Contracting Strategies for Renewable Generators: A Hybrid Stochastic and Robust Optimization Approach

Size: px
Start display at page:

Download "Contracting Strategies for Renewable Generators: A Hybrid Stochastic and Robust Optimization Approach"

Transcription

1 IEEE TRANSACTIONS ON POWER SYSTEMS 1 Contracting Strategies for Renewable Generators: A Hybrid Stochastic and Robust Optimization Approach Bruno Fanzeres, StudentMember,IEEE, Alexandre Street, Member, IEEE, and Luiz Augusto Barroso, Senior Member, IEEE Abstract We present a new methodology to support an energy trading company (ETC) to devise contracting strategies under an optimal risk-averse renewable portfolio. The uncertainty in the generation of renewable energy sources is accounted for by exogenously simulated scenarios, as is customary in stochastic programming. However, we recognize that spot prices largely depend on unpredictable market conditions, making it difficult to capture its underlying stochastic process, which challenges the use of fundamental approaches for forecasting. Under such framework, industry practices make use of stress tests to validate portfolios. We then adapt the robust optimization approach to perform an endogenous stress test for the spot prices as a function of the buy-and-sell portfolio of contracts and renewable energy generation scenarios. The optimal contracting strategy is built through a bilevel optimization model that uses a hybrid approach, mixing stochastic and robust optimization. The proposed model is flexible to represent the traditional stochastic programming approach and to express the ETC s uncertainty aversion in the case where the price distribution cannot be precisely estimated. The effectiveness of the model is illustrated with examples from the Brazilian market, where the proposed approach is contrasted to its stochastic counterpart and both are benchmarked against observed market variables. Index Terms Conditional value-at-risk, power system economics, robust optimization, stochastic optimization. Constants NOMENCLATURE Sale price of the PPA ($/MWh). Price of the capacity payment contract with a renewable unit ($/MWh). Maximum volume that can be sold in the PPA. Defined by the consumer willingness to contract (avgmw). 1 Manuscript received December 25, 2013; revised May 02, 2014 and July 10, 2014; accepted August 06, This work was supported in part by UTE Parnaíba Geração de Energia S.A. through R&D project ANEEL PD /2013. Paper no. TPWRS B. Fanzeres and A. Street are with the Electrical Engineering Department, Pontifical Catholic University of Rio de Janeiro (PUC-Rio), Rio de Janeiro, RJ, Brazil ( bsantos@ele.puc-rio.br; street@ele.puc-rio.br). L. A. Barroso is with PSR Consulting, Rio de Janeiro, RJ, Brazil ( luiz@psr-inc.com). Color versions of one or more of the figures in this paper are available online at Digital Object Identifier /TPWRS An average MW is equivalent to the continuous production/consumption of one MW during the relevant period. One average MW during one year corresponds to 8760 MWh. Decision Variables Firm energy certificate of the renewable unit (avgmw). Energy production of the renewable generator period and scenario (MWh). Number of hours of period. Probability of the renewable production scenario. Opportunity cost of the money in percentage per sub-set of periods, e.g., per year. Opportunity cost of the money in percentage perperiodofthe th subset of periods, e.g., per month. First period of the th subset of periods. Risk aversion parameter that combines the expected value and the CVaR of the th subset of periods. Risk aversion parameter that defines the confidence level of the CVaR risk measure of the th subset of periods. Reference or nominal spot-price scenario in period and scenario ($/MWh). Maximum positive deviation from the spot-price reference scenario in period and scenario ($/MWh). Maximum negative deviation from the spot-price reference scenario in period and scenario ($/MWh). Budget that control the conservatism level of the spot-price stress scenarios in each subset. Maximum return (%) of the spot-price stress scenario from period to. Minimum return (%) of the spot-price stress scenario from period to. Percentage of that the ETC is willing to supply through the PPA. Percentage of the unit that is brought to the ETC portfolio through a capacity contract. in IEEE. Personal use is permitted, but republication/redistribution requires IEEE permission. See for more information.

2 2 IEEE TRANSACTIONS ON POWER SYSTEMS Dual Variables Sets Auxiliary variable that achieves the -value-at-risk of the partial PV of the revenue in each sub-period at the optimal solution ($/MWh). Auxiliary variable that represents the left deviation of the revenue scenario from the value in each sub-period ($/MWh). Spot price in period and scenario ($/MWh). Percentage of the positive deviation from the reference price in period and scenario. Percentage of the negative deviation from the reference price in period and scenario. Dual variable of the spot price envelope constraint (3) in each period and scenario. Dual variable of the budget constraint (4) in each sub-period and scenario. Dual variable of the maximum return constraint (5) in each period and scenario. Dual variable of the minimum return constraint (6) in each period and scenario. Dual variable of the upper bound constraint (7) in each period and scenario. Dual variable of the upper bound constraint (8) in each period and scenario. Set of periods of the supply contract. Subset of periods.. Set of the number of sub-periods in which the set is divided. Set of renewable units. Set of scenarios. I. INTRODUCTION AMAJOR challenge for power generation companies (Gencos) in competitive electricity markets is to determine an optimal contracting strategy for its assets that maximizes their value. This strategy should take into account the company s risk profile and adequately treat all types of external risks, such as the uncertainties in energy production and the spot prices. Energy trading companies (ETC) play a key role in providing market penetration and diversifying risk of Gencos in order to serve consumers. To hedge against the volatility of spot prices, generators or ETC sign mid- and/or long-term energy supply contracts, which is a financial instrument that plays an important role in the power system reform of many countries worldwide. A supply contract involves the need to deliver a given volume of energy over a time horizon by a seller against a fixed payment by the buyer. In most electricity markets, such contracts are only financial instruments (see [1] for a review of the financial instruments used in electricity markets and [2] [4] for application examples). Bilateral contracts provide an adequate hedge against spot prices in the case of thermal plants: if the spot price is low, the plant will not generate but meet its contractual obligations by purchasing (cheaper) energy in the Wholesale Energy Market (WEM). Conversely, if spot price is high, the plant will produce its own energy, thus avoiding expensive purchases. In other words, in the case of thermoelectric generators, the physical production of the asset is a natural hedge and, except for the hazard of outages, mitigates production risks [3]. In the case of renewable generators such as hydroelectric, wind and biomass plants the probabilistic and seasonal nature of their physical production poses a joint volume and price risk: a situation can arise where in moments of high spot prices, the production of a renewable generator is low, which can result in high financial exposures in the short-term market if the plant is contracted with a consumer [5] [7]. The situation is made worse for hydro plants in hydro-dominated countries because spot prices are negatively correlated with hydro production (the so-called hydrological risk, see [8]). The development of renewable electricity contracting strategies in competitive markets via ETC has been widely studied in different contexts: the ETC acts as a purchaser of renewable energy and creates a product that bundles the energy purchased in order to serve a firm load. This involves the definition of the optimal mix of sources to be bought by the ETC tomitigate the price and quantity risk (taking advantage of the complementarity usually existing among the energy production from the different renewable sources) as well as the definition of the optimal amount of load to be served through a co-optimization model [5] [8]. The standard modeling approach of this ETC portfolio optimization problem considers the representation of uncertainty in renewable production and market prices by scenarios generated via Monte Carlo simulation, usually utilizing a production costing model (market equilibrium simulated by a fundamental approach) [9] or a statistical regression on past market prices [10]. One of the main difficulties in implementing such modeling is how to produce meaningful future paths of spot prices. The spot price formation is a very complex process, which results from the combination of market (hydrology, demand, supply, outages, fuel availability, etc.) and political (interference on prices, out of merit order dispatches, etc.) conditions [10]. Even in countries such as Chile, Peru and Brazil, where a production costing model determines the system dispatch and the spot prices (as short-run marginal costs) and the market participants use the same production costing models to predict spot prices, forecasts have proven to be inaccurate and very difficult [11]. When the complexity of the true underlying uncertainty processes requires the knowledge of input parameters whose dynamics are difficult to predict, practitioners generally treat this inaccuracy by means of stress tests, where stress scenarios are used to validate the performance of the optimal portfolios under adverse conditions. However, these scenarios are usually static, generally exogenously determined by an expert, and often do

