in July The team leader will submit (i) an inception report 2 weeks after the commencement of services, (ii) quarterly progress reports during implementation, (iii) a draft final report before the conclusion of the contract, and (iv) the final report 2 weeks after incorporating comments from CCFSM and ADB. IV. THE PRESIDENT'S DECISION 19. The President, acting under the authority delegated by the Board, has approved the provision of technical assistance not exceeding the equivalent of $200,000 on a grant basis to the Government of Uzbekistan for Development of the Capital Market, and hereby reports this action to the Board.

8 6 Appendix 1 TECHNICAL ASSISTANCE FRAMEWORK Design Summary Goal More orderly, fair, and effective capital market Performance Indicators/Targets International best practice standards introduced into the legal and regulatory framework Increased number of IPOs Monitoring Mechanisms Quarterly reports and project completion report ADB missions Assumptions and Risks Increased number of listed companies Increased number of investors and market liquidity Purpose Create a more effective capital market policy and regulatory framework Adoption of amendments to legal and regulatory framework to promote capital market development Application of legal and regulatory requirements to all market participants (including SOEs) Effective enforcement of legal and regulatory framework Feedback from consultants, executing agency, and market participants on effectiveness of recommendations Quarterly reports and project completion report ADB missions Government commitment to capital market development Outputs Recommendations to incorporate best practices into legal and regulatory framework Recommendations for improving enforcement of legal and regulatory requirements Recommendations to address impediments to corporate bond market development Reports and workshop materials Draft laws/amendments, implementing rules/regulations/guidelines Reports ADB missions CCFSM staff working on the TA adequately qualified and Available; key decision makers willing to participate in workshops ADB=Asian Development Bank, CCFSM= Centre on Coordination Functioning of the Securities Market, IPO=initial public offering, SOE=state-owned enterprises, TA=technical assistance.

9 Appendix 1 7 Recommendations to address impediments to development of the secondary equity market Recommendations to effectively implement recent presidential decree to promote better corporate governance and private enterprise development Related workshops Identification of possible follow-up project/s Activities Consultations and meetings Analysis of relevant policies, laws/ decrees and regulations/rules, procedures Drafting of recommendations, reports and workshop materials Training of CCFSM staff Workshops to disseminate findings and discuss key policies Draft amendments, to laws, implementing rules/ regulations / procedures/ guidelines Workshop materials Reports Reports Close supervision by ADB staff Consultants adequately qualified and available CCFSM cooperation and support of other key decision makers Effective implementation of proposals Inputs Consulting services Workshops 4 person-months of international consulting inputs and 10 personmonths of domestic consulting services Successful recruitment and timely fielding of adequately qualified consultants within available budget

10 8 Appendix 2 Item COST ESTIMATES AND FINANCING PLAN ($ 000) Foreign Exchange Local Currency Total Cost A. Asian Development Bank (ADB) Financing a 1. Consultants a. Remuneration and Per Diem i. International Consultants ii. Domestic Consultants b. International and Local Travel c. Reports and Communications Equipment b Training, Seminars, and Conference a. Domestic Training b. Overseas Training c. Interpreters and Translators Transportation Government Observers for Contract Negotiations 6. Contingencies Subtotal (A) B. Government Financing 1. Office Accommodation and Venue/Facilities for Training/Seminar 2. Local Counterpart Staff Contingencies Subtotal (B) Total a Financed by ADB s TA funding program. b Equipment to be purchased includes notebook computers, facsimile machines, and photocopiers. Source: Asian Development Bank estimates.

