1 ASIAN DEVELOPMENT BANK TAR: SAM TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE INDEPENDENT STATE OF SAMOA FOR PREPARING THE SAVAI I RENEWABLE ENERGY PROJECT November 2002

2 CURRENCY EQUIVALENTS (as of 1 October 2002) Currency Unit Tala (ST) ST1.00 = $ $1.00 = ST ABBREVIATIONS ADB Asian Development Bank EIA environmental impact assessment EPC Electric Power Corporation kw kilowatt LARP land acquisition and resettlement plan MWh megawatt-hour NGO nongovernment organization TA technical assistance NOTES (i) (ii) The fiscal year (FY) of the Government and its agencies ends on 31 December. In this report, "$" refers to US dollars. This report was prepared by L. Bodda, Project Economist, Pacific Department.

3 I. INTRODUCTION 1. During the 2002 country programming mission, the Government of Samoa (the Government) confirmed its request for technical assistance (TA) from the Asian Development Bank (ADB) to prepare the feasibility study for the proposed Savai i renewable energy project. 1 A proposed loan of $10.0 million for the project is included in the Samoa country strategy and program for In August 2002, the fact-finding mission was fielded. An understanding was reached on the TA purpose, key activities, consultants terms of reference, cost estimates and financing, and implementation arrangements. The TA framework is given in Appendix 1. II. ISSUES 2. Local renewable energy development is an important element underpinning the government strategy for economic growth and social development in Samoa. ADB has provided assistance for power sector development since Starting with the first TA in 1971, when ADB assisted the corporatization of the power supply service and the creation of the Electric Power Corporation (EPC), ADB has provided 13 TAs and 8 loans to the power sector. In particular, ADB has provided advisory assistance for the commercialization of EPC including institutional strengthening and policy reforms, tariff and revenue studies, and improvement of financial management and lending assistance for the development of the hydropower potential of the capital island of Upolu. EPC has dramatically improved its financial viability 2 and degree of social responsibility, 3 while providing a significant share of power supply from local renewable resources, including a hydropower capacity equal to 75% of the demand during the wet season and 37% during the dry season. 3. The Government intends to improve its peoples living standards and enable private sector development on the island of Savai i which lags behind the capital island of Upolu in hardship and poverty. On the basis of the 1997 household income and expenditure survey, 4 the share of households under the basic needs poverty line is 55% in Savai I island and 48% nationwide. More recently, the share of households under the food poverty line has been estimated at 41% in Savai i island and 35% nationally. 5 The Government has requested ADB to consider assisting the power sector to provide an adequate, reliable, and environmentally sustainable power supply at least cost to the island of Savai i by developing the hydropower potential of the Sili River basin. 4. In June 1996, EPC commissioned a feasibility study of the Sili River hydro potential. 6 In August 1996, the survey group carried out field investigations on land and from the air and gathered the necessary data. 7 The study concluded that it is possible to develop electric power from the Sili River at its midstream valley. The proposed Sili no. 1 hydropower project consists of taking in water from six streams and gathering the water in a comparatively flat tableland area 1 The TA first appeared in ADB Business Opportunities (Internet version) on 15 February In 2002, EPC will have a profit for the first time in its 31-year history. 3 EPC has completed a broad rural development program and has recently adopted a lifeline tariff for low-income consumers. EPC was recently commended for providing reliable power to the poor (ADB Participatory Assessment of Hardship. Manila). 4 United Nations Development Programme-Secretariat of the Pacific Community Food and Basic Needs Expenditure Report. Apia. 5 ADB Discussion Paper on Consultative Workshops for Poverty Reduction Strategies in Selected PDMCs. Manila. 6 In parallel, in 1996, the European Union (EU) financed a Water Master Plan that led to the Rural Water Supply Project (for E8 million) to connect several villages, including Sili village on Savai i. 7 EDC International Limited Study Report on Sili No. 1 Hydropower Project in Western Samoa. Tokyo.

