MSD Rules and Regulations and Engineering Design Requirements February Chapter 16 - Amendments

Size: px
Start display at page:

Download "MSD Rules and Regulations and Engineering Design Requirements February Chapter 16 - Amendments"

Transcription

1 MSD Rules and Regulations and Engineering Design Requirements February 2006 Chapter 16 - Amendments Page Topic 16-2 Amendment No. 1, issued September 26, Amendment No. 2, issued July 1, Amendment No. 3, issued January 1, Amendment No. 4, issued October 15, Amendment No. 5, issued December 1, Amendment No. 6, issued February 15, LD-1 16LS-1 List by Date Issued & Amendment # DELETED List by Section DELETED 16-1

2 MSD Rules and Regulations and Engineering Design Requirements February 2006 Amendment No. 1 Date Issued: September 26, 2007 Affected Part: Subject: Channel Protection Storage Volume Requirements (Cp v ) Abstract: Changes to thresholds and conditions for exemption from requirements. Minor change to orifice size and protection. Changes shown in gray The text of subpart is hereby and of this date amended to the following: 3. Channel Protection Storage Volume Requirements (Cp v ) a. General To protect channels from erosion, a 24-hour extended detention of the one-year, 24-hour storm event shall be provided. The rationale for this criterion is that runoff will be stored and released in such a gradual manner that critical erosive velocities during bankfull and near-bankfull events will seldom be exceeded or prolonged in downstream channels. A detention pond or underground vault is normally needed to meet the CP v requirement (and subsequent flood protection criteria Q p2 and Q p100 ). b. As a Basis for determining Channel Protection Storage Volume the following assumptions may be made: (1) The model TR-55 (or approved equivalent) shall be used for determining peak discharge rates. (See Paragraph 4.b.(1) for additional TR-55 information. (2) The rainfall depth for the one-year, 24-hour storm event is 2.50 inches. Use Type II rainfall distribution. 16-2

3 (3) The length of overland flow used in time of concentration (t c ) calculations is limited to no more than 100 feet for post project conditions. (4) The 24-hour extended detention is defined as providing a 24-hour detention lag time (T) for the one-year storm. The lag time is defined as the interval between the center of mass of the inflow hydrograph and the center of mass of the outflow hydrograph. (5) A Cp v orifice diameter of less than 3.0 will require a special internal control for orifice protection. For Cp v orifice between 3 and 1 1/2 diameter, an internally controlled orifice shall be used with slot width less than or equal to 1/3 of orifice diameter. Less than 1 ½ orifice will not be allowed. (6) Cp v shall be addressed for the entire site. If a site consists of multiple drainage areas, Cp v may be distributed proportionately to each drainage area. (7) Extended detention storage provided for the Cp v does not fully meet the WQ v requirement (that is Cp v and WQ v should be treated separately). (8) The stormwater storage needed for Cp v may be provided above the WQ v storage in stormwater ponds and wetlands; thereby meeting all storage criteria in a single facility with appropriate hydraulic control structures for each storage requirement. (9) Infiltration is not recommended for Cp v control because of large storage requirements. If proven effective, appropriate and desirable however, in some rare situations it may be permissible. c. Exemptions To protect channels from erosion, a 24-hour extended detention of the one-year, 24-hour storm event shall be required at all sites that do require Flood Volume Detention (Qp). Also, the existence of downstream stormwater problems may require treatment for channel protection (CP v ), regardless of any other possible exemptions. At some sites however, the provision of traditional extended detention (Cp v ) may not be effective or may be best achieved by other means. Specifically, the following sites may be exempted from the channel protection storage requirement: A.) For sites 5 acres or larger, exempt if: 1.) No detention for Flood Protection Volume (Qp) is required, and 16-3

4 2.) The project is a redevelopment site (at least 20% of the existing site was impervious coverage as of January 15, 2000) and 3.) The watershed is a less sensitive, i.e. zero increase watershed (per Table 4-5) And either 4.) or 5.) below 4.) Surface BMP s are utilized to treat the required WQ v and more pervious area is created on the site and within the tributary area. OR 5.) Underground devices are utilized to treat the required WQ v but the proposed site will be at least 20% more pervious than the existing site. B.) C.) All sites less than 5 acres will normally be exempt. For all sites, regardless of size, exempt if any of the following apply: 1.) The project site will be 100% pervious, and does not increase annual or more frequent discharge from site (for a 1-year event per TR-55). 2.) The project is a redevelopment site (at least 20% of the existing site was impervious coverage as of January 15, 2000) and the project reduces the site impervious area to less than 10% of the total site area. 3.) The project is located within levee district boundaries or within the very flat portions of the FEMA defined flood plain of the Mississippi, Missouri, or Meramec Rivers. 4.) The project is located upstream of permanent lakes, concrete lined channels, or enclosed pipe systems. However, the presence of any intervening reach or downstream, natural channel which does need extended detention channel protection may then nullify this exemption. 16-4

5 Amendment No. 2 Date Issued: July 1, 2010 Affected Parts: 2.010, , , , , , 8.040, 8.050, 8.070, 9.020, , , , Subject: Stormwater BMP permitting, deposits, and BMP inspection. Abstract: Changes permitting and inspection procedures necessary to facilitate better outcomes from BMP implementation, with greater flexibility for permitting BMPs and a separate BMP construction deposit. Changes shown in gray The text of the affected sections is hereby and of this date added or amended to the following: Definitions BMP: Stormwater Detention: Stormwater Quality Management Facility: Best Management Practices. Structural and non-structural stormwater management methods designed to improve stormwater quality by meeting pollutant removal goals; to reduce stormwater runoff volume and discharge rate from a site; and, for certain features, to provide a degree of channel protection by detention. A stormwater runoff facility or feature designed to detain (hold) stormwater temporarily during and immediately after a runoff event. A stormwater runoff facility or feature designed to improve quality of and/or reduce volume of stormwater runoff (generally referred to as a BMP). These facilities, to be approved, must properly use appropriate techniques and features as approved by MSD over time and for intended water quality and/or volume reduction strategies and compliance goals. 8. APPROVAL AND DEDICATION OF PROJECTS WITH PUBLIC SEWERS AND/OR DISTRICT INSPECTED PRIVATE FACILITIES Construction Escrow Deposit and Cash Deposit Agreement Prior to the issuance of construction permits, a Construction Deposit for all public facilities, as well as an As-Built Deposit will be required as stated in Chapter 9. In addition, the project Owner will be required to execute a "Cash Deposit Agreement Guaranteeing Completion of Sewer Improvements". Two (2) copies of this document will accompany the Plan Approval Notice to the Owner. This document must be executed and returned to the District before construction permits will be issued. One original will be returned to the Owner upon execution by the District. 16-5

6 Flexibility for BMP Permitting and Inspection Developments with BMPs placed on each lot but for which no new public sewers are constructed may be divided into individual P# s for the purpose of tracking BMP inspections and collecting and releasing the BMP deposits. The Developer s Engineer shall indicate the Developer s interest to do this prior to plan approval. Once plans are approved, these requests cannot be accommodated. Additional administrative costs are required to provide for this flexibility. These costs will generally include a submittal fee and review fee proportional to the level of effort required to set up each individual P#, the amount to be determined on a case-by-case basis Stormwater Quality Management Facilities and Cash Deposit Agreement Construction of Stormwater Quality Management Facilities is not required for construction approval. However, prior to the issuance of construction approval: a. The project owner shall execute a "Cash Deposit Agreement Guaranteeing Completion of Stormwater Quality Management Facilities". Two (2) copies of this document will accompany the Plan Approval Notice to the Owner. This document must be executed and returned to the District before construction approval will be issued. One original will be returned to the Owner upon execution by the District. b. The project owner shall provide a construction deposit for all stormwater quality management facilities, as stated in Chapter 9. c. The permittee shall apply for all stormwater BMP permits. The owner executed Cash Deposit Agreement Guaranteeing Completion of Stormwater Quality Management Facilities" and associated deposit shall be provided to MSD before stormwater BMP permits are issued Notification of Construction Approval (New Section Number Only. Formerly ) Requirements for District Approval of Stormwater Quality Management Facility Construction Construction Inspection All permitted stormwater quality management facilities must be inspected by the District. It is the responsibility of the Owner's Contractor to contact the District's Construction Department to arrange for this inspection. The District will issue a BMP Construction Completion Letter when its inspection indicates that stormwater quality management facilities were constructed satisfactorily and in compliance with approved plans. The District will not issue a BMP Construction Completion Letter for any facilities which were not constructed in accordance with approved plans and without District inspection. No portion of the Stormwater Quality Management Facilities Cash Deposit will be released without the District issuing the BMP Construction Completion Letter. 16-6

