1 DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C Circular No March 2016 EXPIRES 30 MARCH 2018 Management EXECUTION OF CHANGE CONTROL BOARDS 1. Purpose. This circular provides guidance for Major Subordinate Commands (MSC) and Districts in the use and conduct of Change Control Boards (CCB) to formalize changes to projects, ensure leadership visibility, and adherence to the USACE change management processes. This document describes the CCB responsibilities, membership, roles, activities, and processes that will be followed for conducting CCBs at MSCs and Districts. 2. Applicability. This document applies to all HQUSACE Civil Works authorized projects and programs for Construction. 3. Distribution. This information is for internal use; unlimited distribution internal to USACE. 4. References. a. Engineer Regulation (ER) , U.S. Army Corps of Engineers Business Process. b. ER Cost Engineering Policy and General Requirements. c. ER Engineering and Design For Civil Works Projects. d. ER Civil Works Cost Engineering e. Project Management Business Process (PMBP) Manual f. Engineering and Construction Bulletin (ECB) Mega Project Management. g. Memorandum, HQUSACE Delegated Authority for Project Cost Management 29 May h. USACE Inspection of Section 902 Cost Limit Requirements for Civil Works Projects May 2013.

2 EC i. Memorandum, HQUSACE Section 902 Cost Limit Policy Clarification and Applicability 07 March District Requirements. a. District Change Control Boards. Districts responsible for managing Civil Works projects will establish a Change Control Board (CCB). The intent is to improve the monitoring and control of project changes, provide oversight of the cumulative changes for quality assurance, and to achieve the stated objectives in the approved PMP. At the discretion of District leadership, the CCB function may be accomplished in conjunction with other key meetings (e.g. Project Review Boards (PRBs), an Executive Session post-prb, etc.); however, its function and value should not be diminished or diluted. The Change Control Board process is shown in Appendix A. (1) CCB Roles and Responsibilities. The District CCB is responsible for reviewing, evaluating, and recommending to the District Engineer (DE) or his/her designee approving, delaying, or rejecting changes to a project within their approved threshold. There are several documents and tools that will assist in carrying out these responsibilities such as approved Change Management Plans (CMPs), risk registers, well-documented change requests, and good management of project contingencies. Upon receiving a decision from the DE or his/her designee, the District CCB is responsible for ensuring the decision is recorded in the Change/Decision Log and communicating the decision appropriately. (2) CCB Membership. The recommended District CCB membership is the Deputy District Engineer for Programs and Project Management, Engineering & Construction Division Chief, and Planning & Policy Chief. However, at a minimum, the District CCB should be consistent with the membership of the Change Control Board at the MSC. (3) CCB Meetings: It is recommended that the District CCB establish at minimum, a monthly meeting battle rhythm. This ensures and secures the availability of CCB members. b. Change Management Plan. In accordance with PMBP, PROC 3010 and REF 8009G, each project is required to have an approved Change Management Plan (CMP) (see template, Appendix B). The CMP defines the process for managing change on a project as well as the use of risk contingency as it relates to scope, cost, schedule, and quality. The level of detail of the CMP is based on the complexity of the project. It is a supporting plan that facilitates the execution of the Project Management Plan (PMP). It also addresses the use of Change Request Forms, contingency usage, established and approved decision thresholds, and maintains a Change/Decision Log (see Appendix C) in conjunction with the project's risk register. The utilization of CMPs will result in continuous management and control of approved changes to the authorized project scope, schedule and cost contributing to the successful execution and delivery of quality projects and services to our stakeholders. 2

