Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Kochi Case Study

Size: px
Start display at page:

Download "Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Kochi Case Study"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Cost Recovery and Tariff Practices for UWSS Sector in India Interim Report on Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India Kochi Case Study Prepared for Water and Sanitation Program South Asia June 2008 Kochi 1

2 KOCHI Table of Contents 1 Context and Background City Profile Physical Environment and Topography Demography Socio-Economic Profile Institutional Framework for Water Supply and Sewerage Services Kochi Municipal Corporation Kerala Water Authority Existing Infrastructure and Services Water Supply Sewerage Key issues in service provision Proposed improvements Water Supply and Sewerage Finances Cost Recovery: Current Performance Tariff Structure Consumer Profile Analysis Cost Recovery Economic Efficiency Equity and Protection of Vulnerable Sections Affordability Resource Conservation Acceptability and Practicality Summary Recommendations Kochi 2

3 KOCHI 1 Context and Background In order to access funds for water supply and sanitation improvements under JNNURM, municipal service providers are required to levy reasonable user charges so that operation and maintenance costs are recovered within seven years. The Ministry of Urban Development, with assistance from the World Bank Water and Sanitation Program - South Asia, has prepared guidelines on the design and implementation of user charge reforms in line with JNNURM requirements. These guidelines are available as a separate document. The guidelines draw on lessons from a review of current user charges and cost recovery arrangements in 23 cities in India. This report focuses on one of those cities: Kochi. 2 City Profile Kochi is the commercial capital of Kerala and the headquarters of Ernakulam district. The city comprises the mainland town of Ernakulam and a series of islands and peninsulas clustered around it. 2.1 Physical environment and topography Kochi is the largest urban agglomeration in Kerala. Much of the land is under water and interspersed with countless backwaters, rivers, canals, tanks and ponds which account for roughly 20 percent of the gross land area, though this is reducing due to large scale reclamation. The city is generally flat, with a very gentle slope from East to West. Most low-lying wetlands in the city are uncultivated and are gradually being developed for a variety of residential and other purposes. Unlike other parts of the country, residential development in Kerala is widely spread out and mixed with other land uses. There are numerous small-scale industries and large-scale industries are being developed on nearby islands. 2.2 Demography The population density of the city is around 166 persons per hectare, and most of the housing is single- or double-storied, with a growing number of apartment buildings. Kochi Municipal Corporation (KMC) has an estimated population of 0.65 million as of 2006 in an area of 95 sq km. Population growth was 5.6 percent from , somewhat lower than in the state as a whole. Most of the growth is taking place beyond the KMC boundary, in the Greater Cochin Urban Agglomeration which includes not only the city but five Municipalities, 15 full Panchayat areas and part of three other Panchayats. The CDP under JNNURM would include the city plus two municipalities (Kalamassery and Thripunithura) and 13 Panchayats. Kochi 3

4 2.3 Socio-economic profile Kochi is the economic capital of Kerala by volume of trade, though it has been slow to industrialize. It has recently recovered from economic stagnation and witnessed heavy investment, making it one of the fastest-growing second-tier metro cities in India. Today, it essentially has a business economy focused on the service sector, with businesses including gold and textile retailing, seafood and spices exports, IT, tourism, health services, banking, shipbuilding and the fishing industry. As in most of Kerala, remittances from nonresident Indians are also a major source of income. The city also houses Kerala's only bourse, the Cochin Stock Exchange. Kochi is ranked by the National Association of Software and Services Companies (NASSCOM) as the second-most attractive city in India for IT-based services, the availability of cheap bandwidth through undersea cables and low operational costs being major advantages. A number of technology and industrial campuses have been developed in recent years. 3 Institutional Framework for Water Supply and Sewerage Services The Kerala Water Authority (KWA) has been responsible for all water and sewerage services in the state for the past 20 years. However, the government of Kerala is now decentralizing accountability for service provision to municipalities, in line with the 74 th CAA. Prior to the introduction of JNNURM, the state government and five city corporations had already entered into an agreement with ADB for the Kerala Urban Sustainable Development Project (KSUDP) which includes substantial upgradation of water supply and sewerage services. The city is, therefore, seeing significant investment in the sector. Box 5.1: Principles underlying the Memorandum of Understanding between government of Kerala and five city corporations Increasing Accountability. Delineating policy, regulatory and service provision functions and transferring control and decision-making to the municipality, who will define and monitor performance and service standards. Promoting Efficiency in Service Delivery. The delineation of functions also provides for improved efficiency through the separation of regulatory and technical support roles between the municipality and KWA. The state government is policy maker and arbitrator. Strengthening Decentralized Service Delivery. This will be achieved through the creation of a city-level unit by KWA. Strengthening Managerial Capacities of the Municipality/ Municipal Corporation. This shall be achieved by supporting the municipality with a strong internal project implementation unit. Achieving administrative and fiscal discipline is an important objective. Ensuring Sustainability. The Memorandum of Understanding (MoU) aims to secure effective linkages between asset creation and asset management so that new services are effectively maintained and become self-sustaining. The state government is committed to transferring accountability of the parastatal municipalities by 2010 under a MoU between itself, the municipality and JNNURM. To this Kochi 4

5 end, a tripartite MoU has also been signed between KMC, KWA and the Department of Local Self Government. This establishes a progressive accountability framework through performance agreements for water supply and sewerage services. These agreements govern all new investments in water supply and sewerage services, whatever the funding source. 3.1 Kochi Municipal Corporation The organizational structure of KMC is provided in Figure 5.1. Figure 5.1: Organizational Structure of Kochi Municipal Corporation QuickTime and a decompressor are needed to see this picture. Under the tripartite agreement, KMC will be the principal contracting authority with responsibilities for the prioritization, planning and approval of works, the assignment of tasks to KWA and performance monitoring. 3.2 Kerala Water Authority KWA is divided into three regions, each headed by a Chief Engineer. It has 465 offices and employs some 9,000 people (Figures 5.2 and 5.3). The service for Kochi city comprises the Kochi municipal area and five panchayats. Figure 5.2: Organizational Structure of Kerala Water Authority Kochi 5

6 Kochi 6

7 In the initial years of its establishment, KWA had a monopoly over water supply and sewerage services in the state, but later responsibility for supplying drinking water was decentralized to local bodies, a change that was more marked in the case of rural water supply. KWA s role is now changing from monopoly provider to facilitator and supervising agency, with direct responsibility only for urban and major rural water supply and sewerage schemes. Within the tripartite agreement for Kochi, KWA will function as service provider. This role will include technical services to KMC, including design and preparation of tender documents; implementation of works; and O&M of new water supply and sewerage schemes. It will be accountable to KMC for achieving performance targets and specified service levels in accordance with a Performance Improvement Plan. Figure 5.3: Organizational structure of Kerala Water Authority s Central Region Office Central Region Headed by Chief Engineer PH Circle Kochi Superintending Engineer PH Circle JNNURM Project Superintending Engineer PH Circle Trichur Superintending Engineer Muvattupuzha Superintending Engineer Kochi Water Supply Project Div JNNURM Irinjalakakuda Piravam Water Works Sub Div Karuvelipady Asst Exec Engg Water Works Sub Div Kaloor Asst Exec Engg Sewerage Sub Div Asst Exec Engg IPD Division Investigation Sewerage Project Div JNNURM Trichur Nattika, Firka Muvattupuzha Kattappana Thodupuzha Water Works Sub Div Kochi Asst Exec Engg Section Office Asst Engineer Meter Inspector Meter Reader Perumbavoor Aluva Kochi 7