7 Stabilization of the drainage area tributary to stormwater quality management facilities is very important to the facility s function. The District will also perform an inspection of the drainage area tributary to stormwater quality management facilities. The District s determination of drainage stability will be determined when the drainage area s final landscape cover is established. Any vegetated covers should provide a uniform, evenly distributed final vegetative cover with a minimum density of 80 percent. MSD reserves the ability to require additional site stabilization measures, where construction sediment or other construction materials are affecting BMP performance Field Changes and Plan Revisions Requirements for field changes and plan revisions for stormwater quality management facilities are the same as those listed in As-Built Drawings As-built drawing requirements for stormwater quality management facilities are similar as those listed in for detention basins. As-built drawings shall be submitted to the District for review and acceptance prior to issuance of the BMP Construction Completion Letter. MSD may waive as-built drawings for stormwater BMPs on a case-by-case basis. In general, this waiver will be limited to smaller surface BMPs that serve small, controlled drainages (e.g., bioretention fed by roof downspouts). This waiver, when applicable, will be noted by MSD on approved plans Dedication and Release of Construction Escrow (New Section Number Only. Formerly 8.040) Residential and Commercial Subdivisions, Apartments and Condominiums (New Section Number Only. Formerly ) Sewer Extensions and Single Lot Developments New Section Number Only. Formerly ) Dedication Inspection Fees (New Section Number Only. Formerly ) Pump Stations (New Section Number Only. Formerly 8.050) Abandonment of Work (New Section Number Only. Formerly 8.060) Release of Stormwater Quality Management Facilities Cash Deposit The District will release up to seventy-five percent (75%) of the deposit upon issuance of BMP Construction Completion Letter. For sites with multiple (more than four (4)) permitted BMPs, the District will consider proportionally releasing the deposit at twenty-five percent (25%) and fifty (50%) percent of the total number of BMPs constructed. Where dedication of public sewers is not required, the District will also perform an inspection of the drainage area tributary to stormwater quality management facilities. MSD will hold the balance of the stormwater quality management facility deposit until the BMP drainage areas (for which the developer has 16-7

8 disturbed or has reasonable control over) is sufficiently stable for stormwater quality management facility operation and all BMPs are functioning properly. Where dedication of public sewers is required, the District will perform the inspection of the drainage area tributary to stormwater quality management facilities as part of the dedication inspection process. The balance of the BMP escrow will be released as part of the dedication process Deposits Required Before Issuance of Construction Permits Construction Deposit BMP Deposit Permittee For projects with public sewer facilities, detention facilities or private facilities requiring the District construction inspection, certain deposits will be required prior to the issuance of construction permits. All Construction Deposits, Stormwater Quality Management Facility Deposits, and Conditional Plan Approval Deposits must be in the form of cash or a cashier s check, or wire transfer. No vouchers or Letters of Credit will be accepted. As-Built deposits may be cash, cashier checks, corporate checks personal checks or wire transfer. The Construction Deposit, Stormwater Quality Management Facility Deposits, and As-Built Deposit must be remitted from the Owner, not the Contractor or Engineer. The Owner will be required to submit to the District a Construction Deposit in the amount of ten percent (10%) of the estimated construction cost of the public sewers and private facilities to be constructed under the District inspection, not including stormwater quality management facilities (see for BMP deposits). The Deposit amount will be computed by the District at the time of request for required number of plans. Release of the Construction Deposit will be made as stated in Chapter The Owner will be required to submit to the District a BMP Deposit (Stormwater Quality Management Facility Deposit) in the amount of fifty percent (50%) of the estimated construction cost of the stormwater quality management facilities constructed under the District inspection. The Deposit amount will be computed by the District at the time of request for required number of plans. Release of the BMP Deposit will be made as stated in Chapter Excluding certain aboveground stormwater quality best management practices, all applications for permits for construction of sewer and drainage facilities, for connection to such facilities and for repair of a connection to such facilities shall be made by a master drainlayer having a certificate of qualification or other applicable license to perform work as a master drainlayer issued in his name by the Board of Examiners of Plumbers and Drainlayers of the City of St. Louis or of St. Louis County or other applicable licensing authority. For permit application for aboveground stormwater quality best management practices: where the permittee is not a master drainlayer, the permittee shall provide MSD a certificate of General Liability Insurance meeting the requirements of Section and before permits are issued. 16-8

9 Performance Bond [Amended by Amendment 4] Excluding permits for certain aboveground stormwater quality best management practices, no construction or connection permit shall be issued unless the applicant shall first have filed with the District a cash or corporate bond in an amount not less than Ten Thousand Dollars ($10,000.00). Such bond shall run to the District and shall be conditioned as follows: That the permittee, his agents and servants, shall comply with all of the terms, conditions, provisions, requirements and specifications of the District's applicable rules and regulations. A permittee may elect to maintain such bond with respect to all permits issued hereunder during the period of the bond or with respect to a single permit. Before acceptance, all bonds shall be approved by the Appointing Authority. All bonds must be executed by a surety company satisfactory to the District and duly authorized to transact business in Missouri as evidenced by a Certificate of Authority granted by the Insurance Commissioner, Department of Insurance, State of Missouri. The surety company must have a policyholder's rating of "A" or better and a financial rating of Class V or higher in BEST'S KEY RATING GUIDE, latest edition. If a cash bond is offered, it shall be deposited with the Secretary-Treasurer, who shall give his official receipt therefore, reciting that the cash has been deposited in compliance with and subject to the provisions of applicable rules and regulations. 16-9

10 Amendment No. 3 Date Issued: January 1, 2011 Affected Parts: , , , , 8.050, 8.080, 9.020, , Subject: Letters of Credit & Stormwater Management Criteria Abstract: Outlines requirements for District acceptance of Letters of Credit (LOC) for construction and BMP deposits. Includes current stormwater BMP requirements required from the existing Phase II stormwater permit (i.e., the small MS4 NPDES Stormwater Permit). Changes shown in gray The text of the affected sections is hereby and of this date added or amended to the following: General Performance Criteria for Stormwater Management When Required 5. Controls shall be designed and implemented to prevent or minimize water quality impacts by reasonably mimicking pre-construction runoff conditions on all new development projects to the maximum extent practicable. (This is a Small MS4 NPDES Stormwater Discharge Permit requirement. It necessitates controls and practices that reduce runoff volume through infiltration, evapotranspiration, and/or rainwater harvesting.) On redevelopment sites, controls shall be designed and implemented to prevent or minimize water quality impacts by effectively utilizing water quality strategies and technologies, including those that reduce runoff volume, to the maximum extent practicable. When micro-detention is required in the combined sewer area to address sewer capacity problems, these controls should also apply runoff reducing strategies and technologies. Sites with 20 percent or less existing imperviousness are considered new development for determining if the mimicking pre-construction runoff conditions requirement is applicable. Any subsequent or additional development or expansion projects on those sites will also be considered new development. Subdividing does not affect that requirement Construction Deposit and Construction Deposit Agreement Prior to the issuance of construction permits, a Construction Deposit for all public facilities, as well as an As-Built Deposit will be required as stated in Chapter 9. In addition, the project Owner will be required to execute a construction deposit agreement guaranteeing completion of sewer improvements. Two (2) copies of the document will accompany the Plan Approval Notice to the Owner. The agreements must be executed and returned to the District before construction permits will be issued. One original will be returned to the Owner upon execution by the District

11 Stormwater Quality Management Facilities and Construction Deposit Agreement Construction of Stormwater Quality Management Facilities is not required for construction approval. However, prior to the issuance of construction approval: Construction Inspection a. The project owner shall execute a construction deposit agreement guaranteeing completion of stormwater quality management facilities. Two (2) copies of this document will accompany the Plan Approval Notice to the Owner. This document must be executed and returned to the District before construction approval will be issued. One original will be returned to the Owner upon execution by the District. b. The project owner shall provide a construction deposit for all stormwater quality management facilities, as stated in Chapter 9. c. The permittee shall apply for all stormwater BMP permits. The owner executed construction deposit agreement guaranteeing completion of stormwater quality management facilities and associated deposit shall be provided to MSD before stormwater BMP permits are issued. All permitted stormwater quality management facilities must be inspected by the District. It is the responsibility of the Owner's Contractor to contact the District's Construction Department to arrange for this inspection. The District will issue a BMP Construction Completion Letter when its inspection indicates that stormwater quality management facilities were constructed satisfactorily and in compliance with approved plans. The District will not issue a BMP Construction Completion Letter for any facilities which were not constructed in accordance with approved plans and without District inspection. No portion of the Stormwater Quality Management Facilities Construction Deposit will be released without the District issuing the BMP Construction Completion Letter. Stabilization of the drainage area tributary to stormwater quality management facilities is very important to the facility s function. The District will also perform an inspection of the drainage area tributary to stormwater quality management facilities. The District s determination of drainage stability will be determined when the drainage area s final landscape cover is established. Any vegetated covers should provide a uniform, evenly distributed final vegetative cover with a minimum density of 80 percent. MSD reserves the ability to require additional site stabilization measures, where construction sediment or other construction materials are affecting BMP performance Dedication and Release of Construction Deposit (New Title Only) Release of Stormwater Quality Management Facilities Construction Deposit The District will release up to seventy-five percent (75%) of the deposit upon issuance of BMP Construction Completion Letter. For sites with multiple (more than four (4)) permitted BMPs, the District will consider proportionally 16-11