11 Appendix 3 9 OUTLINE TERMS OF REFERENCE FOR CONSULTANTS A. International Consultants (4 person-months) 1. A team of three international experts will be recruited to assist the Center on Coordination Functioning of the Securities Market (CCFSM). The terms of reference (TOR) are provided to outline the indicative tasks. International consultants will be required to formulate the specific TOR for domestic consultants in their respective area and oversee the domestic consultants work. All consultants (domestic and international) will be required to provide detailed written inputs in their respective areas to the team leader in a timely manner to meet their reporting obligations outlined in para. 18 of the technical assistance (TA) report. The consultants will be required to undertake any other related tasks to attain the objectives of the TA. 1. Team Leader/Capital Market Regulatory Expert (2 person-months) 2. The consultant should have an advanced degree in finance, law, or related field and at least 10 years experience in capital market regulation and development in countries in transition. The consultant will be responsible for the overall management of TA implementation and the timely delivery of quality interim and final reports. The consultant should review the current institutional and policy framework and its role in promoting capital market development, identify impediments to such development, make proposals to address such impediments, recommend additional measures to complement earlier proposals, address any perceived gaps, and prepare a table of indicators to help CCFSM track the status of recommendations and the impact on market development. The consultant will assist the Government in introducing reforms to the current framework to promote international best practice standards. In particular, the consultant will do the following: (i) Review CCFSM s most recent self-assessment with the International Organization of Securities Commissions (IOSCO) principles governing the regulator, self-regulation, issuers (including state-owned enterprises [SOEs]), market intermediaries, and the secondary market; review subsequent developments, recommendations/reports/proposals to incorporate such principles and the status thereof, and outstanding issues (policy and implementation); and, after extension consultation with CCFSM staff, prepare a draft written plan to incorporate such principles into the legal and regulatory framework, including key steps that need to be undertaken (rules, regulations, legislative amendments, etc., in coordination with advice being given on a related ADB technical assistance activity (e.g., independence of the regulator, selfregulatory role and duties of Uzbekistan Securities Exchange [UZSE]). Co-host a workshop with CCFSM for key decision makers (GOS Kom Imushestvo [GKI], Ministry of Justice, UZSE, market participants) to clarify the importance of incorporation of IOSCO principles to market development; present the findings and draft recommendations; and solicit feedback and comments on the feasibility of such incorporation. Incorporate workshop comments into final report, which should include a proposed strategy and a timetable to monitor progress and market impact. (ii) Review current disclosure requirements for listed issuers (including SOEs), procedures for monitoring compliance (including development of technology to electronically file and consolidate information) and enforcement (including recent

12 10 Appendix 3 enforcement actions for noncompliance), role of CCFSM (including regional offices) and the UZSE and any other government agencies, and accountability of other market participants for noncompliance (UZSE, market intermediaries, auditors, lawyers, directors/management of listed issuers). Draft recommendations to address perceived gaps and promote enhanced disclosure for discussion and review by CCFSM. Incorporate CCFSM comments into the final report, which should include a proposed strategy and timetable for implementation to monitor progress and market impact. (iii) Review the latest presidential decrees/resolutions/orders (collectively the decree ) promoting good corporate governance and the implementing rules/regulations/guidelines issued by CCFSM to ensure compliance; identify key implementation issues (e.g., rights of shareholders in joint stock companies that are being reorganized due to inability to comply with new capital requirements); assess the proposed impact of the decree on capital market development; identify the role of CCFSM and other regulators in the implementation of corporate governance standards and implementation strategies; and prepare a draft report summarizing findings, identifying implementation gaps and outstanding issues, and recommending measures to address such gaps. Present the draft written report to CCFSM staff for discussion, and incorporate CCFSM s comments into the final report. 2. Corporate Bond Market Expert (1 person-month) 3. The consultant should have an advanced degree in finance or a related field and at least 10 years experience in corporate bond market development, including experience in countries in transition. The consultant will be responsible for preparation of a report and recommendations to identify and address key impediments to corporate bond market development, including implementation issues and proposed sequencing of reforms with a focus on CCFSM s role. The consultant will review and assess the current institutional and policy framework for corporate bond market development, including the role of CCFSM and the National Bank of Uzbekistan (NBU); identify impediments to the development of the primary and secondary market, including the adequacy of current disclosure requirements and the ability of investors to monitor risk; work with CCFSM and key decision makers to develop a strategy to address such impediments; and develop mechanisms to enhance institutional capacity in this area, including workshops for CCFSM staff on key development issues. The consultant shall also prepare a matrix of sequenced policy recommendations to address impediments to development of the corporate bond market. 3. Secondary Equity Market Development Expert (1 person-month) 4. The consultant should have an advanced degree in finance or a related field and at least 10 years experience in capital market development in countries in transition. The consultant will conduct an assessment of the current institutional and policy framework for the primary offering and secondary trading of securities on the UZSE, the formal over-the-counter market, and the curb market; review procedures for offering and trading shares on such markets; identify impediments to development; and develop recommendations to address such impediments and promote the development of the secondary market. In particular, the consultant will do the following:

