1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5595 Project Name Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region SOUTH ASIA Sector General Financial Sector 100% Project ID P Borrower(s) Government of Sri Lanka Implementing Agency Ministry of Finance and Planning, Government of Sri Lanka Environment Category [ ] A [ ] B [ ] C (proposed) [x] FI [ ] TBD Date PID Prepared March 22, 2010 Estimated Date of May 31, 2010 Appraisal Authorization Estimated Date of Board September 20, 2010 Approval 1. Key development issues and rationale for Bank involvement 1. Background: Small and medium-sized enterprises (SMEs) play a very important role in the Sri Lankan economy owing to their considerable share in the total number of enterprises and in total employment. The Government of Sri Lanka announced in its National Strategy for SME Sector Development to a significant array of programs aimed at making SMEs more competitive, more efficient by applying modern technology to improve production processes, and more effective exporters. One of the major priority areas for SME policies has been broader access to medium-term finance. Moreover, the World Bank Country Assistance Strategy builds on the Government s vision for economic development laid out in the Mahinda Chinthana 1, calling for expanding economic opportunities in lagging regions and improving the investment climate and competitiveness, in an economy driven by SMEs. 2. After being severely underserved during the conflict and in the aftermath of the 2004 tsunami, SMEs had been making inroads in gaining access to credit, but the crisis has reversed that trend in both relative and absolute terms. The proposed Crisis Response Small and Medium Enterprises Development Facility Project aims to respond to the developmental need for broadening and deepening access to medium term funds for investment and working capital to SMEs. This lending operation marks the re-engagement of the World Bank in financial sector development in Sri Lanka, building on past previous World Bank-supported programmatic SME financial intermediation loans 2. Macroeconomic and Sector Background 3. Overall GDP growth between 2008 and 2009 declined from 6 percent to 3.5 percent, a decline of 2.5 percent. Like most other countries in the South Asia Region, exports was the main channel through which the Global Financial Crisis (GFC) hit Sri Lanka, while 1 The last two National Development Plans of Sri Lanka, the Mahinda Chinthana 2005 and 2010, both recognize that SME sector as the engine of growth for the national economy. 2 Sri Lanka Small and Medium Industries Projects 1-4,

2 direct impacts through the financial sector was muted, in large part because Sri Lankan financial institutions did not have any exposure to toxic assets. During the first 10 months of 2009, total exports were more than 15 percent lower than during the same period in As a result, in the first half of 2009, economic growth slowed to only 1.8 percent (against 6.3 percent during the same period in 2008). As the Sri Lankan economy teetered on the brink of a balance of payment crisis, banks cut back lending and consumer spending slowed. Data for the third quarter of 2009 suggest that the economy is now slowly recovering (real GDP grew 4.2 percent yoy in 2009-Q3), but exports and industrial production in export oriented branches continue to be depressed. 4. In addition to the Global Financial Crisis, the Sri Lankan economy has also in recent years been significantly buffeted by the armed ethnic conflict and by the tsunami. Armed confrontations in the north intensified during the 2008, and peaked during the first half of 2009, just when the GFC was most severely felt. The end of the war has put strains on public finances due to the need to rapidly launch reconstruction efforts in the war-affected areas and the need to provide assistance to a large number of newly internally displaced persons. The room for maneuver on the fiscal side has been further reduced by a significant drop in tax revenues, in particular from import duties and VAT as trade declined. One of the main lessons learned in post conflict countries is that employment opportunities are critical for faster recovery. The Government s focus on the SME sector is therefore critical. 5. In line with the national focus on SMEs, the Government of Sri Lanka is concerned that SMEs have been particularly hard hit 3 as a result of the GFC, and has requested World Bank support. This is because SMEs, compared to larger-scale corporates have more limited access to finance, are less well diversified in terms of products and markets, and also entered the crisis with thin cushions and fewer built up reserves. The sectors most affected by the GFC are the apparel, agribusiness (tea, rubber, fisheries a.o.) and tourism industries, sectors that retain a substantial number of SMEs and account for a significant proportion of employment 4. In particular, in the garment industry, which contributes around 45 percent of total export earnings in 2008 and makes up about 20 percent of the Sri Lankan manufacturing sector, exports in October 2009 were 7.2 percent lower than a year earlier. Banking Sector Background 6. The Sri Lankan banking sector has proven resilient to the effects of the global credit crisis, although the system is showing signs of strain. The system remains well capitalized and profitable. However, the performance of corporate and commercial loans and mortgages has deteriorated, in particular NPLs on SME loans have grown considerably. The NPL ratio for the system as a whole was 8.8 percent at end-sept 2009 and twice this amount among loans to SMEs. Capital adequacy was relatively high at 14.5 percent at the end of the same period, since bank credit portfolios contracted significantly under the GFC, though it may be overstated given the sharp decline in the provisioning ratio. 3 There is no single, uniform definition of SMEs. Most commercial banks use a mix of data for turnover (generally less than Rs300 mill. annually), total asset value (less than Rs100 million, depending on whether land is included), and in some cases number of employees to define SMEs. 4 According to a UNDP report on the GFC, the industry and service sectors lost 217,000 jobs y-o-y in Q