12 releasing the deposit at twenty-five percent (25%) and fifty (50%) percent of the total number of BMPs constructed. Where dedication of public sewers is not required, the District will also perform an inspection of the drainage area tributary to stormwater quality management facilities. MSD will hold the balance of the stormwater quality management facility deposit until the BMP drainage areas (for which the developer has disturbed or has reasonable control over) is sufficiently stable for stormwater quality management facility operation and all BMPs are functioning properly. Where dedication of public sewers is required, the District will perform the inspection of the drainage area tributary to stormwater quality management facilities as part of the dedication inspection process. The balance of the BMP deposit will be released as part of the dedication process Deposits Required Before Issuance of Construction Permits Construction Deposit BMP Deposit For projects with public sewer facilities, detention facilities or private facilities requiring the District construction inspection, certain deposits will be required prior to the issuance of construction permits. All Construction Deposits, Stormwater Quality Management Facility Deposits, and Conditional Plan Approval Deposits must be in the form of cash, a cashier s check, wire transfer or letter of credit. No vouchers or Letters of Credit will be accepted. As-Built deposits may be cash, cashier checks, corporate checks personal checks or wire transfer. The Construction Deposit, Stormwater Quality Management Facility Deposits, and As-Built Deposit must be remitted from the Owner, not the Contractor or Engineer. The Owner will be required to submit to the District a Construction Deposit. When the deposit is in the form of cash, the amount of the deposit shall be ten percent (10%) of the estimated construction cost of the public sewers and private facilities to be constructed under the District inspection, not including stormwater quality management facilities (see for BMP deposits). When the deposit is in the form of a letter of credit, the amount is also ten percent (10%), however, the minimum amount of the letter of credit shall be $30,000. The Deposit amount will be computed by the District at the time of request for required number of plans. Release of the Construction Deposit will be made as stated in Chapter The Owner will be required to submit to the District a BMP Deposit (Stormwater Quality Management Facility Deposit) in the amount of fifty percent (50%) of the estimated construction cost of the stormwater quality management facilities constructed under the District inspection. When the deposit is in the form of a letter of credit, the minimum amount of the letter of credit shall be $30,000. The Deposit amount will be computed by the District at the time of request for required number of plans. Release of the BMP Deposit will be made as stated in Chapter

13 Amendment No. 4 Date Issued: October 15, 2012 Affected Parts: , , 4.060, 4.070, , , 4.100, , and Subject: Design Requirements for Sanitary Sewers, Requirements for Storm Drainage Facilities, and Construction Permits Abstract: Modifies maximum infiltration rates per MDNR, modifies protection from surcharging wording, updates Figures 3-1 and 3-2 to match local plumbing codes, deletes limitations to areas draining across sidewalks or driveways, deletes threshold for required impervious area to be sewer connected, adds miscellaneous clarifications on storm water quality volume and BMP options, revises Table 4-5 Storm Water Management Requirements for Harlem and Baden Watersheds, and Other Watersheds as Directed by the District, modifies Performance Bond requirements, and updates insurance requirements. Changes shown in gray The text of the affected sections is hereby and of this date added or amended to the following: Infiltration An additional amount of flow due to infiltration shall be evaluated. All sanitary sewers shall be limited to a maximum of one two hundred (100) (200) gallons per inch of diameter per day per mile of line, as required by MDNR Specifications, when tested by appropriate water of low pressure air testing. In addition, there shall be no visible leaks Special Situations and Design Requirements 5. Location in Conjunction with Water Service Sanitary sewers and manholes shall be at least ten (10) feet horizontally from any existing or proposed water main. On crossings, a minimum vertical clearance of eighteen (18) inches shall be provided between the outside of the water main and outside of the sanitary sewer. MoDNR provisions for waiver will be considered on a case by case basis. 14. Protection from Surcharging Due to sewer overcharge and water backup potential, building structures shall be protected with appropriate backflow prevention measures (i.e. approved backwater valves or strapped plumbing) as outlined in local plumbing codes. It is noted that the District may prohibit gravity sewer service to basements in some combined sewer areas and some known problem areas served by separate sanitary sewers. In these situations a backwater valve will not suffice for surcharge protection and instead strapped plumbing shall be required as directed by the District. See most recent Figures 3-1 and

14 Due to sewer overcharge and water backup potential, gravity sewer service to basements Is prohibited in some combined sewer areas and as directed by the District in known problem areas served by separate sanitary sewers. This requirement is for all new construction and all rehabilitation construction. Strapped plumbing and grinder pumps serving individual basements shall be used as necessary (See Figure 4-5). Limited variance to this rule will only be granted per the District review of project plans. All variance requests shall be submitted as a District P-job for formal review and must include elevations and demonstration of existing sewer system capacity or other allowable relief

15 Figure 3-1 below replaces old SHT NO. 1 OF 2 dated JUNE 2006 Figure

16 Figure 3-2 below replaces old SHT NO. 2 OF 2 dated JUNE 2006 Figure

17 4.060 Limitations on Areas Draining Across Sidewalks or Driveways This section has been removed Impervious Areas In City of St. Louis This section has been removed Unified Stormwater Sizing Criteria 2. Water Quality Volume (WQv) a. The Water Quality Volume (denoted as the WQv) is the storage needed to capture and treat the runoff from 90% of the recorded daily rainfall events. In numerical terms, it is equivalent to 1.14 inches of rainfall multiplied by the volumetric runoff coefficient (Rv) and site area. The WQv is directly related to the amount of impervious cover created at a site. A minimum WQv of 0.2 inches per acre shall be met at all sites where WQv is required. b. As a basis for determining water quality treatment volume the following assumptions may be made: (1) The water quality volume WQv for offsite areas is not required. The following equations are used to determine the storage volume, WQv (in acre-feet of storage): WQv = [(P)(Rv)(A)]/12 P = 1.14 inches of rainfall Where: WQv =water quality volume (in acre-feet) Rv = (I) where I is percent impervious cover A = drainage area to BMP in acres (2) Measuring Impervious Cover: The measured area of a site plan that does not have vegetative or permeable cover shall be considered total impervious cover. (3) Multiple Drainage Areas: When a project contains or is divided by multiple drainage areas, the WQv volume shall be addressed for each drainage area. (4) Offsite Drainage Areas: The WQv shall be based on the impervious cover of the proposed site. Offsite existing impervious areas may be excluded from the calculation of the water quality volume requirements. (5)(4) BMP Treatment: The final WQv shall be treated by an acceptable BMP(s) from the list presented in Section , or as approved by the District. (6)(5) Subtraction for Non-structural Practices: When non-structural practices are employed in the site design, the WQv volume can be reduced in accordance with the conditions outlined in Section (7)(6) Extended Detention for Water Quality Volume: The water quality requirements can be met by providing a 24-hour draw down of a portion of the water quality volume (WQv) in conjunction with a stormwater pond or wetland system. Referred to as ED, this is different than providing the extended detention of the one-year storm for the channel protection volume (Cpv). The ED portion of the WQv may be included when routing the Cpv