13 Appendix 3 11 (i) (ii) (iii) (iv) Conduct an assessment of the role of these three markets, requirements for trading thereon, pricing of securities, transaction costs, clearance and settlement, and role of intermediaries. Review the role of, and procedures used by, the UZSE and the formal over-thecounter market, Elsis Savdo, in self-regulation and customer dispute resolution. Present recommendations at a workshop with key decision makers. Prepare a matrix of sequenced policy recommendations to address impediments to development of the secondary equity market. B. Domestic Consultants (10 person-months) 5. The domestic consultants will be required to assist the international consultants in (i) providing country background information and helping to ensure that the work done by the international consultants is appropriate to the Uzbekistan situation; (ii) collating recent policy and institutional, legal, and regulatory measures governing the capital market in the consultants respective areas; (iii) providing logistical and other technical translation services as appropriate and needed; and (iv) providing written inputs to facilitate the preparation of team reports. 1. Capital Market Regulatory Specialist (6 person-months) 6. The consultant should have a solid background in Uzbekistan legislation relating to the capital markets and sufficient experience working with CCFSM. The consultant will support the international capital market regulatory expert and the other international experts with respect to legal and regulatory issues. The TOR for the consultant will include, but not be limited to, the following: (i) (ii) (iii) Help the capital market regulatory expert review current requirements governing self-regulatory organizations; regulation of issuers (including SOEs), market intermediaries, and the secondary market; proposed changes to such requirements, and CCFSM s current supervision and enforcement practices in these areas including the imposition of related sanctions for noncompliance. Help the capital market regulatory expert review requirements governing corporate governance (duties of the board/management/controlling shareholders, liability, disclosure, etc.), and the role of CCFSM and other regulators in monitoring and enforcing compliance with such requirements, including the imposition of related sanctions for noncompliance. Help other experts review current regulatory requirements governing the issuance and trading of corporate bonds and equity securities; the role of CCFSM and other regulators (and self regulatory bodies) in monitoring and enforcing compliance with such requirements, including imposition of related sanctions for noncompliance; and procedures/requirements for addressing customer complaints/disputes. 2. Corporate Bond Market Specialist (2 person-months) 7. The consultant should have solid experience in developing a corporate debt market in Uzbekistan and will work under the supervision of the international corporate bond market expert. The TOR for the consultant will include, but not be limited to, the following: (i) Contribute to the review and assessment of the current institutional and policy framework for corporate bond market development, including the role of the

14 12 Appendix 3 banking sector, key market participants, and market regulators (CCFSM and NBU). (ii) Contribute to the development of a policy reform agenda to promote development of the corporate bond market and strengthen supervision and regulation of market participants. 3. Secondary Equity Market Development Specialist (2 person-months) 8. The consultant should have solid experience in developing the equity market in Uzbekistan and will work under the supervision of the international secondary equity market development expert. The TOR for the consultant will include, but not be limited to, the following: (i) (ii) Contribute to the assessment of the current institutional framework for the primary and secondary trading of equity securities, including requirements and procedures for offering and trading shares thereon, how securities are priced on such markets, transaction costs, clearance and settlement of trades, the role of intermediaries, and impediments to future growth/development. Contribute to the development of a policy reform agenda to promote development of the equity securities market and strengthen supervision and regulation of market participants.

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:CAM 36593 TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR IMPROVING INSURANCE SUPERVISION December 2002 CURRENCY EQUIVALENTS (as of 3 December 2002) Currency Unit riel (KR)

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

ASIAN DEVELOPMENT BANK TAR:PRC

ASIAN DEVELOPMENT BANK TAR:PRC ASIAN DEVELOPMENT BANK TAR:PRC 34096-03 TECHNICAL ASSISTANCE TO THE PEOPLE'S REPUBLIC OF CHINA FOR ADVISORY SUPPORT FOR THE NATIONAL COUNCIL FOR THE SOCIAL SECURITY FUND October 2003 CURRENCY EQUIVALENTS

