VERIFICATION REPORT for CDM Gold Standard Programme of Activity

Size: px
Start display at page:

Download "VERIFICATION REPORT for CDM Gold Standard Programme of Activity"

Transcription

1 VERIFICATION REPORT for CDM Gold Stadard Programme of Activity Improved Cook Stoves for East Africa (ICSEA) Limited Improved Cook Stoves for East Africa (ICSEA) Iteratioal Lifelie Fud Ugada CPA 1 (ILFUg1) I Republic of Ugada (Gold Stadard Ref.No. GS 973(POA); GS2518 (CPA) Moitorig Period 15 September 2012 to 14 March 2013 Report No: CCL177/ICSEA/ Revisio No: 03 Report Date: 17/07/2014 Carbo Check (Pty) Ltd. Block-A, Groud Floor 374 Rivoia Boulevard Rivoia, Johaesburg Republic of South Africa 2128 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev. 03 Formulated February

2 Team leader Actig/traiee Team Leader Local Expert Team Member (Auditor) Techical Expert Actig/Traiee Tech. Expert Traiee Auditor Techical Reviewer Expert to TR Traiee TR I. PROJECT DATA Title of the PoA Registratio No. / Date of the PoA: Title of CPA/s verified 1 : Improved Cook Stoves for East Africa (ICSEA) CPA: Iteratioal Lifelie Fud Ugada CPA 1 (ILFUg1) GS 973 / GS2518 (CPA 1) Iteratioal Lifelie Fud Ugada CPA 1 (ILFUg1) Referece umber: Iclusio/Registratio date: Moitorig period: Moitorig Period Number: 1 Methodology/ies: AMS-II.G (Versio 03) Publicatio of MR 2 : - Sectoral Scope/Techical Area Fial Moitorig Report: GS Moitorig report versio 02 dated 08 th July 2014 Average emissio reductios: GHG reducig measure/techology of the CPA/s of the PoA: Estimated: 11,526tCO 2 e/yr ( Calculated o the basis of Pro rata basis for the first Moitorig period ( 15/09/2012 to 14/03/2013) Verified: 4,052 tco 2 e 03/03.1 GHG reductio due to reductio of fuel-wood cosumptio (o-reewable biomass) through implemetatio of efficiet cookstoves. Party Project participats Party cosidered a project participat Cotract party Republic of Ugada (Host) Improved Cook Stoves for East Africa (ICSEA) Limited No II. VERIFICATION TEAM (compliace of 319 b of VVS) Verificatio Team Role Full ame Affiliatio Appoited for Sectoral Scopes (Techical Areas) Suil Kathuria RSA 1.1,1.2,3.1, 4.1,13.1 X Baru Kumar RSA 1.2,3.1,13.1 X B. B. Siha Ugada X Amit Aad Vikash Kumar RSA 1.2, 13.1 X RSA 1.2, 3.1, 13.1 X 1 As per 294 of VVS, the request shall relate to all CPAs icluded i the PoA durig the specified moitorig period. 2 As per curret rules, cosolidated MR for all CPAs icluded i the PoA durig the specified moitorig period. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 2

3 III. VERIFICATION REPORT Verificatio Phases ad Status: Desk Review Follow up iterviews, O Site Assessmet Resolutio of outstadig issues Corrective Actios / Clarificatios Requested Full Approval ad Submissio for Issuace Rejected Fial Approval Date Date: Approval By: Adam Simcock Distributio No distributio without permissio from the Cliet or resposible orgaizatioal uit Limited Distributio Urestricted distributio FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 3

4 Abbreviatios AQL BAU CA CDM CER CAR CCL CDM CER CL CME CPA CPA-DD CO2 CO2e DOE DVR EB EF FA FAR FVR GHG GWh ICSEA ICS ILF IPCC MP PoA PoA-DD PP OSV QC/QA RMP TA TR UID UNFCCC UQL VVS Acceptable Quality Limit Busiess As Usual Corrective Actio / Clarificatio Actio Clea Developmet Mechaism Certified Emissio Reductio Corrective Actio Request Carbo Check (Pty) Ltd. Clea Developmet Mechaism Certified Emissio Reductio Clarificatio Request Co-ordiatig ad Maagig etity Compoet Project Activity Compoet Project Activity Desig Documet Carbo Dioxide Carbo Dioxide Equivalet Desigated Operatioal Etities Draft Verificatio Report CDM Executive Board Emissio Factor Fial Approval Forward Actio Request Fial verificatio Report Greehouse gas(es) Giga Watt Hour Improved Cook Stoves for East Africa Improved Cool Stove Iteratioal Lifelie Fud Ugada Itergovermetal Pael o Climate Chage Moitorig Pla Programme of Activities Programme of Activities Desig Documet Project Participat O Site Visit Quality cotrol/quality assurace Revised Moitorig Pla Techical Area Techical Review Uique Idetificatio Uited Natios Framework Covetio o Climate Chage Uacceptable Quality Limit Validatio ad Verificatio Stadard FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 4

5 Verificatio Opiio summary Carbo Check (Pty) Ltd has performed first periodic verificatio of the first CPA registered with the GS PoA Improved Cook Stoves for East Africa with GS referece umber GS 973 registratio date 25/02/2014. CPAs uder verificatio is Iteratioal Lifelie Fud Ugada CPA 1 (ILFUg1) with GS referece umber GS2518 for the period 15 th September 2012 to 14 th March The verificatio team assiged by the DOE cocludes that the GS Programme of Activity as described i the GS Passport /B05/,registered approved revised PoA- DD /B05/ (Versio 06, dated 31/10/2012 & CPA-DD /B05/,(Versio 05, dated 20/07/2012 ) ad Moitorig Report (Versio 02, dated 8 th July 2014). meets all relevat requiremets of the Gold Stadard, The verificatio has bee coducted i-lie with the UNFCCC VVS requiremets versio 07.0 as well as the Gold Stadard Versio 2.1. The PoA uderwet Post Registratio Chage PRC /B05/ ad a revised PoA-DD versio, 06 dated 31/10/2012 was approved by CDM-Executive Board w.e.f 11/06/ Verificatio methodology ad process The Verificatio team cofirms the cotractual relatioship siged o the 14/06/2013, betwee the DOE, Carbo Check (Pty) Ltd ad the Project Participat, Improved Cook Stoves for East Africa (ICSEA) Limited. The team assiged to the verificatio meets the Carbo Check (Pty) Ltd iteral procedures icludig the UNFCCC requiremets for the team compositio ad competece. CCL has coducted a thorough cotract review as per UNFCCC ad Carbo Check procedures ad requiremets. The verificatio has bee performed as per the requiremets described i the VVS versio 07.0 ad costitutes the review ad completio of the followig steps: - Reviewig the registered POA-DD /B05/ (versio 05, dated 20/07/2012) & CPA- DD /B05/ (versio 05, dated 20/07/2012) registered o 17/08/2012, icludig the moitorig pla ad the correspodig validatio report; - Reviewig the approved revised PoA-DD (Versio 06 ad dated 31/10/2012) /B05/, approved o 11/06/2013 ad correspodig validatio opiio 3 ; - Desk review of the validatio report, MR ad other relevat documets icludig documets related to the projects activities ad emissio reductios - Review of the applied moitorig methodology AMS II.G (versio 3), Eergy Efficiecy Measures i Thermal Applicatios of No-Reewable Biomass - Review of ay CMP ad EB decisios, clarificatios ad guidace ad the Secretariat; - O-site assessmet (25/03/2014 to 29/03/2014) - Resolutio of CARs ad CLs raised durig verificatio - Issuace of Verificatio Report I Carbo Checks opiio the project activity was correctly implemeted accordig to selected moitorig methodology moitorig pla ad the registered POA-DD & CPA DD/s /B05/. The moitorig system was istalled, maitaied i a proper maer, while collected moitorig data allowed for the verificatio of the amout of achieved GHG emissio reductios. Through the review ad o site visit the verificatio team cofirms that the PoA has resulted i the 4,052 tco 2 e emissio reductios durig the first moitorig period. The GHG emissio reductios ad o-ghg parameters were correctly calculated /moitored o the basis of the approved moitorig methodology Eergy Efficiecy Measures i Thermal Applicatios of No-Reewable Biomass, AMS-II.G (versio 03). 3 Approved revised PoA-DD used i the report refers to the revisio i geographical boudary of PoA, which was approved by CDM EB o 11/06/2013. The approved revised PoA-DD does t refer to ay chages i project desig or moitorig pla of PoA_DD or CPA-DD ( FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 5

6 TABLE OF CONTENTS 1. INTRODUCTION Objective Scope Project Activity Descriptio 8 2. METHODOLOGY Desk review Backgroud documets: Error! Bookmark ot defied. 2.3 O-site visit ad follow-up iterviews with project stakeholders Resolutio of outstadig issues Iteral quality cotrol Verificatio Team VERIFICATION FINDINGS (COMPLIANCE OF 319 C OF VVS) Project implemetatio Compliace of the moitorig pla with the moitorig methodology icludig applicable tool(s) (compliace of 319 d (ii) of VVS) Compliace of the Actual moitorig with moitorig pla i the CPA- DD (compliace of 319 d (ii) of VVS) Moitored parameters /Ex-ate Parameters (compliace of 319 e of VVS) Moitorig resposibility Deviatio from ad/or Revisio of the registered moitorig pla Assessmet of data ad calculatio of greehouse gas emissio reductios (compliace of 319 d (iii) ad (i) of VVS) Assessmet of actual emissio reductios with the estimate emissio reductios i CPA-DD Compliace with the sustaiability moitorig pla Moitorig of Gold Stadard Sustaiability Idicators Quality ad Maagemet System Assurace 37 APPENDIX A APPENDIX B APPENDIX C APPENDIX D FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 6

7 1. INTRODUCTION Improved Cook Stoves for East Africa (ICSEA) Limited has commissioed the Carbo Check (Pty) Ltd. to perform a idepedet verificatio of the CDM Programme of Activity Improved Cook Stoves for East Africa (hereafter referred to as Programme of Activity or PoA ) for CPA titled Iteratioal Lifelie Fud Ugada CPA 1 (ILFUg1). This report summarises the fidigs of the verificatio of the project, performed o the basis of Gold Stadard requiremets ad toolkit ad paragraph 62 of the CDM M & P, as well as criteria give to provide for cosistet project operatios, moitorig ad reportig ad the subsequet decisios by the CDM Executive Board ad Gold Stadard Secretariat. Verificatio is required for all registered GS project activities itedig to cofirm their achieved emissio reductios ad proceed with request for issuace of CERs. This report cotais the fidigs ad resolutios from the verificatio ad a certificatio statemet for the certified emissio reductios. 1.1 Objective Verificatio is the periodic idepedet review ad ex post determiatio of both quatitative ad qualitative iformatio by a Desigated Operatioal Etity (DOE) of the moitored reductios i GHG emissios that have occurred as a result of the registered CDM project activity durig a defied moitorig period. Certificatio is the writte assurace by a DOE that, durig a specific period i time, a project activity achieved the emissio reductios as verified. The objective of this verificatio was to verify ad certify emissio reductios reported for the Iteratioal Lifelie Fud Ugada CPA-1 (ILFUg1)i Republic of Ugada for the period 15/09/2012 to 14/03/2013. The purpose of verificatio is to review the moitorig results ad verify that the moitorig methodology was implemeted accordig to the moitorig pla ad moitorig data, ad used to cofirm the reductios i athropogeic emissios by sources, is sufficiet, defiitive ad preseted i a cocise ad trasparet maer. Carbo Check s objective is to perform a thorough, idepedet assessmet of the registered programme of activities. I particular, the moitorig pla, moitorig report ad the project s compliace with relevat UNFCCC ad host Party criteria are verified i order to cofirm that the compoet project/s has/have bee implemeted i accordace with the previously registered/icluded compoet project desig ad coservative assumptios, as documeted. It is also cofirmed if the moitorig pla is i compliace with the registered POA-DD & CPA DD /B05/ ad approved moitorig methodology. 1.2 Scope The scope of the verificatio is: To verify the project implemetatio ad operatio with respect to the registered POA-DD /B05/ CPA-DD /B05/ & GS CPA Passport /B05/ To verify the implemeted moitorig pla with the registered POA-DD /B05/ CPA-DD /B05/ & GS CPA Passport /B05/ ad applied baselie ad moitorig methodology./b03/ To verify that the actual moitorig systems ad procedures are i compliace with the moitorig systems ad procedures described i the moitorig pla. To evaluate the GHG emissio reductio data ad express a coclusio with a reasoable level of assurace about whether the reported GHG emissio reductio data is free from material misstatemet. To verify that reported GHG emissio data ad other o-ghg parameters as per the requiremet of GS is sufficietly supported by evidece. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 7

8 Carbo Check s scope of verificatio as a third party verifier is to verify project emissio reductios ad sustaiable developmet impacts agaist the requiremets set out by the Gold Stadard. The verificatio shall esure that the reported emissio reductios are complete ad accurate i order to be certified. The verificatio comprises a review of the moitorig report over the moitorig period from 15/09/2012 to 14/03/2013 ad based o the registered PoA-DD, CPA-DD & GS Passport /B05/ i part of the moitorig parameters ad moitorig pla, emissio reductio calculatio spreadsheet, moitorig methodology ad all related evidece provided by project participat O-site visit ad stakeholders iterviews are also performed as part of the verificatio process. 1.3 Project Activity Descriptio Review of moitorig report /01/ reveals that, the PoA aims to distribute improved cook stoves (ICS) i households of Ugada. Improved Cook Stoves for East Africa (ICSEA) is the coordiatig/ maagig etity (CME) for the programme. Oe CPA has bee icluded i the program /B05/. The CPA 1 (ILFUg1) has dissemiated 3,044 ICS durig the moitorig period, which was cofirmed through stove distributio database /07/. The estimated GHG offset durig this moitorig period is 4,052 tos CO 2 e /03/. The value of f NRB has bee calculated usig coutry level data metioed i the PoA-DD ad CPA-DD. The weighted average value of f NRB is 91.5% /16/. Verificatio team cofirms the NRB assessmet based o the values metioed o the PoA-DD ad CPA-DD, which has already bee validated by the DOE durig the validatio period for registerig the PoA ad CPA 1. The PoA aims to support sustaiable developmet i the host coutry of Ugada where CPA 1 is uder implemetatio. The implemetatio of ICSs has improved the eviromet ad idividual household coditios of air pollutio by reductio i smoke ad black soot ad particulate matter. The stove type distributed withi the geographical boudary of Ugada is Okelo Kuc brad of portable domestic charcoal improved cook stoves (ICS) /05/. These Improved biomass cook stoves are built to reduce use of wood ad therefore related idoor air pollutats from icomplete combustio of fuel wood (CO ad PM). This project reduces greehouse gas emissios by dissemiatig efficiet biomass cook-stoves that were verified durig osite observatio ad iterview with house hold users to be more efficiet tha traditioal three stoes & traditioal stoves models i the Ugada. Usig Improved Cook Stoves provides the followig beefits: Reduce usustaiable wood harvest ad hece reduce the rate of deforestatio. Reduces fuel wood cost for households ad commuities ad save fuel collectio time. Cotributes to the preservatio of wood resources so as to avoid iter-commual coflict over resources. Provides employmet with regards to local moitorig survey, distributio of cook-stoves etc. Provides health beefits e.g. coughig ad irritatio of eyes as well time savig durig the cookig process. The verificatio team cofirm that the project is i lie with the plas cotaied i the registered PoA-DD ad CPA-DD /B05/. 2. METHODOLOGY The verificatio cosists of the followig four phases: FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 8

9 1. Completeess check of the Emissio Reductios Moitorig report ad Gold Stadard Sustaiability Moitorig Report, ad submissio to the Gold Stadard Registry ad Project Admiistratio System; 2. Desk review of the validatio report, moitorig pla, moitorig report, moitorig methodology, compoet project desig documet (CPA-DD), programme of activity desig documet (PoA-DD), applicable tools i particular attetio to the frequecy of measuremets, quality of meterig equipmet s icludig calibratio requiremets, QA/QC procedures ad other relevat documets; 3. O-site visit (icludig follow-up iterviews with project stakeholders, whe deemed ecessary). The o-site assigmet icludes the followig; A assessmet of implemetatio ad operatio of the compoet project activity with respect to registered/icluded CPA-DD or approved revised CPA-DD; Review of iformatio flows for geeratig, aggregatig ad reportig the moitorig parameters; Iterview with relevat persoels to determie whether the operatioal ad data collectio procedures are implemeted ad i accordace with moitorig pla of the CPA-DD /B05/; Cross check of iformatio ad data provided i the moitorig report with plat logbooks, ivetories, purchase records or similar data sources; Check of moitorig equipmet s, calibratio frequecy ad moitorig practice ilie with methodology ad CPA-DD /B05/; Review of assumptios made i calculatig the emissio reductio; Implemetatio of QA/QC procedure i-lie with the CPA-DD /B05/; ad methodology requiremet. 4. Resolutio of outstadig issues ad the issuace of the fial Verificatio report ad Certificatio statemet. The followig sectios outlie each step i more detail. Duratio of Verificatio: Sigig of Letter of Egagemet: 14/06/2013 Uploadig of Moitorig Report: 18/12/2013 Pre-site visit preparatio: 12/03/2014 to 21/03/2014 O Site Visit: 25/03/2014 to 29/03/2014 Reportig/Calculatios/Quality ad Cotrol checks: 30/03/2014 to 30/05/ Desk review The followig table outlies the documetatio reviewed durig the verificatio: Ref o. Referece Documet /01/ GS Moitorig report, versio 01 dated 12/12/2013 /02/ Fial Moitorig report, versio 02, dated 8 th July 2014 /03/ 1. Emissio reductio calculatio spread sheet, CPA CER Calculatios 19/03/2014 correspodig to /01/ 2. Emissio reductio calculatio spread sheet, CPA CER Calculatios ILF versio 06 05/06/2014 correspodig to /02/ /04/ _UCB_HH_KPT_Data_Etry_Sheet_Charcoal_ad_Wood_Fial (HH kitche survey data) /05/ Techical Drawig for Okelo Kuc Stove /06/ Baselie Fuel Cosumptio i Ugada April /October 2010 /07/ Sales Database 19/03/2014 Samples of Warraty Cards /08/ ICSEA Water Boilig Test Procedure versio 09 Records of water boilig Test coducted for o iitial set of stoves coducted by Chemiphar Laboratories dated 10/11/2011 Records of Water Boilig Tests for 32 samples for 1 year & 2 years old stoves years FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 9

10 Results of measured Calorific values for three (3) samples dated 21-22/11/2013 & 29/08/2013 WBT spreadsheet versio Records of Lab Compariso Testig exercise /09/ Copies of Cotracts for Moulder/Packer/Tismith employed with ILF for year 2012/13/14 CPA employmet Record2011 to 2014 /10/ Certificate for Registratio of ICSEA dated 27/01/2011 & Certificate of Registratio of ILF dated 24/05/2013 /11/ Samplig Survey Cover ote & Details of Field Exercise versio 02 Pre-test exercise dated 01/08/2013 spreadsheet Spreadsheet Details of Field exercise(2) Spreadsheet CPA ( ILF UG1) Field Fidigs 1 /12/ Report o Purchase of clay made durig 2011 to 2014 /13/ Report o ILF maiteace strategy /14/ Report o ILF Health ad safety risks & sexual Harassmet /15/ Evirometal clearace give to ILF for extractio of clay dated 26/03/2014 /16/ Respose letter to request of approval for fractio of o reewable biomass dated 10/03/2014 issued by Natioal Forest Authority Ugada /17/ Calibratio record for Thermo couples of Chemiphar labs September 2013 Calibratio record for Weighig scale of Chemiphar labs Jue 2013 Calibratio record for Thermo couples of CREEC September 2013 Calibratio record for Weighig scale of CREEC May 2013 Calibratio record for Thermo couples of UNBS March 2013 Calibratio record for Weighig scale of UNBS May 2013 /18/ Osite site visit /Iterviews ad Photographs Durig the desk review, Carbo Check applied the stadard auditig techiques to assess the quality of iformatio provided. 2.2 Backgroud documets: Ref o. Referece Documet /B01/ 1. Validatio ad Verificatio Stadard (Versio 07.0) 2. Project Stadard (Versio 07.0) 3. Guidelie for Samplig ad Surveys EB 67 Aex 6 4. Stadard Samplig ad Surveys of CDM project activities & program of activities EB 76 Aex 06 /B02/ Gold Stadard specific rule/guidelies/stadard: 1. Gold Stadard tool kit (GSv2.1_Toolkit) 2. GSv2.1-Requiremets 3. GS-aexes to toolkit versio 2.1 /B03/ Applied baselie ad moitorig methodology, AMS IIG versio 03 /B04/ Guidelie o the Applicatio of Materiality i Verificatios Versio 01.0 /B05/ Registered POA-DD (versio 05, dated 20/07/2012) & CPA-DD (versio 05, dated 20/07/2012) Approved revised PoA-DD (Versio 06 ad dated 31/10/2012)/B05/, approved o 11/06/2013 ad correspodig validatio opiio; Registered GS PoA Passport Improved Cook Stoves for East Africa (ICESA)-GS0973 ad correspodig validatio report. GS Passport for CPA project Iteratioal Lifelie Fud Ugada CPA-1 ILFUg01 GS2518 GS PoA registratio Documet dated 25/02/2014 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 10