18 Acceptable Urban BMP Options d. NOTE: Groundwater sump pump discharge may be problematic if directed towards storm water BMPs. In general this practice should be avoided unless otherwise allowed by the District. 2. BMP Group 2. Stormwater Wetlands a. Practices that include significant shallow wetland areas to treat urban stormwater but often may also incorporate small permanent pools and/or extended detention storage to achieve the full WQv include (Modification of existing wetland areas will require a CWA 404/401 permit): W-1 shallow wetland W-2 ED shallow wetland W-3 pond/wetland system W-4 pocket wetland b. U.S. Army C.O.E. Jurisdictional Wetlands shall not be used for control of water quantity (i.e. the flood protection volume). Wetlands shall not be used for control of water quantity (i.e. flood protection volume). c. Wetlands shall be designed by a qualified and experienced team. 4. BMP Group 4. Filtering Practices a. Practices that capture and temporarily store the WQv and pass it through a filter bed of sand, organic matter, soil or other media are considered to be filtering practices. Filtered runoff may be collected and returned to the conveyance system. Design variants include: F-1 surface sand filter F-2 underground sand filter F-3 perimeter sand filter F-4 organic filter F-5 pocket sand filter F-6 bioretention* F-7 proprietary filtering system *may also be used for infiltration b. Filtering practices may be allowed on commercial projects. They are not allowed on residential projects. c. A maintenance agreement and maintenance schedule shall be required

19 4.100 Detention Report 3. The Detention Report shall be signed, dated and sealed by the Missouri Professional Engineer who is responsible for its preparation. If the report is prepared by another person, a note on the cover shall state the preparer s name and that he or she is under the direct supervision of the Missouri Professional Engineer whose seal is shown

20 TABLE 4-5 WATERSHED RELEASE RATES FOR DESIGN OF ROUTED DETENTION FACILITIES FOR DEVELOPMENTS WITH A POST-DEVELOPMENT DIFFERENTIAL RUNOFF GREATER THAN 5 CFS* WATERSHED FINAL ROUTED RELEASE RATE 100-YEAR 24 HOUR STORM FINAL ROUTED RELEASE RATE 2-YEAR 24 HOUR STORM VOLUMETRIC METHOD CRITICAL TIME PERIOD OF WATERSHED Baden ** Zero Increase Zero Increase NA Bonfils 1.0 cfs/acre 0.4 cfs/acre Hour (Cowmire) Bonhomme 1.8 cfs/acre 0.25 cfs/acre Hour Caulks 1.4 cfs/acre 0.2 cfs/acre Hour Coldwater Zero Increase Zero Increase NA Creve Coeur 1.2 cfs/acre 0.13 cfs/acre Hour Deer Zero Increase Zero Increase NA Dunn 1.0 cfs/acre 0.4 cfs/acre Hour Fee Fee 1.3 cfs/acre 0.15 cfs/acre Hour Fenton Zero Increase Zero Increase NA Fishpot 1.5 cfs/acre 0.3 cfs/acre Hour Grand Glaize Zero Increase Zero Increase NA Gravois Zero Increase Zero Increase NA Harlem** Zero Increase Zero Increase NA Kiefer 2.2 cfs/acre 0.7 cfs/acre Hour Maline Zero Increase Zero Increase NA Martigney Zero Increase Zero Increase NA Mattese Zero Increase Zero Increase NA Mill 1.5 cfs/acre.13 cfs/acre Hour River Des Peres Zero Increase Zero Increase NA Spanish Lake 1.0 cfs/acre 0.37 cfs/acre Hour University City Zero Increase Zero Increase NA Watkins Zero Increase Zero Increase NA Williams 0.7 cfs/acre 0.2 cfs/acre Hour Yarnell 1.3 cfs/acre 0.3 cfs/acre Hour Note: *Differential runoff based on the 15-year, 20 minute storm. See Rules and Regulations and Engineering Design Requirements for Sanitary Sewage and Stormwater Drainage Facilities, Chapter 4, Section Differential runoff of 5 cfs or less, use Zero Increase for all watersheds and both routing frequencies. **Differential runoff and detention routings should be computed from a completely undeveloped condition for projects in the Harlem & Baden watersheds, Grand & Bates (March 9, 2001) sewershed, and other sewersheds as may be directed by the District, in the City of St. Louis. System capacity has been found overcharged for rainfall events as small as once every two (2) years. Physical limitations of the site may be considered in special cases. **Projects which have any increase in differential runoff in the Harlem & Baden watersheds, Grand & Bates sewershed, and other sewersheds as may be directed by the District will have stormwater management requirements as shown in items A.) through D.) as follows: 16-20

21 STORMWATER MANAGEMENT REQUIREMENTS FOR HARLEM AND BADEN WATERSHEDS AND OTHER WATERSHEDS AS DIRECTED BY THE DISTRICT A.) For project differential increase 0 to < 2 cfs: Volume reduction type BMPs sized for 75% of the 90 th % rainfall 1.14 WQv calculation as shown in b(1). In general, the minimum amount of tributary impervious area to be treated by the BMPs shall be the acreage of added impervious area. The BMPs shall be designed to capture 75% of the WQv from the total drainage area tributary to the BMP. The BMP shall be designed to drain down completely in 2 days. The BMP overflow path shall be designed for the 100-year, 20-minute storm. For an example, see MSD website BMP toolkit. B.) For project differential increase 2 cfs or >: TR55 analysis for 2-year and 100-year events, with level pool routing to meet release rates as specified in Table 4-5. C.) In the case of new directly sewer connected roof area replacing existing pavement area, MSD will evaluate these on a case-by-case basis. D.) For all cases, where localized downstream flooding or localized downstream sewer surcharging occurs, differential runoff calculations and detention routings shall be computed from a completely undeveloped condition as directed by the District

22 Performance Bond Excluding permits for certain above ground stormwater quality best management practices, no construction or connection permit shall be issued unless the applicant shall first have filed with the District a cash or corporate bond in an amount not less than Ten Thousand Dollars ($10,000.00). Such bond shall run to the District and shall be conditioned as follows: That the permittee, his agents and servants, shall comply with all of the terms, conditions, provisions, requirements and specifications of the District's applicable Rules and Regulations and Standard Construction Specifications. A permittee may elect to maintain such bond with respect to all permits issued hereunder during the period of the bond or with respect to a single permit. Before acceptance, all bonds shall be approved by the Director or a designee thereof. All bonds must be executed by a surety or insurance company satisfactory to the District with the following qualifications: Duly authorized to transact business in Missouri as evidenced by a Certificate of Authority granted by the Insurance Commissioner, Department of Insurance, State of Missouri. Having a financial strength rating of "A" or better and a financial size category of Class V or higher per AM Best Company. If a cash bond is offered, it shall be deposited with the Secretary-Treasurer, who shall give his official receipt therefore, reciting that the cash has been deposited in compliance with and subject to the provisions of applicable Rules and Regulations Minimum Insurance Requirements for Off Site Construction The District may require proof of insurance when projects require off site sewer construction. The need for insurance will be noted on the Approved Project Plans. If proof of insurance is required, the permittee must provide a copy of an executed Certificate of Insurance on ISO ACORD 25 form indicating that the permittee has obtained and will continue to carry commercial general liability and comprehensive automobile liability. The permittee shall carry and maintain adequate commercial general liability insurance for bodily injury, personal injury and property damage with a company satisfactory to the District and which is: 1. Licensed to do business in the State of Missouri (Admitted) with a financial strength rating of A- or better and a financial size category of Class VI or higher per AM Best Company; or 2. Not licensed in the State of Missouri (Non-admitted) with a financial strength rating of A or better and a financial size category of Class IX or higher per AM Best Company. The insurance company will be acceptable regardless of the above requirements if the insurance company furnishes a bond guarantee or policy containing a provision (commonly referred to as a cut-thru 16-22

23 endorsement) giving all claimants thereunder a direct right of recovery against the company s reinsurer, provided the reinsurer meet one of the qualifications listed above. The limits of liability shall not be for less than the amounts listed below and shall be in larger amounts if such are required by the District Comprehensive Business Automobile Liability: Insurance shall apply to all owned, non-owned and hired vehicles. $1,000,000 Liability Coverage each occurrence -and- $5,000,000 Excess (Umbrella) 1 1 Limits of Excess (Umbrella) coverage for Projects less than $100,000 may be reduced to $2,000, Commercial General Liability (occurrence form): The Commercial General Liability (CGL) policy shall include the following: 1. Premises Operations Liability 2. Blanket Contractual Liability 3. Completed Operations Liability 4. Contractor s Protective Liability (Independent Contractors) 5. Personal Injury Liability 6. Broad Form Property Damage Liability Endorsement 7. Coverage for explosion, collapse and underground hazards (XCU) 8. Blasting (provided that blasting coverage may be excluded if not to be performed in connection with the work) A specific endorsement may be needed if non-standard coverage is provided. The following wording must be stated in the Description of Operations section of the Certificate: No amendments to the ISO Commercial General Liability policy have been made (with the exception of: ). The District shall be named as an Additional Insured with respect to the Project. Required Limits of Liability $1,000,000 Combined Single Limit per occurrence per project $1,000,000 Personal Injury $1,000,000 General Aggregate per project or location -and- $5,000,000 Excess (Umbrella) 2 2 Limits of Excess (Umbrella) coverage for Projects less than $100,000 may be reduced to $2,000,000. The District reserves the right to require additional commercial general liability insurance as deemed necessary