3 Table 1: Banking Sector Financial Strength Indicators Percent Sept Gross Nonperforming loans/ Total loans Provisions/NPL ROA before tax ROE Loans/deposits CAR Liquid assets ratio Source: Central Bank of Sri Lanka - Annual Audited Accounts 1/September numbers not annualized. 7. Nevertheless, as a result of the global credit crisis and the ensuing uncertainty, lending volumes have fallen while exposure to government securities has skyrocketed. Since end 2008, commercial bank loan volumes have decreased by 3.9 percent, whereas securities holdings increased by over 130 percent (Source: CBSL) 8. Access to finance is a key Supply Side Constraint. Credit to the private sector has steadily decreased since Jan 2009 and had contracted by 6 percent yoy as of Oct 2009 (see graph). Despite declining interest rates (from high rates) and improved liquidity in the financial sector in recent months, access to finance for SMEs remains significantly constrained. The GFC has led to a reversal in the recent years trend toward lower Non Performing Loan (NPL) ratios in the banking sector (from 5 percent in 2007 to 8.6 percent by end of 2009), in particular in SME lending. This higher risk of lending to SMEs exacerbated by an uncertain global environment makes banks reluctant to % Change in Credit to Private Sector since Oct 2008

4 extend credit to SMEs. While some banks have restructured the debt of affected SMEs, this trend has not occurred across the country, as capacity in conducting risk management for SMEs varies among banks and between banks branches. The lack of a backstopping facility and lack of knowledge from banks to lend to SMEs are key issues driving the lack of access to finance for SMEs in Sri Lanka. 9. The findings from the 2005 Investment Climate Assessment points to access to finance as a large obstacle to growth, and to interest rates on loans and collateral based lending as the highest costs of finance. In this connection, while lending rates, after peaking in September 2008, have been on a downward trend, there is segmentation in the market, with rates charged to SME clients exceeding by far those offered to larger corporate clients. Moreover, the 2006 Report on the Observance of Standards and Codes (ROSC) also highlights high bank interest spread, enforcement of unsecured rights, credit risk management and weak implementation frameworks for corporate insolvency laws as areas requiring strengthening in Sri Lanka. 10. The financial sector is expected to be a continued source of strength but remains risk-averse. Sri Lanka s domestic financial system, although it is well-capitalized and prudential regulations meet modern standards, is shallow, with total banking sector credit accounting for about just under half of GDP, less than regional averages. After surviving the consequences of the tsunami, the ethnic conflict and now the GFC, the Sri Lankan banking sector has been understandably conservative faced with the high uncertainty of late 2008 and early In this connection, the central bank has eased monetary policy and has taken steps to reactivate credit activity and mitigate risk-averse behavior in the banking system. This has been effective in decreasing lending rates but lending volumes remain constrained. 2. Proposed project development objective(s) 11. The main aim of the planned Crisis Response Window (CRW) Small and Medium Enterprise Development Facility (SMEDeF) project will be to broaden and deepen the access of small and medium enterprises to medium and long-term finance, with a view to ultimately contributing to an expansion of productive activities, investment, and job creation. The Project Development Objective is to improve access to finance (including term finance) for SMEs affected by the GFC in Sri Lanka. In accordance with the requirements of OP 8.30, credit would be extended on market terms. This CRW-financed operation would build on the design and implementation arrangements of the on-going World Bank Renewable Energy for Rural Economic Development (RERED) Financial Intermediation Loan (FIL).

