1 May 3, 2013 M E M O R A N D U M O F C O N F E R E N C E PROJECT Montgomery County Public Schools Potomac Elementary School Feasibility Study ARCHITECT S PROJECT NO DATE AND LOCATION April 30, 2013, Potomac Elementary School Work Session #6 PRESENT See attached sign-in sheet DISCUSSIONS AND DECISIONS. The purpose of the meeting was to discuss the options under development: 1. Moseley reviewed the process that has occurred in the development of all the options. There are currently four options remaining. Options one and two are new construction, number three utilizes renovations and additions, and the fourth investigates new construction on the Brickyard site. Through the previous meetings, option one was identified as the preferred option. Each of the options on the existing site have been developed with two site plans, one showing a single entrance in the location of the existing and the second with two entrances off of River Road. 2. Comments from the community regarding the building layout and site layouts: Q: Will moving to the Brickyard site require redistricting? A: No. Q: Did MCPS look at the side street access right of way at the existing Potomac site? A: It has been designated as a stream valley buffer so it is not buildable. Q: What would happen at the Potomac ES (PES) site if the school is built on the Brickyard Road site, and what would happen on the portion of the Brickyard Road site that would not be needed for the school? A: That is not known at this time since this is just a feasibility study for the school. Q: What would be the change in the amount of impervious surface at both sites? A: There would be no significant change. We have a standard program for educational program space, parking, hard surface play, and the building footprint would be the same or similar on either site. The modernized PES will be a LEED certified school; will have a green roof, and MCPS follows storm water management regulations. The green roof in itself will reduce the amount of impervious surface over what currently exists at PES. There would be no increase in runoff at either site. MA-10

2 RE: Potomac Elementary School Feasibility Study, Montgomery County Public Schools Page 2 05/03/13 Q: In Option 4, why does the school seem to be located so close to the road? Couldn t it have a less imposing face on the road? A: The concept plan shows it that way but that could be changed. As shown it is currently 200 from the road edge, but the building could be moved back. We also have to maintain ADA access from the road to the building. Q: Why is the bus loop in front as opposed to on the side? A: MCPS likes to have views from the administration suite to supervise students as they get on and off of the busses. Q: Why is PES being considered to be moved from the central location on River Road to the Brickyard Road site on the edge of the service area? How can people comment? A: The Brickyard Road location is being considered following a comment from the community during the feasibility study process. The feasibility study process itself is one way to voice opinions. People also can provide input directly to the superintendent and the Board of Education by writing letters. There are several months before the superintendent will be making his recommendation at the end of October, There are also public hearings in November when citizens can sign up to testify before the Board of Education makes a decision on which site to utilize. Q: At the last meeting there was a show of hands and only one person out of 27 attendees preferred the Brickyard site. This was not reflected in the meeting notes. A: This omission will be corrected. The director of the MCPS Department of Facilities Management and the Chief Operating Officer were made aware that there was a strong preference for the current PES site expressed at the meeting. Q: Who requested that the Brickyard site be looked at? Did the request come from the school? People do not trust the school board and think MCPS is leaving things out intentionally. They think this was a planted question. A: A community member in attendance at one of the earlier meetings asked if MCPS had considered the Brickyard site. The PTA president said that the vote taken at the last meeting is not representative of the whole community, and that she has heard pros and cons for both sites from parents of students at the school. Q: Does the decision maker know that there are 20 acres of certified organic soil? A: Yes. MCPS is aware of the unique nature of the site and its previous use as an organic farm. Q: What factors will the superintendent consider to make his recommendation on which site to use?

3 RE: Potomac Elementary School Feasibility Study, Montgomery County Public Schools Page 3 05/03/13 A: Cost, feasibility, design, all community input, and the pros and cons of each option are all taken into consideration. Q: What is difference in cost of infrastructure at each site? A: Cost for the site and building for the four options will be developed as part of the feasibility study. Q: Will the options look at costs? When will the costs be made public? A: Yes, costs are the next phase. Costs will be determined before the superintendent makes a recommendation. Q: What is the time frame and transition for PES students? A: Students at PES will not have to move out of the current facility if the school is modernized on the Brickyard Road site. If PES is modernized on the current site, students will move to Radnor Holding Center for eighteen months during construction. Whatever the location of the modernized school, the modernized school is scheduled to open in January Q: What is the condition of the holding center? Is it an existing and a fully functioning school? A: Yes. The Radnor Holding Center is currently being used as a holding center for Bradley Hills Elementary, and fully functions as an elementary school. Q: If PES does not move to the Brickyard Road site, what will happens to that property? A: The Board of Education will retain ownership and has no plans to sell any future school site properties. Q: People don t like using the term feasibility if MCPS doesn t have all of the answers and all of the costs for participants to be able to make informed decisions. A: The purpose of the feasibility study is simply to know if an elementary school can be constructed on the site and will it work and meet the educational program specifications. Q: How often does the Board of Education disagree with a superintendent s recommendation? A: In general if the community is behind a superintendent recommendation, and it achieves the educational objectives for a facility, then the Board is supportive. Q: If the Brickyard Road site is selected for the modernization, and there is controversy about this decision, then parents are concerned that PES could lose its place in the modernization queue and be delayed.

4 RE: Potomac Elementary School Feasibility Study, Montgomery County Public Schools Page 4 05/03/13 A: Staff cannot make a guarantee that there wouldn t be delays due to unforeseen issues, but the Board of Education owns the Brickyard Road property and anticipates its selection should not alter the schedule for the modernization. Q: Brickyard Road neighbors want an opportunity cost analysis done for the Brickyard Road site. They think we will lose great opportunities if the Brickyard Road property, that is rich in organic soil, is used for the school. The school system will lose environmental learning opportunities that the property could provide. A: MCPS suggests that proponents of the educational use of the Brickyard Road property as an organic farm relay their ideas to the Board of Education. This suggestion is outside the scope of this feasibility study. Q: Both sites are feasible, but which is preferable? How do people voice their opinions? How is preference factored in? A: There are four options and one will be noted as preferred. Pros and cons will be shown for all options, as well as the cost of each option. The pros and cons will be included in the feasibility study report. Q: Will future uses of the Brickyard Road site be considered? And will the rest of the community s input be factored? A: If it is not used for the modernization then the Brickyard Road site will continue to be identified as a future school site. Q: Could the floorplan change if the school moved to the Brickyard Road site or would we be locked into what was presented as Option 4? A: If we use the Brickyard Road site, the building design will be refined in the design stage. The architect used the preferred configuration for the current PES site as Option 4 on the Brickyard Road site. However, there will be opportunities to look at the layout in more detail and consider alternative schemes if the Brickyard Road site is selected for the modernization. Q: The PES modernization has been delayed twice and we do not want any further delays. A: MCPS acknowledges that there have been delays in the modernization queue and wants to keep PES on track for completion in January Q: Will external infrastructure work be added in the cost analysis, i.e. road widening and turning lanes? A: MCPS only funds onsite improvements, but will look at other impacts and will meet with the State Highway Administration, Park and Planning, and the Montgomery County Department of Transportation.