4 2 by gravity-flow canals. After being stored in an offstream regulating pond, the water can be conducted to a powerhouse site via a head tank and penstock. The maximum output of the powerhouse is 3,600 kilowatts (kw), 8 which can be obtained by a maximum discharge of 3.0 cubic meters per second, using a total head 9 of 162 meters. 5. The study suggested dividing the construction into two stages of 1,800 kw each. The first stage (2 units of 900 kw) will produce 5,137 megawatt-hours (MWh) annually to supply a peak load of 1,763 kw (March 1995). The addition of the second stage (another 2 units of 900 kw) will supply an additional 8,758 MWh for a total annual supply of 13,715 MWh. The construction cost was estimated at $16.0 million for the first stage and at $10.1 million for the second stage, for a total project cost of $26.1 million. 6. In October 1997, the ADB-financed Power Development Plan 10 estimated for the Sili River an optimum run-of-the-river hydro installed capacity of 4,500 kw (1,100 kw during the dry season) for a long-term average annual output of 13,160 MWh. However, it concluded that there was insufficient demand at that time for this amount of energy in Savai i. 7. Since then, the energy demand on Savai i island has increased dramatically. In 1991, the system peak demand was only 800 kw. In April 2002, a record peak demand of 2,688 kw was reported. In the last decade, Savai i system peak demand has achieved a compound annual growth rate of 11.65%. In December 2001, two new diesel generators totaling 1,600 kw were installed, increasing the total generation capacity of Savai i island to 2,060 kw. A new town and cannery factories are proposed for Savai i island. Hence, there is an urgent need for EPC to increase the firm generation capacity in the Savai i system. 8. The expected impact of the proposal is minimal. Water is to be drawn at intake dams and returned to the river after power generation. No private houses are near the project site. The project area is generally a mix of secondary dense vegetation and scattered plantations of coconut trees typically found on Savai i island. The summary initial poverty and social analysis is reported in Appendix 2. III. THE TECHNICAL ASSISTANCE A. Purpose and Output 9. The TA will establish a least-cost power development plan for the island of Savai i. The plan will consider the development of local renewable resources, including water resources of the Sili River basin, for providing adequate power generation on the island. The TA will assess the social, institutional, and environmental aspects of the sector, recommend development strategies, and, in coordination with the assistance on the implementation of state-owned enterprise reform 11 and of private sector development, 12 explore the possibility of private sector participation in the sector. It will also identify and carry out a feasibility study and develop a small-scale hydro project suitable for financing by ADB or other external funding agencies, and assess its long-term sustainability. 8 The total hydro capacity was estimated at 5.9 MW: 3.6MW Sili hydropower no. 1 and 2.3 MW Sili hydropower no Head is the vertical distance by which water drops. The amount of energy that can be captured is a function of both the head and the volume of water. 10 ADB Small-Scale Technical Assistance for Institutional Strengthening of the Electric Power Corporation. Manila. 11 ADB Technical Assistance to Samoa for Implementation of State-Owned Enterprise Reforms. Manila. 12 ADB Technical Assistance for a Private Sector Development Strategy for the Pacific. Manila.

5 3 10. The proposed project will supply electricity at the lowest economic cost to the poor in rural areas of Samoa, using renewable indigenous resources. The project will reduce the need to run diesel power stations in Savai i, with considerable savings to EPC in imported fuel costs and reduced emission of greenhouse gases. B. Methodology and Key Activities 11. The assistance will be implemented in two stages: (i) assessment of the social, institutional, and environmental aspects of the proposed power supply in Savai i; and (ii) development of a hydropower project suitable for financing by ADB or other external funding agencies and assessment of its long-term sustainability. 12. Phase 1 will (i) review relevant studies with regard to power demand and supply in Savai i; (ii) forecast power demand; (iii) formulate a long-term power development strategy and least-cost option to meet the assessed demand that will maximize economic, social, and poverty reduction impacts; (iv) in close consultation with stakeholders, formulate a realistic 10-year investment plan for power supply development, including new generation renewable energy supply; and (v) explore the possibility of private sector participation. 13. Based on the results of phase 1, Phase 2 will develop a hydropower supply project suitable for external financing. Phase 2 will (i) identify the highest priority components of the project for ADB financing in terms of poverty reduction impact; (ii) prepare a feasibility level design for the project, including scope, components, cost estimates, implementation arrangements, and operation and maintenance procedures; (iii) undertake a detailed socioeconomic survey, initial environmental examination, 13 and financial and economic evaluation of the project; (iv) assess the implementation capacity and future operation and maintenance capacity; (v) propose institutional improvements suitable to ensure efficient implementation of the project, including possible private sector participation; and (vi) recommend sustainable measures to be adopted to ensure that the poor can benefit from the project. C. Cost and Financing 14. The TA is estimated to cost $400,000 equivalent, with a foreign exchange cost of $273,000 and a local currency cost of $127,000 equivalent (Appendix 3). ADB will provide $300,000 equivalent to finance all of the foreign exchange cost and $27,000 equivalent of the local currency cost. The TA will be financed by ADB on a grant basis by the Japan Special Fund, funded by the Government of Japan. The Government will contribute $100,000 equivalent to finance the remaining local currency cost. The Government has been advised that approval of the TA does not commit ADB to financing any ensuing project. D. Implementation Arrangements 15. EPC will be the Executing Agency for the TA. The Government will provide all available relevant information and facilitate the collection of socioeconomic data. The Government will also help ensure adequate cooperation from local government bodies and nongovernment organizations active in the project area. 13 Although the project is likely to be rated by ADB as an environmental category B project, the Government will require a full environmental impact assessment.

