Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006

Size: px
Start display at page:

Download "Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2722 ID-KDP Additional Financing EAST ASIA AND PACIFIC Sub-national government administration (25%);Water supply (20%);Irrigation and drainage (20%);Roads and highways (20%);Primary education (15%) P REPUBLIC OF INDONESIA Department of Community Development, Ministry of Home Affairs Jl. Pasar Minggu Raya, Km. 19 Indonesia Republic of Indonesia Indonesia Environment [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006 Estimated Date of November 13, 2006 Appraisal Authorization Estimated Date of February 20, 2007 Board Approval Key development issues and rationale for Bank involvement 1. This additional financing will provide an additional $116 million loan and $90 million credit to the Indonesia: Third Kecamatan Development Project, second phase. The proposed additional loan and credit would provide additional financing to enhance the scale-up of the KDP program. 2. Launched in 1998, by 2007 KDP was expected to scale-down to 550 subdistricts from its 2006 high of 1,350. However, the president s announcement of a national program that builds on KDP is an important opportunity to help Indonesia tackle poverty reduction using a well-tested instrument. The additional financing will be sufficient to cover a scale-up, to 2,000 poor subdistricts. 3. In 2008 the national program will be fully on-budget. It is expected to cover all 70,000 villages in Indonesia. Donor support by that time will be through a larger partnership

2 approach with additional support requested from the Asian Development Bank and the Japanese Bank for International Cooperation. 4. KDP introduced a number of design innovations that are relevant for reviewing the proposed additional financing. The main ones are: a. KDP s direct disbursement system results in very little transfer loss, and it is now adopted by all Indonesian community projects; 1 b. KDP s facilitators are paid through a payroll managed by a chartered bank rather than through consulting firms, which has improved the timeliness of payment and lowered costs significantly (an estimated $15 million/year). It also reduced the number of management consultant contracts required from 26 to 4; c. KDP was the first World Bank project to appraise an anti-corruption action plan (now mandatory for all projects in Indonesia) and to carry out empirical measurements of interventions designed to reduce project leakage; Evaluations KDP is among the most thoroughly evaluated CDD operations in the Bank s portfolio. Positive evaluations demonstrate the following: Poverty targeting is successful (Alatas, 2005) Infrastructure built by KDP has high economic returns (Dent, 2001, Torrens, 2005) Infrastructure quality is good to very good (Ekart et al, 2004; Torrens, 2005; MOHA 2005) KDP s construction costs are 30-50% less than. alternative means (Torrens 2005) There were no significant safeguards cases in 250 randomly selected subprojects (Gnagy 2005) Corruption rates are low (PwC, Moore s Rowland, BPKP, MIS) Participation of women and the poor is generally high (MIS) Voluntary community contributions are high (MIS) KDP forums reduce conflict (Barron et. Al. 2006) Table 2: Outputs from the Kecamatan Development Project, Subproject Type KDP Phase 1 ( ) KDP Phase 2, ( ) Totals to Date ( ) Infrastructure Roads 16,700 roads 19,000 kms 9,632 roads 11,097 kms 26,332 roads built or upgraded 30,097 kms built or upgraded Bridges 3,500 bridges 3,006 bridges 6,506 bridges built or reconstructed Clean water supply 2,800 units 4,378 units 7,178 clean water supply units built Sanitation 1,300 units 1,604 units 2,904 sanitation units built 1 Donors contributing to KDP include Australia, Canada, Japan, Netherlands, and the United Kingdom