8 4 Existing Infrastructure and Services 4.1 Water supply The current water supply network in the city forms part of a comprehensive scheme serving KMC, four municipalities and 27 panchayats, with a total population of 1,638,071 as per the 2001 Census. Separate schemes are now proposed for two municipalities and 11 panchayats, reducing the intended service area of the main scheme. Table 5.1: Water Supply and Sewerage System in Kochi A. BASIC PROFILE OF CITY/TOWN Total area of the city/town sq km Total population of the city/town 0.59 million (2001) ; 0.65 million (2006) Total slum population NA Number of slum settlements NA Density of population NA Number of wards 71 B. WATER SYSTEM DETAILS Sources of Water Supply Source Production (in kl) /day 1. Own Source Periyar Total water supply /water produced (in kl/day) Flow meters at the production source None Total water demand or water shortage (in kl/day) Total shortage (in kl/day), that is, demand-supply gap Total area served by water supply sq km Total population served by water supply (population coverage) 80% through metered connections and 20% through standposts Total water supply coverage (network coverage %) 100% Population coverage 100% Total sewerage coverage (in %) 5% Daily hours of supply 8 hours Per capita availability of water lpcd; Western Kochi: lpcd Total Transmission Infrastructure for Water Supply and Sewerage WATER SUPPLY Number of schemes currently running: 1 New schemes introduced/proposed in the financial year: 1 Total pipeline length: 600 km Diameter range: 20 mm-1050 mm Rising main (in km): NA Number of standposts: 6259 Number of tankers: 7 Number of handpumps: Nil SEWERAGE Total length of sewer line: km Number of manholes: 840 Number of pumping stations: 2 Number of STPs/sewerage farms: 1 Total water storage capacity Current Capacity Number Capacity OHT (Within Kochi) kl Underground storage: 1(in Kochi) 8000 kl TOTAL kl Source: Data provided in questionnaire The principal water source for Kochi is the Periyar River, located 20 km from the city. The head works has a capacity of 225 mld with roughly 150,000 kld supplied to KMC against a current demand of 184,000 kld. Water from the river is pumped to conventional water treatment plants (WTPs) and from there distributed via two trunk mains to the city and the surrounding areas. Kochi 8

9 Kochi has 100 percent geographical coverage with piped water. Most areas are served for more than eight hours per day though the western part of the city and parts of Vypin Island experience acute shortages, with water supplied on alternate days for two to three hours, providing an average of just 25 lpcd while the rest of the city receives approximately 90 lpcd. 4.2 Sewerage The existing sewerage network serves just a small central area of the city, covering roughly 5 percent of the total area. Sewage is pumped to a treatment plant. An expanded sewerage network is planned under JNNURM, with the aim of 100 percent coverage. 4.3 Key issues in service provision Discussion with city officials and a review of available literature revealed the following constraints on service provision: There are no flow meters in the transmission system or tapping points, hence it is difficult to monitor production and consumption and deal systematically with unaccounted for water; Old and corroded transmission pipes result in distribution losses and heavy leakages; Low pressure in western Kochi has led to communities obtaining water through 'pit taps' with a supply duration of 30 minutes to one hour on alternate days; Groundwater sources within and around the city cannot be tapped due to salinity; and Deteriorating water quality in Vambanadu Lake due to the discharge of untreated domestic and industrial effluents. 4.4 Proposed improvements Initiatives planned under JNNURM include the following: 1. A new intake from the Muvattupuzha River at Pazhoor, about 20 km from the city, and a new treatment plant. The quantity drawn from Periyar River will also be increased; 2. Development of a SCADA system and re-zoning of the network, to reduce unaccounted for water and improve operational management; 3. Energy conservation measures through the repair and rehabilitation of electrical and mechanical equipment; 4. Removal of unnecessary standposts; and 5. Development of a city-wide sewerage network and decentralized sewage treatment based on zonal treatment plants. New building rules will make sewer connections mandatory. Kochi 9

10 Box 5.2: Urban development initiatives in Kochi 1. JNNURM Kochi is one of two cities in Kerala being assisted by JNNURM. The complete package of support addresses not only water supply and sewerage but also solid waste management, storm water drainage, traffic and transportation, poverty alleviation, social amenities, environmental improvements and tourism, amongst other things. 2. KSUDP This covers five Municipal Corporations in Kerala: Kochi, Kollam, Kozhikode, Thrissur and Thiruvananthapuram. The objectives are to improve the urban environment, economy and living conditions. Project support will cover urban infrastructure and services including water supply and sanitation, drainage, solid waste management, roads and transport as well as livelihoods initiatives and improvements in urban management, planning and financing. The Project is expected to be completed by the end of A common Project Implementation Unit is managing the implementation of both projects. 5 Water Supply and Sewerage Finances 5.1 Cost recovery: current performance KWA receives the bulk of its funds from user charges, grants and loans from the government of Kerala, grants from the Government of India (GoI) and loans from financial institutions including the Housing and Urban Development Corporation (HUDCO) and the Life Insurance Corporation of India (LIC). Revenue While KWA has shown an operating surplus since 2005, overall operations are making a loss (Table 5.2). Operating income has grown at a cumulative rate of 10 percent though income from water supply has grown at a rate of just 7 percent. The grant component of the operating income has increased at a rate of 14 percent, though the share of grants in the total revenue income has decreased to 39 percent. Capital income is entirely based on grants and loans. Amongst this, the planned loan component from the state government has increased by 167 percent while state grants have decreased. Expenditure Revenue expenditure has increased by 4 percent. Establishment expenditures have grown only slightly, O&M costs by 7 percent and power charges, which fluctuate, have decreased. The percentage of O&M expenditure to revenue expenditure has remained more or less stable at percent, while establishment costs have reduced from 64 to 56 percent from 2003 to Overall capital expenditure has grown by a massive 58 percent, including a growth of 248 percent in centrally-sponsored schemes. Loan repayments have grown by just 8 percent. Kochi 10