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: IND 34270 TECHNICAL ASSISTANCE TO INDIA FOR REFORM OF THE MUTUAL FUNDS INDUSTRY December 2002 CURRENCY EQUIVALENTS (as of 8 November 2002) Currency Unit Indian rupee/s (Re/Rs)

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

Republic of the Philippines: Enhancing Revenue Collection and Strengthening the Criminal Prosecution of Tax Evasion Cases

Republic of the Philippines: Enhancing Revenue Collection and Strengthening the Criminal Prosecution of Tax Evasion Cases Technical Assistance Report Project Number: 41675 December 2007 Republic of the Philippines: Enhancing Revenue Collection and Strengthening the Criminal Prosecution of Tax Evasion Cases The views expressed

More information

Technical Assistance Republic of Indonesia: Secondary Mortgage Facility

Technical Assistance Republic of Indonesia: Secondary Mortgage Facility Technical Assistance Report Project Number: 39427 December 2005 Technical Assistance Republic of Indonesia: Secondary Mortgage Facility (Financed by the Japan Special Fund) CURRENCY EQUIVALENTS (as of

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK R191-00 12 September 2000 TECHNICAL ASSISTANCE TO INDONESIA FOR CORPORATE GOVERNANCE REFORM The attached Report is circulated for the information of the Board. The President approved

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform Technical Assistance Report Project Number: 39606 June 2006 Republic of the Philippines: Government-Owned and -Controlled Corporations Reform The views expressed herein are those of the consultant and

More information

Institutional Strengthening for Aviation Regulation

Institutional Strengthening for Aviation Regulation Technical Assistance Report Project Number: 43429 Regional capacity development technical assistance (R-CDTA) December 2010 Institutional Strengthening for Aviation Regulation The views expressed herein

More information

ASIAN DEVELOPMENT BANK TAR: TRA 31389

ASIAN DEVELOPMENT BANK TAR: TRA 31389 ASIAN DEVELOPMENT BANK TAR: TRA 31389 TECHNICAL ASSISTANCE FOR SECURED TRANSACTIONS LAW REFORM January 1998 ABBREVIATIONS ASEAN - Association of Southeast Asian Nations AUSAID - Australian Agency for International

More information

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization Technical Assistance Report Project Number: 42226 Capacity Development Technical Assistance (CDTA) September 2011 Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Georgia: Strengthening Domestic Resource Mobilization

Georgia: Strengthening Domestic Resource Mobilization Technical Assistance Report Project Number: 48044-003 Policy and Advisory Technical Assistance (PATA) September 2014 Georgia: Strengthening Domestic Resource Mobilization This document is being disclosed

More information

Republic of Indonesia: Strengthening National Public Procurement Processes

Republic of Indonesia: Strengthening National Public Procurement Processes Technical Assistance Report Project Number: 43219-01 Capacity Development Technical Assistance (CDTA) November 2010 Republic of Indonesia: Strengthening National Public Procurement Processes (Financed

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls Technical Assistance Report Project Number: 50258-001 Cluster Regional Capacity Development Technical Assistance (C-R-CDTA) December 2016 Developing Anti-Money Laundering and Combating the Financing of

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Republic of the Philippines: Institutionalizing Capital Market Reforms

Republic of the Philippines: Institutionalizing Capital Market Reforms Encouraging Investment through Capital Market Reforms Program, SP2 (RRP PHI 48427-002) Technical Assistance Report Project Number: 48427-002 Transaction Technical Assistance (TRTA) October 2017 Republic

More information

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 49400-001 Policy and Advisory Technical Assistance (PATA) January 2017 Policy Coordination and Planning of Border Economic Zones of the People's Republic of

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: PHI 36419 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF THE PHILIPPINES FOR PREPARING THE PROGRAM TO ACCELERATE SMALL AND MEDIUM ENTERPRISE FINANCING

More information

Law 10 of 2009 Regulating Non-banking Financial Markets and Instruments. The People's Assembly has approved the following law which we hereby issued:

Law 10 of 2009 Regulating Non-banking Financial Markets and Instruments. The People's Assembly has approved the following law which we hereby issued: Law 10 of 2009 Regulating Non-banking Financial Markets and Instruments In the name of the people, The President of the Republic: The People's Assembly has approved the following law which we hereby issued:

