2. LEGAL FRAMEWORK This Performance Report is submitted in compliance with;

Size: px
Start display at page:

Download "2. LEGAL FRAMEWORK This Performance Report is submitted in compliance with;"

Transcription

1 . INTRODUCTION The purpose of this report is to present the Performance Report of the Municipality for Midyear/section 72 report ( July 26 to 3 December 26) 2. LEGAL FRAMEWORK This Performance Report is submitted in compliance with; Section 52(d) of the Municipal Finance Act, Act 56 of 23 which requires the Mayor to within 3 days of the end of each quarter submit a report to Council on the implementation of the budget and the financial state of affairs of the Municipality. Regulation 28 of the Municipal Budget and Reporting Regulations, 29 (GN 393) which prescribes the format of the Section 52(d) Report and requires that the report be submitted to National Treasury within 5 days of it being tabled. Regulation 3 of the Municipal Budget and Reporting Regulations, 29 (GN 393) which require that the Section 52(d) Report be publicised by placing it on the Municipal Website in accordance with Section 75()(k) of the MFMA. Regulation of the Municipal Planning and Performance Regulations, 2 (GN R796) (which requires the Internal Auditor to audit the Municipality s performance and submit quarterly reports thereon to the Municipal Manager and the Performance Audit Committee. MFMA Circular 3 which requires the Municipality to report quarterly on its Service Delivery Budget Implementation Plan (SDBIP). The Municipal Finance management Act, Act 56 of 23 (MFMA) defines the SDBIP as; a detailed plan approved by the mayor of a municipality in terms of section53 () (c)(ii) for implementing the municipality s delivery of services and the execution of its annual budget and which must include (as part of the top-layer) the following: (a) projections for each month of; (i) revenue or (ii) operational and capital expenditure, (b) service delivery targets and performance indicators for each quarter 3. Performance Discussions The SDBIP is a public document which was approved by the Executive Mayor on 2 June 25. Performance reporting on the top layer SDBIP is done to the Mayoral Committee and Council on a quarterly, half yearly (Mid-year Budget and Performance Assessment Report) and annual basis (Annual Report). Any amendments to the Top Layer SDBIP must be approved by Council following the submission of the Mid-year Budget and Performance Assessment Report and the approval of the budget

2 This report is based on the Top Layer SDBIP and comprises the following; A summary of the overall performance of the Municipality in terms of the National Key Performance Areas of Local Government for the quarter A summary of the performance of each Directorate for the quarter A detailed performance review per National Key Performance Area The overall assessment of actual performance against targets set for the Key Performance Indicators as documented in the SDBIP is illustrated in terms of the following assessment methodology: Color Category Explanations Quarter Targets and Year Budgets Kpi not for a Quarter t Measured Kpi not Met Target 5 % and Less Kpi achieved Target % Kpi overachieved Target above %

3 . SUMMARY OF OVERALL PERFORMANCE OF THE MUNICIPALITY FOR THE QUARTER PER KEY PERFORMANCE AREA. The following graph provides an overview of the performance of the Municipality per National Key Performance Areas (KPA) for Mid-year/section 72 report ( July 26 to 3 December 26). The graph is followed by a summary which indicates both percentages and number of KPI s Lejweleputswa District municipality Basic Service Delivery Good Governance and Public Participation National Key Performance Areas Local Municipal Economic Financial Development Viability and Safe and Healthy environment Municipal Transformation and Institutional Development Kpi not met Kpi met Kpi overachieved

4 Municipal Performance Against KPA's Good Governance and Public Participation 2 6 Local Economic Development 3 Municipal Financial Viability and 9 Safe and Healthy environment Municipal Transformation and Institutional Development 5

5 Overall Performance Chart KPI's not met KPI's met 33% 67%

6 LOCAL ECONOMIC DEVELOPMENT Municipal Strategic Focus Area Objective Strategy Project Name Key Performanc e Indicator Basel ine 2 6/2 7 Bud get (R) Midyear targe ts Quar ter Achie ved targe ts Quar ter 2 Achie ved targe ts Mid-year Achieve d targets Achieve ments yes/no Challenges 2. ( A )Economic Development Expand Agricultural development to sustain food security 26 Facilitate 2 Capacity building workshops for Cooperatives in the District Capacity Building Programme Number Capacity Building programmes 2 2 Yes ( B ) Economic Development Expand Agricultural development to sustain food security 26 Develop the LDM LED Strategy Implementation Plan LED Strategy Implementation Plan LED Strategy Implementatio n Plan ( C ) Economic Development Expand Agricultural development to sustain food security 26 Convene District LED Forum Meetings District LED Forum District LED Forum Meetings convened ( A ) SMME Development Workshop for SMME s Convene small scale mining workshop Small scale mining workshop small scale mining New project 8

7 workshops Conducted ( B ) SMME Development Workshop for SMME s Convene Smme s Workshop on bid processes Smme Bid process Workshops SMME s Bid process w/shops convened New Project ( A) Tourism Development Promotion of tourists Attraction Develop tourism banners Tourism Banners Numbers of tourism banners Developed ( B ) Tourism Development Promotion of tourists Attraction Launch District Tourism Forum Tourism forum Tourism forums launched ( C ) Tourism Development Create an environment for the promotion of singing talent Invitation of Artists to perform during year end festival in December 26 Year-end festival year end festivals held Yes ( D ) Tourism Development To attract tourists to Lejweleputswa Region Organise Easter Festival Virginia Easter Festival Easter Festival held To be achieved in quarter ( E ) Arts and Culture To ensure arts and culture is celebrated in the district Organise Arts and Culture activities in the district Arts and Culture celebrations activities organised Annual activity Summary of LED Quarterly Performance

8 Municipal Yearly Targets Quarterly Targets Achieved KPI s Unachieved KPI s Variance Explanation Expenditure Strategic Focus

9 MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT Municipal Strategic Focus Area Objective Strategy Project Name Key Performa nce Indicator Basel ine- Year 26 /2 7 Budg et Midyear targe ts Quar ter Achi eved targe ts Qu art er 2 Ach iev ed targ ets Midyear Achie ved targe ts Achievem ents yes/no Challenges 3. ( A ) Sound municipal administration To adhere to all administrative responsibilities Develop and distribute 2 signed portfolio committee agendas and minutes Portfolio committee meetings signed portfolio committee agendas and minutes developed and distributed Council delayed the appointment of members of Portfolio Committees in quarter. ( B ) Sound municipal administration To adhere to all administrative responsibilities Develop and distribute all signed MAYCO agendas and minutes MAYCO meetings Number signed MAYCO agendas and minutes 2 Executive Mayor did not announce /present MAYCO members to Council in quarter. ( C ) Sound municipal administration To adhere to all administrative responsibilities Develop and distribute signed council agendas and minutes Council meetings signed council agendas and minutes Yes

10 3.2 Local Labour forum To ensure a functional LLF Convene LLF meetings annually LLF meetings LLF meetings convened 2 Council delayed the nomination of councillors to the LLF in quarter ( A ) Skills Development Support indigents students with bursaries to register and attend tertiary institutions in pursuit of post matric qualifications in the areas of mining, IT etc. Sign 2 experiential learners by the end of June 26. Student bursaries bursaries issued per annum 2 2 To be Achieved in quarter 3 ( B ) Skills Development To give experiential training to students at tertiary institutions to complete their qualifications. learners completing the experiential training. Experiential training students trained Depend on colleges to give the municipality the students to train them. 3. ( A ) Workplace Skills Plan Upgrade the skills of the staff members Enrol staff members for attending short courses by the end of June 26 Short courses staff members undertaking short courses to upgrade their skills Yes ( B ) Workplace Skills Plan Support staff members to Provide financial assistance to staff members Financial assistance staff members 5 To be achieved in quarter