5 12. The development and implementation results will be monitored through several indicators that may include: (i) Number of loans and volume of finance to SMEs across the country supported by the facility, (ii) number of loans and volume of finance that has original maturity greater than 1 year in the supported sectors, (iii) number of loans and volume of finance classified as non-performing according to the lenders classification, in the supported sectors (iv) lending rates to enterprises, and (v) employment and annual turnover by participating SMEs. 3. Preliminary project description 13. The proposed $58mn SMEDeF loan is a three-year Financial Intermediary Loan 5 consisting of a credit line and a risk sharing facility available to both public and private participating financial institutions (PFIs). Selection would be based on clearly defined eligibility criteria that would ensure minimum performance and profitability of the PFIs 6 and focus on SME lending. The project will be designed to comply with OP 8.30 guidelines. The following components are proposed, working toward enabling IFC participation (see Annex 2 for more detail): a) A wholesale Line of credit to increase the liquidity for SMEs in selected export-oriented sectors: Based on established demand, the World Bank would provide a credit line of to participating commercial banks for SMEs, with a focus on affected sectors. Access, modalities and pricing would include features such as competitive interest rates and maturities in line with on going commercial practices and OP 8.30, so that no market distortions are created. b) Partial guarantee facility to reduce the risk of lending to SMEs: The purpose of the guarantee facility would be to backstop commercial lenders losses in case of default. This well tested instrument would provide an additional incentive for commercial banks to engage in short to medium term lending to SMEs. The guarantees would be issued on a portfolio basis, and the loan portfolios eligible for guarantees would include commercial banks loans to viable SMEs of the affected sectors. The IFC has expressed interest in acting as a second loss partner in selected private banks, in agribusiness and possibly tourism. By sharing up to 50 percent of the credit risk with PFIs, the guarantee will leverage lending from banks to SMEs amounting at a minimum to twice the amounts invested. c) Capacity building for lending institutions and SMEs: In partnership with the IFC, provide technical assistance to (i) the commercial banks benefitting from the credit line, in order to help build capacity in lending services to SMEs; (ii) to SMEs to assist in business development services such as preparation of loan application, provision of relevant financial information, marketing, supply chains (iii) to the banking sector in Sri Lanka to help develop guidelines and practices for debt restructuring of SMEs and to support the policy and regulatory framework for insolvency. 14. The project aims to use an incentive approach to support bank downscaling in supplying credit to SMEs. The incentive approach would combine the provision of appropriate financing instruments to banks (line of credit and guarantee facility) with commitments from participating banks to strengthen their SME lending capability over time. The project would also provide complementary technical assistance at the SME level to increase their bankability. 5 The CRW is a global IDA facility set up to assist eligible countries in developing, implementing and monitoring programs to manage the poverty, social, and economic impact of the crisis. The operation will need to be successfully negotiated by the end of FY10 in order to access CRW resources. 6 These would include

6 15. The envisaged project is to be implemented through the Administrative Unit (AU) of the DFCC Bank, using similar implementation arrangements as the existing credit lines under RERED. The AU will be staffed with qualified personnel and capable of satisfactorily implementing all aspects of the project. Its responsibilities will also include: (i) on-lending to PFIs for final lending to sub-borrowers (ii) ensure effective functioning of the on-lending facility to final borrowers through PFIs; (iii) on-going monitoring of the PFIs to ensure compliance with project criteria; (iv) responsibility for adherence to all fiduciary and safeguard requirements of the World Bank for final borrowers; and (v) monitoring and evaluation based on key project development indicators. The eligibility criteria for PFIs creditworthiness and internal operating practices and procedures would be determined by the World Bank in close collaboration with the Government of Sri Lanka and the Central Bank. 4. Safeguard policies that might apply Environmental Category: [] A [] B [] C [ ] FI [ ] TBD Safeguard Policies Triggered Yes No TBD Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Forests (OP/BP 4.36) Pest Management (OP 4.09) Cultural Property (OPN 11.03) Indigenous Peoples (OP 4.10) Involuntary Resettlement (OP/BP 4.12) Safety of Dams (OP/BP 4.37) Projects on International Waterways (OP/BP 7.50) Projects in Disputed Areas (OP/BP 7.60) 5. Tentative financing Source: ($m.) BORROWER/RECIPIENT TBD IDA 58 Total 58 Contact points Cecile Thioro Niang Title: Economist Tel: cniang@worldbank.org Location: Washington DC, USA

