1 Floating Solar Panel Project Council and District Presentation August 2,

2 Recap: Presentation to Council and District on December 7, 2016 Staff presented results of RFP process to select a PV vendor to install a floating solar system Council approved staff s recommendation to pursue Power Purchase Agreement (PPA) negotiations with Ciel et Terre 2

3 Background 2015 Greenhouse Gas Action Update o Gilleran Energy Management o Water Reclamation Facilities: 45% of Town municipal greenhouse gas emissions Climate Action 2020: Reduce GHG by 25% by 2020 Governor Brown s proposal: Reduce GHG by additional 40% by

4 Floating Solar Array Opportunity Place floating solar panels on a portion of Pond 7, the Town s largest reclaimed water pond. Pond surface can be used to provide clean energy for the Geysers Pump Station, Corporation Yard, & Wastewater Facility (WRF) Preserve undeveloped areas in the Corporation Yard for future beneficial use 4

5 Close-up of Ciel & Terre Hydrelio Solar Floats 5

6 PPA Advantages Town will pay no capital cost Solar Array optimally-sized for energy demands of the treatment plant, Corporation Yard, and Geyser s Pump Station Town will not own nor have any responsibility to maintain system Solar energy purchased at a lower rate than current costs Town and District will retain all environmental credits 6

7 Three Agreements Power Purchase Agreement (PPA) Town and Water District Lease Agreement Water District Option to Lease Agreement (OLA) Water District 7

8 25-year Term PPA Starting price of 10.5 cents/kwh with 2% annual increase PG&E/SCP cost would be 13.4 cents/kwh Utility Costs historically increase 4% per year Projected Year 1 savings of $87,000 in energy costs Net Present Value of ~ $4.0 M savings over 25 years Pricing based on Aggregated Net Metering Includes prevailing wages for both construction and maintenance of the solar array Approximately 1.7 MW DC solar array 5,046 panels Approximately 4.11 acres on pond Covers ~ 22% of pond surface 8

9 PPA 9

10 Lease Agreement Provides Ciel et Terre legal access to pond surface, including easements for access, equipment, etc. Rental rate based on 2013 SCWA Memorandum $800 per acre per year = estimated $3,520 per year. Contains language for logistics, O&M, & safety Commits Ciel et Terre to standard Town construction and building department protocols, and insurance requirements Contains provisions for mosquito abatement Contains provisions for moving/removing/replacing the solar array if ever needed 10

11 PPA and Lease The PPA and Lease exist together One does not exist without the other 11

12 Option to Lease Agreement Temporary document Gives Ciel et Terre exclusive option to initiate PPA and Lease when ready During the OLA Period Ciel et Terre will Complete a PG&E interconnection application and begin final design of the system Complete Engineering investigations Perform CEQA documentation Develop Mosquito Abatement Plan OLA Period is expected to last 15 months with certain allowances for exceptions 12

13 Option to Lease Agreement By signing the OLA, Ciel et Terre is provided assurances that during the option period: Town and District will not enter into an agreement with another floating solar panel provider on Pond 7 District will not lease Pond 7 area to another entity 13

14 Option to Lease Agreement Ciel et Terre may opt out of the PPA and lease during the OLA period Town/District may opt out at a cost of $20,000 intended to partially repay Ciel et Terre for lost engineering costs. Once Ciel et Terre s exercises the option, the OLA is terminated and the PPA and Lease terms begin. All three agreements will be signed at the same time but the PPA and Lease will have no effect until the option is exercised 14

15 Special Provisions of Agreements Anticipated Shutdowns Unplanned Shutdowns Mosquito Abatement Plan Pond Operation and Maintenance by Town 15

16 PPA System Shutdown by Town Up to 48 hours per year of normal downtime no charge If Town requests a shutdown for reasons within its control : Three months or less» Town pays Ciel et Terre for lost energy and associated profit according to the PPA rates Between three and six months» Town pays no reimbursement to Ciel et Terre; however, the PPA term will be extended for a period to allow Ciel et Terre to recover revenues lost during the down time Greater than six months» Town will make monthly payments to Ciel et Terre in amounts equal to the average of previous years payments for the period in question. PPA term will be extended and the Town will be credited for future electricity. 16

17 System Shutdown - Unplanned If the solar system is shut down for reasons outside of the Town s control, such as regulatory requirements and orders: No reimbursement to Ciel et Terre The term of the PPA will be extended for a period to allow Ciel et Terre to recover revenues lost during the down time. 17

18 PPA System Shutdown If the solar system is shut down for reasons outside of the Town s control, such as regulatory requirements or orders: No reimbursement to Ciel et Terre The term of the PPA will be extended for a period to allow Ciel et Terre to recover revenues lost during the down time 18

19 Mosquito Abatement Discussions with MSMVCD regarding floating solar project 19

20 Lease Agreement Move/relocate Solar Array If solar array has to be temporarily moved from one side of the pond to the other Or, if the solar array has to be removed completely and then reestablished Work will be performed by Ciel et Terre on a time-andmaterials-basis, separate from the PPA payments. Year Zero estimated costs: Move array: $141,795 Remove/replace the array: $393,282 Net Present Value savings realized by the of project with one remove/replace in ten years = $3.64 M Ciel et Terre and Town will collaborate to avoid the full costs of a remove/replace, and keep the array on during any periods of construction. 20