11 further their qualifications. to further their studies financially supported 3.5. Employee Wellness Programme Conduct employee physical and mental wellness programmes Facilitate two fun walk for the employees by the end of June 26 Employee wellness employees wellness programme conducted yes 3.6. Security Create an environment to improve safety of people staff and property in municipal s Monitor weekly in and out register book in all municipal entrances. Security consolidate d monthly access reports developed Yes 3.7. Policy Development Development of new municipal Policy Develop 3 new Municipal policies Policy Development New Municipal policies Developed New Projec t 2 Summary of Municipal Transformation s Quarterly performance Municipal Yearly Targets Quarterly Targets Achieved KPI s Unachieved KPI s Variance Explanation Expenditure Strategic Focus

12 MUNICIPAL FINANCIAL VIABILITY Municipal Strategic Focus Area Objective Strategy Project name Key Performance Indicator Baseli ne- Year 26 /2 7 Budg et Midyear targe ts Qu arte r Ach iev ed targ ets Quar ter 2 Achie ved targe ts Midyear Achiev ed targets Achieve ments yes/no Challenges.. ( A ) Clean audit Achieve a clean audit by 27 To address all the matters of emphasis raised in the 26/27 financial year Clean audit matters of emphasis eliminated Clean Audit 5 25 Cle an au dit Cl ea n au di t Cle an au dit ( B ) Clean audit Achieve a clean audit by 27 To review 3 financial and IT policies (Disaster recovery plan, SCM, IT) by the end of June 27. Financial policy review financial and IT policies reviewed 3 3 To be achieved ( C ) Clean Audit Achieve a clean audit by 27 To develop virement, Business continuity plan and 3 G Data policies by june 27 Financial policy development new policies Developed 3 3 To be achieved.2. (A) Supply Chain compliance Improve management of Train staff members on procurement processes. SCM Training staff members trained, Yes

13 . procurement processes ( B ) Supply Chain compliance Improve management of procurement processes Train bid committees members on procurement processes annually Bid committees training bid committee members 3 3 To be achieved.3. ( A ) Asset To ensure improved and updated municipal assets Update asset register as and when purchases are made Asset asset register updates done yes ( B ) Asset To ensure improved and updated municipal assets Update asset register on a monthly basis Asset asset register updated yes.. Financial reports To strengthen and sustain sound administrative and financial capacity of the district Comply and submit financial reports. Financial reporting financial reports submitted yes.5. ( A ) IT To render effective & efficient ICT services To procure new version of Microsoft licence by June 25 Microsoft licences Frequency of procuring new Microsoft licences 2 ( B ) IT To render effective & efficient ICT services Upgrade the municipal domain controller in June 25 Upgrading municipal domain controller Frequency of upgrading municipal domain controller 2

14 ( C ) IT To render effective & efficient ICT services Install wireless points to improve connectivity in the Disaster centre by June 25 Wireless points installation wireless points connected 2 2 ( D ) IT To render effective & efficient ICT services Increase the server capacity back-up to cater for all municipal users municipal officials catered for through the back-up service municipal officials catered for through the backup service Summary of municipal Financial Viability Quarterly Performance report Municipal Yearly Targets Quarterly Targets Achieved KPI s Unachieved KPI s Variance Explanation Expenditure Strategic Focus

15 GOOD GOVERNANCE Municipal Strategic Focus Area Objective Strategy Project Name Key Performance Indicator Baseli ne- Year 26/ 27 Budg et Midyear targe ts Quart er targe ts Quarte r 2 Achiev ed targets Mid-year Achieved targets Achiev ements Challenges 5.. (A ) IDP Ensure participation of all stakeholders in the IDP forum meetings. Invite all stakeholders on our IDP database to participate in our forum meetings IDP stakeholders invited to our IDP forum meetings. 2 no ( B ) IDP Ensure implementation of a District wide integrated planning process To review and approve a District IDP framework plan to inform process plans of all local municipalities. District IDP framework plan framework plans reviewed yes ( C ) IDP Ensure implementation of a District wide integrated planning process Review and approve a District IDP process plan District IDP process plan process plans reviewed yes ( D) IDP Ensure implementation of a District wide integrated planning process Coordinate the review and approval of local IDP process plans Local IDP process plans local IDP process plans reviewed no ( E) IDP Ensure implementation of a District wide integrated planning process Convene four IDP Managers forum meetings by the end of June 26 IDP Managers forum IDP Managers forum meetings convened 2 no

16 5.2. Moral regeneration Restore societal moral values Convening public Moral regeneration convened 5 2 Target was unachieved Political Office was preparing for National Elections in quarter Poverty Alleviation To Address the plight of indigent households in our District Establish five food Gardens in Five Local Municipalities by 27 Poverty Alleviation Five Food Gardens Established in Five Local Municipalities 3 2 Target unachieved Political Office was preparing for National Elections in quarter. 5.. ( A) District Aids Council & HIV & AIDS Reduce the spread of HIV & AIDS in the District Coordinate District Aids Council meetings DAC DAC meetings coordinated, 2 Target unachieved Political Office was preparing for National Elections in quarter. ( B ) District Aids Council & HIV & AIDS Reduce the spread of HIV & AIDS in the District Coordinate HIV and AIDS throughout the district. HIV and AIDS HIV and AIDS coordinated. 5, 2 Targets unachieved Political Office was preparing for National Elections in quarter (A) Gender, Disability, Elderly and Children s Programme Promote the interests of designated groups Conduct targeted on the elderly Targeted targeted conducted for the elderly 39,5 ( B) Gender, Disability, Elderly and Children s Programme Promote the interests of designated groups Conduct targeted for women Targeted targeted 5, Target unachieved Political Office was preparing for

17 conducted for the women National Elections in quarter. ( C ) Gender, Disability, Elderly and Children s Programme Promote the interests of designated groups Conduct targeted for the people with disabilities Targeted targeted conducted for people with disabilities Promote the interests of designated groups Conduct targeted on children s programmes. Targeted targeted conducted for children 5, 5.6. ( A) National Campaigns Ensure coordination of all national and provincial in the district. Convene state of the province address session State of the Province address conducted. 5, Targets unachieved Political Office was preparing for National Elections ( B )National Campaigns Ensure coordination of all national and provincial in the district. Undertake international trips International trips trips undertaken 2 Targets unachieved Political Office was preparing for National Elections ( C )National Campaigns Ensure coordination of all national and provincial Convene international women s day celebration activity International women s day international women s day celebration activity convened To be Achieved in quarter 3

18 in the district. ( D )National Campaigns Ensure coordination of all national and provincial in the district. Convene freedom day celebration activity Freedom day celebration freedom day celebration activity convened To be achieved in quarter ( E )National Campaigns Ensure coordination of all national and provincial in the district. Launch 6 days of activism against women and children abuse 6 Days activism 6 days activism against women and children launched Yes 5.7 Mandela day To participate in the 67 minutes Mandela day in July. Launch Mandela day Mandela day, Targets unachieved Political Office was preparing for National Elections 5.8 Bursaries T provide bursaries to deserving students in Lejweleputswa region/district Identify needy students in the district to apply for bursaries Bursaries bursaries awarded 2 2, To be Achieved in quarter Educational project Encourage matriculation learners to improve their learning/passing grades. Conduct motivational talk Motivational talk motivational talks conducted 3, To be Achieved in quarter 3

