1 The Redevelopment of Davisville Public School & Spectrum Alternative School Community Meeting #2 30 May

2 AGENDA # Item ACTION 1.1 Welcome and Introductions Superintendent Ian Allison 1.2 Greetings from Elected Representatives Trustee Shelley Laskin 1.3 Project Background & Schedule Senior Manager MCP & BP Jeff Latto 1.4 Site Plan & Building Design Snyder Architects 1.5 Questions 1.6 Next Steps Senior Manager MCP & BP Jeff Latto 2

3 WELCOME AND INTRODUCTIONS Shona Farrelly, Principal Cecile Robertson, Vice Principal Shelley Laskin, Trustee, Ward 11 Ian Allison, Superintendent of Schools, Learning Network 2 Jeff Latto, Senior Manager Major Capital Projects & Building Partnerships Elsa Chow, Toronto Children s Services Doug Snyder, Snyder Architects Avinash Garde, Snyder Architects Rochelle Moncarz, Snyder Architects Sharon Sterling and Racheal Saunders, WSP 3

4 GREETINGS FROM ELECTED REPRESENTATIVES 4

5 PROJECT BACKGROUND & SCHEDULE BACKGROUND In 2012, the TDSB Board approved the plans to redevelop the Davisville/ Spectrum property involving: A Surplus Declaration of.98 acres of the school property for residential development. This land disposition would fund the construction of a new 668 pupil placement school; With the announcement of funding from the Ministry of Education for the new replacement school in late 2015, the need to redevelop the school property no longer was required; Design has gone from integrated with development to a stand alone school on the site; 5

6 PROJECT BACKGROUND & SCHEDULE BACKGROUND New school will have: Accommodation for 731 students; Dedicated area for Spectrum Alternative School; Dedicated child care space (5 rooms) for 88 children from Infants up to Pre-school age; A City of Toronto funded Third Gymnasium; City of Toronto funded below-grade parking garage with 60 parking spaces that accommodates 40 parking spaces for school staff (during the school day). This parking garage will have direct access to the new school and a future Aquatic Centre (City of Toronto funded); The Toronto Lands Corporation (TLC) is currently negotiating an agreement with the City of Toronto to determine lease arrangements for the land for the Aquatic Centre and a shared use agreement for the facilities. 6

7 PROJECT BACKGROUND & SCHEDULE BACKGROUND Through the New School Review Process for the Replacement School the following milestones have been completed: Introductory Public Meeting was held on 20 September 2016; The New School Review Team (NSRT) signed off on the Site Plan layout on 14 December, 2016; The NSRT signed off on the School Design on 23 March 2017; and Site Plan Application was submitted to the City of Toronto on 1 May We are looking to this evening s Public Meeting as a chance to show the School Design, listen to community feedback, and to discuss time lines related to the Replacement School project. 7

8 PROJECT BACKGROUND & SCHEDULE NEW REPLACEMENT SCHOOL - MAP 8

9 PROJECT BACKGROUND & SCHEDULE CONSTRUCTION SCHEDULE OF REPLACEMENT SCHOOL January 2016: Space Template Approved June 2016: Snyder Architects awarded commission for architectural services for project December 2016/March 2017: NSRT Meetings May 2017: Public Meeting November 2017 January 2018: Tendering of contract to select contractor Construction of Replacement School: assuming school operates on-site during construction July 2018: Construction start July 2020: Construction is Substantially Complete September 2020: New Replacement School opens October 2020 August 2021: Existing school is demolished, and completion of outdoor play areas. September 2021: Completion of school play grounds and fields. 9

10 Site Parameters RECAP 10

11 Site PARAMETERS RECAP 11

12 Site Parameters RECAP 12

13 Site Parameters recap 13

14 Site Parameters recap 14

15 Site Parameters recap 15

16 Site Parameters recap 16

17 Site Parameters recap 17

18 Site Parameters recap 18

19 Site Parameters recap 19

20 proposed design 20

21 UP UP UP PROPOSED DESIGN Site Plan Outdoor Classroom FDK Play FDK Play Childcare Play Ramp down Siamese Connection Existing Hydrant Entrance Court 21

22 UP UP UP PROPOSED Design UNDERGROUND PARKING PLAN Outdoor Classroom FDK Play FDK Play Childcare Play Ramp down bike P A R K I N G Siamese Connection Existing Hydrant Entrance Court 22

23 UP UP UP PROPOSED DESIGN Site Plan Outdoor Classroom FDK Play FDK Play Childcare Play Ramp down Siamese Connection Existing Hydrant Entrance Court 23

24 PROPOSED Design GROUND FLOOR plan K I N D E R G A R T E N S K I N D E R G A R T E N S C H I L D C A R E kitchen A T R I U M A D M I N G Y M N A S I U M RECEIVING 24

25 PROPOSED Design GROUND FLOOR plan K I N D E R G A R T E N S K I N D E R G A R T E N S C H I L D C A R E kitchen A T R I U M A D M I N G Y M N A S I U M RECEIVING 25

