Plainfield Township Environmental Advisory Council 2014 Year End Report

Size: px
Start display at page:

Download "Plainfield Township Environmental Advisory Council 2014 Year End Report"

Transcription

1 Plainfield Township Environmental Advisory Council 2014 Year End Report On December 13, 2006, the Plainfield Township Board of Supervisors passed Ordinance #315. The Ordinance provides operating procedures and powers for the Environmental Advisory Council. The Council advises other local government agencies, including, but not limited to, the planning commission, park and recreation boards, and elected officials, on matters dealing with protection, conservation, management, promotion and use of natural resources including air, land and water resources located within its territorial limits. The Board of Supervisors appointed seven residents to serve on the Council. The 2014 members were: Chairman Terry Kleintop, Vice-Chairman Robert Cornman, Supervisor Jane Mellert, Robert Simpson, Robin Dingle, Bruce Rabenold and Don Moore Meetings are held at the Municipal Building on the first Thursday of the month at 7:00 P.M. Additional meetings are scheduled as necessary. The meetings are open to the public. The Plainfield Township EAC met on the following dates in 2014: January 6 February 10 March 2 April 17 May - cancelled June 16 July cancelled August 12 & 20 September 9 October 2 November 6 December 4 A quorum of members was present at each meeting. A majority of the meetings had several interested Township residents in attendance. Minutes were prepared and adopted by the EAC for each meeting. The EAC has the following responsibilities: 1. Identify environmental problems; 2. Recommend plans and programs to the appropriate agencies for the promotion and conservation of the natural resources and for the protection and improvement of the quality of the environment within the area of the Municipality; 3. Make recommendations as to the possible use of open land areas of this Municipality; 4. Promote a community environmental program; 5. Keep an index of all open areas, publicly or privately owned, including, but not limited to, flood prone areas, swamps, and other unique natural areas; 6. Advise the appropriate local governmental agencies in the acquisition of property, both real and personal; 7. Undertake such environmental tasks as requested by the Board of Supervisors of Plainfield Township.

2 During 2014 the EAC reviewed and/or were involved in the following: Land preservation with the Northampton County Farmland Preservation and the Local Municipal Partnership Program Northampton County received twenty-eight (28) Farmland Preservation applications for Eight (8) applications were submitted by seven (7) Plainfield Township landowners. Out of the eight (8) applications, four (4) applications qualified for the County/State preservation program and two (2) qualified for the County/Municipal preservation program and two (2) did not meet the criteria. All qualified landowners signed to move forward with preservation. On January 7, 2014 the Northampton County Farmland Preservation Board reviewed the Resolution from Plainfield Township committing $385,000 of the.25 percent of the 2013 earned income tax funds collected, for the State of Pennsylvania matching program. The request was denied due to Plainfield Township s having a remaining Municipal Partner program fund balance. The fund balance was carried over from 2013 into In October of 2014 letters explaining the preservation program and encouraging landowners to apply to for the 2015 preservation program were mailed out by the Township. Plainfield Township submitted a resolution to Northampton County to commit $350,000 of the.25 percent of earned income tax funds collected, for the State of Pennsylvania matching program. The resolution noted that the commitment is contingent upon Northampton County continuing to fund $750,000 for farmland preservation in the 2015 County Budget. Flood Plain Ordinance Reviewed and recommended approval of the flood plain updates as required by the State of Pennsylvania. Utility Right of Way Little Bushkill Creek stream side plantings within the Met Ed and Williams/Transco pipeline right of ways Williams Pipeline/Transco - Stream Side Riparian Buffers In 2012, Terry Kleintop, Chairman of the EAC and Matt Glennon, President of the Bushkill Stream Conservancy met with Roy Ramsey Jr. the District Manager for Transco Pipeline. They walked along the stream banks at the pipeline crossings of the Little Bushkill watershed. Different types of trees for planting along the stream bank were reviewed. The information will be included in the study of the Little Bushkill Stream. The EAC reviewed information regarding the proposed plantings and worked with a Boy Scout that would like to plant live tree stakes in order to earn an Eagle Scout Badge. The tree stakes were not planted during Municipal Separate Storm Sewer System (MS4) - Streets, ditches, drainage, swales and culverts. The annual report was submitted by Keystone Consulting Engineers in June of Contents of the MS4 report were discussed by the EAC