19 5.. Grant-in-Aid Create a conducive environment for the provision of aid during times of need Donate money to members of the communities during times of need. Grant -in Aid members given donation + Depen dent on the amoun t neede d 3 To be Achieved in quarter 3 Targets unachieved Political Office was preparing for National Elections 5. Youth Developme nt To ensure that the needs of young people are catered for Organise youth activities in the District Youth development of youth development activities organised 52 Targets unachieved Political Office was preparing for National Elections 5.2 OR Tambo games To facilitate hosting of OR Tambo games OR Tambo games games facilitated Training Ward councillors Improve skills of ward councillors & committee members throughout the district Conduct 2 district wide accredited skills training sessions for all ward committees. Accredited Skills Training accredited training sessions conducted. New project 2 2 Targets unachieved Political Office was engaged In preparation s of National elections 5.. Ward committee competitions Reward best performing ward committees in the district Convene annual ward committee award by the end of June 26 Ward committee competitions ward awards convened New project Annual activity 5.5. Public Participation and Education Provide a platform for the promotion of stakeholder participation Convene three public participation meetings on IDP by June 26. Public Participation meetings Public participation meetings convened Yes

20 5.6.National Population registration campaign Coordinate continuous registration of new born babies and all citizens from 6 years upwards Convene 2 outreach programmes in each local municipality by the end of June 26. Outreach programmes Provide birth certificates and id s for residents Waiting for home affairs to finalise the programme 5.7.Men s Forum Encourage the promotion of a nonviolent society through men outreach programme Convene local municipal sessions per year Men s forum men s forum sessions held per year ,5 2 The speaker requested that the project be done on the second quarter 5.8. ( A ) IGR Ensure implementation of a single window of coordination in the district. Conduct four () M & E site visits per year. IGR monitoring and evaluation site visits conducted per year 2 ( B ) IGR Ensure implementation of a single window of coordination in the district. Convene technical district coordinating committee meetings per year IGR technical district coordinating forum meetings held. 2 Induction of new councillors was still in the process for quarter ( C ) IGR Ensure implementation of a single window of coordination in the district. Convene political coordinating forum meetings per year IGR political district coordinating forum meetings held. 2 Induction of new councillors was still in the process for quarter 5.9.LED Forum Coordinate all local economic development initiatives throughout the district Convene LED forum meetings per year LED Forum LED forum meetings convened 2

21 5.2. Policy Development Create an improved policy environment in the municipality. Revise three identified policies by June 26 Policy development policies revised Branding Ensure effective branding of LDM activities Procure a x meter municipal banner Branding municipal banners procured sources 2 2 Yes Internal audit Facilitate achievement of a clean audit of the municipality and its entity Conduct quarterly internal audits to ensure improvement of service delivery. Internal audit quarterly internal audits conducted per annum New project, 2 2 Yes Risk Conduct quarterly risk assessments on identified municipal programmes as per the risk audit plan. Conduct monthly monitoring of identified risks and provide feedback Risk management quarterly risk assessments conducted New project Performance System Promote a culture of performance management Coordinate the development of eighteen (8) nonfinancial performance reports by the end of June 26 Performance reports developed by the end of June 26 6, 2 2 Yes Ensure effective branding of LDM and communication with all its stakeholders Reflect quarterly Communication of Achievements of the Municipality through newsletters, print or electronic Data Advertise in various media sources Municipal branding And Communication Adverts in the Media 6 3 9

22 5.27.EPWP Programme To facilitate creation Jobs for disadvantaged Youth women and men Create jobs for 8 unemployed youth, women and men EPWP jobs created Rural Roads To ensure that all district rural roads are in good conditions Re Gravel all district rural roads Rural roads asset maintenance Annual activity Summary of Good Governance Quarterly Performance Municipal Yearly Targets Quarterly Targets Achieved KPI s Unachieved KPI s Variance Explanation Expenditure Strategic Areas

23 MUNICIPAL HEALTH SERVICES Municipal Strategic Focus Area Objective Strategy Project Name Key Performance Indicator Basel ine- Year 26/ 27 Budget Midyear targe ts Quar ter Achie ved targe ts Quart er 2 Achie ved targe ts Mid-year Achieved targets Achievem ents challenges 6.Municipal health services To do water quality monitoring to ensure safe and healthy potable water Implement effective water quality monitoring program. Water quality monitoring water quality samples taken in terms of SANS , Shortage of Environmental Health Practitioners. National Policy Ratio is : ; LDM ration : Municipal health services Enhance consumer protection with sufficient food control Monitor all food selling outlets for compliance to legislation Food quality monitoring food selling outlets complied 5 5, Shortage of Environmental Health Practitioners. National Policy Ratio is : ; LDM ration : Implement effective food sampling program Food sampling food samples taken Offices closed on the 5 th of December, that s why couldn t reach the target. 6.3 Municipal health services To create public environmenta l health Implement environmental health Environmental health campaign environmental health conducted. 29, 2 Role players and stakeholders like the Department of Environmental Affairs and Matjhabeng Waste Recyclers was not available during this quarter. Two

24 will be held in the 2 nd quarter. 6. Municipal health services Ensure safe air quality Ensure licensing of air quality emitters. Licensing of air quality emitters licenses issued, 2 Auditing of Atmospheric Emission Licenses issued Auditing of Licences Licenses audited New projec t 2 6.5Municipal health services To ensure responsible waste management practices Quarterly Monitoring 6 waste management landfill sites Waste management monitoring waste management landfill sites monitored Municipal health services Quarterly Monitoring 7 waste collection services Waste collection monitoring waste collection services monitored Municipal health services Conduct quarterly waste management. Waste management waste management held 2 Role players and stakeholders like the Department of Environmental Affairs and Matjhabeng Waste Recyclers was not available during this quarter. Two will be held in the 2 nd quarter. 6.9 Disaster Conduct Disaster Conduct monthly disaster in Disaster monthly disaster 2 2 6, 6 5

25 . schools, and among the communities in conjunction with the 5 local municipalities in the district held. 6. (A) Disaster Ensure an integrated, and multi-sectoral approach to Disaster in the District Convene four quarterly disaster management advisory forum meetings Disaster Relief Awareness. disaster Advisory Forum meetings held 23, 2 2 ( B) Disaster Ensure an integrated, and multi-sectoral approach to Disaster in the District Attend the Provincial Advisory Forum meetings held quarterly. Disaster Relief Awareness. Provincial Disaster Meetings attended. 2 2 ( C ) Disaster Ensure an integrated, and multi-sectoral approach to Disaster in the District Establish Local Municipalities Disaster Forums in the 5 Local Municipalities. Disaster Relief Awareness. Local Municipality Disaster Forums established and subsequent meetings attended. New ( D ) Disaster Ensure an integrated, and multi-sectoral approach to Disaster Conduct Disaster workshops for Councillors and Officials in conjunction with SALGA and the Disaster Relief Awareness. Disaster Workshops held. New t for a quarter

26 in the District Provincial Disaster Centre. ( E ) Disaster Ensure an integrated, and multi-sectoral approach to Disaster in the District Participate in Sector Departments public. Disaster Relief Awareness. sector departments public attended. NEW t for a quarter 6. Disaster Formalize and promote integrated, uniform, and consistent response and recovery to Disasters, and Disaster incidents throughout the district. Develop disaster mitigation strategies; Contingency Plans; Evacuation Plans; and Draft a Relief Assistance Policy for Incidents. Disaster Relief of reports submitted on incidents responded to and relief rendered 6, 2 incidents reported 6.2 ( A) Fire services Ensure coordination of fire services throughout the District. Conduct fire safety. Fire Safety Campaigns. reports on fire safety conducted 2 5

27 Summary of Safe and Environmental Health Quarterly Performance Municipal Yearly Targets Quarterly Targets Achieved KPI s Unachieved KPI s Variance Explanation Expenditure Strategic Focus

28

Performance management provides mechanism to measure whether strategic targets set by an organisation and employees are met.