11 2.3 O-site visit ad follow-up iterviews with project stakeholders The verificatio team alog with local expert of Carbo Check performed a OSV durig 25/03/2014 to 29/03/2014 ad the followig activities were performed: i. A assessmet of the implemetatio ad operatio of the registered project activity as per the registered CPA-DD /B05/; ii. A review of iformatio flows for geeratig, aggregatig ad reportig the moitorig parameters; iii. Iterviews with relevat persoel to determie whether the operatioal ad data collectio procedures are implemeted i accordace with the moitorig pla i the CPA-DD; /B05/; iv. A cross check betwee iformatio provided i the moitorig report ad data from other sources such as plat logbooks, ivetories, purchase records or similar data sources; v. A check of the moitorig equipmet icludig calibratio performace ad observatios of moitorig practices agaist the requiremets of the CPA-DD /B05/; ad the selected methodology ad correspodig tool(s), where applicable; vi. A review of calculatios ad assumptios made i determiig the GHG data ad emissio reductios; vii. A idetificatio of quality cotrol ad quality assurace procedures i place to prevet or idetify ad correct ay errors or omissios i the reported moitorig parameters. The project represetatives ad stakeholders iterviewed are : Name Orgaizatio Topic Meas of iterview 1. William Farmer UCB MR/ER Calculatios Oe to Oe 2. Namazzi Gloria UCB MR/ER Calculatios Oe to Oe 3. Fuke Adeyemi UCB MR/ER Calculatios Oe to Oe 4. Sarah Kihuguru UCB Customer Coordiatio Oe to Oe 5. Keyi Nimaya UCB Customer Coordiatio Oe to Oe 6. Phioa Atim UCB Customer Coordiatio Oe to Oe Nicholus Macus Kaye Sulpya Eway Patric ILF ILF ILF Maufacturig/ Sales / Data Maagemet/Legal Compliace Maufacturig/ Sales / Data Maagemet/Legal Compliace Maufacturig/ Clay removal site maagemet Oe to Oe Oe to Oe Oe to Oe 10. Odogo Edward ILF Maufacturig Oe to Oe 11. Jacob Sedagire ILF Maufacturig Oe to Oe 12. Omara Sam Alyech Clay removal site Oe to Oe 13. Oryec William Alyech Clay removal site Oe to Oe 14. Okeya Jimmy Clay removal site Oe to Oe FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 11

12 Sl. # Cook Stove Ower Sr. No. CO STOVE USERS Meas of Iterview 1. Margrel Obala Oe to Oe 2. Lillia Ajim Oe to Oe 3. Ayo Nacy Oe to Oe 4. Ogom Oscar Oe to Oe 5. Sarah Alele Oe to Oe 6. Ace Susa Oe to Oe 7. Judith Etia Oe to Oe 8. Okelio Emmauel Oe to Oe 9. Stella Obote 22184/LS2895 Usage Survey Oe to Oe 10. Oca Eva durig Home visit Oe to Oe 11. Christie Owera 19483/LL1313 Oe to Oe 12. Florece Ocla Oe to Oe 13. Breda 22788/LM1757 Oe to Oe 14. Awor Jeifer 09329/LS0967 Oe to Oe 15. Molly Bua 24629/LL0622 Oe to Oe 16. P.O.Harriate Oe to Oe 17. Obog Jackso Oe to Oe 18. Hilda okwi Oe to Oe 19. Acom Miriam Oe to Oe Through the above-metioed activities the verificatio team cofirmed the followig CDM & Gold Stadard project aspects i relatio to the project activity: The implemetatio ad operatio of the project activity is as described i the moitorig pla i the registered PoA-DD & CPA-DD /B05/. The operatioal ad data collectio procedures are implemeted as per the moitorig pla i the PoA-DD & CPA-DD /B05/ The iformatio flow for geeratig, groupig ad reportig of the moitored parameters Procedures to avoid double coutig are i place 2.4 Resolutio of outstadig issues The objective of this phase of the verificatio is to resolve ay outstadig issues (issues that require further elaboratio, research or expasio) which have to be clarified/corrective actio doe prior to fial DOE s coclusios o the project implemetatio, moitorig practices ad achieved emissio reductios. I order to esure trasparecy a verificatio protocol is completed for the project activity. The protocol shows i trasparet maer criteria (requiremets), meas of verificatio ad resultig statemets o verificatio actual project activity agaist idetified criteria. The verificatio protocol serves the followig purposes: It orgaises i a table form, details ad clarifies the requiremets, which CDM project is expected to meet CDM requiremets; It esures a trasparet verificatio process where the DOE will documet how a particular requiremet has bee verified ad the result of the verificatio. It esures that the issues are accurately idetified, formulated, discussed ad cocluded i the validatio report. It esures the determiatio of achievig credible emissio reductios from the project activity. The verificatio protocol cosists of two tables. Table 1 reflects the verificatio requiremets ad referece to the materials used to verify the project activity agaist those requiremets, FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 12

13 as well as meas of verificatio, referece to Table 2 (i.e. tables of fidigs) ad prelimiary ad fial opiio of the DOE o every particular requiremet listed i table 1. Verificatio Protocol Table 1: Requiremet checklist Checklist questio Verificatio Team Commet/MoV Referece Fidigs commets refereces, data source / Draft Coclusio Fial Coclusio The checklist items i Table 1 are liked to the various requiremets the project should meet. The checklist is orgaised i various sectios. Each sectio is the further subdivided as per the requiremets of the topic ad the idividual project activity. The sectio is used to elaborate ad discuss the checklist item i detail. It icludes the assessmet of the Verificatio team ad how the assessmet was carried out. The reportig requiremets of the VVS ad Project Stadard shall be covered i this sectio. Gives referece to the iformatio source o which the assessmet is based o Assessmet based o evidece provided if the criterio is fulfilled (), or a CAR, CL or FAR is raised (see below). The assessmet refers to the draft verificatio stage. I case a corrective actio or a clarificatio request the fial assessmet at the fial verificatio stage is give. The fidigs of verificatio process are summarized i the tables below. Fidig (referece sectio of table 1) Classificatio CAR CL FAR Descriptio of fidig (DOE) Corrective Actio or clarificatio #1 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. Coclusio Tick the appropriate checkbox To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed I Table 2 FAR, shall reflect the forward actios iitiated by the verificatio team if the moitorig ad reportig require attetio ad/or adjustmet for the ext verificatio period. The completed verificatio protocol for this project is eclosed i Appedix A to this report. Fidigs durig the verificatio ca be iterpreted as a o-compliace with CDM criteria or a risk to the compliace. Corrective actio requests (CARs) are raised, i case: (a) No-coformities with the moitorig pla or methodology are foud i moitorig ad reportig ad has ot bee sufficietly documeted by the project participats, or if the evidece provided to prove coformity is isufficiet; FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 13

14 Supervisig the work Desk review Site Visit + Iterview Report ad protocol Writig Techical Expert Iput Reportig Support Techical Reviewer (b) Modificatios to the implemetatio, operatio ad moitorig of the registered project activity has ot bee sufficietly documeted by the project participats; (c) Mistakes have bee made i applyig assumptios, data or calculatios of emissio reductios which will impair the estimate of emissio reductios; (d) Issues idetified i a FAR durig validatio/previous verificatio(s) that are ot bee resolved by the project participat(s) to be verified durig curret verificatio. Requests for clarificatio (CLs) are raised, if iformatio is isufficiet or ot clear eough to determie whether the applicable CDM requiremets have bee met. A forward actio request (FAR) is raised durig verificatio to highlight issues related to project implemetatio/moitorig that require review durig the subsequet verificatio of the project activity. FARs shall ot relate to the CDM requiremets for issuace. 2.5 Iteral quality cotrol The fial verificatio report has passed a techical review before beig submitted to the project participat(s) ad UNFCCC Executive Board. A techical reviewer qualified i accordace with CCL s qualificatio scheme for CDM validatio ad verificatio performed the techical review. 2.6 Verificatio Team Carbo Check has appoited a competet team as per the Accreditatio Stadard ad Carbo Check iteral procedures. The team is outlied below: Full ame Verificatio Team Locatio Appoited for Sectoral Scopes (Techical Areas) Type of Ivolvemet Suil Kathuria RSA 1.1, 1.2, 3.1, 4.1, X X X X X 13.1 Baru Kumar RSA 1.2, 3.1, 13.1 X X B. B. Siha Ugada -- X Amit Aad RSA 1.2, 13.1 X Vikash Kumar RSA 1.2, 3.1, 13.1 X Suil Kathuria: Qualified lead assessor ad iteral techical reviewer for offset projects validatios ad verificatios uder CDM, VCS ad actively bee ivolved i the validatio ad validatio or iteral techical review of more tha 100 offset projects. He is qualified as techical expert for TA 1.1, 1.2, 3.1, 4.1 ad 13.1 uder CDM SS categorizatio. He has udergoe extesive traiig i the validatio ad validatio of carbo offset projects. Curretly, he is associated with Carbo Check i the capacity of Team Leader/Techical Expert/Techical Reviewer Baru Kumar: Is a appoited techical expert i techical area 1.2, 3.1ad He holds a M.Sc. Ecology & Evirometal Scieces, Podicherry Cetral Uiversity, Puducherry ad B. Sc Evirometal sciece & Water Maagemet, A.N. College, Pata Magadha Uiversity. He has bee ivolved i she validatio ad verificatio of CDM projects that have bee submitted to UNFCCC BB Siha: Is a appoited Local Expert for Ugada. He holds a B.Tech. i Metallurgical Egieerig from Idia Istitute of techology, Kapur, Idia, Graduate Maagemet Program i Iteratioal Busiess Maagemet from Florida Iteratioal Uiversity, Miami, USA. IRCA (Iteratioal Registrar for Certificated Auditors) UK, registered QMS 2008 Auditor. He is workig i Ugada sciece He was ivolved i validatio of Ugada grid FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 14

15 emissio factor as a local expert ad also he is ivolve i Productio of biodiesel from ofood oil. (COMPLIANCE OF 319 C OF VVS) 3. VERIFICATION FINDINGS The fidigs of the verificatio are described i the followig sectios. The verificatio criteria (requiremets), the meas of verificatio ad the results of verificatio are documeted i detail i the verificatio protocol i Appedix A. 3.1 Project implemetatio The implemetatio of the project activity (compliace of 319 d (i) of VVS) Co-ordiatig ad Maagig etity/project Participats: Title of the PoA: GS registratio No: Applied Baselie ad moitorig methodology: Improved Cook Stoves for East Africa (ICSEA) Ltd. Improved Cook Stoves for East Africa (ICSEA) GS973 AMS-II.G (versio 03) Title of the CPA: Iteratioal Lifelie Fud Ugada (ILFUg-1) GS CPA referece umber: GS2518 CPA start date: 01/04/2011 CPA start of operatio: 01/04/2011, CPA implemeter Iteratioal Lifelie Fud Project Scale: Small scale Locatio of the CPA: Lira, Ugada CPA creditig period: 15/09/2012 to 14/09/2019 Reported moitorig Period 15/09/2012 to 14/03/2013 verified i this verificatio: As part of the site visit the verificatio team was able to cofirm that the project implemetatio is i accordace with the project descriptio cotaied i the registered PoA- DD ad CPA-DD. The verificatio took cogizace of 236, 237 & 240 of CDM Project Stadard /B01/ ad 260 (a) ad 261 of VVS. A CAR-01 was raised o completeess of the details i F-CDM-MR, which was subsequetly addressed. Project physical features ( techology, project equipmet, moitorig ad meterig equipmet) Review of moitorig report /01/ reveals that, the PoA aims to distribute improved cook stoves (ICS) i households of Ugada. Improved Cook Stoves for East Africa (ICSEA) is the coordiatig/ maagig etity (CME) for the programme. Oe CPA has bee icluded i the program /B05/. The PoA aims to support sustaiable developmet i the host coutry of Ugada where CPA 1 is uder implemetatio. The implemetatio of ICSs has improved the eviromet ad idividual household coditios of air pollutio by reductio i smoke ad black soot ad particulate matter. The stove type distributed withi the geographical boudary of Ugada is Okelo Kuc brad of portable domestic charcoal improved cook stoves (ICS) /05/. These Improved biomass cook stoves are built to reduce use of wood ad therefore related idoor air pollutats from icomplete combustio of fuel wood (CO ad PM). This project reduces greehouse gas emissios by dissemiatig efficiet biomass cook-stoves that was verified durig osite observatio ad iterview with house hold users to be more efficiet tha FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 15

16 traditioal three stoes & traditioal stoves models i the Ugada. Ay Project Desig Chage bee sought ad approved by EB for the CPA? 319 (f) of VVS} {compliace of Yes No No chage sought. Projected activity is implemeted i lie with the registered PoA-DD/CPA-DD /B05/ i.e. dissemiatio of efficiet cook stoves to households i Republic of Ugada. Total 3044 stoves are distributed uder the CPA for the proposed moitorig period. The stove type distributed withi the geographical boudary of Ugada is Okelo Kuc brad of portable domestic charcoal improved cook stoves (ICS) /05/. Total stoves sold durig the moitorig period (15/09/ /03/2013): CPA 1 (ILFUg1) Year No. of stoves Total 3044 The implemeted project activity is cosistet with the POA-DD & CPA-DD /B05/. The verified timelie of the project s implemetatio is as follow: Milestoe of the project activity Timelie Assessmet by the verificatio team Startig date of operatio: (ote: Project implemetatio i.e. 01/04/2011 The start date of project is 01/04/2011, which is the date of first sale of usage of the dissemiated efficiet improved cook stoves. The same was cook stoves ) cofirmed through review of the sales 3044 agreemet No as stated i the sales records /07/ Registratio of PoA at Gold stadard Registry Creditig period 1 st moitorig period 15/09/2012 to 14/03/ /02/2014 Verificatio team verified the registratio of the project activity from the GS registry ad foud appropriate. Registered PoA-DD ad CPA-DD /B05/, sales records /07/ were checked, which was further substatiated durig osite visit ad iterviews with local stakeholders ad ed users of the project stoves (households) The project activity was implemeted ad stoves istalled as described i the registered CPA-DD /B05/. O the basis of site visit, iterview ad the reviewed project documetatio alog with documetary evideces, it ca be cofirmed that the project implemetatio is i accordace with realized techology. The project has bee implemeted ad operated as described i the registered PoA-DD /B05/ ad CPA-DD /B05/. The moitorig ad sustaiable developmet FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 16

17 idicators parameters are also moitored as per the registered PoA-DD /B05/, CPA-DD /B05/ ad GS guidelie /B02/ ad foud to be appropriate. As per 263 of VVS DOE cofirms that the project activity has bee implemeted ad operated i accordace to the descriptio of equipmet istalled as described i the registered CPA-DD /B05/. DOE cofirms that oly those stoves are icluded i the MR: a) Which have bee sold after the start date of validatio of PoA i.e. 11/11/2010. b) Sale of stoves uder this CPA commeced 1st April 2011 ad 3044 stoves were sold betwee April 2011 to March 2013 ad the same have bee icluded i the Moitorig report. This was verified through sales record of the stoves maitaied with CME. Verificatio Team summarizes major chages betwee webhosted Moitorig Report ad fial versio of Moitorig Report for submissio as follows: Subject MR (project title / participats ivolved/ project locatio / referece umbers / report date ad versio etc.) CER calculatios (amout of emissio reductio) Moitorig (period dates ad period) Creditig period ( type / start date) Webhosted Moitorig Report (MR) /01/ Cosistecy PoA: Improved Cook Stoves for East Africa (ICSEA) CPA: Iteratioal Lifelie Fud Ugada (ILFUg1) Verified Moitorig Report /06/ PoA: Improved Cook Stoves for East Africa (ICSEA) CPA: Iteratioal Lifelie Fud Ugada (ILFUg1) 4063 toes of CO2 4,052 toes of CO2 The chage has bee the results of CL-3 & CAR-4 1 st Moitorig Period. 15/09/ /03/2013 Type: Reewable Start date: 15/09/2012 Ay other chage NIL NIL 1 st Moitorig Period. 15/09/ /03/2013 (Iclusive of both days) Type: Reewable Start date: 15/09/2012 The verificatio team has also assessed the moitorig ad impact o the sustaiable developmet idicators by the project implemetatio ad foud to be appropriate as per the registered PoA-DD ad CPA-DD /B05/. Carbo Check s verificatio team cosiders the CPA descriptio of the project cotaied i the registered SSC PoA-DD ad CPA-DD /B05/ to be complete ad accurate. The SSC PoA-DD ad CPA-DD /B05/ complies with the relevat methodology, tools, forms ad guidace at the time of submissio for registratio/iclusio. 3.2 Compliace of the moitorig pla with the moitorig (compliace of 319 d (ii) of VVS) methodology icludig applicable tool(s) Ay Revisio i Moitorig pla is sought ad approved by EB for the project? Yes No No revisio i Moitorig Pla is sought. The verificatio team determied agaist all the iformatio provided i MR, whether i-lie with the applied moitorig methodology. Determiatio Requiremets Ay Deviatio bee sought ad approved by EB for the project. Is complete set of data for the specified moitorig period is available Criteria fulfilled Yes No Yes Determiatio ad reportig by the verificatio team No revisio i Moitorig Pla is sought. Complete set of data for the specified moitorig period i.e. 15/09/2012 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 17

18 Determiatio Requiremets Is the required iformatio provided i the moitorig report has bee crosschecked with other sources (ex plat logbooks, ivetories, purchase records, laboratory aalysis) Is the calculatio of baselie emissios ad project activity emissios ad leakage bee i accordace with the formulae ad methods described i moitorig pla ad the applied methodology? Is all assumptios used for emissio calculatio have bee justified Is appropriate emissio factors, IPCC default values ad other referece values have bee correctly applied Does the moitorig methodology provides ay provisio of verificatio for parameters other tha moitorig of GHG data ad shall be specific to the applicability criteria of applied methodology. Criteria fulfilled No Yes No Yes No Yes No Yes No Yes No Determiatio ad reportig by the verificatio team 14/03/2013 was provided by the PP, which was verified o sample basis by the verificatio team ad foud to be appropriate. Verificatio team has verified the data submitted by PP durig osite ispectio ad documet review. 18 radom selected samples of cook stoves (ed users) were checked ad all the relevat iformatio was verified, Icludig the iterview of the local households. Sales record /07/ cotaiig all the required metioed iformatio, e.g. serial umber, date of sale, ame of the ed users etc. were verified to be appropriate. Total umber of the stoves sold, WBT, baselie survey ad user survey data are the mai parameters based o which the real ERs are accrued durig this applied moitorig period ad verified to be accurate by the verificatio team. The formulae ad methods used i calculatio of emissio reductio are cosistet with the registered PoA-DD ad CPA-DD /B05/ ad the applied CDM methodology /B03/. All the assumptios used for emissio calculatio were justified i the MR ad registered PoA-DD ad CPA- DD /B05/. Default values take i the calculatio of ERs are cross-verified from the registered PoA-DD ad CPA-DD /B05/ ad foud to be appropriate. NA Based o above, the verificatio team cofirms that the moitorig pla cotaied i the registered PoA-DD ad CPA-DD /B05/ is appropriately followed i the moitorig report by the project activity ad also i accordace with the applied approved moitorig methodology, i.e. Eergy Efficiecy Measures i Thermal Applicatios of No-Reewable Biomass, AMS II.G versio 03 /B03/. Durig the verificatio all relevat moitorig parameters (PoA-DD ad CPA-DD /B05/ ) have bee verified with regard to the appropriateess of the applied measuremet/determiatio method, the correctess of the values applied for ER calculatio, the accuracy, ad applied QA/QC measures. The verificatio took cogizace of 224 of CDM Project Stadard /B01-2/ ad 264 to 267 ad 260 (d) 272, 278, ad 279 of VVS /B01/ FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 18

19 3.3 Compliace of the Actual moitorig with moitorig pla i the (compliace of 319 d (ii) of VVS) CPA-DD Ay Revisio i Moitorig pla is sought ad approved by EB for the project? Does the moitorig report provide lie diagram showig all relevat moitorig poits? Yes No Yes No No revisios i moitorig pla have bee sought from EB. Lie diagram for moitorig poit is ot applicable as the project moitorig is based o the sales data of cookstoves ad survey report. The moitorig has bee carried out i accordace with the moitorig pla cotaied i the registered PoA-DD /B05/ (versio 06 dated 31/10/2012) ad CPA-DD /B05/ (versio 05 of 20/07/2012). Durig the course of verificatio, all relevat moitorig parameters have bee verified with regard to the appropriateess of the applied measuremet / determiatio method, ad applied QA/QC procedures. Accordig to the methodology, a Total Sales Record, Detailed Customer Database, ad Project Database are maitaied. The verificatio team reviewed the moitorig pla i the registered CPA-DD / B05/ ad compared it agaist the requiremets of the applied methodology/ B03/ ad cofirms that appropriate provisios are icluded for the moitorig ad reportig procedures, data maagemet, ad QA/QC procedures, icludig maitaiig the detailed customer database ad project database ad foud i lie with the 229 of the VVS (Versio 07.0) /B01/. CCL cofirms that the moitorig pla has bee properly implemeted by the PP i accordace with the registered CPA-DD /B05/ ad applied methodology. Followig are the assessmet poits as follows: Usage Survey The purpose of the survey was to cofirm the availability, usage of ICS ad compile iformatio for moitorig of parameters i accordace with the registered CPA-DD /B05/, GS Passport /B05/, amely: 1. Improved stove usage locatio, serial umber cofirmatio, commissioig date, curret usage 2. Usage of origial (baselie) stove(s) frequecy ad extet of use ad purpose 3. Household family size 4. Adjustmet for cotiued use of baselie stoves 5. Istructios regardig, ad practice of, disposal of origial stove(s) 6. Household fuel usage ad expediture chages 7. Local fuel (charcoal) price chages 8. Perceptio of air quality chages A questioaire with 22 questios was desiged ad admiistered to collect above iformatio. CME used the Simple radom samplig ad followig equatio is used for determiig the sample size: ³ NV N -1 ( ) ( ) V ad V = p 1- p p 2 Where, N 3,044 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 19