More information

TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND. B. PROJECT NAME AND ID# China Social Security Reform Trust Fund

TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND. B. PROJECT NAME AND ID# China Social Security Reform Trust Fund November 22, 2003 TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND A. COUNTRY China B. PROJECT NAME AND ID# China Social Security Reform Trust Fund C. TECHNICAL ASSISTANCE SUMMARY The objective

More information

Technical Assistance Republic of the Philippines: Harmonization and Managing for Results

Technical Assistance Republic of the Philippines: Harmonization and Managing for Results Technical Assistance Report Project Number: 35166 November 2005 Technical Assistance Republic of the Philippines: Harmonization and Managing for Results The views expressed herein are those of the consultant

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

Federal Decree-Law No. (13) of 2016 On the Establishment of the Federal Tax Authority

Federal Decree-Law No. (13) of 2016 On the Establishment of the Federal Tax Authority Federal Decree-Law No. (13) of 2016 On the Establishment of the Federal Tax Authority We, Khalifa bin Zayed Al Nahyan President of the United Arab Emirates, Having reviewed the Constitution; Federal Law

More information

Taiwan Depository & Clearing Corporation. Principles for Financial Market Infrastructure. Disclosure Report (CSD)

Taiwan Depository & Clearing Corporation. Principles for Financial Market Infrastructure. Disclosure Report (CSD) Taiwan Depository & Clearing Corporation Principles for Financial Market Infrastructure Disclosure Report (CSD) 1 Taiwan Depository and Clearing Corporation PFMI Information Disclosure Report (CSD) Responding

More information

Maldives: Developing the Revenue Administration Management Information System

Maldives: Developing the Revenue Administration Management Information System Completion Report Project Number: 44414-012 Technical Assistance Number: 7946 July 2015 Maldives: Developing the Revenue Administration Management Information System This document is being disclosed to

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT Sustainable Transport Infrastructure Improvement Program (RRP SOL 46499) A. Background and Information Sources PROGRAM FIDUCIARY SYSTEMS ASSESSMENT 1. Under the proposed program, country public financial

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Validation Report Reference Number: PVR-478 Project Numbers: 42235-013 and 42235-023 Loan Numbers: 2877 and 3213 December 2016 Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Independent

More information

Republic of Indonesia: Capital Market Development Program Cluster (Subprogram I)

Republic of Indonesia: Capital Market Development Program Cluster (Subprogram I) Draft Design and Monitoring Framework Project Number: 32507 September 2007 Republic of Indonesia: Capital Market Development Program Cluster (Subprogram I) A design and monitoring framework is an active

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Financial Sector Deepening Program RECONCILIATION OF THE ORIGINAL SUBPROGRAM 2 TO THE REVISED SUBPROGRAM 2

Financial Sector Deepening Program RECONCILIATION OF THE ORIGINAL SUBPROGRAM 2 TO THE REVISED SUBPROGRAM 2 Financial Sector Deepening Program, (RRP VIE: 44251-034) Financial Sector Deepening Program RECONCILIATION OF THE ORIGINAL SUBPROGRAM 2 TO THE REVISED SUBPROGRAM 2 1. 2. 3. 4. 5. 6. 7. 8. 9. 1.1.3 Output

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA Second edition November 20, 2018 PEFA Secretariat Washington DC, USA Table of Contents PEFA ASSESSMENT HANDBOOK...

More information

Securities Commission An Introduction

Securities Commission An Introduction Securities Commission An Introduction The Securities Commission (SC) was established on 1 March 1993 under the Securities Commission Act 1993. Its purpose is spelt out in its Mission Statement: To promote

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: SAM 35132 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE INDEPENDENT STATE OF SAMOA FOR PREPARING THE SAVAI I RENEWABLE ENERGY PROJECT November 2002 CURRENCY

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

ASIAN DEVELOPMENT BANK TAR: MLD 30026

ASIAN DEVELOPMENT BANK TAR: MLD 30026 ASIAN DEVELOPMENT BANK TAR: MLD 30026 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF MALDIVES FOR PRIVATE SECTOR PARTICIPATION IN THE MALDIVES' PORTS November 1998 CURRENCY