Performance management provides mechanism to measure whether strategic targets set by an organisation and employees are met. . . OVERVIEW OF PERFORMANCE WITHIN THE ORGANISATION. Municipal Performance system is a tool used to measure the implementation of Organisational strategies. It is a planning tool used to monitor, measure

More information

2 nd Quarterly Performance Report 2014/ P a g e

2 nd Quarterly Performance Report 2014/ P a g e 2 nd Quarterly Performance Report 2014/2015 1 P a g e Index PMS background Page 3-8 KPA 1 Basic Services and Infrastructure Investment Page 9-9 KPA 2 Local Economic Development Page 10-14 KPA 3 Municipal

More information

PIXLEY KA SEME DISTRICT MUNICIPALITY

PIXLEY KA SEME DISTRICT MUNICIPALITY PIXLEY KA SEME DISTRICT MUNICIPALITY FINAL SERVICE DELIVERY BUDGET IMPLEMENTATION PLAN ( SDBIP ) 2014/2015 1 Table of Contents Page no. 1. Introduction 3 2. Legislative Framework in terms of MFMA 3 3.

More information

BERGRIVIER MUNICIPALITY REPORT BY THE STRATEGIC MANAGER

BERGRIVIER MUNICIPALITY REPORT BY THE STRATEGIC MANAGER BERGRIVIER MUNICIPALITY REPORT BY THE STRATEGIC MANAGER TO: MAYORAL COMMITTEE COUNCIL 2018/19 QUARTERLY BUDGET AND PERFORMANCE REPORT FOR QUARTER 1: 1 JULY 30 SEPTEMBER 2018 SUBMITTED IN TERMS OF SECTION

More information

Moretele Local Municipality. IDP/Budget Process Plan 2018/ ( IDP: Process Plan)

Moretele Local Municipality. IDP/Budget Process Plan 2018/ ( IDP: Process Plan) Moretele Local Municipality IDP/Budget Process Plan /2019 1 Revision Control Final - August 2017 Strategic Services IDP/PMS Unit Enquiries: 012 716 1321 / 1324 (tel) thabo.makwela@moretele.org.za nyakale.lale@moretele.org.za

More information

Toplayer Service Delivery Budget Implementation Plan for 2016/17

Toplayer Service Delivery Budget Implementation Plan for 2016/17 Toplayer Service Delivery Budget Implementation Plan for 206/7 Provincial Strategic Outcome KPI Calculation Type Assist Directorate [R] [R] National KPA [R] IDP Objective [R] KPI Name [R] Unit of Measurement

More information

NATIONAL YOUTH DEVELOPMENT AGENCY ANNUAL REPORT PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATIONS DATE: 16 October 2013

NATIONAL YOUTH DEVELOPMENT AGENCY ANNUAL REPORT PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATIONS DATE: 16 October 2013 NATIONAL YOUTH DEVELOPMENT AGENCY ANNUAL REPORT 2012-2013 PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATIONS DATE: 16 October 2013 PRESENTATION OUTLINE A OVERVIEW OF NYDA 2012/2013 PERFORMANCE B

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

By 2030 ethekwini will be Africa s most caring and liveable city. ethekwini Municipality s Annual Report

By 2030 ethekwini will be Africa s most caring and liveable city. ethekwini Municipality s Annual Report ethekwini Municipality s Annual Report BACKGROUND Annual Report is a legislative requirement Constitution s41 (1) (c), s152: Promotion of accountability and transparency of government. Municipal Systems

More information

NDT Briefing to the SELECT COMMITTEE ON TRADE AND INTERNATIONAL RELATIONS

NDT Briefing to the SELECT COMMITTEE ON TRADE AND INTERNATIONAL RELATIONS NDT Briefing to the SELECT COMMITTEE ON TRADE AND INTERNATIONAL RELATIONS Annual Report 2010/11 November 2011 1 Unqualified Audit No matters of emphasis AUDITOR-GENERAL S REPORT Compliance with laws and

More information

CHAPTER 2: MUNICIPAL DEVELOPMENT PROFILE KPA: Municipal Transformation and Organizational Development

CHAPTER 2: MUNICIPAL DEVELOPMENT PROFILE KPA: Municipal Transformation and Organizational Development CHAPTER 2: MUNICIPAL DEVELOPMENT PROFILE 2.3.1 KPA: Transformation Organizational 2.3.2.1 Macro Structure Manager Manager Support IDP Performance Management Director: Community & Technical Services Director:

More information

1 July Guideline for Municipal Competency Levels: Chief Financial Officers

1 July Guideline for Municipal Competency Levels: Chief Financial Officers 1 July 2007 Guideline for Municipal Competency Levels: Chief Financial Officers issued in terms of the Local Government: Municipal Finance Management Act, 2003 Introduction This guideline is one of a series

More information

EPIP Projects Funding and Implementation Model. Mashudu Gavhi Date: 29/09/2015

EPIP Projects Funding and Implementation Model. Mashudu Gavhi Date: 29/09/2015 EPIP Projects Funding and Implementation Model Mashudu Gavhi Date: 29/09/2015 Outline Background of EPIP Programme Focus Areas Process for soliciting EPIP projects Criteria for EPIP projects Planning phase

More information

PLAN AND MANAGE THE BUDGET POLICY & PROCEDURE MANUAL

PLAN AND MANAGE THE BUDGET POLICY & PROCEDURE MANUAL PLAN AND MANAGE THE BUDGET POLICY & PROCEDURE MANUAL THABA CHWEU LOCAL MUNICIPALITY Approved 25 June 2012 Resolution no: A50/2012 TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 Vision and value statement...

More information

2017/18 INTEGRATED DEVELOPMENT PLAN (IDP), BUDGET, MONITORING, EVALUATION AND REPORTING PROCESS PLAN

2017/18 INTEGRATED DEVELOPMENT PLAN (IDP), BUDGET, MONITORING, EVALUATION AND REPORTING PROCESS PLAN 2017/18 INTEGRATED DEVELOPMENT PLAN (IDP), BUDGET, MONITORING, EVALUATION AND REPORTING PROCESS PLAN 1. STRATEGIC THRUST Well governed and managed city. 2. OBJECTIVE To obtain approval for the 2017/18

More information

2012/13 MEDIUM TERM REVENUE AND EXPENDITURE FORECASTS

2012/13 MEDIUM TERM REVENUE AND EXPENDITURE FORECASTS ANNUAL BUDGET OF LEJWELEPUTSWA DISTRICT MUNICIPALITY 2012/13 MEDIUM TERM REVENUE AND EXPENDITURE FORECASTS Copies of this document can be viewed: In the foyers of all municipal buildings All public libraries

More information

EPWP INCENTIVE GRANT MANUAL

EPWP INCENTIVE GRANT MANUAL EPWP Incentive Grant Manual 2009/10 EPWP INCENTIVE GRANT MANUAL FROM THE NATIONAL DEPARTMENT OF PUBLIC WORKS FOR THE IMPLEMENTATION OF THE EPWP INCENTIVE GRANT BY IMPLEMENTING PUBLIC BODIES Version 1 May

More information

NATIONAL TREASURY MFMA IMPLEMENTATION PLAN - TEMPLATE (Medium Capacity Municipality Only)

NATIONAL TREASURY MFMA IMPLEMENTATION PLAN - TEMPLATE (Medium Capacity Municipality Only) NATIONAL TREASURY MFMA IMPLEMENTATION PLAN - TEMPLATE (Medium Capacity Municipality Only) Name of municipality: SIYANDA DISTRICT (eg: City of Johannesburg) Demarcation code:_dc8 (eg: GT001) Plan Action