5 RE: Potomac Elementary School Feasibility Study, Montgomery County Public Schools Page 5 05/03/13 Q: Would Mr. Crispell please describe the decision making process that he described at the PTA meeting? A: Mr. Crispell described the steps in the feasibility study and design process. Please see notes from meeting #5 for more details. Q: How many minutes do people get to give testimony to BOE? A participant recommends people to go to the Board of Education meetings and make their voices heard and to write to the Montgomery County Council. A: Cluster representatives are typically given five minutes or longer if there is a major issue in the cluster. Homeowner associations, civic associations and individuals are given a few minutes. Q: People have been trying to get a meeting with the Board of Education members and have gotten no response. They feel like they can not engage the Board to save Brickyard site for other educational opportunities, particularly saving the soil for use by students countywide. A: Staff cannot speak for the Board, but people may write letters to Board members. Q: If the Brickyard Road site is chosen, Brickyard Road is very narrow, and would probably have to be widened for busses, so who would pay for that? Would property taxes increase to widen the road? A: MCPS will work with the Montgomery County Department of Transportation to review possible impacts on the roadways. Q: No official position has been taken by Brickyard Road adjacent landowners or the Brickyard Road coalition, on use of the Brickyard Road site for the PES modernization. They are raising questions as to the process and how the Brickyard Road site came up during the process. It can be expected that 80-90% of students would have added travel time to the Brickyard Road site, and would have to travel through the intersection of Falls Road and River Road. Has there been any progress on the traffic study? A: We are not funded to do a full traffic study on either site during the feasibility study. The architect and MCPS staff will meet with Montgomery County and Park and Planning staff to look at existing traffic counts and other information before the superintendent s recommendation. Q: A Brickyard Road neighbor says there is no opposition and doesn t want to be seen as complaining, but wants to save the Brickyard Road site for future educational opportunities associated with the organic soil. Neighbors feel that the soil is very important and want MCPS to bring the Board s attention to its value and to prevent the loss of this environmental asset. A: MCPS acknowledges these comments and will take note of the organic and educational value of the Brickyard Road property.

6 RE: Potomac Elementary School Feasibility Study, Montgomery County Public Schools Page 6 05/03/13 Q: A participant is frustrated because the concept plans affects building design, and wants to redesign the school to be a more interactive school design with different grades helping each other, such as the oldest students helping the youngest. A: MCPS is moving away from open classroom design. However, certain program adjacencies are important and MCPS is building schools to have more flexibility than in the past. Canopies, awnings, creative design features and other architectural details will be addressed and shown later in the design phase. Q: How are the costs of different sites considered? A: The site, building, and topographic and construction costs will be itemized and tabulated in a chart as part of the feasibility study brochure. Q: Why hasn t there been a site selection committee involved in moving to the Brickyard Road site? A: Site selection is a process for new schools, not modernizations. In this instance there is the one Board of Education owned property in the school service area, the Brickyard Road property. Q: Why is there not a set budget first, if this is a fictitious design that can change? A: The budget is developed based on the results of the feasibility study. Much of the cost is associated with the amount of square footage. Even if there are some changes to the design, the program square footages will not change much, even if corridors and spaces are shifted around. Q: There are many different school designs in MCPS. Are the costs per square foot similar? Do architects talk to newly built schools to see what they like and don t like about their schools? A: Staff gave three examples of recently completed schools: Farmland ES, Carderock Springs ES, and Flora Singer ES, and briefly described the nature of the designs of those facilities and key features. MCPS is trying to build opportunities for environmental interaction at every school. Q: What is the schedule, when is budget developed, is there public input before superintendent makes his recommendation, and when and how does public learn what the budget is? A: The architect will develop a budget for each option before the superintendent makes a recommendation on which site to use. A link will be posted on the school website when the feasibility study is completed so the public can view the results. Q: People on sign in sheet for tonight s meeting want to be notified by when the feasibility study brochure is complete and available. A: MCPS will notify attendees by . Q: Which is better design? The T option or the courtyard option?

7 RE: Potomac Elementary School Feasibility Study, Montgomery County Public Schools Page 7 05/03/13 A: Both designs are successful and it is mostly a matter of preference. The courtyard option does provide better visibility down the corridors. The PTA representative said that from the earliest meetings they wanted a courtyard design to ensure that there would be a safe enclosed outdoor space where children could go if there is ever an incident such as the sniper incident that occurred a few years ago. The courtyard also provides a good opportunity for garden projects. Q: What is the size of the proposed courtyard? A: It is approximately 100x100. It will provide natural light into the classrooms that have windows facing into the courtyard. Q: Will the school have a fully functional kitchen? A: PES will just have a warming kitchen. All meals are cooked at the central food processing center and delivered to schools. The above information is the writer s recollection of the discussions and decisions at the meeting. Should there be any additions or corrections, please notify the writer within two weeks of distribution for correction. NOTES BY: Jim Henderson, AIA

8

9

10 Montgomery County Public Schools POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY WORK SESSION #6 APRIL 30, 2013 Jim Henderson, AIA, LEED BD+C Managing Principal

11 Meeting Schedule Work Session #1 February 6, 6:30pm Work Session #2 February 21, 3:45pm Work Session #3 March 7, 7:00 pm Work Session #4 March 19, 3:45pm Work Session #5 April 18, 7:00pm Work Session #6 April 30, 7:00 pm PTA Presentation May 15, 7:00 pm