26 PROPOSED Design GROUND FLOOR plan K I N D E R G A R T E N S K I N D E R G A R T E N S C H I L D C A R E kitchen A T R I U M A D M I N G Y M N A S I U M RECEIVING 26

27 PROPOSED Design GROUND FLOOR plan K I N D E R G A R T E N S K I N D E R G A R T E N S C H I L D C A R E kitchen A T R I U M A D M I N G Y M N A S I U M RECEIVING 27

28 PROPOSED Design GROUND FLOOR plan K I N D E R G A R T E N S K I N D E R G A R T E N S C H I L D C A R E kitchen A T R I U M A D M I N G Y M N A S I U M RECEIVING 28

29 PROPOSED Design SECOND FLOOR plan C L A S S R O O M S C L A S S R O O M S C H I L D C A R E C L A S S R O O M S L I B R A R Y PLAY AREA OPEN TO GYM BELOW MULCH 29

30 PROPOSED Design SECOND FLOOR plan C L A S S R O O M S C L A S S R O O M S C H I L D C A R E C L A S S R O O M S L I B R A R Y PLAY AREA OPEN TO GYM BELOW MULCH 30

31 PROPOSED Design SECOND FLOOR plan C L A S S R O O M S C L A S S R O O M S C H I L D C A R E C L A S S R O O M S L I B R A R Y PLAY AREA OPEN TO GYM BELOW MULCH 31

32 PROPOSED Design SECOND FLOOR plan C L A S S R O O M S C L A S S R O O M S C H I L D C A R E C L A S S R O O M S L I B R A R Y PLAY AREA OPEN TO GYM BELOW MULCH 32

33 PROPOSED Design SECOND FLOOR plan C L A S S R O O M S C L A S S R O O M S C H I L D C A R E C L A S S R O O M S L I B R A R Y PLAY AREA OPEN TO GYM BELOW MULCH 33

34 PROPOSED Design THIRD FLOOR plan C L A S S R O O M S C L A S S R O O M S GREEN ROOF S T A F F C L A S S R O O M S M E C H M U S I C S P E C T R U M p l a y g r o u n d 34

35 PROPOSED Design THIRD FLOOR plan C L A S S R O O M S C L A S S R O O M S GREEN ROOF S T A F F C L A S S R O O M S M E C H M U S I C S P E C T R U M p l a y g r o u n d 35

36 PROPOSED Design THIRD FLOOR plan C L A S S R O O M S C L A S S R O O M S GREEN ROOF S T A F F C L A S S R O O M S M E C H M U S I C S P E C T R U M p l a y g r o u n d 36

37 PROPOSED Design Classroom Configuration 37

38 PROPOSED Design MASSING MODEL Field & Learning Grounds MILLWOOD ROAD Future Community Aquatics Centre Triple Gym School DAVISVILLE AVENUE Vehicular Access & Ramp Childcare 38

39 PROPOSED Design South-West 3d View 39

40 PROPOSED Design South Elevation Davisville Jr. Public Sc hool Spectrum Alternative School 40

41 PROPOSED Design North-East 3d View 41

42 PROPOSED Design North Elevation 42

43 questions 43

44 next steps Davisville Jr. Public Sc hool Spectrum Alternative School City of Toronto Site Plan Approval - first comments: end of June 2017 Detailed Design & Construction Documents Building Permit Submission: early 2018 Tender: early

ST. JOHN THE EVANGELIST CATHOLIC SCHOOL WARD 6 CAPITAL PROJECT TENDER AWARD

ST. JOHN THE EVANGELIST CATHOLIC SCHOOL WARD 6 CAPITAL PROJECT TENDER AWARD PUBLIC REPORT TO REGULAR BOARD ST. JOHN THE EVANGELIST CATHOLIC SCHOOL WARD 6 CAPITAL PROJECT TENDER AWARD I can do all this through Him who gives me strength. Philippians 4:13 (NIV) Created, Draft First

More information

Elementary School Boundary Review

Elementary School Boundary Review Elementary School Boundary Review South West Brantford May 23, 2017 Agenda Welcome and Introductions The Boundary Review Process Grand Erie s Demographics and Long Term Accommodation Forecasts for the

More information

Block 31 in the Railway Lands: Development Agreement, Update and Next Steps

Block 31 in the Railway Lands: Development Agreement, Update and Next Steps STAFF REPORT ACTION REQUIRED Block 31 in the Railway Lands: Development Agreement, Update and Next Steps Date: January 20, 2014 To: From: Wards: Executive Committee Brenda Patterson, Deputy City Manager,

More information

Meaford New School Repeat Design. At a Regular Meeting of the Board held on March 22, 2016, the following motions were approved:

Meaford New School Repeat Design. At a Regular Meeting of the Board held on March 22, 2016, the following motions were approved: BC-D-03 Report Meaford New School Repeat Design Background At a Regular Meeting of the Board held on March 22, 2016, the following motions were approved: That Bluewater District School Board approve that

More information

BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee

BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee AGENDA November 17, 2011 6:00 7:30 PM 1720 Oregon Street Berkeley, CA 94703 (510) 644-6066 1. Call to Order 2. Approval of Meeting