3 In August the EAC Secretary submitted a chart to the EAC, Board of Supervisors and Keystone Consulting Engineers. The chart lists strategies for distributing educational material to the public. MS4 information was ed to the Pen Argyl Area School District. The material will be reported on in the school newspaper the Green Echo. On December 4, 2014, Kevin Horvath from Keystone Consulting Engineers gave a public presentation on MS4 requirements. Little Bushkill Stream Due to high fecal coliform counts the stream was listed as impaired for recreational use by the Department of Environmental Protection in The Little Bushkill Creek Restoration Plan prepared by URS Corporation was sent to Megan Bradburn, PWS Wetland Ecologist and Gary Walters at the DEP for their review Keystone Coldwater Conference February 21-22, 2014 The conference was hosted by the Pennsylvania Council of Trout Unlimited in State College, PA. The conference was titled Coldwater Resources: Current Practices in Conservation, Protection, and Restoration Kristy Hoffman from URS Corporation gave a presentation titled Addressing Recreational Use Impairment in a Pennsylvania Trout Stream. The presentation was based on the Little Bushkill Creek Restoration Plan prepared by URS Corporation during The EAC presented a report to the Board of Supervisors in February The report gave recommendations for steps to move forward with the Little Bushkill Creek Restoration Plan. DEP Growing Greener Plus Grant In February 2014 notification was received that the grant was approved in the amount of $46,942. The Township match is 15%. The EAC discussed the process to move forward with utilizing the grant funds in 2014.The completed contract for the grant was mailed back to the DEP on February 28, In order to make a decision on how to proceed with the Little Bushkill Creek Restoration plan labor rates were obtained from Hanover Engineering and The ELM Group, Inc. The ELM Group submitted a standard rate chart and a Municipal rate chart. In March 2014, the EAC recommended The ELM Group to continue the work on a watershed management plan. The Board of Supervisors reviewed the recommendation and approved a contract using municipal rates with The ELM Group, Inc. At the March 6, 2014 EAC meeting the outfall investigation was discussed with Chris Noll, the SEO at Keystone Consulting Engineers. A quote for the work was reviewed and approved by the Board of Supervisors in March. The ELM Group prepared a draft report and map of the sampling locations for the EAC and Board of Supervisors review. Meetings were held with landowners in order to access their property for stream sampling. A mailing regarding the ongoing study of the stream was sent out to property owners along the stream. Due to a tributary of the Little Bushkill Creek coming down from the Wind Gap area and high counts of fecal coliform bacteria being found in the stream, the Borough of Wind Gap was asked for a liaison to attend meetings regarding the study of the Little Bushkill Creek. Wind Gap Council member Joseph Weaver and

4 Wind Gap Municipal Authority member Ralph Stampone were assigned the Liaison positions. On June 19, 2014, EAC members Terry Kleintop and Robin Dingle attended the Board of Supervisors meeting to discuss additional grant opportunities, MS4 requirements and the ACT 537 plan. A 2014 DEP Growing Greener Plus Grant application was submitted on July 11, The grant application is requesting $103,212 with a 15% match of $31,300 for a total of $134,512. In August the EAC and Board of Supervisors reviewed a technical memorandum from the ELM Group and the outfall investigation report from Keystone Consulting Engineers. Little Bushkill Creek ELM Group Stream Testing Update started the September sampling last In September a quote was requested to conduct an investigation of the remaining 10 outfalls along the creek. SEO Chris Noll from Keystone Consulting Engineers provided a quote of $1,000-$1,400. The quote was approved by the Board of Supervisors. The EAC reviewed the draft Little Bushkill Creek Watershed Management Plan in November and sent the draft with the recommended changes to the Board of Supervisors for their review. On December 4, 2014 Matt Bennett from the ELM Group gave a public presentation of the Little Bushkill Creek Watershed Management Plan. Megan Bradburn, DEP Water Specialist, members of the Plainfield Township Board of Supervisors, Plainfield Township EAC, a Wind Gap Municipal Authority member, the Pen Argyl School District Biology Teacher, PAASD students and other interested parties attended the meeting. A Coldwater Heritage Implementation Grant A grant application due on December 19 th was considered for submission. The discussed purpose for the grant is to study the Trout populations on the Little Bushkill. The grant amount is $5,000 total. The grant study will cost approximately $10,000. Due to a lack of time and funding sources, at this time, the application was not submitted. Grand Central Road Bridge In September the EAC reviewed two designs submitted by Keystone Consulting Engineers for the replacement of the Grand Central Road Bridge. The Township submitted an application for a Monroe County LSA Grant to replace the bridge. Wildlands Conservancy (The Lehigh Valley s Nonprofit Land Trust) Christine Dettore the new director of the Wildlands Conservancy and Christopher Strohler a Conservation Planner attended the September EAC meeting. The services that the Wildlands Conservancy can offer were discussed. Information can be provided on (BMP) best management practices for interested landowners; they can assist with developing stricter regulations on buffers and riparian corridors and developing an Official Map. An Official Map can be a good tool to use to show a future plan including an extension of the Township recreation trail. The Conservancy provided the following maps to the Township: Appalachian Trail Connection, Historical Land Protection Map, Lehigh Valley Trails Inventory, Plainfield Township Conservation Priorities, Upper Lehigh Cluster Map

