1 Progress Report on Tranche Release Project Number: Loan Number: 2673 April 2017 Cambodia: Water Resources Management Sector Development Program (Second Tranche) This consultant s document report is being does not disclosed necessarily to reflect the the public views of in ADB accordance the government with concerned. ADB's Public [For Communications PPTAs: Also, all of Policy the views expressed herein may not be incorporated into the proposed project s design.]

2 CURRENCY EQUIVALENTS (as of 4 April 2017) Currency Unit riel (KR) KR1.00 = $ $1.00 = KR4, ABBREVIATIONS ADB Asian Development Bank CISIS Cambodia Irrigation Schemes Information System CoM Council of Ministers FWUC farmers water user community ITC Institute of Technology Cambodia IWRM Integrated water resources management MOWRAM Ministry of Water Resources and Meteorology NRBMC National River Basin Management Committee O&M operation and maintenance PDWRAMs provincial departments of water resources and meteorology TSC Technical Services Center NOTE In this report, "$" refers to US dollars. Vice-President S. Groff, Operations 2 Director General J. Nugent, Southeast Asia Department (SERD) Director J. Zhang, Environment, Natural Resources, and Agriculture Division, SERD Team leader Team member R. Farrukh, Water Resources Specialist, SERD E. Battung, Project Analyst, SERD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS Page I. INTRODUCTION 1 II. BACKGROUND 1 III. PROGRESS IN PROGRAM IMPLEMENTATION 1 A. Overall Progress 1 B. Status of Compliance with Tranche Two Conditions 3 IV. CONCLUSION 5 V. THE PRESIDENT SDECISION 5 APPENDIX: STATUS OF COMPLIANCE WITH TRANCHE TWO CONDITIONS 6

4 I. INTRODUCTION 1. The Asian Development Bank (ADB) approved the Water Resources Management Sector Development Program (WRMSDP) on 23 September 2010 for SDR13,207,000.0 ($20.0 million equivalent at approval). 1 The loan agreement was signed on 22 October 2010, and declared effective on 3 June The Government of Cambodia fulfilled the conditions for release of the first tranche of the program loan, equaling SDR6,603,000 ($10,371,794), which was released on 3 October The original loan closing date was 30 June It has been extended five times on the requests of the government to meet with the 12 policy conditions for release of the second tranche. The revised loan closing date is 30 June II. BACKGROUND 2. Cambodia s economy is highly dependent on water. Its importance for food production, rural livelihoods and economic development is recognized in phase III of the government s Rectangular Strategy for Growth, Employment, Equity and Efficiency (2013); and the Strategy for Agriculture and Water ( ). Rainfall distribution and river discharges are highly seasonal, variable and unpredictable, with a natural pattern of wet and dry seasons, typhoons, floods and droughts. The associated annual rise and fall of the Mekong River has both positive and negative effects, sustaining the critical water cycles of the Tonle Sap Lake and Lower Mekong Delta necessary for agriculture and fisheries production, but with the potential to cause major flooding and damage to infrastructure and crops, and loss of life. Climate change has further increased the challenges of water management, with a decrease in rainfall in the dry season and an increase in the wet season, more frequent extreme weather events, and potential worsening of seasonal water shortages and floods. 3. The sector development program supports the process of (i) strengthening national water sector policy and regulations, and the institutional environment; (ii) improving integrated water resources management (IWRM) performance in river basins; and (iii) strengthening irrigation services. The impact of the program will be enhanced food security, and the outcome is improved management of water resources and more efficient and sustainable irrigation services. The Ministry of Water Resources and Meteorology (MOWRAM) is the executing agency. III. PROGRESS IN PROGRAM IMPLEMENTATION A. Overall Progress 4. The program has delivered the envisaged outputs: (i) enhanced capacity for sustainable water resources management, and (ii) enhanced capacity of MOWRAM to manage and deliver irrigation services. Details of the achievements under these outputs are provided below. 1. Output A: Enhanced Capacity for Sustainable Water Resources Management 5. The program has (i) strengthened the enabling policy, regulatory and institutional environment to coordinate and collaborate on water resources management; and (ii) strengthened MOWRAM s capacity to promote IWRM in river basins. Key policy and legal 1 ADB Report and Recommendation of the President to the Board of Directors: Proposed Loans, Grant, Technical Assistance Grant, and Administration of Loan and Technical Assistance Grants for the Water Resources Management Sector Development Program in the Kingdom of Cambodia. Manila.