More information

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Date:July 30, 2003 Board Members - Parks and Recreation General Manager - Parks and Recreation CHAMPLAIN HEIGHTS COMMUNITY CENTRE ADDITION

Date:July 30, 2003 Board Members - Parks and Recreation General Manager - Parks and Recreation CHAMPLAIN HEIGHTS COMMUNITY CENTRE ADDITION Date:July 30, 2003 TO: FROM: SUBJECT: Board Members - Parks and Recreation General Manager - Parks and Recreation CHAMPLAIN HEIGHTS COMMUNITY CENTRE ADDITION RECOMMENDATION A) THAT the Board endorse a

More information

M E M O R A N D U M O F C O N F E R E N C E

M E M O R A N D U M O F C O N F E R E N C E May 3, 2013 M E M O R A N D U M O F C O N F E R E N C E PROJECT Montgomery County Public Schools Potomac Elementary School Feasibility Study ARCHITECT S PROJECT NO. 522030 DATE AND LOCATION April 30, 2013,

More information

Montclair Public Schools

Montclair Public Schools Montclair Public Schools Budget Presentation 2014-2015 March 3, 2014 Dr. Penny MacCormack Superintendent of Schools Mr. Brian Fleischer Chief Operations Officer Budget Sources and Uses 2008-2013 Budget

More information

Item No Halifax Regional Council October 2, 2018

Item No Halifax Regional Council October 2, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.2.3 Halifax Regional Council October 2, 2018 TO: Mayor Savage and Members of Halifax Regional Council Original Signed SUBMITTED BY: Councillor

More information

HONG KONG SCIENCE AND TECHNOLOGY PARKS CORPORATION

HONG KONG SCIENCE AND TECHNOLOGY PARKS CORPORATION Description The Hong Kong Science and Technology Parks Corporation (HKSTP) is now inviting qualified and experienced Contractors to apply for pre-qualification for inclusion in the tenderer s list of Design

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

Beaver Dam Unified School District Community Survey Results. Spring 2016

Beaver Dam Unified School District Community Survey Results. Spring 2016 Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit.. 2 Background Information. 2-3 Procedures Performed... 3-4 Results

More information

October 4, 2007 Page 1 of 8

October 4, 2007 Page 1 of 8 Children and adults learn and perform best in a safe and comfortable environment. Arlington Public Schools therefore provides safe, comfortable, accessible, efficient and attractive spaces for instructional

More information

PROJECT BUDGET PRESENTATION

PROJECT BUDGET PRESENTATION PROJECT BUDGET PRESENTATION Monomoy Regional High School Building Committee Meeting June 19, 2012 Project Features Serves 700 Students Grades 8-12 8 th Grade Wing located near main entrance 168,000 GSF

More information

AGENDA. School Budget Allocation School Budget Planning Non Board Funds Cashless Schools

AGENDA. School Budget Allocation School Budget Planning Non Board Funds Cashless Schools AGENDA School Budget Allocation School Budget Planning Non Board Funds Cashless Schools New Classroom Funding Additional funding of $3,000 is provided to schools that experience growth to help address

More information

GM20.13 REPORT FOR ACTION SUMMARY RECOMMENDATIONS FINANCIAL IMPACT

GM20.13 REPORT FOR ACTION SUMMARY RECOMMENDATIONS FINANCIAL IMPACT GM20.13 REPORT FOR ACTION Date: April 13, 2017 To: Government Management Committee From: President, Toronto Parking Authority Wards: Ward 6 Etobicoke - Lakeshore SUMMARY The purpose of this report is to

More information

S M A L L S T E P S B I G C H A N G E S

S M A L L S T E P S B I G C H A N G E S page 1 S M A L L S T E P S B I G C H A N G E S 1 CONTENTS PAGE 2 INTRODUCTION 3 SCOPE 2. INTRODUCTION 2 3. SCOPE 2 4. IDEAL LAYOUT 3 5. BASIS FOR BUDGETARY ANALYSIS 4 6. WARD LOCATIONS 5 7. WARD URBAN

More information

Report by Garry Sheret, Head of Property and Facilities Management

Report by Garry Sheret, Head of Property and Facilities Management Midlothian Council Tuesday 27 March 2018 New Dalkeith Primary School Report by Garry Sheret, Head of Property and Facilities Management 1 Purpose of Report The purpose of this report is to obtain governance

More information

Future Home of the Peterborough Family YMCA. Report of the Joint City/YMCA Working Committee

Future Home of the Peterborough Family YMCA. Report of the Joint City/YMCA Working Committee Future Home of the Peterborough Family YMCA Report of the Joint City/YMCA Working Committee May 2005 Committee Members On behalf of the City Ken Doherty Joyce Hawthorne Malcolm Hunt Resource: Brian Buchardt,

More information

Balancing the Operating Budget. Ward Forum Presentation

Balancing the Operating Budget. Ward Forum Presentation Balancing the 2016-2017 Operating Budget Ward Forum Presentation Introduction Introduction of staff Brief outline of presentation Video presentation & handout Operating vs. capital budgets School-based