20 p 86% Represets the 90% cofidece required 0.1 Represets the 10% relative precisio Usig the above formula the sample size thus determied is 43. CME expected that respose rate will be 80% hece the sample size was adjusted by dividig the sample size by respose rate i.e. 43/0.8=55 (Rouded off). Hece DOE cofirms that sample size of 55 is correctly determied ad it meets the requiremet of CPA-DD & POA-DD /B05/. I lie with paragraph 16 of the methodology AMS IIG versio 03, CME has carried out a field exercise for checkig the operatig status of all ICS o the basis of represetative samplig. A list of 300 ICS serial umbers was geerated for the stove usage survey usig simple radom samplig with the aid of a computerised radomiser. There after the moitorig team made telephoe calls to the 96 registered owers of the radomly selected stoves but due to the 41 o-resposes, oly 55 stove users were evetually cotacted ad their households were visited by moitorig team. A questioaire with 22 questios was also admiistered to those 55 users, which icluded questios viz., baselie stoves, family size ad frequecy of usage of ICS. DOE could cofirm that the samples size was based o a 90% cofidece iterval ad a 10% margi of error requiremet for first survey & sample size of 55 coforms to EB 74-A06 versio 4 /B01/. Hece DOE cofirm the selectio of sample sizes were appropriate ad i lie with the CPA-DD /B05/ ad above guidace. The same was also cross-checked through review of calculatio sheet for sample size calculatio as aexed i CPA CER calculatio spreadsheet /03/. For o site visit, the verificatio team has followed the paragraphs of Stadard for Samplig & Surveys for CDM project Activities & Programme of Activity versio 04.1 /B01/. DOE assumed followig values for acceptace samplig method for verifyig the PP s samples as defied i table 1 of the applied stadard. Acceptace Quality Level (AQL) Uacceptable Quality Level (UQL) Producer Risk Cosumer Risk Sample Size () Acceptace umber (c) 1.0% 20% 10% 10% The sample size thus derived is eightee (18) with acceptace umber of oe (01). So, if discrepacies exist i more tha oe (01) record i the sample the the PPs set of records is ot accepted. Verificatio team have performed osite check o ietee (19) samples i.e. oe (01) more tha the acceptace samplig pla. The ame of stove owers (alog with serial umber of stoves) visited durig OSV is listed i sectio 2.3 of the report above. A CAR-2 was raised o makig the samplig pla trasparet ad the same was addressed i the revised MR. Stove Efficiecy Check Survey For determiig stoves efficiecy CME applied radom samplig based o the "Stadard for samplig ad surveys for CDM project activities ad programme of activities". Replacemet stoves were haded over to those households from where samples were picked ad set to laboratories where WBT was coducted. Stratified radom samplig ad followig equatio is used for determiig the sample size separately for 1year old ICS & 2 year old ICS: 4 Prior to Moitorig survey CME coducted a Oe-day pre-test exercise/11/ i Lira District o 01/08/2013 to determie a pre-survey estimate of the expected proportio of stoves i use. Durig that exercise PP visited 30 households ad foud 26 households were usig the ICS. Hece DOE cofirms the use of this value as appropriate ad based o the real life situatio i the field 26/30*100=86%. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 20

21 ³ NV N -1 ( ) V ad V = 2 æ SD ö ç è Mea ø Parameters 1 year Old ICS 2 year old ICS N Mea value of efficiecy * These are the mea value of efficiecy of 4 ICS. DOE has cross checked these values with the test report with the test report These are the mea value of efficiecy of 4 ICS. DOE has cross checked these values SD* These are the Stadard These are the Stadard deviatio calculated of deviatio calculated o efficiecy values of 4 ICS. efficiecy value of 4 ICS. DOE DOE has cross checked has cross checked these these values with the test values with the test report report % Cofidece required 90% Cofidece required % Precisio 10% Precisio Sample size (after adjustmet of respose rate () Miimum Sample size take for curret Moitorig period * For determiig sample size CME got the efficiecy reports of 4 ICS for each vitage year. Mea value of efficiecy & SD thus determied were used for calculatig sample size. Sample size calculatio is aexed i CER calculatio spreadsheet /03/. Sice the ICS are factory maufactured as per laid out desig ad specificatio /05/, the operatig efficiecy are desiged to be i a arrow bad. Additioally ICS are sold primarily i oe district i.e Lira ad the usage patter of the households is moreover cosistet. DOE verified the same durig OSA through iterviews with stove owers. Hece, DOE cofirms the adequacy of four stoves for determiatio of mea ad stadard deviatio ad the same has bee crosschecked with the efficiecy of iitial set of stoves determied i 2011 /08/. Durig moitorig survey the moitorig team made telephoe calls to the registered owers of the radomly selected stoves i the order geerated by the radomiser. A total of 72 Owers (1 year Old stoves) 108 owers (2 year Old stoves) were telephoed, but due to orespose from households, 32 owers each for 1 year as well as 2 years stoves were evetually cotacted. Miimum of 30 ICS were eeded for the efficiecy check (i accordace with EB 74-A06 versio 4). All users whose ICS was collected for testig, were provided with ew ICS ad records of all such replacemets were maitaied ad DOE cross checked the records through visit to those households & verified the ICS umbers of the replaced ICS with that i the records. The stoves collected from households were set to three laboratories amely Chemiphar Laboratory, Cetre for Research i Eergy & Eergy Coservatio (CREEC) ad Ugada Natioal Bureau of Stadards (UNBS) for determiatio of efficiecy of ICS. Verificatio team checked 100 % of the PP s sample data records /08/ for efficiecy measuremets for each year ad cofirms the followig: WBT are carried out as per Water Boilig Test spreadsheet versio ad the three laboratories used the same protocol ad values determied are cosistet with protocol. The average value for 1 Year / 2 Year old is determied by averagig Thermal value of efficiecy for 32 stoves for respective year ad the records are available i the CER spreadsheet FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 21

22 Thermal values of efficiecy for a idividual ICS is calculated i followig maer Efficiecy Cold start (A) Efficiecy Hot start (B) Efficiecy Simmerig (C) Thermal Efficiecy of a ICS is calculated as ((A+B)/2+C)/2. DoE cofirm that calculatio of this value is appropriate ad i lie with the moitorig pla of CPA-DD /B05/. Assessmet of Fractio of woody biomass f NRB,y : Fractio of woody biomass saved by the project activity i the year y that ca be established as o-reewable biomass. As per moitorig Pla this value eeds to be determied aually through data or literature available i public domai. Sice there is o revisio i data published last i 2011 DOE feels the value of 91.5%, which was determied at the time of validatio, is the most appropriate ad coservative ad was cofirmed through review of letter (dated 10/03/2014) by Executive Director of Natioal Forest Authority of Ugada /16/. DOE has further crosschecked the calculatios i the spreadsheet /03/. A CL-2 was raised to seek clarificatio o the aual updatig of this parameter ad same was respoded by PP ad closed. Materiality Assessmet Durig the course of verificatio, DOE has cosidered ad applied Guidelies o the applicatio of materiality i verificatios (versio 01.0) /B02/. A threshold of 5% of the aual emissio reductio estimatio has bee cosidered as appropriate ad i lie with the requiremet of paragraph 10 (d) guidelie /B02/. Verificatio team cosidered the cocept of materiality ad chose threshold i detectio of errors, omissios or misstatemets i emissio reductios claimed by project participats i the moitorig report /01/, /02/ ad associated emissio reductio spread sheet /03/. The cocept of materiality has bee cosidered i plaig (idetificatio of materiality threshold, uderstadig the project their % cotributio i emissio reductio, risk assessmet preparatio of verificatio ad samplig pla for executio of the verificatio i.e. for desk review ad OSV check), executio (apply verificatio ad samplig pla durig desk review ad osite visit data check) ad reportig (refer verificatio checklist ad list of fidigs i appedix B of this report). Verificatio team with reasoable level of assurace cofirms that the claimed emissio reductios are free from material errors, omissios or misstatemets. 3.4 Moitored parameters /Ex-ate Parameters Ex-Post Parameters: Moitorig Parameter Requiremet Data / Parameter: (as i moitorig pla of CPA-DD): Measurig frequecy/time Iterval: Reported Value (compliace of 319 e of VVS) Assessmet/ Observatio by the DOE η ew,(i,j) : Efficiecy of the ICS beig deployed as part of the project activity. Every two years:-. The first measuremet was carried durig August- November 2013 i.e. 12 moths after iclusio of this CPA o 17/08/ year old stoves: 0.41 (Average value of the average efficiecy of 32 Stoves) 2 year old stoves: 0.37 (Average value of the average efficiecy of 32 Stoves) Reportig frequecy: Is measurig ad reportig frequecy i accordace with the moitorig pla ad Every two years Yes. It is i lie with the moitorig pla of CPA-DD /B05/ which states at least every two FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 22

23 moitorig methodology? (Yes / No) Details of moitorig equipmet: year Exteral Laboratories performed the tests ad the details of moitorig equipmet used i tests are as uder: Laborat ory Chemip har Laborat ory CREEC Weighig Balace Model: KERN ID: CP/1/231. Capacity: 12000g by 1g. Calibratio: Calibrated every 12 moths (Last calibratio /17/ performed i July 2013 ad is valid till July 2014) Model: HIWEIGH WPS. ID: FZ Ca pacity: 30kg by 1g. Calibratio: Calibrated every 12 moths (Last calibratio /17/ performed i May 2013 ad is valid till May 2014). Model: HIWEIGH WPS ID: FZ Ca pacity: 30kg by 1g. Calibratio: Calibrated every 12 moths (Last calibratio /17/ was performed i May 2013 ad is valid till May 2014). Digital Thermometer Model: TESTO 925. ID: CP/1/080. Capacity: -20 o C to 600 o C. Calibratio: Calibrated every 12 moths (Last calibratio /17/ performed i September 2013 ad is valid till September 2014). Model: VOLTCRAFT K101. ID: Capacity: -200 o C to 1370 o C by 0.1 o C. Calibratio: Calibrated every 12 moths (Last calibratio /17/ performed i September 2013 ad is valid till September 2014). Model: TME. ID: Capacity: -30 o C to 50 o C by 0.1 o C. Calibratio: Calibrated every 12 moths (Last calibratio /17/ was performed i September 2013 ad is valid till September 2014). FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 23

24 UNBS Model: ELE Iteratioal Ltd. Double Beam. ID: BM/152. Capacity: 15kg by 1g. Calibratio: Calibrated every 12 moths (Last calibratio /17/ was performed i Jue 2013 ad is valid till Jue 2014). Model: HANNA TYPE K Thermocouple. ID: Capacity: 1200 o C. Calibratio: Calibrated every 12 moths (Last calibratio /17/ was performed i March 2013 ad is valid till March 2014). Is accuracy of the moitorig equipmet as stated i the PDD? If the PDD does ot specify the accuracy of the moitorig equipmet, does the moitorig equipmet represet good moitorig practise? Calibratio frequecy /iterval: Is it moitorig methodology /CDM EB guidace / local or atioal stadards / maufacturers specificatio Is the calibratio iterval i lie with the moitorig pla of the PDD? If the PDD does ot specify the frequecy of calibratio, does the selected frequecy represet good moitorig practise? Compay performig the calibratio(iteral or exteral calibratio): Did calibratio cofirm proper fuctioig of moitorig equipmet? (Yes / No): Is (are) calibratio(s) valid for the whole reportig period? If applicable, has the reported data bee cross-checked with other available data? Bomb Calorimeter: Calorific Value for the Charcoal was tested by exteral laboratory usig Bomb Calorimeter havig followig idetificatio tag: Model: GALLENKAMP AUTOBOMB CALORIMETER. ID: SG96/02/536. Calibratio: Calibrated every four moths (Last calibratio /17/ was performed i November 2013 ad is valid till March 2014). Sice the above moitorig equipmet belog to 3 rd party idepedet laboratories o details of the same exists i CPA-DD /B05/ Accuracy for moitorig equipmet are described i Details of Moitorig Equipmet above ad yes, the moitorig equipmet represet good moitorig practise. Calibratio frequecy /17/ of the equipmet is oe year. This was cofirmed by the Certificate & Photograph of the stickers issued by UNBS. Ugada Natioal Bureau of Stadards (UNBS) is a statutory orgaizatio established by Govermet of Ugada 5. Sice the above moitorig equipmet belog to the laboratories o details of the same exists i CPA-DD /B05/ Frequecy of Calibratio for each moitorig equipmet is defied by UNBS, which is a statutory orgaizatio established by Govermet of Ugada ad hece represet good moitorig practise. Ugada Natioal Bureau of Stadards (UNBS) is a statutory orgaizatio established by Govermet of Ugada 6. Yes. Calibratio /17/ reports cofirm proper fuctioig of moitorig equipmet. Yes, calibratios were valid for the whole reportig period. The reported data has bee cross-checked through review of 100 % of the PP s sample data records /08/ i.e., 64 test records (32 records for 1 year old stoves ad 32 records FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 24

25 How were the values i the moitorig report verified? Does the data maagemet (from data geeratio to emissio reductio calculatio) esure correct trasfer of data ad reportig of emissio reductios ad are ecessary QA/QC processes i place? I case oly partial data are available because activity levels or o-activity parameters have ot bee moitored i accordace with the registered moitorig pla, has the most coservative assumptio theoretically possible bee applied or has a request for deviatio bee approved? for 2 year old stoves. Refer to the assessmet above. Yes, the data maagemet esures correct trasfer of data ad reportig of emissio reductios ad all ecessary QA/QC processes are i place. NA. Moitorig Parameter Requiremet Assessmet/ Observatio by the DOE Data / Parameter: (as i moitorig pla of CPA-DD): f NRB,y : Fractio of woody biomass saved by the project activity i the year y that ca be established as o-reewable biomass Measurig frequecy/time Iterval: Aually Reported Value 91.5% Reportig frequecy: Aually Is measurig ad reportig frequecy i Yes. accordace with the moitorig pla ad moitorig methodology? (Yes / No) Details of moitorig equipmet: There is o moitorig equipmet ivolved for this parameter. Is accuracy of the moitorig equipmet as Not Applicable stated i the PDD? If the PDD does ot specify the accuracy of the moitorig equipmet, does the moitorig equipmet represet good moitorig practise? Calibratio frequecy /iterval: Not Applicable Is it moitorig methodology /CDM EB guidace / local or atioal stadards / maufacturers specificatio Is the calibratio iterval i lie with the Not Applicable moitorig pla of the PDD? If the PDD does ot specify the frequecy of calibratio, does the selected frequecy represet good moitorig practise? Compay performig the calibratio (iteral Not Applicable or exteral calibratio): Did calibratio cofirm proper fuctioig of Not Applicable moitorig equipmet? (Yes / No): Is (are) calibratio(s) valid for the whole Not Applicable reportig period? If applicable, has the reported data bee cross-checked with other available data? Yes. The oly data published by Ugada Natioal Forest Authority was i the year 2011 ad is the most appropriate ad coservative data. Letter (dated 10/03/2014) by Executive Director of Natioal Forest Authority of Ugada /16/ was reviewed to cofirm the same. DOE has further crosschecked the calculatios i the How were the values i the moitorig report verified? spreadsheet /03/. Refer assessmet above. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 25

26 Does the data maagemet (from data geeratio to emissio reductio calculatio) esure correct trasfer of data ad reportig of emissio reductios ad are ecessary QA/QC processes i place? I case oly partial data are available because activity levels or o-activity parameters have ot bee moitored i accordace with the registered moitorig pla, has the most coservative assumptio theoretically possible bee applied or has a request for deviatio bee approved? Yes, the data maagemet esures correct trasfer of data ad reportig of emissio reductios ad all ecessary QA/QC processes are i place. NA. Moitorig Parameter Requiremet Assessmet/ Observatio by the DOE Data / Parameter: (as i moitorig pla of CPA-DD): t fractio,(i,j) - Fractio of the days i use i year y of a sigle ICS deployed Measurig frequecy/time Iterval: Cotiuously recorded from date of commissioig of a ICS Reported Value The value is calculated by coutig of days betwee date of commissioig of to the ed date of curret moitorig period i.e. 14/03/2013, ad the dividig the umber of days by 365. The value for each stove is tabulated i the tab "CPA CER Calculatio for ILF v06.xls" Reportig frequecy: Cotiuously recorded from date of commissioig of a ICS Is measurig ad reportig frequecy i accordace with the moitorig pla ad moitorig methodology? (Yes / No) Yes measurig ad reportig frequecy i accordace with the moitorig pla ad moitorig methodology Details of moitorig equipmet: No Moitorig equipmet is required for this Is accuracy of the moitorig equipmet as stated i the PDD? If the PDD does ot specify the accuracy of the moitorig equipmet, does the moitorig equipmet represet good moitorig practise? Calibratio frequecy /iterval: Is it moitorig methodology /CDM EB guidace / local or atioal stadards / maufacturers specificatio Is the calibratio iterval i lie with the moitorig pla of the PDD? If the PDD does ot specify the frequecy of calibratio, does the selected frequecy represet good moitorig practise? Compay performig the calibratio(iteral or exteral calibratio): Did calibratio cofirm proper fuctioig of moitorig equipmet? (Yes / No): Is (are) calibratio(s) valid for the whole reportig period? If applicable, has the reported data bee cross-checked with other available data? How were the values i the moitorig report verified? Does the data maagemet (from data geeratio to emissio reductio parameter Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Yes, the reported data was cross checked through review of sales database /07/ ad review of ER calculatio sheet /03/ Refer assessmet above. Yes, the data maagemet esures correct trasfer of data ad reportig of emissio FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 26

27 calculatio) esure correct trasfer of data ad reportig of emissio reductios ad are ecessary QA/QC processes i place? I case oly partial data are available because activity levels or o-activity parameters have ot bee moitored i accordace with the registered moitorig pla, has the most coservative assumptio theoretically possible bee applied or has a request for deviatio bee approved? reductios ad all ecessary QA/QC processes are i place. NA. Moitorig Parameter Requiremet Assessmet/ Observatio by the DOE Data / Parameter: U (imp) The fractio by which emissio (as i moitorig pla of CPA-DD): reductios are multiplied to obtai a assessmet adjust for drop off of ICS i use per cohort year. A cohort is defied as the ICS model sold or goe through maiteace i the same year Measurig frequecy/time Iterval: Bieially Reported Value 0.95 Reportig frequecy: Bieial Is measurig ad reportig frequecy i Yes. accordace with the moitorig pla ad moitorig methodology? (Yes / No) Details of moitorig equipmet: There are o moitorig equipmets used for measuremet of this parameter. Is accuracy of the moitorig equipmet as Not Applicable stated i the PDD? If the PDD does ot specify the accuracy of the moitorig equipmet, does the moitorig equipmet represet good moitorig practise? Calibratio frequecy /iterval: Not Applicable Is it moitorig methodology /CDM EB guidace / local or atioal stadards / maufacturers specificatio Is the calibratio iterval i lie with the Not Applicable moitorig pla of the PDD? If the PDD does ot specify the frequecy of calibratio, does the selected frequecy represet good moitorig practise? Compay performig the calibratio(iteral Not Applicable or exteral calibratio): Did calibratio cofirm proper fuctioig of Not Applicable moitorig equipmet? (Yes / No): Is (are) calibratio(s) valid for the whole Not Applicable reportig period? If applicable, has the reported data bee Yes, the reported data was cross checked cross-checked with other available data? through review of sales database /07/ ad review of ER calculatio sheet /03/ How were the values i the moitorig report verified? Values i the moitorig report were verified through iterview with household about usage of ICS durig OSV ad further checked through review of sales database /07/ ad Does the data maagemet (from data geeratio to emissio reductio calculatio) esure correct trasfer of data ad reportig of emissio reductios ad are ecessary QA/QC processes i place? I case oly partial data are available because activity levels or o-activity review of ER calculatio sheet /03/ Yes, the data maagemet esures correct trasfer of data ad reportig of emissio reductios ad all ecessary QA/QC processes are i place. NA. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 27