11 Table 5.2: Overall Accounts of Kerala Water Authority (in Rs million) Financial Year Revised Estimates Estimates REVENUE ACCOUNT Grant from government of Kerala % Grant from GoI for O&M of ARWSS % Total Government Grants % Income from water supply % Income from sewerage charges % Interest receipts % Other income % Income due to proposed tariff/nonplan grant 1050 Revenue from own source of KWA % Total Revenue Receipts % CAGR Salaries, establishment and other expenses % O&M charges % Power charges % Investments for provident fund/pension % Interest on loans from LIC/HUDCO/banks Interest % Total Revenue Expenditure % Surplus/Deficit against Own Source Income % Overall Operative Surplus/Deficit % CAPITAL ACCOUNT Grant from government of Kerala-Plan-KWA % Loan from government of Kerala- Plan % Centrally-sponsored ARWSS % 50% centrally-sponsored AUWSS % Centrally-sponsored-TM-RWSS Centrally-sponsored other schemes % Loan from LIC Loan from HUDCO Loan from bank/nabard % Debts, deposits and recoveries % Total Capital Receipts % State plan schemes % Centrally-sponsored schemes % Schemes outside state plan Share debit from salaries, establishment and other expenses 43% Debts deposits and recoveries % Repayment of loans from LIC/HUDCO/bank % Total Capital Expenditure % Total Income % Total Expenditure % Surplus/Deficit % Kochi 11

12 Financial status of Kochi Division operations The following analysis is based on data for Public Health Division Kochi in totality (Table 5.3). While accounts are maintained at the Divisional level, no financial planning or analysis is undertaken there since overall financial control rests with the Head Office. Operations in the Division have fluctuated between surplus and deficit over the review period. This is largely due to irregular disbursements from the Head Office. Income from water supply constitutes 93 percent of total revenue receipts, with the nondomestic category accounting for 46 percent, domestic 35 percent, and local body 11 percent. Total revenue receipts have grown at a cumulative rate of 3 percent, though the revenue under all consumer categories is miniscule in absolute terms since there is virtually no service charge. For sewerage, the nondomestic and industrial categories generated zero revenue and the domestic category generated just Rs. 30,000 in Table 5.3: Operating Account of Public Health Division Kochi (in Rs. million) Water Supply (Estimates) Share in Total Revenue Receipts Domestic % 1% Nondomestic % 13% Industrial % 23% Sewerage Services Domestic % 22% CAGR Nondomestic % -100% Industrial % From Local Body Water supply % -17% Sewerage system % Maintenance % Other income % -47% Deposits % -30% Interest income % 216% Total Revenue Receipts % Share in Total Revenue Expenditure O&M charges % -15% Power charges % -42% Establishment expenses % 4% Office expenses % 30% Travel/administration expenses % 4% Total Revenue Expenditure % Operative Surplus/Deficit % Revenue expenditure in the Division constitutes 3 percent of KWA s total revenue expenditure, since most costs (including O&M, salaries, power, etc.) are paid centrally by the KWA Head Office. Due to a financial crisis in KWA, power bills have not been paid for over a year. Kochi 12

13 Salaries and establishment costs constitute 85 percent of revenue expenditure in the Division, while O&M expenditure accounts for 11 percent. Overall the Divisional operations show an operating surplus of Rs million in but with nearly stagnant income and expenditure. Billing and collection Computerized bills are generated bimonthly for domestic consumers and monthly for nondomestic ones based on meter readings, though KWA officials estimate that one-third of the meters are not working. Bills are payable at four subdivisional offices. Table 5.4:: Demand Collection and Balance Statement for Public Health Division Kochi (in Rs. million) Year Arrears at the Current year Total Demand Recovery Any Rebate/discount Total Recovery Total Arrears Collection Efficiency beginning of the year Demand given at the end of year (2+3) 5.6 7(5-6) 8(4-7) 9 (7/4) % % % % (Apr to Oct) % Collection efficiency of the division has been decreasing in recent years and in stood at just 13 percent (Table 5.4). KWA has a penalty clause for nonpayment of water charges of Rs. 5 per month for domestic users and 2 percent of arrears monthly for nondomestic consumers. However, the current billing and collection software does not have the capacity for applying these penalties. Efforts are underway to resolve this. Sewerage charges No sewerage charge is applied in the small part of the city that has a network. A connection fee is theoretically applied for new connections, but very few premises pay it since it is easy to discharge wastewater into the many water bodies in and around the city. 5.2 Tariff Structure State policy stipulates that KWA should recover maintenance and debt service costs with a view to securing an economic return on its fixed assets. At present, a common tariff structure is applied throughout the state, based on volumetric slabs and metered connections. Tariffs are set by KWA with approval from the state government for any revisions. Tariffs and charges from 1991 onwards are provided in Table 5.5. The last revision of tariffs happened in 1999 and included a clause for an annual 15 percent increase in water charges with the concurrence of the state government. This permission has not been granted despite petitioning from KWA. Kochi 13

14 Table 5.5: Tariff Structure for Water Supply Category Domestic Nondomesti c Industrial Street Taps/Stand posts Monthly Consumption 0-10 kl " " Above 50 " 0-50 " Above 50 " For the monthly consumption Rate from Jan 1, 1991 to April 31, 1993 Rs.1/kl subject to mini. of Rs. 10/ month Rs.10 Rs.1.5/ kl for above 10 kl Rs. 40 Rs. 2/ kl for above 30 kl Rs. 80 Rs. 3 kl above 50 kl Rs.3/ kl mini. Rs. 25/ month + Rs. 1 as SC Rs Rs. 4/ kl for above 50 kl Rs.5/ kl subject to mini. of Rs. 100/ month Existing Water Supply-related Fees and Penalties Rate from June 1, 1993 to April 31,1994 Rs.1.5/ kl subject to mini. of Rs. 15/ month Rs.15 Rs.2/ kl for above 10 kl Rs. 55 Rs. 3/ kl for above 30 kl Rs.115 Rs. 4 kl for above 50 kl Rs.4/ kl mini. Rs. 50/ month + Rs. 2 as SC Rs Rs. 6/ kl for above 50 kl Rs.6/ kl subject to mini. of Rs. 100/ month Rate from June 1, 1994 to March 31, 1999 Rs.1.7/ kl subject to mini. of Rs. 17/ month +Rs.2 as MIC Rs.19 Rs.2.3/ kl for above 10 kl Rs. 65 Rs.3.45/ kl for above 30 kl Rs Rs kl above 50 kl Rs.4.60/ kl mini. of Rs. 60/ month +Rs. 2 as MIC Rs Rs kl above 50 kl Rs.6.90/ kl subject to mini. of Rs. 100/ month Rate from April 1,1999 Till Date Rs.2/ kl subject to mini. of Rs. 20 per month+rs.2 as MIC Rs.22 Rs.3 / kl for above 10 kl Rs.82 Rs. 5/ kl for above 30 kl Rs Rs / kl above 50 kl Rs.7.35/ kl mini.of Rs. 100 month +Rs. 2 as MIC Rs Rs / kl or above 50 kl Rs.10.60/ kl mini. Rs month +Rs. 2 as MIC Rs per tap per year in KMC area Cost of application form for new water connection 15 Domestic connection 500 Fee for Nondomestic connection 1000 Industrial connection 1000 Special casual connection 1000 Street main extension 500 Deposit for special casual connection Rs /m 2 Renewal charges for special casual connection Rs. 250/annum Inside installation 50 Inside extension 50 Alteration to house connection Cost of application 15 Alteration fee 100 Temp/permit disconnection Cost of application 15 Fee 50 Reconnection Cost of application 15 Fee 50 Disconnection and reconnection Cost of application 15 Fee 100 Reconnection for meter stolen cases Cost of application 15 Fee 50 Kochi 14