3 EC (1) Change Requests. All changes impacting project scope, schedule, cost, and any use of risk contingency must be formally requested and documented. It is recommended that each change request be accompanied by an Analysis of Alternatives to ensure the requested change is required and needed. Establishing decision thresholds ensure requested changes are addressed by the appropriate decision maker in a timely fashion. Appendix D.1 is a sample Change Request Form and Appendix D.2 is a sample Analysis of Alternatives. (2) Risk Register. The risk register is a project management tool used to identify, record, and track all project risks (and details) that could result from actions taken or not taken during each stage of a project's life cycle. The risk register plays a key role in determining the project contingency. The document is also used to record the results of the risk analysis and risk response planning efforts. (3) Contingency. Every project has an associated contingency for risk in the form of dollars and/or time in accordance with ER Having undergone a Cost and Schedule Risk Analysis (CSRA) based on the project's risk register, the Cost MCX produces a certified cost estimate. A Total Project Cost Summary (TPCS) is part of the certified cost estimate. Note: Although all projects are not required to obtain a cost certification from the Cost MCX, one will be required for the HQ CCB. It is imperative that the PDT manage the project contingency within and based on the approved decision thresholds. (4) Cost Analysis. Every change request must be accompanied by a cost analysis. A sample Cost Analysis worksheet is provided, Appendix E. The cost analysis, using the TPCS, provides a current status of overall costs in relation to the proposed change request as well as assists in determining what decision thresholds have been triggered. (5) Decision Thresholds. Decision thresholds within the risk contingency for a project may be established. These thresholds will be used to determine/measure the tolerance for change within or outside of the risk contingency for a project. A threshold is a cost, time, quality, technical, or resource value used as a parameter to establish a lower and/or upper limit to trigger an action. The project delivery team (PDT) will examine, at the lowest level practicable, the project s scope, schedule, cost and risk to develop change thresholds. Decision thresholds may be developed for multiple levels of approval to include the PDT level, District CCB, and MSC CCB. The HQUSACE CCB decision threshold has already been established and is the authorized project cost plus inflation. (6) Performance Measurement Baseline (PMB). The PMB is an approved, integrated scope-schedule-cost plan for the project work against which project execution is compared to measure and manage performance. The PMB is the authorized project cost (congressionally authorized or other as approved by HQUSACE) which includes contingency. For projects which do not have a congressional authorization, HQUSACE may establish an equivalent amount. As an example, the 3

4 EC Dam Safety Program has determined that an approved Dam Safety Modification Report is equivalent to the authorized amount for a project. Based on leadership at the District, MSC, and other programs similar to the Dam Safety Program, the contingency may be split thus establishing layered thresholds within the PMB for the District and the MSC. 6. MSC Requirements. a. MSC Change Control Boards. A CCB will be established in MSCs having districts responsible for managing Civil Works projects with the responsibility for reviewing, evaluating, and recommending to the MSC Commander or his/her designee approving, delaying, or rejecting changes to a project within their approved threshold, and for recording and communicating such decisions. The intent is to improve the monitoring and control of project changes, provide oversight of the cumulative changes for quality assurance, and to achieve the stated objectives in the approved PMP. At the discretion of Division leadership, the CCB function may be accomplished in conjunction with other key meetings. The Change Control Board process is shown in Appendix A. b. CCB Roles and Responsibilities. The MSC CCB is responsible for reviewing, evaluating, and recommending to the MSC Commander approving, delaying, or rejecting changes to a project within their approved decision threshold or as required by the MSC CCB. There are several documents and tools that will assist in carrying out these responsibilities such as approved Change Management Plans (CMPs), risk registers, well-documented change requests, and good management of project contingencies. Upon receiving a decision from the MSC Commander or his/her designee, the MSC CCB is responsible for ensuring the decision is recorded in the Change/Decision Log and communicating the decision appropriately. For change requests that require HQ CCB decision, the MSC is responsible for notifying the respective HQ Civil Works Deputy RIT Leader and coordinating/scheduling a HQ CCB meeting. (1) Change Requests. It is recommended that the MSC CCB review the disposition of all change requests as all other change requests could impact and influence decisions and recommendations on current proposed change requests that have reached MSC and HQ decision thresholds. (2) Risk Registers. MSC must ensure the risk register for each project is up-to-date and used to identify, record, and track all project risks (and details) as they arise. As decisions are made that impact identified risks, they should be appropriately recorded as risk responses. (3) Contingency. The MSC has the overall responsibility for ensuring the project is managed within the authorized cost plus inflation. Although not required, the MSC may determine that a portion of the contingency will be managed at the MSC's discretion. (4) Cost Analysis. MSCs may use the Cost Analysis worksheet as a tool for discussion of project health (e.g. to measure use of contingency, project progress, and 4