28 parameters have ot bee moitored i accordace with the registered moitorig pla, has the most coservative assumptio theoretically possible bee applied or has a request for deviatio bee approved? Moitorig Parameter Requiremet Assessmet/ Observatio by the DOE Data / Parameter: (as i moitorig pla of CPA-DD/01,/02/): Adjustmet factor for cotiued use of traditioal stoves Measurig frequecy/time Iterval: Yearly Reported Value For calculatig the above values a usage survey was carried out o 55 samples which were picked out from populatio size of 3044 ICS. The details of sample size determiatio for usage survey & ad how DOE verified this value, is detailed i sectio 3.3 above Durig the visit to these 19 households DOE could cofirm the followig Total No. of ICS User 19 Visited Total Nos. of ICS Verified 19 Exclusive user of ICS havig o 15 covetioal stove User of Additioal Covetioal 04 stove Family size of Household where 18 Additioal Covetioal stoves 06 are used As per CPA-DD B05/ page 17 If the household size is larger tha 04 (e.g. a small ICS for a household of 4 is used i a household of 8 together with a traditioal stove) the it ca be assumed that the ICS is beig fully utilized ad o adjustmet should be applied Hece DOE cofirms that the factor value of is coservative. Reportig frequecy: Is measurig ad reportig frequecy i accordace with the moitorig pla ad moitorig methodology? (Yes / No) Details of moitorig equipmet: Is accuracy of the moitorig equipmet as stated i the PDD? If the PDD does ot specify the accuracy of the moitorig equipmet, does the moitorig equipmet represet good moitorig practise? Calibratio frequecy /iterval: Is it moitorig methodology /CDM EB guidace / local or atioal stadards / maufacturers specificatio Yearly Yes, measurig ad reportig frequecy i accordace with the moitorig pla ad moitorig methodology There are o moitorig equipmets used for this parameter Not Applicable Not Applicable FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 28

29 Is the calibratio iterval i lie with the moitorig pla of the PDD? If the PDD does ot specify the frequecy of calibratio, does the selected frequecy represet good moitorig practise? Compay performig the calibratio(iteral or exteral calibratio): Did calibratio cofirm proper fuctioig of moitorig equipmet? (Yes / No): Is (are) calibratio(s) valid for the whole reportig period? If applicable, has the reported data bee cross-checked with other available data? How were the values i the moitorig report verified? Does the data maagemet (from data geeratio to emissio reductio calculatio) esure correct trasfer of data ad reportig of emissio reductios ad are ecessary QA/QC processes i place? I case oly partial data are available because activity levels or o-activity parameters have ot bee moitored i accordace with the registered moitorig pla, has the most coservative assumptio theoretically possible bee applied or has a request for deviatio bee approved? Not Applicable Not Applicable Not Applicable Not Applicable Yes, the reported data was cross checked through review of sales database /07/ ad review of ER calculatio sheet /03/ Values i the moitorig report were verified through iterview with household about usage of ICS durig OSV ad further checked through review of sales database /07/ ad review of ER calculatio sheet /03/ Yes, the data maagemet esures correct trasfer of data ad reportig of emissio reductios ad all ecessary QA/QC processes are i place. NA. Moitorig Parameter Requiremet Assessmet/ Observatio by the DOE Data / Parameter: L (i,j) Fractio - The fractio by which emissio (as i moitorig pla of CPA-DD/01,/02/): reductios are multiplied to obtai a assessmet adjusted for leakage risks Measurig frequecy/time Iterval: Default value as per methodology Reported Value 0.95 Reportig frequecy: Default value as per methodology Is measurig ad reportig frequecy i accordace with the moitorig pla ad moitorig methodology? (Yes / No) Details of moitorig equipmet: Not Applicable Is accuracy of the moitorig equipmet as Not Applicable stated i the PDD? If the PDD does ot specify the accuracy of the moitorig equipmet, does the moitorig equipmet represet good moitorig practise? Calibratio frequecy /iterval: Not Applicable Is it moitorig methodology /CDM EB guidace / local or atioal stadards / maufacturers specificatio Is the calibratio iterval i lie with the Not Applicable moitorig pla of the PDD? If the PDD does ot specify the frequecy of calibratio, does the selected frequecy represet good moitorig practise? Compay performig the calibratio(iteral Not Applicable or exteral calibratio): Did calibratio cofirm proper fuctioig of Not Applicable FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 29

30 moitorig equipmet? (Yes / No): Is (are) calibratio(s) valid for the whole reportig period? If applicable, has the reported data bee cross-checked with other available data? How were the values i the moitorig report verified? Does the data maagemet (from data geeratio to emissio reductio calculatio) esure correct trasfer of data ad reportig of emissio reductios ad are ecessary QA/QC processes i place? I case oly partial data are available because activity levels or o-activity parameters have ot bee moitored i accordace with the registered moitorig pla, has the most coservative assumptio theoretically possible bee applied or has a request for deviatio bee approved? Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Ex-Ate Parameters: Data / Parameter: Uit: Descriptio: NCV biomass TJ/toe Net calorific value of the o-reewable woody biomass that is substituted IPCC default for wood fuel Source of data: Value(s) applied): Purpose of data: Baselie emissio calculatio Data / Parameter: Uit: Descriptio: Source of data: EF projected-fossilfuel tco 2 /TJ Emissio factor for the substitutio of o-reewable woody biomass by similar cosumers. IPCC Value(s) applied): 81.6 Purpose of data: Baselie emissio calculatio Data / Parameter: Uit: Descriptio: Source of data: Value(s) applied): Purpose of data: C y,fueltype,regio,old toes/year Quatity of woody biomass used i the absece of the project activity i toes per type of ICS Survey of local usage o regioal level which could comprise a coutry Charcoal equivalet to 4.56 toes of wood/stove/year Baselie emissio calculatio Data / Parameter: Uit: Descriptio: η old,i Fractio Efficiecy of the baselie appliace beig replaced Source of data: Default value accordig to AMS-II.G Versio 03 Value(s) applied): 0.1 Purpose of data: Baselie emissio calculatio Additioal commet: Optio 2 from the PoA-DD has bee take to calculate B y,savigs FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 30

31 I summary, the verificatio team cofirms that all ex-post parameters are moitored i accordace with the approved moitorig pla ad applied methodology. The verificatio took cogizace of 240, 241 ad 242 of CDM Project Stadard /B01-2/ ad 260, 268 to 281 of VVS /B01/. 3.5 Moitorig resposibility Durig the OSV has the verificatio team checked the defied maagemet structure as idicated i the orgaisatio chart provided i the revised approved GS Passport & CPA- DD /B05/ ICSEA ad the ILF team has implemeted a system of crosschecks to esure data quality. There was a separatio of roles for every step of the data geeratio, aggregatio ad recordig, calculatio ad reportig betwee those who were resposible ad those who were cotrollig the respective step, at both the CPA ad at the CME level. The ILF team is resposible for sortig out Sales Agreemets/Logbooks, filterig those with icomplete or icorrect data, eterig the data of those correctly completed ito the sales record Excel database, flaggig ay duplicates, ad updated databases are set to CME s Office i Kampala. The Sales data for ICS is received at CME s Office i Kampala from CPA Implemeter i Hard copies of warraty card as well as sales cotract. The data received i electroic form is agai reviewed by CME for esurig its correctess. Wherever the samples for picked for efficiecy determiatio Sales agreemet ad log books were ameded.. Verificatio team evaluated the maagemet systems i place to implemet the moitorig of the project activity. This icluded the orgaizatioal structure, roles ad resposibilities, data collectio, trasfer ad aggregatio procedures, traiig of persoel, data storage ad archivig ad emergecy procedures for the moitorig system. O the basis of osite iterview with the employee of ICSEA Ltd ad ILF ivolved i the project moitorig ad data collectio, ispectio of data storage logbooks & equipmet s ad documet review. Carbo Check ca cofirm that the resposibilities ad authorities for moitorig ad reportig are appropriate ad effective for the project type ad hece i accordace with moitorig pla of the registered PoA-DD ad applied moitorig methodology Accuracy of equipmet There is o particular moitorig equipmet uder purview of PP for moitorig of this project type, hece assessmet of accuracy ad calibratio of the moitorig equipmet is ot applicable. Moreover, for carryig out WBT moitorig equipmet have bee used which are located at the idepedet 3 rd party laboratories cotracted by the PP The details of equipmet used, alog with their accuracy ad calibratio status /17/ is provided i Sectio 3.5 of this report. I summary, the verificatio team is able to verify the accuracy the moitorig equipmet s used i carryig out WBT. Furthermore, the verificatio team cofirms that all the moitorig equipmet used for carryig out the WBT were calibrated o the day of carryig out the test /17/. 3.6 Deviatio from ad/or Revisio of the registered moitorig pla This is the 1 st periodic verificatio of registered GS project ad after a thorough assessmet durig documets review, osite visit ad iterview with the local stakeholders (HHs/ed users) it ca be cocluded that there has ot bee ay deviatio ad/or revisio of the registered moitorig pla. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 31

32 3.7 Assessmet of data ad calculatio of greehouse gas emissio (compliace of 319 d (iii) ad (i) of VVS) reductios The Project Propoet has submitted the spreadsheet showig the detailed calculatio of emissio reductio for CPA 01 i.e., Iteratioal Lifelie Fud Ugada (ILFUg1). The Project Propoet submitted all the relevat data ad parameters required to be moitored to the verificatio team alog with the moitorig report. All the parameters required to moitored are as per the registered PoA-DD/CPA-DD /B05/ have bee moitored ad reported i the moitorig report. CCL reviewed the calculatio worksheet /03/ for the emissio reductio calculatio for the moitorig period 15/09/2012 to 14/03/2013. CCL cofirms that the formulas, coversios, aggregatios ad factors are cosistet with the moitorig pla i the registered PoA-DD ad CPA-DD /B05/. The reported data was checked as follows: All the ecessary data ad all the parameters required to be moitored i the registered P0A-DD ad CPA-DD /B05/ were reviewed to esure accuracy; The Project Sales Database kept electroically /07/ was reviewed alog with a iterview with the perso resposible for data etry ad data review from the ILF, to cofirm the umber of stoves sold durig the moitorig period. Sample sales ivoices ad warraty card /07/ were also assessed for further check Baselie emissios The equatios for baselie emissios as provided i the moitorig report/01/ ad cofirmed with the registered CPA-DD/B04/ ad the methodology AMS-II.G, versio 03/B02/ are: ER y = B y,savigs * f NRB,y * NCV biomass *EF projected_fossilfuel Where: ER y = Emissio reductios durig the year y i tco 2 e B y, savigs = Quatity of woody biomass that is saved per stove per aum i toes. The formula for calculatig this is: B old *(1- η old / η ew ) f NRB,y = Fractio of woody biomass saved by the project activity i the year y that ca be established as o-reewable biomass NCV biomass = Net calorific value of the o-reewable woody biomass that is substituted EF projected_fossilfuel = Emissio factor for the substitutio of o-reewable woody biomass by similar cosumers. B old Quatity of woody biomass used i the absece of the project activity i toes per model ad cohort of ICS η old = Efficiecy of the baselie system/s beig replaced η ew Efficiecy of the system beig deployed as part do the project activity Project emissios There are o project emissios idetified i the moitorig methodology /B03/ or CPA-DD /B05/ Leakage emissios As idetified i the moitorig methodology /B03/, CPA-DD /B05/ ad MR /01/, leakage emissios are accouted by multiplyig the ER y by L y (Leakage, et to gross adjustmet factor). Verificatio team cofirms that all parameters are used correctly i the calculatios, all results are verifiable ad trasparet, all assumptios are described ad based o verifiable evidece ad calculatios are doe i accordace with the pre-defied formulae from registered CPA-DD /B05/. The total umber of CERs achieved durig the moitorig period is 4,052 tco 2 e. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 32

33 3.8 Assessmet of actual emissio reductios with the estimate emissio reductios i CPA-DD Estimated Emissio Reductio as per Registered (icluded)/approved CPA DD: Actual Emissio Reductio for the Moitorig Period Has ay icrease of CER s occurred? Reaso for Icrease of CER s 11,526tCO 2 e Pro-rata for the first Year for the first Moitorig Period of 181 days (15/09/ /03/2013 iclusive) 4,052 tco 2 e No NA The verificatio took cogizace of 244 & 245 of CDM Project Stadard /B01/ ad 263 (c) of VVS /B01/. I summary, the verificatio team cofirms that actual emissio reductio is lower tha the estimate of the approved CPA-DD for the curret moitorig period. 3.9 Compliace with the sustaiability moitorig pla Sustaiability moitorig pla i the GS passport /B05/ is completely followed by the PP ad the same is followed i the Moitorig report. No chages are foud from the sustaiabilitymoitorig pla of GS passport /B05/. The same was assessed ad verified by the verificatio team durig o site visit, iterview with the local stake holders ad persoel of CME ad CPA implemeter who iteracted with the local people before ad after implemetatio of the project for baselie ad project field survey ad WBTs. All the o-eutral idicators are moitored ad verified by the verificatio team which were foud to be i lie with osite observatio fidig ad also the survey report (co2balace) /03/ Based o above, CCL cofirms that, all mitigatios measures bee put i place to prevet the violatio of the do o harm assessmet the way of moitorig has bee followed appropriately. As per do o harm assessmet, followig project project-specific risks are idetified by PP: Project specific risks idetified based o Assessmet by DOE Do No Harm Assessmet i GS Passport /XX/ Compliace to Health ad Safety guidelies Durig osite visit /18/, DOE visited the maufacturig uit ad iteracted with persoel egaged i maufacturig of the stoves. Most of the operatios are maual. There are o machies ivolved i maufacturig. The maufacturig staffs are provided with adequate protective gear /18/,. The compay has a adequately equipped First aid Box available /18/,. i the maufacturig area. A compliace report has bee submitted by ILF /14/ that o major icidet related to health ad safety has Sexual harassmet occurred sice iceptio of the CPA. A compliace report 14/ has bee submitted by ILF that o icidet related to sexual harassmet has occurred sice iceptio of the CPA. Fraud ad cheatig DOE has verified the employmet records /09/ of the employees ad foud to be maitaied i correct order. There exist a formal cotract /09/ detailig the terms of employmets ad paymets. DOE verified this with the sample cotracts for Molder FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 33

34 Quality of ICS /Tismith ad Packer. ILF also maitais a list of vedors /09/ sellig the stoves. Persoel are adequately traied ad their traiig records are maitaied. Each stove is factory ispected before it reaches user ed. To moitor the quality of stoves CME has picked samples a total of 64 ICS (32 for 1 year old stoves ad 32 from 2 year stoves) at radom ad tested by idepedet accredited laboratories /08/: Chemiphar; Ugada Natioal Bureau of Stadards; Cetre for Research i Eergy ad Eergy Coservatio (CREEC), (Makerere Uiversity). The objective of testig was to determie how the ICS operate uder field workig coditios ad how efficiet they remai after i use for 01 to 02 years. I additio ILF has a maiteace strategy /13/ where it repairs ay faulty stoves received at their premises Moitorig of Gold Stadard Sustaiability Idicators The moitorig pla for sustaiability idicators as referred i the Gold Stadard Passport /B05/ (10/03/2014) ad moitorig report (versio,02 21/05/2014). Is asuder Idicator Moitorig Source Variables, Uit ad Frequecy of measuremet Air Quality Usage Survey Visible reductio i smoke/soot. Access to affordable ad clea eergy services Usage Survey Frequecy of measuremet: Bieial The icreased sale of cleaer ad improved efficiecy cook-stoves, Frequecy of measuremet: Bieial Assessmet by DOE This parameter is moitored through the usage surveys. CME coducted the survey of 52 households users ad 96% of them felt that the air quality has improved. DOE while cross checkig picked up 19 samples ad i all the cases the stove user cofirmed the improvemet of ambiet air quality durig their iterviews /18/, Coclusio:- The value of 96% determied durig usage survey stads verified by DOE DOE cross checked this iformatio durig iterviewig the stove users /18/,. DOE team could cofirm with iterviews of ICS that households are spedig much less tha before o buyig charcoal. O a estimated basis oe household havig a family of 5 members speds aroud Ugada Shilligs (Approximate 12 USD) for a bag of charcoal, which lasts FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 34

35 Qualitative employmet ad icome geeratio Employmet records of CPA Number of ew jobs created as a result of project activity for aroud 2 moths. This is much less tha what the household used to sped ( aroud 50,000 Ugada shilligs for oe ad a half bag lastig over a 2 moth period, as foud durig iterviews with households/ 18/ Coclusio: The value of 96% of users reported usig less charcoal, ad 81% reported spedig less o charcoal. determied durig usage survey stads verified by DOE There is icreased umber of employees ad other persos like vedors egaged i CPA as well as. CPA have icreased mapower by aroud 1 persos The mapower is deployed for moitorig ad carryig out surveys & ihouse efficiecy. Testig of stoves. DOE have cofirmed this by reviewig employmet records/ 09/ ad foud to be maitaied i correct order. There exist a formal cotracts /09/ & /18/ detailig the terms of employmets ad paymets. DOE verified this with the sample cotracts for Molder /Tismith ad Packer /09/, ILF also maitais a list of vedors /09/ sellig the stoves. Persoel are adequately traied ad their traiig records are maitaied Coclusio:- The DOE cofirms that project is creatig ew quality jobs ad project has a potetial to icrease icome. Evirometal Protectio Clay Extractio Evirometal Clearace ad coditios of clearace Records of clay removed. For the years Aual Ogoig ILF has a evirometal clearace /15/ dated 26/03/2014 issued by the Evirometal Office of Alebtog District of LIRA for extractio ad removal of clay from Alyec Village. DOE ameded its audit pla to visit the site of excavatio aroud 30 Km from Lira. O site iterviews ad FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 35

36 assessmet /18/ cofirms that excavatio is very modest ad the site is also visited by the local potteries ad brick makers for excavatio of clay. The evirometal clearace /15/ dated 26/03/14 i place has certai coditios to be complied ad which could t be verified durig curret verificatio.hece a FAR has bee raised so that the same ca be verified durig ext periodic verificatio. Forward Actio Request No.- 01 Followig actios as per Evirometal Clearace dated 26/04/2014 eeds to verified durig the ext verificatio a) A permit for the activity i the wetlad has to be obtaied i lie with the secod schedule the Natioal Eviromet regulatios. a) Evirometal Audit is carried out at the ed of b) Esure Evirometal coservatio through establishmet of ursery i April 2014 Project Specific Risk Fraud ad Cheatig Project Specific Risk ICS Quality Detectio of fake stove Sales :- Agreemet/Lo gbooks by CPA vedors.sales Records Sales Agreemets Warraty Cards Thermal efficiecy. Water Boilig Tests o radom samples take from ed users for the moitorig purpose. At the ed of each moitorig period DOE has cross checked with the sales records, sales agreemets /07/ ad cotracts that it exists for every sale. A record of all sales are maitaied at CME as well as CPA Levels. DOE could cofirm through this radom samplig of sales records. /07/ Each stove is factory ispected before it reaches ed user. To moitor the quality of stoves CME has picked a total of a total of 64 samples at radom ad tested by ICSEA s FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 36

37 idepedet accredited laboratories. /08/,. Labour stadards- Compliace with health ad safety Guidelies Labor Stadard Sexual Harassmet ILF maagemet checks compliace with the parameter o a o-goig basis, ILF reports set to CME Moitorig Maager. ILF provides quarterly ad aual compliace reports to CME As icidets arise, ad as summarised at the ed of each moitorig period The objective of testig was to determie how the stoves operate uder field workig coditios ad how efficiet they remai after i use for 01/02 years. I additio ILF has a maiteace strategy where it repairs ay of the stoves received at their premises. The records for the same are maitaied at CPA level DOE visited the Maufacturig uit ad iteracted with persoel egaged i maufacturig of the stoves. Most of the operatios are maual. There are o machies ivolved i maufacturig /18/,. The maufacturig staff are provided with adequate protective gear /18/,. The compay has a adequately equipped First aid Box /18/ available i the maufacturig area.a compliace report /14/, has bee submitted by ILF that o major icidet related to health ad safety have occurred sice iceptio of the CPA. A compliace report /14/, has bee submitted by ILF that o icidet related to sexual Harassmet have occurred sice iceptio of the CPA 3.11 Quality ad Maagemet System Assurace The project s maagemet system was reviewed to determie the effectiveess of its implemetatio. The moitorig pla has clearly prescribed the maagemet ad operatioal procedures for moitorig, recordig, data maagemet, ad traiig i accordace with the registered PoA-DD ad CPA-DD /B05/. CCL verified the same through documet reviews ad site visit iterviews the maagemet system ad quality assurace procedures ad has foud them to be appropriate ad effective. The verificatio team cofirms that the maagemet system of the project is i place with the resposibilities properly idetified. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 37

38 APPENDIX A CARBON CHECK Certificatio statemet for the Verificatio Report (Compliace of 321 of VVS) CCL177/ICSEA/ Carbo Check (Pty) Ltd., (DOE) has performed the 1 st periodic verificatio of first CPA registered with the GS- PoA Improved Cook Stoves for East Africa with GS referece umber GS973. CPA uder verificatio is Iteratioal Life Lie Fud (ILFUG1) with GS referece umber GS2518 i Ugada. The project activity is desiged to geerate emissio reductios by dissemiatio ad use of efficiet cook stoves, which miimises the fuel wood cosumptio ad hece resultig i social beefits such as moey savigs, time savig ad health beefits etc. The project participats are resposible for the collectio of data i accordace with the moitorig pla ad the reportig of GHG emissios reductios from the project. It is DOE s resposibility to express a idepedet verificatio statemet o the reported GHG emissio reductios from the project. The verificatio is carried out i-lie with the VVS (versio07.0) & Gold stadard (Versio 2.1) requiremets. The verificatio was performed to idetify the compliace of the compoet project activity with implemetatio ad moitorig requiremets, ad to verify the actual amout of achieved emissio reductios, through obtaiig evidece ad iformatio o-site that icluded i) checkig whether the provisios of the moitorig methodology ad the moitorig pla were cosistetly ad appropriately applied ad ii) the collectio of evidece supportig the reported data. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 38

