1 PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central government administration (10%) Project ID P Borrower(s) United Republic of Tanzania Implementing Agency Ministry of Health and Social Welfare Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared 6 September 2009 Estimated Date of 0 September 2009 Appraisal Authorization Estimated Date of Board 15 December 2009 Approval I. Key development issues and rationale for Bank involvement 1. In 2000, the Government of Tanzania (GOT) embarked upon a long-term (through 2011) program of reform for the health sector which aims to improve access, utilization, quality, and financing of health services through increased efficiency and effectiveness in use and allocation of resources, to maximize impacts on health outcomes, especially among the poor, women, and children. 2. IDA is supporting the implementation of the GOT long-term program through participation in the health Sector Wide Approach (SWAp) and the financing of a slice of the total health expenditures. IDA s support over the period was organized in phases: The first phase of the Health Sector Development Project (HSDP) was a US$22 million Adaptable Program Loan (APL) (HSDP, Credit 800) implemented in It aimed to accelerate the reforms and emphasize institutional capacity development, focusing on: (i) strengthening capacity (particularly at local levels) to manage and adapt to changing roles and responsibilities; (ii) developing and piloting systems to improve quality and delivery of services to improve health status; and (iii) improving resource mobilization and management. The second phase of the Health Sector Development Project is a US$64 million APL (HSDP II, Credit 8410, Grant H0710) approved in 200 and running through December HSDP II supports the implementation of the Second Health Sector Strategic Plan (HSSP) Its objectives are to expand the reforms and systems/capacity development for better management of resources and quality improvements, with a view to institutionalizing decentralized management of health, nutrition and population
2 services at district level and below, and shifting from an input-orientation to output/outcome-based planning and performance management. Originally, the third phase of the Health Sector Development Project was expected to support the final phase of the government s program ( ) with the objectives to institutionalize output-based management, and institute improved systems for high quality care. This third phase was expected to be supported by the Poverty Reduction Support Credit (PRSC) rather than a third APL.. When the second phase of the Project was negotiated in November 200, it was agreed that upon completion of HSDP II (December 2007) the Bank would shift the funds from direct sector support to general budget support (i.e., commit funds through the PRSC rather than through a specific health sector project). However, the conditions for the transition to the PRSC listed in the Development Financing Agreement had not been fully met, and the GOT requested IDA to extend HSDP II for 2 additional years and to seek additional financing in order to (i) continue to support the implementation and objectives of the HSSP through its conclusion; ii) extend the time required to meet the criteria for the transition to the PRSC and to better prepare for it; and (iii) smooth short term delay in anticipated external funds from the US Government for the malaria program. 4. However, since the first Additional Financing, three important developments have occurred, which have an impact on any potential move towards General Budget Support (GBS): (a) The Ministry of Health has adopted a position that only those providing direct support to the health sector (project or pooled funding) should play a role in health sector policy discussions, meaning that a shift to GBS would effectively exclude the Bank from providing health policy input to the sector. (b) An external evaluation of the health sector in October, 2007 (after the first Additional Financing was approved), concluded that the SWAp approach, and the Basket Fund in particular were extremely effective in getting funds to the front line and improving outcomes. (c) As part of the MKUKUTA review (the Tanzanian version of the Poverty Reduction Strategy), an assessment is being done of the effectiveness of different aid modalities, including GBS, basket funds and project-based financing. The results of this assessment are expected later this year and should help inform future financing approaches for the health sector. 5. The proposed Additional Financing will enable IDA to continue to support the implementation and the objectives of the new HSSP III, and will provide transitional financing for pursuing a new longer-term pooled funding arrangement. Bridge financing is needed to allow time to include such an operation in the CAS and pursue project preparation. In light of these developments, the GOT has requested IDA to: (i) extend HSDP II for one additional year; and (ii) to provide Additional Financing in order to sustain support for the HSSP. This additional financing would be used both to address an ongoing funding gap, and finance additional interventions which would enhance the project s development impact and effectiveness. Despite the significant amount of external financing coming into the health sector,
3 the Health Basket Fund (HBF) remains the only vehicle for providing significant amounts of external support (either in cash or in kind through drugs and medical supplies) directly to frontline health services at the district level. Support for this area is essential for strengthening the overall health system and ensuring that external financing for vertical programs is well utilized. 6. IDA resources and the Bank s expertise will complement those provided by other partners. The Bank is the one partner who can forge necessary linkages between the public sector reforms and the health sector reforms, and the Bank Team will complement technical/policy guidance provided by other partners with its global experience in health systems, financing and human resources for health. External financing targeted to the sector has been essential for addressing delays in GOT financing and meeting valid, but unanticipated, sector budget requirements. In the longer term, IDA resources should be disbursed through the budget or a multi-sector pooled fund mechanism, a larger share of public expenditure should be allocated to the health sector and sectoral budgeting and financial management should improve, but for medium-term term, IDA financing at the sectoral level will be critical to enabling the health sector to contribute towards achieving the MDGs. II. Proposed objective(s) 7. The development objective and expected outcomes of the Additional Financing are identical to the original project, although outcome indicators have been revised upwards to reflect the one year extension of the project. The Project Development Objective (PDO) is therefore: to achieve improvements in the provision of quality health services through continuing to support the reforms, capacity development and improved management of resources while focusing on quality III. Preliminary Description 8. About three quarters of the Additional Financing (US$0 million) will disburse under Category 1 (Pooled Funds Expenditures financed under the Subprograms of the Health Sector Strategic Plan (HSSP)) of the existing Development Financing Agreement (DFA). Specifically, through the pooled fund, IDA Additional financing will support activities for FY 09/10 and FY 10/11 at central, regional, district level and at secondary/tertiary hospitals level with a focus on health service delivery and quality. An essential element of this support will be increasing the funds flowing to districts from $1.00 to $1.25 per capita, as well as support for essential commodities. 