More information

JOE MOROLONG LOCAL MUNICIPALITY TOP LAYER (SDBIP) SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN 2017/ 18 FINANCIAL YEAR

JOE MOROLONG LOCAL MUNICIPALITY TOP LAYER (SDBIP) SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN 2017/ 18 FINANCIAL YEAR JOE MOROLONG LOCAL MUNICIPALITY TOP LAYER (SDBIP) SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN / 18 FINANCIAL YEAR 1 Table of contents No Chapter Heading Page No 1. Foreword Mayor 2 2. 1 Chapter 1 Introduction

More information

4/7/2015. Group. Governance and Legislation

4/7/2015. Group. Governance and Legislation Group 3 Governance and Legislation DIPLOMA IN PUBLIC ACCOUNTABILITY MINIMUM MUNICIPAL COMPETENCY PROGRAMME Karel van der Molen Module 2 Intergovernmental Fiscal Relations, Legislation and Policies affecting

More information

RELATIONSHIP BETWEEN THE BUDGET AND THE IDP 28 FEBRUARY 2017

RELATIONSHIP BETWEEN THE BUDGET AND THE IDP 28 FEBRUARY 2017 RELATIONSHIP BETWEEN THE BUDGET AND THE IDP 28 FEBRUARY 2017 1 Contents Introduction Legislative Requirements Inc. MSCOA Why MSCOA Local Government Accountability Cycle Budget Process and linkage to IDP

More information

AU SMALL FINANCE BANK LIMITED CSR POLICY APRIL, 2017

AU SMALL FINANCE BANK LIMITED CSR POLICY APRIL, 2017 AU SMALL FINANCE BANK LIMITED CSR POLICY APRIL, 2017 Contents 1. Introduction... 2 2. Objectives of the Policy... 3 3. Applicability... 4 5. CSR Principles followed by the Bank... 6 6. Implementation of

More information

FISCAL STRATEGY PAPER

FISCAL STRATEGY PAPER REPUBLIC OF KENYA MACHAKOS COUNTY GOVERNMENT THE COUNTY TREASURY MEDIUM TERM FISCAL STRATEGY PAPER ACHIEVING EQUITABLE SOCIAL AND ECONOMIC DEVELOPMENT IN MACHAKOS COUNTY FEBRUARY2014 Foreword This Fiscal

More information

3. The terms of reference of Portfolio Standing Committees will be to :

3. The terms of reference of Portfolio Standing Committees will be to : POLICY ON PORTFOLIO COMMITTEES 1. That standing committees be created for each portfolio consisting of Councillors nominated by the various political parties on a proportional basis. Where a party does

More information

PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES DPW STRATEGIC PLAN AND BUDGET FOR 2012/13 15 MAY 2012

PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES DPW STRATEGIC PLAN AND BUDGET FOR 2012/13 15 MAY 2012 PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES DPW STRATEGIC PLAN AND BUDGET FOR 2012/13 15 MAY 2012 TABLE OF CONTENTS MINISTER S FOREWORD PART A: STRATEGIC OVERVIEW INTRODUCTION AND STRATEGIC

More information

64.ity of Johannesburg 64.1 Council

64.ity of Johannesburg 64.1 Council 64.ity of Johannesburg 64.1 Council 2015-03-25 64 REQUEST FOR THE APPROVAL OF PROPOSED REFUSE REMOVAL TARIFFS FOR 2015/18 MTEF 1 STRATEGIC THRUST Well governed City, well governed entity and compliance

More information

at 8 th IAEG-SDGs Proportion of men, women and children of all ages living in poverty in all its dimensions according to national definition

at 8 th IAEG-SDGs Proportion of men, women and children of all ages living in poverty in all its dimensions according to national definition indicators and changes made at 8 th meeting of the IAEG-SDGs Target Indicator / changes made at 8 th IAEG-SDGs 1.2 1.2.2 Proportion of men, women and children of all ages living in poverty in all its dimensions

More information

RT THE APPOINTMENT OF SERVICE PROVIDERS FOR AN INTEGRATED FINANCIAL MANAGEMENT AND INTERNAL CONTROL SYSTEM FOR LOCAL GOVERNMENT

RT THE APPOINTMENT OF SERVICE PROVIDERS FOR AN INTEGRATED FINANCIAL MANAGEMENT AND INTERNAL CONTROL SYSTEM FOR LOCAL GOVERNMENT RT25 2016 THE APPOINTMENT OF SERVICE PROVIDERS FOR AN INTEGRATED FINANCIAL MANAGEMENT AND INTERNAL CONTROL SYSTEM FOR LOCAL GOVERNMENT PERIOD: 01 JUNE 2016 31 MAY 2019 BID CLOSING DATE: 18 APRIL 2016 VALIDITY

More information

Together We Raise Tomorrow. Alberta s Poverty Reduction Strategy. Discussion Paper June 2013

Together We Raise Tomorrow. Alberta s Poverty Reduction Strategy. Discussion Paper June 2013 Together We Raise Tomorrow. Alberta s Poverty Reduction Strategy Discussion Paper June 2013 Discussion Paper June 2013 1 2 Discussion Paper June 2013 Table of Contents Introduction...4 A Poverty Reduction

More information

KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW AND BUDGET PROCESS PLAN 2018/19

KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW AND BUDGET PROCESS PLAN 2018/19 KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW BUDGET PROCESS PLAN /19 Mangaung Metropolitan Municipality wishes to inform all its stakeholders and communities of the key opportunity to

More information

MPAC PRESENTATION STRATEGIC PLAN 2013

MPAC PRESENTATION STRATEGIC PLAN 2013 MPAC PRESENTATION STRATEGIC PLAN 2013 MPAC The roles and responsibilities of council should always be carried out with a clear distinction between oversight and interference in administration, as defined

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

STEVE TSHWETE LOCAL MUNICIPALITY MP

STEVE TSHWETE LOCAL MUNICIPALITY MP BUDGET POLICY AMENDED 1 JULY 2016 STEVE TSHWETE LOCAL MUNICIPALITY MP 313 Approved May 2016 C36/05/2016 TABLE OF CONTENTS 1. Definitions 2. Introduction 3. Objective 4. Budgeting principles 5. Budget preparation

More information

Sishen Iron Ore Company (Pty) Ltd. Mining Right No: MPT 50/2009. DMR Ref: NC 30/5/1/1/2/069 MR KOLOMELA MINE SOCIAL AND LABOUR PLAN EXTRACT

Sishen Iron Ore Company (Pty) Ltd. Mining Right No: MPT 50/2009. DMR Ref: NC 30/5/1/1/2/069 MR KOLOMELA MINE SOCIAL AND LABOUR PLAN EXTRACT Sishen Iron Ore Company (Pty) Ltd Mining Right No: MPT 50/2009 DMR Ref: NC 30/5/1/1/2/069 MR KOLOMELA MINE SOCIAL AND LABOUR PLAN EXTRACT LED PROGRAMME 2015-2019 KOL-MNG-DMR-PLN-0001 Page 1 of 6 PLEASE

More information

Barito Kuala, Indonesia

Barito Kuala, Indonesia Barito Kuala, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support

More information

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( ) Palu, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support Consultant

More information

2016/17 Quarter 3 Spending Outcome

2016/17 Quarter 3 Spending Outcome 2016/17 Quarter 3 Spending Outcome STANDING COMMITTEE ON APPROPRIATIONS Presenter: Dondo Mogajane DDG: Public Finance, National Treasury 01 March 2017 Contents Summary of 2016/17 voted expenditure Spending

More information

QUARTERLY PERFORMANCE REPORT FOR QUARTER 3: 1 JANUARY MARCH 2016

QUARTERLY PERFORMANCE REPORT FOR QUARTER 3: 1 JANUARY MARCH 2016 ANNEXURE C QUARTERLY PERFORMANCE REPORT FOR QUARTER 3: 1 JANUARY 2016 31 MARCH 2016 2/9/2 REPORT BY THE MANAGER STRATEGIC SERVICES 1 PURPOSE The purpose of this report is to present the quarterly performance

More information

UN-OHRLLS COUNTRY-LEVEL PREPARATIONS

UN-OHRLLS COUNTRY-LEVEL PREPARATIONS UN-OHRLLS COMPREHENSIVE HIGH-LEVEL MIDTERM REVIEW OF THE IMPLEMENTATION OF THE ISTANBUL PROGRAMME OF ACTION FOR THE LDCS FOR THE DECADE 2011-2020 COUNTRY-LEVEL PREPARATIONS ANNOTATED OUTLINE FOR THE NATIONAL

More information

TABLE OF CONTENTS. 3 Acronyms. 4 Introduction, Background and Objectives. 5 Aims and Objectives of the Communications Strategy.