5 2 reforms include (i) approval by the Prime Minister of sub-decrees for farmers water user communities (FWUCs) and river basin management, and submission of sub-decrees for water licensing and water quality monitoring by MOWRAM to the Council of Ministers, for approval of the Prime Minister; (ii) establishment of a national river basin management committee (a ministerial-level committee for coordination of water resources management); (iii) formation of two pilot river basin committees; and (iv) adoption of guidelines for division of asset responsibility between MOWRAM and water users, and assignment of appropriate rights and responsibilities for irrigation infrastructure to respective FWUCs within the project area. 6. All other activities envisaged under this output have been completed. A national water status report has been prepared that comprehensively reviews water resources in Cambodia. In support of a national water resources plan for Cambodia, a detailed work plan (including mainstreaming of IWRM) has been prepared for the National Water Resources Policy review, along with an implementation and investment plan. River basin committees for two pilot basins Stung Sen and Stung Sreng have been formed. The process followed for river basin planning (including mainstreaming climate change) has been generalized in a set of procedures, which include the mainstreaming of IWRM in climate change adaptation plans and actions. 2. Output B: Enhanced Capacity of the Ministry of Water Resources and Meteorology to Manage and Deliver Irrigation Services 7. To deliver this output, the program provided support to MOWRAM to improve its organizational and financial management at national, provincial and local levels by (i) strengthening the technical capacity of MOWRAM, provincial departments of water resources and meteorology (PDWRAMs), and district offices; and (ii) developing the capacity of government staff and farmers to carry out sustainable operation and maintenance (O&M). Guidelines for division of asset responsibility between MOWRAM and water users have been completed and the process of assigning rights and responsibilities has been demonstrated through agreements with several FWUCs in the project area. Activities have been conducted to strengthen financial management in MOWRAM and technical support provided for the ministry s transition to program budgeting. A review of MOWRAM s organizational structure, capacity, systems and staff resources was included in a report on institutional arrangements for the management of water resources in Cambodia; while further improvements are recommended, the report indicates that present arrangements provide a clear separation of responsibilities for water resource management and irrigation service delivery, with departmental roles that are well understood. 8. A gender unit in MOWRAM was established in October 2013 and the gender mainstreaming action plan for MOWRAM was updated. A comprehensive irrigation O&M plan was developed and approved; implementation of the plan commenced in early 2014 and resulted in a 2015 budget (approved by Ministry of Economy and Finance) of $7.8 million for O&M of 131 irrigation schemes. Considerable work has been undertaken to improve the Cambodia Irrigation Schemes Information System (CISIS) database by surveying 1,026 schemes and updating their data. Training courses were developed and delivered for farmers on water management. A technical skills (vocational training) plan was prepared following a training needs assessment, and training provided accordingly.

6 3 B. Status of Compliance with Tranche Two Conditions 9. Of the 12 policy conditions for release of the second tranche of the program loan, the Borrower has fully complied with 9 second tranche conditions and substantially complied with 3 tranche conditions. The details are reflected below. 10. Condition 1. Tranche condition 1 required the Borrower to issue either sub-decrees or prakas (administrative orders), as appropriate, on (a) the procedures for the establishment of FWUCs, (b) river basin management, (c) the establishment of water licensing, and (d) water quality. The Borrower has issued two sub-decrees with approval of the Prime Minister for (a) and (b). The Borrower has also issued two prakas relating to the water licensing and drinking water quality monitoring standards. Ministry of Industry and Handicraft is responsible for providing water licensing and monitoring water quality standards. Prakas for water licensing fully comply with the policy condition requirement. Prakas for water quality standards is only for drinking water therefore is considered partly compliant with the requirement of tranche condition. In view of the overall objective of Condition 1 of strengthening the strategy, policy and legal framework for IWRM, therefore, this tranche condition is considered substantially complied with. 11. Condition 2. For tranche condition 2, the Borrower was required to establish and operationalize a ministerial-level committee for coordination of water resources management to be chaired by the Borrower at the highest level, include relevant ministers as members, and be supported by an inter-ministerial secretariat. The Borrower established and operationalized the National River Basin Management Committee (NRBMC) as an apex national committee for coordination of water resources management in Cambodia on 6 October It is chaired by the minister of MOWRAM, with the secretaries of state of 13 relevant ministries as members, as well as the general secretary of the Cambodia National Mekong Committee. A secretariat to support the NRBMC has been established with the advisor to the MOWRAM minister as the chairperson, comprising 15 members from various departments of MOWRAM, the Tonle Sap Authority, and the planning and international cooperation departments. The NRBMC is considered to have substantially complied with the requirement that the committee be chaired at the highest level (the chair heads the ministry with specific jurisdiction over water resources, and the committee has been established by the Prime Minister). 12. Condition 4. For tranche condition 4, the Borrower (through the ministerial-level committee for coordination of water resources management) was required to have (a) commissioned a review of the national water resources plan ( ), and (b) issued recommendations for the preparation of the national water resources plan ( ). During implementation, it was noted that national water resources plan ( ) was a draft that was not finalized and approved by the Borrower. Consequently, a national report on the status of water resources was prepared to document the existing state of water resources 2, and the NRBMC chairman issued recommendations through a notification to prepare a national water resources plan for A work plan has been prepared that provides guidelines for preparing the plan, and outlining essential plan elements. This condition is considered substantially complied with. 13. Remaining conditions. Tranche conditions 3, 5, 6, 7, 8, 9, 10, 11 and 12 are fully complied with by the Borrower. Tranche condition 3 required the Borrower to have issued a This consultant s report does not necessarily reflect the views of ADB or the government concerned. [For policy for clarifying the coordination and cooperation mechanisms between the Cambodia PPTAs: Also, all of the views expressed herein may not be incorporated into the proposed project s National design.] Mekong Committee, Tonle Sap Authority, MOWRAM and river basin committees, 2 This was advised by the midterm review mission, 22 April 4 May 2013.