6 4 16. ADB will engage the services of international and domestic consultants, with relevant experience in all aspects of the specified scope of work. The consultants will be selected through the quality and cost-based selection method as well as simplified TA submission in accordance with ADB s Guidelines on the Use of Consultants and other arrangements satisfactory to ADB for the engagement of domestic consultants. The international consultants will have expertise in (i) power system planning and power economics, (ii) hydropower station design, (iii) economic and financial analysis, (iv) environmental assessment, (v) social and poverty impact assessment, and (vi) resettlement planning (if required). The domestic consultants will have expertise in social and community development and participation. An estimated total of 12 person-months of consulting services will be required: 9 for international and 3 for domestic consulting services. The outline terms of reference for the consultants are given in Appendix EPC/Government will recruit/appoint a project manager with qualifications acceptable to ADB. Some of the office equipment will be financed under the TA and will be procured by the international consultants in accordance with ADB s Guidelines for Procurement The TA will be implemented over a period of about 9 months. It is expected to commence in January 2003 and be completed by September Within 3 weeks after commencement of the TA, the consultants will submit a brief inception report summarizing their initial findings, identifying specific issues, and suggesting changes to the methodology and program, if any. Within 6 months after TA commencement, the consultants will submit a draft final report for ADB and EPC comments. A tripartite meeting among EPC, ADB, and the consultants will discuss the draft final report and any changes to be made. Subsequently, the consultants will make all the recommended changes and submit the final report within 1 month of the tripartite meeting. The TA will produce design and analytical results that fully comply with all relevant ADB policies. The consultants will submit three copies of all reports to ADB and six copies to EPC. IV. THE PRESIDENT'S DECISION 19. The President, acting under the authority delegated by the Board, has approved the provision of technical assistance not exceeding the equivalent of $300,000 on a grant basis to the Government of Samoa for preparing the Savai i Renewable Energy Project, and hereby reports this action to the Board. 14 The computer equipment will be transferred to EPC upon TA completion.

7 Appendix 1 5 TECHNICAL ASSISTANCE FRAMEWORK Design Summary Performance Indicators/Targets Monitoring Mechanisms Assumptions and Risks Goal Create an environment enabling poverty reduction on Savai i by satisfying power demand with reliable and environmentally sustainable supply. Improved power supply availability and reliability Lower import of fossil fuels Improved operation and maintenance Country economic and power sector statistics Policy dialogue with the Government Customer surveys Economic and social development in Savai i may be slower than anticipated. Purpose Develop an efficient, reliable, and environmentally sustainable power supply system in Savai i. Least-cost power supply Minimal environmental impact Least negative social impact Review missions Technical assistance (TA) final report and TA completion report Report and recommendation to the President Cost comparisons and performance benchmarking Renewable energy supply is available. Electricity demand continues to grow. Community accepts the proposed development. Outputs Agreement among stakeholders on the feasibility of the project Power demand forecast and leastcost development strategy for Savai i Commercialization/ privatization plan Feasibility study at a level suitable for Asian Development Bank (ADB) financing Environmental impact assessment (EIA) and summary EIA acceptable to the Government, ADB, and other stakeholders (e.g., nongovernment organizations [NGOs]) Signed agreement between the Government, Electric Power Corporation (EPC), and the local villagers Assessment of technical, economic, and financial viability of the project Review of possible private sector participation Assessment of EPC governance standards Assessment of social, environmental, poverty, and resettlement impacts (if any) TA progress reports Review mission reports Tripartite review of planning and engineering aspects of the project Tripartite review of governance and institutional issues Tripartite review of scope of the project There is adequate counterpart support. Adequate data will be available. Stakeholders are able and willing to pursue the project. There is good consultant performance.

8 6 Appendix 1 Design Summary Performance Indicators/Targets Monitoring Mechanisms Assumptions and Risks Poverty and social analysis, including poverty monitoring framework Review and upgrade of plans to address environmental, social, and resettlement (if any) issues Updated knowledge on strengthening rural distribution system Project cost estimates, contract packaging, and implementation schedule Detailed scope of project components Activities Review of available project reports Field data gathering Recommend development strategy, including private sector participation Carry out economic, poverty impact, financial, environmental, social, and governance and institutional analyses Prepare environmental and social action (including resettlement plan, if necessary) reports in line with ADB guidelines Involve the local communities in the design of the project Prepare progress, draft final, and final reports Stakeholder involvement and participation (at least 3 meetings with villagers and NGOs) Social and poverty analysis completed within 3 months Resettlement plan, if required, with compensation and mitigation measures completed and agreed within 6 months Institutional recommendations agreed on within 9 months TA progress reports Meeting with consultants Monthly progress reports Review mission reports Draft final report Final report TA implementation plan Required reports completed on time Qualified local staff available on time Data are made available on time Local villagers willing to dialogue Good cooperation of government agencies Consultants selected are suitably qualified Inputs International consulting services 9 person-months