5 remaining work) during CCB meetings. The sample Cost Analysis worksheet is designed to utilize decision thresholds for contingency. EC (5) Decision Thresholds. The decision threshold for an MSC will not exceed the authorized project cost plus inflation. Guidance currently exists for both mega projects and dam safety projects requiring the use of thresholds for PDTs, Districts, MSCs, and HQUSACE. c. CCB Membership. The recommended MSC CCB membership is the MSC Programs Director, the MSC Engineering & Construction Chief, and the MSC Planning & Policy Chief. However, MSC CCB membership is at the discretion of the MSC Commander or his/her designee. d. CCB Meetings: It is recommended that the MSC CCB establish a monthly meeting battle rhythm. This ensures and secures the availability of CCB members. e. Performance Measurement Baseline. Unless otherwise approved by the HQ CCB, the PMB is the authorized project cost plus inflation or its equivalent as determined by HQUSACE. 7. HQ CCB Requirements. a. HQ Change Control Boards. A CCB has been established in HQUSACE with the responsibility for reviewing, evaluating, and recommending to the DCG-CEO approving, delaying, or rejecting changes to a project as well as recording and communicating such decisions. The intent is to improve the monitoring and control of project changes, provide oversight of the cumulative changes for quality assurance, and to achieve the stated objectives in the approved PMP. The Change Control Board process is shown in Appendix E. b. CCB Roles and Responsibilities. The HQ CCB is responsible for reviewing, evaluating, and recommending to DCG-CEO approving, delaying, or rejecting changes to a project. Upon receiving a decision from the DCG-CEO, the HQ CCB is responsible for ensuring the decision is recorded in the Change/Decision Log and communicating the decision appropriately. The HQ Project Cost Management Review (PCMR) team provides initial recommendations to the HQ CCB as well as informs HQ CCB of systemic issues, challenges, and concerns regarding USACE policy, guidance, and regulations. For change requests that require approval beyond the Section 902, HQ CCB will collaborate with the Deputy RIT Leader, MSC CCB, and District CCB on the most appropriate path forward. c. CCB Membership. The HQ CCB membership is comprised of Chief, Civil Works Programs Integration, Chief, Engineering & Construction Division, and the Chief, Planning & Policy Division. 5

6

7 EC APPENDIX A CHANGE CONTROL BOARD PROCESS Project Delivery Team 1 Start Develop Change Management Plan (CMP) (including proposed thresholds and CCB membership) and Submit to DPM PROC 3000 Project Execution and Control Incorporate change request DECISION into PMP and CMP documents Yes Identify & Document Proposed Change Request and Record in Change Log Approval Authority? No Prepare CCB documents and schedule CCB meeting(s) District Change Control Board No DPM will coordinate the approval of thresholds & CCB Membership Approved? Approved Yes Approval Authority? No Prepare CCB documents & schedule MSC CCB meeting(s) Conduct District CCB MSC Change Control Board (Approval authority limited to the authorized project cost plus inflation) Yes Execute the Approved Change Management Plan (DPM Transmits Approved CMP to PDT) Yes Approval Authority? No Prepare CCB documents & schedule HQ CCB meeting(s) Conduct MSC CCB HQUSACE Change Control Board (Approval authority above authorized project cost plus inflation up to 902 limit) Conduct HQ CCB (HQ CCB recommendations to DCG) Flowchart Notes: 1 This will be completed in conjunction With the development of the PMP. A-1