7 4 through a ministerial-level committee for coordination of water resources management. The Chairman of the NRBMC issued the required policy notification. Tranche condition 5 required the Borrower to establish the Stung Sen river basin committee, which was established on 6 April Tranche condition 6 required the Borrower to prepare and approve a national water resources profile, which was approved on 29 March Tranche condition 7 required the Borrower to establish procedures to mainstream (a) IWRM in the national water resources plan, (b) climate change adaptation in IWRM plans, and (c) IWRM in climate change adaptation plans and actions. The Borrower has prepared a work plan for preparing the national water resources management plan that includes the procedures for mainstreaming IWRM and climate change adaptation. The work plan has been approved by the chairman of the NRBMC (para. 11). Tranche condition 8 required the Borrower to commence implementation of the plan developed by the Institute of Technology Cambodia (ITC) and MOWRAM for effective delivery of bachelor s and post-graduate engineering degree courses in water resources management. ITC commenced a bachelor s degree course in 2011 and a master s degree course in The bachelor s degree course is being financed by the capacity building technical assistance (footnote 1) by providing scholarships and other expenses for 120 students enrolled in four batches from 2011 to The letter of agreement for funding of the scholarship program was signed on 21 July A progress report was submitted by ITC in June 2015 that confirms the delivery of courses in water resources. 15. Tranche condition 9 required the Borrower to have (a) adopted the guidelines for division of asset responsibility between the Borrower and water users, and (b) assigned appropriate rights and responsibilities for irrigation infrastructure to respective FWUCs within the project area. The Borrower prepared and adopted guidelines on the division of asset responsibility between the government and FWUCs. Implementation of the guidelines to establish legal status of irrigation works and assigned rights was done by approving the FWUCs sub-decree. Tranche condition 10 required the Borrower to (a) complete the review of MOWRAM s organizational structure, capacity, systems and staff resources; and (b) define the appropriate demarcation of responsibilities within MOWRAM for water resource management and irrigation service delivery. The Borrower completed the review and prepared a report on Institutional Arrangements for the Management of Water Resources in Cambodia (including a review of MOWRAM s organizational structure) in February Responsibilities within MOWRAM for water resources management and irrigation service delivery are set out in the report. 16. Tranche condition 11 required the Borrower to prepare, adopt and implement a comprehensive irrigation O&M plan. The Borrower put special emphasis on O&M and prepared a comprehensive O&M plan in October 2014, and an implementation manual that includes guidelines for irrigation scheme O&M. Implementation commenced in early The Ministry of Economy and Finance approved a budget of $7.8 million for 2015 on the basis of the O&M plan. Training to support PDWRAMs in implementing the O&M plan was undertaken in the first quarter of Tranche condition 12 required the Borrower to have (a) developed and delivered training courses to include on-farm water management and irrigation practices, and maintenance of major and minor irrigation works; and (b) harmonized the training curriculum between the FWUC Department and the Technical Service Center (TSC). Training courses regarding onfarm water management and irrigation practices, and maintenance of major and minor irrigation works were developed and delivered by the TSC. Training was also delivered at the provincial level in the project area (Battambang, Banteay Meancheay, Pursat and Kampong Thom) during Training on O&M, budget preparation, accounting, climate change, CISIS, IWRM

8 5 and gender issues was conducted through the capacity development technical assistance. TSC training courses were prepared in cooperation with FWUC Department. The training curriculum was updated and harmonized between the TSC and FWUC Department. IV. CONCLUSION 18. The government has implemented important policy and institutional reform measures agreed to under the program, and substantially fulfilled the conditions for second tranche release. Major reforms have been implemented for IWRM, and to improve irrigation service delivery. The institutional capacity of the MOWRAM has been strengthened by introducing new budget planning and financial management systems, and providing training. Nine of the policy conditions have been fully met and three have been substantially complied with (Appendix 1). V. THE PRESIDENT S DECISION 19. In view of the progress made in the implementation of the Water Resources Management Sector Development Program, as evidenced by the full compliance with nine second tranche release conditions and substantial compliance with three second tranche release conditions, the President is satisfied with the overall implementation of the Water Resources Management Sector Development Program, and that the necessary conditions for the release of the second tranche have now been fulfilled. In accordance with the established procedure, the President will authorize the release of the second tranche in the amount of SDR6,604,000. The authorization shall be effective not less than 10 working days after circulation of this progress report to ADB's Board of Directors. This consultant s report does not necessarily reflect the views of ADB or the government concerned. [For PPTAs: Also, all of the views expressed herein may not be incorporated into the proposed project s design.]