21 Recommendation Authorize the Town Manager/General Manager approve and sign PPA, Lease Agreement, and OLA Begin the OLA Period for Ciel et Terre to begin the PG&E interconnection application and engineering design 21

22 22 Questions

23 23

24 24

25 Close-up of Solar Floats 25

26 MSMVCD is: Lease Agreement Mosquito Abatement Collaborating with Town and Ciel et Terre Expressed reasonable confidence in the mosquito abatement plans for the floating solar array Ciel et Terre will construct the solar array with features to abate mosquito larvae growth, including insecticide injection points. Town will continue to pay for insecticides used Town and MSMVCD will continue to abate mosquito larvae growth outside of the solar array footprint. 26

27 Energy and Financial Assumptions 2.0% Inflation Rate 3.0% Discount Rate 4.0% Energy Escalation 0.5% Output Degradation 25 Year System Life 27

Solutions for Financing Local Government PV Projects September Nick Hylla, Executive Director Midwest Renewable Energy Association

Solutions for Financing Local Government PV Projects September Nick Hylla, Executive Director Midwest Renewable Energy Association Solutions for Financing Local Government PV Projects September 2017 Nick Hylla, Executive Director Midwest Renewable Energy Association MREA Overview Founded in 1990 501c3 non-profit RE education and demonstration

More information

RFP17-03 ADDENDUM NO. 1 EL DORADO IRRIGATION DISTRICT SOLAR ASSESSMENT AND DESIGN PROJECT NO AUGUST 10, 2017

RFP17-03 ADDENDUM NO. 1 EL DORADO IRRIGATION DISTRICT SOLAR ASSESSMENT AND DESIGN PROJECT NO AUGUST 10, 2017 RFP17-03 ADDENDUM NO. 1 EL DORADO IRRIGATION DISTRICT SOLAR ASSESSMENT AND DESIGN PROJECT NO. 16030.01 AUGUST 10, 2017 To: All Potential Proposers THIS IS AN ADDENDUM TO WHICH SPECIAL ATTENTION SHOULD

More information

2015S Utah Solar Request for Proposals Bidders Workshop North Temple Office, Room 130K Salt Lake City UT 84116

2015S Utah Solar Request for Proposals Bidders Workshop North Temple Office, Room 130K Salt Lake City UT 84116 2015S Utah Solar Request for Proposals Bidders Workshop North Temple Office, Room 130K Salt Lake City UT 84116 June 3, 2015 3:00PM to 5:00PM Mountain Logistics June 3, 2015 3:00 PM - 5:00 PM (Mountain)

More information

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION Portland General Electric Company Sheet No. 201-1 PURPOSE SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION To provide information about Standard Avoided Costs and

More information

Potential Risk Factors in City of Logansport Power Plant Project And Risk Mitigation Approach

Potential Risk Factors in City of Logansport Power Plant Project And Risk Mitigation Approach Potential Risk Factor and City s Risk Mitigation Approach Document Reference Quantification 1 Developer 2 Fails to Obtain Firm Financing Commitment by Date to be Negotiated Authorizing Resolutions and

More information

Solar Renewable Energy Credit Aggregation Customer Information

Solar Renewable Energy Credit Aggregation Customer Information Solar Renewable Energy Credit Aggregation Customer Information Thank you for choosing Hampshire Council of Governments as your Solar Renewable Energy Credit (SREC) Aggregator! We are excited to be working

More information

CITY OF SIMI VALLEY MEMORANDUM

CITY OF SIMI VALLEY MEMORANDUM CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (7) May 16, 2016 TO: FROM: City Council Office of the City Manager SUBJECT: ADOPTION OF RESOLUTIONS OF INTENTION TO ISSUE TAX EXEMPT OBLIGATIONS IN

More information

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS The following is a summary of the key terms and conditions of the proposed standard form electricity purchase agreement ( EPA ) for

More information

Stifel 2017 Industrials Conference

Stifel 2017 Industrials Conference Stifel 2017 Industrials Conference NYSE: CVA JUNE 2017 Cautionary Statements All information included in this earnings presentation is based on continuing operations, unless otherwise noted. Forward-Looking

More information

UK Solar Investment. 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible.

UK Solar Investment. 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible. UK Solar Investment 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible. Sovereign backed income. All investments presently generating projected real

More information

Power Contracts in Florida. Eduardo Balbis, P.E. Commissioner Florida Public Service Commission

Power Contracts in Florida. Eduardo Balbis, P.E. Commissioner Florida Public Service Commission Power Contracts in Florida Interconnection Rules, Policies and their Impact on Electricity Pricing Eduardo Balbis, P.E. Commissioner Florida Public Service Commission USAID/ARE/ECREEE/ERERA/NARUC Integrating

More information

PacifiCorp. Request for Proposal. Solar Resources (RFP 2015S) ISSUED: May 27, DUE DATE: July 20, 2015

PacifiCorp. Request for Proposal. Solar Resources (RFP 2015S) ISSUED: May 27, DUE DATE: July 20, 2015 PacifiCorp Request for Proposal Solar Resources (RFP 2015S) ISSUED: May 27, 2015 DUE DATE: July 20, 2015 2015S RFP Responses: PacifiCorp RFP 2015S Attention: Origination 825 NE Multnomah, Suite 600 Portland,