9 Appendix 1 7 Design Summary Performance Indicators/Targets Monitoring Mechanisms Assumptions and Risks Domestic consulting services Counterpart facilities Computers and office equipment 3 person-months $100,000 equivalent $5,000 equivalent

10 8 Appendix 2 SUMMARY INITIAL POVERTY AND SOCIAL ANALYSIS A. Linkages to the Country Poverty Analysis Sector identified as a national priority in country poverty analysis? Country poverty analysis ongoing Contribution of the sector/subsector to reduce poverty in Samoa: Sector identified as a national priority in country poverty partnership agreement (PPA)? PPA not yet finalized To produce economic, renewable hydropower to serve poor electricity consumers; create unskilled and semi-skilled jobs for the poor during project construction and implementation B. Poverty Analysis Proposed Classification: Analysis: Direct project poverty reduction Impact analysis, poverty impact ratio analysis C. Participation Process Stakeholder analysis prepared Yes Sili Village, owners of the land for the proposed access roads, environmental organizations, general public, Government agencies Participation strategy : Yes Proactive community participation, particularly by the poor and women, to obtain their input and feedbacks in the planning, design, and implementation of the project. D. Social Issues Subject Significant, Not Significant, None Strategy to Address Issues Output Prepared a Resettlement b None --- None Gender None --- None Affordability Not significant To lower costs of electric supply None Labor Not significant Preferential treatment of the poor None Indigenous People None --- None Other Risks/ Vulnerabilities None None a b A plan will be required if any of the potential issues are found to be significant. Significant involuntary resettlement requires a full resettlement plan; nonsignificant resettlement requires a short resettlement plan.

11 Appendix 3 9 COST ESTIMATES AND FINANCING PLAN ($'000) Foreign Local Total Item Exchange Currency Cost A. Asian Development Bank Financing a 1. Consultants a. Remuneration and Per Diem i. International Consultants ii. Domestic Consultants b. International and Local Travel c. Reports and Communications Computers and Office Equipment b Miscellaneous Administration and Support Costs Contract Negotiations c Contingencies Subtotal (A) B. Government Financing 1. Office Accommodation and Transport Remuneration and Per Diem of Counterpart Staff Others Subtotal (B) Total a Financed by the Japan Special Fund, funded by the Government of Japan. b One personal computer, one printer, and supplies. c Cost related to participation of Government official as observer during contract negotiations. Source: Asian Development Bank estimates.

12 10 Appendix 4 OUTLINE TERMS OF REFERENCE A. Terms of Reference for the Consultants 1. The consultants will ensure that all works and outputs under the technical assistance (TA) are fully compliant with all relevant Asian Development Bank (ADB) policies and guidelines. 1. Hydropower Engineer and Team Leader (international, 4 person-months) 2. The consultant s work will include, but not be limited to, the following: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) Prepare the detailed work program and implementation schedule for the TA, and coordinate the work of the consultants on the team. Review available studies relating to the energy sector of Savai i Island. Prepare a summary of the current status of resources and the energy sector requirements for Savai i Island. In coordination with the assistance for implementation of state-owned enterprise reforms (TA 3768-SAM), 1 explore the possibility of private sector participation in the power sector. Carry out the least-cost generation expansion planning of the Savai i Power System up to 2020; discuss the assumptions, methodology, and completeness of data used; and present an analysis of the results. Verify and confirm that the proposed project is part of the least-cost plan with full assessment of all alternatives, and provide full economic and technical justification for the project in relation to other alternatives. Assess site hydrology information. Prepare a hydrological balance for the project. Review the geo-technical conditions at the site and need for monitoring the safety of the water-storing pond. Assess and improve the project design. Recommend pro-poor activities for Savai i Island, including supply of freshwater to the nearby villages. Assess the impact of hydropower development on the availability of water for human consumption, irrigation, and other downstream uses in areas where water could be in short supply. Assess and update the project cost estimates, including unit costs and estimates of quantities for project components, local and foreign cost components, and physical and price contingencies. Determine the financing requirements of the project, identify options for cofinancing, and evaluate the possibility of private sector participation. Identify the goods to be procured and civil works to be undertaken, and prepare indicative procurement packages for the proposed project. Evaluate the adequacy of the government policy and regulatory framework, and idenfity measures ADB could take to facilitate participation. Prepare the project implementation schedule, a Gantt chart showing the schedule, and a procurement schedule. Assess the project s technical risks and carry out sensitivity analysis to check project viability under these risks. Prepare terms of reference, expertise requirements, and person-month and cost estimates for implementation consulting services. Prepare the project logical framework and undertake any reasonable requests made by ADB in association with the TA. 1 ADB Technical Assistance to Samoa for Implementation of State-Owned Enterprise Reforms. Manila.

