1 Primary Health Care Improvement Project (RRP UZB ) RISK ASSESSMENT AND RISK MANAGEMENT PLAN 1. This Risk Assessment and Risk Management Plan (RAMP) for the Primary Health Care Improvement Project summarizes the risks and key mitigation measures identified during due diligence. The change of scope undertaken for the project confirmed it to be a low risk, having met all low-risk categorization criteria Country governance risks. The World Bank conducted a Country Integrated Fiduciary Assessment (CIFA) of the Republic of Uzbekistan (Uzbekistan) in March Prior to this report, a Public Expenditure Review was conducted in The CIFA has benefits for the government, the Asian Development Bank (ADB), and other development partners. It provides an update on all the various studies conducted by the development partners and the government since It also details the progress made by the government in implementing key reforms in several critical public financial management (PFM) areas. 3. The CIFA was designed to provide information on the public sector s financial accountability and fiduciary arrangements in Uzbekistan; identify and document the most significant fiduciary risks in the government s PFM and procurement systems; document the existing program of reforms and capacity building to improve transparency and accountability aspects of PFM, and make proposals for actions that can bring positive change; and provide a road map for using the country PFM system in investment projects along with adequate fiduciary safeguards. The report recommended to the government (i) to strengthen the role of the investment committee, (ii) to improve financial reporting and internal audits, and (iii) to continuously strengthen procurement capacities and regulations. 4. Project risks. Project-related risks were identified in the following areas: (i) technical; (ii) economic and financial; (iii) governance in financial management, procurement, and anticorruption measures, as well as capacity and institutional governance; and (iv) poverty, social, and gender. 4 No civil works are being undertaken by the project and no safeguards risks were identified. Risks are rated high, substantial, moderate, or low. The proposed mitigation measures were discussed and agreed with the government and built into the design of the project. The risks, rating, mitigation measures, and responsible agencies are summarized in the table below. 1 Change of Scope memo; Project Number and TA9148-UZB: Electronic Healthcare Development Project Change in Project and Transaction Technical Assistance (TRTA) Scope and Implementation Arrangements, signed 4 April 2017Manila. 2 Republic of Uzbekistan Country Integrated Fiduciary Assessment, The World Bank. Operations Services and Quality Department Europe and Central Asia Region. Report UZ. March World Bank Uzbekistan: Public Expenditure Review. Public expenditure review. Washington, DC. World Bank. License: CC BY 3.0 IGO. 4 Detailed analyses are included in the project s Economic Analysis (Linked Document 6), Financial Analysis (Linked Document 7), Summary Poverty Reduction and Social Strategy (Linked Document 8) and Gender Action Plan (Linked Document 9).

2 2 Table 1: Risks and Mitigating Measures Risk Description Rating Mitigation Measures Responsibility 1. Technical 1.1 Unreliable power supply. Rural areas in Uzbekistan suffer from unreliable availability of electricity and face regular power outages. A substantial number of facilities do not have the required equipment (generators) to maintain stable and reliable power supply to maintain basic service levels. 1.2 Weak maintenance logistics and/or allocated financing. The large amount of equipment spread over 793 facilities requires substantial efforts and resources for preventive and standard maintenance. Lack of maintenance logistics and/or allocated financing for maintenance (post-warranty) may lead to premature deterioration of equipment. 1.3 Limited technical capacity for equipment installation and commission. Limited implementation capacities at the oblast (region) level to meet all ADB and project requirements (training, installation, commission). 1.4 Limited clinical experience of staff using advanced diagnostic technology. There is a high number of staff (across many different positions) who require training to utilize modern equipment. High staff turnover jeopardizes the training needs. 1.5 Weak health information data collection and reporting. Data reported through the routine health information system are inaccurate and not up to date. Government and have assured that measures are being taken to improve the situation and that power supply equipment will be provided to affected facilities prior or in tandem with the supply of project equipment. Government and have assured that measures are being taken to improve the situation regarding maintenance logistics and allocated financing. 5 They are expanding a maintenance center to cover nationwide maintenance of medical equipment. Capacity building measures are part of the project (user training through suppliers). The government has experience in nationwide supply of equipment and a traditionally coherent framework for nationalto-regional dissemination. In addition, the PIU will be supported by international and national medical equipment logistics experts. The government and are taking steps to recruit and retain the staff required for the operation of the family polyclinics including providing housing and other incentives. The government and are taking steps to standardize and improve health information and reporting. Capacity building measures and the pilot of digital reporting are part of the project. Government and MOF,, polyclinics, PIU, regional government authorities, and polyclinics, PIU 5 order About the Decree of the President of the Republic of Uzbekistan No. DP-2857 of March 29, 2017 On measures of further improving organization of activities of primary medico-sanitary care institutions in the Republic of Uzbekistan ; and order On organization of activities of Primary medico-sanitary care institutions provide specific guidance on the allocation of funds for consumables and reagents used by the family polyclinics and states they will be procured centrally by.