More information

D Los Angeles ""VV Department of

D Los Angeles VV Department of D Los Angeles ""VV Department of... P.Water & Power RESOLUTION NO.-------- BOARDLETTERAPPROVAL Senior Assistant General Manager Power System MARCIE L. EDWARDS General Manager DATE: May 13, 2015 SUBJECT:

More information

Illinois Shines PV System Power Purchase Agreement Disclosure Form

Illinois Shines PV System Power Purchase Agreement Disclosure Form Illinois Shines This form gives consumers who are considering contracting for a solar photovoltaic ("PV") system clear information about the system and their transaction. Execution of this form is required

More information

Proposed Rule 350 Greenhouse Gas (GHG) Program Fees. SMAQMD April 29, 2010

Proposed Rule 350 Greenhouse Gas (GHG) Program Fees. SMAQMD April 29, 2010 Proposed Rule 350 Greenhouse Gas (GHG) Program Fees SMAQMD April 29, 2010 Overview Board adopted Rule 250, Sacramento Carbon Exchange Program (SCEP), on March 25, 2010 Established a mechanism to bank voluntary

More information

Community-Solar Utility Programs

Community-Solar Utility Programs Community-Solar Utility Programs Andrea Romano, CSVP Team Consultant Navigant Consulting November 2015 Community Solar Value Project interviewed five program managers at utilities across the United States

More information

Bank of China Limited Green Bond Management Statement

Bank of China Limited Green Bond Management Statement Bank of China Limited Green Bond Management Statement Bank of China Limited, including all its branches globally ( BOC ) is responsible for the preparation and fair presentation of this Green Bond Management

More information

Lecture # 7 -- Taxes and Subsidies

Lecture # 7 -- Taxes and Subsidies I. Emission Fees Lecture # 7 -- Taxes and Subsidies Recall that the problem with externalities is that they are not reflected in prices. o The government can rectify the problem by setting a price for

More information

ELECTRIC SCHEDULE E-CHP Sheet 1 (N) COMBINED HEAT AND POWER PPA

ELECTRIC SCHEDULE E-CHP Sheet 1 (N) COMBINED HEAT AND POWER PPA Original 30809-E ELECTRC SCHEDULE E-CHP Sheet 1 COMBNED HEAT AND POWER PPA APPLCABLTY: TERRTORY: RATES: This Schedule provides a power purchase agreement (PPA) for combined heat and power systems with

More information

Development of the Renewable Dispatchable Generation Model. Overview of SEPA & ScottMadden Engagement

Development of the Renewable Dispatchable Generation Model. Overview of SEPA & ScottMadden Engagement Development of the Renewable Dispatchable Generation Model Overview of SEPA & ScottMadden Engagement Speakers John Sterling Senior Director, Advisory Services Smart Electric Power Alliance John Pang Partner

More information

MEMORANDUM OF UNDERSTANDING

MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding ( MOU ) is made effective as of January 30, 2019 among Central Maine Power Company, a Maine corporation with offices located at 83 Edison Drive,

More information

LGUGC Facts Brief History Vision & Mission

LGUGC Facts Brief History Vision & Mission LGUGC Facts Brief History Incorporated in March 1998 with 51% ownership by BAP member banks, and 49% DBP ownership Initially opened only to Local Government Units (LGUs) Essentially launched the Municipal

More information

STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD

STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD IN RE: : : APPLICATION OF MIDAMERICAN : DOCKET NO. RPU-2016- ENERGY COMPANY FOR A : DETERMINATION OF : RATEMAKING PRINCIPLES : REQUEST FOR APPROVAL

More information

2014 through This goal would also be a guide in establishing the annual budget and compliance filing process for 2014 through 2017.

2014 through This goal would also be a guide in establishing the annual budget and compliance filing process for 2014 through 2017. Staff Draft Straw Proposal NJCEP 2013 through 2016 Funding Level Now the NJCEP 2014 through 2017 Funding Level Comprehensive Energy Efficiency and Renewable Energy Resource Analysis August 21, 2012 Summary

More information

Time to consider buying out. You need an independent partner you. your solar PPA? can trust. It s going to save us general fund money.

Time to consider buying out. You need an independent partner you. your solar PPA? can trust. It s going to save us general fund money. Time to consider buying out Don Ulrich, Clovis USD your solar PPA? TerraVerde emphasizes education and transparency. We feel confident that they provide us an unbiased assessment of the risks and benefits.

More information

ELECTRIC SCHEDULE E-CHPSA Sheet 1 (N) COMBINED HEAT AND POWER SIMPLIFIED UNDER 500 KW PPA

ELECTRIC SCHEDULE E-CHPSA Sheet 1 (N) COMBINED HEAT AND POWER SIMPLIFIED UNDER 500 KW PPA Original 30825-E ELECTRC SCHEDULE E-CHPSA Sheet 1 COMBNED HEAT AND POWER SMPLFED UNDER 500 KW PPA APPLCABLTY : This Schedule provides a power purchase agreement (PPA) for combined heat and power systems

More information

Proposed Rate Changes

Proposed Rate Changes COUNCIL BUDGET STAFF REPORT CITY COUNCIL of SALT LAKE CITY www.slccouncil.com/city-budget TO: City Council Members FROM: Lehua Weaver Budget & Policy Analyst Project Timeline: Briefing: June 3, 2014 Budget