12 Work Session #1 Idea Mining

13 Work Session #

14 Work Session #

15 Work Session #4 (Options re-numbered) 1 2 3

16 Work Session #5 (Brickyard Road discussion started)

17 Existing Site Plan River Road Site

18 Option 1 Site Plan Two Entrances (River Road)

19 Option 1 Site Plan One Entrance (River Road)

20 Option 1 Lower Floor Plan

21 Option 1 Upper Floor Plan

22 Option 2 Site Plan Two Entrances (River Road)

23 Option 2 Site Plan One Entrance (River Road)

24 Option 2 Lower Floor Plan

25 Option 2 Upper Floor Plan

26 Option 3 Site Plan (River Road)

27 Option 3 Lower Floor Plan

28 Option 3 Upper Floor Plan

29 Existing Site Plan Brickyard Road Site

30 Option 4 Site Plan (Brickyard Road)

31 Option 4 Lower Floor Plan

32 Option 4 Upper Floor Plan

33

34 Meeting Schedule Work Session #1 February 6, 6:30pm Work Session #2 February 21, 3:45pm Work Session #3 March 7, 7:00 pm Work Session #4 March 19, 3:45pm Work Session #5 April 18, 7:00pm Work Session #6 April 30, 7:00 pm PTA Presentation May 15, 7:00 pm

35

CAPITAL IMPROVEMENT PROGRAM (CIP) GUIDEBOOK Revised: June 2015

CAPITAL IMPROVEMENT PROGRAM (CIP) GUIDEBOOK Revised: June 2015 Montgomery County Council of Parent Teacher Associations CAPITAL IMPROVEMENT PROGRAM (CIP) GUIDEBOOK 12900 Middlebrook Road, 3rd Floor Germantown, MD 20874 Telephone: 301-208- 0111 Fax: 301-208- 2003 Email:

More information

October 4, 2007 Page 1 of 8

October 4, 2007 Page 1 of 8 Children and adults learn and perform best in a safe and comfortable environment. Arlington Public Schools therefore provides safe, comfortable, accessible, efficient and attractive spaces for instructional

More information

Harleton ISD May 7, 2016 Bond Proposal FAQs

Harleton ISD May 7, 2016 Bond Proposal FAQs Harleton May 7, 2016 Bond Proposal FAQs How was the total projected cost of the project developed? The cost of the project was based upon data concerning average costs of school construction found on the

More information

CITY OF ISSAQUAH PLANNING POLICY COMMISSION MINUTES. August 27, Council Chambers Issaquah, WA 98027

CITY OF ISSAQUAH PLANNING POLICY COMMISSION MINUTES. August 27, Council Chambers Issaquah, WA 98027 CITY OF ISSAQUAH PLANNING POLICY COMMISSION MINUTES August 27, 2015 City Hall South 135 E. Sunset Way Council Chambers Issaquah, WA 98027 PPC MEMBERS PRESENT Joan Probala, Chair Ray Extract Joy Lewis Carl

More information

MINUTES OF THE MEETING LEE ZONING BOARD OF ADJUSTMENT July 16, :00 PM

MINUTES OF THE MEETING LEE ZONING BOARD OF ADJUSTMENT July 16, :00 PM MINUTES OF THE MEETING LEE ZONING BOARD OF ADJUSTMENT July 16, 2014 7:00 PM MEMBERS PRESENT: James Banks, Chairman; Tobin Farwell; John A. Hutton III; Philip Sanborn Jr.; Roy Wilson, Alternate (non-voting);

More information

Item #3 - Approval/Physical Services Committee Meeting Minutes/ March 20, 2018

Item #3 - Approval/Physical Services Committee Meeting Minutes/ March 20, 2018 PHYSICAL SERVICES COMMITTEE HELD IN ROOM 318 PUTNAM COUNTY OFFICE BUILDING CARMEL, NEW YORK 10512 (Chairman Albano, Legislators Nacerino & Scuccimarra) Tuesday April 17, 2018 The meeting was called to

More information

PLAN COMMISSION AND ZONING BOARD OF APPEALS MINUTES. September 6, 2018

PLAN COMMISSION AND ZONING BOARD OF APPEALS MINUTES. September 6, 2018 PLAN COMMISSION AND ZONING BOARD OF APPEALS MINUTES September 6, 2018 ROLL CALL: Chairwoman Ochoa Present Commissioner Hollingshead Present Commissioner Wood Absent Commissioner Kloth Present Commissioner

More information

Time Item Notes: Presenter. Approval of Meeting Minutes (see attachment) -October 26, 2016 Please fill out: Public Input Request form

Time Item Notes: Presenter. Approval of Meeting Minutes (see attachment) -October 26, 2016 Please fill out: Public Input Request form WOODBURN SCHOOL DISTRICT 103 Bond Advisory & Accountability Committee Agenda Woodburn School District Office 1390 Meridian Drive January 18, 2017 6:30-8:30 pm Time Item Notes: Presenter 6:30-6:35 Welcome

More information

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

David Gibby Stacey Haws Shelly Jenkins Doug Peterson

David Gibby Stacey Haws Shelly Jenkins Doug Peterson Administrative Offices 4600 So. Weber River Drive Riverdale, Utah 84405 Minutes of the Meeting of the Board of Directors of the Redevelopment Development Agency of Riverdale City held Tuesday, May 16,

More information

Zoning Board of Appeals TOWN OF BRUNSWICK 336 Town Office Road Troy, New York 12180

Zoning Board of Appeals TOWN OF BRUNSWICK 336 Town Office Road Troy, New York 12180 Zoning Board of Appeals TOWN OF BRUNSWICK 336 Town Office Road Troy, New York 12180 MINUTES OF THE BRUNSWICK ZONING BOARD OF APPEALS MEETING HELD SEPTEMBER 17, 2018 PRESENT were MARTIN STEINBACH, CHAIRMAN,

More information

CITY OF COLORADO SPRINGS PLANNING COMMISSION RECORD-OF-DECISION

CITY OF COLORADO SPRINGS PLANNING COMMISSION RECORD-OF-DECISION CITY OF COLORADO SPRINGS PLANNING COMMISSION RECORD-OF-DECISION January 20, 2011 Page 16 NEW BUSINESS CALENDAR MEETING: JANUARY 20, 2011 ITEM: 5 STAFF: FILE NO: PROJECT : BRETT VELTMAN CPC NV 10-00098(RF)