5 Northampton County Open Space Coordinator Bryan Cope attended the September EAC meeting. Northampton County now allows less public access requirements on environmentally sensitive preserved land. (An example is not allowing public access during hunting season on a preserved property in Williams Township) The County is trying to get funding for the land from Stockertown to Jacobsburg for the trail. Bryan reported that there are six (6) trail gaps within Northampton County that need to be continued, there are plans to develop a 911 Memorial Trail, and Wind Gap would like to become an Appalachian Trail Gap community in order to bring in tourism. AECOM (Transcontinental Gas Pipeline) In August and September contact was made with AECOM. The company had plans to come in off Getz Road to conduct the anomaly investigation. Questions were asked regarding how the property would be accessed, if the company would provide property owner compensation in order to obtain easier access onto the easement, how the stream would be protected during the investigation. The Board of Supervisors sent a letter to Karen Olson that split rail fencing repairs are needed along Church, Rupple, Getz and 200 yards South of Sandt Roads. Draft Transitional Buffer Yards in the Farm and Forest Zoning District Ordinance In October, Kevin Harwick reviewed the draft Ordinance with the EAC members. The subject of the requirements for a Transitional Buffer Yard Ordinance was addressed at a Planning Commission meeting. If adopted the proposed requirements are for the Subdivision and Land Development Ordinance (SALDO) and would only effect new development coming in. Buffer yards would be required for all developments submitting a Land Development or Subdivision Plan. Minor subdivision plans would be exempt. After the EAC completes the review of the draft it will go back to the Planning Commission. If the proposed ordinance is voted through the planning commission then it will go to the Board of Supervisors for review and passage. Regional EAC meetings were held by the EAC members from Bushkill, Lower Mount Bethel, Plainfield, Moore and Upper Mount Bethel Townships. The Lehigh Valley Planning Commission, located at 961 Marcon Boulevard, Suite 310, Allentown, PA hosted meetings that were attended by members of the EAC s in the Lehigh Valley. Report submitted by Jane Mellert on 12/29/14. Minor revisions were incorporated on 1/8/14 after review by the EAC members.

6. MITIGATION STRATEGY. 62 municipalities have devised. 1,161 actions designed to prepare the Lehigh Valley for disaster.

6. MITIGATION STRATEGY. 62 municipalities have devised. 1,161 actions designed to prepare the Lehigh Valley for disaster. 6. MITIGATION STRATEGY 6.1 UPDATE PROCESS SUMMARY The 2018 Plan focuses on improving the county and local mitigation strategies from the 201 Plan. Throughout the planning process, both counties and all

More information

THEABCS OF EACS: Understanding the Benefits and Roles of Environmental Advisory Councils

THEABCS OF EACS: Understanding the Benefits and Roles of Environmental Advisory Councils THEABCS OF EACS: Understanding the Benefits and Roles of Environmental Advisory Councils SPEAKERS Glenda Boyer, Assistant Manager Mechanicsburg Borough Lisa Heilman, Borough Manager/Treasurer Robesonia

More information

9.51 PLAINFIELD TOWNSHIP

9.51 PLAINFIELD TOWNSHIP 9.51 PLAINFIELD TOWNSHIP This section presents the jurisdictional annex for Plainfield Township. A. HAZARD MITIGATION PLAN POINT OF CONTACT Name Title/ Department Address Telephone Fax Email Primary Point

More information

Natural Hazards Mitigation Plan. Executive Summary

Natural Hazards Mitigation Plan. Executive Summary Natural Hazards Mitigation Plan Executive Summary 1. Introduction Kane County Illinois, is subject to natural hazards that threaten life and health and have caused extensive property damage. Floods struck

More information

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Typical EAC Activities

Typical EAC Activities CHAPTER 5 Typical EAC Activities In general, an EAC should develop programs and products to: Assist local officials in making policy decisions that relate to natural resource conservation. Educate the

More information

KITTITAS COUNTY CONSERVATION DISTRICT KITTITAS COUNTY, WASHINGTON RESOLUTION NO

KITTITAS COUNTY CONSERVATION DISTRICT KITTITAS COUNTY, WASHINGTON RESOLUTION NO KITTITAS COUNTY CONSERVATION DISTRICT KITTITAS COUNTY, WASHINGTON RESOLUTION NO. 2016-002 Kittitas County Conservation District A RESOLUTION of the Board of Supervisors of Kittitas County Conservation

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT tatamy1@rcn.com dwerkheiser@tatamypa.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Topic Identify source of information, if different from the one listed Additional

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

Contact Info. Newsletter Info Editor Cathy Rowe, Administrative Coordinator Printing and Mailing Mailing, Inc

Contact Info. Newsletter Info Editor Cathy Rowe, Administrative Coordinator Printing and Mailing Mailing, Inc Contact Info Address: 801 Burrows Run Road Chadds Ford, PA 19317 6103881300 (T) 6103880461 (F) www.kennett.pa.us kennett.twp@kennett.pa.us Kennett Township Police 6103882874 (T) 6103888594 (F) ktpd@kennett.pa.us

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT lee.laubach@allentownpa.gov james.wehr@allentownpa.gov MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) 1. Staff

More information

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING January 11, 2017

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING January 11, 2017 FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING January 11, 2017 ROLL CALL Present were Supervisors David Sprigg, Naomi Decker, Kevin Cummings, Eric Stonesifer and Michael Ryan. Also present were