More information

New York State Initiatives and Futures

New York State Initiatives and Futures New York State Initiatives and Futures NY Green Bank s Evolving Role in the Marketplace Solar & Storage Finance USA October 30, 2017 New York, NY NY Green Bank Advances New York s Clean Energy Investments

More information

Sanford C. Bernstein Strategic Decisions Conference AES CORPORATION. Paul Hanrahan President and Chief Executive Officer. May 31,

Sanford C. Bernstein Strategic Decisions Conference AES CORPORATION. Paul Hanrahan President and Chief Executive Officer. May 31, AES CORPORATION Sanford C. Bernstein Strategic Decisions Conference Paul Hanrahan President and Chief Executive Officer May 31, 2006 1 Safe Harbor Disclosure Certain statements in the following presentation

More information

RENEWABLE FINANCING CONSIDERATIONS. Bond Buyer 2011 CA Public Finance Renewable Panel

RENEWABLE FINANCING CONSIDERATIONS. Bond Buyer 2011 CA Public Finance Renewable Panel RENEWABLE FINANCING CONSIDERATIONS Panel Federal and State Proposals and Regulations Issue Background and Status Effects Clean Water Act (CWA) Section 316(b) requires that the location, design, construction

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: Meeting Date: July 21, 2014 Department: CITY MANAGER SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Rebecca Woodbury, Management Analyst City Manager Approval: SUBJECT: RESOLUTION APPROVING

More information

NEWS RELEASE Oct 5, 2018

NEWS RELEASE Oct 5, 2018 Oct 5, 2018 R&I Green Bond Assessment Tokyo Century Corporation Unsec. Str. Bonds No. 25 (Tokyo Century Green Bond) :GA1 Formal Rating and Investment Information, Inc. (R&I) has announced the following

More information

RENEWABLE ENERGY SOLUTIONS

RENEWABLE ENERGY SOLUTIONS RENEWABLE ENERGY SOLUTIONS THIS PRESENTATION IS AN OVERVIEW OF APPLICABLE LEGAL AND TAX CONSIDERATIONS AND IS NOT DIRECTED TO ANY SPECIFIC TRANSACTION. TO ENSURE COMPLIANCE WITH INTERNAL REVENUE SERVICE

More information

Board of Directors Meeting. December 7, 2017

Board of Directors Meeting. December 7, 2017 Board of Directors Meeting December 7, 2017 2018 Annual Budget December 7, 2017 Agenda Recap new sections in budget document Budget changes since October Financial impact Final results Highlights 2017

More information

For Third Party Financed Renewable Energy Facilities Richard T. Holland, Esq. January 2012

For Third Party Financed Renewable Energy Facilities Richard T. Holland, Esq. January 2012 For Third Party Financed Renewable Energy Facilities Richard T. Holland, Esq. January 2012 All materials Copyright 2012 Kopelman and Paige, P.C.. All rights reserved. Purchase Provisions What s a good

More information

Utility Franchise Agreements in Illinois

Utility Franchise Agreements in Illinois Utility Franchise Agreements in Illinois RESEARCH & FINDINGS FOR METROPOLITAN MAYORS CAUCUS BY: STRONG LEGAL & REGULATORY SOLUTIONS THE POWER BUREAU Overview Municipal Energy Supply Options Franchise Agreements

More information

Appendix. Investor Conference April 4, 2007 New York, NY

Appendix. Investor Conference April 4, 2007 New York, NY Appendix Investor Conference April 4, 2007 New York, NY 1 Cautionary Statement Regarding Forward- Looking Information This presentation contains forward-looking statements regarding management s guidance

More information

SUBJECT: UPDATE ON SAN JOSE CLEAN DATE: March 20, 2017 ENERGY SUPPLEMENTAL

SUBJECT: UPDATE ON SAN JOSE CLEAN DATE: March 20, 2017 ENERGY SUPPLEMENTAL CITY OF C: 3 SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 03/21/17 ITEM: 7.1 Memorandum FROM: Kerrie Romanow SUBJECT: UPDATE ON SAN JOSE CLEAN DATE: ENERGY Approved

More information

AGENDA. Members: Derik Broekhoff David McCaughey James Rufo-Hill (Co-Chair) Lara Hansen (Co-Chair) Michelle McClure Deborah Rudnick

AGENDA. Members: Derik Broekhoff David McCaughey James Rufo-Hill (Co-Chair) Lara Hansen (Co-Chair) Michelle McClure Deborah Rudnick CLIMATE CHANGE ADVISORY COMMITTEE REGULAR MEETING WEDNESDAY, OCTOBER 17, 2018 6:15 7:45 PM CITY HALL PLANNING CONFERENCE ROOM (MADISON AVENUE ENTRANCE) 280 MADISON AVENUE NORTH BAINBRIDGE ISLAND, WA 98110

More information

Annual Report on Bank of China s Green Bonds. Outstanding BOC Green Bonds

Annual Report on Bank of China s Green Bonds. Outstanding BOC Green Bonds Annual Report on Bank of China s Green Bonds Bank of China ( BOC ) Green Bonds enables BOC to support environment friendly projects and companies which are particularly active in terms of environment preservation,

More information

EEI International Utility Conference. Armando Pimentel Chief Financial Officer March 15, 2010