8 EC THIS PAGE INTENTIONALLY LEFT BLANK A-2

9 EC APPENDIX B CHANGE MANAGEMENT PLAN TEMPLATE 1. Introduction Paragraph 1 Instructions: Start the development of your Project Change Management Plan with this template or other as appropriate. Change Management is an important part of any project. Changes must be vetted and managed to ensure that they are within the scope of the project and are communicated to all stakeholders if they are approved. The process for submitting, reviewing, and approving changes must also be communicated to all stakeholders in order to properly set expectations. If changes are allowed to be submitted or are implemented in and unorganized way, any project is sure to fail. ALL projects must include a Change Management Plan as part of the overall Project Management Plan. It can either be included as a section in the Project Plan or as an appendix as a subsidiary management plan. The Change Management Plan was created for the [enter project name] Project in order to set expectations on how the approach to changes will be managed, what defines a change, the purpose and role of the change control board, and the overall change management process. All stakeholders (customers, PDT members, management, ALL) will be expected to formally submit or request changes to the [enter project name] Project in accordance with this Change Management Plan and all requests and submissions will follow the process detailed herein. This plan, including thresholds, has been approved by: District Change Control Board: MSC Change Control Board: Other entity (i.e. Dam Safety/RMC/etc): 2. Change Management Approach Paragraph 2 Instructions: This section of the Change Management Plan describes the approach the organization will use for managing change throughout the project. Throughout a project s lifecycle there may be very few or very many submitted changes. The approach taken to manage these changes must be consistent and repeatable in order to provide a quality change management plan and process. B-1

10 EC The Change Management approach for the [enter project name] Project will ensure that all proposed changes are defined, reviewed, agreed upon, and approved so they can be properly implemented and communicated to all stakeholders. This approach will also ensure that only changes within the authorized scope of this project are approved and implemented. The Change Management approach is not to be confused with the Change Management Process which will be detailed later in this plan. The Change Management approach consists of three areas: Ensure changes are within scope and beneficial to the project Determine how the change will be implemented Manage the change as it is implemented The Change Management process has been designed to make sure this approach is followed for all changes. By using this approach methodology, the [enter project name] Project Team will prevent unnecessary change from occurring and focus its resources only on beneficial changes within the project's authorized scope. 3. Definitions of Change Paragraph 3 Instructions: This section of the Change Management Plan defines the different types of changes that may be requested and considered for the project. These changes may include schedule change, budget change, scope change, or project document changes. Most changes will impact at least one of these areas and it is important to consider these impacts and how they will affect the project. There are several types of changes which may be requested and considered for the [enter project name] Project. Depending on the extent and type of proposed changes, formal documentation and the communication of these changes will be required to include any approved changes into the project plan as well as ensure all stakeholders are notified. Types of changes include: Scheduling Changes: changes which will impact the approved project schedule. These changes may require fast tracking, crashing, or re-baselining the schedule depending on the significance of the impact. Budget Changes: changes which will impact the approved project budget (i.e. authorized cost). These changes may require requesting additional funding, releasing funding which would no longer be required or adding to project or management reserves. This may require changes to the cost baseline for the project. B-2