More information

Barneveld School District Community Survey Results. Spring 2017

Barneveld School District Community Survey Results. Spring 2017 Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

BHS Renovation Plan. August 22, 2018

BHS Renovation Plan. August 22, 2018 BHS Renovation Plan August 22, 2018 Deferred Maintenance in Schools is a National Trend Inherent Challenges of Existing Building Needs Identified by Staff and Community Project Design Priorities Accessibility

More information

TOWN OF PERINTON FEE SCHEDULE 2018 DEPARTMENT OF PUBLIC WORKS PERMIT & INSPECTION FEES. $60 per inspection / $150 per re-inspection

TOWN OF PERINTON FEE SCHEDULE 2018 DEPARTMENT OF PUBLIC WORKS PERMIT & INSPECTION FEES. $60 per inspection / $150 per re-inspection TOWN OF PERINTON FEE SCHEDULE 2018 DEPARTMENT OF PUBLIC WORKS PERMIT & INSPECTION FEES Sewer Connection Fees Town Sewer District Entrance Fee Town Out-of-District Fee Monroe County Pure Waters Connection

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

PROPERTY ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY

PROPERTY ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY PROPERTY ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY - 2017 Introduction One of the main purposes of Local Authorities under the LGA 2002 is to meet the current and future needs of communities for good quality

More information

MINUTES OF THE CORPORATION MEETING HELD ON MONDAY 17 OCTOBER Independent Member. - Independent Member (Vice-Chair)

MINUTES OF THE CORPORATION MEETING HELD ON MONDAY 17 OCTOBER Independent Member. - Independent Member (Vice-Chair) Item 3 MINUTES OF THE CORPORATION MEETING HELD ON MONDAY 17 OCTOBER 2016 Meeting commenced: 6.00 p.m. Meeting closed: 8.00 p.m. Present: Mr J Lyne Ms A Ashworth Mr M Mistry Mrs J Ryan Mr M Dinsdale Mr

More information

City Planning Division Performance Metrics

City Planning Division Performance Metrics PG16.2 REPORT FOR ACTION City Planning Division Performance Metrics Date: November 14, 2016 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Wards:

More information

Time Item Notes: Presenter. Approval of Meeting Minutes (see attachment) -October 26, 2016 Please fill out: Public Input Request form

Time Item Notes: Presenter. Approval of Meeting Minutes (see attachment) -October 26, 2016 Please fill out: Public Input Request form WOODBURN SCHOOL DISTRICT 103 Bond Advisory & Accountability Committee Agenda Woodburn School District Office 1390 Meridian Drive January 18, 2017 6:30-8:30 pm Time Item Notes: Presenter 6:30-6:35 Welcome

More information

I. The following decisions shall be deemed to significantly affect the education, health or safety of a student:

I. The following decisions shall be deemed to significantly affect the education, health or safety of a student: The Greater Victoria School District is committed to each student s success in learning within a responsive and safe environment. BYLAW 9330.1 APPEAL PROCESS Preamble In the spirit of administrative fairness,

More information

Toronto District School Board

Toronto District School Board Toronto District School Board Summary of Decisions of the Co-Management Team for November 2003 November 13, 2003 1. Contract Awards (10-03-0404) (see page 4) (a) (b) That contract awards presented in Appendix

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

WATERLOO REGION DISTRICT SCHOOL BOARD NOTICE AND AGENDA

WATERLOO REGION DISTRICT SCHOOL BOARD NOTICE AND AGENDA JUNE 11, 2018 WATERLOO REGION DISTRICT SCHOOL BOARD NOTICE AND AGENDA A Committee of the Whole meeting of the Waterloo Region District School Board will be held in the Board Room, Building 2, 1 st Floor,

More information

NOTICE OF MEETING SPECIAL MEETING OF THE PLANNING AND PRIORITIES ADVISORY COMMITTEE

NOTICE OF MEETING SPECIAL MEETING OF THE PLANNING AND PRIORITIES ADVISORY COMMITTEE Laura Elliott, Director of Education NOTICE OF MEETING MEETING: DATE & TIME: LOCATION: SPECIAL MEETING OF THE PLANNING AND PRIORITIES ADVISORY COMMITTEE 2018 May 15, 6:00 p.m. Board Room, Education Centre

More information

Muskego Norway Schools Community Survey Results. Fall 2015

Muskego Norway Schools Community Survey Results. Fall 2015 Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included

More information

Planning and Regulatory Services Department Planning Policy Division

Planning and Regulatory Services Department Planning Policy Division ormo RICHMOND HILL 0.. 0 0 0 0. 0 0 II ' 6 II I 0 0 INCORPORATED 1873 0 Agenda Hem 7 COMMITTEE OF THE WHOLE MEETING Planning and Regulatory Services Department Planning Policy Division SUBJECT: Ed Sackfield

More information

University Services Preparing for Capital Renovations and Small Projects

University Services Preparing for Capital Renovations and Small Projects University Services Preparing for Capital Renovations and Small Projects Anthony C. Masi Provost Robert Couvrette Associate Vice-Principal (University Services) Academic Leadership Forum 24 February 2015