EEI International Utility Conference. Armando Pimentel Chief Financial Officer March 15, 2010 EEI International Utility Conference Armando Pimentel Chief Financial Officer March 15, 2010 Cautionary Statements And Risk Factors That May Affect Future Results Any statements made herein about future

More information

Green Bond Framework. for. Prologis, Inc., Prologis, L.P., related co-investment ventures and other affiliates (together, Prologis )

Green Bond Framework. for. Prologis, Inc., Prologis, L.P., related co-investment ventures and other affiliates (together, Prologis ) Getafe D Green Bond Framework for Prologis, Inc., Prologis, L.P., related co-investment ventures and other affiliates (together, Prologis ) February 2018 1 Contents Overview of the Companies... 3 ESG Strategy

More information

Encore Community Development District

Encore Community Development District 1 Encore Community Development District www.encorecdd.org Adopted Budget for Fiscal Year 2018/2019 Presented by: Rizzetta & Company, Inc. 9428 Camden Field Parkway Riverview, Florida 33578 Phone: 813-533-2950

More information

2017 Robert W. Baird Global Industrial Conference

2017 Robert W. Baird Global Industrial Conference 2017 Robert W. Baird Global Industrial Conference NYSE: CVA NOVEMBER 2017 Cautionary Statements All information included in this earnings presentation is based on continuing operations, unless otherwise

More information

SAN DIEGO COUNTY WATER AUTHORITY S CARLSBAD SEAWATER DESALINATION PUBLIC-PRIVATE PARTNERSHIP

SAN DIEGO COUNTY WATER AUTHORITY S CARLSBAD SEAWATER DESALINATION PUBLIC-PRIVATE PARTNERSHIP Third Annual Water Innovations Alliance Conf. Boston, MA September 27, 2011 SAN DIEGO COUNTY WATER AUTHORITY S CARLSBAD SEAWATER DESALINATION PUBLIC-PRIVATE PARTNERSHIP Eric S. Petersen Partner Hawkins

More information

Administrative Response PwC - CO2 Reduction Initiatives Audit Report

Administrative Response PwC - CO2 Reduction Initiatives Audit Report Administrative Response PwC - CO2 Reduction Initiatives Audit Report Recommendation That the report of the Acting General Manager, Corporate Performance Department, dated August 7, 2018, be received as

More information

Going Green What Every College or University President Needs to Know about Renewable Energy Renewable Energy on Campus

Going Green What Every College or University President Needs to Know about Renewable Energy Renewable Energy on Campus Going Green What Every College or University President Needs to Know about Renewable Energy By Lee Goodwin, Richard Cogen, and Michael Cooney Cambridge, Palo Alto, the Research Triangle... academic institutions

More information

Deep Dive into Policy Instruments Emissions Trading Schemes. Pablo Benitez, PhD World Bank Hanoi, Vietnam March 14, 2014

Deep Dive into Policy Instruments Emissions Trading Schemes. Pablo Benitez, PhD World Bank Hanoi, Vietnam March 14, 2014 Deep Dive into Policy Instruments Emissions Trading Schemes Pablo Benitez, PhD World Bank Hanoi, Vietnam March 14, 2014 bout this Lesson In this lesson, you will review: n overview of emissions trading

More information

The Ministry of Energy consists of the Department of Energy, the Alberta Petroleum Marketing Commission, and the Alberta Energy and Utilities Board.

The Ministry of Energy consists of the Department of Energy, the Alberta Petroleum Marketing Commission, and the Alberta Energy and Utilities Board. Energy BUSINESS PLAN 2007-10 ACCOUNTABILITY STATEMENT The business plan for the three years commencing April 1, 2007 was prepared under my direction in accordance with the Government Accountability Act

More information

Dividend Solar Green Use of Proceeds Securitized Bonds $104,664,000 Dividend Solar Loan Backed Notes, Series

Dividend Solar Green Use of Proceeds Securitized Bonds $104,664,000 Dividend Solar Loan Backed Notes, Series Second-Party Opinion Dividend Solar Green Use of Proceeds Securitized Bonds $104,664,000 Dividend Solar Loan Backed Notes, Series 2018-1 Evaluation Summary Sustainalytics is of the opinion that the Dividend

More information

Joint venture for a PV project in Honduras. January 2015

Joint venture for a PV project in Honduras. January 2015 Joint venture for a PV project in Honduras January 2015 1. The project: The goal is to carry out several PV and wind projects in Honduras. The first PV project is a 48 Mw (up to 55 Mwp installed) facility

More information

Raising Equity for large biomass to power projects

Raising Equity for large biomass to power projects Specialist investment. 16/09/2016 Raising Equity for large biomass to power projects Presentation to IrBEA 'Financing Bioenergy Projects' Workshop Dublin 14 th September 2016 Dedicated Renewable Focused

More information

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016 The Economics and Financing of Distributed Generation Investment Budapest, Hungary November 17, 2016 Topics to Cover How to Finance Distributed Generation Investments 1 Importance of financial aspects

More information

Illinois Adjustable Block Program PV System Purchase Disclosure Form

Illinois Adjustable Block Program PV System Purchase Disclosure Form Illinois Adjustable Block Program PV System Purchase Disclosure Form Draft for Stakeholder Comments Released October 3, 2018 Comments Due October 26, 2018 This form gives consumers who are considering