3 FANZERES et al.: CONTRACTING STRATEGIES FOR RENEWABLE GENERATORS: A HYBRID STOCHASTIC AND ROBUST OPTIMIZATION APPROACH 3 not represent the true worst-case price scenario for the portfolio in hands. For example, different ETC portfolios may require different worst-case scenarios. One alternative to overcome this difficulty is to consider endogenously-defined stress-price scenarios that create the worst-case financial adversity for the ETC portfolio. In other words, they would be definedbyanembedded optimization problem that ensures they really represent the worst possible realization of this uncertainty against the ETC portfolio revenue. Robust optimization (RO) has recently emerged [12] [14] and proven to be a powerful tool for addressing decision-making problems involving uncertainty parameters whose true probability distribution is difficult to predict, which is exactly the case of our spot price modeling challenge. Recent applications have dealt with robust-based decisions in operations and scheduling [15] [18], bidding strategies of generators in the short-term spot market [19] and in portfolios with wind and storage [20], demand response and consumption strategies [22], [23], integration of plug-in hybrid electric vehicles [24], just to name a few. This work leverages on robust and stochastic optimization to represent different uncertainties in different ways in a renewable energy portfolio optimization problem. We propose a model that combines in one single optimization problem the endogenous stress-analysis approach for the spot prices (via RO) with the stochastic approach for the representation of renewable production. A. Objective of This Work The objective of this work is to present a portfolio optimization model to determine the risk-adjusted optimal trading strategy for an ETC in a contract market backed by a renewable energy portfolio to serve a firm load. The two relevant uncertainties are the future spot prices and the production of the renewable energy sources, which are treated in our portfolio optimization model by robust and stochastic optimization, respectively. We use the RO approach with polyhedral uncertainty set to constrain spot-price stress scenarios within the agent s prior hypothesis for adverse conditions. To obtain the optimal portfolio, spot prices are endogenously determined by a set of second-level optimization problems, one for each exogenous scenario of renewable energy generation (assumed to follow a well-behaved stochastic process). Prices are allowed to deviate from a reference scenario toward a worst-case realization within a constrained uncertainty set. The modeling approach allows for the consideration of deterministic or stochastic reference scenarios for the spot prices, which can be obtained following standard time-series approaches or by means of equilibrium models. In other words, we consider that the spot-price scenarios may be misspecified and consist of only an approximation of the true underlying stochastic process whereas renewable production scenarios are produced via the classic Monte Carlo approach. The model proposed in this paper can be seen as an extension of the model proposed in [6] to account for the modeling uncertainty in the spot prices by means of an embedded stress analysis. An example of a practical result that this model can provide is the optimal contracting strategy such that the ETC may survive even if the spot price reaches its cap or floor value, depending on what is the worst case for the portfolio (considering scenarios of renewable production), during (set by the decision maker) periods (hours/months) within a given time horizon (day/year). This techniqueprovestoberatherflexible for incorporating other constraints and conceptually speaking it resembles but is not equal to the security criterion,which is widely used in operation problems, as shown in [15]. Our methodology is flexible to consider the standard case where the decision maker fully believes in his/her price scenarios. B. Contributions Regarding the Existing Literature The contribution of our work is to present an alternative methodology to devise the ETC s optimal contracting strategy via a hybrid robust-stochastic optimization model. More objectively, the proposed model aims at recognizing the well-defined stochastic dynamics of renewable energy production as well as the difficulty to forecast spot prices, thus ensuring the robustness of the results against unexpected price variations. The methodology is flexible to model spot-price stress scenarios, endogenously defined in the portfolio problem, as well as to follow a pure stochastic approach 2 that considers exogenously-defined scenarios to characterize all uncertainty factors. To solve the problem, the proposed model is rewritten as a maximization program, following the standard single-stage RO approach (see [12] for more details),andsolvedbycommercial solvers [26]. We illustrate the methodology to devise a portfolio of renewable sources (wind and small hydros) in the Brazilian system, where the proposed approach is contrasted to its fully stochastic counterpart and both are benchmarked against actual (observed) market variables. There are many papers in the literature dealing with RO models. We believe our work is more related to the ones presented in [17], which explores the modeling of an expanded polyhedral uncertainty set to account for different load patterns or security criteria in the unit commitment problem; [18], which combines the robust and stochastic approaches to account for both the worst-case and the expected dispatch cost under nodal injection uncertainty through a weighted objective function; and [20], which deals with portfolios with wind and storage in the short-term market. Differently from previous reported works, we consider as a motivation for our hybrid approach the fact that one of the uncertainty parameters, the spot price, is of difficult modeling via stochastic programming and the rest of the uncertainties are assumed to follow a known and well-behaved stochastic process. To the best of our knowledge, no work has been performed on applying RO to the definition of commercial strategies for portfolio of renewables in contract markets, which is the subject of our work. On the methodological side, [17] and [18] also provide hybrid robust-stochastic models. Our paper differs on the way this hybridization is done: via a concave function, which accounts for the well-known coherent measure of risk, namely the conditional value at risk [28] ([17] and [18] use a linear combination approach without risk constraints). Finally, it is worth mentioning that the problems addressed in [17] and [18] lie in the class of adjustable (two-stage) RO models [34], requiring more complex solution methodologies (see [35]) than the single-stage 2 However, the challenges associated to the computation of a joint probability distribution of the uncertain factors are seen as an additional motivation to adopt the proposed stochastic-robust approach.

4 4 IEEE TRANSACTIONS ON POWER SYSTEMS RO approach [12] employed in the proposed model. Therefore, our methodology requires only a linear programming solver [26]. C. Organization of This Work The rest of this paper is organized as follows. Section II describes the modeling approach proposed for the representation of the uncertainties. Section III presents the bilevel formulation for the hybrid robust-stochastic renewable portfolio selection model, and Section IV shows its single-level-equivalent counterpart. Section V presents two case studies. Section VI concludes this work and discusses extensions and future research. II. UNCERTAINTY MODELING APPROACH Two main risk factors are considered in the ETC s future revenue:, which is a random variable that expresses the amount of renewable energy produced by the generating unit in period (MWh), and, which is the random variable that represents the spot price in period ($/MWh). Throughout this work, random variables are assumed to be discrete in a finite support following stochastic programming standards. Both uncertainty factors are characterized by a set of possible scenarios and probabilities,,ascustomaryin stochastic optimization [31]. A. Electricity Contracts and the Energy Trading Company Standard financial power purchase agreements (PPA) and capacity payment contracts are considered in this work. A PPA is a bilateral supply contract agreement in which the buyer pays a fixed price for a given fixedamountofenergytotheseller party [6] [8]. In capacity payment contracts with renewables, the generator (selling counterpart) transfers a percentage of its future, therefore uncertain, production to the buyer in exchange of a fixed payment. The fixed payment of the capacity contracts can be parameterized in two terms: price and quantity. The latter is based on the contracted percentage multiplied by the firm energy certificates (FEC) of the unit [5] [8]. The FEC of a renewable unit is issued by the system regulator based on a long-term quantile (generally set to the median or 10%) of the observed generation. The role of the FEC in the Brazilian regulatory framework is to limit the total amount of energy each unit can sell through contracts (see [11] for further discussion on this subject). Therefore, a capacity payment contract with a unit acts as if the buyer rents percent of the power plant, which includes both the generation and FEC. In the case of renewables, for simplicity purposes, we assume that the variable generating cost is zero; however, such cost could be easily included in the model, as shown in [6]. Differently from the short-term market, the financial contract market does not impose any real energy exchange, all transactions are purely financial. The contract market operator runs a market clearing after the determination of the spot prices, which occurs in the short-term market, by clearing the differences between all volumes produced (consumed) and contracted of each agent at this price. In this framework, ETCs play an important role in the market acting as risk managers, creating commercial opportunities, and mitigating risks. Fig. 1 illustrates the proposed contractual scheme for the ETC. At the left and right-hand-side of this figure, the ETC buys two Fig. 1. ETC contractual scheme. Continuous lines for energy rights and dotted lines for financial income/payments. capacity contracts with two complementary renewables and therefore, receives the right of commercialize the bought generation. This provides the ETC with a positive settlement in the contract market clearing regarding the purchased proportion of the generation of each unit (first term of the market settlement payment at the top of the figure),,in exchange of a fixed payment,. Then, at the bottom of the figure, the ETC sells a standard flat PPA for a consumer, e.g., industries or large commercial entities, ensuring the amount to be delivered. Due to this agreement, the ETC receives a fixed income from the consumer,, in exchange of a negative settlement in market clearing regarding the sold amount (second term of the market settlement at the top of the figure),. Under the proposed contracting scheme, the stochastic cash flow of the ETC can be divided into three parts: 1) a fixed income due to the PPA sell; 2) a fixed expenditure due to the capacity payments for all renewable generating units we assume aset of units; and 3) a random term that accounts for the net contract market settlement by the spot price between the renewable generation, acquired by means of the capacity contracts, and the total amount sold through the PPA. Expression (1) illustrates the net revenue stream of an ETC for a given scenario under the proposed commercial model: According to (1), the ETC purchases generation capacity to back sales in the forward market. For simplicity and didactic purposes, it is assumed that the ETC has no existing portfolio, which could be easily included in the model by an additional constant term in (1). Note that in this contracting scheme, the ETC bears all of the price and quantity risk because the capacity contracts do not guarantee a fixed energy delivery to fulfill the bilateral PPA with the consumer. If, on the one hand, the fixed revenue, due to the first term of expression (1), increases as the ETC sells more energy through the PPA, on the other hand, the net revenue due to the settlement in the spot market, third term (1)