13 Appendix Economic and Financial Analyst (international, 2 person-months) 3. The consultant will do the following: (i) (ii) (iii) (iv) (v) (vi) (vii) Provide macro and sector information, including energy production and consumption by sector, energy efficiency, and electricity production and consumption by sectors (current and historical) for the Savai i Island. Assess the short-term (3 years) and long-term (system planning period) demand forecasts for different consumer categories. Provide a detailed discussion on the assumptions and methodology used in the demand forecast. Analyze system hourly load curves, and monthly peak load and demand curves for Savai i Island; present the existing power supply/shortage situation in the island. List all operational thermal and other types of power plants on Savai i Island, indicating age, unit size, installed capacity, and energy generation, and indicate the location of these power plants on a map. Analyze economic parameters and present the model for least-cost generation expansion. Provide quantitative and qualitative project benefits. Carry out an economic analysis including (a) power demand, (b) least-cost and equalizing discount rate, (c) economic viability, and (d) risk analysis. Discuss alternative methodologies for carrying out the economic analysis and justify the method(s) chosen. Provide a table detailing the conversion of economic cost from financial cost of the Project and the specific conversion factors used. Incorporate an economic quantification of environmental impact due to the project. Discuss the assumptions and parameters used in the economic analysis, including consumers willingness to pay and resource cost savings in relation to alternative options. Compare the shadow prices with those in similar projects and discuss justification for shadow prices. Identify and analyze economic uncertainties and carry out a risk analysis. Review the accounting and financial records of the Electric Power Corporation (EPC). Present EPC s capacity addition and investment program for the next 10 years. Present the financing plan for this proposed investment program. Examine the financial feasibility of this plan. Determine the financial viability of the project and each of its components. Assess the methodology for determining the tariff for power supply of the project, and review the adequacy of this tariff compared with the economic costs and financial targets. Assess the impact of the existing tariff structure/levels on energy conservation, efficient use of power system facilities, and private sector participation. Evaluate the economic impact of the tariff increase required for cost recovery and the affordability of different users. 3. Social and Environmental Impact Expert (international, 3 person-months) 4. The consultant will do the following: (i) Organize surveys in the project area, and consult with relevant officials from the government and other organizations to supplement available secondary data. During phase 1, prepare an initial poverty and social analysis (IPSA) in accordance with ADB s Handbook on Poverty and Social Analysis. In phase 2, prepare a poverty profile of the project area and project impact area. Clearly

14 12 Appendix 4 (ii) (iii) (iv) (v) (vi) (vii) define the poverty line and the poverty incidence. Assess the pro-poor impact of the project in line with ADB s poverty reduction strategy, taking into account rural electrification and other linkage effects. Provide a detailed discussion of the potential impacts on the economy in the project area, particularly on the poor. Identify ways to make the project pro-poor. In coordination with the economist, estimate power price elasticities for inputs and outputs, and for consumers. On the basis of the project economic analysis, estimate the expected distribution of project net benefits among electricity consumers, power utilities, labor, the government, the economy in general, and where appropriate, lenders. Estimate the number of poor people who will benefit from the project. Estimate the willingness and ability to pay of the consumer and proportion of net benefits going to the poor, and calculate the poverty impact ratio as per ADB guidelines. Conduct a risk analysis for key variables used in calculating the ratio, and explain the implications. Summarize the poverty reduction effects of the project. Identify any complementary activities that would enhance the poverty reduction effects of the project, including (a) poverty-related measures considered at project design and implementation stage, and (b) strategy used to enhance participation of the poor in project design and implementation. In consultation with local nongovernment organizations, identify the different project stakeholders; examine their existing rights and possible risks. Help EPC build public acceptance of the project. Prepare an initial social assessment, including land acquisition effects and any potential adverse effects. Prepare a social analysis as per ADB guidelines and an analysis of indigenous peoples impacts (including preparation of an indigenous peoples development plan, if required) and appropriate socioeconomic monitoring and management plans to be implemented by EPC. The social analysis, the recommendations on changes in design to incorporate social dimensions, the analysis of minority nationality impacts, and the socioeconomic monitoring plans are separate outputs. Review the adequacy of EPC s land acquisition and resettlement plan (LARP), if any, in accordance with ADB s Handbook on Resettlement. If needed, prepare a LARP including a baseline for monitoring and evaluating incomes and living standards, and for developing rehabilitation strategies. The LARP will include eligibility criteria, compensation rates for assets lost, specific measures for the poor and vulnerable, time frame showing how those affected will be compensated, and a monitoring and evaluation plan. Identify key environmental issues and assist EPC to prepare the environmental impact assessment (EIA) and an EIA following ADB s format prescribed in the Environmental Assessment Requirements and Environmental Review Procedures. The EIA will include a study of the conditions, trends, and protection of the watershed. Submit the draft summary for review, and incorporate any subsequent comments in completing the summary. Based on the review, provide EPC with specific and detailed recommendations for revisions and/or additional studies, if needed, to make the EIA conform to ADB s requirements. Assess the impact of soil erosion and sediment on the proposed hydropower plants. Prepare a summary EIA. Assess other options for power generation and meeting the energy demand. Compare their environmental and social sustainability. Review the environmental management capability of EPC and the local environmental protection bureaus and recommend institutional strengthening measures.