More information

Module Quality Assurance: Risk Mitigation and Safeguarding Project Value

Module Quality Assurance: Risk Mitigation and Safeguarding Project Value SPI 2016 Quick Talk Module Quality Assurance: Risk Mitigation and Safeguarding Project Value 13 September 2016 CEA is a solar PV advisory firm that is able to provide unrivaled insight into the manufacturing

More information

Draft Illinois Adjustable Block Program Community Solar Disclosure Form

Draft Illinois Adjustable Block Program Community Solar Disclosure Form Draft Illinois Adjustable Block Program Community Solar Disclosure Form This form gives consumers who are considering subscribing to a community solar project clear information about the transaction. Community

More information

EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS AND

EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS AND EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS 2017-18 AND 2018-19 ADOPTED JUNE 7, 2017 STRATEGIC PLAN... 10 MISSION, VISION, AND GUIDING PRINCIPLES... 10 Mission... 10 Vision... 10 Guiding

More information

MARIN ENERGY AUTHORITY REQUEST FOR PROPOSALS

MARIN ENERGY AUTHORITY REQUEST FOR PROPOSALS MARIN ENERGY AUTHORITY REQUEST FOR PROPOSALS FOR LOCAL RENEWABLE ENERGY PROJECTS RFP RELEASE DATE: DECEMBER 3, 2010 RESPONSE DEADLINE: FEBRUARY 4, 2011 BY 2:00 P.M. TABLE OF CONTENTS Overview... 3 Background...

More information

PG&E Corporation: Peter Darbee, Chairman & CEO Merrill Lynch Investor Conference New York, NY September 26-27, 2006

PG&E Corporation: Peter Darbee, Chairman & CEO Merrill Lynch Investor Conference New York, NY September 26-27, 2006 PG&E Corporation: Positioned to Lead in a Carbon-Constrained World Peter Darbee, Chairman & CEO Merrill Lynch Investor Conference New York, NY September 26-27, 2006 This presentation is not complete without

More information

Encore Community Development District

Encore Community Development District 1 Encore Community Development District www.encorecdd.org Approved Proposed Budget for Fiscal Year 2018/2019 Presented by: Rizzetta & Company, Inc. 9428 Camden Field Parkway Riverview, Florida 33578 Phone:

More information

How the City of Prince George Uses Benchmarking to Continuously Improve its Water and Wastewater Utilities Kristy Brown

How the City of Prince George Uses Benchmarking to Continuously Improve its Water and Wastewater Utilities Kristy Brown How the City of Prince George Uses Benchmarking to Continuously Improve its Water and Wastewater Utilities Kristy Brown Asset Manager, City of Prince George Chris Lombard, P. Eng. MBA Asset Management

More information

A4. Budget WBG LAC A4-1

A4. Budget WBG LAC A4-1 A4. Budget Attachment 4 identifies and discusses the overall Proposal budget as well as the individual budgets for each of the seven projects proposed for implementation in the Santa Barbara County Region

More information

Solar Power in Small Municipalities

Solar Power in Small Municipalities Solar Power in Small Municipalities March 30, 2011 Agenda Why Solar? Regulatory Environment & Incentives Technologies Selecting a Site Financing Structures Why Solar? Costs are Coming Down Federal and

More information

Submission for the NRG Energy Case Study

Submission for the NRG Energy Case Study Submission for the NRG Energy Case Study Colorado School of Mines Team Westpaw Source: Sundance Solar, accessed March 4, 2017 PREPARED BY: WALTER MEEKER, PHILLIP RUBAN, AUGUST STEINBECK DATE: MARCH 8,

More information

Clean Energy States Alliance. Innovations in Renewable Energy Finance

Clean Energy States Alliance. Innovations in Renewable Energy Finance Clean Energy States Alliance Innovations in Renewable Energy Finance Moderated by Robert Sanders, Senior Finance Advisor, Clean Energy Group August 20, 2013 Housekeeping All participants will be in listen-only

More information

ONTARIO POWER GENERATION REPORTS 2007 THIRD QUARTER FINANCIAL RESULTS

ONTARIO POWER GENERATION REPORTS 2007 THIRD QUARTER FINANCIAL RESULTS ONTARIO POWER GENERATION REPORTS 2007 THIRD QUARTER FINANCIAL RESULTS November 16, 2007 [Toronto]: Ontario Power Generation Inc. ( OPG or the Company ) today reported its financial and operating results

More information

TRANSALTA CORPORATION

TRANSALTA CORPORATION Management's Discussion and Analysis TRANSALTA CORPORATION Second Quarter Report for 2018 This Management s Discussion and Analysis ( MD&A ) contains forward-looking statements. These statements are based

More information

Wastewater Utility Enterprise

Wastewater Utility Enterprise Wastewater Utility Enterprise Wastewater Utility Operating Fund Summary Wastewater Utility Revenue (62) Wastewater Utility Collection Systems Operations (62-4510) Wastewater Treatment Operations (62-4515)

More information

Solar Finance and Investment

Solar Finance and Investment Solar Finance and Investment Michael Mendelsohn Sr. Director, Project Finance & Capital Markets Solar Energy Industries Association (SEIA) DRAFT - March 31, 2016 2016 Solar Energy Industries Association

More information

Dominion Energy Virginia

Dominion Energy Virginia Request for Proposal 2017 Solicitation for New Photovoltaic Solar and Onshore Wind Power Supply Generation October 16, 2017 Dominion Energy Virginia TABLE OF CONTENTS Table of Contents PART I RFP Overview...