39 This statemet covers verificatio period of 181 days betwee 15/09/2012 ad 14/03/2013. The DOE has raised 03 clarificatio ad 04 corrective actio requests, all of which have bee successfully resolved by PP. 01 Forward Actio Request has also bee raised ad shall be addressed ad verified durig the ext periodic verificatio. The DOE cosiders it ecessary to give reasoable assurace that reported GHG emissio reductios were calculated correctly o the basis of the approved baselie ad moitorig methodology ad the moitorig pla cotaied i the registered PoA-DD & CPA-DD are fairly stated. The DOE, hereby certifies that the project activity, achieved emissio reductios by sources of GHG equal to 4,052 tco 2 equivalet ad all moitorig requiremets have bee fulfilled ad is substatiated by a audit trail that cotais evidece ad records. Carbo Check is of the opiio that the project activity is i lie with the priciples of Gold Stadard ad certifies 4,052 tco 2 e emissio reductios. 2014/07/ /07/ /07/17 Adam Simcock CEO Carbo Check (Pty) Ltd Amit Aad Techical Reviewer Carbo Check (Pty) Ltd Suil Kathuria Team Leader Carbo Check (Pty) Ltd FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 39

40 APPENDIX B Photographic Evidece Referece umber: Name of Parameter: Name of equipmet: Date: 26/03/2013 to 29/03/2014 Baselie Project FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 40

41 APPENDIX C Carbo Check CDM Verificatio Protocol Improved Cook Stoves for East Africa (ICSEA) To Report No. CCL177/ICSEA/ FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 41

42 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 1. Project implemetatio 1.1 Have all physical features proposed i the registered POA- DD & CPA-DD bee implemeted at the project site? 184 of CDM Project Stadard ad 225 (a), 226 (a) ad 227 (a) of VVS versio 05. /01/,/05/ /B01//B02/,,/B03/ The ILF Okelo Kuc brad of portable domestic charcoal ICS is 100% locally maufactured i Ugada i various sizes (small, medium, large ad extra large). ILF is also resposible for the marketig, distributio, sales ad after sales services provided to the households. A total of 3044 stoves have bee sold durig the moitorig period. 7 MoV = Meas of Verificatio, DR = Documet Review, I = Iterview, www = iteret search. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 42

43 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 1.2 Has the project activity bee operated i accordace with the project sceario described i the registered POA-DD & CPA-DD ad relevat guidace? Referece: 75 ad 185 of CDM Project Stadard ad 225 (a), 226 (a) ad 227 (b), (c) of VVS versio 05. /01/,/05/, /07/ /B01/,/B02/,/B03/ The CPA implemeter ad its supply chai are resposible for the sale ad after-sales service of the Okelo Kuc ICS ad ay arragemets for the distributio of carbo reveues. The operatio of the ICS is carried out by the ICS user, while traiig or istructios o how to operate ad care for the ICS are provided by the CPA 1.3 If the project activity is implemeted o a umber of differet locatios, has the Moitorig report provided the verifiable startig dates for each site? 188of CDM Project Stadard ad 227 (a) of VVS versio 05. /01/,/05/ /B01/,B02/, /B03/ Project activity is implemeted i LIRA district of Ugada Oly. The primary divisios of LIRA district are Cetral, Adyel, Ojwia, Adekokwok where stoves have bee sold stoves have bee sold durig the period FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 43

44 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 1.4 Is the diagram provided of the project layout (icludig a diagram of the project boudary ad the labellig ad locatio of each meter ad other equipmet) icluded ad cosistet with what was foud at site? Is the descriptio i the MR cosistet with the registered POA- DD & CPA-DD? /01/,/05/ /B01/,/B02/, /B03/ Locatio of stoves is icluded ad cosistet with what was foud at site i LIRA district. The primary divisios of LIRA district are Cetral, Adyel, Ojwia, Adekokwok where stoves have bee sold. 1.5 Is the start date of moitorig period cosistet? /01/,/05/ /B01/,/B02/, /B03/,/B05/ Yes the start date of Moitorig period 15/09/2012 is cosistet ad after the registratio of POA i.e. 17/08/2012 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 44

45 Carbo Check s Checklist questio 1.6 Is the moitorig report cosistetly filled with respect to all sectios as required by its guidelie of fillig the moitorig report? Ref. /01/,/05/ /B01/,/B02/, /B04/ MoV 7 Fidigs, commets, refereces, data sources Corrective Actio Request No.01 The F-CDM-MR is ot filled i lie with Guidelies for completig Moitorig Report Form versio 03.2 EB 66 Aex-20. Please follow the complete guidace. Few issues are poited below a) Duratio of the moitorig period should idicate that if first ad last day are icluded. b) Format has bee altered to iclude Appedix 1 c) The descriptio of the istalled techology, techical process & equipmets icludig diagrams are ot described. It is ot clear if there oly oe type of stove or we have commercial uses also i the sectio B.1 of the web hosted moitorig report. How the usage has bee determied? d) A map of the area where CPA is implemeted to be icluded. e) Sectio D3 o Samplig Pla is ot i lie with the above guidace The F-CDM-MR has bee corrected to iclude above. Draft coclusio CAR-01 Fial coclusio 1.7 Does the CER s obtaied for the moitorig period withi the limit of estimate i the registered POA-DD & CPA-DD? Is the claimed CER s justifiable? /01/,/05/ /B01/,/B02/, /B03/ CER s obtaied for the six moths moitorig period are 4,052 CO 2 e toes of agaist estimates of CO 2 e ( Full Year 23,244 ) CO 2 e lower tha the estimate i the registered POA-DD & CPA-DD 1.8 Is the moitorig system provided i lie diagrams showig all relevat moitorig poits? /01/,/05/ /B01/,/B02/, /B03/ Not applicable to this type of project FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 45

46 Carbo Check s Checklist questio 2. Moitorig pla ad methodology 2.1 Is the moitorig pla established i accordace with the moitorig methodology? 186 of CDM Project Stadard ad 229 of VVS versio 05. Ref. /01/,/05/ /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio Moitorig Pla is established i lie with the POA-DD 2.2 I case the implemeted moitorig pla defers from the moitorig methodology, has ay requests for revisio to or deviatio from the moitorig methodology bee officially commuicated to the CDM EB? 193 of CDM Project Stadard ad 251 of VVS versio 05. Deviatios are required to be approved by the /01/,/05/ /B01/,/B02/, /B03/ Moitorig pla is as per POA-DD ad Methodology AMS IIG versio 03 ad o revisio is required. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 46

47 Carbo Check s Checklist questio UNFCCC. Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio Have the above chages to the moitorig pla bee approved by the CDM EB? 3. Moitorig ad the moitorig pla 3.1 Is moitorig established i full compliace with the moitorig pla, cotaied i the registered POA-DD & CPA-DD/01,/02/ (or ew moitorig pla approved by the CDM EB)? 191of CDM Project Stadard ad 233 of VVS versio 05. /01/,/05/ /B01/,/B02/, /B03/ /01/,/05/, /07/,/08/ /B01/,/B02/, /B03/ See above i 2.2 No Moitorig is ot established i full compliace with the moitorig pla, cotaied i the registered POA-DD & CPA-DD/01,/02/ See below i sectio 4.1 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 47

48 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 3.2 Are all baselie emissio parameters moitored ad updated i accordace with moitorig pla, moitorig methodology ad relevat CDM EB decisios? Are there ay differeces betwee the methodology ad the moitorig pla i the registered POA-DD & CPA-DD? /01/,/05/, /07/,/08/ /B01/,/B02/, /B03/ The methodology does ot specify the baselie emissio parameter but calculates emissio reductio through savig i quatity of woody biomass by calculatig efficiecy of the ICS Was the moitorig equipmet for baselie emissio parameters cotrolled ad moitorig results recorded as per approved frequecy? /01/,/05/, /07/,/08/ /B01/,/B02/, /B03/ Not applicable see above i sectio 3.2 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 48

49 Carbo Check s Checklist questio Was the moitorig equipmet for baselie emissio parameters calibrated i accordace with QA&QC procedures described i the registered moitorig pla? Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Not applicable see above i sectio 3.2 Fial coclusio 3.3 Are all project emissio parameters moitored ad updated i accordace with moitorig pla, moitorig methodology ad relevat CDM EB decisios? /01/,/05/, /07/,/08/ /B01/,/B02/, /B03/ The methodology does ot specify the project emissio parameter but calculates emissio reductio through savig i quatity of woody biomass by calculatig efficiecy of the ICS Was the moitorig equipmet for project emissio parameters cotrolled ad moitorig results recorded as per approved frequecy? /01/,/05/, /07/,/08/ /B01/,/B02/, /B03/ Not applicable see above i sectio 3.3 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 49

50 Carbo Check s Checklist questio Was the moitorig equipmet for project emissio parameters calibrated i accordace with QA&QC procedures described i the registered moitorig pla? 3.4 Are all leakage emissio parameters moitored ad updated i accordace with moitorig pla, moitorig methodology ad relevat CDM EB decisios? Was the moitorig equipmet for leakage emissio parameters cotrolled ad moitorig results recorded as per approved frequecy? Ref. /01//07/,/08/ /B01/,/B02/, /B03/ /1/,/03/, /B01/,/B02/, /B03/ /1/,/03/, /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Not applicable see above i sectio 3.3 The project accouts for leakage by multiplyig B old by adjustmet factor of as per methodology AMS IIG versio 03 paragraph 13 See above i 3.4 Fial coclusio FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 50

51 Carbo Check s Checklist questio Was the moitorig equipmet for leakage emissio parameters calibrated i accordace with QA&QC procedures described i the registered moitorig pla? Ref. /1/,/03/, /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources Draft coclusio See above i 3.4 Fial coclusio 3.5 Were all moitorig parameters available ad verifiable through the whole moitorig period? /1/,/03/, /B01/,/B02/, /B03/ Yes the moitorig parameters were available ad verifiable through the whole moitorig period however there are clarificatios Clarificatio request-01 It is ot clear i the F-CDM-MR i. How moitorig has esured that the replaced low efficiecy appliaces are disposed off ad are ot used withi the boudary or withi the regio. ii. If baselie stoves are cotiued to be used, the how wood fuel cosumptio of those stoves is excluded from calculatios as stated i CPA-DD/01,/02/. CL-01 The above has bee clarified i the Revised MR ad CER calculatio spreadsheet I case, oly partial moitorig data is available ad PP(s) provide estimatios or assumptios for the rest of data, was it possible to verify those estimatios ad /1/,/03/, /B01/,/B02/, /B03/ Moitorig of usage is based o samplig however. F-CDM-MR does ot clearly explai how sample size was calculated. Hece a CAR is raised. Corrective Actio Request-02 It is ot clearly explaied i the Moitorig report a) How radom samplig has bee carried out ad how it complies with the requiremets stated i POA-DD & CPA-DD/01,/02/. Please describe the complete procedure justifyig, how the samples CAR-02 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 51

52 Carbo Check s Checklist questio assumptios? Ref. MoV 7 Fidigs, commets, refereces, data sources represet the complete populatio of stoves. b) Please also clearly explai how the sample size of 55 cook stoves for usage survey ad sample size for efficiecy determiatio (30 each for 1 / 2 years old) has bee determied The MR ad Spreadsheet has bee revised to iclude above Draft coclusio Fial coclusio 3.6 Was maagemet ad operatio system established ad operated i accordace with the moitorig pla? /1/,/03/, /B01/,/B02/, /B03/ Yes there is a robust maagemet ad operatio system with CME which receives all records from the CPA implemeter i Hard as well as electroic records. 3.7 Was is it possible to verify that ivolved maagemet ad operatio persoel is fully aware of the resposibilities ad perform all operatios accordig to the registered moitorig pla ad iterally developed mauals? /1/,/03/, /B01/,/B02/, /B03/ Yes the maagemet ad operatio persoel are fully aware of the resposibilities ad perform all operatios accordig to the registered moitorig pla. 3.8 Does the moitorig system provide orgaizatioal structure, role ad resposibilities, emergecy procedures? Yes,the moitorig system does provide orgaizatioal structure, role ad resposibilities are clearly defied ad data maagemet systems are quite robust. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 52

53 Carbo Check s Checklist questio 3.9 Have ay ucertaities idetified beig addressed? Ref. /1/,/03/, /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources There are o ucertaities addressed i the MR Draft coclusio Fial coclusio 4. Parameters 4.1 Moitored parameter Title: η ew,(i,j) Idicatio: Adjusted average efficiecy of the ICS Okelo Kuc beig deployed as part of the project activity. Uits: % Estimated (ex-ate): value Measured value (ex-post): 41 for 1-year old ICS 37 for 2-year old ICS /1/,/03/,/08/, /11/ /B01/,/B02/, /B03/ Corrective Actio Request No.-03 The moitorig report does ot give ay procedural details o ICSEA WBT. Please correct explaiig clearly a) How the Water Boilig tests performed by three laboratories were cosistet with each other. b) How the values of 41% ad 37% for 1year ad 2 year old stoves have bee determied. The calculatios for the same must be show i the CER calculatios spreadsheet. c) The value of ηew,(i,j) i the CPA-DDis show as fractio while i the moitorig report as % d) Why the value i the MR grossly differs with the value of 35.08%.assumed i CPA-DD e) Please submit the test report summary issued by all the three laboratories of the samples tested by each oe respectively idicatig the followig I. Method used for coductig the WBT II. The Measurig /moitorig Equipmet used i carryig out WBT III. Calibratio status of the Measurig /moitorig equipmet used i carryig out WBT The Moitorig report has bee revised to iclude above details CAR-03 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 53

54 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio Title: f NRB,y Idicatio: Fractio of woody biomass saved by the project activity i the year y that ca be established as o-reewable biomass. Uits: Fractio Estimated (ex-ate): Measured (ex-post): value value /1/,/03/,/11/ /B01/,/B02/, /B03/ Clarificatio Request No.-02 It is ot clearly explaied ad demostrated. Please Clarify a) How the value of Fractio of woody biomass saved by the project activity i the year y has bee aually updated, as the value 91.5% is based o 2010 data. b) If the aual updatig is ot carried out the why default value for Ugada as per EB 67 Aex 22 has ot bee used c) How the spreadsheet _UCB_HH_KPT_Data_Etry_Sheet_Charcoal_ad_Woo d_fial (HH kitche survey data) has bee used i calculatig Emissio reductios The Clarificatios have bee built i MR CL-02 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 54

55 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio Title: t fractio,(i,j) Idicatio: Fractio of the days i use i year y of a sigle ICS deployed. Uits: Fractio of 365 Days Estimated value (ex-ate): Measured value (expost): ).915 /1/,/03/, /B01/,/B02/, /B03/ Start date of the creditig period is 15 th September 2012 ad last date of this moitorig period is 14 th March 2013 This parameter is calculated as uder a) For stoves commissioed betwee start date of validatio & 14 th September 2012 the fractio is determied by fidig the umber of creditig days betwee two dates 14 th September 2012 & 14 th March 2013 ( iclusive of both days) This is calculated as 182 days ad the fractio is 182/365=0.499 b) For stoves commissioed later tha 14 th September the umber of creditig days are calculated for each stove by subtractig date of commissioig from Last day of moitorig period. However icosistecies have bee observed i calculatio of days for stoves havig the same date of commissioig Clarificatio request No-03 I the spreadsheet CPA CER Calculatio icosistecies are observed i the umber of creditig days eve though the date of commissioig remais the same e.g. stove # & Please check the correctess of creditig days for etire spreadsheet. CL-03 Icosistecies have bee removed i the revised spreadsheet FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 55

56 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio Title: U (i,j) Idicatio: The fractio by which emissio reductios are multiplied to obtai a adjustmet for drop off of ICS i use i the total populatio of ICS. Uits: Fractio of 365 Days. Estimated value (ex-ate): Measured value (ex-post): 0.95 /1/,/03/, /B01/,/B02/, /B03/ There exist a icosistecy betwee the values used i MR ad spreadsheet Please see 5.2 below CAR Default parameter Title: NCV biomass Idicatio: Net calorific value of the o- reewable woody biomass that is substituted Uits: TJ/toe Default/Used value: /1/,/03/, /B01/,/B02/, /B03/ Value of is used as per IPCC guidelies ad stated i methodology AMS IIG Versio 03. This is a default value to be used for wood fuel FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 56

57 Carbo Check s Checklist questio 4.2 Default parameter Title: EF projectedfossilfue l Idicatio: Emissio factor for the substitutio of oreewable woody biomass by similar cosumers. Uits: tco 2 /TJ Default/Used value: 81.6 Ref. /1/,/03/, /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio Emissio factor for the substitutio of o-reewable woody biomass by similar cosumers. DOE cofirms that the value of 81.6 tco2/tj3 is correctly applied as per the methodology. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 57

58 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 4.2 Default parameter Title: C y,fuelt ype,regi o,old Idicatio: Quatity of woody biomass used i the absece of the project activity i toes per type of ICS Uits: toes/year /1/,/03/, /B01/,/B02/, /B03/ Charcoal equivalet to toes of wood/stove/year. Is as per registered CPA-DD/01,/02/. Default/Used value: Charcoal equivalet to toes of wood/stove/year 4.2 Default parameter Title: η old,i Idicatio: Efficiecy of the baselie appliace beig replaced 0.1 Uits:Fractio Default/Used value: /1/,/03/, /B01/,/B02/, /B03/ As per methodology AMS IIG versio 03 a default value of 0.10 may be optioally used if the replaced system is a three stoe fire, or a covetioal system with o improved combustio air supply or flue gas vetilatio system, i.e. without a grate or a chimey;. DOE cofirmed durig iterviews ad home visits that a three stoe fire stove was used i baselie i all cases ad the replaced stove does ot have grate /chimey. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 58

59 Carbo Check s Checklist questio 4.2 Default parameter Title: L (i,j) Idicatio: The fractio by which emissio reductios are multiplied to obtai a assessmet adjusted for leakage risks Uits: Fractio Default/Used value: Calculatios 5.1 Have all the calculatios related to the baselie emissios bee carried accordig to the formulae ad methods described i the registered POA- DD & CPA- DD/01,/02/ ad applied methodology? 194 of CDM Project Stadard ad 244 of VVS versio 05. Ref. /1/,/03/, /B01/,/B02/, /B03/ /1/,/03/,/06/ /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources As per methodology AMS IIG versio 03 paragraph 23 for POA B old ca be multiplied a et to gross adjustmet factor of 0.95 to accout for leakages, i which case surveys are ot required. Draft coclusio Fial coclusio Equatio used for the calculatio of emissio reductios, i lie with AMS II. G., ver. 3: ER y = B. y,savigs f. NRB,y NCV. biomass EF projected-fossilfuel FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 59

60 Carbo Check s Checklist questio 5.2 Have all the calculatios related to the project emissios bee carried accordig to the formulae ad methods described i the registered POA- DD & CPA- DD/01,/02/ ad applied methodology? Ref. /1/,/03/, /B01/,/B02/, /B03/ MoV 7 Fidigs, commets, refereces, data sources Corrective Actio Request No.4 The spreadsheet CPA CER Calculatios is ot clearly uderstood. Please make it easy to uderstad ad also correct the followig. a) The symbols i cells B59 & B60 are icosistet with that used i MR as well as i the spreadsheet b) Icosistecy betwee values used for i MR ad spreadsheet e.g. U (i,j).please check all values. c) Ex Post summary tab is ot very clearly uderstood. Please make it easily to uderstad. No of stoves metioed i MR are 3044 while the spreadsheet shows the 4063 stoves as well as 2016 stoves d) The values of η ew & η old calculated are icorrect. Draft coclusio CAR-04 Fial coclusio Ok The spreadsheet has bee revised to remove descrepacies 5.3 Have all the calculatios related to the leakage emissios bee carried accordig to the formulae ad methods described i the registered POA- DD & CPA- DD/01,/02/ ad applied methodology? /1/,/03/, /B01/,/B02/, /B03/ There are o formula give for Leakage calculatios FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 60

61 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 6. Other 6.1 Are there ay issues from the previous validatio/verificatio? (ie FARs, requests/approvals for RMP) 6.2 Has the project ever received ay requests for reviews or icompletes from the UNFCCC. 7. Sustaiability Moitorig /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ NO there is o FAR from the previous validatio Ok Project has bee registered with both UNFCCC 7.1 Have all o-eutral idicators bee moitored as per the sustaiability moitorig pla? /01/,/B02/,/B05/ Yes the idicators have bee defied FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 61

62 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 7.2 Have the methods to moitor data chaged? Ad are they suitable to the project scale ad type? /01/,/B02/,/B05/ The moitorig activities are carried out by the CME team throughout the moitorig period, ad these icluded: DOE cofirmed this by carryig out checks o the basis of radom samplig of (i) (ii) (iii) cross-checkig that the iformatio filled out i the Warraty Cards ad/or Sales Agreemet/Log Books was authetic ad complete, ad that they correspoded to the data i the electroic sales database; How the commuicatio was made through phoe calls to radomly selected ICS buyers, to cross check the validity of the data collected; How radom visits to cofirm the validity of the data collected ad the ICS usage 7.3 Has the way of moitorig bee followed? With the iclusio of dates ad parameters? /01/,/B02/,/B05/,18 Yes Moitorig has bee implemeted through the surveys coducted durig August September 2013 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 62