TABLE OF CONTENTS. 3 Acronyms. 4 Introduction, Background and Objectives. 5 Aims and Objectives of the Communications Strategy. THABA CHWEU LOCAL MUNICIPALITY COMMUNICATIONs AND MARKETING STRATEGY 2014-2015 T h a b a C h w e u L o c a l M u n i c i p a l i t y C o m m u n i c a t i o n s a n d M a r k e t i n g S t r a t e g y

More information

CAPRICORN DISTRICT MUNICIPALITY

CAPRICORN DISTRICT MUNICIPALITY 2016/17 Notwithstanding the review date as shown, this policy shall remain effective until approved otherwise by Council and may be reviewed on an earlier date as deemed necessary. Date: Printed name:

More information

THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY 2015/2016

THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY 2015/2016 REPUBLIC OF KENYA THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY JUNE 2015 0 Table of contents Table of contents... 1 Revenue Estimates FY 2015/16-2017-18... 2 Summary

More information

Unit Standard : Apply the principles of budgeting within a municipality. Karel van der Molen

Unit Standard : Apply the principles of budgeting within a municipality. Karel van der Molen Unit Standard 116345: Apply the principles of budgeting within a municipality Karel van der Molen Group The full programme 1. Strategic Management; Budgeting Implementation & Performance Management 2.

More information

BERGRIVIER MUNICIPALITY REPORT BY THE STRATEGIC MANAGER

BERGRIVIER MUNICIPALITY REPORT BY THE STRATEGIC MANAGER BERGRIVIER MUNICIPALITY REPORT BY THE STRATEGIC MANAGER TO: MAYORAL COMMITTEE COUNCIL 2015/16 QUARTERLY BUDGET AND PERFORMANCE REPORT FOR QUARTER 4: 1 APRIL 30 JUNE 2016 SUBMITTED IN TERMS O F SECTION

More information

Padang Lawas, Indonesia

Padang Lawas, Indonesia Padang Lawas, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support

More information

MNQUMA LOCAL MUNICIPALITY

MNQUMA LOCAL MUNICIPALITY MNQUMA LOCAL MUNICIPALITY DRAFT REVIEWED INTEGRATED DEVELOPMENT PLAN FOR THE PERIOD 1 JULY 2015 TO 30 JUNE Mnquma Local Municipality Draft Reviewed Integrated Development Plan for the period 2015- TABLE

More information

THE BUDGET OF DR RUTH SEGOMOTSI MOMPATI DISTRICT MUNICIPALITY

THE BUDGET OF DR RUTH SEGOMOTSI MOMPATI DISTRICT MUNICIPALITY THE BUDGET OF DR RUTH SEGOMOTSI MOMPATI DISTRICT MUNICIPALITY 2017/18 TO 2019/20 MEDIUM TERM REVENUE AND EXPENDITURE FORECASTS SCHEDULE A ANNUAL BUDGET AND SUPPORTING DOCUMENTATION OF A MUNICIPALITY ii

More information

DRAFT PROCESS PLAN. to guide the planning, drafting, adoption and review of the SWARTLAND INTEGRATED DEVELOPMENT PLAN. for. 1 July June 2022

DRAFT PROCESS PLAN. to guide the planning, drafting, adoption and review of the SWARTLAND INTEGRATED DEVELOPMENT PLAN. for. 1 July June 2022 DRAFT PROCESS PLAN to guide the planning, drafting, adoption and review of the SWARTLAND INTEGRATED DEVELOPMENT PLAN for 1 July 2017-30 June 2022 For public inputs and comments June 2016 Draft IDP Process

More information

Supplement to the Estimates. Fiscal Year Ending March 31, 2019

Supplement to the Estimates. Fiscal Year Ending March 31, 2019 Supplement to the Estimates Fiscal Year Ending March 3, 209 Supplement to the Estimates Fiscal Year Ending March 3, 209 British Columbia Cataloguing in Publication Data British Columbia. Estimates, fiscal

More information

KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW/BUDGET 2017/18

KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW/BUDGET 2017/18 KEY DATES FOR THE MANGAUNG METROPOLITAN MUNCIPALITY IDP REVIEW/BUDGET 2017/18 Mangaung Metropolitan Municipality wishes to inform all its stakeholders and communities of the key opportunity to make inputs

More information

REPORT: COUNCIL RESOLUTIONS FOR THE FIRST QUARTER (JULY TO SEPTEMBER 2017) OF THE 2017/2018 FINANCIAL YEAR

REPORT: COUNCIL RESOLUTIONS FOR THE FIRST QUARTER (JULY TO SEPTEMBER 2017) OF THE 2017/2018 FINANCIAL YEAR REPORT: COUNCIL RESOLUTIONS FOR THE FIRST QUARTER (JULY TO SEPTEMBER 2017) OF THE 2017/2018 FINANCIAL YEAR Committee Services # Item No and Description as on the Agenda and Minutes Resolution SPECIAL MEETING:

More information

An EMPOWERDEX Guide. The Codes of Good Practice. Codes Definitions

An EMPOWERDEX Guide. The Codes of Good Practice. Codes Definitions An EMPOWERDEX Guide The Codes of Good Practice Codes Definitions ABET: Means Adult Basic Education and Training as determined by the National Qualifications Authority Accreditation Body: Means the South

More information

SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government Budget. 000s

SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government Budget. 000s SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government 000s MAIN EXPENDITURE GROUP (MEG) Resource and Capital (Excluding AME) Resource Capital Total Health and Social Services

More information

3. DEVELOPMENT STRATEGIES

3. DEVELOPMENT STRATEGIES 3. DEVELOPMENT STRATEGIES Table 60: ZDM Development Strategies 1 Infrastructure and No (Powers and 1.1 Water & Sanitation Water & Sanitation 1.1.1 To progressively provide a cost effective, reliable water

More information

JOB DESCRIPTION FORM Job title:

JOB DESCRIPTION FORM Job title: Overall Purpose of the Job: To provide strategic and oversight support to the CEO, as Accounting Officer of JOSHCO in the key areas of Financial and Budgetary Management, Supply Chain and Asset Management

More information

THEEWATERSKLOOF MUNICIPALITY

THEEWATERSKLOOF MUNICIPALITY THEEWATERSKLOOF MUNICIPALITY IDP/BUDGET REVIEW 2018/2019 DRAFT PROCESS PLAN Approved by Council: Reference: C Integrated Development Plan (IDP) Process Plan Compiled in terms of Sections 27, 28 and 29