More information

2017/2018 Annual Budget Presentation. April 5, 2017

2017/2018 Annual Budget Presentation. April 5, 2017 2017/2018 Annual Budget Presentation April 5, 2017 Operating, Special Purpose and Capital Funds School districts manage financial resources in three funds: Operating Fund Where the main operating expenditures

More information

Update to the Memorial Park Master Plan. Initial Community Consultation Meeting Monday December 5 th, 2011

Update to the Memorial Park Master Plan. Initial Community Consultation Meeting Monday December 5 th, 2011 Update to the Memorial Park Master Plan Initial Community Consultation Meeting Monday December 5 th, 2011 Context Council has directed that Staff consult with members of the Public to determine whether

More information

STAFF REPORT ACTION REQUIRED. Sign Variance Request Finch Avenue East SUMMARY RECOMMENDATIONS. Date: February 19, 2010

STAFF REPORT ACTION REQUIRED. Sign Variance Request Finch Avenue East SUMMARY RECOMMENDATIONS. Date: February 19, 2010 STAFF REPORT ACTION REQUIRED Sign Variance Request Date: February 19, 2010 To: From: Chairman and Members, North York Community Council Director of Building and Deputy Chief Building Official Wards: Willowdale

More information

COMMUNITY SERVICES DIVISION Parks and Recreation Department. Chair and Members of the Community and Corporate Services Committee

COMMUNITY SERVICES DIVISION Parks and Recreation Department. Chair and Members of the Community and Corporate Services Committee Pg 1 of Report PR 13/09 COMMUNITY SERVICES DIVISION Parks and Recreation Department TO: SUBJECT: Chair and Members of the Community and Corporate Services Committee APPLEBY ICE CENTRE EXPANSION & RENOVATION

More information

Design Build Contract with a Guaranteed Maximum Price (DB w/ GMP) West Campus Parking Garage Penn State Health Milton S. Hershey Medical Center

Design Build Contract with a Guaranteed Maximum Price (DB w/ GMP) West Campus Parking Garage Penn State Health Milton S. Hershey Medical Center DATE: July 19, 2017 Updated July 21, 2017 SUBJECT: TO: Design Build Contract with a Guaranteed Maximum Price (DB w/ GMP) West Campus Parking Garage Penn State Health Milton S. Hershey Medical Center Short

More information

Update and Next Steps on the Potential Relocation of the Etobicoke Civic Centre

Update and Next Steps on the Potential Relocation of the Etobicoke Civic Centre EX28.12 REPORT FOR ACTION Update and Next Steps on the Potential Relocation of the Etobicoke Civic Centre Date: October 16, 2017 To: Executive Committee From: Deputy City Manager, Internal Corporate Services

More information

BUDGET ESTIMATES

BUDGET ESTIMATES PUBLIC REPORT TO REGULAR BOARD 2017-18 BUDGET ESTIMATES A generous man will himself be blessed, for he shares his food with the poor. Proverbs 22:9 Created, Draft First Tabling Review May 9, 2017 May 18,

More information

Swimming Lesson Requirement: Ability: Swimmers: Non-Swimmers: Special Needs: Payment Method: INVOICING CASH ON ATTENDANCE (Circle) Please Note:

Swimming Lesson Requirement: Ability: Swimmers: Non-Swimmers: Special Needs: Payment Method: INVOICING CASH ON ATTENDANCE (Circle) Please Note: School Booking Pack MOSS VALE AQUATIC CENTRE 8 KIRKHAM STREET MOSS VALE NSW 2577 Phone: 02 4868 1967 Email: learn2swim@mvaquatic.com.au School Details School: ABN: Address: Contact Person: Phone: Fax:

More information

UBC Faculty and Staff Housing Demand Survey

UBC Faculty and Staff Housing Demand Survey UBC Faculty and Staff Housing Demand Survey Vancouver Campus Prepared by McClanaghan & Associates dalemcclanaghan@gmail.com 604-644-9844 Table of Contents 1.0 Summary of Findings & Housing Market Context...

More information

Facilities Update Construction Progress

Facilities Update Construction Progress Major Projects Update October 2018 Prepared by Business and Operations October 19, 2018 Facilities Update Construction Progress Bismarck High School Addition & Renovation Auditorium: Concrete foundation

More information

MINUTES OF NEW SCHOOL REVIEW TEAM MTG.1

MINUTES OF NEW SCHOOL REVIEW TEAM MTG.1 MINUTES OF NEW SCHOOL REVIEW TEAM MTG.1 Prject N 1620 Date December 14, 2016 Prject Davisville PS & Spectrum AS File 1620/3.01.1 Pages 4 Lcatin Davisville PS/Spectrum AS, 43 Millwd Rd. The fllwing summarizes

More information

THE CITY OF RANCHO CUCAMONGA

THE CITY OF RANCHO CUCAMONGA THE CITY OF RANCHO CUCAMONGA WORKSHOP OF THE PLANNING COMMISSION - 7:00 PM * Rancho Cucamonga Civic Center RAINS ROOM 10500 Civic Center Drive Rancho Cucamonga, California I. CALL TO ORDER Roll Call 7:35

More information

Freedom Area School District Community Survey Results. Fall 2018

Freedom Area School District Community Survey Results. Fall 2018 Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.