15 Appendix Social Analysis and Community Development Expert (domestic, 3 personmonths) 5. The expert will do the following: (i) (ii) (iii) Assist the organization of surveys in the project impact areas, and consult with relevant officials from the government and other organizations to supplement available secondary data. Assist the preparation of a poverty profile of the project impact area. Assess the pro-poor impact of the project in line with ADB s poverty reduction strategy, taking into account rural electrification and other linkage effects. Provide a detailed discussion of the potential impacts on the economy in the project area, particularly on the poor. Identify ways to make the project propoor. Facilitate the public acceptance of the project. Assist the preparation of an initial social assessment, including land acquisition effects and any potential adverse effects. Prepare a social analysis as per ADB guidelines and an analysis of impacts on indigenous peoples and appropriate socioeconomic monitoring and management plans to be implemented by EPC. Facilitate an awareness campaign and capacity building, and conduct stakeholder workshops, ensuring full participation of women and vulnerable groups at all stages of the TA. B. Reporting Requirements 6. The following reports will be prepared by the consultants and submitted simultaneously to the Government and ADB: (i) (ii) (iii) (iv) an inception report 4 weeks from the commencement of services detailing initial findings and recommendations for the future direction of the TA; brief monthly reports summarizing the progress of work, major findings and notation of problem areas such as lack of data and other impediments that could hamper the TA; a draft final report incorporating the findings of the TA and containing especially a comprehensive proposal and institutional formation plan based on the recommendations of the consultants consistent with the ADB country strategy and program for Samoa following the format of a report and recommendation to the President with appendixes; and a final report, based on the draft final report, incorporating the comments and view received on the draft.

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:CAM 36593 TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR IMPROVING INSURANCE SUPERVISION December 2002 CURRENCY EQUIVALENTS (as of 3 December 2002) Currency Unit riel (KR)

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Institutional Strengthening for Aviation Regulation

Institutional Strengthening for Aviation Regulation Technical Assistance Report Project Number: 43429 Regional capacity development technical assistance (R-CDTA) December 2010 Institutional Strengthening for Aviation Regulation The views expressed herein

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Independent State of Samoa: Port Development Project

Independent State of Samoa: Port Development Project Project Design Advance Project Number: 47358-003 April 2018 Independent State of Samoa: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand)

Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand) Technical Assistance Report Project Number: 40287 December 2007 Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand) The views

More information

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project Technical Assistance TAR: PAK 37359 Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project July 2005 CURRENCY EQUIVALENTS (as of 7 July 2005) Currency

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

Republic of the Philippines: Preparing the Road Sector Improvement Project

Republic of the Philippines: Preparing the Road Sector Improvement Project Technical Assistance Report Project Number: 41076 July 2008 Republic of the Philippines: Preparing the Road Sector Improvement Project (Financed by the Japan Special Fund) The views expressed herein are

More information

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT Access to Clean Energy Investment Program (RRP PAK 49056) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT A. Expenditure Framework 1. Macroeconomic context. The budget preparation and approval process is

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:PRC 36432 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF CHINA FOR PREPARING THE DALI-LIJIANG RAILWAY PROJECT June 2003 CURRENCY EQUIVALENTS (as of 14 May 2003) Currency Unit

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: PHI 36419 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF THE PHILIPPINES FOR PREPARING THE PROGRAM TO ACCELERATE SMALL AND MEDIUM ENTERPRISE FINANCING

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project Technical Assistance Report Project Number: 41425 October 2008 Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

ASIAN DEVELOPMENT BANK TAR:UZB 36498

ASIAN DEVELOPMENT BANK TAR:UZB 36498 ASIAN DEVELOPMENT BANK TAR:UZB 36498 TECHNICAL ASSISTANCE TO THE REPUBLIC OF UZBEKISTAN FOR DEVELOPMENT OF THE CAPITAL MARKET July 2003 CURRENCY EQUIVALENTS (as of 30 June 2003) Currency Unit sum SUM1.00