More information

PRESENT Maria Augimeri. Ronald Chopowick. THAT the Minutes of Meeting #3/16, held on October 14, 2016, be approved. CARRIED

PRESENT Maria Augimeri. Ronald Chopowick. THAT the Minutes of Meeting #3/16, held on October 14, 2016, be approved. CARRIED Budget Audit Advisory Board Meeting #1/17 was held at TRCA Head Office, on Friday, March 24, 2017. The Chair Maria Augimeri, called the meeting to order at 8:33 a.m. PRESENT Maria Augimeri Jack Ballinger

More information

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 13, 2016

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 13, 2016 FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 13, 2016 ROLL CALL Present were Supervisors John Holder, David Sprigg, Naomi Decker, Kevin Cummings and Michael Ryan. Also present were Solicitor

More information

Minutes Educational Advisory Committee (EAC) 15 October :00-4:00 pm

Minutes Educational Advisory Committee (EAC) 15 October :00-4:00 pm Minutes Educational Advisory Committee (EAC) 15 October 2018-2:00-4:00 pm In Attendance: Ken Fisher, Forestry Willie Lantz, Agriculture Greg Rouse, Recreation Gary Shafer, Property Owner Bob Sutton, Property

More information

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary 1. Introduction Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary Kankakee County is subject to natural hazards that threaten life, safety, health, and welfare and cause extensive

More information

Overview of Presentation

Overview of Presentation Rocky Mountain Land Use Institute March 10, 2016 Overview of Presentation Why planning for hazards is important to Colorado Approaches to planning for hazards Overview of the planning for hazards guide

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT ddellecker@uppermac.org ggrim@uppermac.org MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Topic 1. Staff Resources Is the Community Floodplain Administrator (FPA) or

More information

Radnor Township Environmental Advisory Council Annual Report 2011

Radnor Township Environmental Advisory Council Annual Report 2011 Radnor Township Environmental Advisory Council Annual Report 2011 I. Introduction and Background The Radnor Township Environmental Advisory Council ( EAC ) provides leadership and guidance on environmental

More information

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY FORMATION, ALTERATION AND OPERATION OF A-48 1 of 6 : It is the policy of the Board of Supervisors that a County Service Area (CSA) shall be formed when it is critical to the health, safety, and welfare

More information

Tamra Mabbott, Richard Jennings, Carol Johnson, Gina Miller, Connie Hendrickson

Tamra Mabbott, Richard Jennings, Carol Johnson, Gina Miller, Connie Hendrickson UMATILLA COUNTY PLANNING COMMISSION Meeting of Thursday, March 28, 2013 6:30 p.m., Umatilla County Justice Center, Media Room Pendleton, Oregon ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **

More information

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter Agenda Date: 6/7/2016 Agenda Placement: 8A Set Time: 1:30 PM PUBLIC HEARING Estimated Report Time: 20 Minutes NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter TO: FROM: Board

More information

2. We continue to work on the year end close in preparation of the audits commencement.

2. We continue to work on the year end close in preparation of the audits commencement. To: FROM: Board of Supervisors Charles F. Haas, District Treasurer RE: Treasurer s Report for the month of February 2019 CC: Staff Date: February 21, 2019 Routine Business 1. The District received a total

More information

There were approximately twenty-seven people in the audience.

There were approximately twenty-seven people in the audience. MINUTES OF MEETING (APPROVED JUNE 5, 2006) REGULAR MEETING: 1:30 p.m. MEMBERS PRESENT: Commissioners Ken Carbone; Richard Hancocks; Frank Imhof, Chair; Mike Jacob; Glenn Kirby, Vice Chair; Alane Loisel

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Name Title/ Department Address Telephone Fax

Name Title/ Department Address Telephone Fax 9.36 FORKS TOWNSHIP This section presents the jurisdictional annex for Forks Township. A. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Name Title/ Department Address Telephone Fax Email

More information

Montour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions

Montour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions (MARC) North Branch Canal Trail Construction Invitation to Bid Application Terms and Conditions Sealed bids for North Branch Canal Trail construction will be received by MARC at any time until Monday,

More information

Hurricane SANDY DR-4086-NJ

Hurricane SANDY DR-4086-NJ Public Assistance Applicant s Briefing Hurricane SANDY DR-4086-NJ State Coordinating Officer Lt Jeff Mottley Disaster Information Declaration Date October 30 th, 2012 Incident Period 10-26-2012 - On-Going

More information

MUNICIPAL LAND USE STRATEGIES for Improving Flood Resilience

MUNICIPAL LAND USE STRATEGIES for Improving Flood Resilience MUNICIPAL LAND USE STRATEGIES for Improving Flood Resilience Strategy for a Flood Resistant Southern Tier Central Region (LWRP project) This presentation was prepared by Southern Tier Central Regional

More information

Monroe County Local Mitigation Strategy (LMS) 2015 Update Working Group Meeting #1

Monroe County Local Mitigation Strategy (LMS) 2015 Update Working Group Meeting #1 Monroe County Local Mitigation Strategy (LMS) 2015 Update Working Group Meeting #1 Meeting Notes Date: January 22 nd, 2015 Time: 1:00 pm 4:00 pm Location: City of Marathon Councilmen Meeting Room 8900