More information

SFPUC s 2011 Strategic Sustainability Plan. July 2011 Susan Wade Manager, Strategic Sustainability Planning External Affairs

SFPUC s 2011 Strategic Sustainability Plan. July 2011 Susan Wade Manager, Strategic Sustainability Planning External Affairs SFPUC s 2011 Strategic Sustainability Plan July 2011 Susan Wade Manager, Strategic Sustainability Planning External Affairs What is the SSP? A system for planning, managing, and evaluating SFPUC-wide performance

More information

ASSET MANAGEMENT WEBINAR SERIES

ASSET MANAGEMENT WEBINAR SERIES ASSET MANAGEMENT WEBINAR SERIES Rick Brown, PhD President TerraVerde Energy rick.brown@terraverde.energy David Burdick VP Asset Management TerraVerde Energy david@terraverde.energy INTRODUCTIONS TerraVerde

More information

Request for Proposal. General Counsel Services. Santa Rosa Regional Resources Authority

Request for Proposal. General Counsel Services. Santa Rosa Regional Resources Authority Request for Proposal General Counsel Services Santa Rosa Regional Resources Authority Santa Rosa Regional Resources Authority REQUEST FOR PROPOSAL Purpose... 3 Instructions to Proposers... 3 Background...

More information

Subj: REQUIREMENTS FOR PAYMENT OF STORMWATER MANAGEMENT CHARGES

Subj: REQUIREMENTS FOR PAYMENT OF STORMWATER MANAGEMENT CHARGES DEPARTMENT OF THE NAVY COMMANDER, NAVY INSTALLATIONS COMMAND 716 SICARD STREET, SE, SUITE 1000 WASHINGTON NAVY YARD, DC 20374-5140 CNIC INSTRUCTION 5090.5 From: Commander, Navy Installations Command CNICINST

More information

Minnesota Community Solar Garden Subscription

Minnesota Community Solar Garden Subscription Minnesota Community Solar Garden Subscription Leading the way as a prosperous diverse regional community 2 Definition: Centrallylocated solar PV systems that provide electricity to participating subscribers

More information

PSE&G Solar Loan III Program General Q&A

PSE&G Solar Loan III Program General Q&A PSE&G Solar Loan III Program General Q&A Note: The following are common questions that PSE&G has received regarding the Solar Loan III Program. This document is for informational purposes only. See your

More information

BELMONT MUNICIPAL LIGHT DEPARTMENT NET METERING AND BUYBACK TARIFF FOR EMISSION FREE RENEWABLE GENERATING FACILITIES SERVING CUSTOMER LOAD

BELMONT MUNICIPAL LIGHT DEPARTMENT NET METERING AND BUYBACK TARIFF FOR EMISSION FREE RENEWABLE GENERATING FACILITIES SERVING CUSTOMER LOAD Page 1 Applicability 1. A Two-Phase Program for Extending Credits for Excess Production from an Emission- Free Renewable Facility ( EFR Facility ). The Belmont Municipal Light Department (the Department

More information

Unitil Corporation Earnings Conference Call Second Quarter 2017

Unitil Corporation Earnings Conference Call Second Quarter 2017 Unitil Corporation Earnings Conference Call Second Quarter 2017 Financial and Other Information July 27, 2017 1 Safe Harbor Provision This presentation contains forward looking statements made pursuant

More information

BARNSTABLE Massachusetts

BARNSTABLE Massachusetts Town of BARNSTABLE Massachusetts TEN YEAR 2018 FINANCIAL FORECAST In order to assist town leaders with their strategic planning process, this document provides an in-depth look at the Town s current financial

More information

Dear Stakeholders, As a reminder, please see below for the remaining schedule for this docket.

Dear Stakeholders, As a reminder, please see below for the remaining schedule for this docket. From: To: Cc: Subject: Date: Attachments: PRAUSE Elaine DELMAR Robert; FREEMAN Robin; PEACOCK Julie; "cmfink@blueplanetlaw.com"; "dockets@oregoncub.org"; "jeff@oregoncub.org"; "bob@oregoncub.org"; "sommer@oregoncub.org";

More information

Economic Impacts of New Jersey s Proposed Renewable Portfolio Standard Report Schedules

Economic Impacts of New Jersey s Proposed Renewable Portfolio Standard Report Schedules Economic Impacts of New Jersey s Proposed Renewable Portfolio Standard Report Schedules David E. Dismukes, Ph.D. Acadian Consulting Group 6455 Overton Street Baton Rouge, Louisiana 70808 December 16, 2005

More information

Southern California Edison s Renewable Auction Mechanism (RAM) Program. June 6, 2014 EPRG Workshop on Distributed Generation and Smart Connections

Southern California Edison s Renewable Auction Mechanism (RAM) Program. June 6, 2014 EPRG Workshop on Distributed Generation and Smart Connections Southern California Edison s Renewable Auction Mechanism (RAM) Program June 6, 2014 EPRG Workshop on Distributed Generation and Smart Connections The RAM Contracting Tool In D.10-12-048 ( the RAM Decision

More information

RGGI Program Review: REMI Modeling Results

RGGI Program Review: REMI Modeling Results RGGI Program Review: REMI Modeling Results Inputs and Draft Results from MRPS Case Run December 2017 Modeling Inputs 2 Overall Modeling Methodology Two broad set of inputs used to model the economic impacts