9. The remaining twenty-five per cent (US$10 million) will disburse under Category 2 (Non-Pooled Expenditures financed under the Subprograms of HSSP) of the existing DFA. This area will support key high priority investments, including essential medical equipment for Emergency Obstetric Care and other high priority areas such as diagnostic services, support to health human resources development, and the introduction of a comprehensive food fortification program for Tanzania to reduce the high prevalence of micro-nutrient deficiencies in the population. These areas are specific, high-value activities which are difficult to fund through the HBF, have been identified by the Ministry of Health and Social Welfare (MOHSW) as the major gaps in existing Government and/or external financing. The HSDP II Project was designed to facilitate disbursements both through the pooled fund and outside of the pooled fund. The exact
4 distribution of funds between the pooled and non-pooled categories will be fixed during project preparation and appraisal, but efforts will be made to maximize the use of pooled funding arrangements. IV. Safeguard Policies that might apply 10. No new construction or acquisition of land is supported under the program. To mitigate potential harm caused by improper disposal of medical waste, the Health Care Waste Guidelines and the Management Plan adopted under HSDP II will continue to be followed. The Plan focuses on (i) legislation and regulation; (ii) standardizing practices; (ii) collection, storage and disposal; and (iv) capacity and management. Implementation of the Waste Management Plan does not involve any new construction or acquisition of land. Guidelines on incinerators and waste pits imply adaptations to or replacement of existing facilities that occupy existing sites on facility grounds. Safeguard Policies Triggered by the Project Yes No TBD Environmental Assessment (OP/BP 4.01) [X] [ ] Natural Habitats (OP/BP 4.04) [ ] [X] Pest Management (OP 4.09) [ ] [X] Physical Cultural Resources (OP/BP 4.11) [ ] [X] Involuntary Resettlement (OP/BP 4.12) [ ] [X] Indigenous Peoples ( OP/BP 4.10) [ ] [X] Forests (OP/BP 4.6) [ ] [X] Safety of Dams (OP/BP 4.7) [ ] [X] Projects in Disputed Areas (OP/BP 7.60) * [ ] [X] Projects on International Waterways (OP/BP 7.50) [ ] [X] Piloting the Use of Borrower Systems to Address Environmental and Social Issues in Bank-Supported Projects (OP/BP 4.00) [ ] [X] V. Tentative financing Source ($m.): Borrower/Recipient 1,5.0 Other development partners IDA 40.0 Total VI. Contact point Contact: Dominic S. Haazen Title: Lead Health Policy Specialist Tel: Fax: dhaazen@worldbank.org Location: Dar es Salaam, Tanzania * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas
5
Table 1 the Road Network of Mozambique (in kilometers)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Health Sector Support Project
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health
More information1. Key development issues and rationale for Bank involvement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR
More informationAFRICA. Investment Project Financing P Federal Ministry of Finance
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053
More informationSector-wide Health System and Social Development Support Project Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1473 Country Mali Prpoject ID P093689 Project Name Sector-wide Health System and Social Development Support Project Region AFRICA Sector Health
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Health Service Delivery Project (HSDP) Region AFRICA Sector Health (100%) Project ID P111840 Borrower(s) GOVERNMENT OF ANGOLA Implementing
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961
Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Implementing Agency Environmental Category PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 IMPROVING
More informationPROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC47357
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationTransit Transport Co-ordination Authority
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1177 Project Name EAC
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 25-Apr-2018
More informationEmergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 48043 Emergency
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 26-Jun-2014
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: March 12, 2015 I. BASIC INFORMATION A. Basic Project Data Country: Project Name: Task Team Leader: Estimated Date of Approval:
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive
More informationPROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417
PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No: PIDA1417 Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project ID Borrower(s)
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 04-Oct-2018
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 13-Feb-2018
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION A. Basic Project Data Country:
More informationIntegrated Safeguards Data Sheet (Updated)
THE WORLD BANK GROUP._-- - = -InfoShop Date Prepared/Updated: 03/12/2003 Section I - Basic Information A. Basic Project Data Country: MOZAMBIQUE Project: Public Sector Reform Authorized to Appraise Date:
More information[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:
More informationProject Name. Region. Date of Board Approval July 29, 2008
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: AB3458.: MAURITANIA:
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC10930 Project Name Financial
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing Region AFRICA Sector Railways (80%); Ports, waterways and shipping (5%); Aviation
More informationPROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing
More informationPROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE
Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Name Implementing Agency Environment Category Date PID Prepared Estimated Date of Approval Initiation Note Review Decision
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132 Country: Morocco Project ID: P125799 Project Name: Morocco
More informationProject Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING
More informationI Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1
Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 36184 Report No.: AB219 I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized Public Disclosure
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET
More informationPROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument
More informationProject Name. Region Sector. Project ID Borrower(s) Implementing Agency. Republic of Madagascar Madagascar
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationPROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Report No: I050655
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC14882 Project Name Improved
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/15/2005 INTEGRATED SAFEGUARDS DATASHEET
More informationSri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5595 Project Name Sri
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name Kosovo Health Project
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
More informationWorld Bank Environmental. and Social Policy for Investment Project Financing
World Bank Environmental and Social Policy for Investment Project Financing Purpose 1. This Environmental and Social Policy for Investment Project Financing 1 sets out the mandatory requirements of the
More informationINTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID:
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Date ISDS Prepared/Updated: 10-Aug-2015 Report.: ISDSA15003 Date ISDS Approved/Disclosed: 03-Aug-2015, 16-Aug-2015 Public
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. eghana Additional Financing
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name. BO-Enhancing Human Capital of Children and Youth Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name BO-Enhancing Human Capital of Children and Youth Region LATIN AMERICA AND CARIBBEAN Sector Other social services (100%)
More informationPROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 18-Sep-2013
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 05-Sep-2013
More informationWorld Bank Safeguard Policies: An Overview
Forest Carbon Partnership Facility World Bank Safeguard Policies: An Overview Victor Mosoti, Legal Department, World Bank Pan Africa Indigenous Peoples Dialogue Arusha, Tanzania April 19-24, 2012 Overview
More informationINTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name Bahia
More informationIntegrated Safeguards Data Sheet Identification / Concept Stage (ISDS)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:
More informationCOMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I. BASIC INFORMATION 1. Basic Project Data INTEGRATED SAFEGUARDS
More informationPublic Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I - Basic Information Date ISDS Prepared/Updated:
More informationProject Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)
Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 02-Jun-2016 Report : PIDISDSC17616 Public Disclosure Authorized Public Disclosure Authorized
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region
PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 65032 Project Name Railway Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Railways (100%) Project ID P120192
More informationOP Investment Project Financing. Bank Access to Information Policy Designation Public
Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July
More information6 Report No.: JSDSC1361 1
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure
More informationPROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project
More informationINTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING
More informationINTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
More informationProject Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)
Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 31-Aug-2016 Report : PIDISDSC18959 Public Disclosure Authorized Public Disclosure Authorized
More informationGovernment of Peru Peru. PROVIAS Departamental Peru
Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name. 1. Key development issues and rationale for Bank involvement
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name Honduras State Modernization Region LATIN AMERICA AND CARIBBEAN Sector General public administration sector (100%) Project
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6500 Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6500 Project Name Ghana
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA8551 Project Name Essential Health Services Access Project (P149960) Region EAST ASIA AND PACIFIC Country Myanmar Sector(s) Health (85%),
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC19292 Project Name Road
More informationCombined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)
Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Appraisal Stage Date Prepared/Updated: 15-Jun-2018 Report No: PIDISDSA24904 Public Disclosure Authorized Public Disclosure
More informationOECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6619 OECS
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic
More informationNon-compulsory pensions and insurance (70%);General water, sanitation and flood protection sector (30%) Lending Instrument
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6737 Southeast Europe and Caucasus Catastrophe Risk Insurance Facility GEF Project Region Europe and Central Asia Country Southeast
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA URBAN DEVELOPMENT SUPPORT PROJECT (P147147)
PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA117125 Project Name Region Country Financing Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/Updated
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: INTEGRATED SAFEGUARDS DATA SHEET 20-Mar-2017 Date ISDS
More informationTURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bhutan Second Rural Access
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Mar-2012
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country. Sector(s) Health (100%) Theme(s)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA61910 Project Name
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationReport No.: ISDSA13476
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Prepared/Updated: 13-May-2015
More informationInfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Updated) AWorhi dfrc
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan
More information