3 3 2. Economic and Financial 2.1 Poor linkage between health care policies and budgeting. This brings the risk of inadequate prioritization of allocation for expenditures and investments in the primary, secondary, and tertiary health care service sectors and may impact sustainability of project measures. will engage in policy dialogue with primary health care stakeholders to ensure that financing and budgetary measures are part of the UHC initiatives. 2.2 Insufficient sector capacities for planning, forecasting, and cost benefit analysis. Health care planning is not indicator-based, which leads to suboptimal use of resources. The government will initiate development of a health care indicator framework to enable better and results-oriented health care planning and analysis. 3. Governance (Financial Management, Procurement, Anticorruption Measures, Capacity, and Institutional) 3.1 Weakness in the country financial management system. While the government s PFM system functions well in some areas (e.g., budget credibility and comprehensiveness, tax administration, and the treasury function) there are weaknesses in medium-term budgeting, the appropriation system, accounting, payroll-related internal controls, procurement, and internal and external audits. 3.2 Lack of clarity in the roles of regulatory or supervisory agencies. The role delineation between the States Investment Committee and the Ministry of Finance for regulation and supervision of IFI loans is not clearly defined. 3.3 Incomplete financial reporting and monitoring. Financial reporting of income and expenditure is not produced automatically, and cannot be easily verified for completeness and accuracy by management. 3.4 Immature internal audit system. The government put in place a resolution for the financial control and restructure of the The government has taken steps to mitigate and reduce risks, including the update of detailed accounting standards by the Ministry of Finance and a very recent presidential resolution (No. RP-3231 of 21 August 2017) on financial control and restructuring of the accounting and internal audit in budget organizations. The government is taking steps to clearly outline the role for the States Investment Committee and its decision-making responsibilities within this project. Under new internal audit procedures and recently revised accounting standards, the government will put in place specific financial reporting steps to ensure accurate accounting. With adoption of an upgraded 1C (version 8) accounting software, the degree of automation will be increased. Internal audit and financial control services were created in the structure of the and other relevant ministries. The Government and and MOF MOF

4 4 accounting and internal audit in budget organizations on 1 September Limited data capture and management capability., data are managed in spreadsheets, which can lead to data entry and management errors. 3.6 Limited familiarity of with ADB s recent procurement procedures and practices. While and PIU have experienced staff to undertake procurement, there is less knowledge available on recent ADB procurement procedures because the last ADBfunded project was completed in Poverty, Social, and Gender 4.1 Lack of awareness. Especially in remote and/or economically disadvantaged areas, a lack of awareness of improved primary health care services through family polyclinics may have a detrimental effect on the polyclinic s utilization. This is especially notable in services related to prenatal and pediatric care. 4.2 Lack of sex-disaggregated data. A paucity of sexdisaggregated data makes it difficult to analyze genderdifferentiated patterns of access to health care and social protection measures, and acts as a critical impediment to targeted and gender-sensitive social policies and health services for the poor. new subdivisions will manage prevention and detection of cases of illegal consumption and theft of budget funds Internal auditors will be hired to strengthen financial controls, including development of an internal audit manual and adoption of annual work plans. a Data capture will be carefully managed by staff, and an emphasis will be put on strengthening the relationship between Excel and the 1C software applied under the PIU. Risk monitoring recommended: (a) annual procurement plan to be prepared and schedule of procurement timeline to be followed strictly; (b) an international consulting company to assist in the procurement process; (c) frequent training to be provided to procurement staff on national and ADB guidelines on procurement of goods, works, and services; and (d) Uzbekistan s guidelines, the procurement of donor-funded projects to follow strictly the guidelines of the donor. The government is continually updating the population on development and improvements in health care service provision through the print media, which is available and affordable in all areas. Family polyclinic patronage nurses are communicating new services in remote areas through family visits. The project will ensure monitoring of gender indicators in the health system performance monitoring database. Gender indicators are institutionalized in the monitoring database. Gender analysis based on the system will be conducted. The PIU will be supported by a dedicated gender expert throughout the project and PIU, PIU, and PHC facilities PIU