5 FANZERES et al.: CONTRACTING STRATEGIES FOR RENEWABLE GENERATORS: A HYBRID STOCHASTIC AND ROBUST OPTIMIZATION APPROACH 5 of (1), decreases. This materializes the price and quantity threat, which is related with scenarios with low renewable production, below the amount sold, and high spot price. In such cases, expression (1) can reach negative values and significantly jeopardize the company financial performance. Therefore, according to expression (1), in defining the optimal sell and buy percentages, the ETC must take into account the tradeoff between the fixed payment, composed of the first and second terms, and the price and quantity risk introduced by the third term. Note that the ETC plays the role of a risk manager in the proposed model and may therefore embody a variety of other different commercial roles (such as an electricity retailer or a Genco). For example, the model devised in this paper can be used by a Genco devising its optimal investment strategy in a portfolio of renewable technologies to mitigate the price and quantity risk and then supplying a consumer through a longterm flat PPA. Under this setting, the capacity payment in (1) can represent the annualized investment cost and interests expenses of the units owned by the company. In this context, the fixed capacity payment term,, in (1) could be replaced by a simpler fixed payment term,, representing those expenses in each period of the cash flow time horizon. Then, expression (1) can represent the net revenue of the generation company selling a long-term PPA as a function of the percentages of the renewable units in which the company is willing to invest. It is worth mentioning that this business format, in which an ETC is formed to represent a given Genco in the contract market, is largely adopted in countries where the financial contract markets are representative such as in Brazil. B. Renewables Generation Scenarios The modeling approach adopted to generate the scenarios of the renewable production is based on simulation procedures of periodic stochastic processes via, e.g., a Monte Carlo procedure. For the model proposed here, the generation scenarios for each plant are considered as input data, and, therefore, exogenous to the model. For example, in [5], a Monte Carlo procedure is proposed to simulate renewable production scenarios based on a vector-autoregressive stochastic process with variance law. C. Polyhedral Uncertainty Set (PUS) for Spot Prices Spot price scenarios are usually obtained by utilizing a production costing model (a fundamentalist approach) [9] or through a statistical regression on past market prices [10]. On the one hand, the fundamentalist approach takes into account ex-ante hypothesis on market uncertainties, such as fuel prices, availability, supply expansion scenario, hydrology, etc. Statistical models, on the other hand, are based on the assumption that past realizations explain future prices. Both approaches can be easily challenged: in the first, any deviation of the assumptions affects the estimated probability distribution of prices, whereas the second approach is not suitable for markets with technological developments, in which the supply mix changes significantly over time and does not make the historical record a good proxy for the future. Our proposal considers the price uncertainty by means of endogenously generated scenarios following the RO approach. Such scenarios are defined within Fig. 2. Uncertainty characterization: spot price polyhedral uncertainty sets. a polyhedral uncertainty set, which can be used to robustify the portfolio by means of the use of worst-case analyses. To allow the ETC to express its inter-temporal risk-preference, the set of periods,, is partitioned into subsets of periods,, e.g., months of each year,, in the time horizon. In our approach, we consider that for each renewable generation scenario,thereare subsets of partial spot price time series, each one of them related to a given subset of periods. In this work, we use the following polyhedral uncertainty set (PUS) to represent those sets: (2) (3) (4) (5) (6) (7) (8) where is a copy of except for the last term, which is disregarded to account for expressions (5) and (6). Lagrangian multipliers (or dual variables) are shown after each constraint to ease the understanding of the robust counterpart that will be presented next. Expression (3) defines the envelope for the spot-price time series. Expression (4) constrains the number of periods within that the stress scenarios can deviate from the reference. Expressions (5) and (6) constrain the maximum and minimum returns to and, respectively. Finally, expressions (7) and (8) sets the bounds for and. Fig. 2 depicts the arrangement of the PUS s over time and for different renewable energy scenarios. It is important to mention that the PUS (2) (8) is flexible enough to be particularized to the pure stochastic modeling approach, where a set of exogenous scenarios are used to characterize the uncertainties, following previous reported works [5] [8]. By making the reference scenarios meet the simulated ones and, the grey areas of Fig. 2 reduce to the exogenous scenario and the pure stochastic approach is met. Moreover, the same rationale applies to consider an exogenously defined static-stress scenario. However, under the proposed framework, by increasing the value of from zero

6 6 IEEE TRANSACTIONS ON POWER SYSTEMS to some positive value, the decision maker admits a deviation, e.g., of periods within each sub-period, from the reference scenario that, in this work, is explored as an endogenous stress scenario, because it is going to be chosen to create the worst-case adversity. In this framework, the proposed approach has the advantage of not requiring the specification of the entire stress-scenario path. Instead, the definition of the stress scenario is parameterized by intuitive parameters, such as the maximum and minimum price values, the maximum and minimum returns between periods, and the number of periods in which the price can deviate from the reference. Depending on the agent modeling choice and available information, the reference scenarios can be either obtained by a degenerated distribution, where only one trajectory of price is considered and repeated for all reference scenarios in expression (3), or by a non-degenerated distribution, where different price trajectories are simulated by a given methodology and accounted for in (3). Notwithstanding, it is important to say that in the stress analysis, the decision maker is not willing to reproduce nor to capture the dynamic of the true underlying spot-price process, but rather guard against the occurrence of unpredictable adverse conditions. This is a step beyond in the subject of stress analysis largely used in industry practices, which generally relies on exogenous (static) stress-scenarios. Additionally, such an approach can be combined with the standard pure-stochastic approach in many different ways, e.g., constraining the loss under the stress scenarios and optimizing for the scenarios obtained by a stochastic model. For didactic purposes, we consider the case in which the decision maker maximizes the portfolio value under the stress scenarios. For each renewable generation scenario and portfolio decision-vector,, the present value of expression (1) is minimized for each subset of periods. Thus, for a given, the stress scenario for the ETC outcome within each is obtained by the following deterministic optimization problem: The main idea behind expression (9) is that for each simulated renewable generation scenario and portfolio decision-vector, the stress scenario for the spot prices is endogenously obtained for the entire contract horizon by means of sub-level optimization problems, as defined in (9). The spot-price scenarios are defined to penalize as much as possible the revenue present value of the ETC, considering a set of constraints for the spot behavior to control the degree of stress produced. A partial present value accounts for the money value over the time within each subset of periods by means of a discount rate. In this setting, means the worst-case present value of the ETC revenue for a given scenario at the first period of, accounted for by. (9) Fig. 3. Stress scenario for the spot price obtained for three different years with different values for for some arbitrary scenario and portfolio. Note that controls the conservatism of the solution in each sub-level optimization problem. For example, in a scenario, asmall induces a low conservative solution because only few sub-periods can decouple from the reference and penalize the ETC s revenue. Hence, the larger the value of,themore freedom the sub-problems have to attack the portfolio, which would lead to more conservative solutions. Fig. 3 illustrates a stress spot-price scenario for a set of three subsets of periods (3 years on a monthly basis). Therefore, each subset of periods is built to represent the months of each of the three years as follows:, and,where.forillustrative purposes, a hypothetical renewable generation scenario and a decision vector were chosen to calculate the energy settlement (third term of expression (9)). Moreover, and were set to illustrate the response of the worst-case stress model. In Fig. 3 the bars represent the energy settled by the spot price in expression (9),, the dotted line represents the spot price reference, and the continuous line represents the stress scenario. In the first and third year, the worst-case spot scenario is obtained by decreasing the value of the energy during the sub-periods of the highest production surplus. In contrast, in the second year, the worst-case spot scenario is obtained by increasing the energy price during the two periods in which the renewable portfolio faces its worst production. This simple example shows the different structures for the stress scenario that resemble the well-known security criterion used in power system operation [15]. Under such interpretation, the optimized portfolio is set to withstand a spot-price spike, or deviations from the expected price pattern, in up to periods, e.g., months, in a subset of the contract horizon, e.g., a year. Finally, it is important to emphasize that the definition of the subset of periods is arbitrary in the proposed framework and constitute a modeling choice of the decision maker. This would allow for the decision maker to make use of the proposed uncertainty modeling approach for long-term strategies that would last for many accounting periods. III. HYBRID ROBUST AND STOCHASTIC MODEL The objective of the model is to determine the optimal renewable portfolio to back up a bilateral PPA sale in the forward market. Within this objective, the model determines the decision

7 FANZERES et al.: CONTRACTING STRATEGIES FOR RENEWABLE GENERATORS: A HYBRID STOCHASTIC AND ROBUST OPTIMIZATION APPROACH 7 vector through a risk-averse trading strategy, which is driven by the maximization of the certainty equivalent of the ETC s future cash flow. We use the left-tail conditional value-at-risk (CVaR) [27] to account for the risk in a risk-adjusted objective function composed of a convex combination between the CVaR and the expected value [28]. The portfolio model is a hybrid approach between robust and stochastic optimization and can be stated as follows: (10) (11) (12) (13) (14) Problem (10) (14) is a particular case of a bilevel problem, in which the first-level problem maximizes a concave function, namely the CVaR combined with the expected value, of a set of worst-case revenue scenarios obtained as the objective function of second-level minimization problems. Therefore, the proposed model is a sort of max-min optimization problem. In expression (10), the risk-averse certainty equivalent of the ETC is maximized. In such an expression, and play the role of risk-averse parameters for the ETC. The first term, weighted by, recovers the left-tail -CVaR of the th subset of periods of net income. Roughly speaking, the -CVaR can be understood as the average of the % worst-case scenarios of the total net income within. In practical applications, generally ranges from 0.90 to The second term, multiplied by the complementary weight, accounts for the expected value of the net income in the objective function. For further details on the economic interpretation of the adopted risk-metric, we refer to Appendix A. Expression (11) is part of the CVaR assessment, and the net revenue of the ETC is evaluated under the worst-case spot-price scenario (stress scenario) for each subset of periods. Expression (12) constrains PPA sales to the acquired amount of FECs, and (13) and (14) impose bounds on decision variables. Within this model, the ETC is allowed to express its riskpreference for different subset of periods. Furthermore, in this model, the CVaR measures the risk of the ETC under a given level of modeling uncertainty defined by the PUS. Thus, both the CVaR and the PUS are two combined ways to express the agent s risk-aversion. However, the role of the former is to assess the risk through the scenarios, while the latter inputs a level of uncertainty in those scenarios to consider the fact that the model that generates spot price scenarios is only an approximation of the real one. In Fig. 4, an outlook of the proposed model is depicted. In the first level, a unique portfolio vector is defined with the optimum amounts to be contracted by the ETC. Given the portfolio selected by the first-level problem, for each simulated renewable generation scenario, the worst-case revenue stream is assessed for all sub-periods by means of the spot-price stress scenarios Fig. 4. Overview of the stochastic max-min optimization approach. following expression (9). Then, the objective function is evaluated according to (10). IV. SINGLE-LEVEL EQUIVALENT MODEL Problem (10) (14) is a bilevel optimization problem and cannot be directly solved by commercial optimization solvers. Based on the RO approach presented in [12], an efficient maximization-equivalent formulation can be provided for (10) (14) using the following: 1) derive the dual objective function of the linear program defined by the right-hand-side of (9). It constitutes a lower bound for the worst-case settlement term, for all dual feasible solutions; 2) derive the dual feasible constraints of the linear program defined by the right-hand side of (9); 3) replace in (10) and (11) by the dual objective function found in 1) and add in (10) (14), the dual feasible constraints derived in 2). For an interested reader, we refer to [12] for further details on the aforementioned transformation. The equivalent single-level model for problem (10) (14) is the following: (15) (16) (17) (18)