15 Table 5.5: Continued Change of ownership Fee 15 Category conversion Fee 5 Meter replacement 10 Duplicate meter reading card 10 Duplicate provisional invoice card 10 Meter hire (department meters) 10/ month Meter inspection charges 2 /month Meter testing fee 15 mm & 20 mm mm mm mm mm 50 Domestic 5 /month Fine for nonremittance of water charges Fine for non-replacement/ repair of nonworking water meter Nondomestic-2% of outstanding arrears on a monthly basis minimum Rs.10 Industrial - 2% of " " Rs.10 Casual - 2% of " " Rs.10 After one month of notice 25% of PIC After two months of notice 50% of PIC After four months of notice (till disconnection) 100% of PIC Fine for malpractice of the connection 50 to 500 Application fee for complaints 5 Fine for malpractice of the water supply connection by plumber 100 to 500 Sewerage rates are given in Table 5.6. Table 5.6: Fee for Sewer Connection and Related Services Application Fee Category Fee Residential houses, nondomestic and industrial (new) sewer connections Rs. 50 Residential flats, residential complexes like colonies (new) Rs. 200 For repairs, alterations, etc. Rs. 50 For category conversion Rs. 50 For disconnection/reconnection Rs. 50 Connection Fee and Security Deposit Category Connection Fee Security Deposit Domestic connection 10% of the estimate cost - minimum Rs. 500 Rs. 500 Nondomestic " 10% of the estimate cost - minimum Rs.1000 Rs Casual " 10% of the estimate cost - minimum Rs.1000 Rs Industrial " 10% of the estimate cost - minimum Rs.2500 Rs Fee for Repairs/Alterations/Disconnection/Reconnection Repairs/Alteration 10% of estimated cost - minimum of Rs.100/- Disconnection Rs. 200 in all cases Reconnection Rs.100 in all cases Change of Ownership Ownership change Rs. 100 " in case of legal heirs - domestic Rs. 50 " for residential complex / flat type Rs. 150 Kochi 15

16 5.3 Consumer Profile Kochi Division has 123,636 registered water connections against a population base of 650,000 (Table 5.7). Eighty-seven percent of consumers are domestic and there has been a moderate growth in new connections, while 5% 1% 0% nodomestic and industrial categories have 7% been stagnant (Figure 5.4). The majority of connections are household connections (87 percent), followed by nondomestic connections (7 percent), panchayats (5 percent), corporations (1 percent) and industrial (0 percent). The reason for industrial connections being so low is largely that many being counted under nondomestic connections also. Figure 4: Distribution of Water Connections over Consumer Categories (as of ) 8 7 % Domestic Non Domestic Industrial Panchayats Corporations Table 5.7: Number of Water Connections in Public Health Division Kochi Individual Connections (Dec) Domestic Nondomestic Industrial Sub Total Street Taps/Standposts Panchayats Corporations Sub Total Total Analysis 6.1 Cost recovery Water supply and sewerage services in Kochi appear to have an operating surplus, with almost stagnant revenue income and expenditure. However, proper analysis and management of cost recovery is very difficult when most operating costs are borne centrally. Finances need to be managed on a divisional basis if JNNURM objectives are to be met. One of the principal challenges for the Division is to reduce the high level of unaccounted for water arising from technical losses and free standpost supplies. This problem is coupled with low collection efficiency or capacity to increase service coverage. There is also substantial scope for revising the tariff structure. Nonrevenue water Roughly one-fifth of the total supply is lost in transmission and distribution due to old and corroding pipelines. This amounts to an annual revenue loss of Rs million based on the minimum tariff of Rs. 2 per kl kld x 0.20 = kld loss of water x 365 days = Annual water loss of kl x Rs. 2 = million. Kochi 16

17 There are more than 6,000 standposts in the city, operating for eight hours per day. KMC pays for this water, but at just Rs. 2,628 per tap per annum. Furthermore, the standposts are widely used by commercial operations, hence the loss in potential revenue is enormous. Collection efficiency The collection efficiency of Kochi Division was just 13 percent in If this was improved to 50 percent, it would generate an additional Rs. 169 million. Improvement to the international benchmark level of 90 percent total collection would generate Rs. 418 million compared to the current figure of Rs. 61 million. Coverage Based on a population of 650,000, the Division should have at least 130,000 2 household connections, when it currently has just under 108,000. Achieving the higher figure would yield an additional Rs. 13 million 3 per year based on current tariffs, or Rs. 23 million at the rate proposed below. Tariff structure The tariff has not been revised since 1999 and is too low to enable recovery of operational costs, which currently stand at Rs. 4.5 per kl excluding interest and depreciation. Furthermore, the tariff structure provides up to 30 kl per household (which is considerably more than subsistence consumption) at just Rs. 2-3 per kl. Taking interest and depreciation into account, the real production and maintenance cost is estimated at Rs. 8.5 per kl. Using a hypothetical flat rate of Rs. 4.5 per kl for domestic connections, and a consumption of 20 kl per month, the revenue potential from existing domestic connections would be Rs. 116 million per year against the current Rs. 64 million. In short, Kochi Division has the potential to improve revenue generation dramatically from current levels (Table 5.8). Table 5.8: Revenue Generation Potential from Multiple Reform Areas Reform Area Potential Revenue (Rs. million) Controlling distribution losses and leakages of 20% 21 Collection efficiency at 90% 357 ( at 13% collection efficiency) Increasing coverage by connections 23 Revising tariff structure for domestic connections to Rs 4.5/kl 52 (116-64) Total Economic efficiency Current tariff rates do not provide any incentive for users to moderate their consumption. Monthly domestic bills are just Rs. 52 for 20 kl consumption or Rs. 82 for 30 kl and easily affordable even for poor households. With one-third of domestic meters being faulty, economic management of the service is even more challenging. 6.3 Equity and protection of vulnerable sections Standposts were installed at KMC s request to serve slum dwellers, but coverage with metered connections is now so high that very few slum dwellers use them. Instead, the poor 2 Assuming a household size of five members, on a population base of 0.65 million. 3 This figure is calculated based on 20 kl consumption per household connection per month at existing tariff rates. Kochi 17