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

CHANNAHON VILLAGE BOARD BOARD MEETING FEBRUARY 19, 2018

CHANNAHON VILLAGE BOARD BOARD MEETING FEBRUARY 19, 2018 CHANNAHON VILLAGE BOARD BOARD MEETING FEBRUARY 19, 2018 Village President Missey Moorman Schumacher called the meeting to order at 7:59 p.m. and led the Board in the Pledge of Allegiance. Roll call was

More information

City of Excelsior Hennepin County, Minnesota MINUTES EXCELSIOR CITY COUNCIL WORK SESSION FEBRUARY 2, 2015

City of Excelsior Hennepin County, Minnesota MINUTES EXCELSIOR CITY COUNCIL WORK SESSION FEBRUARY 2, 2015 City of Excelsior Hennepin County, Minnesota MINUTES EXCELSIOR CITY COUNCIL WORK SESSION FEBRUARY 2, 2015 1. CALL TO ORDER/ROLL CALL Mayor Gaylord called the meeting to order at 6:02 p.m. Present: Absent:

More information

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS) 1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal

More information

Tomei appointed Alternate Member John Gillott as Acting Member in place of Lisa Schleelein.

Tomei appointed Alternate Member John Gillott as Acting Member in place of Lisa Schleelein. Village of Lansing Planning Board Meeting July 29, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 The meeting of the Village of Lansing Planning Board

More information

COMMUNITY INVESTMENT PLAN FOR FISCAL YEARS 2016 TO 2021

COMMUNITY INVESTMENT PLAN FOR FISCAL YEARS 2016 TO 2021 COMMUNITY INVESTMENT PLAN FOR FISCAL YEARS 2016 TO 2021 PUBLIC SCHOOLS: New Construction, Additions, Modernizations Fiscal Year 2016 2017 2018 2019 2020 2021 Allocation Complete Project Cost Career and

More information

Approval of the Minutes: Item No. 1. The Providence City Planning Commission will consider for approval the minutes of December 13, 2017.

Approval of the Minutes: Item No. 1. The Providence City Planning Commission will consider for approval the minutes of December 13, 2017. 1 1 1 1 1 1 0 1 PROVIIDENCE CITY PLANNING COMMISSION Providence City Office Building, 1 North Gateway Drive, Providence UT January, 01 :00 p.m. ATTENDANCE Chair: Commissioners: Alternates: Absent: B Fresz

More information

NORTH FAYETTE TOWNSHIP PUBLIC HEARING MARCH 27, :45 P.M.

NORTH FAYETTE TOWNSHIP PUBLIC HEARING MARCH 27, :45 P.M. NORTH FAYETTE TOWNSHIP PUBLIC HEARING MARCH 27, 2018 6:45 P.M. A public hearing was held on with Board of Supervisors Chairman Jim Morosetti presiding for the purpose of taking public comment on: APPLICATION

More information

Polk County Board of Adjustment August 25, 2017

Polk County Board of Adjustment August 25, 2017 Polk County Board of Adjustment August 25, 2017 Call to Order: 9:20 a.m. Members in Attendance: Robert Franks, Mike Powers, Rolland Gagner, Donovan Wright, and Courtney Pulkrabek. Members Absent: None

More information

Chairman Carlson called the meeting to order at 7:00 p.m.

Chairman Carlson called the meeting to order at 7:00 p.m. PAGE 1 CALL TO ORDER: Chairman Carlson called the meeting to order at 7:00 p.m. PRESENT: ABSENT: Chairman Kent Carlson and Commissioners Jim Anderson, Brandon Gustafson, Gen McJilton, Bill Sharpe, and

More information

Overview of Public Schools CIP

Overview of Public Schools CIP Overview of Public Schools CIP The Public Schools Community Investment Plan (CIP) includes school construction, additions and modernizations, as well as other school related projects. For more than a decade

More information

TOWN OF GILMANTON HISTORIC DISTRICT COMMISSION ACADEMY BUILDING TUESDAY, JUNE 6, PM MINUTES

TOWN OF GILMANTON HISTORIC DISTRICT COMMISSION ACADEMY BUILDING TUESDAY, JUNE 6, PM MINUTES MINUTES Present: Chair Ernie Hudziec, Marshall Bishop (Selectmen's Rep), Matt Grasberger, Betty Ann Abbott, Roy Buttrick (alternate) Also present: Annette Andreozzi (Land Use Admin.) Chair Hudziec opened

More information

CYPRESS COUNTY SUBDIVISION & DEVELOPMENT APPEAL BOARD

CYPRESS COUNTY SUBDIVISION & DEVELOPMENT APPEAL BOARD Board Order No.: SDAB 17/01 Hearing Held: March 27, 2017 File No.: Development Application 17/08 CYPRESS COUNTY SUBDIVISION & DEVELOPMENT APPEAL BOARD CHAIRMAN: Jason Tweten Board Member: Gerald vossler

More information

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s MANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE 38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s Panel Moderator:

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively.

The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively. 2.1.1.2 HYDRAULIC IMPACTS VALLEY The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively. General. The computation of valley storage

More information

MINUTES OF THE ZONING BOARD OF ADJUSTMENT REGULAR MEETING BOROUGH OF ORADELL HELD IN THE TOWN HALL FEBRUARY 21, 2018

MINUTES OF THE ZONING BOARD OF ADJUSTMENT REGULAR MEETING BOROUGH OF ORADELL HELD IN THE TOWN HALL FEBRUARY 21, 2018 MINUTES OF THE ZONING BOARD OF ADJUSTMENT REGULAR MEETING BOROUGH OF ORADELL HELD IN THE TOWN HALL FEBRUARY 21, 2018 Chairman Michelman called the Zoning Board of Adjustment meeting to order at 7:30 p.m.

More information

JULY 14, 2016 PUBLIC HEARING

JULY 14, 2016 PUBLIC HEARING Minutes of a public hearing of the Town Board of the Town of Somers held on Thursday evening July 14, 2016 at 7:02 PM at the Town House, 335 Route 202, Somers, New York. ROLL CALL: PRESENT: Supervisor

More information

Board members Chair Rob Devinney, Mark Greenwald, Kevin Guidera and James Zuhusky were present. Dan Guzewicz was absent.

Board members Chair Rob Devinney, Mark Greenwald, Kevin Guidera and James Zuhusky were present. Dan Guzewicz was absent. ZONING BOARD OF APPEALS VILLAGE OF SOUTHAMPTON FEBRUARY 28, 2019 PUBLIC HEARING Due notice having been given, the public hearing of the Zoning Board of Appeals for he Village of Southampton was held in

More information

The Open Public Meeting Act Announcement was read by Mr. Jeney and the pledge of allegiance was performed.