5 5 implementation. 4.3 Poor social perception. Poor social perception of the capabilities of (especially rural) primary health facilities may continue to divert patients directly to secondary or tertiary care facilities. Overall The government is implementing and increasingly enforcing referral requirements and an appropriate policy framework for care escalation. Family polyclinics and regional governments are continually updating the population (local media, town meetings, community committee meetings) on improved services and availability of specialists on primary care level., regional government authorities, and PHC facilities ADB = Asian Development Bank, IFI = international financial institution, MOF = Ministry of Finance, = Ministry of Health; PFM = public financial management, PHC = primary health care, PIU = project implementation unit, UHC = universal health coverage. a Government of Uzbekistan On further improvement of the mechanism of financing educational and medical institutions and the system of the state financial control Presidential decree No. RP-3231 Tashkent (21 August). Source: Asian Development Bank.

FINANCIAL ANALYSIS. Table 1: Uzbekistan Health Financing Indicators

FINANCIAL ANALYSIS. Table 1: Uzbekistan Health Financing Indicators Primary Health Care Improvement Project (RRP UZB 50190-002) FINANCIAL ANALYSIS A. Introduction 1. This financial analysis was undertaken in accordance with the guidelines for financial management and analysis

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Emergency Assistance Project (RRP BAN 52174-001) FINANCIAL ANAGEENT ASSESSENT EXECUTIVE SUARY I. Introduction 1. An updated financial management assessment (FA) has been conducted for the four implementing

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT kills ector Enhancement Program (RRP RI 42251) PROGRAM FIDUCIARY YTEM AEMENT A. Background and Information ources 1. The kills ector Enhancement Program (EP) will finance the government s kills ector Development

More information

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program Country Public Financial Management System Assessment Project Number: 49078 Loan Number(s): June 2015 Republic of Armenia: Seismic Safety Improvement Program ABBREVIATIONS ADS - Armenian Development Strategy

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR Economic Management Improvement Program (Subprogram 1) (RRP UZB 51350-001) SECTOR ASSESSMENT (SUMMARY): MULTISECTOR Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Public financial

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Country Partnership Strategy: Cambodia, 2014 2018 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Lagging public sector management

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Earthquake Emergency Assistance Project (RRP NEP 49215) FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY 1. An updated financial management assessment (FMA) has been conducted for the four Implementing

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT Sustainable Transport Infrastructure Improvement Program (RRP SOL 46499) A. Background and Information Sources PROGRAM FIDUCIARY SYSTEMS ASSESSMENT 1. Under the proposed program, country public financial

More information

Republic of Indonesia: Strengthening National Public Procurement Processes

Republic of Indonesia: Strengthening National Public Procurement Processes Technical Assistance Report Project Number: 43219-01 Capacity Development Technical Assistance (CDTA) November 2010 Republic of Indonesia: Strengthening National Public Procurement Processes (Financed

More information

Governance Assessment (Summary) Nepal

Governance Assessment (Summary) Nepal Governance Assessment (Summary) Nepal Country Partnership Strategy: Nepal, 2013 2017 A. Current State of Governance GOVERNANCE ASSESSMENT 1. Nepal is passing through a historic political transition. The

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Fiscal and Public Expenditure Management Program (Subprogram 2) (RRP INO 50168-002) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 A. Sector Performance,

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Republic of the Philippines: Institutionalizing Capital Market Reforms

Republic of the Philippines: Institutionalizing Capital Market Reforms Encouraging Investment through Capital Market Reforms Program, SP2 (RRP PHI 48427-002) Technical Assistance Report Project Number: 48427-002 Transaction Technical Assistance (TRTA) October 2017 Republic

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT Affordable Rural Housing Program (RRP UZB 50022) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT 1. The program expenditure and financing assessment reviews the extent to which the new revised State Affordable

More information

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LOAN NUMBER 2766-MON(SF) LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LAS:MON 43007 LOAN AGREEMENT (Special Operations)

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program)

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) A. Road Sector Road Map 1. Strategic Objective 1. The strategic objective of the National Road Development

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Participation and Poverty Monitoring and Evaluation