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA798 Project Name TURKEY

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC10930 Project Name Financial

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name. Cambodia Agribusiness SME Access to Finance Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name. Cambodia Agribusiness SME Access to Finance Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name Cambodia

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 31-Aug-2016 Report : PIDISDSC18959 Public Disclosure Authorized Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name Frontier Finance (P147183)

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Implementing Agency Environmental Category PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 IMPROVING

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Frontier Finance (P147183)

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 48043 Emergency

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 02-Jun-2016 Report : PIDISDSC17616 Public Disclosure Authorized Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417 PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No: PIDA1417 Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project ID Borrower(s)

More information

Financial Sector Lending Instrument. Government of Sierra Leone Implementing Agency

Financial Sector Lending Instrument. Government of Sierra Leone Implementing Agency Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6433 (The

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7824 March 8, 2016 Operation

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 25-Apr-2018

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

Tanzania Health Sector Development APL II Region

Tanzania Health Sector Development APL II Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

OECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country

OECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6619 OECS

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

Sri Lanka Crisis Response Small Medium Enterprise Development Facility-SMEDeF. Social Management Framework (SMF)

Sri Lanka Crisis Response Small Medium Enterprise Development Facility-SMEDeF. Social Management Framework (SMF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E2485 v3 Sri Lanka Crisis Response Small Medium Enterprise Development Facility-SMEDeF

More information

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 36184 Report No.: AB219 I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized Public Disclosure

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE

SECTOR ASSESSMENT (SUMMARY): FINANCE Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): FINANCE Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bhutan s finance sector developed steadily during

More information

AFRICA. Investment Project Financing P Federal Ministry of Finance

AFRICA. Investment Project Financing P Federal Ministry of Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 65032 Project Name Railway Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Railways (100%) Project ID P120192

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4439 Access to Finance for Small and Medium Enterprises

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4439 Access to Finance for Small and Medium Enterprises Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4439 Access

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Health Sector Support Project

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISES FINANCING) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISES FINANCING) 1. Sector Performance, Problems, and Opportunities Additional Financing of Small and Medium-Sized Enterprises Line of Credit Project (RRP SRI 49273-002) SECTOR ASSESSMENT (SUMMARY): FINANCE (SMALL AND MEDIUM-SIZED ENTERPRISES FINANCING) 1. Sector Performance,

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: March 12, 2015 I. BASIC INFORMATION A. Basic Project Data Country: Project Name: Task Team Leader: Estimated Date of Approval:

More information

SOUTH ASIA. Bangladesh

SOUTH ASIA. Bangladesh Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA62169 Project Name

More information

PROGRAM INFORMATION DOCUMENT (PID)

PROGRAM INFORMATION DOCUMENT (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) Appraisal STAGE September 25, 2015

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Name Implementing Agency Environment Category Date PID Prepared Estimated Date of Approval Initiation Note Review Decision

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC14882 Project Name Improved

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.: 120338

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 13-Feb-2018

More information

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Appraisal Stage Date Prepared/Updated: 16-Jan-2018 Report : PIDISDSA21367 Public Disclosure Authorized Public Disclosure

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name Kosovo Health Project

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48040) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$57.4 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48040) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$57.4 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Document of The World Bank Report No: ICR00003643 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48040) ON A CREDIT IN THE AMOUNT OF SDR 37.80

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector. Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing Region AFRICA Sector Railways (80%); Ports, waterways and shipping (5%); Aviation

More information

Brief description, overall objective and project objectives with indicators

Brief description, overall objective and project objectives with indicators Sri Lanka: NDB IV (Promotion of the private sector) Ex post evaluation OECD sector BMZ project ID 1999 65 062 Project executing agency Consultant 24030 - Financial institutions of the formal financial

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 11-Aug-2016 Report : PIDISDSC18528 Public Disclosure Authorized Public Disclosure Authorized

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 04-Oct-2018

More information

Mauritius First Public Sector Performance Development Policy Loan Region

Mauritius First Public Sector Performance Development Policy Loan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6561 Operation Name Mauritius