24 Cancellation & Replacement Policy Should any of the required insurance coverage be cancelled prior to the expiration date, the contractor/permittee must provide at least sixty (60) days written notice to the District prior to the cancellation. For policy cancellation for non-payment of premium, the contractor/permittee must notify the District at least ten (10) calendar days prior to the cancellation. Should any of the required insurance coverage be cancelled, terminated or materially altered, the contractor/permittee will send written notice to MSD at least sixty (60) days prior to the effective date of said cancellation, termination or alteration. Upon receipt of any notice of insurance cancellation, termination or alteration, the contractor/permittee shall within thirty (30) days procure other policies of insurance identical in all respects to the policy or policies about to be cancelled, terminated or altered and shall provide the District with evidence of coverage before the cancellation or termination date; and if the contractor/permittee fails to provide, procure and deliver acceptable policies of insurance and satisfactory certificates or other evidence thereof, the District may obtain such insurance at the cost and expense of the contractor/permittee without notice to the contractor/permittee and elect to pursue any other remedy permitted by law and/or the applicable contract

25 Amendment No. 5 Date Issued: December 15, 2014 Affected Parts: EXHIBIT 4-A, 7.070, 7.080, , Subject: Storm Drainage Facilities Underground Detention Facilities, Vacation of Easements, Stormwater BMP Construction Permits, Recording Fees Abstract: Deletes last sentence of item 41 in EXHIBIT 4-A Check List for Review of Stormwater Detention, modifies the easement vacation process by indicating these do not require passage of an Ordinance by the District s Board of Trustees, and instead requires the approval of the Director, modifies item c. in Section , and modifies Sections 7.070, 7.080, and to require Recording Fee checks to be made payable to MSD. Amendment 5 Changes shown in dark gray The text of the affected sections is hereby and of this date added or amended to the following: EXHIBIT 4-A 41. Control structures are to be reinforced concrete; no brick allowed; wall thickness is at least 8 w/one row of steel or 10 w/two rows of steel. Underground basins, as appropriate Vacation of Easements [See Amendment 5] The District shall consider vacating its rights within an easement or public right-of-way when it determines that the easement or right-of-way is not required for any existing or future sewer or drainage facility. The vacation of an easement or the District's rights within a public right-of-way can only be accomplished with the approval of the Director. by the passage of an Ordinance by the District's Board of Trustees. In order to determine if the easement or right-of-way can be vacated, and to prepare the vacation document, Ordinance, the following information must be provided to the District: 1. A letter from the petitioner stating the reason or the request to vacate. 2. A legal description of the area to be vacated, prepared by a registered land surveyor, and an Easement Vacation Plat, prepared in the format outlined in Section

26 If the District determines that there is no future need for the easement or right-of-way in question, a vacation document an Ordinance will be prepared. for consideration and adoption by the Board of Trustees. If the easement to be vacated is part of a project still under review or construction, a vacation document an Ordinance will not be prepared or presented for consideration and adoption by the Board of Trustees until such time as the project has received construction approval or by special permission of the Director. The exhibit A Easement Vacation Plat however will still be reviewed as part of the Plan Review process. In certain situations, if as-built/construction approval is being delayed, easement vacation may proceed by special approval of the Director. Upon the Director s approval of the vacation, passage of the Ordinance, the petitioner will be required to submit the recording fee, payable to MSD the "Recorder of Deeds" for the recording of the vacation. Ordinance. Should the District determine that it is necessary to retain its rights within the easement or public right-of-way in question; the petitioner will be notified in writing that the request has been denied Easement Encroachment [See Amendment 5] Modifies the third paragraph in item Three (3) sets of plans showing the existing sewer or drainage facility, the existing easement, the proposed structure, and the proposed foundation design in plan and profile relative to the sewer. The foundation design calculations must also be submitted. Upon receipt of this information, the existing sewer will be inspected to determine its condition. Based on this inspection and a review of the plans, the District will determine if the encroachment will be allowed and what, if any, sewer rehabilitation, will be required. If the encroachment is to be allowed, the property owner will be required to enter into an "Encroachment Agreement" with the District. The property owner will also be required to submit a recording fee, payable to MSD the "Recorder of Deeds" for the recording of this document. If the encroachment is denied, the petitioner will be notified in writing of this denial

27 Stormwater Quality Management Facilities and Construction Cash Deposit Agreement [Added by Amendment 2, Amended by Amendments 3 and 5] Construction of Stormwater Quality Management Facilities is not required for construction approval. However, prior to the issuance of construction approval items a.) and b.) below shall be completed: a. The project owner shall execute a "Construction Deposit Agreement Guaranteeing Completion of Stormwater Quality Management Facilities". Two (2) copies of this document will accompany the Plan Approval Notice to the Owner. This document must be executed and returned to the District before construction approval will be issued. One original will be returned to the Owner upon execution by the District. b. The project owner shall provide a construction deposit for all stormwater quality management facilities, as stated in Chapter 9. c. BMP permits shall be obtained prior to BMP construction. The permittee shall apply for all stormwater BMP permits. The owner executed Construction Deposit Agreement Guaranteeing Completion of Stormwater Quality Management Facilities" and associated deposit shall be provided to MSD before stormwater BMP permits are issued Recording Fees [See Amendment 5] The Owner will be responsible for paying the recording fees for all documents to be recorded with the Recorder of Deeds for St. Louis County or the City of St. Louis. Checks are to be made payable only to MSD. the appropriate Recorder. Documents are to be reviewed by the District prior to execution. After execution and notarizations, the documents are to be delivered to the District for transport to the Recorders Office and MSD will then pay the Recording Fees along with the Recording Fees. (Subdivision plats are not recorded by the District for private development projects)

28 Amendment No. 6 Date Issued: February 15, 2015 Affected Parts: item 9, , Subject: Oil/Gas Separators, Sand Filters and Grease Traps, BMP deposit, Machine Tap Abstract: Adds clarification for design of interceptors and traps. Adds clarification on when the BMP deposit must be paid. Removes the 24 maximum diameter limitation on machine tap connections and changes the requirement as to which entity (MSD or drainlayer) is responsible for making the physical connection to the existing sewer. Amendment 6 Changes shown in dark gray The text of the affected sections is hereby and of this date added or amended to the following: Special Situations and Design Requirements [See Amendments 4 and 6] 9. Oil/Gas Separators, Sand Filters, and Grease Traps [See Amendment 6] If required by the District, grease, oil and sand interceptors or traps shall be provided when such devices are necessary for the proper handling of liquid wastes containing grease or oil in excessive amounts or any flammable wastes, sand, or other harmful materials which can be trapped. Such interceptors or traps shall not be required for private dwelling units. Prior to the installation of any interceptor or trap, drawings and specifications shall be submitted to the District for approval. All interceptors and traps shall be located so as to be readily accessible for cleaning and visual inspection on influent and effluent sides. An exterior location shall be the norm. Design of interceptors and traps shall be per local plumbing codes. Discharge of wastewater into the MSD sewer system shall not exceed sewer use ordinance limits and prohibitions. Grease and oil interceptors or traps shall be constructed of impervious materials capable of withstanding sudden and extreme changes in temperature. All such devices shall be of substantial construction, water-tight, and equipped with easily removable covers which, when bolted in place, shall be gas tight and watertight, unless otherwise approved by the District. All grease, oil and sand interceptors or traps shall be maintained in effective operation at all times by and at the expense of the user

10. CONSTRUCTION PERMITS General Permits Required

10. CONSTRUCTION PERMITS General Permits Required 10. CONSTRUCTION PERMITS 10.010 General 10.010.01 Permits Required 10.010.02 Defaults 10.020 Permittee [See Amendment 2] Any person, firm or corporation desiring to construct, install, relocate, connect

More information

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3

More information

Exhibit A. City of Roswell Stormwater Utility. Stormwater Utility Credit Manual. December 27, 2010

Exhibit A. City of Roswell Stormwater Utility. Stormwater Utility Credit Manual. December 27, 2010 Exhibit A City of Roswell Stormwater Utility Stormwater Utility Credit Manual December 27, 2010 Section 1 Introduction and Overview Stormwater utility credits recognize efforts by private and public entities

More information

City of Kinston. Stormwater Utility Credit Manual

City of Kinston. Stormwater Utility Credit Manual City of Kinston Stormwater Utility Credit Manual Effective Date: July 1, 2008 Table of Contents 1.0 INTRODUCTION...3 2.0 DEFINITIONS...4 3.0 GENERAL CREDIT POLICIES...4 4.0 STORMWATER BMP CREDIT POLICY.......................