11 EC Scope Changes: changes which are necessary and impact the project s scope which may be the result of unforeseen requirements which were not initially planned for. These changes may also impact budget and schedule. These changes may require revision to WBS, project scope statement, and other project documentation as necessary. The project manager must ensure that any approved changes are communicated to the project stakeholders. Additionally, as changes are approved, the project manager must ensure that the changes are captured in the project documentation where necessary. These document updates must then be communicated to the project delivery team and stakeholders as well. 4. Decision Thresholds Paragraph 4 Instructions: Decision thresholds within the risk contingency for a project may be established (see Figure 1). These thresholds will be used to determine/measure the tolerance for change within or outside of the risk contingency for a project. A threshold is a cost, time, quality, technical, or resource value used as a parameter to establish a lower and/or upper limit to trigger an action. The project delivery team (PDT) will examine, at the lowest level practicable, the project s scope, schedule, cost and risk to develop change thresholds. Decision thresholds will be developed for multiple levels of approval to include the PDT level, District CCB, MSC CCB and the HQUSACE CCB, as applicable. See sample Decision Threshold Matrix, Figure 1. Consideration will be given to individual changes, cumulative changes, and remaining contingency for schedule and cost. Note: Guidance currently exists for both mega projects and dam safety projects requiring the use of thresholds for PDT, District, MSC, and headquarters. The chart below is only an example. Prior to including such a chart, the leadership at district, MSC, and headquarters should be included in the decision. For [enter project name], the following decision thresholds have been approved. Decision Authority Estimated Cumulative Contingency Usage Overall Physical Progress HQ CCB/DCG-CEO Estimating that all contingency exhausted TBD MSC CCB (range)% or $$$ TBD District CCB (range) % or $$ TBD PDT (range)% and/or $ below TBD Figure 1: Decision Threshold Matrix Example B-3

12 EC Change Control Boards Paragraph 5 Instructions: Here the Change Management Plan describes the Change Control Board, the purpose of the board, and the members and their roles on the board. The change control board is the approval authority for all proposed project changes. If a change is not approved by the control board then it will not be implemented with the project. The size and function of change control boards may vary depending on the organization but their purpose and the roles and responsibilities are consistent. The Change Control Board (CCB) is the approval authority for all proposed change requests pertaining to the [enter project name] Project. The purpose of the CCB is to review all change requests, determine their impacts on the project risks, scope, cost, and schedule, and to approve or deny each change request. The following chart provides a list of the CCB members for the [enter project name] Project: [Enter district name] District CCB Name Position CCB Role DPM/Programs Chief Chief, Planning Chief, Engineering Chief, Construction District Engineer CCB Chair - recommends CCB Co-Chair - recommends CCB Co-Chair - recommends CCB Memberrecommends Approves/Rejects Changes [Enter MSC name] Division CCB Name Position CCB Role DPM/Programs Chief Chief, Planning Chief, Engineering Chief, Construction MSC Commander CCB Chair CCB Member CCB Co-Chair CCB Member Approves/Rejects Changes B-4

13 EC HQUSACE CCB Name Position CCB Role HQ, Chief, CW Integration Division HQ, Chief, Planning Division HQ, Chief, Engineering & Construction Division DCG-CEO CCB Chair CCB Co-Chair CCB Co-Chair Approves/Rejects Changes As change requests are submitted to the [enter project name] Project Manager by the project team/stakeholders, the Project Manager will log the requests in the change log and the CCB will convene [enter frequency] to review all change requests. For a change request to be approved, all CCB members must vote in favor. In the event more information is needed for a particular change request, the request will be deferred and sent back to the requestor for more information or clarification. If a change is deemed critical, an ad hoc CCB meeting can be called in order to review the change prior to the next scheduled CCB meeting. 6. Roles and Responsibilities Paragraph 6 Instructions: This section of the Change Management Plan describes the roles and responsibilities of project team members in regards to the change management process. It is important that everyone understands these roles and responsibilities as they work through the change management process. These roles and responsibilities must be communicated as part of the change management plan to all project stakeholders. The following are the roles and responsibilities for all change management efforts related to the [enter project name] Project: District Engineer/MSC Commander/DCG-CEO: Approve/reject all changes to budget/funding allocations within approved thresholds Approve/reject all changes to schedule baseline within approved thresholds Approve/reject any changes in project scope within approved thresholds Chair the CCB Project Manager: Receive and log all change requests from project stakeholders Conduct preliminary risk, cost, schedule, scope analysis of change prior to CCB B-5