The Open Public Meeting Act Announcement was read by Mr. Jeney and the pledge of allegiance was performed. OPEN PUBLIC MEETINGS ACT ROLL CALL Delran Township Zoning Board regular meeting of Thursday, April 20, 2017 was called to order by Mr. Jeney at 7:00pm, in the Delran Township Municipal Building. The Open

More information

Marple Newtown School District Delaware County, Pennsylvania. Act 34 Hearing for Culbertson Elementary School. Location of the Public Hearing

Marple Newtown School District Delaware County, Pennsylvania. Act 34 Hearing for Culbertson Elementary School. Location of the Public Hearing Marple Newtown School District Delaware County, Pennsylvania Act 34 Hearing for Culbertson Elementary School Location of the Public Hearing MARPLE NEWTOWN SCHOOL DISTIRCT ADMINISTRATION BUILDING 40 MEDIA

More information

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget? Over the last few weeks the Board of Education has received a number of questions regarding the proposed 2018-19 budget. We hope that the Frequently Asked Questions and our Answers below will help to shed

More information

Climax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions

Climax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions Climax Scotts Community Schools 1. BOND PROPOSAL What is the District asking for as part of this Bond Proposal? The Bond Proposals request funds to: Proposal 1 WILL: Raise $9.40 Million for projects at

More information

Commission members present were: Bruce Lee, Larry Hepworth, Nelson Boren, Brad Crookston and Casey Moriyama. (Robert Burt was excused).

Commission members present were: Bruce Lee, Larry Hepworth, Nelson Boren, Brad Crookston and Casey Moriyama. (Robert Burt was excused). 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 Minutes of the North Logan City

More information

TOWN OF BRISTOL ZONING BOARD OF REVIEW MINUTES. Thursday, June 18, 2015

TOWN OF BRISTOL ZONING BOARD OF REVIEW MINUTES. Thursday, June 18, 2015 TOWN OF BRISTOL ZONING BOARD OF REVIEW MINUTES Thursday, June 18, 2015 The following petitions were received and were heard by the Bristol Zoning Board of Review on Thursday, June 18, 2015 at 7:00 p.m.

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

CITY OF CHINO HILLS PLANNING COMMISSION MEETING/PUBLIC HEARING MINUTES. May 15, 2007

CITY OF CHINO HILLS PLANNING COMMISSION MEETING/PUBLIC HEARING MINUTES. May 15, 2007 CITY OF CHINO HILLS PLANNING COMMISSION MEETING/PUBLIC HEARING MINUTES May 15, 2007 CHINO HILLS COUNCIL CHAMBERS 2001 GRAND AVENUE CHINO HILLS, CALIFORNIA The Planning Commission Meeting of May 15, 2007,

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

MINUTES ADJOURNED PLANNING COMMISSION MEETING JANUARY 9, 2017

MINUTES ADJOURNED PLANNING COMMISSION MEETING JANUARY 9, 2017 MINUTES ADJOURNED PLANNING COMMISSION MEETING JANUARY 9, 2017 A adjourned meeting of the Planning Commission of the City of Rolling Hills Estates was called to order at 7:00 p.m. in the City Hall Council

More information

TOWN OF FARMINGTON PLANNING BOARD March 2, 2011 APPROVED MINUTES

TOWN OF FARMINGTON PLANNING BOARD March 2, 2011 APPROVED MINUTES Page 1 of 5 Planning Board Meeting Minutes March 2, 2011 TOWN OF FARMINGTON PLANNING BOARD March 2, 2011 APPROVED MINUTES The following minutes are written as a summary of the main points that were made

More information

Tooele City Council and the Tooele City Redevelopment Agency of Tooele City, Utah Work Session Meeting Minutes

Tooele City Council and the Tooele City Redevelopment Agency of Tooele City, Utah Work Session Meeting Minutes Tooele City Council and the Tooele City Redevelopment Agency of Tooele City, Utah Work Session Meeting Minutes Date: Wednesday, May 16, 2018 Time: 5:00 p.m. Place: Tooele City Hall, Large Conference Room

More information

CITY OF NORWALK PLAN REVIEW COMMITTEE. April 11, 2013

CITY OF NORWALK PLAN REVIEW COMMITTEE. April 11, 2013 CITY OF NORWALK PLAN REVIEW COMMITTEE PRESENT: STAFF: OTHERS: Jill Jacobson, Chair; Jim White; Emily Wilson; Joseph Santo; Nathan Sumpter; Mike Mushak; Mike O Reilly; Adam Blank (arrived at 8:25 p.m.)

More information

The oath was administered to Mary Werner, Sharon Fulop, Truman Irving, Marc Thompson, and Mike Muse.

The oath was administered to Mary Werner, Sharon Fulop, Truman Irving, Marc Thompson, and Mike Muse. The June 28, 2018 meeting of the Ottawa Hills Zoning Commission was called to order by Mayor Kevin Gilmore at 4:30 pm in the Community Room of the Elementary School. In attendance were members Sam Zyndorf,

More information

Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions

Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions Oak Park and River Forest High School Five-Year Facilities Plan and Referendum Overview and Frequently Asked Questions On Aug. 16, 2016, the Board of Education unanimously adopted a five-year facilities

More information

DRAFT MAPLE GROVE PLANNING COMMISSION May 29, 2018

DRAFT MAPLE GROVE PLANNING COMMISSION May 29, 2018 DRAFT MAPLE GROVE PLANNING COMMISSION CALL TO ORDER A meeting of the Maple Grove Planning Commission was held at 7:00 p.m. on at the Maple Grove City Hall, Hennepin County, Minnesota. Chair Colson called

More information

Supervisor Jenkins welcomed everyone to the meeting and asked that all electronic devices be turned off or silenced.