More information

City of Duluth Stormwater Utility

City of Duluth Stormwater Utility City of Duluth Stormwater Utility Stormwater Utility User Fee Credit Manual JUNE 13, 2011 TABLE OF CONTENTS SECTION 1 GENERAL INFORMATION... 1 DEFINITIONS... 1 SUMMARY OF STORMWATER USER FEE CREDITS...

More information

City of Galesburg Stormwater Utility Credits and Incentives Policy

City of Galesburg Stormwater Utility Credits and Incentives Policy Stormwater Utility Credits and Incentives Policy December, 2014 Table of Contents 1 Background... 2 2 Applicability of Incentives and Credits... 2 3 Incentives... 3 3.1.1 Rain Barrels... 3 3.1.2 Other

More information

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL Adopted by the Board of Mayor and Aldermen of the City of Spring Hill on December 21, 2009 TABLE OF CONTENTS STORM WATER UTILITY CREDIT AND ADJUSTMENT

More information

Sugar Hill Stormwater Utility Credit Technical Manual

Sugar Hill Stormwater Utility Credit Technical Manual CITY OF SUGAR HILL. Sugar Hill Stormwater Utility Credit Technical Manual.......... Amended January 14, 2010 Table of Contents City of Sugar Hill Stormwater Utility Credit Technical Manual DEFINITIONS...

More information

Lake County Stormwater Utility Fee

Lake County Stormwater Utility Fee County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit

More information

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program. Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources

More information

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY CITY OF NORTH RIDGEVILLE STORMWATER UTILITY NON-RESIDENTIAL CREDIT MANUAL January 2019 City of North Ridgeville, 7307 Avon Belden Road, North Ridgeville, Ohio 44039 www.nridgeville.org, 440-353-0819 (office),

More information

FY19 BUDGET ORDINANCE NO AN ORDINANCE, repealing and superseding Ordinance No , adopted

FY19 BUDGET ORDINANCE NO AN ORDINANCE, repealing and superseding Ordinance No , adopted FY19 BUDGET ORDINANCE NO. 14920 AN ORDINANCE, repealing and superseding Ordinance No. 14683, adopted June 8, 2017, and making appropriations for the current expenses of the District in the General Fund,

More information

*** DRAFT - NOT YET FILED ***

*** DRAFT - NOT YET FILED *** 3745-39-03 Ohio EPA NPDES requirements for small MS4s. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal

More information

Peachtree City Public Works Department. Peachtree City Stormwater Utility. Stormwater Utility Credit Technical Manual ...

Peachtree City Public Works Department. Peachtree City Stormwater Utility. Stormwater Utility Credit Technical Manual ... . Peachtree City Public Works Department Peachtree City Stormwater Utility Stormwater Utility Credit Technical Manual.......... January 31, 2013 Section 1. Overview This manual outlines the methodology

More information

STORMWATER UTILITY FEE CREDIT MANUAL

STORMWATER UTILITY FEE CREDIT MANUAL Single-Family Residential Properties STORMWATER UTILITY FEE CREDIT MANUAL Department of Public Works Stormwater Management Program 941 Fir Street Waynesboro, Virginia 22980 (540) 942-6624 waynesboro.va.us/291/stormwateradministration

More information

City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees

City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees Prepared by: Jeff Baines, P.E. Commissioner of Public Services Lebanon, Tennessee May 25, 2018 Instruction Revisions June

More information

City of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees

City of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees City of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees Prepared By: AMEC Earth and Environmental, Inc. Knoxville, Tennessee June 17, 2005 TABLE OF CONTENTS 1 INTRODUCTION...

More information

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT FP CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP" SECTION 15.1 STATUTORY AUTHORIZATION The legislature of the State of Minnesota in Minnesota Statutes, Chapter 103F and Chapter 394 has delegated the responsibility

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST Applicant shall provide three (3) copies of the following attachments: Geotechnical Report (Soils Report with grading specifications and

More information

Stormwater Management Utility Fee Reduction Credit Application

Stormwater Management Utility Fee Reduction Credit Application Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on

More information

South Carolina NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES

South Carolina NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES www.scdhec.gov/water South Carolina NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES In compliance with the provisions of the SC Pollution Control Act (S.C.

More information

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS of the Morrow Roachester & Morrow-Cozaddale Sewer Improvement Areas, Warren County Sewer District April, 2019 Warren County is accepting sealed statement

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

City of Brunswick Stormwater Utility

City of Brunswick Stormwater Utility City of Brunswick Stormwater Utility Stormwater User Fee Credit Manual JUNE 2018 TABLE OF CONTENTS SECTION 1 GENERAL INFORMATION... 1 DEFINITIONS... 1 SUMMARY OF STORMWATER USER FEE CREDITS... 3 STORMWATER

More information

Town of South Kingstown Public Services Department. Regulations Governing On-Site Wastewater Management

Town of South Kingstown Public Services Department. Regulations Governing On-Site Wastewater Management Town of South Kingstown Public Services Department Regulations Governing On-Site Wastewater Management 1 REGULATIONS GOVERNING THE SOUTH KINGSTOWN ONSTIE WASTEWATER MANAGEMENT DISTRICT October 15, 2001

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT Amended 6/09 APPLICABILITY: These procedures will apply where an individual desires to install or abandon a temporary monitoring

More information

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Green Stormwater Infrastructure for Flood Risk Reduction June 2016 Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Topics 1. Proposed ASFPM Policy Paper 2. Background Why is

More information

COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES Board of Trustees Wallace D. Van Buren President Amy S. Kovacevic Vice President Paul W. Coultrap Clerk 2710 Curtiss Street P.O. Box 1412 Downers Grove, IL 60515-0703 Phone: 630-969-0664 Fax: 630-969-0827

More information

INTERMUNICIPAL WASTEWATER AGREEMENT

INTERMUNICIPAL WASTEWATER AGREEMENT INTERMUNICIPAL WASTEWATER AGREEMENT THIS AGREEMENT made the day of, 2013, by and between the COUNTY OF ONONDAGA, having its principal offices at 421 Montgomery Street, Syracuse, New York 13202 ( the County

More information

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors June 23, 1998 Revised April 5, 2016

More information

APPLICATION FOR CERTIFICATE OF QUALIFICATIONS TO PROPOSE FOR PROFESSIONAL SERVICES

APPLICATION FOR CERTIFICATE OF QUALIFICATIONS TO PROPOSE FOR PROFESSIONAL SERVICES THE METROPOLITAN ST. LOUIS SEWER DISTRICT 2350 MARKET STREET ST. LOUIS, MO 63103 (USED IN PREQUALIFYING CONSULTANTS ON ARCHITECTURAL, ENGINEERING, AND SURVEYING SERVICES) January 1, 2014 through December

More information

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION TOWN OF KENT, CT PLANNING AND ZONING COMMISSION FLOOD PLAIN MANAGEMENT REGULATIONS Whereas, Congress has determined that a National Flood Insurance Program would alleviate personal hardships and economic

More information

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING

More information

LINE EXTENSION AGREEMENT FOR PUBLIC WASTEWATER SYSTEM

LINE EXTENSION AGREEMENT FOR PUBLIC WASTEWATER SYSTEM LINE EXTENSION AGREEMENT FOR PUBLIC WASTEWATER SYSTEM This AGREEMENT is made and entered into this day of 20, by and between, a(n) ( ADEVELOPER@) and the SNYDERVILLE BASIN WATER RECLAMATION DISTRICT, a

More information

Chapter 6 - Floodplains

Chapter 6 - Floodplains Chapter 6 - Floodplains 6.1 Overview The goal of floodplain management is to reduce the potential risks to both existing and future developments, and infrastructure, in the 100-year floodplain. Over the

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address:

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address: A (Office Use Only) Encroachment Permit Permit #: City of Seaside Public Works 440 Harcourt Avenue Seaside, Ca 93955 Phone: (831) 899-6825, Fax: (831) 899-6211 All information except signature must be

More information

Fee Schedule for 2017

Fee Schedule for 2017 EXHIBIT A Fee Schedule for GENERAL CITY ADMINISTRATIVE FEES Business Licenses Neighborhood Business License Neighborhood Business License - Initial Application Neighborhood Business License - Annual Renewal