More information

PACE: A World Changing Green Financing Tool Oct 10, 2018

PACE: A World Changing Green Financing Tool Oct 10, 2018 PACE (Property Assessed Clean Energy) is an innovative financing instrument which permits building and land owners to upgrade their buildings with energy and resource saving retrofits 1 or install renewable

More information

GEEREF IMPACT METHODOLOGY

GEEREF IMPACT METHODOLOGY S I T I, U G A N D A ( F RO N T I E R ) GEEREF IMPACT METHODOLOGY L a s t u p d a t e : M a y 2 0 1 5 Frontier Investment Management INTRODUCTION The GEEREF team focuses on backing emerging investment

More information

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide. Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University

More information

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process MILWAUKIE CITY COUNCIL STAFF REPORT Agenda Item: WS 4. Meeting Date: 9-16-14 To: Mayor and City Council Through: Bill Monahan, City Manager Subject: Proceeding with the ESCO Process From: Gary Parkin,

More information

New York s Clean Energy Standard. Doreen Harris, NYSERDA December 1, 2016

New York s Clean Energy Standard. Doreen Harris, NYSERDA December 1, 2016 New York s Clean Energy Standard Doreen Harris, NYSERDA December 1, 2016 2 Clean Energy Standard - Overview 3 New York s Clean Energy Standard By Order issued August 1, 2016, the New York Public Service

More information

Estimating Capacity Benefits of the AC Transmission Public Policy Projects

Estimating Capacity Benefits of the AC Transmission Public Policy Projects Memorandum TO: NYISO Board of Directors FROM: David B. Patton and Pallas LeeVanSchaick DATE: RE: Estimating Capacity Benefits of the AC Transmission Public Policy Projects A. Introduction In the second

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE 17-172 DEVELOPMENT OF RENEWABLE ENERGY FUND PROGRAMS FOR LOW AND MODERATE INCOME RESIDENTIAL CUSTOMERS Order Approving Request for Proposals for Low-Moderate

More information

DWSRF Contacts. Sources of Monies. Purpose. Type of Projects. Eligibility. New Jersey Drinking Water State Revolving Fund Program

DWSRF Contacts. Sources of Monies. Purpose. Type of Projects. Eligibility. New Jersey Drinking Water State Revolving Fund Program New Jersey Drinking Water State Revolving Fund Program DWSRF Contacts Lorraine Salamanca Lorraine.Salamanca@dep.nj.gov Alan Dillon Alan.Dillon@dep.nj.gov Department of Environmental Protection Division

More information

Risk Assessment of Participation in the Marin Clean Energy Community Choice Aggregation Program On Behalf of the City of Benicia

Risk Assessment of Participation in the Marin Clean Energy Community Choice Aggregation Program On Behalf of the City of Benicia Risk Assessment of Participation in the Marin Clean Energy Community Choice Aggregation Program On Behalf of the City of Benicia MRW & Associates, LLC 1814 Franklin Street, Suite 720 Oakland, CA 94612

More information

Current Budget Environment and OMB Scoring Rules

Current Budget Environment and OMB Scoring Rules Current Budget Environment and OMB Scoring Rules 1 Moderator Kenyattah A. Robinson Jones Lang LaSalle Panelists Sara Streff Office of the Deputy Under Secretary of Defense for Installations and Environment

More information

FINAL DRAFT STAFF REPORT

FINAL DRAFT STAFF REPORT FINAL DRAFT STAFF REPORT PROPOSED RULE 2260 REGISTRATION REQUIREMENTS FOR EQUIPMENT SUBJECT TO CALIFORNIA S OIL AND GAS REGULATION AND PROPOSED RULE 3156 FEES FOR EQUIPMENT SUBJECT TO RULE 2260 REGISTRATION

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415) 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) 332-0244 Fax: (415) 332-0453 Budget FY 2017/18 Adopted by Board on June 5, 2017 BUDGET EXECUTIVE SUMMARY FISCAL YEAR 2017/18 DISTRICT OVERVIEW The Sausalito-Marin

More information

Radnor Township Environmental Advisory Council Annual Report 2011

Radnor Township Environmental Advisory Council Annual Report 2011 Radnor Township Environmental Advisory Council Annual Report 2011 I. Introduction and Background The Radnor Township Environmental Advisory Council ( EAC ) provides leadership and guidance on environmental

More information

Green Bond Framework

Green Bond Framework Green Bond Framework ENGIE is committed to successfully addressing the energy challenges of coming decades by producing energy that emits low CO 2. The environment, universal access to energy and the quest

More information

Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund

Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund Vesna Vidič, Assistant Director October 2007 Fund overview: The Slovenian Environmental Development

More information

Financing Stormwater Projects: Providing an Innovative Vision

Financing Stormwater Projects: Providing an Innovative Vision Financing Stormwater Projects: Providing an Innovative Vision Newsha Ajami, PhD Stanford University EPA Region 9 Finance Forum April 5 th, 2017 Research Question: How can the water sector finance non-traditional

More information

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012 PacifiCorp Utah All Source Request for Proposal 2016 Resource Issued January 6, 2012 Responses May 9, 2012 TABLE OF CONTENTS Page SECTION 1. INTRODUCTION... 7 SECTION 2. RESOURCE ALTERNATIVES AND PROPOSAL