Supervisor Jenkins welcomed everyone to the meeting and asked that all electronic devices be turned off or silenced. called the meeting to order at 7:00 p.m. Town Board Members Present Bob Prendergast Councilman Gina LeClair Councilwoman Todd Kusnierz Councilman Robert J. Vittengl, Jr. Councilman Preston L. Jenkins,

More information

Unlock the value in your home

Unlock the value in your home CHIP Reverse Mortgage Unlock the value in your home A guide to reverse mortgages 2 Dear Homeowner, When most of us dream of retirement, we imagine ourselves in our homes sharing a meal with family, or

More information

ELKO COUNTY REGIONAL TRANSPORTATION COMMISSION

ELKO COUNTY REGIONAL TRANSPORTATION COMMISSION WARREN RUSSELL, CHAIR JOHN PATRICK RICE JEFF WILLIAMS 540 COURT STREET ELKO, NEVADA 89801 PHONE (775) 738-5398 FAX # (775) 753-8535 ELKO COUNTY REGIONAL TRANSPORTATION COMMISSION ELKO COUNTY, COUNTY OF

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

19 South Tejon Street, Suite Colorado Springs, CO Tel: Fax:

19 South Tejon Street, Suite Colorado Springs, CO Tel: Fax: PROJECT: Arapahoe Ridge High School PROJECT NO: 08010 DATE: June 24, 2008 MEETING REPORT ATTENDANCE: Rex Hartman (BVSD), Joan Bludorn (ARHS), Dave Krassowski (ARHS), Peggy Slater (Print shop), Pat Z. (RTA),

More information

Department ofalcoholic Beverage Control

Department ofalcoholic Beverage Control Department ofalcoholic Beverage Control 0 COMMISSIONERS JEFFREY L. PAINTER, CHAIRMAN JUDITH G NAPIER HENRY L. MARSH, III CHIEF OPERATING OFFICER/SECRETARY TO THE BOARD TRAVIS G. HILL NOTICE OF INITIAL

More information

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Section 3 Capability Identification Requirements Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Documentation of the Planning

More information

RICHLAND-BEAN BLOSSOM COMMUNITY SCHOOL CORPORATION

RICHLAND-BEAN BLOSSOM COMMUNITY SCHOOL CORPORATION RICHLAND-BEAN BLOSSOM COMMUNITY SCHOOL CORPORATION CAPITAL PROJECTS FUND PLAN for the years 2017-2018-2019 September 19, 2016 Public Hearing CAPITAL PROJECTS PLAN (2017-2018-2019) September 19, 2016 RICHLAND-BEAN

More information

Block 31 in the Railway Lands: Development Agreement, Update and Next Steps

Block 31 in the Railway Lands: Development Agreement, Update and Next Steps STAFF REPORT ACTION REQUIRED Block 31 in the Railway Lands: Development Agreement, Update and Next Steps Date: January 20, 2014 To: From: Wards: Executive Committee Brenda Patterson, Deputy City Manager,

More information

KENT PLANNING COMMISSION BUSINESS MEETING December 5, Jeff Clapper John Gargan Peter Paino Michel Bruder

KENT PLANNING COMMISSION BUSINESS MEETING December 5, Jeff Clapper John Gargan Peter Paino Michel Bruder KENT PLANNING COMMISSION BUSINESS MEETING MEMBERS PRESENT: STAFF PRESENT: Amanda Edwards Jeff Clapper John Gargan Peter Paino Michel Bruder Jennifer Barone, Development Engineer Bridget Susel, Community

More information

CITY COUNCIL MEETING CITY OF FRIDLEY SEPTEMBER 26, Councilmember Barnette Councilmember Saefke Councilmember Varichak Councilmember Bolkcom

CITY COUNCIL MEETING CITY OF FRIDLEY SEPTEMBER 26, Councilmember Barnette Councilmember Saefke Councilmember Varichak Councilmember Bolkcom CITY COUNCIL MEETING CITY OF FRIDLEY SEPTEMBER 26, 2016 The City Council meeting for the City of Fridley was called to order by Mayor Lund at 7:02 p.m. ROLL CALL: MEMBERS PRESENT: OTHERS PRESENT: Mayor

More information

Barneveld School District Community Survey Results. Spring 2017

Barneveld School District Community Survey Results. Spring 2017 Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey

More information

FREQUENTLY ASKED QUESTIONS (FAQs)

FREQUENTLY ASKED QUESTIONS (FAQs) FREQUENTLY ASKED QUESTIONS (FAQs) Q. What is a school bond? A. A bond election requires the voter to express support for or against the district selling school bonds. If the bond election is approved,

More information

Your children may qualify for free or reduced price meals if your household income falls at or below the limits on this chart.

Your children may qualify for free or reduced price meals if your household income falls at or below the limits on this chart. July 2018 Dear Parent/Guardian: Children need healthy meals to learn. Oak Park and River Forest High School offers healthy meals every school day. Breakfast costs $3.25; lunch costs $4.00. Your children

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

Chairman Pat Lucking, Commissioners Jennifer Gallagher, Doug Reeder, and David Steingas

Chairman Pat Lucking, Commissioners Jennifer Gallagher, Doug Reeder, and David Steingas 1. CALL TO ORDER/ROLL CALL Chairman Lucking called the meeting to order at 7:00 p.m. Members Present: Others Present: Absent: Chairman Pat Lucking, Commissioners Jennifer Gallagher, Doug Reeder, and David

More information

Freedom Area School District Community Survey Results. Fall 2018

Freedom Area School District Community Survey Results. Fall 2018 Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.

More information

TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH (435) BUSINESS MEETING February 2, 2005

TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH (435) BUSINESS MEETING February 2, 2005 TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH 84074 (435) 843-3160 BUSINESS MEETING February 2, 2005 The Tooele County Planning Commission Meeting was called to order at 7:00p.m.

More information

UNOFFICIAL MINUTES MUSCATINE BOARD OF DIRECTORS PLANNING MEETING May 29, 2012

UNOFFICIAL MINUTES MUSCATINE BOARD OF DIRECTORS PLANNING MEETING May 29, 2012 UNOFFICIAL MINUTES MUSCATINE BOARD OF DIRECTORS PLANNING MEETING May 29, 2012 The Board of Directors of the Muscatine Community School District, in the County of Muscatine, State of Iowa, met in planning

More information

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,

More information

PLANNING COMMISSION MINUTES OF APRIL 3, 2014

PLANNING COMMISSION MINUTES OF APRIL 3, 2014 PLANNING COMMISSION MINUTES OF APRIL 3, 2014 The San Joaquin County Planning Commission met in regular session on April 3, 2014 at 6:30 p.m., in the Public Health/Planning Commission Auditorium, 1601 East

More information

Chairman Potts called the meeting to order at 7:00 p.m. and everyone joined in the Pledge of Allegiance to the flag.