Participation and Poverty Monitoring and Evaluation By Galsandorj BATKHUREL, Senior Specialist, Macro Policy Department, MOF, Mongolia Participation and Poverty Monitoring and Evaluation 1. Citizens and public participation in the of state policy and social

More information

Uzbekistan: Small Business Finance Project

Uzbekistan: Small Business Finance Project Project Administration Manual Project Number: 42007-018 Loan Number: June 2016 Uzbekistan: Small Business Finance Project Important Note: This Project Administration Manual is an active document. It will

More information

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND 1. This case study reviews the efforts of Government of Bangladesh (GoB) to develop capacity in and

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing to the Third Primary Education Development Project (RRP BAN 42122) ECONOMIC AND FINANCIAL ANALYSIS 1. This document provides an analysis of the economic rationale for additional financing

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

Outline of the Presentation

Outline of the Presentation Outline of the Presentation I. Background on Fiscal Transparency a. What is Fiscal Transparency b. Why Fiscal Transparency Matters c. Background on the Global Fiscal Transparency Effort d. Progress in

More information

Georgia: Strengthening Domestic Resource Mobilization

Georgia: Strengthening Domestic Resource Mobilization Technical Assistance Report Project Number: 48044-003 Policy and Advisory Technical Assistance (PATA) September 2014 Georgia: Strengthening Domestic Resource Mobilization This document is being disclosed

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities State Accountability Revitalization Project (RRP INO 38354) Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017)

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017) Secondary Education Sector Investment Program (RRP BAN 44213) DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017) DLIs and Definition Baseline Results Area 1. Enhanced Quality and Relevance of Secondary Education

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

ASIAN DEVELOPMENT BANK TAR:UZB 36498

ASIAN DEVELOPMENT BANK TAR:UZB 36498 ASIAN DEVELOPMENT BANK TAR:UZB 36498 TECHNICAL ASSISTANCE TO THE REPUBLIC OF UZBEKISTAN FOR DEVELOPMENT OF THE CAPITAL MARKET July 2003 CURRENCY EQUIVALENTS (as of 30 June 2003) Currency Unit sum SUM1.00

More information

Development Policy Instruments to Support Decentralization and Local Governance Reforms Bruno Carrasco

Development Policy Instruments to Support Decentralization and Local Governance Reforms Bruno Carrasco Development Policy Instruments to Support Decentralization and Local Governance Reforms Bruno Carrasco Director Public Management, Financial Sector and Trade Division South Asia Department Asian Development

More information

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acronyms List AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acquired immunodeficiency syndrome Country Coordinating Mechanism,

More information

Maldives: Developing the Revenue Administration Management Information System

Maldives: Developing the Revenue Administration Management Information System Completion Report Project Number: 44414-012 Technical Assistance Number: 7946 July 2015 Maldives: Developing the Revenue Administration Management Information System This document is being disclosed to

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS)

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) OPERATIONS POLICY AND COUNTRY SERVICES APRIL 2, 2002 FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) CONTENTS Page I. Introduction..1 II.

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project Report and Recommendation of the President to the Board of Directors Project Number: 45366 October 2013 Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project CURRENCY EQUIVALENTS

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government Public Expenditure and Financial Accountability Baseline Report Central Provincial Government 1 Table of Contents Summary Assessment... 4 (i) Integrated assessment of PFM performance... 4 (ii) Assessment

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Chongqing Integrated Logistics Demonstration (RRP PRC 48024-002) FINANCIAL MANAGEMENT ASSESSMENT Executive Summary 1. The financial management assessment (FMA) was conducted in October 2015 in accordance

More information

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 Attachment I: Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 ISSUES BACKGROUND ACTIONS DEADLINE RESPONSIBLE STATUS as of 15 June 2008 1.1 With relevant capacity

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 Policy-Based Lending 2008 2017: Performance, Results, and Issues of Design, Linked Document 2 LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 A. Armenia: 2008 and 2013 1. Overall,

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

FRAMEWORK FINANCING AGREEMENT

FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT (Second Power Transmission Enhancement Investment Program) Parties This Framework Financing Agreement ( FFA ) dated 15 July 2016 is between

More information

Maldives: Enhancing Tax Administration Capacity

Maldives: Enhancing Tax Administration Capacity Completion Report Project Number: 47150-001 Technical Assistance Number: 8525 August 2018 Maldives: Enhancing Tax Administration Capacity This document is being disclosed to the public in accordance with