8 8 IEEE TRANSACTIONS ON POWER SYSTEMS (19) (20) (21) (22) (23) (24) (25) In (15), the dual variables of the second level problem defined by (9) are optimization variables. Expressions (16) and (19) (25) follow steps 1) and 2), respectively. For expository purposes, expression (16) is used to facilitate the model understanding. Therefore, step 3) is performed in this expression. Finally, in (18), expressions (12) (14) are repeated. Model (15) (25) is the implementable version of problem (10) (14), which belongs to the class of two-stage stochastic linear programming models with recourse [31]. In this paper the extensive form of the stochastic program was solved (no decomposition used) but we highlight our problem structure is suitable for decomposition methods, such as the Benders approach [32]. Under such decomposition framework, the problem structure could be explored to decompose the sub-problem and solve it by sub-periods and scenarios. V. CASE STUDY In this section, two case studies illustrate the applicability of the proposed methodology with realistic data from the Brazilian power sector. In the first case study, we motivate the usage and analyze the results of the portfolio model (15) (25) as a strategic tool to define the optimal medium-term renewable portfolio to back up a one-year flat PPA. In the second case study, we consider a case where an ETC needs to define its optimal participation in a given set of renewable projects to supply a long-term PPA. In this setting, we assume a 10-year PPA, as typically required by financial institutions to provide competitive interest rates for project financing. For expository purposes, both case studies assume % is set to the equivalent monthly rate) and the opportunity of contracting two renewable units to back the PPA sale: a run-of-river small hydro (SH) plant with 30 MW of installed capacity and 17.4 avgmw of FEC, and a wind power plant (WPP) with 54.6 MW of installed capacity and avgmw of FEC. Furthermore, we also assume a deterministic spot price reference and maximum/minimum deviation parameters throughout both case studies by dropping its scenario index: and.wemake Fig. 5. Monthly statistics for the generation profile of complementary renewable generation units in the Brazilian power system: SH and WP. use of the methodology presented in [5] to jointly simulate a set of 2000 scenarios for the renewable energy generation based on the historical data available for the SH and WPP. In Fig. 5, the average and extreme quantiles (5% and 95%) of the simulated scenarios for the renewable production are depicted for the year of For reproducibility purposes, [29] makes available all data used in both case studies. A. Case Study I: Medium-Term Portfolio Strategy In this case study, we assume that the ETC has a selling opportunity of avgmw by R$/MWh and that both renewable units agree to sell 100% of their FEC by R$/MWh-of-FEC. In this first case study,. Thus,. The risk-aversion parameters are set to and the effect of varying parameter for 1, 2, and 3 is studied. For comparison purposes, a pure stochastic (PS) model (similar to the one proposed in [6]) is used to provide a base-case solution to be compared with the proposed hybrid stochastic-robust (HSR) model. The PS model considers the spot price scenarios as exogenous variables produced by a least cost dispatch model based on the SDDP methodology [9]. As mentioned in Section II-C, the PS model can be obtained from the HSR model by making the reference spot-price scenarios equal to the simulated ones and.official system data from December 2011 were used to produce the set of spot price scenarios for January 2012 to December In this case-study, the methodology used provides paired scenarios that account for the correlation between both processes (see [5] for further details). 3 Fig. 6 shows the statistics for the set of simulated spot price scenarios. The reference scenario used to run the robust portfolio model (15) (25) was set to the simulated average, shown in Fig. 6, to capture the conditional information of the spot prices throughout the contract horizon. Nevertheless, the maximum positive and negative deviations from the reference scenario were chosen to allow the stress scenario to reach the price cap (730 R$/MWh) and floor (12.1 R$/MWh), respectively, in any period. To constrain the worst-case spot-price scenarios, the maximum and minimum returns were obtained from the historical data for each month and are presented in Table I (see also [29] for all data used in this case study, including the spot price 3 The definition of how to derive generation and spot-price reference scenarios is case-dependent and out of the scope of this paper (they are consider as input data in our model).

9 FANZERES et al.: CONTRACTING STRATEGIES FOR RENEWABLE GENERATORS: A HYBRID STOCHASTIC AND ROBUST OPTIMIZATION APPROACH 9 Fig. 6. Average and extreme quantiles (5% and 95%) for the simulated spot prices: from January 2012 to December 2012 on a monthly basis. Fig. 7. Generation profile of the portfolios found with the stochastic and hybrid stochastic-robust models for the observed data (renewables generation) during the contract horizon: months of TABLE I ROBUST PORTFOLIO MODEL INPUT DATA FOR CASE STUDY I Fig. 8. Spot prices and revenue profile of the portfolios found with the stochastic and robust models for the observed data (renewables generation and spot prices) during the contract horizon: months of TABLE II OPTIMAL CONTRACTING OF EACH CANDIDATE OPTIONINTHESTOCHASTIC AND HYBRID STOCHASTIC-ROBUST CASE (AVGMW) and renewable production for both plants in each month and scenario). We have solved (15) (25), and the optimal amount sold and contracted of each technology is shown in Table II. Each problem was solved in less than one minute using a Dell Inspiron 15R Special Edition Laptop. We observed that when the spot price is treated as an exogenous variable (second column of Table II), the optimal strategy for the trader is to back its sales solely on the wind generator. One way to interpret this result is to observe that the wind production pattern is similar to the spot price one, i.e., high spot price seasons coincide, in general, with high wind power production (see Figs. 5 and 6 for better comparison). In contrast, hydro production presents almost full complementarity with these two variables, thus adding no value to the portfolio. When the model (15) (25) is utilized with and 2, the optimal strategy is also to sell the total of the PPA, but supporting it by a mixed portfolio that is composed of both wind and small hydro. This result is due to the stress-scenarios for the spot prices that penalize portfolios with high exposure to the spot market, which occurs whenever the portfolio generation is below the amount sold. This situation can be observed in Fig. 7, which shows an out-of-sample comparison (in energetic terms) for the first three portfolios shown in Table II with actual generation observed in In this year, spot prices lie within the 5th and 95th quantiles. However, the observed price for 2012 can be considered as atypical (when compared to the historical profile) since we have experienced an unusual spot-price dynamic (path through the year) with two price peaks, in April and November (see Fig. 8). As a conclusion, the role of the price dynamic is also considered when building the optimal HSR portfolio, because in (9), the stress-scenario is conceived to attack the portfolio with the worst-case path within a subset of periods. Therefore, the robust approach also guards the portfolio against the occurrence of unusual price dynamics. It is possible to see that the portfolios found with the robust model mitigate purchases in the spot market by raising the generation profile throughout the months. The effect of such mitigation is shown in Fig. 8, where the impact of the first semester spot-price disturbance (April and May) is attenuated under the robust solutions. Moreover, the excess of capacity contracted by the HSR model provides an extra benefit during the second peak (November) not fully obtained by the PS approach. For, the stress created to the portfolio is so high that it is optimal to not set up the business. Nevertheless, it is important to note that it is not always the case that the HSR model outperforms the PS one. In Table III,