More information

LEKWA-TEEMANE LOCAL MUNICIPALITY TERMS OF REFERENCE OVERSIGHT COMMITTEE

LEKWA-TEEMANE LOCAL MUNICIPALITY TERMS OF REFERENCE OVERSIGHT COMMITTEE LEKWA-TEEMANE LOCAL MUNICIPALITY TERMS OF REFERENCE OVERSIGHT COMMITTEE To be read in conjunction with National Treasury MFMA Circular 32 The Oversight Report CONTENTS 1. INTRODUCTION 3 2. BACKGROUND 3

More information

Engcobo Local Municipality: Revised Integrated Development Plan for

Engcobo Local Municipality: Revised Integrated Development Plan for Engcobo Local Municipality: Revised Integrated Development Plan for 2013-2014 Contact Details Contact Person Position Mr. S. Mahlasela Municipal Manager Address P.O. Box 24, Engcobo, 5050 Telephone Number

More information

6/10/2017 NOTE ORIENTATION. Unit Standard Apply the principles of budgeting within a municipality

6/10/2017 NOTE ORIENTATION. Unit Standard Apply the principles of budgeting within a municipality NOTE DIPLOMA IN PUBLIC ACCOUNTABILITY MODULE 13 208 191 / Compliance and control 1 (4 UNIT STANDARDS) US 116345 Dr Len Mortimer Participants are advised to have access to: The respective learner guide,

More information

Corporate Social Responsibility Policy. CORDS CABLE INDUSTRIES LIMITED (Approved by Board of Director s in their meeting held on April 01, 2015)

Corporate Social Responsibility Policy. CORDS CABLE INDUSTRIES LIMITED (Approved by Board of Director s in their meeting held on April 01, 2015) Corporate Social Responsibility Policy CORDS CABLE INDUSTRIES LIMITED (Approved by Board of Director s in their meeting held on April 01, 2015) Contents 1. Concept 2. CSR in India 3. Policy Objective 4.

More information

Supplement No. 1 published with Extraordinary Gazette No. 82 dated 26 th October, 2018.

Supplement No. 1 published with Extraordinary Gazette No. 82 dated 26 th October, 2018. CAYMAN ISLANDS Supplement No. 1 published with Extraordinary Gazette No. 82 dated 26 th October, 2018. THE SUPPLEMENTARY APPROPRIATION (JULY 2016 TO DECEMBER 2017) LAW, 2018 (LAW 25 OF 2018) 2 CAYMAN ISLANDS

More information

1. INTRODUCTION 2. OVERVIEW OF POLICY PRIORITIES FOR 2016/17

1. INTRODUCTION 2. OVERVIEW OF POLICY PRIORITIES FOR 2016/17 REPORT OF THE PORTFOLIO COMMITTEE ON COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS ON THE ANNUAL PERFORMANCE PLAN AND BUDGET VOTE 4 OF THE DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS

More information

Karlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Karlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Karlstad, Sweden Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: Ulf Nyqvist Name of focal point: -Anna -Sjödin Organization: -Karlstad Municipality

More information

Design & Planning of EPWP Phase II

Design & Planning of EPWP Phase II Design & Planning of EPWP Phase II Briefing and Key Decisions 10 November 2008 EPWP 2 GOAL To create 4,5 million (short and ongoing) work opportunities for poor and unemployed people in South Africa so

More information

TRANSFORMATION POLICY

TRANSFORMATION POLICY SANRAL TRANSFORMATION POLICY DRAFT Policy Reference Number Version Number Effective Date Review Date Policy Owner Signature Policy Sponsor Signature Date of Approval FRAMEWORK 1. INTRODUCTION 2. POLICY

More information

Padang Lawas, Indonesia

Padang Lawas, Indonesia Padang Lawas, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Tesco Bengaluru Corporate Social Responsibility Policy

Tesco Bengaluru Corporate Social Responsibility Policy Tesco Bengaluru Corporate Social Responsibility Policy 2018-19 [Section 135 of the Companies Act, 2013, read with Schedule VII of the Companies Act, 2013 and the Companies (Corporate Social Responsibility

More information

Course Framework for Effective Cash Flow Management

Course Framework for Effective Cash Flow Management Date: 1 to 3 November 2017 Venue: The Dunes, Arniston Western Cape Facilitator: Deon van der Westhuizen Course Framework for Effective Cash Flow Management UPDATED September 2017 Effective cash flow management

More information

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the European Year for Active Ageing (2012) (text with EEA relevance)

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the European Year for Active Ageing (2012) (text with EEA relevance) EUROPEAN COMMISSION Brussels, 6.9.2010 COM(2010) 462 final 2010/0242 (COD) C7-0253/10 Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the European Year for Active Ageing (2012)

More information

Bone Bolango, Indonesia

Bone Bolango, Indonesia Bone Bolango, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Highlights From The Approved 2013 Budget Budget in Brief

Highlights From The Approved 2013 Budget Budget in Brief Highlights From The Approved 2013 Budget 2013 Budget in Brief Preparing for the FUTURE: The City of Brandon is committed to building a sustainable future. Our 2013 budget process was improved in many ways,

More information

Sol Plaatje Local Municipality (NC091)

Sol Plaatje Local Municipality (NC091) Sol Plaatje Local ity (NC091) Annual Performance Report for the period 1 July 2016 to 30 June Table of Contents 1. Introduction... 2 2. Legislative Background... 2 3. Statistical Background of the ity...

More information

Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012

Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012 Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012 Country situation and challenges Serbia and the EU The EU is the major partner

More information

By 2030 ethekwini will be Africa s most caring and liveable city ORGANISATIONAL PERFORMANCE MONITORING. Presented by: Nevana Srikissoon

By 2030 ethekwini will be Africa s most caring and liveable city ORGANISATIONAL PERFORMANCE MONITORING. Presented by: Nevana Srikissoon ORGANISATIONAL PERFORMANCE MONITORING Presented by: Nevana Srikissoon BACK TO BASICS In implementing legislation and carrying out Constitutional mandate, municipalities work to ensure: -Basic Services:

More information

KENYA'S VISION 2030: AN AUDIT FROM AN INCOME AND GENDER INEQUALITIES PERSPECTIVE. SID Society for International Development

KENYA'S VISION 2030: AN AUDIT FROM AN INCOME AND GENDER INEQUALITIES PERSPECTIVE. SID Society for International Development KENYA'S VISION 2030: AN AUDIT FROM AN INCOME AND GENDER INEQUALITIES PERSPECTIVE SID Society for International Development I Contents Section 1 List of Abbreviations and Acronyms x Executive Summary xiv

More information

SECTION 2: OVERVIEW OF AUDIT OUTCOMES. Consolidated general report on national and provincial audit outcomes for

SECTION 2: OVERVIEW OF AUDIT OUTCOMES. Consolidated general report on national and provincial audit outcomes for SECTION 2: OVERVIEW OF AUDIT OUTCOMES 45 Consolidated general report on national and provincial audit outcomes for 204-5 Figure : Slight improvement in audit outcomes (all auditees) 7% (76) 28% (3) 26%

More information

HEALTH AND SOCIAL SERVICES

HEALTH AND SOCIAL SERVICES HEALTH AND SOCIAL SERVICES SUMMARY New New Resource Capital TOTAL RESOURCE AND CAPITAL (Excluding AME) Resource AME Capital AME TOTAL AME 7,813,088 2,300 7,815,388 0 0 0 373,096 0 373,096 338,488 0 338,488

More information

Learner Guide Municipal budgeting and implementation. Unit Standard Title Plan a municipal budgeting and reporting cycle. Unit Standard ID

Learner Guide Municipal budgeting and implementation. Unit Standard Title Plan a municipal budgeting and reporting cycle. Unit Standard ID Learner Guide Municipal budgeting and implementation Unit Standard Title Plan a municipal budgeting and reporting cycle Unit Standard ID 116364 Notice This material has been developed by National Treasury

More information

Ministry of Environment. Plan for saskatchewan.ca

Ministry of Environment. Plan for saskatchewan.ca Ministry of Environment Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 9 Financial Summary...10

More information

I n t r o d u c t i o n

I n t r o d u c t i o n T he District Health Systems (DHS) across South Africa are the decentralised building blocks of the National Health System. The aim of the DHS is to have decisions made locally about services and resources.