More information

Georgia: Strengthening Domestic Resource Mobilization

Georgia: Strengthening Domestic Resource Mobilization Technical Assistance Report Project Number: 48044-003 Policy and Advisory Technical Assistance (PATA) September 2014 Georgia: Strengthening Domestic Resource Mobilization This document is being disclosed

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

Republic of Indonesia: Strengthening National Public Procurement Processes

Republic of Indonesia: Strengthening National Public Procurement Processes Technical Assistance Report Project Number: 43219-01 Capacity Development Technical Assistance (CDTA) November 2010 Republic of Indonesia: Strengthening National Public Procurement Processes (Financed

More information

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program Appendix 3 9 Technical Assistance Report Project Number: 42267-027 Transaction Technical Assistance (TRTA) June 2017 INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program This document

More information

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project Project Administration Manual Project Number: 46044 October 2013 Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

Grant Assistance Report

Grant Assistance Report Grant Assistance Report Project Number: 41504-024 March 2012 Proposed Grant Assistance Papua New Guinea: Improved Energy Access for Rural Communities (Cofinanced by the Japan Fund for Poverty Reduction

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:ETM 34402 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO EAST TIMOR FOR TRANSPORT SECTOR IMPROVEMENT October 2001 ABBREVIATIONS ADB Asian Development Bank ETTA

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

Nepal: Preparing the North South Fast Track Road Project

Nepal: Preparing the North South Fast Track Road Project Technical Assistance Report Project Number: 40011 September 2006 Nepal: Preparing the North South Fast Track Road Project (Financed by the Japan Special Fund) CURRENCY EQUIVALENTS (as of 15 September 2006)

More information

ASIAN DEVELOPMENT BANK TAR:INO 35144

ASIAN DEVELOPMENT BANK TAR:INO 35144 ASIAN DEVELOPMENT BANK TAR:INO 35144 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SUPPORT TO STATE AUDIT REFORM PROJECT May 2003 2 CURRENCY EQUIVALENTS

More information

Philippines: Philippine Energy Efficiency Project

Philippines: Philippine Energy Efficiency Project Validation Report Reference Number: PVR-436 Project Number: 42001-013 Loan/Grant Numbers: 2507 and 0142 December 2015 Philippines: Philippine Energy Efficiency Project Independent Evaluation Department

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47926 April 2014 Proposed Equity Investment ReNew Power Ventures Private Limited ReNew Power Investment Project (India)

More information

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform Technical Assistance Report Project Number: 39606 June 2006 Republic of the Philippines: Government-Owned and -Controlled Corporations Reform The views expressed herein are those of the consultant and

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

ASIAN DEVELOPMENT BANK TAR: TRA 31389

ASIAN DEVELOPMENT BANK TAR: TRA 31389 ASIAN DEVELOPMENT BANK TAR: TRA 31389 TECHNICAL ASSISTANCE FOR SECURED TRANSACTIONS LAW REFORM January 1998 ABBREVIATIONS ASEAN - Association of Southeast Asian Nations AUSAID - Australian Agency for International

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Georgia: Preparing the Second Domestic Resource Mobilization Program

Georgia: Preparing the Second Domestic Resource Mobilization Program Technical Assistance Report Project Number: 52161-002 Transaction Technical Assistance (TRTA) September 2018 Georgia: Preparing the Second Domestic Resource Mobilization Program This document is being

More information

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 23 TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 1. The Asian Development Bank (ADB) is providing technical assistance to the Government of the Philippines (the government)

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: IND 34270 TECHNICAL ASSISTANCE TO INDIA FOR REFORM OF THE MUTUAL FUNDS INDUSTRY December 2002 CURRENCY EQUIVALENTS (as of 8 November 2002) Currency Unit Indian rupee/s (Re/Rs)

More information

Papua New Guinea: Town Electrification Investment Program, Tranche 2

Papua New Guinea: Town Electrification Investment Program, Tranche 2 Periodic Financing Request Report Project Number: 41504-025 MFF Number: 0051 June 2017 Papua New Guinea: Town Electrification Investment Program, Tranche 2 Distribution of this document is restricted until

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program Project Design Advance Project Administration Manual Project Number: 47243-003 June 2016 People s Republic of Bangladesh: Rural Infrastructure Maintenance Program CONTENTS I. PROPOSED PROJECT DESCRIPTION

More information

SECOND PROGRESS REPORT INDIA VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT (LOAN NO IN)

SECOND PROGRESS REPORT INDIA VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT (LOAN NO IN) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION SECOND PROGRESS REPORT ON THE IMPLEMENTATION OF MANAGEMENT S ACTION PLAN IN RESPONSE TO THE INSPECTION PANEL