More information

World Bank Environmental. and Social Policy for Investment Project Financing

World Bank Environmental. and Social Policy for Investment Project Financing World Bank Environmental and Social Policy for Investment Project Financing Purpose 1. This Environmental and Social Policy for Investment Project Financing 1 sets out the mandatory requirements of the

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132 Country: Morocco Project ID: P125799 Project Name: Morocco

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PY Energy Sector Strengthening

More information

Project Name. Region. Date of Board Approval July 29, 2008

Project Name. Region. Date of Board Approval July 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: AB3458.: MAURITANIA:

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region Safeguard Policies: A Quick View Tbilisi April 1-3, 1 2008 The World Bank Europe & Central Asia Region 1 Why do we have the World Bank Safeguard Policies? Do no harm: protect people and environment from

More information

Transit Transport Co-ordination Authority

Transit Transport Co-ordination Authority Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1177 Project Name EAC

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE

SECTOR ASSESSMENT (SUMMARY): FINANCE Inclusive Financial Sector Development Program, Subprogram 1 (RRP CAM 44263 013) SECTOR ASSESSMENT (SUMMARY): FINANCE 1. Sector Performance, Problems, and Opportunities a. Sector Context and Performance

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name

More information

MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES

MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES MEMORANDUM OF ECONOMIC AND FINANCIAL POLICIES The slowdown in the global economy, coupled with declining export prices and capital outflows, is placing Sri Lanka s recent economic and social progress under

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC47357

More information

SECTOR OVERVIEW. Proposed Senior Unsecured Loan DFCC Vardhana Bank (RRP SRI 46912)

SECTOR OVERVIEW. Proposed Senior Unsecured Loan DFCC Vardhana Bank (RRP SRI 46912) Proposed Senior Unsecured Loan DFCC Vardhana Bank (RRP SRI 46912) SECTOR OVERVIEW 1. Sri Lanka s prospects have improved following the cessation of the civil war. In 2011, the economy grew by 8%. Growth

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Our Expertise. IFC blends investment with advice and resource mobilization to help the private sector advance development.

Our Expertise. IFC blends investment with advice and resource mobilization to help the private sector advance development. Our Expertise IFC blends investment with advice and resource mobilization to help the private sector advance development. Where We Work As the largest global development institution focused on the private

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Mar-2012

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 59729 Health

More information

Sector-wide Health System and Social Development Support Project Region

Sector-wide Health System and Social Development Support Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1473 Country Mali Prpoject ID P093689 Project Name Sector-wide Health System and Social Development Support Project Region AFRICA Sector Health

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6500 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6500 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6500 Project Name Ghana

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4566. Date ISDS Prepared/Updated: 10/02/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4566. Date ISDS Prepared/Updated: 10/02/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 10/02/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE WBG-CSO Forum October 7, 2010 1. Objective and Methodology First comprehensive evaluation

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1

SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): FINANCE 1 1. Sector Performance, Issues and Opportunities 1. Financial sector participants. Pakistan s financial sector is

More information

Our Expertise. IFC blends investment with advice and resource mobilization to help the private sector advance development.

Our Expertise. IFC blends investment with advice and resource mobilization to help the private sector advance development. Our Expertise IFC blends investment with advice and resource mobilization to help the private sector advance development. 76 IFC ANNUAL REPORT 2016 Where We Work As the largest global development institution

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy

More information

Status: Lending Sector: Banking (100%) Theme: State enterprise/bank restructuring and privatization (P)

Status: Lending Sector: Banking (100%) Theme: State enterprise/bank restructuring and privatization (P) Section I - Basic Information Date ISDS Updated: 12/19/2003 A. Basic Project Data (from PDS) I.A.1. Project Statistics Country: NEPAL Integrated Safeguards Data Sheet (Negotiation Stage) Project ID: P084219

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:

More information

SECOND DRAFT FOR CONSULTATION JULY WORLD BANK. Environmental and Social Framework

SECOND DRAFT FOR CONSULTATION JULY WORLD BANK. Environmental and Social Framework WORLD BANK Environmental and Social Framework Setting Environmental and Social Standards for Investment Project Financing SECOND DRAFT FOR CONSULTATION THE CONTENT OF THE DRAFT IS FOR CONSULTATION PURPOSES

More information