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Taiwan Depository & Clearing Corporation. Disclosure Report (SSS)

Taiwan Depository & Clearing Corporation. Disclosure Report (SSS) Taiwan Depository & Clearing Corporation Principles for Financial Market Infrastructure Disclosure Report (SSS) (For Emerging Stocks traded over the Emerging Stock Market and Bonds traded over the counter)

More information

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN AFGHANISTAN FINANCIAL MANAGEMENT Report No. 1233 Issue Date: 10 December 2013 Table of Contents Executive Summary i I. Introduction

More information

Program and Project Administration Memorandum. Proposed Loans and Technical Assistance Grant Kingdom of Bhutan: Financial Sector Development Program

Program and Project Administration Memorandum. Proposed Loans and Technical Assistance Grant Kingdom of Bhutan: Financial Sector Development Program Program and Project Administration Memorandum Program Number: 37164 Loan Number: 2279/2280 October 2007 Proposed Loans and Technical Assistance Grant Kingdom of Bhutan: Financial Sector Development Program

More information

RISK ASSESSMENT AND RISK MANAGEMENT PLAN

RISK ASSESSMENT AND RISK MANAGEMENT PLAN Primary Health Care Improvement Project (RRP UZB 50190-002) RISK ASSESSMENT AND RISK MANAGEMENT PLAN 1. This Risk Assessment and Risk Management Plan (RAMP) for the Primary Health Care Improvement Project

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

Republic of the Philippines: Islamic Finance for the Philippines

Republic of the Philippines: Islamic Finance for the Philippines Technical Assistance Report Project Number: 50325-001 Knowledge and Support Technical Assistance (KSTA) December 2017 Republic of the Philippines: Islamic Finance for the Philippines This document is being

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. Page 1 of 4 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction CONSULTANTS 1. The Asian Development Bank (ADB) and its borrowers

More information

ASIAN DEVELOPMENT BANK TAR:INO 35144

ASIAN DEVELOPMENT BANK TAR:INO 35144 ASIAN DEVELOPMENT BANK TAR:INO 35144 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SUPPORT TO STATE AUDIT REFORM PROJECT May 2003 2 CURRENCY EQUIVALENTS

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 47291-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2014 Enhancing Roles of Supreme Audit Institutions in Selected Association of

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

HIGH LEVEL SURVEY Regarding implementation of the IOSCO Objectives and Principles of Securities Regulation

HIGH LEVEL SURVEY Regarding implementation of the IOSCO Objectives and Principles of Securities Regulation HIGH LEVEL SURVEY Regarding implementation of the IOSCO Objectives and s of Securities Regulation I. INTRODUCTION: The IOSCO Objectives and s of Securities Regulation As the global forum for securities

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and CONFORMED COPY LOAN NUMBER 4674 HR Loan Agreement (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated September

More information

VILLAGE OF NEW HAVEN REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES

VILLAGE OF NEW HAVEN REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES VILLAGE OF NEW HAVEN REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES The Village of New Haven, is requesting proposals from qualified firms of certified public accountants, in accordance with

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

Watching over public money

Watching over public money Watching over public money What is the Court of Audit? The Slovenian Constitution provides that the Court of Audit of the Republic of Slovenia is the highest body for supervising state accounts, the state

More information

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair

SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair SPECIFIC TERMS OF REFERENCE Fee-based service contract TA support to the PFM Working Group Chair FWC BENEFICIARIES 2013 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/132633/C/SER/multi

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:IND 36062 TECHNICAL ASSISTANCE TO INDIA FOR DEVELOPING THE ENABLING ENVIRONMENT FOR AND STRUCTURING ASSET RECONSTRUCTION COMPANIES IN INDIA October 2002 CURRENCY EQUIVALENTS

More information

RULES CONCERNING FOREIGN SECURITIES TRANSACTIONS

RULES CONCERNING FOREIGN SECURITIES TRANSACTIONS RULES CONCERNING FOREIGN SECURITIES TRANSACTIONS (December 4, 1973) CHAPTER I. GENERAL PROVISIONS (Purpose) Article 1 The purpose of the Rules Concerning Foreign Securities Transactions (hereinafter referred