More information

Strategic Flood Risk Assessment for SDCC Development Plan

Strategic Flood Risk Assessment for SDCC Development Plan Strategic Flood Risk Assessment for SDCC Development Plan Detailed Report on Flood Risk in the Baldonnell Area 8 th May 2015 rpsgroup.com/ireland Strategic Flood Risk Assessment for SDCC Development Plan

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget

More information

SEWER LATERAL REPAIR APPLICATION

SEWER LATERAL REPAIR APPLICATION CITY OF BALLWIN 14811 Manchester Road Ballwin, MO 63011 (636) 227-2129 FAX: (636) 207-2360 inspections@ballwin.mo.us APPLICATION # OUT OF MONEY SEWER LATERAL REPAIR APPLICATION IMPORTANT NOTICE APPLICANT

More information

ORANGE WATER AND SEWER AUTHORITY SCHEDULE OF RATES, FEES, AND CHARGES APPLICABLE TO ALL BILLINGS AND SERVICES ON AND AFTER OCTOBER 1, 2017

ORANGE WATER AND SEWER AUTHORITY SCHEDULE OF RATES, FEES, AND CHARGES APPLICABLE TO ALL BILLINGS AND SERVICES ON AND AFTER OCTOBER 1, 2017 APPLICABLE TO ALL BILLINGS AND SERVICES ON AND AFTER OCTOBER 1, 2017 Page SECTION I: SCHEDULE OF WATER RATES AND FEES... 2 SECTION II: SCHEDULE OF SEWER RATES AND FEES... 8 SECTION III: SCHEDULE OF RECLAIMED

More information

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF GALVESTON COUNTY MUNICIPAL UTILITY DISTRICT NO.

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF GALVESTON COUNTY MUNICIPAL UTILITY DISTRICT NO. ORDER ESTABLISHING RATES FOR WATER AND SEWER SERVICE; PROVIDING FEES FOR CONNECTION AND RECONNECTION; ESTABLISHING REGULATIONS FOR WATER AND SEWER SERVICE; AND CONTAINING OTHER PROVISIONS RELATING TO THE

More information

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90) CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1: [CI] (EFF. 7/16/90) To use sound fiscal policies to provide adequate public facilities concurrent with, or prior to development in order

More information

CHAPTER 160 FLOOD PLAIN REGULATIONS

CHAPTER 160 FLOOD PLAIN REGULATIONS CHAPTER 160 FLOOD PLAIN REGULATIONS 160.01 Statutory Authority 160.13 Special Shallow Flooding Areas Standards 160.02 Findings of Fact 160.14 Administration 160.03 Purpose 160.15 Flood Plain Development

More information

Title 6 WATER AND SEWER FEES AND CHARGES

Title 6 WATER AND SEWER FEES AND CHARGES Title 6 WATER AND SEWER FEES AND CHARGES Chapter 6.04 - GENERAL PROVISIONS Chapter 6.08 - WATER SERVICE CHARGES Chapter 6.12 - SEWER SERVICE CHARGES Chapter 6.16 - OTHER FEES AND CHARGES Chapter 6.04 GENERAL

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY19 Strategic Business and Operating Plan and Preliminary Budget Review April 3, 2018 1 Finance Committee Meeting FY19 Strategic Business Operating Plan and Preliminary Budget

More information

2664 RIVA ROAD, P.O. BOX 6675

2664 RIVA ROAD, P.O. BOX 6675 2664 RIVA ROAD, P.O. BOX 6675 County Executive John R. Leopold ANNAPOLIS, MARYLAND 21401 OFFICE OF PLANNING AND ZONING STORMWATER MANAGEMENT TAX CREDIT On January 7, 2008, the Anne Arundel County Council

More information

THE CORPORATION OF THE CITY OF WATERLOO

THE CORPORATION OF THE CITY OF WATERLOO PWS2012-070 Appendix A Page 1 of 16 THE CORPORATION OF THE CITY OF WATERLOO BY LAW NO. 2012- I J_ 5 BY-LAW TO IMPOSE A STORMWATER CHARGE AND IMPLEMENT A STORMWATER CREDIT PROGRAM WHEREAS municipalities

More information

THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012

THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012 THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012 Individual Permits Building Requirements 0% Net-fill Standards JET SKIING DURING A FLOOD ESCAPING THE FLOOD

More information

SEWER LINE CHEMICAL ROOT CONTROL. TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.)

SEWER LINE CHEMICAL ROOT CONTROL. TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.) SEWER LINE CHEMICAL ROOT CONTROL TECHNICAL SPECIFICATIONS (as provided by Duke s Root Control, Inc.) TABLE OF CONTENTS 1. General 2. Contractor Responsibilities 3. Guarantee 4. Composition of the Chemical

More information

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES. Engineering & Permitting Requirements

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES. Engineering & Permitting Requirements 3.6 Docks, Davits, Boat Lifts and Bulkheads 3.6.1 Docks, Davits and Boat Lifts 3.6.1.1 A permit may be issued upon receipt of all requirements contained in this section. The permit shall be temporary and

More information

APPENDIX K Drainage Study

APPENDIX K Drainage Study APPENDIX K Drainage Study Storm Drainage Study For Project 65 Sacramento, California Prepared for: Capital Station 65, LLC Prepared by: Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth Floor Sacramento,

More information

Rates and Fees for New Connections (Developer Fees)

Rates and Fees for New Connections (Developer Fees) Rates and Fees for New Connections (Developer Fees) Table V: New Connection (Developer) Rates and Fees Effective Date 1/1/2019 1/1/2020 1/1/2021 A. Plan Review Fees Per Linear Foot (LF) - Water $0.65 $0.65

More information

Request for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project

Request for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project Request for Proposal For Design Engineering Services City of Lansing, Kansas Wastewater Utility Department 800 First Terrace Lansing, Kansas 66043 February 14, 2018 Page 1 of 14 A. INTRODUCTION The City

More information

Subcontractor Qualification Statement

Subcontractor Qualification Statement Subcontractor Qualification Statement Trade: Legal Name of Firm: Address: No. & Street City State Zip Mailing Address: If different from above address E-mail address: Telephone #: Fax #: Website: Type

More information

SIDNEY-SHELBY COUNTY BOARD OF HEALTH PLUMBING REGULATIONS

SIDNEY-SHELBY COUNTY BOARD OF HEALTH PLUMBING REGULATIONS SIDNEY-SHELBY COUNTY BOARD OF HEALTH PLUMBING REGULATIONS Regulations of the Combined Shelby County General Health District establishing standards governing the installation, maintenance, testing and inspection

More information

TITLE 18. ENVIRONMENTAL QUALITY CHAPTER 14. DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT AND COMPLIANCE FEES ARTICLE 1. WATER QUALITY PROTECTION FEES

TITLE 18. ENVIRONMENTAL QUALITY CHAPTER 14. DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT AND COMPLIANCE FEES ARTICLE 1. WATER QUALITY PROTECTION FEES Section R18-14-101. R18-14-102. Table 1. R18-14-103. R18-14-104. Table 2. Table 3. R18-14-105. R18-14-106. R18-14-107. R18-14-108. Table 4. Table 5. R18-14-109. Table 6. R18-14-110. Table 7. R18-14-111.

More information

RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES

RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES RULES OF TENNESSEE DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER 0780-2-4 NEW MANUFACTURED HOMES AND RECREATIONAL VEHICLES TABLE OF CONTENTS 0780-2-4-.01 Definitions 0780-2-4-.08

More information

SITE SPECIFIC POLLUTION LIABILITY APPLICATION This application is for a Claims Made and Reported Site Specific Pollution Liability Policy

SITE SPECIFIC POLLUTION LIABILITY APPLICATION This application is for a Claims Made and Reported Site Specific Pollution Liability Policy 2561 Moody Blvd., Suite C Flagler Beach, FL 32136 Phone: 386/439-3378 Fax: 386/439-3376 SITE SPECIFIC POLLUTION LIABILITY APPLICATION This application is for a Claims Made and Reported Site Specific Pollution

More information

HENRY COUNTY, OHIO SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS TABLE OF CONTENTS

HENRY COUNTY, OHIO SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS TABLE OF CONTENTS HENRY COUNTY, OHIO SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS TABLE OF CONTENTS TABLE OF CONTENTS... i-ii SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS OF FACT PURPOSE AND OBJECTIVES 1.1 STATUTORY