9 6 Appendix STATUS OF COMPLIANCE WITH TRANCHE TWO CONDITIONS No. Description Compliance status TC1 TC2 TC3 Strengthen Legal Framework for IWRM The Borrower shall have issued either sub-decrees or Prakas, as appropriate, on (a) the procedures for the establishment of FWUCs; (b) river basin management; (c) the establishment of water allocation/licensing; and (d) water quality. Improve National Coordination and Collaboration on Water Resources Management The Borrower shall have established and operationalized a ministerial level committee for coordination of water resources management to be chaired at the highest level of the Borrower and include relevant ministers as members, and supported by an inter-ministerial secretariat. The Borrower through a ministerial level committee for coordination of water resources management shall have issued a policy that shall clarify the coordination and cooperation mechanisms between Cambodia National Mekong Committee, Tonle Sap Authority, MOWRAM and river basin committees. Substantially Complied With The FWUC sub-decree was issued in March 2015, and the River Basin Management subdecree in July Prakas for water licensing and national drinking water quality standards were issued in July Substantially Complied With Prime Minister formed the NRBMC as an apex national committee for coordination of water resources management in Cambodia on 6 October It is chaired by the minister of MOWRAM; members include the secretaries of state of the following ministries: Public Works and Transport, Economy and Finance, Environment, Agriculture, Forestry and Fisheries, Industry and Handicraft, Mines and Energy, Rural Development, Tourism, Land Management, Urban Planning and Construction, Planning, Culture and Art, and Health. The general secretary of the Cambodia National Mekong Committee is also a member. The NRBMC is considered to comply with the requirement that it should be chaired at the highest level (the chairman heads the ministry with specific jurisdiction over water resources), and the committee was formed by the Prime Minister. The Secretariat was established on 21 October 2015, chaired by the MOWRAM advisor, with members from the ministries of Planning, Agriculture, Forestry and Fisheries, Environment, Mines and Energy. The chairman of the NRBMC issued the policy notification for adopting the coordination and cooperation mechanism detailed in the report on institutional arrangements for the management of water resources in Cambodia.

10 Appendix 7 No. Description Compliance status TC4 TC5 TC6 TC7 Implement National Water Resources Policy The Borrower through the ministerial level committee for coordination of water resources management shall have (a) commissioned a review of the national water resources plan ( ); and (b) issued recommendations for the preparation of the national water resources plan ( ). Pilot Test Mechanisms for River Basin Level Coordination and Collaboration have established the Stung Sen river basin committee. National Assessment of Water Resources have prepared and approved a national water resources profile. Mainstream IWRM and Climate Change Adaptation The Borrower through the ministerial level committee for coordination of water resources management shall have established procedures to mainstream (a) IWRM in the national water resources plan; (b) climate change adaptation in IWRM plans; and (c) IWRM in climate change adaptation plans and actions. Substantially Complied With The national water resources plan ( ) to be reviewed was not finalized and approved by the Borrower, so a national water status report was prepared under the program to document the existing status of water resources. The NRBMC chairman issued recommendations through a notification to prepare a national water resources plan for A work plan has been prepared that provides guidelines for preparing the plan and essential elements to be included. The river basin committee was established on 6 April 2015 with approval of the MOWRAM minister. The committee is chaired by the deputy governor of Kampong Thom Province and has 14 members from offices of the governors of the two provinces; departments of water resources and meteorology; and agriculture, forestry and fisheries; and heads of FWUCs. The national water resources profile report was prepared and approved on 29 March The work plan for preparing the national water resources management plan includes the procedures for mainstreaming IWRM and climate change adaptation. The work plan has been approved by the chairman of the NRBMC (the ministerial level committee for coordination of water resources management). This consultant s report does not necessarily reflect the views of ADB or the government concerned. [For PPTAs: Also, all of the views expressed herein may not be incorporated into the proposed project s design.]

11 8 Appendix No. Description Compliance status TC8 TC9 TC10 Develop Technical Skills (tertiary) at Institute of Technology Cambodia (ITC). have commenced the implementation of the plan developed by ITC and MOWRAM for effective delivery of bachelor and post-graduate engineering degree courses in water resources management. Legal status of irrigation works have (a) adopted the guidelines for division of asset responsibility between the Borrower and water users; and (b) assigned appropriate responsibilities and rights for irrigation infrastructure to respective FWUCs within the Project Area. Strengthen MOWRAM s internal linkages between line departments have (a) completed the review of MOWRAM s organizational structure, capacity, systems and staff resources; and (b) defined the appropriate demarcation of responsibilities within MOWRAM for water resource management and irrigation service delivery. The plan, documented as a contract between ITC and MOWRAM, was prepared to start bachelor s and master s degree courses on water resources in the Department of Rural Engineering. Subsequently a report on development of a water resources engineering curriculum for ITC was prepared. ITC commenced a bachelor s degree course in 2011 and master s degree course in The bachelor s degree course is financed through the capacity development technical assistance, by providing scholarships and other expenses for 120 students enrolled in four batches during A letter of agreement for funding the scholarship program was signed on 21 July A progress report was submitted by ITC in June 2015 that confirms the delivery of courses in water resources. Guidelines on the division of asset responsibility between the government and FWUCs were prepared and adopted. Implementation of the guidelines to establish legal status of irrigation works and assigned rights was done by approving an FWUC sub-decree. (a) A report on Institutional Arrangements for the Management of Water Resources in Cambodia (including a review of MOWRAM s organizational structure) was completed in February 2015 and the MOWRAM minister issued a notification of approval on 29 March (b) The report clearly describes the demarcation of responsibilities within MOWRAM for water resource management and irrigation service delivery. The report concludes that the separation of responsibilities for water resource management and irrigation service delivery is clear under the present arrangements, with departmental roles well understood. The report also makes recommendations for structures that would further strengthen separation of responsibilities.