14 EC Seek clarification from change requestors on any open issues or concerns Make documentation revisions/edits as necessary for all approved changes Participate on CCB Project Delivery Team / Stakeholders: Submit all change requests on standard organizational change request forms Provide all applicable information and detail on change request forms Be prepared to address questions regarding any submitted change requests Provide feedback as necessary on impact of proposed changes 7. Change Control Process Paragraph 7 Instructions: This part of the Change Management Plan should describe the change control process from beginning to end. Typically, a change control process should be an organizational standard and repeatable. This process is the tool which is used to ensure adherence to the organization s change management approach which was discussed in an earlier section. By following all of the steps, the project team can successfully incorporate approved changes, communicate the changes, and update project documentation. The Change Control Process for the [enter project name] Project will follow the organizational standard change process for all projects. The project manager has overall responsibility for executing the change management process for each change request. [Enter Change Control Board Process or processes/standard operating procedures to be used.] B-6

15 EC APPENDIX C Change and Decision Log Template C-1

16 EC THIS PAGE INTENTIONALLY LEFT BLANK C-2

17 EC APPENDIX D SCOPE, SCHEDULE, AND COST CHANGE REQUEST (SSACCR) FORM D-1

18 EC APPENDIX D SCOPE, SCHEDULE, AND COST CHANGE REQUEST (SSACCR) FORM D-2

19 EC APPENDIX E COST ANALYSIS WORKSHEET SAMPLE Project Level Contingency: This option allows the Change Control Boards' contingency thresholds to be established at the project level. In this instance the total project contingency is $21,862k. The PM will fill in columns highlighted in yellow at the beginning of the project. Columns highlighted in blue will be changed each time a new change is either approved (in column G) or proposed (in column K). The fields highlighted in green are the threshold percentages that the PDT, District CCB, and Division CCB has authority to approve and will add up to 100%. When the total of the cumulative approved change requests plus the current change request(s) is greater than a threshold, the next higher approver will be required to authorize the change. Change Request Cost Analysis Summary (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) Account Number & Feature Description Feature Base Costs Feature Contingency Feature Full Costs Sunk Costs Cumulative Cost of Approved Change Requests Remaining Base Cost Remaining Contingency Remaining Full Cost Current Change Request(s) Remaining Contingency After Change Request ($k) ($k) ($k) ($k) ($k) ($k) ($k) ($k) ($k) ($k) 01 LANDS AND DAMAGES ,200 (22,044) 02 RELOCATIONS RESERVOIRS DAMS LOCKS FISH & WILDLIFE FACILITIES 62,492 15,623 78,115 24,000-38,492 15,623 54,115-15, POWER PLANT ROADS, RAILROADS & BRIDGES CHANNELS & CANALS BREAKWATER & SEAWALLS LEVEES & FLOODWALLS NAVIGATION PORTS & HARBORS PUMPING PLANT RECREATION FACILITIES FLOODWAY CONTROL & DIVERSION STRUC BANK STABILIZATION BEACH REPLENISHMENT CULTURAL RESOURCE PRESERVATION BUILDINGS, GROUNDS & UTILITIES PERMANENT OPERATING EQUIPMENT Planning Engineering and Design 16,111 4,028 20,139 6,500-9,611 4,028 13,639-4, Construction Management (S&A) 8,220 2,055 10,275 2,500-5,720 2,055 7,775-2, HTRW Investigation Project Risk Total 87,448 21, ,310 33,350-54,098 21,862 75,960 22,200 (338) Authorized Cost Inflated thru Midpoint of Construction 109,310 Maximum Authorized Project Cost Limit (Section 902 Limit or Administrative Limit) Project Delivery Team Contingency Threshold District Change Control Board Contingency Division Change Control Board Contingency Thre 10.00% 2, % 8, % Total Project Risk Contingency 21,862 This change request will be evaluated by the 115,000 HQUSACE Change Control Board E-1