63 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 7.4 Have mitigatio measures bee put i place to prevet the risk of the violatio of the safe guardig priciple of Do No Harm assessmet or to eutralise a Sustaiable Developmet Idicator that is beig moitored? /01/,,/09/,18 /10/,/B02/,/B05/ The project-specific risks are idetified as below Compliace to Health ad Safety guidelies:-doe visited the Maufacturig uit ad iteracted with persoel egaged i maufacturig of the stoves. Most of the operatios are maual. There are o machies ivolved i maufacturig. The maufacturig staff are provided with adequate protective gear. The compay has a adequately equipped First aid Box available i the maufacturig area.a compliace report has bee submitted by ILF that o major icidet related to health ad safety have occurred sice iceptio of the CPA. Sexual harassmet:- A compliace report has bee submitted by ILF that o major icidet related to sexual Harassmet have occurred sice iceptio of the CPA. Fraud ad cheatig: DOE has verified the employmet records of the employees ad foud to be maitaied i correct order. There exist a formal cotracts detailig the terms of employmets ad paymets. DOE verified this with the sample cotracts for Molder /Tismith ad Packer. ILF also maitais a list of vedors sellig the stoves. Persoel are adequately traied ad their traiig records are maitaied. Quality of ICS:- Each stove is factory ispected before it reaches user ed. To moitor the quality of stoves CME has picked a radopm sample of 64 ICS that were tested by ICSEA s idepedet accredited laboratories: Chemiphar (private etity), Ugada Natioal Bureau of Stadards (atioal body) ad the Cetre for Research i Eergy ad Eergy Coservatio - CREEC (Makerere Uiversity). The objective of testig was to determie how the ICS operate uder field workig coditios ad how efficiet they remai after i use for 01/02 years. I additio ILF has a maiteace strategy where it repairs ay of the stoves received at their premises. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 63

64 Carbo Check s Checklist questio Ref. 7.5 Has all the data i the Sustaiability developmet matrix bee verified ad cross checked agaist available sources of project data? Has it bee described how sustaiable developmet would be affected if a variace occurred? /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ MoV 7 Fidigs, commets, refereces, data sources CPA has defied the followig SD Idicators 1.Air Quality: - This parameter is moitored through the usage surveys. CME coducted the survey of 52 users ad 96% of them felt that the air quality has improved. DOE while cross checkig picked up 19 samples ad i 100% cases the stove user cofirmed the improvemet of ambiet air quality durig their iterviews 2.Access to affordable ad clea eergy services:- DOE cross checked this iformatio durig iterviewig the stove users of 19 Household. DOE team could cofirm with iterviews of ICS that households are spedig much less tha before o buyig charcoal. O a estimated basis oe household havig a family of 5 members speds aroud Ugada Shilligs (Approximate 12 USD) for a bag of charcoal which lasts for aroud 2 moths. This is much less tha what the household used to sped earlier. 3.Quatitative employmet ad icome geeratio:- There is icreased umber of employees at CPA level. The CPA has icreased mapower by 01 perso. ad. The mapower is deployed for moitorig ad carryig out stove trackig ad testig of stoves. DOE have cofirmed this by reviewig employmet records 4. Evirometal Protectio- Clay extractio: ILF has a evirometal clearace /15/ dated 26/03/2014 issued by the Evirometal Office of Alebtog District of LIRA for extractio ad removal of clay from Alyec Village. DOE ameded its audit pla to visit the site of excavatio aroud 30 Km from Lira. O site assessmet/20/ cofirms that excavatio is very modest ad the site is also visited by the local potteries ad brick makers for excavatio of clay The excavatio is very modest & ILF maitais the records of clay removed. Durig the years ILF received Draft coclusio Fial coclusio FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 64

65 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio. Year No. Of Trips Estimated CU Mt (3.36 CuMT/Trip) Cu. Mt Cu. mt 2014 ( till March 2014) Cu.mt This was cross checked with records ad estimated size of the most commo vehicle used for clay trasportatio. A FAR is raised to be verified durig the ext verificatio Forward Actio Request No.-01 Followig actios as per Evirometal Clearace dated 26/03/2014 eeds to verified durig the ext verificatio /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ c) A permit for the activity i the wetlad has to be obtaied i lie with the secod schedule the Natioal Eviromet regulatios. b) Evirometal Audit is carried out at the ed of d) Esure Evirometal coservatio through establishmet of ursery i April Project Specific Risk Fraud ad Cheatig FAR-1 DOE has cross checked with the sales records, sales agreemets /07/ ad cotracts that it exists for every sale. A record of all sales are maitaied at CME as well as CPA Levels. DOE could cofirm through this radom samplig of sales records. I regards to hirig employees DOE has verified the employmet records of the employees ad foud to be maitaied i correct order. There exist a formal cotracts detailig the terms of employmets ad paymets. DOE verified this with the sample cotracts for Molder /Tismith ad Packer. ILF also maitais a list of vedors sellig the stoves. Persoel are adequately traied ad their traiig records are maitaied FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 65

66 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 6. Project Specific Risk ICS Quality Each stove is factory ispected before it reaches user ed. To moitor the quality of stoves CME has picked samples a total of 64 ICS were at radom ad tested by ICSEA s idepedet accredited laboratories: Chemiphar (private etity), Ugada Natioal Bureau of Stadards (atioal body) ICS ad the Cetre for Research i Eergy ad Eergy Coservatio CREEC (Makerere Uiversity). The objective of testig was to determie how the operate uder field workig coditios ad how efficiet they remai after i use for 01/02 years. I additio ILF has a maiteace strategy where it repairs ay of the stoves received at their premises. 7. Labour stadards-compliace with health ad safety Guidelies Compliace to Health ad Safety guidelies:-doe visited the Maufacturig uit ad iteracted with persoel egaged i maufacturig of the stoves. Most of the operatios are maual. There are o machies ivolved i maufacturig. The maufacturig staff are provided with adequate protective gear. The compay has a adequately equipped First aid Box available i the maufacturig area.a compliace report has bee submitted by ILF that o major icidet related to health ad safety have occurred sice iceptio of the CPA. 8 Labour stadards-sexual harassmet A compliace report has bee submitted by ILF that o major icidet related to sexual Harassmet have occurred sice iceptio of the CPA. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 66

67 Carbo Check s Checklist questio Ref. MoV 7 Fidigs, commets, refereces, data sources Draft coclusio Fial coclusio 7. 6 Other Are there ay issues from the previous validatio/verificatio? (ie FARs, requests/approvals for RMP) /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ NO there is o FAR from the previous validatio Has the project ever received ay requests for reviews or icompletes from the UNFCCC or GS Secretariat? /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ Project has bee registered with both UNFCCC & GS The evaluatio of the status of mitigatio ad compesatio measures have bee verified. /01/,,/09/, /10/,/12/13/,/14/, /15//B02/,,/B05/ Evaluatio ad status of mitigatio measures is listed above FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 67

68 List of fidigs (compliace of 284 c ad g of VVS) Fidig (referece 1.6 sectio of table 1) CAR-01 Classificatio CAR CL FAR Descriptio of fidig (DOE) The F-CDM-MR is ot filled i lie with Guidelies for completig Moitorig Report Form versio 03.2 EB 66 Aex-20. Please follow the complete guidace. Few issues are poited below a) Duratio of the moitorig period should idicate that if first ad last day are icluded. b) Format has bee altered to iclude Appedix 1 c) The descriptio of the istalled techology, techical process & equipmets icludig diagrams are ot described i Is there oly oe type of stove or we have commercial uses also i the sectio B.1 of the web hosted moitorig report. How the usage have bee determied? d) A map of the area where CPA is implemeted to be icluded. e) Sectio D3 o Samplig Pla is ot i lie with the above guidace Corrective Actio #1 a) This has bee corrected i the F-CDM-MR (PP shall write a detailed ad clear corrective actio or further b) This has bee corrected i the F-CDM-MR iformatio for clarificatio as per fidig) c) The sectio has bee edited i the F-CDM-MR d) This has bee icluded i the F-CDM-MR e) This sectio has bee edited to be i lie with Guidelies for completig Moitorig Report Form versio 03.2 EB 66 Aex-20 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 68

69 Fidig (referece 1.6 sectio of table 1) DOE Assessmet #01 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. Corrective Actio #01 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #02 CAR-01 The MR has bee completed i Lie with EB 66 Aex 20. a) The moitorig period shows iclusio of first day ad last day ( Issue Closed) b) The alteratio to the format have bee removed ad ow format is as per F-CDM- MR versio 03.2 ( Issue Closed) c) This sectio still does ot trasparetly defie what type of stoves have bee istalled uder this CPA ad if ay of the stoves are used i Commercial area. Additioally it is ot clear why the mothly sales volumes of stoves ad other iformatio o page 8 of the CPA_DD has bee removed.(issue Pedig ) d) Map of the area has where CPA has bee icluded i the MR but the descriptio of the commuity i sectio A.2.c has bee icorrectly metioed as LIRA Tow (Issue Pedig ) e) Sectio D3 of the samplig pla still does ot iclude the followig 1) How the selected sample complies with the plas specified i POA-DD ad CPA-DD/01,/02/? 2) Iclude the calculatios of how sample size chose have bee calculated.(issue Pedig ) c) Sectio A A.1(b) describes that the Okelo Kuc stoves are solely for domestic use. A further commet has bee added ito Sectio D D.3(a) para. 4 that durig the moitorig usage survey oly domestic usage of the stoves was foud. No commercial; use of the stoves was foud. The iformatio o mothly sales volumes of stoves ad other iformatio o page 8 of the previous CDM Moitorig Report has bee reistated. d) The descriptio of the commuity i sectio A.2.c has bee corrected to Lira District. e) Sectio D3 (a) has bee edited to state how the selected samples comply with plas specified i the POA-DD ad the CPA-DD/01,/02/. The calculatios of how the sample sizes were chose are described i sheets Efficiecy Sample Calc 1yr Old, Efficiecy Sample Calc 2yr Old ad Stove Usage Sample Size Calc i the spreadsheet CPA CER Calculator for ILF v4 ow submitted. (a), (b) issue closed. c) Iformatio has bee provided trasparetly o usage ad quatity of stoves d) The descriptio has bee corrected. e) Sectio D3 of the samplig pla has bee revised to iclude how the selected sample size complies with the plas specified i POA-DD ad CPA-DD/01,/02/ FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 69

70 Fidig (referece 1.6 sectio of table 1) Coclusio Tick the appropriate checkbox CAR-01 To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed Fidig (referece sectio of table 1) CAR-02 Classificatio CAR CL FAR Descriptio of fidig (DOE) It is ot clearly explaied i the Moitorig report a) How radom samplig has bee carried out ad how it complies with the requiremets stated i POA-DD & CPA-DD. Please describe the complete procedure justifyig, how the samples represet the complete populatio of stoves. b) Please also clearly explai how the sample size of 55 cook stoves for usage survey ad sample size for efficiecy determiatio (32 each for 1 / 2 years old) has bee determied Corrective Actio #1 a) This has bee explaied i sectio C ad sectio D3 of the F-CDM-MR. Also see sheet (PP shall write a detailed ad clear corrective actio or further 5 ad 6 iformatio for clarificatio as per fidig) b) This has bee explaied i sectio C ad sectio D3 of the F-CDM-MR DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. a) The radom samplig approach ad how the same has bee carried out has bee adequately defied i the MR. IT is ow clear how the radom selectio of stoves were carried out.( Issue closed) b) It is still ot trasparetly defied i MR how the sample size of 55 ad 30 have bee calculated ad secodly, how they comply with the requiremet of samplig detailed i CPA-DD & POA-DD. I additio it is ot very trasparetly demostrated i the sample calculators how the choice of 30 samples meets the criteria of samplig laid i CPA-DD FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 70

71 Fidig (referece sectio of table 1) Corrective Actio #2 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) CAR-02 b) Sectio D3 (a) of the MR has bee edited for further trasparecy to state how the selected samples comply with plas specified i the POA-DD ad the CPA-DD. The calculatios of how the sample sizes were chose are described i sheets Efficiecy Sample Calc 1yr Old, Efficiecy Sample Calc 2yr Old ad Stove Usage Sample Size Calc i the spreadsheet CPA CER Calculator for ILF v4 ow submitted. These sheets have bee reamed for further clarity. DOE Assessmet #2 a) Issue closed. b) MR still does ot explai how the sample size of 55 ad 30 have bee calculated ad explai, how they comply with the requiremet of samplig detailed i CPA- DD/ & POA-DD. Corrective Actio #3 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #3 Coclusio Tick the appropriate checkbox b) Sectio D3 (a) of the MR has bee further edited to explai how the respective sample sizes were calculated ad how they comply with the requiremet of samplig described i the CPA-DD ad POA-DD. a) Issue closed b) MR has bee revised to iclude the methodology of sample size calculatio To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 71

72 Fidig (referece 4.1 sectio of table 1) CAR-03 Classificatio CAR CL FAR Descriptio of fidig (DOE) The moitorig report does ot give ay procedural details o ICSEA WBT. Please correct explaiig clearly Corrective Actio or clarificatio #1 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) f) How the Water Boilig tests performed by three laboratories were cosistet with each other. g) How the values of 41% ad 37% for 1year ad 2 year old stoves have bee determied. The calculatios for the same must be show i the CER calculatios spreadsheet. h) The value of ηew,(i,j) i the CPA-DD/01,/02/ is show as fractio while i the moitorig report as % i) Why the value i the MR grossly differs with the value assumed i CPA-DD/01,/02/ 35.08%. j) Please submit the test report summary issued by all the three laboratories of the samples tested by each oe respectively idicatig the followig I. Method used for coductig the WBT II. The Measurig /moitorig Equipmet used i carryig out WBT III. Calibratio status of the Measurig /moitorig Equipmet equipmet used i carryig out WBT a) This has bee explaied i sectio C of the F-CDM-MR ad results attached. b) This has bee explaied ad show o sheet 1 ad sheet 2 of the CPA CER Calculatio for ILF spread sheet c) This has bee corrected i sectio D of the F-CDM-MR d) The value i the CPA-DD/01,/02/ was the iitial ratig of the ICS to meet the 20% bechmark for ICS e) It has bee addressed. See sectio D of the F-CDM-MR. Also see sheet 1 ad sheet 2 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 72

73 Fidig (referece 4.1 sectio of table 1) DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. CAR-03 a) It is ot clear o what dates the tests for stoves were coducted by UNBS & CREEC. Additioally provide the test os. ad codes for each test. b) The sheets have bee provided i the CER Calculatios sheet, however Tabs have ot bee amed. Please provide a ame for each tab showig clear descriptio for what each sheet cotais. c) The value has bee corrected i the revised MR ( Issue closed) d) The respose is ot clear. Please justify givig reasos for such icrease i efficiecy. e) Sice there were three laboratories used for carryig out the WBT It is ot clear the details i sectio D of CPA-DD/01,/02/ pertais to which laboratory. MR should iclude calibratio details all the equipmets used by the three laboratories ad the copies of records of their Calibratio should be submitted as evidece. Additioally it should also detail the method of calculatio which is left blak. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 73

74 Fidig (referece 4.1 sectio of table 1) Corrective Actio #2 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) CAR-03 a) The exact dates o which the sampled stoves were tested at all the accredited laboratories have ow bee added ito the respective sheets Efficiecy tests 1yr old, Efficiecy tests 2yr old i the spreadsheet CPA CER Calculator for ILF v4. Oly the Chemiphar laboratory used a compay code umber for the test results. The other two laboratories used the referece of the respective stove serial umbers. b) The tabs i the sheet CPA CER Calculator for ILF v4 sheet have ow bee reamed with a clear descriptio for what each sheet cotais. d) The value i the CPA-DD/01,/02/ ex-ate calculatio was based o the iitial ratig of the ILF ICS udertake by Chemiphar i October 2011 (attached) o a sample of 4 stoves i accordace with the ICSEA Ratig Test protocol (as referred to i the ILF CPA- DD/01,/02/). This gave a figure of 35% for thermal efficiecy. I the MR, 1-year old stoves ad 2-year old stoves gave thermal efficiecy results of 43.9% ad 46.7% respectively. The apparet icrease i efficiecy is due to the small sample size used i the iitial Ratig Test compared to the larger ad more represetative samples used i the moitorig exercise, ad the substatial improvemet i ILF s stove maufacturig quality ad the resultig thermal efficiecy of the stove sice e) Sectio D of the CDM-MR has had additioal iformatio added describig the way that the three testig laboratories as a group were used to coduct the stove efficiecy Water Boilig Tests. All the calibratio certificates for the testig equipmet that was used durig the testig work, which were preseted durig the o-site verificatio visit, have ow bee scaed ad submitted. DOE Assessmet #2 a) The dates of coductig the tests have bee icluded i the spreadsheet alog with the uique ID of ICS. b) Tabs have bee amed appropriately c) Issue closed earlier. d) The respose is accepted by the DOE. The cotiual improvemet i ILF s stove maufacturig quality is a established process i maufacturig. It was also verified through iterviews with the egieerig staff. e) The CPA-DD/01,/02/ still does ot give a clear descriptio of which equipmet belogs to which laboratory. FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 74

75 Fidig (referece 4.1 sectio of table 1) Corrective Actio #3 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) CAR-03 e) The CDM-MR has had additioal iformatio added that provides a clear descriptio of which equipmet belogs to which testig laboratory, ad which ties i with the calibratio certificates for the testig equipmet which were scaed ad submitted. DOE Assessmet #3 Coclusio Tick the appropriate checkbox The MR has bee corrected to iclude the same. To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed Fidig (referece 5.2 sectio of table 1) CAR-04 Classificatio CAR CL FAR Descriptio of fidig (DOE) The spreadsheet CPA CER Calculatios is ot clearly uderstood. Please make it easy to uderstad ad also correct the followig. a) The symbols i cells B59 & B60 are icosistet with that used i MR as well as i the spreadsheet b) Icosistecy betwee values used for i MR ad spreadsheet e.g U (i,j).please check all values. c) Ex Post summary tab is ot very clearly uderstood. Please make it easily to uderstad. No of stoves metioed i MR are 3044 while the spreadsheet shows the 4063 stoves as well as 2016 stoves d) The values of η ew & η old calculated are icorrect i the spreadsheet Corrective Actio or clarificatio #1 a) This has bee corrected i the spread sheet (PP shall write a detailed ad clear corrective actio or further b) This has bee corrected i the spread sheet iformatio for clarificatio as per fidig) c) The Ex Post sheet is a error sheet ad has bee removed. d) Same commet as i c) FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 75

76 Fidig (referece 5.2 sectio of table 1) DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. Corrective Actio or clarificatio #2 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) CAR-04 Sice the ex post sheet is removed the above issues (a),(b),(c),(d) are closed However the spread sheet is still ot self uderstood for followig reasos a) Tabs are ot amed b) Remove o tested stoves from sheet 1 & 3. c) It is ot clear why oly efficiecy values of 4 stoves are used for determiig the average ad stadard deviatio ad what is the source of values used d) What is the purpose of sheet 11 & it shows some ER calculatios which is differet. Extra sheets/pages /sectios which are ot i use also eed to be removed. a) The tabs i the spreadsheet CPA CER Calculator for ILF v4 have ow bee reamed with a clear descriptio for what each sheet cotais. b) For coservative purposes, the o-testable stoves (broke grate) were give the baselie efficiecy of 10% because they were still foud to be i use. For the 1- year cohort, this accouts for 10% of the stoves collected, ad for the 2-year old cohort this accouts for 25% of the stoves collected. This creates a icetive for CPAs to esure that their stoves are made i a more durable fashio, ad avoids ay over-claimig of CERs as if all stoves ca be assumed last for at least 2 years. c) The table i the CDM-MR i Sectio D D.3(c) has bee ameded to reflect the correct source of the stadard deviatio figures. d) The extra sheets i the earlier versio of the spreadsheet CPA CER Calculator for ILF have bee removed ad/or hidde as appropriate.sheet 11 (ow reamed as CER calc up to 31 Dec 2012 ) was used to compute the CERs to be issued up to 31 Dec 2012 (see page 1 of the CDM-MR). DOE Assessmet #02 a) Each tab has bee clearly amed to describe the cotets (( Issue closed) b) The respose is accepted by the DOE sice it accouts for broke stoves are still i use.(issue closed) c) The table has bee ameded to reflect the correct source but it is still ot corrected while calculatig the sample size i tabs Efficiecy test ½ year old of CPA CER calculatio. I additio please iclude the statemet o how precisio level was met/ot met i the MR. d) The sheet is to calculate CER up to 31/12/2012.( Issue closed) FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 76

77 Fidig (referece 5.2 sectio of table 1) Corrective Actio or clarificatio #3 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #3 Coclusio Tick the appropriate checkbox ` CAR-04 c) The table i the CDM-MR i Sectio D D.3(c) has bee ameded to reflect the correct stadard deviatio figures i the sheets Efficiecy tests 1yr old ad Efficiecy tests 2yr old i the spreadsheet CPA CER Calculator for ILF v4. A statemet o how the precisio levels were met/ot met has also bee added ito the MR., ad further clarity o the way that samples were draw has bee added. c) The Spreadsheet stads corrected. To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 77