More information

INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT THIS INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT,

INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT THIS INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT, INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT THIS INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT, ALLEGHENY TOWNSHIP, ANTIS TOWNSHIP, BELLWOOD BOROUGH, BLAIR TOWNSHIP, CITY OF ALTOONA, DUNCANSVILLE

More information

FY 16 - FY 18 Capital Fund Revenues

FY 16 - FY 18 Capital Fund Revenues FY 16 - FY 18 Capital Fund Revenues Fiscal Year $ Change 2016 2017 2018 FY 17 to Revenue Source Budget Budget Budget FY 18 Local Transfer from General Fund $3,136,950 $2,977,556 $6,087,130 $3,109,574 Local

More information

WEST LAKELAND TOWNSHIP

WEST LAKELAND TOWNSHIP Present: Chairman Dan Kyllo, Supervisor Steven Ebner, Supervisor Dave Schultz; Mary Rinkenberger, Deputy Clerk; Mr. Scott McDonald, Township Attorney; Ms. Marsha Olson, Treasurer, Public Hearing Amend

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT jmilot@hanovereng.com manager@eatwp.org MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Identify source of information, if different Topic from the one listed 1. Staff

More information

Sketch Plan Alternatives: Summary of Planning Commission and Board of Supervisors Recommendations

Sketch Plan Alternatives: Summary of Planning Commission and Board of Supervisors Recommendations HUMBOLDT COUNTY GENERAL PLAN UPDATE Sketch Plan Alternatives: Summary of Planning Commission and Board of Supervisors Recommendations September 2004 Prepared by Humboldt County Department of Community

More information

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES SEPTEMBER 2018 Submit proposal to: Tony Williams, Principal Civil Engineer Marin County Flood Control & Water Conservation

More information

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017 FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017 ROLL CALL Present were Supervisors David Sprigg, Naomi Decker, Kevin Cummings, Eric Stonesifer and Michael Ryan. Also present were

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT.  MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT troseberry@easton-pa.gov cmanges@easton-pa.gov MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT louise@windgap-pa.gov jeffreyyob@gmail.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source

More information

HEIDELBERG TOWNSHIP BOARD OF SUPERVISORS PO Box Mill Road Schaefferstown, PA (717) fax (717)

HEIDELBERG TOWNSHIP BOARD OF SUPERVISORS PO Box Mill Road Schaefferstown, PA (717) fax (717) HEIDELBERG TOWNSHIP BOARD OF SUPERVISORS PO Box 188 111 Mill Road Schaefferstown, PA 17088 (717) 949-3885 fax (717) 949-2915 htwpbs@comcast.net March 26, 2019 MEETING MINUTES Board members present: Paul

More information

Hancock County Board of Commissioner s Minutes

Hancock County Board of Commissioner s Minutes Hancock County Board of Commissioner s Minutes May 20, 2014 Commissioners met in regular session. Those present were Commissioner Derek Towle, President, Commissioner Brad Armstrong Vice President and

More information

How To Score, Rank & Prioritize. Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014

How To Score, Rank & Prioritize. Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014 How To Score, Rank & Prioritize Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014 Why score & prioritize? You can t implement ALL your ideas! (at least not all at once)

More information

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Section 3 Capability Identification Requirements Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Documentation of the Planning

More information

SOLEBURY TOWNSHIP BOARD OF SUPERVISORS November 1, :00 P.M. Solebury Township Hall BUDGET WORK SESSION MINUTES

SOLEBURY TOWNSHIP BOARD OF SUPERVISORS November 1, :00 P.M. Solebury Township Hall BUDGET WORK SESSION MINUTES SOLEBURY TOWNSHIP BOARD OF SUPERVISORS November 1, 2016 7:00 P.M. Solebury Township Hall BUDGET WORK SESSION MINUTES Attendance: Helen Tai, Chair, James Searing, Vice-chair, Noel Barrett, Paul Cosdon and

More information

Minimum Elements of a Local Comprehensive Plan

Minimum Elements of a Local Comprehensive Plan Minimum Elements of a Local Comprehensive Plan Background OKI is an association of local governments, business organizations and community groups serving more than 180 cities, villages, and townships in

More information

TOWN OF LOGY BAY-MIDDLE COVE-OUTER COVE MUNICIPAL PLAN

TOWN OF LOGY BAY-MIDDLE COVE-OUTER COVE MUNICIPAL PLAN TOWN OF LOGY BAY-MIDDLE COVE-OUTER COVE MUNICIPAL PLAN 2005-2015 Add Flood Risk Mapping to the Future Land Use Map Amend Plan Policy 4.3.14, Designated Flood Plain Add New Plan Policy 4.3.21, Wetlands

More information

Financial Statements. Toronto and Region Conservation Authority. December 31, 2014