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA October 18, 2016 PEFA Secretariat Washington DC USA 1 Table of Contents PEFA ASSESSMENT HANDBOOK... 5 Preface... 5

More information

PRESENTATION Overview of Securities Market in the Region

PRESENTATION Overview of Securities Market in the Region PRESENTATION Overview of Securities Market in the Region By Mr. Sunat Bekenov, Head of Securities and financial markets Department Ministry of Finance of the Republic of Uzbekistan Sixth OECD Conference

More information

Completion Report. Project Number: Loan Number: 2224-KGZ December Kyrgyz Republic: Banking Sector and Capital Market Development Program

Completion Report. Project Number: Loan Number: 2224-KGZ December Kyrgyz Republic: Banking Sector and Capital Market Development Program Completion Report Project Number: 34172 Loan Number: 2224-KGZ December 2010 Kyrgyz Republic: Banking Sector and Capital Market Development Program CURRENCY EQUIVALENTS Currency Unit som (Som) At Appraisal

More information

IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES. Version for public consultation

IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES. Version for public consultation IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Version for public consultation DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Introduction:

More information

Pakistan: Decentralization Support Program

Pakistan: Decentralization Support Program Validation Report Reference Number: PCV: PAK 2011-53 Program Number: 34328 Loan Numbers: 1935/1936/1937/1938 December 2011 Pakistan: Decentralization Support Program Independent Evaluation Department ABBREVIATIONS

More information

Evaluation Study. Midterm Review Process. Operations Evaluation Department

Evaluation Study. Midterm Review Process. Operations Evaluation Department Evaluation Study Reference Number: SES:REG 2008-78 Special Evaluation Study Update December 2008 Midterm Review Process Operations Evaluation Department ABBREVIATIONS ADB Asian Development Bank BTOR back-to-office

More information

Republic of Indonesia: Fiscal Aspect of Social Security Reform

Republic of Indonesia: Fiscal Aspect of Social Security Reform Technical Assistance Report Project Number: P45110-001 Capacity Development Technical Assistance (CDTA) October 2012 Republic of Indonesia: Fiscal Aspect of Social Security Reform (Financed by the Japan

More information

Republic of the Philippines: Support to Local Government Financing

Republic of the Philippines: Support to Local Government Financing Technical Assistance Report Project Number: 39516 Policy and Advisory Technical Assistance (PATA) December 2009 Republic of the Philippines: Support to Local Government Financing The views expressed herein

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

Report on the activities of the Independent Integrity Unit

Report on the activities of the Independent Integrity Unit Meeting of the Board 1 4 July 2018 Songdo, Incheon, Republic of Korea Provisional agenda item 23 GCF/B.20/Inf.17 30 June 2018 Report on the activities of the Independent Integrity Unit Summary This report

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. Title: Reinforcement of institutional and administrative capacity of the financial sector 2. Project nº: ES 9904 3. Location: Ministry of Finance, Securities Inspectorate, (Bank

More information

Attention! Bishkek July 29, 1997 #60

Attention! Bishkek July 29, 1997 #60 Attention! Creation date: 2009-07-27 Changes and amendments, introduced by the Kyrgyz Republic Law No.167, dated May 26, 2009, will come into effect in three months after official publication of the above-mentioned

More information

GGGI Project Cycle Management Manual

GGGI Project Cycle Management Manual GGGI Project Cycle Management Manual VERSION 1.0 1 VERSION CONTROL Current version: Version 1.0 Authorized by: Date: 27 January 2017 Frank Rijsberman, Director General, GGGI 2 Contents Acronyms...4 1.

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach Technical Assistance Report Project Number: 48037-001 Policy and Advisory Technical Assistance (PATA) October 2014 Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach (Cofinanced

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:ETM 34402 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO EAST TIMOR FOR TRANSPORT SECTOR IMPROVEMENT October 2001 ABBREVIATIONS ADB Asian Development Bank ETTA

More information

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project Technical Assistance TAR: PAK 37359 Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project July 2005 CURRENCY EQUIVALENTS (as of 7 July 2005) Currency

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.07A Page 1 of 4 PROJECT COMPLETION REPORT FOR SOVEREIGN OPERATIONS 1 A. Objective and Scope 1. The main objective of a project completion report (PCR) 1 is to

More information