18 are expected to pay the same rate as other domestic consumers. This might be regarded as unfair were it not for the fact that tariff rates are extremely low. 6.4 Affordability The current rate of Rs. 2 per kl up to 10 kl and Rs. 3 per kl for kl consumption, plus a Rs. 2 per month service charge, amounts to a monthly domestic bill of Rs 52. for 20 kl consumption. This translates into 1.86 percent of the monthly budget for people on the poverty line (currently set at Rs. 559 per person per month), well below the WHO benchmark of 5 percent. 6.5 Resource conservation While a volumetric tariff is in place, tariff rates are so low that they do not provide an incentive to moderate consumption. Moreover, leakages and technical losses are extremely high. KWA has no legislative tools or incentive schemes for promoting water harvesting, bearing in mind the ecological sensitivity of the area. 6.6 Acceptability and practicality The volumetric tariff is practical and fair, enabling clarity and ease in the calculation of water charges. 7 Summary While operations in Kochi are nominally in surplus, service provision needs improvement as the per capita availability varies from 20 to 90 lpcd across the city. If KWA is able to implement the various improvements outlined here, the problems associated with NRW could be largely resolved, and safe management of excreta achieved for the first time. 7.1 Recommendations KWA should prioritize the following actions: Install flow meters at source to enable the management and monitoring of production and a reduction in unaccounted for water; Incentivize the maintenance of metered connections; Adopt collection targets and incentivize staff to meet them. Private sector participation in billing and collection could also be useful; Introduce stricter penalties for nonpayment of charges; Develop user-friendly systems, including adequate and conveniently sited payment points and online payment options; Promote water harvesting through legislative reforms, incentive schemes and awareness generation; and Adopt interim measures to control the discharge of untreated wastewater, pending the development of city-wide sewerage which will take years to complete. A sewage treatment plant could be constructed on the main canal to protect Vambanadu Lake. In addition, tariff reform is essential, though this is a politically sensitive issue and any price rise may meet with stiff resistance from the public and civil society organizations. In revising the tariff, the first priority should be to ensure that the poor can afford at least a minimum level of service, using carefully targeted subsidies if absolutely necessary. Kochi 18

19 This could be done by providing free house connections in line with the JNNURM mandate, and introducing an increasing block tariff while retaining the first, lifeline block at the current rate of Rs. 2 per kl, up to a maximum of 10 kl consumption per month. Amongst the existing consumer base, 20 percent are in the 0-10 kl water consumption category and 40 percent per cent in the 0-30 kl category, while the rest are bulk nondomestic consumers (Table 5.9). It should therefore be possible to introduce an additional kl to promote Table 5.9: Percentage of Consumers in each Volumetric Slab Up to 10 kl 20% Up to 30 kl 40% More than 30 kl 20% (commercial) More than 50 kl 20% (industrial) economic efficiency. This slab could be priced at the operational cost of Rs. 4.5 per kl. For consumption beyond 20 kl, prices should be set at a level where they act as a deterrent for wastage and over-consumption. A price of Rs. 8.5 per kl would recover interest and depreciation costs. For commercial and industrial users consuming beyond 30 kl per month, a reduction in the current rate to Rs. 10 per kl is proposed, for reasons of fairness and to help promote capital investment and economic growth. Kochi 19

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Pune Case Study

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Pune Case Study Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Cost Recovery and Tariff Practices for UWSS Sector in India Interim Report on Cost Recovery

More information

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Chandigarh Case Study

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Chandigarh Case Study Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Cost Recovery and Tariff Practices for UWSS Sector in India Interim Report on Cost Recovery

More information

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product

More information

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 BEFORE: Graham Lane, CA, Chairman Susan Proven, P.H.Ec., Member MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES Page

More information

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Volume II. Detailed Case Study Report

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Volume II. Detailed Case Study Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Cost Recovery and Tariff Practices for UWSS Sector in India Interim Report on Cost Recovery

More information

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Volume I. Guidelines. Comparative Analysis Report

Interim Report. Cost Recovery and Tariff Practices for Urban Water Supply and Sanitation in India. Volume I. Guidelines. Comparative Analysis Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Cost Recovery and Tariff Practices for UWSS Sector in India Interim Report on Cost Recovery

More information

HPEC (Ahluwalia) Report 2011

HPEC (Ahluwalia) Report 2011 HPEC (Ahluwalia) Report 2011 Highlights and Recommendations October 11, 2012 Goa First Regional Knowledge Dissemination Workshop Bhopal, Madhya Pradesh Urban Share of Total Population in 2011 (per cent)

More information

DFID. Sustainable Community Management of a Multi-village Water Supply Scheme in Kolhapur, Maharashtra, India. SPI Series:2.

DFID. Sustainable Community Management of a Multi-village Water Supply Scheme in Kolhapur, Maharashtra, India. SPI Series:2. Field Note Water and Sanitation Program An international partnership to help the poor gain sustained access to improved water supply and sanitation services Sustainable Community Management of a Multi-village

More information

ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA

ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA A Institutional Implement 74 th Constitutional Within six months of 1 st tranche approval develop and submit a plan

More information

TOWNSHIP OF WEST LINCOLN

TOWNSHIP OF WEST LINCOLN TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965

More information

Pricing and cost recovery of urban services: issues in the context of decentralized urban governance in India

Pricing and cost recovery of urban services: issues in the context of decentralized urban governance in India Pricing and cost recovery of urban services: issues in the context of decentralized urban governance in India Soumen Bagchi Senior Analyst, ICRA Advisory Services, 4th Floor, Kailash Building 26 KG Marg,

More information

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS FINAL RATE SUPPORTED BUDGET TABLE OF CONTENTS Final Operating Budget WATER & WASTEWATER SUMMARY PSAB Format... 1 WATER & WASTEWATER SUMMARY... 2 Water & Wastewater Administration Summary... 3 Water Operations

More information

NWC Tariff Submission for the Period January 2019 to December Submission to the Office of Utilities Regulation (OUR)

NWC Tariff Submission for the Period January 2019 to December Submission to the Office of Utilities Regulation (OUR) NWC Tariff Submission for the Period January 2019 to December 2021 Submission to the Office of Utilities Regulation (OUR) October 2018 Table of Contents 1 Executive Summary 1 1.1 Build-Up of the Revenue

More information

1. Risk of regularizing illegal connections

1. Risk of regularizing illegal connections 1. Risk of regularizing illegal connections Background: This is an example of a contract provision for mitigating the risk of converting illegal connections to legal connections in a 300,000 population

More information

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond

More information

As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013

As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Paper title: OUTCOMES FROM A SEWER MAINTENANCE BACKLOG INVESTIGATION As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Morné Pienaar a a Aurecon Port Elizabeth,