3 Irrigation 5,200 irrig 2,126 irrig systems 7,326 irrigation systems built systems Public Markets 400 new markets 16 rehabilitated 327 new markets 91 rehabilitated 727 public markets built 107 markets rehabilitated Electrification 260 activities 254 activities 514 rural electrification activities Workdays generated from infrastructure projects 25 million workdays 14 million workdays * 39 million workdays generated from infrastructure projects Economic Loan Activities (incl. women s loans) Loan activities 18,000 economic loan activities 24,931 loan activities Loan recipient/ 280,000 loan 471,554 loan Loan group recipients recipients members 42,931 loan activities 751,554 loan recipients Education and Health Health 140 health posts 1,868 health posts 2,008 health posts supported Education 285 new schools built 190 school rehab 380 individual Scholarships 1,046 new schools built 1,159 schools rehab 94,801 individual Scholarships 1,331 new schools built 1,349 schools rehabilitated 95,181 individual scholarships Workday figures not yet complete for last cycles in 2005 Evaluations have also shown the main areas requiring improvement: New statistical methods can improve targeting (Alatas 2005) Heightened audit samples and improved audit procedures will lower losses (Olken 2005) Community institutions lack adequate representation (Evers, Olken) Management capacity is weak (aide-memoirs) O&M is inadequate (MOHA 2005) 5. KDP s planning for 2007 responds to these concerns. Poverty targeting will be improved by using the new village mapping techniques to recalculate the eligibility list. KDP s Aceh reconstruction program piloted an improved audit design based on the Olken study on corruption and village roads, and, pending final evaluation, will extend the approach to the national program. Also as part of the national program, GOI is working with donors through the Decentralization Support Facility (DSF) and the DPL policy series to design a policy reform program for improving subdistrict and village governance. And a DSF-financed study will be assessing village cash flows to identify whether the poor communities covered by CDD programs can afford user fees to improve maintenance. 6. KDP is part of the World Bank s overall community driven development program in Indonesia. That program rests on three strategic directions. KDP and its urban sister UPP provide the main architecture for bottom-up development planning. Linked to KDP and

4 UPP are an increasing number of sectoral programs that provide specialized inputs to improve the delivery of poverty services, including the new conditional cash transfer program. Finally, KDP, working together with IFC and Ausaid, recently launched a longterm program to promote private sector linkages to community development programming. 7. The long-term sustainability of the program to some extent hinges on stabilizing the public administration environment within which community development operates. GOI and the Bank agree on a three year action program that will cover the following themes through a mix of analytical and advisory activities supported through the Decentralization Support Facility, DPL triggers, and policy actions sponsored through KDP s high level coordination group: a. Clarifying the national procurement law to allow for community participation (2007) b. Reforming the bottom-up planning regulations (2007); c. Revising the law on village government (2008); d. Stabilizing subdistrict structure and functions under decentralization (2008); and e. Developing a long-term budget transfer mechanism for community planning (2009). 8. Economic and Financial Analysis of Financing Gap 9. Economic analysis of the scaled-up project does not change the analysis presented in the PAD. Even at full funding, total amounts remain less than 5% of district budgets. Although up-to-date surveys of Indonesia s tertiary infrastructure gap are not available, it remains quite large, particularly off-java. Lack of access infrastructure reduces the viability of rural production. KDP economic rates of return are high in large part because KDP infrastructure creates substantial producer surpluses. 10. Analysis of the financing gap is straightforward. KDP currently has funds sufficient for 575 subdistricts in 2007, which receive approximately Rps. 0.8 billion each. Factoring in an additional 25% to cover the costs of technical assistance, training, and evaluations, this means that 2007 without the national program would require project financing of approximately $72.0 million. This amount is available from the original KDP3b. 11. The proposed 2007 scale-up consists of approximately 2,000 kecamatans, with their block tentatively grants set at an average of Rps 1.2 billion, or $260 million. The MDG performance program costs $60 million. Total costs of all other KDP components amount to approximately 22% of the block grant, or $64 million. Scaling up KDP to the level proposed by government for 2007 therefore requires additional financing of $406.0 million. Subtracting the $72.0 million available from KDP3 leaves a financing gap of

5 $334.0 million, of which the government has already allocated US$130.0 million from the national budget. 12. Benefits and Risks 13. Benefits of the project are twofold. First, KDP provides demonstrably valuable benefits to poor communities across Indonesia. These would be increased and they would reach a larger number of poor communities. More importantly however, is that GOI is now making the transition into transforming these community based programs into on-budget support for all villages across Indonesia. Making community transfers predictable and sustained will allow the model to expand into new areas already being piloted: a. Partnerships for improved education and health service delivery; b. Village links to private sector suppliers and marketing; c. Village-based safety nets; d. Rapid responses to disasters and emergencies. 14. Risks are primarily macro and are unchanged from the risk matrix described in the KDP3b appraisal report. KDP s higher profile (and bigger block grant) increases the corruption risks; for that reason a strengthened anti-corruption plan is attached to this concept note as Annex 3. However, to date KDP s confirmed corruption rate has been quite low and the risk should be appraised as medium rather than high. 15. Appraisal carried out a full fiduciary review, which is available IRIS. The purpose of this assessment was to identify improvements needed both for the additional financing in 2007 but also for the larger national program that will start in Recommendations from that assessment were to: a. Strengthen the fiduciary training program for local government and communities; b. Strengthen the financial management teams and financial controls within PMD; c. Provide an expanded FM training and supervision to facilitators; d. Increase BPKP audit sampling of at least 20% of the kecamatan using the special audit program that has been developed for CDD projects; e. Train local government auditors (Bawasda) and include them in auditing of the kecamatan financial management groups; f. Introduce and train a kecamatan supervisory board and make them the community auditor for the UPK g. Expand the current program of community-based cross audits and to provide small fund for helping CG to pursue their own legal cases; h. Place the complaints handling data based, including audit findings, online. Proposed objective(s)