More information

REGIONAL ROAD CONCURRENCY AGREEMENT CONSTRUCTION OF IMPROVEMENTS

REGIONAL ROAD CONCURRENCY AGREEMENT CONSTRUCTION OF IMPROVEMENTS Return recorded document to: Planning and Redevelopment Division 1 North University Drive, Suite 102A Plantation, Florida 33324 Document prepared by: NOTICE: PURCHASERS, GRANTEES, HEIRS, SUCCESSORS AND

More information

Stormwater System Development Charges

Stormwater System Development Charges Methodology Report Stormwater System Development Charges Prepared For City of Springfield April 20, 2009 GALARDI CONSULTING, LLC PAGE 1 OF 9 SECTION 1 Introduction Oregon legislation establishes guidelines

More information

Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents

Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents Issuing Agency: City of Avondale Estates 21 North Avondale Plaza Avondale Estates, GA 30002 Phone:

More information

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET Sutter County Water Resources Department 1130 Civic Center Boulevard Yuba City, California, 95993 (530) 822-7400 Floodplain management regulations cannot

More information

SFPP, L.P. CONNECTION POLICY

SFPP, L.P. CONNECTION POLICY CONNECTION POLICY Any Shipper seeking to obtain a connection to the pipelines and other facilities of SFPP, L.P. (the SFPP System or System ) under SFPP s currently effective rules and regulations tariff

More information

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

THE PEOPLE OF THE STATE OF MICHIGAN ENACT: DRAFT A bill to authorize local units of government to create storm water utilities; to permit the establishment and collection of storm water utility fees; to provide for the allocation of the costs of

More information

Solicitation of Interest for Grant-Funded Private Property Flood Risk Reduction Construction/Engineering Projects

Solicitation of Interest for Grant-Funded Private Property Flood Risk Reduction Construction/Engineering Projects SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION Solicitation of Interest for Grant-Funded Private Property Flood Risk Reduction Construction/Engineering Projects NOVEMBER 2017 (REVISED

More information

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations Town of Boones Mill Water and Sewer Ordinance Rules and Regulations SUPERVISION The Town of Boones Mill (Town) Water and Sewer Department shall be under the supervision of the Town Manager, who shall exercise

More information

FLOOD PLAIN DEVELOPMENT ORDINANCE

FLOOD PLAIN DEVELOPMENT ORDINANCE FLOOD PLAIN DEVELOPMENT ORDINANCE DES MOINES COUNTY, IOWA ORDINANCE NO. 25 Adopted July 19, 1993 Amended July 26, 1993 Amended January 3, 1995 Amended August 7, 2011 Amended October 16, 2015 TABLE OF CONTENTS

More information

North Pecos Water & Sanitation District. Rates, Charges, Fees and Penalties Effective January 1, 2015

North Pecos Water & Sanitation District. Rates, Charges, Fees and Penalties Effective January 1, 2015 North Pecos Water & Sanitation District Rates, Charges, Fees and Penalties Effective January 1, 2015 Updated : 1-1-2015 RATES, CHARGES, FEES AND PENALTIES OF THE NORTH PECOS WATER AND SANITATION DISTRICT

More information

WATER AND SEWER SERVICES AGREEMENT

WATER AND SEWER SERVICES AGREEMENT WATER AND SEWER SERVICES AGREEMENT Execution Copy WATER AND SEWER SERVICES AGREEMENT Between CITY OF DETROIT And GREAT LAKES WATER AUTHORITY Dated June 12, 2015 TABLE OF CONTENTS Page RECITALS... 1 ARTICLE

More information

CURB CUTS SPECIFICATIONS AND STANDARDS

CURB CUTS SPECIFICATIONS AND STANDARDS City of Elmira, New York CURB CUTS SPECIFICATIONS AND STANDARDS Just a click away Effective Date: April 1992 This document, the Curb Cut Permit Application, and other specifications and standar ds are

More information

CITY OF LEE S SUMMIT DESIGN AND CONSTRUCTION MANUAL SECTION GENERAL PROVISIONS

CITY OF LEE S SUMMIT DESIGN AND CONSTRUCTION MANUAL SECTION GENERAL PROVISIONS CITY OF LEE S SUMMIT DESIGN AND CONSTRUCTION MANUAL SECTION 1000 - GENERAL PROVISIONS 1001 PURPOSE The purpose of the City of Lee s Summit Design and Construction Manual ( Manual ) is to provide minimum

More information

Public Hearing. Fiscal Year 2019 Budget, Taxes, User Charges and Capital Improvement & Replacement Program May 10, 2018

Public Hearing. Fiscal Year 2019 Budget, Taxes, User Charges and Capital Improvement & Replacement Program May 10, 2018 Public Hearing Fiscal Year 2019 Budget, Taxes, User Charges and Capital Improvement & Replacement Program May 10, 2018 Strategic Business and Operating Plan The Charter of the Metropolitan St. Louis Sewer

More information

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended. Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS A. GOALS, OBJECTIVES, AND POLICIES... 3 B. SUMMARY... 17 LIST OF TABLES Table IX 1: City of Winter Springs Five-Year Schedule of Capital Improvements (SCI) FY 2013/14-2017/18... 11 Table

More information

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs: Vision Statement: Provide high quality public facilities that meet and exceed the minimum level of service standards. Goals, Objectives and Policies: Goal CIE-1. The City shall provide for facilities and

More information

Right of Way Permits. Contact Information:

Right of Way Permits. Contact Information: Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,

More information

General Business Rules and Regulations

General Business Rules and Regulations General Business Rules and Regulations GENERAL BUSINESS POLICIES The Western Virginia Water Authority (Authority) rates, fees, and penalties referred to in this document are reflected in the Approved Rates

More information

Notice of Termination General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)

Notice of Termination General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) Notice of Termination General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) 1. Construction Activity Operator: Contact: Mailing Address: (Please Type or Print All Information)

More information

INSURANCE APPLICATION FORM

INSURANCE APPLICATION FORM INSURANCE APPLICATION FORM Insurance coverage under Illinois Drycleaner Environmental Response Trust Fund is available to qualified drycleaning facilities actively engaged in drycleaning operations for

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits

CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES Section 1. New Water Connection Fees Limits Service Complete Service Connection Installation (Potable or Irrigation) Meter Only Installation for

More information

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES PART 3702 CONSTRUCTION AND MAINTENANCE OF DAMS Section Page No. 3702.10 Purpose 2 3702.20 Definitions 3 3702.30

More information

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER STATE REVOLVING FUND TABLE OF CONTENTS

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER STATE REVOLVING FUND TABLE OF CONTENTS RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER 0400-46-06 STATE REVOLVING FUND TABLE OF CONTENTS 0400-46-06-.01 Introduction 0400-46-06-.05 Uses of the

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

FLOOD DAMAGE PREVENTION RULES

FLOOD DAMAGE PREVENTION RULES 60.3(d) FLOOD DAMAGE PREVENTION RULES ARTICLE 1 STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS SECTION A. STATUTORY AUTHORIZATION The Legislature of the State of Texas adopted the Flood

More information

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. 1. INSURANCE REQUIREMENTS A. INSURANCE: The Contractor shall be required to maintain insurance for

More information

MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT Providing Quality Services to the Community STAFF REPORT

MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT Providing Quality Services to the Community STAFF REPORT MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT Providing Quality Services to the Community STAFF REPORT AGENDA TITLE: Approval of Amendments to Severn Trent Contract Extension MEETING DATE: September 9, 2015

More information

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810 REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment

More information

Audit of Selected Stormwater Activity

Audit of Selected Stormwater Activity Audit of Selected Stormwater Activity Report #1302 December 12, 2012 Copies of this audit report #1302 may be obtained from the City Auditor s web site (http://www.talgov.com/auditing/auditreports.cfm),

More information

SERVICE CONNECTION CONSTRUCTION PERMIT WSSC Permit Services Unit APPLICANT/OWNER: PROPERTY DESCRIPTION: ADDRESS: CONTACT PERSON: ADDRESS:

SERVICE CONNECTION CONSTRUCTION PERMIT WSSC Permit Services Unit APPLICANT/OWNER: PROPERTY DESCRIPTION: ADDRESS: CONTACT PERSON:  ADDRESS: SERVICE CONNECTION CONSTRUCTION PERMIT WSSC Permit Services Unit PERMIT NUMBER: APPLICANT/OWNER: PROPERTY DESCRIPTION: ADDRESS: CONTACT PERSON: TELEPHONE NUMBER: FAX NUMBER: E-MAIL ADDRESS: 1. The Applicant

More information

*Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed.

*Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed. ARTICLE XIII. WELLFIELD PROTECTION* *Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed. Sec. 27-376. Definitions. The following definitions apply only to this

More information