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY

FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY Ulaanbaatar Urban Services and Ger Areas Development Investment Program (RRP MON 45007) FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY A. BACKGROUND 1. The Water Supply

More information

Environmental Improvement Fund

Environmental Improvement Fund Informational Paper 64 Environmental Improvement Fund Wisconsin Legislative Fiscal Bureau January, 2009 Environmental Improvement Fund Prepared by Kendra Bonderud Wisconsin Legislative Fiscal Bureau One

More information

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES April 2005 Introduction This document has been published by the Project Preparation Committee (PPC) within the framework of the DABLAS Task Force

More information

Office of Utilities Regulation REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION ( )

Office of Utilities Regulation REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION ( ) REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION (2008-2013) REGULATORY FRAMEWORK FOR NATIONAL WATER COMMISSION (2008-2013) Introduction - Legal Authority Pursuant to Section 4(1) (a) of the OUR

More information

Nith Peninsula, Brant County Fiscal Impact Study

Nith Peninsula, Brant County Fiscal Impact Study Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com

More information

M A N I T O B A ) Order No. 7/16 ) THE PUBLIC UTILITIES BOARD ACT ) January 14, 2016

M A N I T O B A ) Order No. 7/16 ) THE PUBLIC UTILITIES BOARD ACT ) January 14, 2016 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Susan Proven, P.H.Ec., Acting Chair The Hon. Anita Neville, P.C., B.A. (Hons.), Member TOWN OF LAC DU BONNET WATER and WASTEWATER UTILITY FINAL

More information

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate 2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November

More information

P Performance Benchmarking of Urban Water

P Performance Benchmarking of Urban Water Performance Benchmarking of Urban Water Supply and Sanitation in Gujarat: Data Book (2008 09) Part II: City Profiles (M Municipal Corporations) CEPT University April 2011 Performance Benchmarking of Urban

More information

Restructuring of Government Departments-Karnataka Experience

Restructuring of Government Departments-Karnataka Experience Restructuring of Government Departments-Karnataka Experience T V Ramanayya, V.Nagadevara & Shyamal Roy Indian Institute of Management Bangalore Abstract Public expenditure in India has played a key role

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

Models of Successful Water Sector Reform: Identifying the Building Blocks

Models of Successful Water Sector Reform: Identifying the Building Blocks Models of Successful Water Sector Reform: Identifying the Building Blocks Dr. Allen Eisendrath Senior Infrastructure Finance Specialist Office of Infrastructure & Engineering, USAID/Washington 1 Cost Recovery

More information

MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING

MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING INFRA GUIDANCE NOTES THE WORLD BANK, WASHINGTON, DC May 2009 IN-1 MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING

More information

Mbombela Water Indaba : April 2012

Mbombela Water Indaba : April 2012 Background South Africa is a dry country, with a low average rainfall. Our rivers are small in comparison with other countries and shared with other countries. Presented by: Willem Wegelin Many of our

More information

Date of Approval by GoI. Project Component Housing Municipality

Date of Approval by GoI. Project Component Housing Municipality S. No ANNEXURE I : PROJECT INFORMATION (FINANCIAL) State /UT Code 19 State/UT Name West Bengal SLNA KMDA City Implementing Agency Code Title Bank Account No. Component Date of Approval by GoI Cost (Rs.

More information

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006

More information

FINANCIAL ANALYSIS. 1. Introduction and Methodology

FINANCIAL ANALYSIS. 1. Introduction and Methodology Third Urban Governance and Infrastructure Improvement (Sector) Project (RRP BAN 39295) 1. Introduction and Methodology FINANCIAL ANALYSIS 1. The project finances basic urban services improvements and aims

More information

IMPROVING THE COST RECOVERY OF WATER SUPPLY IN PATAN MUNICIPALITY, GUJARAT

IMPROVING THE COST RECOVERY OF WATER SUPPLY IN PATAN MUNICIPALITY, GUJARAT IMPROVING THE COST RECOVERY OF WATER SUPPLY IN PATAN MUNICIPALITY, GUJARAT Performance Assessment System Prepared by: Urban Management Centre, Ahmedabad The Urban Management Centre (UMC) is a not-for-profit

More information

Statement of Revenue Policy

Statement of Revenue Policy Gwydir Shire Council Statement of Revenue Policy 2014-15 To be the recognised leader in Local Government through continuous learning and sustainability TRIM Reference: S3362 Version:1 Adopted 11 February

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

FINAL 2018 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS

FINAL 2018 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS FINAL RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS Section 1 Final Rate Supported Operating Budget Water & Wastewater Summary PSAB Format...1 Water & Wastewater Summary...2 Water & Wastewater Administration...3

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

M A N I T O B A ) Order No. 136/11 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2011

M A N I T O B A ) Order No. 136/11 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2011 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA, Member Susan Proven, P.H.Ec., Member THE TOWN OF GILBERT PLAINS WATER AND SEWER RATES FINAL

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment

More information

uthungulu District Municipality

uthungulu District Municipality The Municipality Tariff Policy TABLE OF CONTENTS 1. Definitions 2. Preamble 3. General Introduction and Objective 4. Principles 5. Classification and pricing strategies of services 6. Calculation of Tariffs

More information

FINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE

FINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE UCS2018-0223 ATTACHMENT 1 FINANCIAL PLAN 2019-2022 WATER AND WASTEWATER LINES OF SERVICE 2018 MARCH 14 MAKING LIFE BETTER EVERY DAY UCS2018-0223 Financial Plan 2019-2022 - Water and Wastewater Lines of

More information

A FINANCIAL TURNAROUND STRATEGY FOR PUBLIC WATER AND SANITATION UTILITIES N A Macleod

A FINANCIAL TURNAROUND STRATEGY FOR PUBLIC WATER AND SANITATION UTILITIES N A Macleod A FINANCIAL TURNAROUND STRATEGY FOR PUBLIC WATER AND SANITATION UTILITIES N A Macleod 14.03.2016 Introduction Achieving financial sustainability cannot be achieved unless the customers of the utility are

More information

M A N I T O B A ) Order No. 151/08 ) THE PUBLIC UTILITIES BOARD ACT ) November 7, 2008 WATER AND/OR SEWER UTILITIES FINANCIAL REPORTING REQUIREMENTS

M A N I T O B A ) Order No. 151/08 ) THE PUBLIC UTILITIES BOARD ACT ) November 7, 2008 WATER AND/OR SEWER UTILITIES FINANCIAL REPORTING REQUIREMENTS M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) November 7, 2008 BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA, Member Susan Proven, P.H.Ec., Member WATER AND/OR SEWER UTILITIES FINANCIAL

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY T a p p i n g F e e C a l c u l a t i o n A p r i l 2 0 1 8 5 1 7 3 C A M P B E L L S R U N R O A D P I T T S B U R G H, P A 1 5 2 0 5-9 7 3 3 Table of Contents