More information

Report by Garry Sheret, Head of Property and Facilities Management

Report by Garry Sheret, Head of Property and Facilities Management Midlothian Council Tuesday 27 March 2018 New Easthouses Primary School Report by Garry Sheret, Head of Property and Facilities Management 1 Purpose of Report The purpose of this report is to obtain governance

More information

SOLANO COMMUNITY COLLEGE DISTRICT GOVERNING BOARD AGENDA ITEM

SOLANO COMMUNITY COLLEGE DISTRICT GOVERNING BOARD AGENDA ITEM AGENDA ITEM MEETING DATE May 16, 2018 GOVERNING BOARD AGENDA ITEM TO: SUBJECT: Members of the Governing Board RESOLUTION TO APPROVE CHANGE ORDER #01 TO SOLANO COUNTY ROOFING FOR BUILDING 1000 RE- ROOFING

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

January Ontario Financing Authority

January Ontario Financing Authority January 2018 Ontario Financing Authority Ontario s Economic and Fiscal Highlights Ontario s Economy Over the 2014 to 2017 period, Ontario s economic growth is on pace to exceed that of all G7 countries.

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit. 2 Background Information 2-3 Procedures Performed... 3-4 Results

More information

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS) 1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal

More information

INSPECTION SERVICES DIVISION FEE SCHEDULE

INSPECTION SERVICES DIVISION FEE SCHEDULE BUILDING INSPECTION SERVICES DIVISION FEE SCHEDULE Effective January 1, 2017 ** To calculate fees for building projects use the higher of the fees by valuation or square footage ** New Buildings, Additions

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER SERVICES NEW MIDDLE SCHOOL 212,000 SQUARE FEET DICKINSON PUBLIC SCHOOL DISTRICT NO. 1 DICKINSON, NORTH DAKOTA November 25, 2014 1. INTRODUCTION: Dickinson

More information

Allan Hancock Joint Community College District

Allan Hancock Joint Community College District One Stop Studen Allan Hancock Joint Community College District One Stop Student Services Public S Public Safety Com Public Safety Complex Childc Childcare Addit Childcare Addition BOND MEASURE I Progress

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

BOARD OF DIRECTORS MEETING

BOARD OF DIRECTORS MEETING BOARD OF DIRECTORS MEETING DATE: TIME: 12:00 p.m. LOCATION: Ramada Hotel & Conference Centre 805 Brookdale Avenue St. Lawrence West Room Cornwall, Ontario 1. CALL MEETING TO ORDER A G E N D A 2. ROLL CALL

More information

COMMUNITY SERVICES DIVISION Parks & Recreation Department. Chair and Members of the Community and Corporate Services Committee

COMMUNITY SERVICES DIVISION Parks & Recreation Department. Chair and Members of the Community and Corporate Services Committee Pg 1 of Report PR 53-09 COMMUNITY SERVICES DIVISION Parks & Recreation Department TO: SUBJECT: Chair and Members of the Community and Corporate Services Committee Tyandaga Municipal Golf Course - Preferred

More information

Allan Hancock Joint Community College District

Allan Hancock Joint Community College District One Stop Studen Allan Hancock Joint Community College District One Stop Student Services Public S Public Safety Com Public Safety Complex Childc Childcare Addit Childcare Addition BOND MEASURE I Progress

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

Councillor Vandal & the Planning, Property, & Development Department welcome you to tonight s open house

Councillor Vandal & the Planning, Property, & Development Department welcome you to tonight s open house W e l c o m e N o r t h S t. B o n i f a c e S e c o n d a r y P l a n & B o u l e v a r d P r o v e n c h e r Z o n i n g D i s t r i c t A m e n d m e n t s Councillor Vandal & the Planning, Property,

More information

CAPITAL FUNDING SUMMARY

CAPITAL FUNDING SUMMARY CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations

More information

RE: Takoma Junction SHARED PARKING STUDY Takoma Park, Maryland Our Job No.:

RE: Takoma Junction SHARED PARKING STUDY Takoma Park, Maryland Our Job No.: February 13, 2019 Ms. Jingjing Liu Senior Development Associate Neighborhood Development Company 3232 Georgia Avenue NW, Suite 100 Washington D.C. 20010 A SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

Decision by Jo-Anne Garrick, a Reporter appointed by the Scottish Ministers

Decision by Jo-Anne Garrick, a Reporter appointed by the Scottish Ministers Appeal Decision Notice T: 01324 696 400 F: 01324 696 444 E: dpea@gov.scot Decision by Jo-Anne Garrick, a Reporter appointed by the Scottish Ministers Planning appeal reference: Site address: 7 Redhall

More information

Residential Permit Fee Schedule

Residential Permit Fee Schedule l home Residential Permit Fee Schedule City of Shenandoah 29955 I-45 North Shenandoah, Texas 77381 281-298-5522 New Residential Home Building Permit (includes all sub-contractors fees, plan review, and

More information

POLICY ON CAPITAL PLANNING & CAPITAL PROJECTS

POLICY ON CAPITAL PLANNING & CAPITAL PROJECTS POLICY ON CAPITAL PLANNING & CAPITAL PROJECTS 2 POLICY ON CAPITAL PLANNING AND CAPITAL PROJECTS PREAMBLE 1. GENERAL PLANNING MATTERS A. MASTER PLANS. B. CAPITAL PLANS. C. INFRASTRUCTURE RENEWAL PLANS.