6 16. On August 16, 2006, the President of Indonesia announced that his government would support a national program for poverty reduction. This will be the first national program for sustainable poverty reduction rather than crisis management -- since the East Asian Crisis plunged nearly 40% of Indonesia s population into poverty. 17. The program consists of two main approaches. Approximately $4.0 billion would be invested in a conditional cash transfer program to improve poor people s use of social services. In its first year the CCT program would target 1.7 million poor families, with a plan to rise to 18.0 million poor families by The second wing of the poverty program is called the National Program for Community Empowerment. Called PNPM in Indonesian, (Program Nasional Pemberdayaan Masyarakat), the PNPM covers both rural and urban parts of Indonesia. Both rural and urban areas will be built by scaling up two World Bank-financed community driven development projects, the Urban Poverty Project and the Kecamatan Development Project. By 2009, all 5,300 rural and urban subdistricts in the county will be covered with one of these two programs. 19. Total financing requirements for the national community empowerment program will reach $1.5 billion per year. Most of this amount will be provided from the national budget. However, because of the late presidential announcement, insufficient provisions were made in the 2007 budget to cover the approximately $930 million to launch the first phase scale-up of the KDP and UPP projects. The purpose of the additional financing being proposed here is to help Indonesia fill that gap. There is no change to the project s original development objectives or closing date other than to adjust their scope to reflect achievements from the extra funding Preliminary description 20. KDP consists of unearmarked block grants that are spent to finance economically productive activities that have been planned through facilitated village and subdistrict meetings. Subdistrict grants amounts are fixed within categories established by subdistrict population density, but village proposals can vary within a pre-determined range. Grants are disbursed directly from the Special Account to collectively held village accounts (through a transfer bank), without entering the inter-governmental financial transfer system. 21. KDP3b has 5 components: a. Block grants to poor communities These constitute approximately 80% of KDP. They consist of unearmarked transfers to subdistrict financial management units, where they are used to support priority investments identified selected through a participatory planning process and ratified in a subdistrict selection meeting. Other than a small negative list that blocks use of funds for activities prohibited by World Bank and government policy (i.e. weapons, civil service salaries etc), menu choices are open. Up to 10% of the block grant can be used to purchase engineering services. Subcategories of the block grant cover:

7 i. Planning grants ( DOK ) covers the cost of the participatory planning process, engineering design services, and village level training; ii. Main block grants In the past approximately 65% of these funds are used for economic infrastructure such as roads, tertiary irrigation and the like, although in the past two years there has been an increase in using the grants for education and health services as well. They are allocated based on the decisions of the subdistrict decision meeting. Up to 25% of the grant can be allocated to village-level revolving funds for women; iii. MDG achievement grants thes block grants fund a randomized pilot evaluation in 300 kecamatans that will test whether using KDP grant mechanism to support village-level poverty reduction action proposals produces results on MDG performance indicators. b. Implementation support consists of social and technical kecamatan facilitators. They oversee the planning process, provide technical advice and training, manage the project s reporting system, and certify project completion. There are usually two facilitators per Kecamatan, although in particularly isolated areas there are three. c. Technical assistance is the formal project administration. It consists of three levels, each of which reports to a corresponding level of government. Overall coordination is through a national management team within the Ministry of Home Affairs. d. Monitoring and Evaluation KDP reserves approximately 2.5% of its budget for monitoring and evaluation. The full monitoring system is described in the main PAD for KDP3b. KDP provides both quantitative and qualitative monitoring, and it also has a mix of internal and outsourced evaluations. For the proposed additional financing, the internal system will be strengthened through better technology, additional training, and improved oversight. e. Operational expenses This category covers government incremental expenses, particularly for the extra travel and contract management caused by KDP. It does not cover salaries. This catergory is less than 1% of project costs. 22. Of special relevance for the proposed additional financing is KDP s modular structure. Each subdistrict is a self-contained set of activities that is not dependent on a master procurement or disbursement plan other than the overall budget. As a result, each year the number of subdistricts can expand or contract depending on the availability resources without jeopardizing contracts or budgeting. KDP s management structure is also flexible. The large majority of staff are hired as individual consultants and paid directly through a payroll managed by a bank. This minimizes the extent to which contracts must be procured and amended as the annual plan is adjusted.