78 Fidig (referece 3.5 sectio of table 1) Classificatio CAR CL FAR Descriptio of fidig (DOE) Corrective Actio or clarificatio #1 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. Corrective Actio or clarificatio #2 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #2 Corrective Actio or clarificatio #3 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #3 Clarificatio request-01 CL-01 It is ot clear i the F-CDM-MR i. How moitorig has esured that the replaced low efficiecy appliaces are disposed off ad are ot used withi the boudary or withi the regio. ii. If baselie stoves are cotiued to be used, the how wood fuel cosumptio of those stoves is excluded from calculatios as stated i CPA-DD/01,/02/. i. See sectio C of the F-CDM-MR ii. See sheet 9 of CPA CER calculatio for ILF i. Sectio C does ot iclude ay statemet o replaced low efficiecy appliaces are disposed off ad are ot used withi the boudary or withi the regio. ii. Sheet 9 of the revised calculatio sheet correctly calculates the drop off ad determies how the wood fuel cosumptio is excluded. ( Closed. Subject to closure of CAR-4 i. See sectio C of the F-CDM-MR page 9, a adjustmet factor for the cotiued use of baselie low efficiecy appliaces by Okelo Kuc users i the period was calculated from the households resposes to Questios 7-13 i the usage survey ad the results were used to discout the umber of CERs beig requested. The GS MR states that the disposal of discarded stoves are recycled by metal scrap pickers, or are used as household geeral receptacles. This issue has still ot bee addressed i MR correctly i. Sectio C of the F-CDM-MR icludes a statemet o how the replaced low efficiecy appliaces were disposed of ad were o loger i use withi the boudary or withi the regio. The reviser MR ow have clear descriptio o how replaced low efficiecy appliaces are disposed off ad are ot used withi the boudary or withi the regio FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 78

79 Fidig (referece 3.5 sectio of table 1) Coclusio Tick the appropriate checkbox CL-01 To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed Fidig (referece 4.1 sectio of table 1) Classificatio CAR CL FAR Descriptio of fidig (DOE) It is ot clearly explaied ad demostrated. Please Clarify a) How the value of Fractio of woody biomass saved by the project activity i the year y has bee aually updated, as the value 91.5% is based o 2010 data. b) If the aual updatig is ot carried out the why default value for Ugada as per EB 67 Aex 22 has ot bee used c) How the spreadsheet _UCB_HH_KPT_Data_Etry_Sheet_Charcoal_ad_Wood_Fial (HH kitche survey data) has bee used i calculatig Emissio reductios Corrective Actio or clarificatio #1 a) See sheet 8 of the CPA CER Calculator for ILF (PP shall write a detailed ad clear corrective actio or further b) Update has bee carried out. See sheet 9 ad attached is the approval letter from NFA iformatio for clarificatio as per fidig) Ugada o the update. c) This is the data collectio sheet used i the CIRCODU baselie study to determie C y,fueltype,regio,old. = toes wood/stove/y (baselie household fuel cosumptio for DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. Ugada). CL-02 I regards to Sheet 8 of the spreadsheet please submit the evidece of source of values so that the same ca be cross checked. a) I PDD it eeds to explaied ad justified why the value remais same as last year ad how this is the most justified value. Sheet 9 does ot show ay calculatio of Fractio of woody biomass. b) CL-02 c) closed FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 79

80 Fidig (referece 4.1 sectio of table 1) Corrective Actio or clarificatio #2 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) CL-02 a) Sheet 8 (ow reamed Ugada fnrb ) is supported by the letter from the Natioal Forestry Authority of 10 March 2014, which was availed durig the o-site verificatio visit, a copy of which is ow submitted agai. b) The value remais the same as before, as the NFA has cofirmed to UCB (i the letter cited i a) above) that it has o more recet iformatio to update the earlier oreewable woody biomass figure, that it still regards as beig valid for our use. This iformatio has ow bee icluded i the CDM-MR. D DOE Assessmet #2 Coclusio Tick the appropriate checkbox Justificatio accepted ad the letter of cofirmatio issued by Natioal Forest Authority of Ugada that o ew iformatio is available after the publicatio of last data i Hece the issues closed To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed Fidig (referece 4.1 sectio of table 1) Classificatio CAR CL FAR Descriptio of fidig (DOE) I the spreadsheet CPA CER Calculatio icosistecies are observed i the umber of creditig days eve though the date of commissioig remais the same e.g stove # & Please check the correctess of creditig days for etire spreadsheet. Corrective Actio or clarificatio #1 (PP shall write a detailed ad clear corrective actio or further Correctios have bee effected i the etire spreadsheet iformatio for clarificatio as per fidig) DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. CL-03 The No. of creditig days for each stove ow stads corrected. ( CL-03 closed) FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 80

81 Fidig (referece 4.1 sectio of table 1) Coclusio Tick the appropriate checkbox CL-03 To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed Fidig (referece 6.5 sectio of table 1) FAR-01 Classificatio CAR CL FAR Descriptio of fidig (DOE) Forward Actio Request No.-01 Followig actios as per Evirometal Clearace dated 26/04/2014 eeds to verified durig the ext verificatio a) A permit for the activity i the wetlad has to be obtaied i lie with the secod schedule the Natioal Eviromet regulatios. b) Evirometal Audit is carried out at the ed of c) Esure Evirometal coservatio through establishmet of tree ursery i April 2014 Corrective Actio or clarificatio #1 (PP shall write a detailed ad clear corrective actio or further iformatio for clarificatio as per fidig) DOE Assessmet #1 The assessmet shall ecompass all ope issues i the fidig. I case of o-closure, additioal corrective actio ad DOE assessmets (#2, #3, etc.) shall be added. Coclusio Tick the appropriate checkbox The FAR is oted ad actios will be take i readiess for the ext verificatio. The verifyig DOE for the ext periodic verificatio must check the actios related to this FVR To be checked durig the ext periodic verificatio Outstadig fidig (ot closed) The fidig is closed FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 81

82 APPENDIX D Certificates of Competece FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 82

83 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 83

84 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 84

85 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 85

86 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 86

87 FM 4.9 Verificatio Report Template GS N CCL177/ICSEA/ , Rev.03 87

Review Procedures and Reporting by Peer Reviewer

Review Procedures and Reporting by Peer Reviewer Review Procedures ad Reportig by Peer Reviewer QUALITY OF REPORTING BY AUDITORS Desired Quality Audit report to cotai a clear writte expressio of opiio o the fiacial iformatio PU should have policies ad

More information

Statistics for Economics & Business

Statistics for Economics & Business Statistics for Ecoomics & Busiess Cofidece Iterval Estimatio Learig Objectives I this chapter, you lear: To costruct ad iterpret cofidece iterval estimates for the mea ad the proportio How to determie

More information

Internal Control Framework

Internal Control Framework Iteral Cotrol Framework NMASBO Boot Camp October 2017 Make up of participats Superitedets Aspirig Superitedets School Districts Charter Schools Former Coaches 1 Take Away Items A iteral cotrol system is

More information

An Initiative to Minimise the Non- Technical Barriers to DG within Europe

An Initiative to Minimise the Non- Technical Barriers to DG within Europe Distributio Europe 2005, Sessio 4.3 Maagig for Growth i Distributed Geeratio A Iitiative to Miimise the No- Techical Barriers to DG withi Europe Richard Kight Rolls-Royce Strategic Research Cetre 2005

More information

TERMS OF REFERENCE. Project: Reviewing the Capital Adequacy Regulation

TERMS OF REFERENCE. Project: Reviewing the Capital Adequacy Regulation TERMS OF REFERENCE Project: Reviewig the Capital Adequacy Regulatio Project Ower: Project Maager: Deputy Project Maagers: Techical Achor (TAN): Mr. Idrit Bak, Bak of Albaia, Supervisio Departmet. Mrs.

More information

CHAPTER 8 Estimating with Confidence

CHAPTER 8 Estimating with Confidence CHAPTER 8 Estimatig with Cofidece 8.2 Estimatig a Populatio Proportio The Practice of Statistics, 5th Editio Stares, Tabor, Yates, Moore Bedford Freema Worth Publishers Estimatig a Populatio Proportio

More information

SEC Adopts. Amendments. To The Advisers Act Custody Rule SECURITIES LAW ALERT MARCH 2010

SEC Adopts. Amendments. To The Advisers Act Custody Rule SECURITIES LAW ALERT MARCH 2010 MARCH 2010 SEC Adopts Amedmets To The Advisers Act Custody Rule The Securities Exchage Commissio ( SEC ) has adopted amedmets to Rule 206(4)-2 (the Custody Rule ) uder the Ivestmet Advisers Act of 1940

More information

A Technical Description of the STARS Efficiency Rating System Calculation

A Technical Description of the STARS Efficiency Rating System Calculation A Techical Descriptio of the STARS Efficiecy Ratig System Calculatio The followig is a techical descriptio of the efficiecy ratig calculatio process used by the Office of Superitedet of Public Istructio

More information

Risk Assessment for Project Plan Collapse

Risk Assessment for Project Plan Collapse 518 Proceedigs of the 8th Iteratioal Coferece o Iovatio & Maagemet Risk Assessmet for Project Pla Collapse Naoki Satoh 1, Hiromitsu Kumamoto 2, Norio Ohta 3 1. Wakayama Uiversity, Wakayama Uiv., Sakaedai

More information

Standard BAL a Real Power Balancing Control Performance

Standard BAL a Real Power Balancing Control Performance A. Itroductio. Title: Real Power Balacig Cotrol Performace 2. Number: BAL-00-0.a 3. Purpose: To maitai Itercoectio steady-state frequecy withi defied limits by balacig real power demad ad supply i real-time.

More information

Enhancing Service to Large Businesses. The Audit Protocol Real-Time Audit Concurrent Audit Single-Window Focus

Enhancing Service to Large Businesses. The Audit Protocol Real-Time Audit Concurrent Audit Single-Window Focus Ehacig Service to Large Busiesses The Audit Protocol Real-Time Audit Cocurret Audit Sigle-Widow Focus 5&(5HY Visually impaired persos ca get iformatio o services available to them, ad ca order publicatios

More information

TENS Unit Prior Authorization Process

TENS Unit Prior Authorization Process TENS Uit Prior Authorizatio Process Objectives Uderstad the HUSKY Health program s prior authorizatio process for TENS uits (Trascutaeous Electrical Nerve Stimulatio) Access the DSS Fee Schedule Reduce

More information

Your Appeal Rights Under the Income Tax Act

Your Appeal Rights Under the Income Tax Act Your Appeal Rights Uder the Icome Tax Act P148(E) Rev. 00 3327 Visually impaired persos ca get iformatio o services available to them, ad ca order publicatios i braille or large prit, or o audio cassette

More information

Chapter 8: Estimation of Mean & Proportion. Introduction

Chapter 8: Estimation of Mean & Proportion. Introduction Chapter 8: Estimatio of Mea & Proportio 8.1 Estimatio, Poit Estimate, ad Iterval Estimate 8.2 Estimatio of a Populatio Mea: σ Kow 8.3 Estimatio of a Populatio Mea: σ Not Kow 8.4 Estimatio of a Populatio

More information

Labour Force Survey in Belarus: determination of sample size, sample design, statistical weighting

Labour Force Survey in Belarus: determination of sample size, sample design, statistical weighting Labour Force urvey i Belarus: determiatio of sample size, sample desig, statistical weightig Natallia Boku Belarus tate Ecoomic Uiversity, e-mail: ataliaboku@rambler.ru Abstract The first experiece of

More information

Supersedes: 1.3 This procedure assumes that the minimal conditions for applying ISO 3301:1975 have been met, but additional criteria can be used.

Supersedes: 1.3 This procedure assumes that the minimal conditions for applying ISO 3301:1975 have been met, but additional criteria can be used. Procedures Category: STATISTICAL METHODS Procedure: P-S-01 Page: 1 of 9 Paired Differece Experiet Procedure 1.0 Purpose 1.1 The purpose of this procedure is to provide istructios that ay be used for perforig

More information

Methodology on setting the booking prices Project Development and expansion of Bulgartransgaz EAD gas transmission system

Methodology on setting the booking prices Project Development and expansion of Bulgartransgaz EAD gas transmission system Methodology o settig the bookig prices Project Developmet ad expasio of Bulgartrasgaz EAD gas trasmissio system Art.1. The preset Methodology determies the coditios, order, major requiremets ad model of

More information

Structuring the Selling Employee/ Shareholder Transition Period Payments after a Closely Held Company Acquisition

Structuring the Selling Employee/ Shareholder Transition Period Payments after a Closely Held Company Acquisition Icome Tax Isights Structurig the Sellig Employee/ Shareholder Trasitio Period Paymets after a Closely Held Compay Acquisitio Robert F. Reilly, CPA Corporate acquirers ofte acquire closely held target compaies.

More information

Estimating Proportions with Confidence

Estimating Proportions with Confidence Aoucemets: Discussio today is review for midterm, o credit. You may atted more tha oe discussio sectio. Brig sheets of otes ad calculator to midterm. We will provide Scatro form. Homework: (Due Wed Chapter

More information

Calculation of the Annual Equivalent Rate (AER)

Calculation of the Annual Equivalent Rate (AER) Appedix to Code of Coduct for the Advertisig of Iterest Bearig Accouts. (31/1/0) Calculatio of the Aual Equivalet Rate (AER) a) The most geeral case of the calculatio is the rate of iterest which, if applied

More information

EU ETS Hearing, European Parliament Xavier Labandeira, FSR Climate (EUI)

EU ETS Hearing, European Parliament Xavier Labandeira, FSR Climate (EUI) EU ETS Hearig, Europea Parliamet Xavier Labadeira, FSR Climate (EUI) 0. Thaks Chairma, MEPs. Thak you very much for ivitig me here today. I am hoored to participate i the work of a Committee whose previous

More information

Chapter 8. Confidence Interval Estimation. Copyright 2015, 2012, 2009 Pearson Education, Inc. Chapter 8, Slide 1

Chapter 8. Confidence Interval Estimation. Copyright 2015, 2012, 2009 Pearson Education, Inc. Chapter 8, Slide 1 Chapter 8 Cofidece Iterval Estimatio Copyright 2015, 2012, 2009 Pearso Educatio, Ic. Chapter 8, Slide 1 Learig Objectives I this chapter, you lear: To costruct ad iterpret cofidece iterval estimates for

More information

Terms and conditions for the 28 - Day Interbank Equilibrium Interest Rate (TIIE) Futures Contract (Cash Settlement)

Terms and conditions for the 28 - Day Interbank Equilibrium Interest Rate (TIIE) Futures Contract (Cash Settlement) The Eglish versio of the Terms ad Coditios for Futures Cotracts is published for iformatio purposes oly ad does ot costitute legal advice. However, i case of ay Iterpretatio cotroversy, the Spaish versio

More information

Confidence Intervals. CI for a population mean (σ is known and n > 30 or the variable is normally distributed in the.

Confidence Intervals. CI for a population mean (σ is known and n > 30 or the variable is normally distributed in the. Cofidece Itervals A cofidece iterval is a iterval whose purpose is to estimate a parameter (a umber that could, i theory, be calculated from the populatio, if measuremets were available for the whole populatio).

More information

. (The calculated sample mean is symbolized by x.)

. (The calculated sample mean is symbolized by x.) Stat 40, sectio 5.4 The Cetral Limit Theorem otes by Tim Pilachowski If you have t doe it yet, go to the Stat 40 page ad dowload the hadout 5.4 supplemet Cetral Limit Theorem. The homework (both practice

More information

Speak to the experts before you start any project involving basement construction, engineered foundations, underpinning or structural repairs

Speak to the experts before you start any project involving basement construction, engineered foundations, underpinning or structural repairs ASUCplus represets Specialist Domestic Cotractors i: UNDERPINNING Ad Subsidece Repair T E C H N I Q U E S ENGINEERED FOUNDATION S O L U T I O N S CONSTRUCTION OF RETRO-FIT BASEMENTS Speak to the experts

More information

Mine Closure Risk Assessment A living process during the operation

Mine Closure Risk Assessment A living process during the operation Tailigs ad Mie Waste 2017 Baff, Alberta, Caada Mie Closure Risk Assessmet A livig process durig the operatio Cristiá Marambio Golder Associates Closure chroology Chilea reality Gov. 1997 Evirometal basis

More information

Standard Deviations for Normal Sampling Distributions are: For proportions For means _

Standard Deviations for Normal Sampling Distributions are: For proportions For means _ Sectio 9.2 Cofidece Itervals for Proportios We will lear to use a sample to say somethig about the world at large. This process (statistical iferece) is based o our uderstadig of samplig models, ad will

More information

ii. Interval estimation:

ii. Interval estimation: 1 Types of estimatio: i. Poit estimatio: Example (1) Cosider the sample observatios 17,3,5,1,18,6,16,10 X 8 X i i1 8 17 3 5 118 6 16 10 8 116 8 14.5 14.5 is a poit estimate for usig the estimator X ad

More information

CAPITAL PROJECT SCREENING AND SELECTION

CAPITAL PROJECT SCREENING AND SELECTION CAPITAL PROJECT SCREEIG AD SELECTIO Before studyig the three measures of ivestmet attractiveess, we will review a simple method that is commoly used to scree capital ivestmets. Oe of the primary cocers

More information

Indice Comit 30 Ground Rules. Intesa Sanpaolo Research Department December 2017

Indice Comit 30 Ground Rules. Intesa Sanpaolo Research Department December 2017 Idice Comit 30 Groud Rules Itesa Sapaolo Research Departmet December 2017 Comit 30 idex Characteristics of the Comit 30 idex 1) Securities icluded i the idices The basket used to calculate the Comit 30

More information

Basic formula for confidence intervals. Formulas for estimating population variance Normal Uniform Proportion

Basic formula for confidence intervals. Formulas for estimating population variance Normal Uniform Proportion Basic formula for the Chi-square test (Observed - Expected ) Expected Basic formula for cofidece itervals sˆ x ± Z ' Sample size adjustmet for fiite populatio (N * ) (N + - 1) Formulas for estimatig populatio

More information

Electronic Transactions Association Certified Payments Professional. Maintaining Your Credential

Electronic Transactions Association Certified Payments Professional. Maintaining Your Credential Electroic Trasactios Associatio Certified Paymets Professioal Maitaiig Your Credetial The Recertificatio Cycle The ETA Certified Paymets Professioal(tm) (ETA CPP) certificatio is valid for 3 years from

More information

The Time Value of Money in Financial Management

The Time Value of Money in Financial Management The Time Value of Moey i Fiacial Maagemet Muteau Irea Ovidius Uiversity of Costata irea.muteau@yahoo.com Bacula Mariaa Traia Theoretical High School, Costata baculamariaa@yahoo.com Abstract The Time Value

More information

Information Services Group Public Sector

Information Services Group Public Sector IV&V Assessmet Report - Deliverable IVV2.2 Preseted by: Iformatio Services Group Public Sector September 11, 2018 2018 Iformatio Services Group, Ic. All Rights Reserved Copyright 2018, Iformatio Services

More information

The roll-out of the Jobcentre Plus Office network

The roll-out of the Jobcentre Plus Office network Departmet for Work ad Pesios The roll-out of the Jobcetre Plus Office etwork REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 346 Sessio 2007-2008 22 February 2008 SummARy What is the Jobcetre Plus roll-out?