More information

Franklin Township Public Schools FINAL BUDGET PRESENTATION BOARD OF EDUCATION MEETING APRIL 28, 2016

Franklin Township Public Schools FINAL BUDGET PRESENTATION BOARD OF EDUCATION MEETING APRIL 28, 2016 Franklin Township Public Schools 2016 2017 FINAL BUDGET PRESENTATION BOARD OF EDUCATION MEETING APRIL 28, 2016 Franklin Township Board of Education Edward Potosnak, President Nancy LaCorte, Vice President

More information

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s MANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE 38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s Panel Moderator:

More information

Request for Proposal City Hall Facility Space Needs Assessment City of Alexandria, MN

Request for Proposal City Hall Facility Space Needs Assessment City of Alexandria, MN Request for Proposal City Hall Facility Space Needs Assessment City of Alexandria, MN Issue Date: June 11, 2018 Statement of Objectives, Goals and Tasks The City of Alexandria is seeking proposals from

More information

Ministère de l Éducation Bureau du sous-ministre adjoint Division des opérations et des finances 20 e étage, Édifice Mowat

Ministère de l Éducation Bureau du sous-ministre adjoint Division des opérations et des finances 20 e étage, Édifice Mowat Ministry of Education Office of the ADM Business & Finance Division 20th Floor, Mowat Block Queen s Park Toronto ON M7A 1L2 Ministère de l Éducation Bureau du sous-ministre adjoint Division des opérations

More information

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions

More information

Franklin Township Public Schools FINAL BUDGET PRESENTATION BOARD OF EDUCATION MEETING - APRIL 27, 2017

Franklin Township Public Schools FINAL BUDGET PRESENTATION BOARD OF EDUCATION MEETING - APRIL 27, 2017 Franklin Township Public Schools 2017 2018 FINAL BUDGET PRESENTATION BOARD OF EDUCATION MEETING - APRIL 27, 2017 Franklin Township Board of Education Edward Potosnak, President Nancy LaCorte, Vice President

More information

MINUTES OF MEETING ALAMEDA COUNTY PLANNING COMMISSION MAY 4, 2009 (Approved May 18, 2009)

MINUTES OF MEETING ALAMEDA COUNTY PLANNING COMMISSION MAY 4, 2009 (Approved May 18, 2009) FIELD TRIP: MINUTES OF MEETING MAY 4, 2009 (Approved May 18, 2009) MEMBERS PRESENT: Commissioners Kathie Ready and Richard Rhodes. MEMBERS EXCUSED: Commissioners Ken Carbone, Chair; Frank Imhof; Mike Jacob,

More information

Long-Term Care Homes and Services

Long-Term Care Homes and Services CAPITAL PROGRAM SUMMARY Contents Long-Term Care Homes and Services I: 2014 2023 CAPITAL BUDGET AND PLAN OVERVIEW 2014 2023 Capital Budget and Highlights I: Overview 1 II: Council Approved Budget III: 10-Year

More information

2010 AIG Global Real Estate Annual Funds Meeting. September 28-29, 2010 New York, NY SAVE THE DATE

2010 AIG Global Real Estate Annual Funds Meeting. September 28-29, 2010 New York, NY SAVE THE DATE September 28-29, 2010 SAVE THE DATE Please join us in New York City for our AIG Global Real Estate. Portfolio managers and their teams will review existing investments and provide an update to fund strategies.

More information

FORWARD LOOKING STATEMENTS

FORWARD LOOKING STATEMENTS FORWARD LOOKING STATEMENTS This presentation contains forward-looking statements within the meaning of applicable Canadian securities legislation. Generally, these forward-looking statements can be identified

More information

Grading Assigned: Mumbai 5 Star out of 7 Star (Assigned in September 2017) Vartak Nagar, Thane, Mumbai. Total 98,237 sq. ft.