Chairman Potts called the meeting to order at 7:00 p.m. and everyone joined in the Pledge of Allegiance to the flag. LURAY PLANNING COMMISSION The Luray Planning Commission met on Wednesday, October 10, 2007, at 7:00 p.m. in regular session. The meeting was held in the Luray Town Council Chambers at 45 East Main Street,

More information

MINUTES OF THE VINEYARD REDEVELOPMENT AGENCY BOARD MEETING 240 East Gammon Road, Vineyard Utah March 8, :53 PM

MINUTES OF THE VINEYARD REDEVELOPMENT AGENCY BOARD MEETING 240 East Gammon Road, Vineyard Utah March 8, :53 PM MINUTES OF THE VINEYARD REDEVELOPMENT AGENCY BOARD MEETING 240 East Gammon Road, Vineyard Utah March 8, 2017 7:53 PM Chair Randy Farnworth Boardmember Tyce Flake Boardmember Julie Fullmer Boardmember Nate

More information

San Pedro Elementary School Community Town Hall Meeting #1 March 22, 2017 MINUTES

San Pedro Elementary School Community Town Hall Meeting #1 March 22, 2017 MINUTES H Y HIBSER YAMAUCHI Architects, Inc. San Pedro Elementary School Community Town Hall Meeting #1 March 22, 2017 MINUTES Date: March 22, 2017 Chair(s): tbd Time: 6:00 7:00 PM Scribe: Tim Steele School Site:

More information

CUYAHOGA FALLS CITY SCHOOL DISTRICT, ADMINISTRATIVE OFFICES 431 Stow Ave, Cuyahoga Falls, Ohio APPLICATION

CUYAHOGA FALLS CITY SCHOOL DISTRICT, ADMINISTRATIVE OFFICES 431 Stow Ave, Cuyahoga Falls, Ohio APPLICATION Dear Parent/Guardian: CUYAHOGA FALLS CITY SCHOOL DISTRICT, ADMINISTRATIVE OFFICES 431 Stow Ave, Cuyahoga Falls, Ohio 44222-0396 2012-2013 APPLICATION Children need healthy meals to learn. Cuyahoga Falls

More information

REDMOND PLANNING COMMISSION MINUTES. August 20, COMMISSIONERS EXCUSED: Commissioners Miller and O Hara

REDMOND PLANNING COMMISSION MINUTES. August 20, COMMISSIONERS EXCUSED: Commissioners Miller and O Hara REDMOND PLANNING COMMISSION MINUTES COMMISSIONERS PRESENT: Chairman Chandorkar, Commissioners Gregory, Sanders, Murray, and Biethan COMMISSIONERS EXCUSED: Commissioners Miller and O Hara STAFF PRESENT:

More information

DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418

DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418 DERBY INLAND WETLANDS AGENCY DERBY, CONNECTICUT 06418 Frederick J. Columbo, Jr. Chairman Philip Marcucio 68 Seymour Avenue Paul Dinice, Jr. Derby, Connecticut 06418 Paul Padilla David Barboza II David

More information

FINAL MINUTES. MEETING: Regular CALLED TO ORDER: 7:32 p.m.

FINAL MINUTES. MEETING: Regular CALLED TO ORDER: 7:32 p.m. FINAL MINUTES BOARD/COMMISSION: Historic Preservation DATE: 9/24/15 MEETING: Regular CALLED TO ORDER: 7:32 p.m. QUORUM: Yes ADJOURNED: 9:07 p.m. LOCATION: Glen Ellyn Civic Center MEMBER ATTENDANCE: PRESENT:

More information

EL DORADO CITY COMMISSION MEETING September 17, 2018

EL DORADO CITY COMMISSION MEETING September 17, 2018 The El Dorado City Commission met in a regular session on September 17, 2018 at 6:30 p.m. in the Commission Room with the following present: Mayor Vince Haines, Commissioner Gregg Lewis, Commissioner Matt

More information

Also Present: Malcolm O Hara, Attorney for the Town and Joe Patricke, Building Inspector.

Also Present: Malcolm O Hara, Attorney for the Town and Joe Patricke, Building Inspector. Acting Chairman Bergman called the meeting to order at 7:00 p.m. Present: Erik Bergman Keith Oborne Chris Barden John Arnold David Paska Linda Riggi Ronald Zimmerman Tricia Andrews Acting Chairman Alternate

More information

LOWELL CHARTER TOWNSHIP PLANNING COMMISSION PUBLIC HEARING AND REGULAR MEETING October 9, 2006

LOWELL CHARTER TOWNSHIP PLANNING COMMISSION PUBLIC HEARING AND REGULAR MEETING October 9, 2006 LOWELL CHARTER TOWNSHIP PLANNING COMMISSION PUBLIC HEARING AND REGULAR MEETING PRESENT: Blumm, Batchelor, Simmonds, Clements and Sanford ABSENT: None TOWNSHIP PLANNER: Tim Johnson CITIZENS IN ATTENDANCE:

More information

COUNCIL OF TRAPPE TRAPPE TOWN HALL November 2, 2016

COUNCIL OF TRAPPE TRAPPE TOWN HALL November 2, 2016 COUNCIL OF TRAPPE TRAPPE TOWN HALL Public Hearing 6:45 pm President Fegel opened the public hearing for Ordinance 14-2016 at 6:45 pm. President Fegel read Ordinance 14-2016 An Ordinance of the Town of

More information

TOWN OF LOCKPORT PLANNING BOARD. April 19, 2016

TOWN OF LOCKPORT PLANNING BOARD. April 19, 2016 TOWN OF LOCKPORT PLANNING BOARD PRESENT: Morris Wingard Rodney Conrad Marie Bindeman Robert Langdon Thomas Grzebinski Adam Tyson Tyler Ray, Alternate Richard Forsey, Chairman ALSO PRESENT: Brian Belson,

More information

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL Adopted by the Board of Mayor and Aldermen of the City of Spring Hill on December 21, 2009 TABLE OF CONTENTS STORM WATER UTILITY CREDIT AND ADJUSTMENT

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

Pest Control Bid REQUIREMENTS

Pest Control Bid REQUIREMENTS Page 2 Pest Control Bid REQUIREMENTS 1. Bid Requirements Bids not conforming to the following requirements may be rejected. (a) (b) (c) (d) (e) (f) Bids must be made on the blank bid form provided. Bids

More information

Mosier Fire District Board Meeting DATE: May 8, 2014 Mosier Fire Hall on Washington St.