More information

developers services charges scheme

developers services charges scheme developers services charges scheme 2017-2018 Wessex Water developers charges scheme 2017-2018 Index to scheme Section Page(s) 1 Charging policy 2-3 2 Water connection charges 4 3 Self lay charges 4 4

More information

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited Kathmandu Valley Wastewater Management Project (RRP NEP 43524) FINANCIAL ANALYSIS A. Kathmandu Upatyaka Khanepani Limited 1. Kathmandu Upatyaka Khanepani Limited (KUKL) is a public company registered under

More information

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES BEFORE: Irene A. Hamilton, Panel Chair Michael Watson, Member Room 400 330 Portage Avenue Winnipeg, MB R3C 0C4 www.pubmanitoba.ca

More information

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT

More information

1. Schedule of Commodity Rates & February 1, 2019 Quarterly Service Charge

1. Schedule of Commodity Rates & February 1, 2019 Quarterly Service Charge MUNICIPALITY OF BOISSEVAIN-MORTON BOISSEVAIN UTILITY WATER & SEWER UTILITY RATES BY-LAW# 2018-05 SCHEDULE A SCHEDULE OF QUARTERLY RATES 1. Schedule of Commodity Rates & February 1, 2019 $13.40 $3.52 $16.92

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

BEFORE: Susan Proven, P.H.Ec., Acting Chair Monica Girouard, CGA, Member

BEFORE: Susan Proven, P.H.Ec., Acting Chair Monica Girouard, CGA, Member M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) May 10, 2012 BEFORE: Susan Proven, P.H.Ec., Acting Chair Monica Girouard, CGA, Member RURAL MUNICIPALITY OF ALEXANDER GREAT FALLS WATER AND SEWER UTILITY

More information

Introduction. to restructure procedures and practices in a manner most appropriate for sustained NRW Control. ABSTRACT

Introduction. to restructure procedures and practices in a manner most appropriate for sustained NRW Control. ABSTRACT Efficient 2011 Challenges and Lessons Learnt from a major Performance Based Contract for Non Revenue Water Reduction - North-Western region - JAMAICA (2005-2010) Fabrice Lupo, Antoine Erout fabrice.lupo@vinci-construction.com

More information

India's urban awakening: Building inclusive cities, sustaining economic growth

India's urban awakening: Building inclusive cities, sustaining economic growth India's urban awakening: Building inclusive cities, sustaining economic growth July 2012 Worldwide, urban populations are growing 20x faster; 57% of world s population will be in urban areas by 2025 Forecast

More information

Thames Water Wholesale Tariff Document Version 1.4 Copyright Thames Water Utilities Ltd

Thames Water Wholesale Tariff Document Version 1.4 Copyright Thames Water Utilities Ltd Thames Water Wholesale Tariff Document Copyright Thames Water Utilities Ltd 2017 1 Legal foreword This version of the Wholesale Tariff Document dated 20 October 2017 was published by Thames Water Utilities

More information

2017 ENTERPRISE ASSET MANAGEMENT PLAN

2017 ENTERPRISE ASSET MANAGEMENT PLAN Corporate Asset Management 2017 ENTERPRISE ASSET MANAGEMENT PLAN Investments in Peel s Infrastructure We are all asset managers! Executive Summary The Region s infrastructure is a public investment with

More information

RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO

RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO. 99/17 DEFICIT RECOVERY FOR 2013, 2014 & 2015 ACTUAL

More information

FISCAL STRATEGY PAPER

FISCAL STRATEGY PAPER REPUBLIC OF KENYA MACHAKOS COUNTY GOVERNMENT THE COUNTY TREASURY MEDIUM TERM FISCAL STRATEGY PAPER ACHIEVING EQUITABLE SOCIAL AND ECONOMIC DEVELOPMENT IN MACHAKOS COUNTY FEBRUARY2014 Foreword This Fiscal

More information

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. Puc "Commission" means the New Hampshire public utilities commission.

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. Puc Commission means the New Hampshire public utilities commission. CHAPTER Puc 700 RULES FOR SEWER UTILITIES REVISION NOTE: Document #6475, effective 3-25-97, made extensive changes to the wording and numbering of rules in Chapter Puc 700. Document #6475 supersedes all

More information

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy Cost Recovery Policy Revised January 2016 VISION Through the unified and committed efforts of each and every employee, Mount Pleasant Waterworks will be a leader in our industry and community. MISSION

More information

INNOVATIVE SANITATION FINANCING

INNOVATIVE SANITATION FINANCING Workshop: Implementing the SDGs in the Post-2015 Development Agenda INNOVATIVE SANITATION FINANCING TO MAKE INDIAN CITIES OPEN DEFECATION FREE 23 RD AUGUST 2015 STOCKHOLM WORLD WATER WEEK CEPT University,

More information

WELCOME TO ST. LUCIE WEST SERVICES DISTRICT

WELCOME TO ST. LUCIE WEST SERVICES DISTRICT WELCOME TO ST. LUCIE WEST SERVICES DISTRICT CONSERVING OUR RESOURCES OFFICE LOCATION 450 SW UTILITY DRIVE PORT ST. LUCIE, FL 34986 TEL: (772)340-0220 FAX: (772)871-5771 www.slwsd.org St. Lucie West Services

More information

ADB RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS. Local Government Unit Support Credit Program (LGUSCP)

ADB RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS. Local Government Unit Support Credit Program (LGUSCP) RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS Local Government Unit Support Credit Program (LGUSCP) Water District Development Project (WDDP) ADB Mindanao Basic Urban Services Sector (MBUSS) PROGRAM

More information

NEW CONNECTIONS CHARGING

NEW CONNECTIONS CHARGING NEW CONNECTIONS CHARGING Our consultation update December 2017 Table of Contents Introduction 1 Background 2 Our approach to developing charges 3 Customer engagement & feedback 3 Site specific infrastructure

More information

Environmental Risk in Insurance Practice

Environmental Risk in Insurance Practice Environmental Risk in Insurance Practice UNEP Finance Initiative May 28, 2010 / Athens Christos Chassiotis Key Analysis Environmental Risk vs Pollution Risk Environmental Liability vs Civil Liability Traditional

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 BEFORE: Susan Proven, P.H.Ec, Acting Chair Monica Girouard, CGA, Member Raymond Lafond, CA, Member RURAL MUNICIPALITY OF DE SALABERRY ST.