Financial Statements. Toronto and Region Conservation Authority. December 31, 2014 Financial Statements Toronto and Region Conservation Authority December 31, 2014 Contents Page Independent Auditor s Report 1-2 Statement of Financial Position 3 Statement of Operations and Accumulated

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. General Fund: Revenue Administration 494,646 501,667 501,035 508,551 Municipal Trash Collection 101,185 60,358 60,358 60,962 Total Revenues

More information

9.11 BUSHKILL TOWNSHIP

9.11 BUSHKILL TOWNSHIP 9.11 BUSHKILL TOWNSHIP This section presents the jurisdictional annex for Bushkill Township. A. HAZARD MITIGATION PLAN POINT OF CONTACT Name Title/ Department Address Telephone Fax Email Primary Point

More information

Mitigation Banking Factsheet

Mitigation Banking Factsheet EXHIBIT 57 Page 1 of 5 Wetlands You are here: EPA Home Office of Water Wetlands, Oceans, and Watersheds Wetlands Wetlands Fact Sheet Mitigation Banking Mitigation Banking Factsheet Compensating for Impacts

More information

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING August 9, 2017

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING August 9, 2017 FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING August 9, 2017 ROLL CALL Present were Supervisors David Sprigg, Naomi Decker, Kevin Cummings, Eric Stonesifer and Michael Ryan. Also present were

More information

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007 A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin Warren County Planning Workshop (2 nd Meeting) March 7, 2007 Study Area Participation: Hunterdon: 16 Eligible Municipalities

More information

4362 Northlake Boulevard Suite 204 Palm Beach Gardens, FL Fax

4362 Northlake Boulevard Suite 204 Palm Beach Gardens, FL Fax Mar. 17, 2016 TO: FROM: Board of Supervisors SOUTH INDIAN RIVER WATER CONTROL DISTRICT Dick Gruenwald Associates DISTRICT PUBLIC INFORMATION SPECIALISTS SUBJECT: Monthly Report March 2016 News releases/notices

More information

MINUTES January 27, 2016

MINUTES January 27, 2016 RICE TOWNSHIP PLANNING COMMISSION RICE TOWNSHIP MUNICIPAL BUILDING 3000 CHUCH ROAD MOUNTAIN TOP, PA 18707 MINUTES January 27, 2016 The regular monthly meeting of the Rice Township Planning Commission was

More information

Marin County Flood Control & Water Conservation District. Zone No. 3 Advisory Board Meeting

Marin County Flood Control & Water Conservation District. Zone No. 3 Advisory Board Meeting Marin County Flood Control & Water Conservation District Zone No. 3 Advisory Board Meeting May 26, 2010 6:30 8:30 pm Mill Valley City Hall Council s Chambers PG&E Utilities at Bothin Marsh PG&E Utilities

More information

Cutting Costs through Regional

Cutting Costs through Regional Cutting Costs through Regional Stormwater Management Presented by: Jim Tomaine, P.E. Executive Director, Wyoming Valley Sanitary Authority Adrienne Vicari, P.E. Financial Services Practice Area Leader

More information

Report to: Development Services Committee Date: June 26, 2017

Report to: Development Services Committee Date: June 26, 2017 SUBJECT: New Provincial Plans Release of the 2017 Growth Plan, Greenbelt Plan and Oak Ridges Moraine Conservation Plan PREPARED BY: Policy and Research, Planning and Urban Design REVIEWED BY: Marg Wouters,

More information

THE BOARD OF SUPERVISORS OF THE COUNTY OF MARIN ORDAINS AS FOLLOWS:

THE BOARD OF SUPERVISORS OF THE COUNTY OF MARIN ORDAINS AS FOLLOWS: ORDINANCE NO.3586 AN ORDINANCE OF THE COUNTY OF MARIN, STATE OF CALIFORNIA, IMPOSING A ONE-QUARTER OF ONE PERCENT RETAIL TRANSACTIONS AND USE TAX TO BE ADMINISTERED BY THE STATE BOARD OF EQUALIZATION FOR

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT susanlmbt@frontier.com jcoyle@carrollengineering.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify

More information

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT Item 1. Approval of Meeting Minutes for February 10, 2014 Recommended Action: Approve minutes. Item 2. Open Time for Items not on the Agenda

More information

3. PLANNING PROCESS. 32 Public Service Annoucements on La Mega 99.5 Spanish Radio PUBLIC ENGAGEMENT. Community Meeting Presentations.

3. PLANNING PROCESS. 32 Public Service Annoucements on La Mega 99.5 Spanish Radio PUBLIC ENGAGEMENT. Community Meeting Presentations. 3. PLANNING PROCESS 3.1 UPDATE PROCESS AND PARTICIPATION SUMMARY The goal of this process was to prepare a plan that not only meets the requirements of the Disaster Mitigation Act of 2000, using the guidelines

More information

DECEMBER 1, 2014 BOARD OF SUPERVISORS MINUTES: 1151

DECEMBER 1, 2014 BOARD OF SUPERVISORS MINUTES: 1151 DECEMBER 1, 2014 BOARD OF SUPERVISORS MINUTES: 1151 The Straban Township Board of Supervisors met this date, as publicly advertised, at 7:00 p.m. in the meeting room of the Straban Township Municipal Building,

More information

Subject: Research Authorization for Provincial Parks and Conservation Reserves. Section Parks & Protected Areas Policy Number PM 2.