8 23. Safeguard policies that might apply Both environment and social safeguard policies apply, but in a context where individual subprojects are all very small and do not pose cumulative threats. Environmental policies primarily refer to proper site management to avoid shoddy disposal or the use of banned materials, including protected species such as rock corals for foundations. Social policies refer to land acquisition. However, a random review of 215 subprojects found no significant environment or social impacts. The primary mechanism for improved environmental management will be improved training and oversight. A grant from CIDA for Sulawesi is experimenting with ways to develop a positive environmental menu that would provide communities with incentives for improved natural resource management. Tentative financing Source: ($m.) BORROWER/RECIPIENT 120 INTERNATIONAL BANK FOR RECONSTRUCTION AND 110 DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 90 Total 320 Contact point Contact: Scott E. Guggenheim Title: Lead Social Development Specialist Tel: Fax: Sguggenheim@worldbank.org Location: Jakarta, Indonesia (IBRD)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Document of The World Bank PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING CREDIT IN THE AMOUNT OF TO THE REPUBLIC OF INDONESIA FOR A

Document of The World Bank PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING CREDIT IN THE AMOUNT OF TO THE REPUBLIC OF INDONESIA FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Kecamatan Development Program M a y 2002

Kecamatan Development Program M a y 2002 Kecamatan Development Program Brief Overview M a y 2002 Introduction The Kecamatan Development Program (KDP) is a Government of Indonesia effort to alleviate poverty in rural communities and improve local

More information

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions.

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions. Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14905 1. Project Data: Date Posted: 06/02/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

PNPM SUPPORT FACILITY (PSF) Project Proposal

PNPM SUPPORT FACILITY (PSF) Project Proposal PNPM SUPPORT FACILITY (PSF) Project Proposal Project Title: Objective: Executing Agency: Estimated Duration: Estimated Budget: Geographic Coverage: Implementation Arrangements: PNPM Mandiri Revolving Loan

More information

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT World Bank PNPM Support Facility (PSF) Gedung Bursa Efek Indonesia Tower 1, lantai 9 Jl. Jenderal Sudirman Kav. 52-53, Jakarta 12190 Ph:

More information

Letter No. SK-519/PSF/XII/2010 December 6, 2010

Letter No. SK-519/PSF/XII/2010 December 6, 2010 Public Disclosure Authorized Address: INTBAFRAD CONFORMED COPYO NAL DEVELOPMENT ASSOCIATION U.S.A. Cable Address: INDEVAS Stefan G. Koeberle Country Director, Indonesia Letter No. SK-519/PSF/XII/2010 December

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6725 Project Name Indonesia-Urban Poverty Project (+) Region Sector Project

More information

Building Community-Based Risk Management Responses to Natural Disasters

Building Community-Based Risk Management Responses to Natural Disasters Building Community-Based Risk Management Responses to Natural Disasters Limiting Governance Risks: Fiduciary Requirements in Disaster Management CDD Projects Prepared by Douglas Graham & Pat Mc Kenzie

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL LOAN IN THE AMOUNT OF US$300 MILLION TO THE

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL LOAN IN THE AMOUNT OF US$300 MILLION TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

OCUMENTS. April 24, 2013

OCUMENTS. April 24, 2013 Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK I BANK DUNIA OFFICIAL 1-r 0 o 4 7 Sharing Development Solutions for an Emerging Indonesia Mr. Lukita Dinarsyah Tuwo Vice Minister

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

PROJECT INFORMATION DOCUMENT (PID) DECISION MEETING STAGE. Ministry of Health, Ghana Ghana

PROJECT INFORMATION DOCUMENT (PID) DECISION MEETING STAGE. Ministry of Health, Ghana Ghana Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) DECISION MEETING STAGE Project Name Health Insurance

More information

Indonesia s Kecamatan Development Program: A Large-Scale Use of Community Development to Reduce Poverty