More information

Highlights of 3 rd Generation SPP Rules 2017

Highlights of 3 rd Generation SPP Rules 2017 Email: Chibuluje@ewura.go.tz Mobile: +255 688 255707 ENERGY AND WATER UTILITIES REGULTORY AUTHORITY Highlights of 3 rd Geeratio SPP Rules 2017 A presetatio at the WRI-TATEDO Report lauchig at the Serea

More information

Auburn Transit Triennial Performance Audit

Auburn Transit Triennial Performance Audit Aubur Trasit For Fiscal Years 2009/10 through 2011/12 Fial Report Prepared for the Placer Couty Trasportatio Plaig Agecy Prepared by AUBURN TRANSIT TRIENNIAL PERFORMANCE AUDIT For Fiscal Years 2009/10

More information

Working conditions in Korea: Survey highlights

Working conditions in Korea: Survey highlights Workig coditios i Korea: Survey highlights Itroductio Methodology Mai fidigs Traiig Health ad safety advice Use of iformatio techology Satisfactio with workig coditios Workig time Commetary Aex Wyattville

More information

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME All Right Reserved No. of Pages - 10 No of Questios - 08 SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME YEAR I SEMESTER I (Group B) END SEMESTER EXAMINATION

More information

Osborne Books Update. Financial Statements of Limited Companies Tutorial

Osborne Books Update. Financial Statements of Limited Companies Tutorial Osbore Books Update Fiacial Statemets of Limited Compaies Tutorial Website update otes September 2018 2 f i a c i a l s t a t e m e t s o f l i m i t e d c o m p a i e s I N T R O D U C T I O N The followig

More information

Guide for. Plan Sponsors. Roth 401(k) get retirement right

Guide for. Plan Sponsors. Roth 401(k) get retirement right Uited of Omaha Life Isurace Compay Compaio Life Isurace Compay mutual of omaha retiremet services Roth 401(k) Guide for Pla Sposors MUGC8764_0210 get retiremet right roth 401(k) expads your optios Drive

More information

A Framework for evaluating the implementation of Private Finance Initiative projects: Volume 1

A Framework for evaluating the implementation of Private Finance Initiative projects: Volume 1 A Framework for evaluatig the implemetatio of Private Fiace Iitiative projects: Volume 1 REPORT BY THE NATIONAL AUDIT OFFICE 15 May 2006 For further iformatio about the Natioal Audit Office please cotact:

More information

Productivity depending risk minimization of production activities

Productivity depending risk minimization of production activities Productivity depedig risk miimizatio of productio activities GEORGETTE KANARACHOU, VRASIDAS LEOPOULOS Productio Egieerig Sectio Natioal Techical Uiversity of Athes, Polytechioupolis Zografou, 15780 Athes

More information

DESCRIPTION OF MATHEMATICAL MODELS USED IN RATING ACTIVITIES

DESCRIPTION OF MATHEMATICAL MODELS USED IN RATING ACTIVITIES July 2014, Frakfurt am Mai. DESCRIPTION OF MATHEMATICAL MODELS USED IN RATING ACTIVITIES This documet outlies priciples ad key assumptios uderlyig the ratig models ad methodologies of Ratig-Agetur Expert

More information

(Zip Code) OR. (State)

(Zip Code) OR. (State) Uiform Applicatio for Ivestmet Adviser Registratio Part II - Page 1 Name of Ivestmet Adviser: Stephe Craig Schulmerich Address: (Number ad Street) 10260 SW Greeburg Rd. Ste 00 (State) (City) Portlad (Zip

More information

Topic-7. Large Sample Estimation

Topic-7. Large Sample Estimation Topic-7 Large Sample Estimatio TYPES OF INFERENCE Ò Estimatio: É Estimatig or predictig the value of the parameter É What is (are) the most likely values of m or p? Ò Hypothesis Testig: É Decidig about

More information

The self-assessment will test the following six major areas, relevant to studies in the Real Estate Division's credit-based courses:

The self-assessment will test the following six major areas, relevant to studies in the Real Estate Division's credit-based courses: Math Self-Assessmet This self-assessmet tool has bee created to assist studets review their ow math kowledge ad idetify areas where they may require more assistace. We hope that studets will complete this

More information

Forecasting bad debt losses using clustering algorithms and Markov chains

Forecasting bad debt losses using clustering algorithms and Markov chains Forecastig bad debt losses usig clusterig algorithms ad Markov chais Robert J. Till Experia Ltd Lambert House Talbot Street Nottigham NG1 5HF {Robert.Till@uk.experia.com} Abstract Beig able to make accurate

More information

Models of Asset Pricing

Models of Asset Pricing APPENDIX 1 TO CHAPTER 4 Models of Asset Pricig I this appedix, we first examie why diversificatio, the holdig of may risky assets i a portfolio, reduces the overall risk a ivestor faces. The we will see

More information

Models of Asset Pricing

Models of Asset Pricing APPENDIX 1 TO CHAPTER4 Models of Asset Pricig I this appedix, we first examie why diversificatio, the holdig of may risky assets i a portfolio, reduces the overall risk a ivestor faces. The we will see

More information

Sampling Distributions and Estimation

Sampling Distributions and Estimation Cotets 40 Samplig Distributios ad Estimatio 40.1 Samplig Distributios 40. Iterval Estimatio for the Variace 13 Learig outcomes You will lear about the distributios which are created whe a populatio is

More information

FOUNDATION ACTED COURSE (FAC)

FOUNDATION ACTED COURSE (FAC) FOUNDATION ACTED COURSE (FAC) What is the Foudatio ActEd Course (FAC)? FAC is desiged to help studets improve their mathematical skills i preparatio for the Core Techical subjects. It is a referece documet

More information

The ROI of Ellie Mae s Encompass All-In-One Mortgage Management Solution

The ROI of Ellie Mae s Encompass All-In-One Mortgage Management Solution The ROI of Ellie Mae s Ecompass All-I-Oe Mortgage Maagemet Solutio MAY 2017 Legal Disclaimer All iformatio cotaied withi this study is for iformatioal purposes oly. Neither Ellie Mae, Ic. or MarketWise

More information

Guidelines For Handling Privacy Breaches

Guidelines For Handling Privacy Breaches Prime Miister s Office Data Protectio Office Volume 4 Guidelies For Hadlig Privacy Breaches Guidelies For HadliG Privacy BreacHes Volume 4 Mrs Drudeisha MADHUB, Data Protectio Commissioer Cotact Details

More information

III. RESEARCH METHODS. Riau Province becomes the main area in this research on the role of pulp

III. RESEARCH METHODS. Riau Province becomes the main area in this research on the role of pulp III. RESEARCH METHODS 3.1 Research Locatio Riau Provice becomes the mai area i this research o the role of pulp ad paper idustry. The decisio o Riau Provice was supported by several facts: 1. The largest

More information

Indices of industrial production in Russia

Indices of industrial production in Russia Idices of idustrial productio i Russia 1. The idex of idustrial productio 1 (IIP) is a short-term idicator of the ecoomic cycle, which eales to aswer the questios aout a curret developmet stage of the

More information

T4032-BC, Payroll Deductions Tables CPP, EI, and income tax deductions British Columbia Effective January 1, 2016

T4032-BC, Payroll Deductions Tables CPP, EI, and income tax deductions British Columbia Effective January 1, 2016 T4032-BC, Payroll Deductios Tables CPP, EI, ad icome tax deductios British Columbia Effective Jauary 1, 2016 T4032-BC What s ew as of Jauary 1, 2016 The major chages made to this guide, sice the last editio,

More information

BUSINESS PLAN IMMUNE TO RISKY SITUATIONS

BUSINESS PLAN IMMUNE TO RISKY SITUATIONS BUSINESS PLAN IMMUNE TO RISKY SITUATIONS JOANNA STARCZEWSKA, ADVISORY BUSINESS SOLUTIONS MANAGER RISK CENTER OF EXCELLENCE EMEA/AP ATHENS, 13TH OF MARCH 2015 FINANCE CHALLENGES OF MANY FINANCIAL DEPARTMENTS

More information

T4032-ON, Payroll Deductions Tables CPP, EI, and income tax deductions Ontario Effective January 1, 2016

T4032-ON, Payroll Deductions Tables CPP, EI, and income tax deductions Ontario Effective January 1, 2016 T4032-ON, Payroll Deductios Tables CPP, EI, ad icome tax deductios Otario Effective Jauary 1, 2016 T4032-ON What s ew as of Jauary 1, 2016 The major chages made to this guide sice the last editio are outlied.

More information

Three Lines of Defense to Enhance Technology Risk Management Maturity

Three Lines of Defense to Enhance Technology Risk Management Maturity Three Lies of Defese to Ehace Techology Risk Maagemet Maturity Abstract Icreasig reliace o techology has added to high complexity of the risk ladscape, makig risk maagemet ad goverace a huge challege for

More information

Twitter: @Owe134866 www.mathsfreeresourcelibrary.com Prior Kowledge Check 1) State whether each variable is qualitative or quatitative: a) Car colour Qualitative b) Miles travelled by a cyclist c) Favourite

More information

Non-Inferiority Logrank Tests

Non-Inferiority Logrank Tests Chapter 706 No-Iferiority Lograk Tests Itroductio This module computes the sample size ad power for o-iferiority tests uder the assumptio of proportioal hazards. Accrual time ad follow-up time are icluded

More information

Receipt Date. You must answer all questions in ink and the application must be signed and notarized, or it will be rejected.

Receipt Date. You must answer all questions in ink and the application must be signed and notarized, or it will be rejected. Office of the New York State Comptroller New York State ad Local Retiremet System Mail completed form to: NEW YORK STATE AND LOCAL RETIREMENT SYSTEM 110 STATE STREET - MAIL DROP 5-9 ALBANY NY 12244-0001

More information

Guide to the Deutsche Börse EUROGOV Indices

Guide to the Deutsche Börse EUROGOV Indices Guide to the Deutsche Börse EUROGOV Idices Versio.2 November 20 Deutsche Börse AG Versio.2 Guide to the November 20 Deutsche Börse EUROGOV Idices Page 2 Geeral Iformatio I order to esure the highest quality

More information

Baan Project Project Invoicing

Baan Project Project Invoicing Baa Project Module Procedure UP061A US Documetiformatio Documet Documet code : UP061A US Documet group : User Documetatio Documet title : Applicatio/Package : Baa Project Editio : A Date : July 1998 Copyright

More information

Angola. A: Identification. B: CPI Coverage. Title of the CPI: Indice de Preços No Consumidor de Luanda

Angola. A: Identification. B: CPI Coverage. Title of the CPI: Indice de Preços No Consumidor de Luanda Agola A: Idetificatio Title of the CPI: Idice de Preços No Cosumidor de Luada Orgaisatio resposible: Istituto Nacioal de Estatística (INE) Periodicity: Mothly Price referece period: December 2010 = 100

More information

FEHB. Health Benefits Coverage for Noncareer Employees

FEHB. Health Benefits Coverage for Noncareer Employees FEHB Health Beefits Coverage for Nocareer Employees Notice 426 September 2005 The Federal Employees Health Beefits (FEHB) Program permits certai ocareer (temporary) employees to obtai health isurace, if

More information

Inferential Statistics and Probability a Holistic Approach. Inference Process. Inference Process. Chapter 8 Slides. Maurice Geraghty,

Inferential Statistics and Probability a Holistic Approach. Inference Process. Inference Process. Chapter 8 Slides. Maurice Geraghty, Iferetial Statistics ad Probability a Holistic Approach Chapter 8 Poit Estimatio ad Cofidece Itervals This Course Material by Maurice Geraghty is licesed uder a Creative Commos Attributio-ShareAlike 4.0

More information

point estimator a random variable (like P or X) whose values are used to estimate a population parameter

point estimator a random variable (like P or X) whose values are used to estimate a population parameter Estimatio We have oted that the pollig problem which attempts to estimate the proportio p of Successes i some populatio ad the measuremet problem which attempts to estimate the mea value µ of some quatity

More information

Economics of Generating Stations. - Definition - Factors affecting cost of generation - Methods of determining depreciation

Economics of Generating Stations. - Definition - Factors affecting cost of generation - Methods of determining depreciation Ecoomics of Geeratig Statios - Defiitio - Factors affectig cost of geeratio - Methods of determiig depreciatio Ecoomics of power geeratig statio is the art of determiig the per-uit cost of electric eergy

More information

CHAPTER 8: CONFIDENCE INTERVAL ESTIMATES for Means and Proportions

CHAPTER 8: CONFIDENCE INTERVAL ESTIMATES for Means and Proportions CHAPTER 8: CONFIDENCE INTERVAL ESTIMATES for Meas ad Proportios Itroductio: I this chapter we wat to fid out the value of a parameter for a populatio. We do t kow the value of this parameter for the etire

More information

CARERS UNEMPLOYMENT CLAIM FORM C

CARERS UNEMPLOYMENT CLAIM FORM C CARERS UNEMPLOYMENT CLAIM FORM C Piacle House, A1 Baret ay, Borehamwood, Hertfordshire D6 2XX Compay Number 1007798 IMPORTANT POLICY TERMS MAY VARY, BUT YOU SHOULD RETURN THE CLAIM FORM AS SOON AS YOU

More information

E-commerce. Electronic Commerce. Definition of E-Commerce. nuse of electronic systems to engage in commercial activities

E-commerce. Electronic Commerce. Definition of E-Commerce. nuse of electronic systems to engage in commercial activities Electroic Commerce Defiitio of E-Commerce Use of electroic systems to egage i commercial activities 1 Goods ad services bought o-lie Travel tickets Holidays Books Cocert/festival tickets Clothes Electroic

More information

Companies COMPANIES BUILDING ON A SOLID FOUNDATION. 1 Intrust Manx

Companies COMPANIES BUILDING ON A SOLID FOUNDATION. 1 Intrust Manx Compaies COMPANIES BUILDING ON A SOLID FOUNDATION 1 Itrust Max Itrust Max Limited Itrust (Max) Limited is based i Douglas, Isle of Ma. Our objective is to provide a bespoke, flexible, cost-effective, efficiet

More information

FOR TEACHERS ONLY. The University of the State of New York REGENTS HIGH SCHOOL EXAMINATION PHYSICAL SETTING/PHYSICS

FOR TEACHERS ONLY. The University of the State of New York REGENTS HIGH SCHOOL EXAMINATION PHYSICAL SETTING/PHYSICS PS P FOR TEACHERS ONLY The Uiersity of the State of New York REGENTS HIGH SCHOOL EXAMINATION PHYSICAL SETTING/PHYSICS Wedesday, Jue, 005 :5 to 4:5 p.m., oly SCORING KEY AND RATING GUIDE Directios to the

More information

1031 Tax-Deferred Exchanges

1031 Tax-Deferred Exchanges 1031 Tax-Deferred Exchages About the Authors Arold M. Brow Seior Maagig Director, Head of 1031 Tax-Deferred Exchage Services, MB Fiacial Deferred Exchage Corporatio Arold M. Brow is the Seior Maagig Director

More information

This section is organized into a discussion of general issues and a list of specific data quality checks.

This section is organized into a discussion of general issues and a list of specific data quality checks. PANCEA Maual Qualit Assurace Checks This sectio is orgaized ito a discussio of geeral issues ad a list of specific data qualit checks. Geeral Issues The followig represet several importat geeral checks

More information

City of Santa Maria SHAPE YOUR CAREER WHILE SHAPING YOUR COMMUNITY.

City of Santa Maria SHAPE YOUR CAREER WHILE SHAPING YOUR COMMUNITY. City of Sata Maria SHAPE YOUR CAREER WHILE SHAPING YOUR COMMUNITY. c a r e e r o p p o r t u i t y ASSISTANT CITY ATTORNEY SALARY: $119,462 $145,212 DOE/DOQ The City of Sata Maria seeks a Assistat City

More information

Collections & Recoveries policy

Collections & Recoveries policy Collectios & Recoveries policy The purpose of this policy is to set out the actio Ledy takes to ecourage borrowers to repay their loas withi term. This policy also serves to set out the actio Ledy takes

More information

Models of Asset Pricing

Models of Asset Pricing 4 Appedix 1 to Chapter Models of Asset Pricig I this appedix, we first examie why diversificatio, the holdig of may risky assets i a portfolio, reduces the overall risk a ivestor faces. The we will see

More information

Department of Mathematics, S.R.K.R. Engineering College, Bhimavaram, A.P., India 2

Department of Mathematics, S.R.K.R. Engineering College, Bhimavaram, A.P., India 2 Skewess Corrected Cotrol charts for two Iverted Models R. Subba Rao* 1, Pushpa Latha Mamidi 2, M.S. Ravi Kumar 3 1 Departmet of Mathematics, S.R.K.R. Egieerig College, Bhimavaram, A.P., Idia 2 Departmet

More information

The Open Cybernetics & Systemics Journal, 2015, 9, Green Construction Economy Research Based on LCC Theory

The Open Cybernetics & Systemics Journal, 2015, 9, Green Construction Economy Research Based on LCC Theory Sed Orders for Reprits to reprits@bethamsciece.ae The Ope Cyberetics & Systemics Joural, 2015, 9, 2805-2810 2805 Gree Costructio Ecoomy Research Based o LCC Theory Ope Access Zheli Ya * Departmet of Egieerig

More information

A New Approach to Obtain an Optimal Solution for the Assignment Problem

A New Approach to Obtain an Optimal Solution for the Assignment Problem Iteratioal Joural of Sciece ad Research (IJSR) ISSN (Olie): 231-7064 Idex Copericus Value (2013): 6.14 Impact Factor (2015): 6.31 A New Approach to Obtai a Optimal Solutio for the Assigmet Problem A. Seethalakshmy

More information

COSC 6385 Computer Architecture. Fundamentals

COSC 6385 Computer Architecture. Fundamentals COSC 6385 Computer Architecture Fudametals Edgar Gabriel Sprig 208 Measurig performace (I) Respose time: how log does it take to execute a certai applicatio/a certai amout of work Give two platforms X

More information

REINSURANCE ALLOCATING RISK

REINSURANCE ALLOCATING RISK 6REINSURANCE Reisurace is a risk maagemet tool used by isurers to spread risk ad maage capital. The isurer trasfers some or all of a isurace risk to aother isurer. The isurer trasferrig the risk is called

More information

T4032-MB, Payroll Deductions Tables CPP, EI, and income tax deductions Manitoba Effective January 1, 2016

T4032-MB, Payroll Deductions Tables CPP, EI, and income tax deductions Manitoba Effective January 1, 2016 T4032-MB, Payroll Deductios Tables CPP, EI, ad icome tax deductios Maitoba Effective Jauary 1, 2016 T4032-MB What s ew as of Jauary 1, 2016 The major chages made to this guide sice the last editio are

More information

When you click on Unit V in your course, you will see a TO DO LIST to assist you in starting your course.

When you click on Unit V in your course, you will see a TO DO LIST to assist you in starting your course. UNIT V STUDY GUIDE Percet Notatio Course Learig Outcomes for Uit V Upo completio of this uit, studets should be able to: 1. Write three kids of otatio for a percet. 2. Covert betwee percet otatio ad decimal

More information

Prospectus Directive Regulation (EC/809/2004), as amended.

Prospectus Directive Regulation (EC/809/2004), as amended. Prospectus Directive Regulatio (EC/809/2004), as ameded. Disclaimer This briefig ote has bee prepared as a referece tool to illustrate the chages to Prospectus Directive Regulatio EC 809/2004 1, as ameded

More information

1. Suppose X is a variable that follows the normal distribution with known standard deviation σ = 0.3 but unknown mean µ.

1. Suppose X is a variable that follows the normal distribution with known standard deviation σ = 0.3 but unknown mean µ. Chapter 9 Exercises Suppose X is a variable that follows the ormal distributio with kow stadard deviatio σ = 03 but ukow mea µ (a) Costruct a 95% cofidece iterval for µ if a radom sample of = 6 observatios

More information

CAPITAL ASSET PRICING MODEL

CAPITAL ASSET PRICING MODEL CAPITAL ASSET PRICING MODEL RETURN. Retur i respect of a observatio is give by the followig formula R = (P P 0 ) + D P 0 Where R = Retur from the ivestmet durig this period P 0 = Curret market price P

More information

Research on the Risk Management Model of Development Finance in China

Research on the Risk Management Model of Development Finance in China 486 Proceedigs of the 8th Iteratioal Coferece o Iovatio & Maagemet Research o the Ris Maagemet Model of Developmet Fiace i Chia Zou Huixia, Jiag Ligwei Ecoomics ad Maagemet School, Wuha Uiversity, Wuha,

More information

TransCanada s GTN System Notice of Available Firm Service Subject to a Right of First Refusal January 8, 2009

TransCanada s GTN System Notice of Available Firm Service Subject to a Right of First Refusal January 8, 2009 TrasCaada s GTN System Notice of Available Firm Service Subject to a Right of First Refusal Jauary 8, 2009 TrasCaada s GTN System ( GTN ) posted otices o its Iteret website o Jauary 6, 2009 idicatig the

More information

Driver s. 1st Gear: Determine your asset allocation strategy.

Driver s. 1st Gear: Determine your asset allocation strategy. Delaware North 401(k) PLAN The Driver s Guide The fial step o your road to erollig i the Delaware North 401(k) Pla. At this poit, you re ready to take the wheel ad set your 401(k) i motio. Now all that

More information

Today: Finish Chapter 9 (Sections 9.6 to 9.8 and 9.9 Lesson 3)

Today: Finish Chapter 9 (Sections 9.6 to 9.8 and 9.9 Lesson 3) Today: Fiish Chapter 9 (Sectios 9.6 to 9.8 ad 9.9 Lesso 3) ANNOUNCEMENTS: Quiz #7 begis after class today, eds Moday at 3pm. Quiz #8 will begi ext Friday ad ed at 10am Moday (day of fial). There will be

More information

Life Products Bulletin

Life Products Bulletin Life Products Bulleti Tredsetter Super Series Tredsetter Super Series: 2009 Chages Effective September 1, 2009, Trasamerica Life Isurace Compay is releasig ew rates for Tredsetter Super Series level premium

More information

1 Random Variables and Key Statistics

1 Random Variables and Key Statistics Review of Statistics 1 Radom Variables ad Key Statistics Radom Variable: A radom variable is a variable that takes o differet umerical values from a sample space determied by chace (probability distributio,

More information

Execution Risk Management at Wachovia Yousef Valine

Execution Risk Management at Wachovia Yousef Valine Executio at Wachovia Yousef Valie Head of Istitutioal Group ad COO, Wachovia Corporatio 1 Ageda Why We Care About Executio Our Approach Accomplishmets Aligmet with AMA ad Operatioal Why We Care About Executio

More information

Subject CT1 Financial Mathematics Core Technical Syllabus

Subject CT1 Financial Mathematics Core Technical Syllabus Subject CT1 Fiacial Mathematics Core Techical Syllabus for the 2018 exams 1 Jue 2017 Subject CT1 Fiacial Mathematics Core Techical Aim The aim of the Fiacial Mathematics subject is to provide a groudig

More information

TRADE ADJUSTMENT ASSISTANCE 2015 Annual Report

TRADE ADJUSTMENT ASSISTANCE 2015 Annual Report TRADE ADJUSTMENT ASSISTANCE 2015 Aual Report INTRODUCTION This report describes the services ad outcomes for Trade-certified workers who participated or completed traiig i the Trade Adjustmet Assistace

More information