10 10 IEEE TRANSACTIONS ON POWER SYSTEMS TABLE III BACK TEST IN THE YEARLY REVENUE OF THE ETC (MMR$) TABLE IV ROBUST PORTFOLIO MODEL INPUT DATA FOR CASE STUDY II. ALL MONTHLY DATA ARE THE SAME FOR ALL YEARS Fig. 9. Sensitivity analysis of the optimal solution of the PS model and HSR model with and 2 on the number of scenarios of renewable generation considered in the model for the Case Study I. the solution obtained with both models were evaluated under the observed generation and prices for 2012 and for two other representative years: 2010 (a typical year with respect to spot price realization lower values at the beginning of the year and high values at the end) and for 2008 (an unusual year a price spike in January and low values at the end of the year). As shown in Table III, the PS model has the highest yearly revenue in the typical year, mainly because the spot price outcome for this year realized as expected in accordance with the pattern of the simulated scenarios. However, when the spot price realization presents a different pattern with respect to the price scenarios simulated by the stochastic model, the hybrid stochastic-robust model outperforms the pure stochastic one. We highlight that the HSR model outperforms the PS one when the spot price increases in the last months of the year as well, indicating that the robust counterpart was also able to capture the effects of standard and normal pattern of prices. Finally, in Fig. 9, convergence analysis is performed by analyzing the convergence of the optimal-primal variables (decision vector as a function of the number of scenarios. In this figure, only the buying variables,,areshownsince the optimal solution of isthesame(equalto10avgmw) for all cases. Note that the optimal solutions stabilize when the number of scenarios meets This suggests that convergence is achieved. This fact provides strong evidences that the solution obtained, which make use of the 2000 scenarios, converged and the results presented are accurate with respect to the asymptotic probability distribution. B. Case Study II: Long-Term Portfolio Strategy In this second case study, we apply the HSR model to the same units (wind and SH) considered before. However, we now consider an ETC deciding its willingness to invest in both units. We consider that the ETC has the same price and quantity selling opportunity described in the previous case study but for a 10-year PPA horizon, from January 2016 to December In this case, is the set of years and is the collection of sets containing the months of each year, i.e., ; and. In this case study, the risk-aversion parameters are set to be constant:,and for all.moreover, remains fixed and equal to 0.95 throughout the case study. Under a time horizon of 10 years, the specification of any price model would rely on unpredictable economic and structural data inputs. The proposed approach provides the decision maker with a tool consistent with well-known stress analysis that is able to consider the information available for the stochastic nature of the renewables generation. The model developed in [5] was used to simulate the joint wind and SH production scenarios throughout the contract horizon, and the data presented in Table IV were used to constrain the related spot-price stress scenarios, in which the same sequence of monthly data are used for each years (all data, including the renewable production for both plants in each month and scenario, are also available in [29]). To evaluate the results, an efficient frontier curve is created by varying the risk-aversion parameter from0.5to0.99ona 0.05 step-basis. Fig. 10 shows the curve for and 2. The vertical axis represents the present value (PV) of the expected value of the 10-year revenue and the horizontal axis stands for risk. The latter is evaluated as the difference between the PV of the expected value and the PV of the CVaR %,i.e., the second and first terms of expression (10), respectively (see Appendix B for further details about the development of a risk metric in the multi-period setting). For and, the risk is higher than the expected return, indicating that the PV of the CVaR % is negative. This fact suggests that under, the investment decision in renewables requires high risk aversion to mitigate the solvency risk (chance of a negative PV). Table V depicts the

Investigation of the and minimum storage energy target levels approach. Final Report

Investigation of the and minimum storage energy target levels approach. Final Report Investigation of the AV@R and minimum storage energy target levels approach Final Report First activity of the technical cooperation between Georgia Institute of Technology and ONS - Operador Nacional

More information

ROBUST OPTIMIZATION OF MULTI-PERIOD PRODUCTION PLANNING UNDER DEMAND UNCERTAINTY. A. Ben-Tal, B. Golany and M. Rozenblit

ROBUST OPTIMIZATION OF MULTI-PERIOD PRODUCTION PLANNING UNDER DEMAND UNCERTAINTY. A. Ben-Tal, B. Golany and M. Rozenblit ROBUST OPTIMIZATION OF MULTI-PERIOD PRODUCTION PLANNING UNDER DEMAND UNCERTAINTY A. Ben-Tal, B. Golany and M. Rozenblit Faculty of Industrial Engineering and Management, Technion, Haifa 32000, Israel ABSTRACT

More information

Resource Planning with Uncertainty for NorthWestern Energy

Resource Planning with Uncertainty for NorthWestern Energy Resource Planning with Uncertainty for NorthWestern Energy Selection of Optimal Resource Plan for 213 Resource Procurement Plan August 28, 213 Gary Dorris, Ph.D. Ascend Analytics, LLC gdorris@ascendanalytics.com

More information

Modeling Flexibilities in Power Purchase Agreements: a Real Option Approach

Modeling Flexibilities in Power Purchase Agreements: a Real Option Approach Modeling Flexibilities in Power Purchase Agreements: a Real Option Approach Rafael Igrejas a,*, Leonardo Lima Gomes a, Luiz E. Brandão a. Abstract Power purchase and sale contracts in Brazil, have been

More information

Publication date: 12-Nov-2001 Reprinted from RatingsDirect

Publication date: 12-Nov-2001 Reprinted from RatingsDirect Publication date: 12-Nov-2001 Reprinted from RatingsDirect Commentary CDO Evaluator Applies Correlation and Monte Carlo Simulation to the Art of Determining Portfolio Quality Analyst: Sten Bergman, New

More information

Value-at-Risk Based Portfolio Management in Electric Power Sector

Value-at-Risk Based Portfolio Management in Electric Power Sector Value-at-Risk Based Portfolio Management in Electric Power Sector Ran SHI, Jin ZHONG Department of Electrical and Electronic Engineering University of Hong Kong, HKSAR, China ABSTRACT In the deregulated

More information

Challenges and Solutions: Innovations that we need in Optimization for Future Electric Power Systems

Challenges and Solutions: Innovations that we need in Optimization for Future Electric Power Systems Challenges and Solutions: Innovations that we need in Optimization for Future Electric Power Systems Dr. Chenye Wu Prof. Gabriela Hug wu@eeh.ee.ethz.ch 1 Challenges in the traditional power systems The

More information

Measuring and managing market risk June 2003

Measuring and managing market risk June 2003 Page 1 of 8 Measuring and managing market risk June 2003 Investment management is largely concerned with risk management. In the management of the Petroleum Fund, considerable emphasis is therefore placed

More information

Crediting Wind and Solar Renewables in Electricity Capacity Markets: The Effects of Alternative Definitions upon Market Efficiency. The Energy Journal

Crediting Wind and Solar Renewables in Electricity Capacity Markets: The Effects of Alternative Definitions upon Market Efficiency. The Energy Journal Crediting Wind and Solar Renewables in Electricity Capacity Markets: The Effects of Alternative Definitions upon Market Efficiency The Energy Journal On-Line Appendix A: Supporting proofs of social cost

More information

MULTISTAGE PORTFOLIO OPTIMIZATION AS A STOCHASTIC OPTIMAL CONTROL PROBLEM

MULTISTAGE PORTFOLIO OPTIMIZATION AS A STOCHASTIC OPTIMAL CONTROL PROBLEM K Y B E R N E T I K A M A N U S C R I P T P R E V I E W MULTISTAGE PORTFOLIO OPTIMIZATION AS A STOCHASTIC OPTIMAL CONTROL PROBLEM Martin Lauko Each portfolio optimization problem is a trade off between

More information

Characterization of the Optimum

Characterization of the Optimum ECO 317 Economics of Uncertainty Fall Term 2009 Notes for lectures 5. Portfolio Allocation with One Riskless, One Risky Asset Characterization of the Optimum Consider a risk-averse, expected-utility-maximizing

More information

Brooks, Introductory Econometrics for Finance, 3rd Edition

Brooks, Introductory Econometrics for Finance, 3rd Edition P1.T2. Quantitative Analysis Brooks, Introductory Econometrics for Finance, 3rd Edition Bionic Turtle FRM Study Notes Sample By David Harper, CFA FRM CIPM and Deepa Raju www.bionicturtle.com Chris Brooks,

More information

Stochastic Programming in Gas Storage and Gas Portfolio Management. ÖGOR-Workshop, September 23rd, 2010 Dr. Georg Ostermaier

Stochastic Programming in Gas Storage and Gas Portfolio Management. ÖGOR-Workshop, September 23rd, 2010 Dr. Georg Ostermaier Stochastic Programming in Gas Storage and Gas Portfolio Management ÖGOR-Workshop, September 23rd, 2010 Dr. Georg Ostermaier Agenda Optimization tasks in gas storage and gas portfolio management Scenario

More information

Lecture 10: Performance measures

Lecture 10: Performance measures Lecture 10: Performance measures Prof. Dr. Svetlozar Rachev Institute for Statistics and Mathematical Economics University of Karlsruhe Portfolio and Asset Liability Management Summer Semester 2008 Prof.

More information

A Simple Model of Bank Employee Compensation

A Simple Model of Bank Employee Compensation Federal Reserve Bank of Minneapolis Research Department A Simple Model of Bank Employee Compensation Christopher Phelan Working Paper 676 December 2009 Phelan: University of Minnesota and Federal Reserve

More information

Stochastic Analysis Of Long Term Multiple-Decrement Contracts

Stochastic Analysis Of Long Term Multiple-Decrement Contracts Stochastic Analysis Of Long Term Multiple-Decrement Contracts Matthew Clark, FSA, MAAA and Chad Runchey, FSA, MAAA Ernst & Young LLP January 2008 Table of Contents Executive Summary...3 Introduction...6

More information

SIMULATION OF ELECTRICITY MARKETS

SIMULATION OF ELECTRICITY MARKETS SIMULATION OF ELECTRICITY MARKETS MONTE CARLO METHODS Lectures 15-18 in EG2050 System Planning Mikael Amelin 1 COURSE OBJECTIVES To pass the course, the students should show that they are able to - apply

More information

Dynamic Replication of Non-Maturing Assets and Liabilities

Dynamic Replication of Non-Maturing Assets and Liabilities Dynamic Replication of Non-Maturing Assets and Liabilities Michael Schürle Institute for Operations Research and Computational Finance, University of St. Gallen, Bodanstr. 6, CH-9000 St. Gallen, Switzerland

More information

A New Resource Adequacy Standard for the Pacific Northwest. Background Paper

A New Resource Adequacy Standard for the Pacific Northwest. Background Paper A New Resource Adequacy Standard for the Pacific Northwest Background Paper 12/6/2011 A New Resource Adequacy Standard for the Pacific Northwest Background Paper CONTENTS Abstract... 3 Summary... 3 Background...