12 Appendix 9 No. Description Compliance status TC11 Strengthen MOWRAM's O&M planning processes have prepared, adopted and implemented a comprehensive irrigation O&M plan. A comprehensive O&M plan was completed in October 2014 and integrated with the policy and implementation manual (including guidelines) for O&M of irrigation schemes. Plan implementation began in early 2014 and resulted in a 2015 budget (approved by the Ministry of Economy and Finance) of $7.8 million for O&M of 131 irrigation schemes. Training to support PDWRAMs for implementation of O&M was undertaken in Q1 of TC12 Develop Technical Skills (vocational training) have (a) developed and delivered training courses to include on-farm water management and irrigation practices, and maintenance of major and minor irrigation works; and (b) harmonized the training curriculum between the FWUC Department and the TSC. (a) Training courses on on-farm water management and irrigation practices, and maintenance of major and minor irrigation works were developed and delivered by the TSC. Under Component C, training was delivered at the provincial level in the project area (Battambang, Banteay Meancheay, Pursat and Kampong Thom) from 2012 to Training on O&M, budget preparation, accounting, climate change, CISIS, IWRM and gender issues were conducted through the capacity development technical assistance. (b) TSC training courses were prepared in cooperation with FWUC Department. Training curriculum was updated to include the new FWUC sub-decree and new funding modality for FWUCs (referring to guidelines for sustainable FWUCs), and was harmonized between TSC and the FWUC Department. CISIS = Cambodia Irrigation Schemes Information System, CoM = Council of Ministers, FWUC = farmers water user community, ITC = Institute of Technology Cambodia, IWRM = integrated water resource management, MOWRAM = Ministry of Water Resources and Meteorology, NRBMC = National River Basin Management Committee, O&M = operation and maintenance, PDWRAMs = provincial departments of water resources and meteorology, TSC = Technical Services Center Source: Asian Development Bank This consultant s report does not necessarily reflect the views of ADB or the government concerned. [For PPTAs: Also, all of the views expressed herein may not be incorporated into the proposed project s design.]

NINTH QUARTERLY PROGRESS REPORT (1 February 2014 to 30 April 2014)

NINTH QUARTERLY PROGRESS REPORT (1 February 2014 to 30 April 2014) KINGDOM OF CAMBODIA Nation Religion King Ministry of Water Resources and Meteorology Water Resources Management Sector Development Program ADB Loan 2673-CAM and TA 7610-CAM NINTH QUARTERLY PROGRESS REPORT

More information

Country Operations Business Plan. Cambodia September 2016

Country Operations Business Plan. Cambodia September 2016 Country Operations Business Plan September 2016 Cambodia 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

MONTHLY LAW UPDATE EDUCATION YOUTH AND SPORT. - Ministry of Tourism; - The Office of Council of Ministers; - Ministry of Economy and Finance;

MONTHLY LAW UPDATE EDUCATION YOUTH AND SPORT. - Ministry of Tourism; - The Office of Council of Ministers; - Ministry of Economy and Finance; MONTHLY LAW UPDATE December 2015 TABLE OF CONTENTS EDUCATION YOUTH AND SPORT ENVIRONMENT HEALTH AND MEDICINES PUBLIC LAW TAXATION AND CUSTOMS TOBACCO AND DRUCG CON- TROL EDUCATION YOUTH AND SPORT Sub Decree

More information

Cambodia: Preparing the Strengthening of Public Financial Management for Rural Development Projects

Cambodia: Preparing the Strengthening of Public Financial Management for Rural Development Projects Technical Assistance Consultant s Report Project Number: TA 4988 CAM October 2008 Cambodia: Preparing the Strengthening of Public Financial Management for Rural Development Projects : October 2008 Prepared

More information

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program Concept Paper Project Number: 49041-002 January 2016 Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program This document

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 49400-001 Policy and Advisory Technical Assistance (PATA) January 2017 Policy Coordination and Planning of Border Economic Zones of the People's Republic of

More information

National Indicative Plan

National Indicative Plan National Indicative Plan Thai National Mekong Committee Secretariat December 2012 Contents Executive Summary 1 Glossary 2 1. Introduction 3 1.1 Background 3 1.2 Purpose of National Indicative Plan 5 1.3

More information

DECISION on approval of the National Target Program to respond to climate change THE PRIME MINISTER DECIDES:

DECISION on approval of the National Target Program to respond to climate change THE PRIME MINISTER DECIDES: THE PRIME MINISTER No: 158/2008/QD-TTg THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 2 December 2008 DECISION on approval of the National Target Program to respond to climate

More information

Cambodia: Tonle Sap Poverty Reduction and Smallholder Development Project (Additional Financing)

Cambodia: Tonle Sap Poverty Reduction and Smallholder Development Project (Additional Financing) Additional Financing of Tonle Sap Poverty Reduction and Smallholder Development Project (RRP CAM 41435-054) Procurement Risk Assessment Report Project Number: 41435-054 August 2017 Cambodia: Tonle Sap

More information

Mekong River Commission

Mekong River Commission Mekong River Commission Office of the Secretariat in Phnom Penh (OSP) 576 National Road, # 2, Chak Angre Krom, P.O. Box 623, Phnom Penh, Cambodia Tel. (855-23) 425 353. Fax (855-23) 425 363 Office of the

More information

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund) Technical Assistance Report Program Number: 48207-003 Transaction Technical Assistance (TRTA) June 2017 Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance

More information

May Fiji: Update This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.