Grading Assigned: Mumbai 5 Star out of 7 Star (Assigned in September 2017) Vartak Nagar, Thane, Mumbai. Total 98,237 sq. ft. Kanchanganga Grading Assigned: Mumbai 5 Star out of 7 Star (Assigned in September 2017) Valid till September 25, 2018 Project profile Type of project Location of project Type of development Land area Total

More information

Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions

Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions On Aug. 16, 2016, the Board of Education unanimously adopted a five-year facilities

More information

10. Approval and Signing of Minutes of the Previous Meetings. 10.a Regular Meeting of the Student Achievement Committee - June 2, 2016

10. Approval and Signing of Minutes of the Previous Meetings. 10.a Regular Meeting of the Student Achievement Committee - June 2, 2016 ADDENDUM REGULAR MEETING OF THE MEETING OF THE TORONTO CATHOLIC DISTRICT SCHOOL BOARD PUBLIC SESSION Angela Kennedy, Chair Frank D'Amico, Vice-Chair Thursday, August 25, 2016 7:00 P.M. Pages 10. Approval

More information

Recommendation Report

Recommendation Report Recommendation Report DATE: November 28, 2017 TO: FROM: SUBJECT: ORIGINATOR: RESOURCE STAFF: REFERENCE: Board of Trustees Darrel Robertson, Superintendent of Schools Fall Update to the Revised 2017-2018

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

Marple Newtown School District Delaware County, Pennsylvania. Act 34 Hearing for Culbertson Elementary School. Location of the Public Hearing

Marple Newtown School District Delaware County, Pennsylvania. Act 34 Hearing for Culbertson Elementary School. Location of the Public Hearing Marple Newtown School District Delaware County, Pennsylvania Act 34 Hearing for Culbertson Elementary School Location of the Public Hearing MARPLE NEWTOWN SCHOOL DISTIRCT ADMINISTRATION BUILDING 40 MEDIA

More information

DELTA SCHOOL DISTRICT 4585 Harvest Drive Delta, B.C. REGULAR MEETING OF THE BOARD OF EDUCATIONU

DELTA SCHOOL DISTRICT 4585 Harvest Drive Delta, B.C. REGULAR MEETING OF THE BOARD OF EDUCATIONU DELTA SCHOOL DISTRICT 4585 Harvest Drive Delta, B.C. REGULAR THE U DATE: May 16, 2017 TIME: 7:30 p.m. PLACE: Boardroom District Administration Building UA G E N D A 1. UCALL TO ORDERU 2. UADOPTION OF THE

More information

REQUEST FOR PROPOSAL RFP #LU PROFESSIONAL DESIGN SERVICES FOR INTERNATIONAL HOUSE RESIDENCE

REQUEST FOR PROPOSAL RFP #LU PROFESSIONAL DESIGN SERVICES FOR INTERNATIONAL HOUSE RESIDENCE REQUEST FOR PROPOSAL Lakehead University 955 Oliver Road Thunder Bay, ON P7B 5E1 RFP #LU13-005 PROFESSIONAL DESIGN SERVICES FOR INTERNATIONAL HOUSE RESIDENCE Issue Date: Friday 4 th October, 2013 Closing

More information

Ofira. Project profile. Grading Assigned: Surat 7 Star out of 7 Star (Assigned in September 2017) Valid till September 25, Location of project

Ofira. Project profile. Grading Assigned: Surat 7 Star out of 7 Star (Assigned in September 2017) Valid till September 25, Location of project Ofira Grading Assigned: Surat 7 Star out of 7 Star (Assigned in September 2017) Valid till September 25, 2018 Project profile Type of project Location of project Type of development Land area Total saleable

More information

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

Building and Site Sinking Fund Millage. Election Date: November 7th 2017 Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount

More information

OFFICE OF HISTORIC RESOURCES City Hall 200 N. Spring Street, Room 559 Los Angeles, CA 90012

OFFICE OF HISTORIC RESOURCES City Hall 200 N. Spring Street, Room 559 Los Angeles, CA 90012 City Hall 200 N. Spring Street, Room 559 Los Angeles, CA 90012 February 2, 2015 TO: Jose Huizar, Chair Planning and Land Use Management Committee FROM: Ken Bernstein, AICP Manager, Office of Historic Resources

More information

INFORMATION SHEET ON BUILDING USE AT LINCOLN STREET UNITED METHODIST CHURCH

INFORMATION SHEET ON BUILDING USE AT LINCOLN STREET UNITED METHODIST CHURCH INFORMATION SHEET ON BUILDING USE AT LINCOLN STREET UNITED METHODIST CHURCH Welcome to : a place of rest, laughter, growth and joy. We believe that God is most clearly known when diverse people seek new

More information

Allen Road Individual Environmental Assessment (EA)

Allen Road Individual Environmental Assessment (EA) STAFF REPORT ACTION REQUIRED PW14.8 Allen Road Individual Environmental Assessment (EA) Date: June 3, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager,

More information

2017 Bond Program Summary

2017 Bond Program Summary 2017 Bond Program Summary Middle School #3 (off Vail Divide) $ 76,225,750 Middle School #3 Off-site Utility and Road Construction $ 2,100,000 Elementary School #7 (in Rough Hollow) $ 33,130,150 Bee Cave

More information

Report to Committee of the Whole May 14, 2012

Report to Committee of the Whole May 14, 2012 Report to Committee of the Whole May 14, 2012 SUBJECT: ORIGINATOR: 2012-2013 This report was prepared by Marilyn Allen Marklevitz, Executive Superintendent of Business and Financial Services, Ian Gaudet,

More information