More information

South African Human Rights Commission

South African Human Rights Commission South African Human Rights Commission Presentation on Strategic Plan and Annual Performance Plan to the Portfolio Committee on Justice & Constitutional Development 1 OUTLINE OF PRESENTATION PART A: OVERVIEW

More information

THE SUSTAINABLE DEVELOPMENT GOALS AND SOCIAL PROTECTION

THE SUSTAINABLE DEVELOPMENT GOALS AND SOCIAL PROTECTION THE SUSTAINABLE DEVELOPMENT GOALS AND SOCIAL PROTECTION Ms Nelisiwe Vilakazi Acting Director General- Ministry of Social Development REPUBLIC OF SOUTH AFRICA Global Practitioners Learning Event Oaxaca,

More information

UNITED REPUBLIC OF TANZANIA NATIONAL AGEING POLICY

UNITED REPUBLIC OF TANZANIA NATIONAL AGEING POLICY UNITED REPUBLIC OF TANZANIA NATIONAL AGEING POLICY MINISTRY OF LABOUR, YOUTH DEVELOPMENT AND SPORTS September, 2003 TABLE OF CONTENTS CHAPTER ONE PAGE 1. INTRODUCTION. 1 1.1 Concept and meaning of old

More information

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA REPORT ON THE INVITATION TO THE PUBLIC TO COMMENT 1. Overview of the public consultation process The objective of this

More information

Beirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Beirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Beirut, Lebanon Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Bilal Hamad Organization: - Title/Position: - E-mail address:

More information

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY, MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2014-2021 between THE KINGDOM OF NORWAY, hereinafter referred to as Norway and THE REPUBLIC OF, hereinafter referred

More information

MINISTRY OF COMMUNITY, ABORIGINAL AND WOMEN'S SERVICES

MINISTRY OF COMMUNITY, ABORIGINAL AND WOMEN'S SERVICES MINISTRY OF COMMUNITY, ABORIGINAL AND WOMEN'S SERVICES The mission of the Ministry of Community, Aboriginal and Women s Services is to work in partnership with governments and communities to improve the

More information

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Palu, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Supplementary Supply Estimates (No. 2) General Revenue Fund

Supplementary Supply Estimates (No. 2) General Revenue Fund 2016-17 Supplementary Supply s (No. 2) General Revenue Fund 2016-17 Supplementary Supply s (No. 2) General Revenue Fund Presented by the Honourable Joe Ceci President of Treasury Board and Minister of

More information

CSR POLICY OF MAX LIFE INSURANCE COMPANY LTD.

CSR POLICY OF MAX LIFE INSURANCE COMPANY LTD. CSR POLICY OF MAX LIFE INSURANCE COMPANY LTD. I. PREAMBLE 1.1 Corporate Social Responsibility has been an area of focus or the Max Group and Max Life Insurance Company Limited, ( Max Life or the Company

More information

MANGAUNG METROPOLITAN MUNICIPALITY BUDGET POLICY

MANGAUNG METROPOLITAN MUNICIPALITY BUDGET POLICY MANGAUNG METROPOLITAN MUNICIPALITY BUDGET POLICY 2 INDEX 1. Statutory Framework... 3 2. Policy Objectives... 8 3. Votes, Categories of Expenditure and Line Items... 8 4. Capital Budget Mythology... 9 5.

More information

LAGOS STATE GOVERNMENT COMPENDIUM OF SECTOR/MDAs INDICATORS

LAGOS STATE GOVERNMENT COMPENDIUM OF SECTOR/MDAs INDICATORS LAGOS STATE GOVERNMENT COMPENDIUM OF SECTOR/MDAs INDICATORS Prepared during the series of workshops conducted by MED/ Sector MDAs representatives & SPARC Updated June 2013. 1 Table of Contents TABLE 1:

More information

LEKWA-TEEMANE LOCAL MUNICIPALITY NW 396

LEKWA-TEEMANE LOCAL MUNICIPALITY NW 396 LEKWA-TEEMANE LOCAL MUNICIPALITY NW 396 Mid-Year Budget Performance Assessment Report 2015/ TABLE OF CONTENTS 1. MUNICIPAL MANAGER S FOREWORD... 1 2. INTRODUCTION... 6 3. SECTION A: MID-YEAR BUDGET ASSESSMENT...

More information

DR BEYERS NAUDÉ LOCAL MUNICIPALITY EC101

DR BEYERS NAUDÉ LOCAL MUNICIPALITY EC101 DR BEYERS NAUDÉ LOCAL MUNICIPALITY EC101 2022 IDP 1st REVIEW & /19 BUDGET PROCESS INTEGRATED ACTION PROGRAMME : ACTIVITIES & TIMELINES "IDP is an ethos; a spirit" A 1 DISTRICTLEVEL MEETING & s : Discussion

More information

WEST COAST DISTRICT MUNICIPALITY DRAFT DELEGATION REGISTER

WEST COAST DISTRICT MUNICIPALITY DRAFT DELEGATION REGISTER WEST COAST DISTRICT MUNICIPALITY DRAFT DELEGATION REGISTER 1 Table of Contents Index Page Preamble 3 Legal requirements 3 General provisions 7 Definitions 8 Abbreviations 10 Principles of delegation 10

More information

Minister Jeff Radebe: Independent Power Producer Programmes. Senior officials from all stakeholders behind this outcome

Minister Jeff Radebe: Independent Power Producer Programmes. Senior officials from all stakeholders behind this outcome Minister Jeff Radebe: Independent Power Producer Programmes 8 Mar 2018 Media Statement by Minister Jeff Radebe, Minister of Energy on the Independent Power Producer Programmes Director-General, Thabane

More information

Mirae Asset Global Investments (India) Pvt. Ltd. Corporate Social Responsibility (CSR) Policy

Mirae Asset Global Investments (India) Pvt. Ltd. Corporate Social Responsibility (CSR) Policy Mirae Asset Global Investments (India) Pvt. Ltd. Corporate Social Responsibility (CSR) Policy 1 CONTENTS I. Introduction 3 II. Background. 3 III. Our Objectives... 4 IV. Activities enumerated in Schedule

More information

CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY)

CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY) CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY) 1. TITLE AND APPLICABILITY The Document describes the Corporate Social Responsibility Policy ( CSR Policy ) of M/s. Modi Builders and Realtors Private

More information

GOVERNMENT PAPER. Challenged by globalisation and ageing of population; the Finnish baby boom cohorts were born in

GOVERNMENT PAPER. Challenged by globalisation and ageing of population; the Finnish baby boom cohorts were born in Forecasting Skills and Labour Market Needs Government Paper Ministry of Labour, Ms. Heli Saijets, Ph.D., Mr. Pekka Tiainen Ministry of Education, Ms. Kirsi Kangaspunta, Mr. Heikki Mäenpää Finnish National

More information

Limpopo Gambling Board. Annual Performance Plan 2013/14

Limpopo Gambling Board. Annual Performance Plan 2013/14 Limpopo Gambling Board Annual Performance Plan 2013/14 Foreword We are submitting the second draft Annual Performance Plan 2013/14, which is guided by the Strategic Plan. The Annual Performance Plan outlines

More information