More information

Papua New Guinea: Preparing the Highlands Highway (Southern Highlands and Enga Provinces Network) Rehabilitation Project

Papua New Guinea: Preparing the Highlands Highway (Southern Highlands and Enga Provinces Network) Rehabilitation Project Technical Assistance Report Project Number: 40173 June 2007 Papua New Guinea: Preparing the Highlands Highway (Southern Highlands and Enga Provinces Network) Rehabilitation Project (Financed by the Japan

More information

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference JAMAICA: FOUNDATIONS FOR COMPETITIVENESS AND GROWTH PROJECT Loan No.:8408-JM Component: 2A Assignment Title: Treatment Plant Engagement of Financial Advisory Services for the Soapberry Wastewater Reference

More information

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian

More information

HO CHI MINH CITY LONG THANH DAU GIAY EXPRESSWAY PROJECT

HO CHI MINH CITY LONG THANH DAU GIAY EXPRESSWAY PROJECT HO CHI MINH CITY LONG THANH DAU GIAY EXPRESSWAY PROJECT 1. Terms of Reference 1. The consulting services under the PPTA will follow the terms of reference set out below. These terms of reference have been

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

KEY SECTOR ANALYSIS / NATIONAL ISSUES PAPERS GUIDELINE

KEY SECTOR ANALYSIS / NATIONAL ISSUES PAPERS GUIDELINE KEY SECTOR ANALYSIS / NATIONAL ISSUES PAPERS GUIDELINE UNDP has launched a capacity development project that will assist developing countries to assess and develop policy options for addressing climate

More information

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006

More information

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

Program Implementation Document. Project Number: November PAK: Access to Clean Energy Investment Program

Program Implementation Document. Project Number: November PAK: Access to Clean Energy Investment Program Program Implementation Document Project Number: 49056 November 2016 PAK: Access to Clean Energy Investment Program CONTENTS Page I. Program Description 1 II. Results and Disbursement 2 A. The RBL Program

More information

Cambodia: Second Power Transmission and Distribution Project

Cambodia: Second Power Transmission and Distribution Project Validation Report Reference Number: PVR-464 Project Number: 37041-013 Loan Number: 2261 December 2016 Cambodia: Second Power Transmission and Distribution Project Independent Evaluation Department ABBREVIATIONS

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:PHI 29226 ASIAN DEVELOPMENT BANK Li TECHNICAL ASSISTANCE TO THE REPUBLIC OF ThE PHILIPPINES FOR PREPARATION OF A NATIONAL TRANSPORT STRATEGY November 1995 CURRENCY EQUIVALENTS (as of 15 October 1995)

More information

Socialist Republic of Viet Nam: Preparing the Ho Chi Minh City Water Supply Project

Socialist Republic of Viet Nam: Preparing the Ho Chi Minh City Water Supply Project Technical Assistance Report Project Number: 41070 June 2008 Socialist Republic of Viet Nam: Preparing the Ho Chi Minh City Water Supply Project (Financed by the Government of France) The views expressed

More information

Technical Assistance to the People s Republic of China for Preparing the Railway Development Project

Technical Assistance to the People s Republic of China for Preparing the Railway Development Project Technical Assistance TAR: PRC 39153 Technical Assistance to the People s Republic of China for Preparing the Railway Development Project September 2005 CURRENCY EQUIVALENTS (as of 14 August 2005) Currency

More information

SECTION Watershed Informed Approach to FY 2016 Budget Development

SECTION Watershed Informed Approach to FY 2016 Budget Development SECTION 2 This section provides information and guidance regarding three new initiatives by the Civil Works Integration within USACE to make the budget formulation more streamlined, our investments more

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: The Islamic Republic of Pakistan Project: Energy Sector Reform Program Loan Agreement Signed: June 4, 2014 Loan Amount: 5,000 million

More information

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions Second Green Power Development Project (RRP BHU 44444) FINANCIAL ANALYSIS 1. The project s financial analysis was carried out in accordance with the Financial Management and Analysis of Project Guidelines

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project

Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project Technical Assistance Report Project Number: 41071 May 2008 Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing Partnership

More information

Good Practice when Preparing a Project Proposal. 15 February 2005

Good Practice when Preparing a Project Proposal. 15 February 2005 Good Practice when Preparing a Project Proposal II 15 February 2005 Before applying Familiarise yourself with the programmes Web site, FAQs, past projects Review open Call for Proposals and associated

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Sector Road Map Country Partnership Strategy: Fiji, 2014 2018 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. The government is responsible

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK R191-00 12 September 2000 TECHNICAL ASSISTANCE TO INDONESIA FOR CORPORATE GOVERNANCE REFORM The attached Report is circulated for the information of the Board. The President approved

More information