May Fiji: Update This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. May 2014 Fiji: Update 2014 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 6 May 2014) Currency unit Fiji dollar (F$)

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 43309-015 Loan Number: 2839-CAM September 2016 Proposed Loan for Additional Financing Kingdom of Cambodia: Provincial

More information

Proposal Report On Flood Hazard Mapping Project in Prey Veng Province

Proposal Report On Flood Hazard Mapping Project in Prey Veng Province Proposal Report On Flood Hazard Mapping Project in Prey Veng Province Prepared by CHUM Sphy. Department of Water Resources and Meteorology Prey Veng Province Cambodia FLOOD HAZARD MAPPING TRAINING COURSE

More information

Cambodia: Small and Medium Enterprise Development Program

Cambodia: Small and Medium Enterprise Development Program Validation Report Reference Number: PCV: CAM 2010-73 Program Number: 36383 Loan Number: 2129(SF) December 2010 Cambodia: Small and Medium Enterprise Development Program Independent Evaluation Department

More information

Mainstreaming climate change adaptation in development: JICA Project in Indonesia as a case

Mainstreaming climate change adaptation in development: JICA Project in Indonesia as a case Mainstreaming climate change adaptation in development: JICA Project in Indonesia as a case Asia-Pacific Climate Change Adaptation Forum 2014 Masato Kawanishi Senior Advisor, JICA 1 Project of Capacity

More information

COUNTRY PAPER - CAMBODIA

COUNTRY PAPER - CAMBODIA COUNTRY PAPER - CAMBODIA Khin Song 1 September 2009 1 Deputy Director General, National Institute of Statistics, Cambodia I. BACKGROUND Since 1979, Cambodia had adopted a decentralized statistical structure.

More information

CLIMATE CHANGE FINANCING FRAMEWORK

CLIMATE CHANGE FINANCING FRAMEWORK KINGDOM OF CAMBODIA NATION RELIGION KING 3 ROYAL GOVERNMENT OF CAMBODIA CLIMATE CHANGE FINANCING FRAMEWORK NATIONAL COUNCIL FOR SUSTAINABLE DEVELOPMENT AUGUST 2015 Contents I. THE RATIONALE FOR CLIMATE

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 47291-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2014 Enhancing Roles of Supreme Audit Institutions in Selected Association of

More information

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project Appendix 3 11 Technical Assistance Report Project Number: 51329-002 Transaction Technical Assistance (TRTA) November 2017 Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade

More information

REPUBLIC OF KENYA BARINGO COUNTY GOVERNMENT COUNTY TREASURY AND ECONOMIC PLANNING

REPUBLIC OF KENYA BARINGO COUNTY GOVERNMENT COUNTY TREASURY AND ECONOMIC PLANNING REPUBLIC OF KENYA BARINGO COUNTY GOVERNMENT COUNTY TREASURY AND ECONOMIC PLANNING 29 th August 2018 TREASURY CIRCULAR NO. BCG/CT/BUDGET/05/VOL.1/77 TO: CLERK COUNTY ASSEMBLY COUNTY EXECUTIVE COMMITTEE

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

India: Supporting the Second West Bengal Development Finance Program

India: Supporting the Second West Bengal Development Finance Program Second West Bengal Development Finance Program (RRP IND 49209) Technical Assistance Report Project Number: 49209-001 Transaction Technical Assistance (TRTA) August 2017 India: Supporting the Second West

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:CAM 36593 TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR IMPROVING INSURANCE SUPERVISION December 2002 CURRENCY EQUIVALENTS (as of 3 December 2002) Currency Unit riel (KR)

More information

MoPW. Directorate of Water Resources Ministry of Public Works

MoPW. Directorate of Water Resources Ministry of Public Works Good Governance for River Basin Management Institutional and Governmental Stakeholders Case of Progo Opak Serang River Basin Territory [INDONESIA] Madrid, 26 May 2010 Sugiyanto Director of Water Resources

More information

Country Operations Business Plan. Afghanistan November 2015

Country Operations Business Plan. Afghanistan November 2015 Country Operations Business Plan November 2015 Afghanistan 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. October Cambodia

Country Operations Business Plan. October Cambodia Country Operations Business Plan October 2009 Cambodia 2009 2012 CURRENCY EQUIVALENTS (as of 14 August 2009) Currency Unit riel/s (KR) $1.00 = KR4,136 ABBREVIATIONS ADB Asian Development Bank ADF Asian

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Country Operations Business Plan. Papua New Guinea August 2016

Country Operations Business Plan. Papua New Guinea August 2016 Country Operations Business Plan August 2016 Papua New Guinea 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Myanmar September 2015

Country Operations Business Plan. Myanmar September 2015 Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Indonesia: Participatory Irrigation Sector Project

Indonesia: Participatory Irrigation Sector Project Validation Report Reference Number: PVR-393 Project Number: 32359 Loan/Grant Numbers: 2064, 2065, and 4229 February 2015 Indonesia: Participatory Irrigation Sector Project Independent Evaluation Department

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

MEKONG INTEGRATED WATER RESOURCES MANAGEMENT PROJECT (M-IWRMP) FUNDING AGREEMENT MK H762 (P104806) Final. Between Thailand and Cambodia.