Indonesia s Kecamatan Development Program: A Large-Scale Use of Community Development to Reduce Poverty Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A case study from Reducing Poverty, Sustaining Growth What Works, What Doesn t, and Why

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia Janelle Plummer, WSP-EAP Bill Paterson, EASTR 2 3 4 5 6 7 In Aceh The disaster was caused by a tsunami and an

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

IN THE AMOUNT OF US$64.7 MILLION

IN THE AMOUNT OF US$64.7 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Environment and Social Development Unit East Asia and Pacific Region Document of The

More information

SECTOR ASSESSMENT (SUMMARY): Community-Driven Development. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): Community-Driven Development. 1. Sector Performance, Problems, and Opportunities KALAHI CIDSS National Project (RRP PHI 46420) SECTOR ASSESSMENT (SUMMARY): A. Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance. Community-driven development (CDD)

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR21722

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Tajikistan Government-implemented grant for targeting and payment of social assistance Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Tajikistan Government-implemented grant for targeting and payment of social assistance Region Report No.: AB5949 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Tajikistan Government-implemented grant for targeting and payment of social assistance Region EUROPE AND CENTRAL ASIA Sector

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7282 Project Name Road Asset Preservation Program ( P113936) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7282 Project Name Road Asset Preservation Program ( P113936) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7282 Project Name Road

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT Country Operations Business Plan: Philippines, 2014 2016 SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT A. Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance.

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

Money Matters: Designing Effective CDD Disbursement Mechanisms

Money Matters: Designing Effective CDD Disbursement Mechanisms Money Matters: Designing Effective CDD Disbursement Mechanisms One of the key challenges associated with Community Driven Development (CDD) approaches is how to disburse funds to communities in an efficient

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized NEGOTIATED TEXT June 2, 2003 CREDIT NUMBER -IND Public Disclosure Authorized Development Credit Agreement (Third Kecamatan Development Project) between Public Disclosure Authorized

More information

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Tanzania Health Sector Development APL II Region

Tanzania Health Sector Development APL II Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

Money Matters: Designing Effective CDD Disbursement Mechanisms

Money Matters: Designing Effective CDD Disbursement Mechanisms Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIAL DEVELOPMENT HOW TO SERIES vol. 4 February 2008 Money Matters: Designing Effective

More information

Loan Agreement. (Third National Program for Community Empowerment in Rural Areas) between REPUBLIC OF INDONESIA. and

Loan Agreement. (Third National Program for Community Empowerment in Rural Areas) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7867-ID Public Disclosure Authorized Loan Agreement (Third National Program for Community Empowerment in Rural Areas) between Public Disclosure Authorized

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE Stepping Up Investments for Growth Acceleration Program- Subprogram 2 (RRP INO 48134) SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE 1. This sector assessment describes the binding constraints to achieving

More information

OFFM.tA DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OFFM.tA DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFM.tA DOCUMENTS Administration Arrangement between the Government of the United Kingdom

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme Document: Agenda: 14(c)(iii) Date: 15 December 2010 Distribution: Public Original: English E President s report Proposed grant to Solomon Islands for the Solomon Islands Rural Development Programme Note

More information

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014 Page 1 of 10 "OP/BP11:00 "Procurement, were revised on July 2014 to take into account the recommendations in " World Bank Group A New Approach to Country Engagement" (R2014-0089), which were approved by

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Health Service Delivery Project (HSDP) Region AFRICA Sector Health (100%) Project ID P111840 Borrower(s) GOVERNMENT OF ANGOLA Implementing

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name. 1. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name. 1. Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name Honduras State Modernization Region LATIN AMERICA AND CARIBBEAN Sector General public administration sector (100%) Project

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:

More information

Responsive Local Government. Accountability, and LG Capacity

Responsive Local Government. Accountability, and LG Capacity Responsive Local Government Operations, Downwards Accountability, and LG Capacity Presentation at the National Workshop, Local Governance Capacity Development tproject Jakarta, August 18, 2011 1 The Objective

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The

More information

OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA

OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA PRESS RELEASE The Draft 2007 : Building Hope for a Brighter Future Jakarta, 16 August 2006 The Draft 2007 represents

More information

I. Key development issues and rationale for Bank involvement

I. Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2491 Project Name Bangladesh Tax Administration Modernization Project Region SOUTH ASIA Sector Other industry (100%) Project ID P083781 Borrower(s)

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Human Settlements Improvement Project (2)