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT Additional Financing of Skills Sector Enhancement Program (RRP SRI 42251-019) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT A. Expenditure Framework 1. Macroeconomic context. Sri Lanka s economic growth

More information

ACHIEVEMENT OF TECHNICAL ASSISTANCE OUTCOMES

ACHIEVEMENT OF TECHNICAL ASSISTANCE OUTCOMES Timor-Leste: CPS 2011 2015 Final Review Validation, Linked Document 7 ACHIEVEMENT OF TECHNICAL ASSISTANCE OUTCOMES Road Transport TA 7698 - Supporting Road Network Development Outcome: The Ministry of

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Name Implementing Agency Environment Category Date PID Prepared Estimated Date of Approval Initiation Note Review Decision

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

PART I REQUIRED COMMUNICATIONS

PART I REQUIRED COMMUNICATIONS To the Board of Trustees of We have audited the financial statements of the business-type activities and the discretely presented component unit of the (CCSNH) as of and for the year ended June 30, 2013,

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Paper 3 Measuring Performance in Public Financial Management

Paper 3 Measuring Performance in Public Financial Management Paper 3 Measuring Performance in Public Financial Management Key Issues 1. Effective financial management of public resources is essential to achieve the objectives of development programmes. It also promotes

More information

ANAHEIM UNION HIGH SCHOOL DISTRICT

ANAHEIM UNION HIGH SCHOOL DISTRICT ANAHEIM UNION HIGH SCHOOL DISTRICT RESPONSES TO FINDINGS AND RECOMMENDATIONS GRAND JURY REPORT THE ANAHEIM UNION HIGH SCHOOL DISTRICT MEASURE Z CAPITAL PROGRAM: THE TIP OF THE ICEBERG August 24, 2007 FINDINGS

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Actual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M

Actual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/22/2008 Report Number : ICRR12969 PROJ ID : P071004 Appraisal Actual Project Name : Social Insurance Project Costs (US$M US$M):

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2010 International Monetary Fund May 2010 IMF Country Report No. 10/138 November 2009 January 29, 2001 January 29, 2001 January 29, 2001 January 29, 2001 Maldives: Action Plan for PFM Reforms Based on

More information

Universal access to health and care services for NCDs by older men and women in Tanzania 1

Universal access to health and care services for NCDs by older men and women in Tanzania 1 Universal access to health and care services for NCDs by older men and women in Tanzania 1 1. Background Globally, developing countries are facing a double challenge number of new infections of communicable

More information

Budget Literacy Practices in PEMPAL Member Countries

Budget Literacy Practices in PEMPAL Member Countries Budget Literacy Practices in PEMPAL Member Countries thematic survey results BCOP Budget Literacy Working Group Deanna Aubrey, World Bank 20 May 2015 Objectives and Scope of Survey (1) This presentation

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

TAJ: Water Resources Management in Pyanj River Basin

TAJ: Water Resources Management in Pyanj River Basin Water Resource Management in Pyanj River Basin (RRP TAJ 47181) Supplementary Document 14 Financial Management Assessment September 2016 TAJ: Water Resources Management in Pyanj River Basin ABBREVIATIONS

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate

More information

Republic of Fiji: Supporting Public Financial Management Reform

Republic of Fiji: Supporting Public Financial Management Reform Technical Assistance Report Project Number: 50378-001 Knowledge and Support Technical Assistance (KSTA) November 2017 Republic of Fiji: Supporting Public Financial Management Reform This document is being

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 47291-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2014 Enhancing Roles of Supreme Audit Institutions in Selected Association of

More information

OFFICIAL DOCUMENTS. Republic of Seychelles Ministry of Finance, Trade and the Blue Economy. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. Republic of Seychelles Ministry of Finance, Trade and the Blue Economy. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Jim Yong Kim President The World Bank Group Washington DC OFFICIAL DOCUMENTS Republic of Seychelles Ministry of Finance, Trade and the Blue

More information

Universal Health Coverage and Immunization Financing

Universal Health Coverage and Immunization Financing Key Points Universal Health Coverage and Immunization Financing * Ensuring access to immunization services is central to the global movement toward universal health coverage (UHC). * Immunization financing

More information

The World Bank Ghana: Public Financial Management Reform Project (P151447)

The World Bank Ghana: Public Financial Management Reform Project (P151447) Public Disclosure Authorized AFRICA Ghana Governance Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 27-Dec-2016 ISR26534 Implementing Agencies: Ministry of Finance

More information