Subject: Research Authorization for Provincial Parks and Conservation Reserves. Section Parks & Protected Areas Policy Number PM 2. Subject: Research Authorization for Provincial Parks and Reserves No. PAM 13.01 New Compiled by Branch Natural Heritage, Lands and Protected Spaces Replaces Directive Title Research Activities in Parks

More information

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects DRAFT Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects February 27, 2019 Purpose This document provides the draft documentation for the Harris County Flood Control

More information

9.2 ALBURTIS BOROUGH. This section presents the jurisdictional annex for Alburtis Borough. A. HAZARD MITIGATION PLAN POINT OF CONTACT

9.2 ALBURTIS BOROUGH. This section presents the jurisdictional annex for Alburtis Borough. A. HAZARD MITIGATION PLAN POINT OF CONTACT 9.2 ALBURTIS BOROUGH This section presents the jurisdictional annex for Alburtis Borough. A. HAZARD MITIGATION PLAN POINT OF CONTACT Name Title/ Department Address Telephone Fax Email Primary Point of

More information

Historic Structures in the Floodplain

Historic Structures in the Floodplain Historic Structures in the Floodplain Frances McJunkin, CFM Deputy Director Sal Vitko Hazard Reduction Planner County of Lycoming Department of Planning & Community Development Pennsylvania Statewide Conference

More information

Local Government Conference White Paper on Prevailing Wage

Local Government Conference White Paper on Prevailing Wage Local Government Conference White Paper on Prevailing Wage Who we are: The Local Government Conference is made up of the County Commissioners Association of Pennsylvania, the Pennsylvania State Association

More information

HIGHLANDS REGIONAL MASTER PLAN MONITORING PROGRAM IMPLEMENTATION TECHNICAL ADVISORY COMMITTEE MEETING

HIGHLANDS REGIONAL MASTER PLAN MONITORING PROGRAM IMPLEMENTATION TECHNICAL ADVISORY COMMITTEE MEETING CHRIS CHRISTIE Governor KIM GUADAGNO Lt. Governor State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205

More information

HARRIS TOWNSHIP Planning Commission Meeting Minutes May 21, 2018

HARRIS TOWNSHIP Planning Commission Meeting Minutes May 21, 2018 HARRIS TOWNSHIP Planning Commission Meeting Minutes May 21, 2018 Members in Attendance: Staff in Attendance: Public in Attendance: Bill Wallace, Vice Chairman Roy Hammerstedt John Wainright Bob Igo Chris

More information

Section moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Section moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert: 1.1... moves to amend H.F. No. 3120 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. Minnesota Statutes 2016, section 103B.101, subdivision 9, is amended to read:

More information

Flood Risk Reduction Program

Flood Risk Reduction Program Village of Glenview July 2012 Update Flood Risk Reduction Program Executive Summary The Flood Risk Reduction Program is a comprehensive approach to solving the flooding and drainage problems that the Village

More information

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update Passaic River Basin Flood Advisory Commission Report/Status of Recommendations October 2014 Update Passaic River Basin Flood Advisory Commission April 2010: By Executive Order, Governor Christie created

More information

Capital Construction and Debt Service

Capital Construction and Debt Service Capital Construction and Debt Service The Capital Construction portion of this section includes an overview and summary of appropriations and expenditures for the design, construction, and repair of major

More information

MINUTES OF REGULAR MEETING OF THE COMFORT LAKE - FOREST LAKE WATERSHED DISTRICT THURSDAY, JULY 23, 2009

MINUTES OF REGULAR MEETING OF THE COMFORT LAKE - FOREST LAKE WATERSHED DISTRICT THURSDAY, JULY 23, 2009 MINUTES OF REGULAR MEETING OF THE COMFORT LAKE - FOREST LAKE WATERSHED DISTRICT THURSDAY, JULY 23, 2009 1) Call to Order The President called the July 23, 2009 regular Board meeting to order at 6:30 p.m.

More information

State Agency Compliance:

State Agency Compliance: State Agency Compliance: Who is responsible for map revisions: State agencies or the locals? Association of State Floodplain Managers Annual Conference June 4, 2015 Katie Lipiecki Senior Mitigation Planning

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT manager@lowersaucontownship.org emermgt@lowersaucontownship.org MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP)

More information

Hurricane Matthew. As of August 24, 2018, the County has received $76,596 in reimbursements from

Hurricane Matthew. As of August 24, 2018, the County has received $76,596 in reimbursements from Matthew Cost Recovery Update #8 When a Federal disaster is declared, FEMA can reimburse affected entities a percent of their costs. President Obama signed an Emergency Declaration for Florida on October