More information

Gas storage: overview and static valuation

Gas storage: overview and static valuation In this first article of the new gas storage segment of the Masterclass series, John Breslin, Les Clewlow, Tobias Elbert, Calvin Kwok and Chris Strickland provide an illustration of how the four most common

More information

Target Date Glide Paths: BALANCING PLAN SPONSOR GOALS 1

Target Date Glide Paths: BALANCING PLAN SPONSOR GOALS 1 PRICE PERSPECTIVE In-depth analysis and insights to inform your decision-making. Target Date Glide Paths: BALANCING PLAN SPONSOR GOALS 1 EXECUTIVE SUMMARY We believe that target date portfolios are well

More information

Managing the Uncertainty: An Approach to Private Equity Modeling

Managing the Uncertainty: An Approach to Private Equity Modeling Managing the Uncertainty: An Approach to Private Equity Modeling We propose a Monte Carlo model that enables endowments to project the distributions of asset values and unfunded liability levels for the

More information

A Multi-Stage Stochastic Programming Model for Managing Risk-Optimal Electricity Portfolios. Stochastic Programming and Electricity Risk Management

A Multi-Stage Stochastic Programming Model for Managing Risk-Optimal Electricity Portfolios. Stochastic Programming and Electricity Risk Management A Multi-Stage Stochastic Programming Model for Managing Risk-Optimal Electricity Portfolios SLIDE 1 Outline Multi-stage stochastic programming modeling Setting - Electricity portfolio management Electricity

More information

Lecture 2 Dynamic Equilibrium Models: Three and More (Finite) Periods

Lecture 2 Dynamic Equilibrium Models: Three and More (Finite) Periods Lecture 2 Dynamic Equilibrium Models: Three and More (Finite) Periods. Introduction In ECON 50, we discussed the structure of two-period dynamic general equilibrium models, some solution methods, and their

More information

Multistage risk-averse asset allocation with transaction costs

Multistage risk-averse asset allocation with transaction costs Multistage risk-averse asset allocation with transaction costs 1 Introduction Václav Kozmík 1 Abstract. This paper deals with asset allocation problems formulated as multistage stochastic programming models.

More information

A Study on Optimal Limit Order Strategy using Multi-Period Stochastic Programming considering Nonexecution Risk

A Study on Optimal Limit Order Strategy using Multi-Period Stochastic Programming considering Nonexecution Risk Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference 2018 A Study on Optimal Limit Order Strategy using Multi-Period Stochastic Programming considering Nonexecution Ris

More information

Callability Features

Callability Features 2 Callability Features 2.1 Introduction and Objectives In this chapter, we introduce callability which gives one party in a transaction the right (but not the obligation) to terminate the transaction early.

More information

UPDATED IAA EDUCATION SYLLABUS

UPDATED IAA EDUCATION SYLLABUS II. UPDATED IAA EDUCATION SYLLABUS A. Supporting Learning Areas 1. STATISTICS Aim: To enable students to apply core statistical techniques to actuarial applications in insurance, pensions and emerging

More information

Calculating VaR. There are several approaches for calculating the Value at Risk figure. The most popular are the

Calculating VaR. There are several approaches for calculating the Value at Risk figure. The most popular are the VaR Pro and Contra Pro: Easy to calculate and to understand. It is a common language of communication within the organizations as well as outside (e.g. regulators, auditors, shareholders). It is not really

More information

AIRCURRENTS: PORTFOLIO OPTIMIZATION FOR REINSURERS

AIRCURRENTS: PORTFOLIO OPTIMIZATION FOR REINSURERS MARCH 12 AIRCURRENTS: PORTFOLIO OPTIMIZATION FOR REINSURERS EDITOR S NOTE: A previous AIRCurrent explored portfolio optimization techniques for primary insurance companies. In this article, Dr. SiewMun

More information

The Value of Flexibility to Expand Production Capacity for Oil Projects: Is it Really Important in Practice?

The Value of Flexibility to Expand Production Capacity for Oil Projects: Is it Really Important in Practice? SPE 139338-PP The Value of Flexibility to Expand Production Capacity for Oil Projects: Is it Really Important in Practice? G. A. Costa Lima; A. T. F. S. Gaspar Ravagnani; M. A. Sampaio Pinto and D. J.

More information

Online Appendix: Extensions

Online Appendix: Extensions B Online Appendix: Extensions In this online appendix we demonstrate that many important variations of the exact cost-basis LUL framework remain tractable. In particular, dual problem instances corresponding

More information

Retirement. Optimal Asset Allocation in Retirement: A Downside Risk Perspective. JUne W. Van Harlow, Ph.D., CFA Director of Research ABSTRACT

Retirement. Optimal Asset Allocation in Retirement: A Downside Risk Perspective. JUne W. Van Harlow, Ph.D., CFA Director of Research ABSTRACT Putnam Institute JUne 2011 Optimal Asset Allocation in : A Downside Perspective W. Van Harlow, Ph.D., CFA Director of Research ABSTRACT Once an individual has retired, asset allocation becomes a critical

More information

The Duration Derby: A Comparison of Duration Based Strategies in Asset Liability Management

The Duration Derby: A Comparison of Duration Based Strategies in Asset Liability Management The Duration Derby: A Comparison of Duration Based Strategies in Asset Liability Management H. Zheng Department of Mathematics, Imperial College London SW7 2BZ, UK h.zheng@ic.ac.uk L. C. Thomas School

More information

The RES-induced Switching Effect Across Fossil Fuels: An Analysis of the Italian Day-ahead and Balancing Prices

The RES-induced Switching Effect Across Fossil Fuels: An Analysis of the Italian Day-ahead and Balancing Prices The RES-induced Switching Effect Across Fossil Fuels: An Analysis of the Italian Day-ahead and Balancing Prices Angelica Gianfreda, Lucia Parisio, Matteo Pelagatti Department of Economics, Management and

More information

The duration derby : a comparison of duration based strategies in asset liability management

The duration derby : a comparison of duration based strategies in asset liability management Edith Cowan University Research Online ECU Publications Pre. 2011 2001 The duration derby : a comparison of duration based strategies in asset liability management Harry Zheng David E. Allen Lyn C. Thomas

More information

PRE CONFERENCE WORKSHOP 3

PRE CONFERENCE WORKSHOP 3 PRE CONFERENCE WORKSHOP 3 Stress testing operational risk for capital planning and capital adequacy PART 2: Monday, March 18th, 2013, New York Presenter: Alexander Cavallo, NORTHERN TRUST 1 Disclaimer

More information

Supplement to the lecture on the Diamond-Dybvig model

Supplement to the lecture on the Diamond-Dybvig model ECON 4335 Economics of Banking, Fall 2016 Jacopo Bizzotto 1 Supplement to the lecture on the Diamond-Dybvig model The model in Diamond and Dybvig (1983) incorporates important features of the real world:

More information

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright c 2018 Ross Baldick www.ece.utexas.edu/ baldick/classes/394v/ee394v.html Title Page 1 of 160

More information

Robust Dual Dynamic Programming

Robust Dual Dynamic Programming 1 / 18 Robust Dual Dynamic Programming Angelos Georghiou, Angelos Tsoukalas, Wolfram Wiesemann American University of Beirut Olayan School of Business 31 May 217 2 / 18 Inspired by SDDP Stochastic optimization

More information

A Quantitative Metric to Validate Risk Models

A Quantitative Metric to Validate Risk Models 2013 A Quantitative Metric to Validate Risk Models William Rearden 1 M.A., M.Sc. Chih-Kai, Chang 2 Ph.D., CERA, FSA Abstract The paper applies a back-testing validation methodology of economic scenario

More information

How multi-technology PPA structures could help companies reduce risk

How multi-technology PPA structures could help companies reduce risk How multi-technology PPA structures could help companies reduce risk 1 How multi-technology PPA structures could help companies reduce risk Table of contents Introduction... 3 Key PPA risks related to

More information

Bloomberg. Portfolio Value-at-Risk. Sridhar Gollamudi & Bryan Weber. September 22, Version 1.0

Bloomberg. Portfolio Value-at-Risk. Sridhar Gollamudi & Bryan Weber. September 22, Version 1.0 Portfolio Value-at-Risk Sridhar Gollamudi & Bryan Weber September 22, 2011 Version 1.0 Table of Contents 1 Portfolio Value-at-Risk 2 2 Fundamental Factor Models 3 3 Valuation methodology 5 3.1 Linear factor

More information

The mean-variance portfolio choice framework and its generalizations

The mean-variance portfolio choice framework and its generalizations The mean-variance portfolio choice framework and its generalizations Prof. Massimo Guidolin 20135 Theory of Finance, Part I (Sept. October) Fall 2014 Outline and objectives The backward, three-step solution

More information

Alternative VaR Models

Alternative VaR Models Alternative VaR Models Neil Roeth, Senior Risk Developer, TFG Financial Systems. 15 th July 2015 Abstract We describe a variety of VaR models in terms of their key attributes and differences, e.g., parametric

More information

The risk/return trade-off has been a

The risk/return trade-off has been a Efficient Risk/Return Frontiers for Credit Risk HELMUT MAUSSER AND DAN ROSEN HELMUT MAUSSER is a mathematician at Algorithmics Inc. in Toronto, Canada. DAN ROSEN is the director of research at Algorithmics

More information

Dynamic Risk Management in Electricity Portfolio Optimization via Polyhedral Risk Functionals

Dynamic Risk Management in Electricity Portfolio Optimization via Polyhedral Risk Functionals Dynamic Risk Management in Electricity Portfolio Optimization via Polyhedral Risk Functionals A. Eichhorn and W. Römisch Humboldt-University Berlin, Department of Mathematics, Germany http://www.math.hu-berlin.de/~romisch

More information

Optimal Dam Management

Optimal Dam Management Optimal Dam Management Michel De Lara et Vincent Leclère July 3, 2012 Contents 1 Problem statement 1 1.1 Dam dynamics.................................. 2 1.2 Intertemporal payoff criterion..........................