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london. 6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER

More information

Operation and Maintenance Expenditure and Cost Recovery

Operation and Maintenance Expenditure and Cost Recovery Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Policy Paper extracted from the World Bank Study on Review of Effectiveness

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

The impact of the Challenging Economic Times on Local Governments: Strategies for coping with the economic crisis (Reflections from India)

The impact of the Challenging Economic Times on Local Governments: Strategies for coping with the economic crisis (Reflections from India) The impact of the Challenging Economic Times on Local Governments: Strategies for coping with the economic crisis (Reflections from India) Dr Rajiv Sharma Director General Centre for Good Governance Road

More information

XXXXX TOWN WATER SUPPLY XXXXX TOWN WATER SUPPLY SYSTEM AND SEWERAGE AUTHORITY MANAGEMENT CONTRACT FOR. Date:

XXXXX TOWN WATER SUPPLY XXXXX TOWN WATER SUPPLY SYSTEM AND SEWERAGE AUTHORITY MANAGEMENT CONTRACT FOR. Date: REPUBLIC OF UGANDA XXXXX TOWN WATER SUPPLY AND SEWERAGE AUTHORITY MANAGEMENT CONTRACT FOR XXXXX TOWN WATER SUPPLY SYSTEM Date:------------------------------ This MANAGEMENT CONTRACT is made this day of..,

More information

STRATHCONA COUNTY CONSOLIDATED FINANCIAL STATEMENTS. Year ended December 31, 2017

STRATHCONA COUNTY CONSOLIDATED FINANCIAL STATEMENTS. Year ended December 31, 2017 CONSOLIDATED FINANCIAL STATEMENTS Year ended December 31, 2017 Consolidated Financial Statements Year ended December 31, 2017 Index Management Report... 1 Independent Auditors Report... 2 Consolidated

More information

LIBERTY UTILITIES (ENTRADA DEL ORO SEWER) CORP.

LIBERTY UTILITIES (ENTRADA DEL ORO SEWER) CORP. DOCKET NO. SW-04316A-16-0078, et al. Sheet No. i 1 TABLE OF CONTENTS Pan One Statement of No. l 1. Rates 11. Taxes and Assessments...Sheet No. 2 111. Additional Charges No. 3. n. Permitted Sheet No. 4

More information

Charging arrangements for new connection services. Our latest proposals. December 2017.

Charging arrangements for new connection services. Our latest proposals. December 2017. Charging arrangements for new connection services. Our latest proposals. December 2017. 1 April 2018 to 31 March 2019 1 Index. Charging arrangements 1. Introduction... 2. You have a choice... Water charging

More information

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE RESOLUTION 30-17 CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE A RESOLUTION establishing and directing the levy, charge and collection of connection charges,

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

Water Supply Customer Contract Terms & Conditions. Table of Contents

Water Supply Customer Contract Terms & Conditions. Table of Contents Water Supply Customer Contract Terms & Conditions Table of Contents 1. What is a customer contract and who is covered by it? 1.1 What is a customer contract? 1.2 Customer categories covered by the contract?

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.

More information

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64 s schemes Page 1 of 64 United Utilities Water Limited has published four charges schemes for 2019/2020 charging year. They include the charges to be paid for services provided by us in the course of carrying

More information

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations Town of Boones Mill Water and Sewer Ordinance Rules and Regulations SUPERVISION The Town of Boones Mill (Town) Water and Sewer Department shall be under the supervision of the Town Manager, who shall exercise

More information

Village of Baltimore Water & Wastewater Analysis. July 2018

Village of Baltimore Water & Wastewater Analysis. July 2018 Village of Baltimore Water & Wastewater Analysis July 2018 Table of Contents Introductory Summary... 1 Data... 1 Water Treatment Plant (WTP)... 1 Production... 2 Costs & Debts... 2 Wastewater Treatment

More information

Elk Point / St. Paul Regional Water System Business Plan

Elk Point / St. Paul Regional Water System Business Plan Elk Point / St. Paul Regional Water System Business Plan Draft 5.0 August 5, 2011 With Revisions to Adjust timing of the Development of the System Presented to Member Municipalities for Approval Member

More information

CHECKLIST OF REFORM E-GOVERNANCE

CHECKLIST OF REFORM E-GOVERNANCE CHECKLIST OF REFORM E-GOVERNANCE Objective: Scheme of Urban infrastructure Development in Satellite Towns around Seven Megacities, requires certain reforms to be undertaken by Towns/Cities in E-Governance.

More information

ASIAN DEVELOPMENT BANK PPA: PRC 25013

ASIAN DEVELOPMENT BANK PPA: PRC 25013 ASIAN DEVELOPMENT BANK PPA: PRC 25013 PROJECT PERFORMANCE AUDIT REPORT ON THE DALIAN WATER SUPPLY PROJECT (Loan 1313-PRC) IN THE PEOPLE S REPUBLIC OF CHINA November 2003 At Appraisal (May 1994) CURRENCY

More information

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT PERFORMANCE NING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT Contents 2 1. Approach to Performance improvement planning model 2. Data Entry and Forecasts 3. Module I: Performance Assessment 4. Module II:

More information

pts empy Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY Public Disclosure Authorized STAFF APPRAISAL REPORT

pts empy Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY Public Disclosure Authorized STAFF APPRAISAL REPORT Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY pts empy Report No. 1882b-IN Public Disclosure Authorized Public Disclosure Authorized STAFF APPRAISAL REPORT INDIA PUNJAB

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK PCR: THA 27262 PROJECT COMPLETION REPORT ON THE CHONBURI WATER SUPPLY PROJECT (Loan 1326-THA) IN THAILAND March 2002 CURRENCY EQUIVALENTS Currency Unit Baht (B) At Appraisal (August

More information

CITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges

CITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges CITY OF TITUSVILLE ORDINANCE Sec. 21-241. Schedule of water and sewer charges (1) No free service. No water or sewer service shall be furnished free of charge to any person whatsoever, and the city and

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

Village of Oak Park, IL Department of Finance. Quarterly Finance and Performance Report 2016, 1st Quarter

Village of Oak Park, IL Department of Finance. Quarterly Finance and Performance Report 2016, 1st Quarter Village of Oak Park, IL Department of Finance Quarterly Finance and Performance Report 2016, 1st Quarter May, 2016 Table of Contents Section 1: Introduction... 3 Section 2: 1 st Quarter Financial Report

More information

Wholesale Service Standards Non-Household

Wholesale Service Standards Non-Household Wholesale Service Standards Non-Household 2017-18 WHOLESALE SERVICE GUARANTEE SCHEME 2017/18 1. COMMENCEMENT 1.1 This scheme comes into force on the 1 April 2017 and is South West Water Limited s guarantee

More information

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018 Aquasol Pty Ltd (Operating) Licence Operational Audit and Asset Management System Effectiveness Review Report 18 September 2018 Perth Melbourne Sydney September 2018 Final Version Liability limited by

More information

Toward Financially Sustainable Drinking- Water and Wastewater Systems

Toward Financially Sustainable Drinking- Water and Wastewater Systems Toward Financially Sustainable Drinking- Water and Wastewater Systems August 2007 Toward Financially Sustainable Drinking- Water and Wastewater Systems Ministry of the Environment August 2007 Table of

More information