More information

PUBLIC WORKS COMMITTEE 4:00 p.m., Monday, March 8, 2010

PUBLIC WORKS COMMITTEE 4:00 p.m., Monday, March 8, 2010 PUBLIC WORKS COMMITTEE 4:00 p.m., Monday, The regular meeting of the Public Works Committee was held at 4 p.m., Wednesday, March 8, 2010 in the Public Works Building located at 1303 Palm Boulevard, Isle

More information

TOWNSHIP OF MAHWAH COMBINED WORK SESSION AND PUBLIC MEETING AGENDA THURSDAY, APRIL 28, 2016

TOWNSHIP OF MAHWAH COMBINED WORK SESSION AND PUBLIC MEETING AGENDA THURSDAY, APRIL 28, 2016 TOWNSHIP OF MAHWAH COMBINED WORK SESSION AND PUBLIC MEETING AGENDA THURSDAY, APRIL 28, 2016 Council Chambers Richard J. Martel Municipal Center 475 Corporate Drive, Mahwah, New Jersey 8:00PM COUNCIL PRESIDENT

More information

MIDDLE SMITHFIELD TOWNSHIP

MIDDLE SMITHFIELD TOWNSHIP MIDDLE SMITHFIELD TOWNSHIP 147 Municipal Drive ~ East Stroudsburg ~ PA ~ 18302 ~ 570.223.8920 December 7, 2015 The 2016 Annual Budget has been prepared by the Board of Supervisors, with the professional

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT clboehm@macungie.pa.us mn5428@aol.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source of information,

More information

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS)

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS) CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS) PURPOSE: The intent of this document is to BEGIN discussions on developing

More information

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name:

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name: RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name: Manatee County 1. MULTIYEAR PLAN VERSION (INITIAL OR AMENDMENT NUMBER): Initial

More information

CYPRESS COUNTY SUBDIVISION & DEVELOPMENT APPEAL BOARD

CYPRESS COUNTY SUBDIVISION & DEVELOPMENT APPEAL BOARD Board Order No.: SDAB 17/01 Hearing Held: March 27, 2017 File No.: Development Application 17/08 CYPRESS COUNTY SUBDIVISION & DEVELOPMENT APPEAL BOARD CHAIRMAN: Jason Tweten Board Member: Gerald vossler

More information

MINUTES OF THE REGULAR MEETING OF WHITE OAK BOROUGH COUNCIL HELD MONDAY, DECEMBER 17, 2012 AT 7:30 P.M.

MINUTES OF THE REGULAR MEETING OF WHITE OAK BOROUGH COUNCIL HELD MONDAY, DECEMBER 17, 2012 AT 7:30 P.M. MINUTES OF THE REGULAR MEETING OF WHITE OAK BOROUGH COUNCIL HELD MONDAY, DECEMBER 17, 2012 AT 7:30 P.M. CALL TO ORDER Mr. Pasternak, President of Council, called the Regular Meeting to order at 7:30 p.m.

More information

Changes in Criteria and Scoring for CRS Outreach Projects

Changes in Criteria and Scoring for CRS Outreach Projects Changes in Criteria and Scoring for CRS Outreach Projects A Handout for the National Flood Insurance Program Community Rating System Many communities want to keep disseminating and obtaining CRS credit

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

COMMON QUESTIONS & ANSWERS CONNECTICUT RESERVE NOMINATION PUBLIC MEETING

COMMON QUESTIONS & ANSWERS CONNECTICUT RESERVE NOMINATION PUBLIC MEETING QUESTION: What is the National Estuarine Research Reserve System? ANSWER: The National Estuarine Research Reserve System (https://coast.noaa.gov/nerrs/) is a network of protected areas representative of

More information

Bucks County, PA Flood Risk Review Meeting. November 2014

Bucks County, PA Flood Risk Review Meeting. November 2014 Bucks County, PA Flood Risk Review Meeting November 2014 Agenda for Today Risk MAP Program overview Overview of non-regulatory Flood Risk Products and datasets Discuss mitigation action Technical overview

More information

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority The Highland Council Main catchment River Conon Summary of flooding impacts Summary of flooding impacts At risk of flooding

More information

City of Surrey. Regular Council Minutes. Absent: Mayor Watts. Councillors Entering Meeting as Indicated:

City of Surrey. Regular Council Minutes. Absent: Mayor Watts. Councillors Entering Meeting as Indicated: City of Surrey Regular Council Minutes Council Chamber City Hall 14245-56 Avenue Surrey, B.C. THURSDAY, JULY 26, 2007 Time: 10:00 a.m. Present: Chairperson - Councillor Villeneuve Councillor Steele Councillor

More information

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors June 23, 1998 Revised April 5, 2016

More information

Pennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions

Pennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions MEMORANDUM OF UNDERSTANDING Pennsylvania Department of Transportation s Statewide Procedures for 2017-2020 STIP and TIP Revisions Purpose This Memorandum of Understanding (MOU) establishes a set of procedures

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT assistmanager@lowermilford.net publicworks@lowermilford.org MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP)

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT northcatasauquaema@yahoo.com scheirerg@gmail.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source

More information