More information

Forward Contracts and Generator Market Power: How Externalities Reduce Benefits in Equilibrium

Forward Contracts and Generator Market Power: How Externalities Reduce Benefits in Equilibrium Forward Contracts and Generator Market Power: How Externalities Reduce Benefits in Equilibrium Ian Schneider, Audun Botterud, and Mardavij Roozbehani November 9, 2017 Abstract Research has shown that forward

More information

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright c 2017 Ross Baldick www.ece.utexas.edu/ baldick/classes/394v/ee394v.html Title Page 1 of 205

More information

Fiduciary Insights. COMPREHENSIVE ASSET LIABILITY MANAGEMENT: A CALM Aproach to Investing Healthcare System Assets

Fiduciary Insights. COMPREHENSIVE ASSET LIABILITY MANAGEMENT: A CALM Aproach to Investing Healthcare System Assets COMPREHENSIVE ASSET LIABILITY MANAGEMENT: A CALM Aproach to Investing Healthcare System Assets IN A COMPLEX HEALTHCARE INSTITUTION WITH MULTIPLE INVESTMENT POOLS, BALANCING INVESTMENT AND OPERATIONAL RISKS

More information

CFA Level III - LOS Changes

CFA Level III - LOS Changes CFA Level III - LOS Changes 2017-2018 Ethics Ethics Ethics Ethics Ethics Ethics Ethics Topic LOS Level III - 2017 (337 LOS) LOS Level III - 2018 (340 LOS) Compared 1.1.a 1.1.b 1.2.a 1.2.b 2.3.a 2.3.b 2.4.a

More information

ESGs: Spoilt for choice or no alternatives?

ESGs: Spoilt for choice or no alternatives? ESGs: Spoilt for choice or no alternatives? FA L K T S C H I R S C H N I T Z ( F I N M A ) 1 0 3. M i t g l i e d e r v e r s a m m l u n g S AV A F I R, 3 1. A u g u s t 2 0 1 2 Agenda 1. Why do we need

More information

Measuring Retirement Plan Effectiveness

Measuring Retirement Plan Effectiveness T. Rowe Price Measuring Retirement Plan Effectiveness T. Rowe Price Plan Meter helps sponsors assess and improve plan performance Retirement Insights Once considered ancillary to defined benefit (DB) pension

More information

Measurement of Market Risk

Measurement of Market Risk Measurement of Market Risk Market Risk Directional risk Relative value risk Price risk Liquidity risk Type of measurements scenario analysis statistical analysis Scenario Analysis A scenario analysis measures

More information

Payment mechanisms and risk-aversion in electricity markets with uncertain supply

Payment mechanisms and risk-aversion in electricity markets with uncertain supply Payment mechanisms and risk-aversion in electricity markets with uncertain supply Ryan Cory-Wright Joint work with Golbon Zakeri (thanks to Andy Philpott) ISMP, Bordeaux, July 2018. ORC, Massachusetts

More information

VOLATILITY EFFECTS AND VIRTUAL ASSETS: HOW TO PRICE AND HEDGE AN ENERGY PORTFOLIO

VOLATILITY EFFECTS AND VIRTUAL ASSETS: HOW TO PRICE AND HEDGE AN ENERGY PORTFOLIO VOLATILITY EFFECTS AND VIRTUAL ASSETS: HOW TO PRICE AND HEDGE AN ENERGY PORTFOLIO GME Workshop on FINANCIAL MARKETS IMPACT ON ENERGY PRICES Responsabile Pricing and Structuring Edison Trading Rome, 4 December

More information

Mean-Variance Analysis

Mean-Variance Analysis Mean-Variance Analysis Mean-variance analysis 1/ 51 Introduction How does one optimally choose among multiple risky assets? Due to diversi cation, which depends on assets return covariances, the attractiveness

More information

Clearing Manager. Financial Transmission Rights. Prudential Security Assessment Methodology. 18 September with September 2015 variation

Clearing Manager. Financial Transmission Rights. Prudential Security Assessment Methodology. 18 September with September 2015 variation Clearing Manager Financial Transmission Rights Prudential Security Assessment Methodology with September 2015 variation 18 September 2015 To apply from 9 October 2015 Author: Warwick Small Document owner:

More information

1. Cash-in-Advance models a. Basic model under certainty b. Extended model in stochastic case. recommended)

1. Cash-in-Advance models a. Basic model under certainty b. Extended model in stochastic case. recommended) Monetary Economics: Macro Aspects, 26/2 2013 Henrik Jensen Department of Economics University of Copenhagen 1. Cash-in-Advance models a. Basic model under certainty b. Extended model in stochastic case

More information

Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets

Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets Nathaniel Hendren October, 2013 Abstract Both Akerlof (1970) and Rothschild and Stiglitz (1976) show that

More information

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL APPENDIX B: PORTFOLIO OPTIMIZATION MODEL PUBLIC UTILITY DISTRICT #1 OF SNOHOMISH COUNTY Prepared by Generation, Power, Rates, and Transmission Management Division Snohomish County PUD DRAFT 2017 Integrated

More information

CFA Level III - LOS Changes

CFA Level III - LOS Changes CFA Level III - LOS Changes 2016-2017 Ethics Ethics Ethics Ethics Ethics Ethics Ethics Ethics Topic LOS Level III - 2016 (332 LOS) LOS Level III - 2017 (337 LOS) Compared 1.1.a 1.1.b 1.2.a 1.2.b 2.3.a

More information

Lecture 2: Fundamentals of meanvariance

Lecture 2: Fundamentals of meanvariance Lecture 2: Fundamentals of meanvariance analysis Prof. Massimo Guidolin Portfolio Management Second Term 2018 Outline and objectives Mean-variance and efficient frontiers: logical meaning o Guidolin-Pedio,

More information

Capacity Expansion in Competitive Electricity Markets

Capacity Expansion in Competitive Electricity Markets Capacity Expansion in Competitive Electricity Markets Efthymios Karangelos University of Liege November 2013 In the past... Vertical Integration A single utility owned & operated all power system infrastructure.

More information

Graduate Macro Theory II: Two Period Consumption-Saving Models

Graduate Macro Theory II: Two Period Consumption-Saving Models Graduate Macro Theory II: Two Period Consumption-Saving Models Eric Sims University of Notre Dame Spring 207 Introduction This note works through some simple two-period consumption-saving problems. In

More information

CHAPTER II LITERATURE STUDY

CHAPTER II LITERATURE STUDY CHAPTER II LITERATURE STUDY 2.1. Risk Management Monetary crisis that strike Indonesia during 1998 and 1999 has caused bad impact to numerous government s and commercial s bank. Most of those banks eventually

More information

Journal of Computational and Applied Mathematics. The mean-absolute deviation portfolio selection problem with interval-valued returns

Journal of Computational and Applied Mathematics. The mean-absolute deviation portfolio selection problem with interval-valued returns Journal of Computational and Applied Mathematics 235 (2011) 4149 4157 Contents lists available at ScienceDirect Journal of Computational and Applied Mathematics journal homepage: www.elsevier.com/locate/cam

More information

Pricing Transmission

Pricing Transmission 1 / 47 Pricing Transmission Quantitative Energy Economics Anthony Papavasiliou 2 / 47 Pricing Transmission 1 Locational Marginal Pricing 2 Congestion Rent and Congestion Cost 3 Competitive Market Model

More information

Chapter 19 Optimal Fiscal Policy

Chapter 19 Optimal Fiscal Policy Chapter 19 Optimal Fiscal Policy We now proceed to study optimal fiscal policy. We should make clear at the outset what we mean by this. In general, fiscal policy entails the government choosing its spending

More information

Market Risk Analysis Volume IV. Value-at-Risk Models

Market Risk Analysis Volume IV. Value-at-Risk Models Market Risk Analysis Volume IV Value-at-Risk Models Carol Alexander John Wiley & Sons, Ltd List of Figures List of Tables List of Examples Foreword Preface to Volume IV xiii xvi xxi xxv xxix IV.l Value

More information

Quantitative Risk Management

Quantitative Risk Management Quantitative Risk Management Asset Allocation and Risk Management Martin B. Haugh Department of Industrial Engineering and Operations Research Columbia University Outline Review of Mean-Variance Analysis

More information

SOLVING ROBUST SUPPLY CHAIN PROBLEMS

SOLVING ROBUST SUPPLY CHAIN PROBLEMS SOLVING ROBUST SUPPLY CHAIN PROBLEMS Daniel Bienstock Nuri Sercan Özbay Columbia University, New York November 13, 2005 Project with Lucent Technologies Optimize the inventory buffer levels in a complicated