MEKONG INTEGRATED WATER RESOURCES MANAGEMENT PROJECT (M-IWRMP) FUNDING AGREEMENT MK H762 (P104806) Final. Between Thailand and Cambodia. Mekong River Commission Office of the Secretariat in Phnom Penh (OSP) 576 National Road, #2, ChakAngreKrom, P.O. Box 623, Phnom Penh, Cambodia Tel. (855-23) 425 353. Fax (855-23) 425 363 Office of the

More information

To reduce emissions from your AFOLU sector, what critical challenges must be overcome?

To reduce emissions from your AFOLU sector, what critical challenges must be overcome? To reduce emissions from your AFOLU sector, what critical challenges must be overcome? Coordination of specific activity data/ information sharing Weak institutional and human capacity Finance Lack of

More information

Cambodia. Progress towards MIPAA implementation Som Monorum, MoSVY. Advancing Health and Well-Being into Old Age

Cambodia. Progress towards MIPAA implementation Som Monorum, MoSVY. Advancing Health and Well-Being into Old Age Cambodia Legislation and National Policies Older Persons and Development Advancing Health and Well-Being into Old Age Ensuring Enabling and Supportive Environments Reflections Progress towards MIPAA implementation

More information

Completion Report. Project Number: Loan Number: 1990 October Viet Nam: Housing Finance Project

Completion Report. Project Number: Loan Number: 1990 October Viet Nam: Housing Finance Project Completion Report Project Number: 35497 Loan Number: 1990 October 2013 Viet Nam: Housing Finance Project CURRENCY EQUIVALENTS Currency Unit dong (D) At Appraisal At Project Completion 15 November 2002

More information

Country Operations Business Plan. Timor-Leste March 2017

Country Operations Business Plan. Timor-Leste March 2017 Country Operations Business Plan March 2017 Timor-Leste 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS The currency

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO)

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO) Board of Directors IN.247-11 14 October 2011 Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO) The attached Report is circulated at the request of the Director

More information

Monitoring & Evaluation Framework for Tracking the results of adaption Projects In Context of Zambia

Monitoring & Evaluation Framework for Tracking the results of adaption Projects In Context of Zambia Monitoring & Evaluation Framework for Tracking the results of adaption Projects In Context of Zambia Charles Mulenga Zambia Institute of Environmental Management 19 th September 2013 Climate Charge Expert

More information

Managing Risk for the Present and the Future IDRM Planning in Thua Thien Hue province

Managing Risk for the Present and the Future IDRM Planning in Thua Thien Hue province Managing Risk for the Present and the Future IDRM Planning in Thua Thien Hue province Natural Disaster Risk Management Project Presenter: Trần Hoàng Yến for Symposium on Disaster Impact and Assessment

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project:

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project: Summary of Project/Program PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Approval Request 1. Country/Region: Zambia 2. CIF Project ID#: XPCRZM041A 3. Project/Program Title: Zambia Strengthening

More information

AFFORDABLE LOANS FOR CLEAN ENERGY IN AGRICULTURE THE CLEAN ENERGY REVOLVING FUND

AFFORDABLE LOANS FOR CLEAN ENERGY IN AGRICULTURE THE CLEAN ENERGY REVOLVING FUND AFFORDABLE LOANS FOR CLEAN ENERGY IN AGRICULTURE THE CLEAN ENERGY REVOLVING FUND How a small Fund has filled a market gap by offering unsecured loans to Cambodian farmers for the purchase of clean energy

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming PAGE 1 OF 12 Country (or region) Executive Summary (in one page) Union of the Comoros Submission Date 29/05/2015

More information

Cambodia: Road Asset Management Project

Cambodia: Road Asset Management Project Completion Report Project Number: 41123-013 Loan Number: 2406-CAM June 2015 Cambodia: Road Asset Management Project This document is being disclosed to the public in accordance with ADB's Public Communications

More information

1. The National Energy Policy Council (NEPC)

1. The National Energy Policy Council (NEPC) The energy sector in Thailand is managed by the National Energy Policy Council (NEPC), established under the National Energy Policy Council Act, B.E. 2535 (1992), with the National Energy Policy Office

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

Nauru Country Operations Business Plan. August 2015

Nauru Country Operations Business Plan. August 2015 Country Operations Business Plan August 2015 Nauru 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 1 July

More information

Country Operations Business Plan. Fiji October 2016

Country Operations Business Plan. Fiji October 2016 1 Country Operations Business Plan October 2016 Fiji 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 29

More information

IMPLEMENTING THE FLOOD DIRECTIVE IN PRUT AND SIRET

IMPLEMENTING THE FLOOD DIRECTIVE IN PRUT AND SIRET IMPLEMENTING THE FLOOD DIRECTIVE IN PRUT AND SIRET Legal and Institutional aspects Iasi, 28-29 January, 2014 Mary-Jeanne ADLER, Scientific Director INHGA, Ministerial Consulter Timetable for adoption &

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Country Partnership Strategy: Cambodia, 2014 2018 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Lagging public sector management

More information

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3)

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 44213-018 MFF Number: 0074 March 2018 People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Distribution of this document

More information

NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference

NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference Project Name: Poverty Reduction Fund, Livelihood Improvement

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

Barito Kuala, Indonesia

Barito Kuala, Indonesia Barito Kuala, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Pakistan: Road Sector Development Program