Mosier Fire District Board Meeting DATE: May 8, 2014 Mosier Fire Hall on Washington St. Mosier Fire District Board Meeting DATE: May 8, 2014 Mosier Fire Hall on Washington St. 7:00 p.m. BOARD: Ken Hudson, Lee Roy Herman, Vic Hamilton, Glenn Bartholomew, Darin Molesworth BUDGET ADVISORY COMMITTEE:

More information

The Redevelopment of Davisville Public School &

The Redevelopment of Davisville Public School & The Redevelopment of Davisville Public School & Spectrum Alternative School Community Meeting #2 30 May 2017 1 AGENDA # Item ACTION 1.1 Welcome and Introductions Superintendent Ian Allison 1.2 Greetings

More information

NORTH FAYETTE TOWNSHIP PUBLIC HEARING APRIL 10, :30 P.M.

NORTH FAYETTE TOWNSHIP PUBLIC HEARING APRIL 10, :30 P.M. NORTH FAYETTE TOWNSHIP PUBLIC HEARING APRIL 10, 2018 6:30 P.M. A public hearing was held on continued from March 27, 2018 with Board of Supervisors Chairman Jim Morosetti presiding for the purpose of taking

More information

County Barn Road RPUD. Deviation Justification

County Barn Road RPUD. Deviation Justification 1. Deviation 1 seeks relief from LDC Section 6.06.02.A.2 which requires dual sidewalks on local roads internal to the site, to allow a sidewalk on one side of the roadway where the property is permitted

More information

Bond Update Presentation Azusa Unified School District

Bond Update Presentation Azusa Unified School District Bond Update Presentation by Isom Advisors, a Division of Urban Futures, Inc. June 9, 2014 1470 Maria Lane, Ste. 315 - Walnut Creek, CA 94596 Community Voter Survey (November 2013) Ballot Measure (pre-information)

More information

Also attending was: Patrick Jaugstetter, Attorney for the County; Cheri Hobson-Matthews, County Manager; and Stephanie Braun, County Clerk.

Also attending was: Patrick Jaugstetter, Attorney for the County; Cheri Hobson-Matthews, County Manager; and Stephanie Braun, County Clerk. Page 1 of 11 STATE OF GEORGIA COUNTY OF HENRY The Henry County Board of Commissioners held a Special Called Meeting at 9:00 a.m. on Thursday, in the Community Room, County Administration Building, 140

More information

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 21a TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 SUBJECT: 901 SAN ANTONIO ROAD [06PLN-00031, 06PLN-00050]: REQUEST BY

More information

MINUTES OF THE REGULAR MEETING ZONING BOARD OF APPEALS BUTLER MEMORIAL HALL APRIL 24, 2017

MINUTES OF THE REGULAR MEETING ZONING BOARD OF APPEALS BUTLER MEMORIAL HALL APRIL 24, 2017 MINUTES OF THE REGULAR MEETING ZONING BOARD OF APPEALS BUTLER MEMORIAL HALL APRIL 24, 2017 The Regular Meeting was called to order at 6:00 P.M. by Chairman Randy Bogar. Board Members present were John

More information

Zoning Board of Appeals Lakeville, Massachusetts Minutes of Meeting February 16, 2017

Zoning Board of Appeals Lakeville, Massachusetts Minutes of Meeting February 16, 2017 Zoning Board of Appeals Lakeville, Massachusetts Minutes of Meeting February 16, 2017 Members present: Donald Foster, Chair; David Curtis, Vice-Chair; John Olivieri, Jr., Clerk; Jim Gouveia, Member; Joseph

More information

Approved minutes of the regular Board of Directors meeting October 21, 2017

Approved minutes of the regular Board of Directors meeting October 21, 2017 Approved minutes of the regular Board of Directors meeting October 21, 2017 BLUE LAKE SPRINGS HOMEOWNERS ASSOCIATION MINUTES OF THE REGULAR MEETING OF THE BOARD OF DIRECTORS 1. Call to order: 9:00am 2.

More information

Debt Service FunDS & Debt ScheDuleS

Debt Service FunDS & Debt ScheDuleS Debt Service Funds & Debt Schedules The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition

More information

PETER STUTO, CHAIRMAN KATHY DALTON LOU MION TIMOTHY LANE KAREN GOMEZ ELENA VAIDA, ESQ., Counsel to the Planning Board

PETER STUTO, CHAIRMAN KATHY DALTON LOU MION TIMOTHY LANE KAREN GOMEZ ELENA VAIDA, ESQ., Counsel to the Planning Board 0 PLANNING BOARD TOWN OF COLONIE COUNTY OF ALBANY *************************************************** KJ ELECTRIC RAILROAD AVENUCE SEQRA DETERMINATION AND APPLICATION FOR FINAL SITE PLAN APPROVAL ***************************************************

More information

CLOVIS PLANNING COMMISSION MINUTES February 22, 2018

CLOVIS PLANNING COMMISSION MINUTES February 22, 2018 CLOVIS PLANNING COMMISSION MINUTES February 22, 2018 A regular meeting of the Clovis Planning Commission was called to order at 6:00 p.m. by Chair Hinkle in the Clovis Council Chamber. Flag salute led

More information

Charles Dorsey, SVP, Wells Fargo Insurance Services of Nevada, Inc. Lisa Dixon, Wells Fargo Insurance Services of Nevada, Inc.

Charles Dorsey, SVP, Wells Fargo Insurance Services of Nevada, Inc. Lisa Dixon, Wells Fargo Insurance Services of Nevada, Inc. MINUTES LAS VEGAS-CLARK COUNTY LIBRARY DISTRICT BOARD OF TRUSTEES RISK MANAGEMENT COMMITTEE MEETING LAS VEGAS, NEVADA (approved September 11, 2007) The Risk Management Committee of the Board of Trustees

More information

Messenger. Fairmont Farmers Mutual

Messenger. Fairmont Farmers Mutual Fairmont Farmers Mutual Messenger Volume 10, Issue 2 May 2018 Sharing the Road with Farm Equipment The weather is warming and this is the time of year when farmers return to the fields to plant crops,

More information