More information

An Approximation Algorithm for Capacity Allocation over a Single Flight Leg with Fare-Locking

An Approximation Algorithm for Capacity Allocation over a Single Flight Leg with Fare-Locking An Approximation Algorithm for Capacity Allocation over a Single Flight Leg with Fare-Locking Mika Sumida School of Operations Research and Information Engineering, Cornell University, Ithaca, New York

More information

Martingale Pricing Theory in Discrete-Time and Discrete-Space Models

Martingale Pricing Theory in Discrete-Time and Discrete-Space Models IEOR E4707: Foundations of Financial Engineering c 206 by Martin Haugh Martingale Pricing Theory in Discrete-Time and Discrete-Space Models These notes develop the theory of martingale pricing in a discrete-time,

More information

Solving real-life portfolio problem using stochastic programming and Monte-Carlo techniques

Solving real-life portfolio problem using stochastic programming and Monte-Carlo techniques Solving real-life portfolio problem using stochastic programming and Monte-Carlo techniques 1 Introduction Martin Branda 1 Abstract. We deal with real-life portfolio problem with Value at Risk, transaction

More information

Essays on Some Combinatorial Optimization Problems with Interval Data

Essays on Some Combinatorial Optimization Problems with Interval Data Essays on Some Combinatorial Optimization Problems with Interval Data a thesis submitted to the department of industrial engineering and the institute of engineering and sciences of bilkent university

More information

Scarcity Pricing Market Design Considerations

Scarcity Pricing Market Design Considerations 1 / 49 Scarcity Pricing Market Design Considerations Anthony Papavasiliou, Yves Smeers Center for Operations Research and Econometrics Université catholique de Louvain CORE Energy Day April 16, 2018 Outline

More information

Target-Date Glide Paths: Balancing Plan Sponsor Goals 1

Target-Date Glide Paths: Balancing Plan Sponsor Goals 1 Target-Date Glide Paths: Balancing Plan Sponsor Goals 1 T. Rowe Price Investment Dialogue November 2014 Authored by: Richard K. Fullmer, CFA James A Tzitzouris, Ph.D. Executive Summary We believe that

More information

Report for technical cooperation between Georgia Institute of Technology and ONS - Operador Nacional do Sistema Elétrico Risk Averse Approach

Report for technical cooperation between Georgia Institute of Technology and ONS - Operador Nacional do Sistema Elétrico Risk Averse Approach Report for technical cooperation between Georgia Institute of Technology and ONS - Operador Nacional do Sistema Elétrico Risk Averse Approach Alexander Shapiro and Wajdi Tekaya School of Industrial and

More information

EE266 Homework 5 Solutions

EE266 Homework 5 Solutions EE, Spring 15-1 Professor S. Lall EE Homework 5 Solutions 1. A refined inventory model. In this problem we consider an inventory model that is more refined than the one you ve seen in the lectures. The

More information

August Asset/Liability Study Texas Municipal Retirement System

August Asset/Liability Study Texas Municipal Retirement System August 2016 Asset/Liability Study Texas Municipal Retirement System Table of Contents ACKNOWLEDGEMENTS... PAGE 2 INTRODUCTION... PAGE 3 CURRENT STATUS... PAGE 7 DETERMINISTIC ANALYSIS... PAGE 8 DETERMINISTIC

More information

Solving dynamic portfolio choice problems by recursing on optimized portfolio weights or on the value function?

Solving dynamic portfolio choice problems by recursing on optimized portfolio weights or on the value function? DOI 0.007/s064-006-9073-z ORIGINAL PAPER Solving dynamic portfolio choice problems by recursing on optimized portfolio weights or on the value function? Jules H. van Binsbergen Michael W. Brandt Received:

More information

Fiduciary Insights LEVERAGING PORTFOLIOS EFFICIENTLY

Fiduciary Insights LEVERAGING PORTFOLIOS EFFICIENTLY LEVERAGING PORTFOLIOS EFFICIENTLY WHETHER TO USE LEVERAGE AND HOW BEST TO USE IT TO IMPROVE THE EFFICIENCY AND RISK-ADJUSTED RETURNS OF PORTFOLIOS ARE AMONG THE MOST RELEVANT AND LEAST UNDERSTOOD QUESTIONS

More information

PAULI MURTO, ANDREY ZHUKOV

PAULI MURTO, ANDREY ZHUKOV GAME THEORY SOLUTION SET 1 WINTER 018 PAULI MURTO, ANDREY ZHUKOV Introduction For suggested solution to problem 4, last year s suggested solutions by Tsz-Ning Wong were used who I think used suggested

More information

Decision Support Models 2012/2013

Decision Support Models 2012/2013 Risk Analysis Decision Support Models 2012/2013 Bibliography: Goodwin, P. and Wright, G. (2003) Decision Analysis for Management Judgment, John Wiley and Sons (chapter 7) Clemen, R.T. and Reilly, T. (2003).

More information

Multistage Stochastic Demand-side Management for Price-Making Major Consumers of Electricity in a Co-optimized Energy and Reserve Market

Multistage Stochastic Demand-side Management for Price-Making Major Consumers of Electricity in a Co-optimized Energy and Reserve Market Multistage Stochastic Demand-side Management for Price-Making Major Consumers of Electricity in a Co-optimized Energy and Reserve Market Mahbubeh Habibian Anthony Downward Golbon Zakeri Abstract In this

More information

Log-Robust Portfolio Management

Log-Robust Portfolio Management Log-Robust Portfolio Management Dr. Aurélie Thiele Lehigh University Joint work with Elcin Cetinkaya and Ban Kawas Research partially supported by the National Science Foundation Grant CMMI-0757983 Dr.

More information

EE365: Risk Averse Control

EE365: Risk Averse Control EE365: Risk Averse Control Risk averse optimization Exponential risk aversion Risk averse control 1 Outline Risk averse optimization Exponential risk aversion Risk averse control Risk averse optimization

More information

16 MAKING SIMPLE DECISIONS

16 MAKING SIMPLE DECISIONS 253 16 MAKING SIMPLE DECISIONS Let us associate each state S with a numeric utility U(S), which expresses the desirability of the state A nondeterministic action a will have possible outcome states Result(a)

More information

ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS

ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS ASSESSMENT OF TRANSMISSION CONGESTION IMPACTS ON ELECTRICITY MARKETS presentation by George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign University

More information

Overview. Forward contracts in the Australian Electricity Market. Generators are paid the clearing price. Spot market

Overview. Forward contracts in the Australian Electricity Market. Generators are paid the clearing price. Spot market Overview Forward contracts in the Australian Electricity Market Eddie Anderson Joint work with Xinmin Hu and Don Winchester Fundamentals: forward and spot Interviews with participants in the NEM: A mix

More information

Spinning Reserve Market Event Report

Spinning Reserve Market Event Report Spinning Reserve Market Event Report 23 January, 2004 TABLE OF CONTENTS PAGE 1. MARKET EVENT... 1 2. BACKGROUND... 2 3. HYDRO GENERATION, THE HYDRO PPA AND THE AS MARKET... 4 4. CHRONOLOGY AND ANALYSIS...

More information

In physics and engineering education, Fermi problems

In physics and engineering education, Fermi problems A THOUGHT ON FERMI PROBLEMS FOR ACTUARIES By Runhuan Feng In physics and engineering education, Fermi problems are named after the physicist Enrico Fermi who was known for his ability to make good approximate

More information

Robust Optimization Applied to a Currency Portfolio

Robust Optimization Applied to a Currency Portfolio Robust Optimization Applied to a Currency Portfolio R. Fonseca, S. Zymler, W. Wiesemann, B. Rustem Workshop on Numerical Methods and Optimization in Finance June, 2009 OUTLINE Introduction Motivation &

More information

Economics 2010c: Lecture 4 Precautionary Savings and Liquidity Constraints

Economics 2010c: Lecture 4 Precautionary Savings and Liquidity Constraints Economics 2010c: Lecture 4 Precautionary Savings and Liquidity Constraints David Laibson 9/11/2014 Outline: 1. Precautionary savings motives 2. Liquidity constraints 3. Application: Numerical solution

More information

Capital Constraints, Lending over the Cycle and the Precautionary Motive: A Quantitative Exploration

Capital Constraints, Lending over the Cycle and the Precautionary Motive: A Quantitative Exploration Capital Constraints, Lending over the Cycle and the Precautionary Motive: A Quantitative Exploration Angus Armstrong and Monique Ebell National Institute of Economic and Social Research 1. Introduction

More information

Random Variables and Probability Distributions

Random Variables and Probability Distributions Chapter 3 Random Variables and Probability Distributions Chapter Three Random Variables and Probability Distributions 3. Introduction An event is defined as the possible outcome of an experiment. In engineering

More information

Vanguard Global Capital Markets Model

Vanguard Global Capital Markets Model Vanguard Global Capital Markets Model Research brief March 1 Vanguard s Global Capital Markets Model TM (VCMM) is a proprietary financial simulation engine designed to help our clients make effective asset

More information

On the value of European options on a stock paying a discrete dividend at uncertain date

On the value of European options on a stock paying a discrete dividend at uncertain date A Work Project, presented as part of the requirements for the Award of a Master Degree in Finance from the NOVA School of Business and Economics. On the value of European options on a stock paying a discrete

More information