Pakistan: Road Sector Development Program Validation Report Reference Number: PCV: PAK 2010-69 Project Number: 32058 Loan Number: 1891 December 2010 Pakistan: Road Sector Development Program Independent Evaluation Department ABBREVIATIONS ADB

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

Pakistan: Decentralization Support Program

Pakistan: Decentralization Support Program Validation Report Reference Number: PCV: PAK 2011-53 Program Number: 34328 Loan Numbers: 1935/1936/1937/1938 December 2011 Pakistan: Decentralization Support Program Independent Evaluation Department ABBREVIATIONS

More information

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Palu, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number:50102 Loan and/or Grant Number(s): {LXXXX; GXXXX} July 2018 Kingdom of Cambodia: Second Urban Environmental Management in the Tonle Sap Basin Project ABBREVIATIONS

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

Padang Lawas, Indonesia

Padang Lawas, Indonesia Padang Lawas, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

THE SPANISH AGRICULTURAL INSURANCE SYSTEM WORKSHOP ON RISK MANAGEMENT MAY 2017

THE SPANISH AGRICULTURAL INSURANCE SYSTEM WORKSHOP ON RISK MANAGEMENT MAY 2017 THE SPANISH AGRICULTURAL INSURANCE SYSTEM WORKSHOP ON RISK MANAGEMENT 18-19 MAY 2017 1. General features of the AIS. Agricultural Insurance System (AIS) is almost 40 years old. Risks covered are the damages

More information

2015 Annual Portfolio Performance Report

2015 Annual Portfolio Performance Report April 2016 2015 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Micro Insurance in Malawi Supply Side

Micro Insurance in Malawi Supply Side Micro Insurance in Malawi Supply Side 1 Perspectives from MASM Andrew Ngomwa, ngomwaa@masmw.com 2 Background Population of Malawi 16 million (July 2012 est.) Levels of Employment 97% of the population

More information

DISASTER RISK FINANCING ADB Operational Innovations in South Asia

DISASTER RISK FINANCING ADB Operational Innovations in South Asia DISASTER RISK FINANCING ADB Operational Innovations in South Asia Erik Kjaergaard, Disaster Risk Management Specialist South Asia Department with input from Mayumi Ozaki, Senior Portfolio Management Specialist

More information

ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO. Based on Article 65 (1) of the Constitution of the Republic of Kosovo,

ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW No. 05/L-079 ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO The Assembly of the Republic of Kosovo; Based on Article 65 (1) of the Constitution of the Republic of Kosovo, Approves LAW ON STRATEGIC

More information

GnuRkwtü sþibi ynþkar nignitivifignuvtþc,ab;sþibicivsuvtißpab Sub-decree on Mechanisms and Procedures for Implementing the Law on Biosafety

GnuRkwtü sþibi ynþkar nignitivifignuvtþc,ab;sþibicivsuvtißpab Sub-decree on Mechanisms and Procedures for Implementing the Law on Biosafety GnuRkwtü sþibi ynþkar nignitivifignuvtþc,ab;sþibicivsuvtißpab Sub-decree on Mechanisms and Procedures for Implementing the Law on Biosafety Sub-decree on Mechanisms and Procedures for Implementing the

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

Tonle Sap Lowland Stabilisation Project PPTA: Study of Micro-Credit Systems

Tonle Sap Lowland Stabilisation Project PPTA: Study of Micro-Credit Systems Tonle Sap Lowland Stabilisation Project PPTA: Study of Micro-Credit Systems Table of Contents Summary 1 INTRODUCTION 1 1.1 Background of Micro Credit in Cambodia 1 1.2 Summary of the Banking System in

More information

Bone Bolango, Indonesia

Bone Bolango, Indonesia Bone Bolango, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

REPUBLIC OF KENYA COUNTY GOVERNMENT OF WAJIR DEPARTMENT OF FINANCE & ECONOMIC PLANNING

REPUBLIC OF KENYA COUNTY GOVERNMENT OF WAJIR DEPARTMENT OF FINANCE & ECONOMIC PLANNING REPUBLIC OF KENYA COUNTY GOVERNMENT OF WAJIR DEPARTMENT OF FINANCE & ECONOMIC PLANNING Tel No: Department of Finance & Economic Planning Email: P.O Box 9-70200, Website: Wajir. When replying quote: Ref

More information

Pidie Jaya, Indonesia

Pidie Jaya, Indonesia Pidie Jaya, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Background and context of DRR and GIS

Background and context of DRR and GIS Mainstreaming DRR into National Plan, Policies and Programmes in Nepal Present to: Regional Workshop on Geo-referenced Disaster Risk Management information System in South and South West Asia and Central

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

APPROPRIATE WAGE RATE AND ESTIMATE OF LABOUR AVAILABILITY FOR A PUBLIC WORKS BASED SAFETY NET CAMBODIA

APPROPRIATE WAGE RATE AND ESTIMATE OF LABOUR AVAILABILITY FOR A PUBLIC WORKS BASED SAFETY NET CAMBODIA APPROPRIATE WAGE RATE AND ESTIMATE OF LABOUR AVAILABILITY FOR A PUBLIC WORKS BASED SAFETY NET IN CAMBODIA Kirit Vaidya Rural Economist for Royal Government of Cambodia and International Labour Organization

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information