Human Settlements Improvement Project (2) INDONESIA Human Settlements Improvement Project (2) Report Date: March 2000 1 Project Summary and Japan s ODA Loan This project aimed to provide water supply systems, environmental sanitation facilities,

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Country Partnership Strategy: Cambodia, 2014 2018 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Lagging public sector management

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

The Urban Poverty Project - Indonesia: Lessons from the first Seven Years

The Urban Poverty Project - Indonesia: Lessons from the first Seven Years The Urban Poverty Project - Indonesia: Lessons from the first Seven Years George Soraya and Ani Dasgupta May 10, 2007, New Delhi, Jakarta and Washington DC UPP starts as a response to the crisis Starts

More information

ASIAN DEVELOPMENT BANK TAR:INO 35144

ASIAN DEVELOPMENT BANK TAR:INO 35144 ASIAN DEVELOPMENT BANK TAR:INO 35144 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SUPPORT TO STATE AUDIT REFORM PROJECT May 2003 2 CURRENCY EQUIVALENTS

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information

Piloting Results-Based Lending for Programs. Asian Development Bank 2014

Piloting Results-Based Lending for Programs. Asian Development Bank 2014 Piloting Results-Based Lending for Programs Asian Development Bank 2014 Outline 1. Why RBL 2. Defining RBL 3. Defining and Assessing Programs 4. Questions 2 Supporting Development Effectiveness Measurable

More information

2015 Development Policy Financing Retrospective: Preliminary Findings

2015 Development Policy Financing Retrospective: Preliminary Findings 2015 Development Policy Financing Retrospective: Preliminary Findings Purpose of this Consultation Meeting on the DPF Retrospective The 2015 Retrospective will focus on the Bank s experience with Development

More information

INDONESIA Country Partnership Framework

INDONESIA Country Partnership Framework INDONESIA Country Partnership Framework 2016-2020 WHO WE ARE Established in 1944. Headquartered in Washington D.C. The World Bank Group comprises five institutions managed by their 188 member countries

More information

Ex-ante Evaluation (for Japanese ODA Loan)

Ex-ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: The Republic of Indonesia Project: Development Policy Loan (VI) Loan Agreement: March 19, 2010 Loan Amount:

More information

RISK ASSESSMENT AND RISK MANAGEMENT PLAN

RISK ASSESSMENT AND RISK MANAGEMENT PLAN Primary Health Care Improvement Project (RRP UZB 50190-002) RISK ASSESSMENT AND RISK MANAGEMENT PLAN 1. This Risk Assessment and Risk Management Plan (RAMP) for the Primary Health Care Improvement Project

More information

OFFICIAL -OV"o DOCUMENTS

OFFICIAL -OVo DOCUMENTS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL -OV"o DOCUMENTS Administration Agreement between the Federal Republic of Germany,

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE National Emergency Rural

More information

Indonesia: Earthquake and Tsunami Emergency Support Project

Indonesia: Earthquake and Tsunami Emergency Support Project Validation Report Reference Number: PVR 237 Project Number: 39127 Grant Number: 0002-SF December 2012 Indonesia: Earthquake and Tsunami Emergency Support Project Independent Evaluation Department ABBREVIATIONS

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC2827 Latvia-Welfare Reform Project (@) Europe and Central Asia Social Sector Adjustment LVPA35807 Republic of Latvia

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7824 March 8, 2016 Operation

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive

More information

Governance Assessment (Summary) Nepal

Governance Assessment (Summary) Nepal Governance Assessment (Summary) Nepal Country Partnership Strategy: Nepal, 2013 2017 A. Current State of Governance GOVERNANCE ASSESSMENT 1. Nepal is passing through a historic political transition. The

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Overview of Financial Intermediary Funds

Overview of Financial Intermediary Funds CHAPTER 4 Overview of Financial Intermediary Funds 4.1 Introduction 157 4.2 Examples of Financial Intermediary Funds 157 4.3 The World Bank s Role in Financial Intermediary Funds 160 4.4 Characteristics

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name. BO-Enhancing Human Capital of Children and Youth Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name. BO-Enhancing Human Capital of Children and Youth Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name BO-Enhancing Human Capital of Children and Youth Region LATIN AMERICA AND CARIBBEAN Sector Other social services (100%)

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities State Accountability Revitalization Project (RRP INO 38354) Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

(Donor Reference No )

(Donor Reference No ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Administration Arrangement between Government of the Netherlands,

More information