20 EC THIS PAGE INTENTIONALLY LEFT BLANK E-2

21 EC APPENDIX F ON-BOARD REVIEW MEETING REQUIREMENTS Two weeks prior to a schedule HQ Change Control Board (CCB) meeting, the MSC must schedule a meeting with the HQ Project Cost Management Review (PCMR) team to conduct an on-board project review with the district and MSC. The HQ PCMR team comprises of selected members from Programs & Project Management, Engineering & Construction, Planning & Policy Division, Real Estate, Cost Mandatory Center of Expertise (MCX), Cost Engineering, and other programs and offices as needed. 1. Documents: At a minimum, the following documents are required: a. Certified Cost Estimate from the Cost MCX in Walla Walla b. MSC Request to Exceed Authorized Cost Plus Inflation FORM (all signatures required) c. HQUSACE CCB Briefing d. The last three Justification Sheets submitted e. Other supporting documents that may be requested: CSRA, Risk Register, Change/Decision Log, Decision Documents, VE reports, etc. 2. Typical Questions: Typical questions asked during the review meeting are listed below; however, some questions may lead to additional follow-on questions. a. When will this project be complete? b. What is the project duration? c. Are there new requirements for the project? Please describe the new requirement(s). When were the requirements identified? What was the estimated cost to implement the new requirement(s)? Who approved the change? d. If new requirements are associated with new design standards in Corps regulations and/or guidance, please specify the regulations including paragraphs. e. What is the project scope and deliverables as stated in the Chief's report? f. What has been completed? g. What work remains to be completed? F-1

22 EC h. What will be completed within the authorized cost plus inflation and/or the Section 902 limit? i. Has the customer/sponsor been notified of the cost increase including their associated responsibility for increased costs? If so, what was their response? j. Has a Value Engineering (VE) study been done on the project? If so, when? What was the outcome/savings? k. Is a PACR/GRR/LRR document underway or planned? If so, when did it begin? When is it scheduled for MSC and HQ submission? What is the estimated cost for the PACR/GRR/LRR? 3. Comments: Districts and MSCs should pay attention to project duration, total project cost estimate versus authorized cost plus inflation, data accuracy, commitments in Justification Sheets, statutory cost limits for projects, physical progress on projects, and remaining work to complete projects. F-2

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Organization and Functions

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Organization and Functions CECW-CE Regulation No. 10-1-51 DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 Organization and Functions ROLES AND RESPONSIBILITIES DAM SAFETY MODIFICATION MANDATORY CENTER

More information

SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER MARCH 2019

SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER MARCH 2019 SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 2 USACE policy and guidance continues to evolve

More information

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas U.S. Army Corps of Engineers Fort Worth District Peer Review Plan Bastrop Interim Feasibility Study Lower Colorado River Basin, Texas September 28, 2007 PEER REVIEW PLAN BASTROP INTERIM FEASIBILITY STUDY

More information

DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS

DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS ER-1105-2-100 DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Regulation 31 January 2007 ER 1105-2-100 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS

More information

APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS

APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS ER-1105-2-100 Appendix F, Revised xx August 2018 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS Paragraph Page SECTION I - PROGRAM OVERVIEW Purpose and Applicability.. F-1 F-1 References..

More information

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014 DEPARTMENT OF THE ARMY EC 1165-2-216 US Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Circular No. 1165-2-216 31 July 2014 EXPIRES 31 July 2016 Water Resource Policies and Authorities POLICY

More information

Dredged Material Management Plans (DMMPs)

Dredged Material Management Plans (DMMPs) Dredged Material Management Plans (DMMPs) Theodore A. Brown, P.E. SES Chief, Planning and Policy Division Headquarters, USACE 12 February 2014 Planning- Construction- Operations & Maintenance Current Guidance

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance

More information

DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers Washington, DC Financial Administration OPERATING BUDGETS

DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers Washington, DC Financial Administration OPERATING BUDGETS CERM-B Regulation No. 37-1-24 DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers Washington, DC 20314-1000 Financial Administration OPERATING BUDGETS ER 37-1-24 31 December 2001 1. Purpose. This regulation

More information

ST. JOHNS COUNTY, FLORIDA

ST. JOHNS COUNTY, FLORIDA ST. JOHNS COUNTY, FLORIDA South Ponte Vedra Beach, Vilano Beach, and Summer Haven Reaches COASTAL STORM RISK MANAGEMENT PROJECT DRAFT INTEGRATED FEASIBILITY STUDY AND ENVIRONMENTAL ASSESSMENT APPENDIX

More information

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2005-7 Issuing Office: CECW-E Issued: 19 May, 2005 Subject: Use of Stipends in Military Construction-Funded Two-Phase Design Build Projects Applicability: Guidance

More information

CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS

CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS South Atlantic Division CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS US Army Corps of Engineers April 2015 1. Overview. This document serves as the South Atlantic

More information

REVIEW PLAN. Panama City Harbor Improvements to Bay Harbor Channel. Limited Reevaluation Report (LRR) with Integrated

REVIEW PLAN. Panama City Harbor Improvements to Bay Harbor Channel. Limited Reevaluation Report (LRR) with Integrated REVIEW PLAN Panama City Harbor Improvements to Bay Harbor Channel Limited Reevaluation Report (LRR) with Integrated Environmental Assessment, Panama City, Florida P2: 395107 Mobile District April 2016

More information

REAL ESTATE A GUIDE FOR PROJECT PARTNERS

REAL ESTATE A GUIDE FOR PROJECT PARTNERS REAL ESTATE A GUIDE FOR PROJECT PARTNERS WHO PAYS, AND WHERE DOES THE MONEY COME FROM? Corps and Sponsor Roles in Sharing and Financing Project Costs INTRODUCTION The Water Resources Development Act of

More information

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, D.C

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, D.C CERM-B Regulation No. 37-1-31 DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, D.C. 20314-1000 ER 37-1-31 1 August 2002 Financial Administration PLANNING, PROGRAMMING, BUDGETING ANDEXECUTING

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314 1000 CECW-I MAR 1 1 2008 MEMORANDUM FOR Commanders, Major Subordinate Commands, Districts, and Separate Field

More information

[Letter to be printed on official Levee Sponsor letterhead]

[Letter to be printed on official Levee Sponsor letterhead] [Letter to be printed on official Levee Sponsor letterhead] [Date] COL Joel R. Cross, Commander US Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 RE: [Levee Sponsor

More information

ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE

ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE Project Name: Project Location: Kanopolis Dam, KS Project P2 Number: 351875 Project Manager or POC Name: Chance Bitner NWD Original Approval Date:

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-PA Engineer Regulation 1165-2-122 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resource Policies and Authorities STUDIES OF HARBOR OR INLAND HARBOR PROJECTS

More information

ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE

ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE ATR REVIEW PLAN USING THE NWD ATR REVIEW PLAN TEMPLATE Project Name: Ecosystem Restoration Project Project Location: Kent, WA Project P2 Number: 336787 Project Manager or POC Name: Gordon Thomson NWD Original

More information

DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited

DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited DEPARTMENT OF THE ARMY ER 11-2-240 U.S. Army Corps of Engineers CECW-BE Washington, D.C. 20314-1000 Regulation 6 August 1996

More information

Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects

Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects Risk-Based Project Management Approach for Large- Scale Civil Engineering Projects Alex Bredikhin, P.E., Risk Manager - Megaprojects, U.S. Army Corps of Engineers, Pittsburgh District 1000 Liberty Ave.,

More information

Five-Day Schedule and Course Content

Five-Day Schedule and Course Content Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course

More information

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2016-8 Issuing Office: CECW-CE Issued: 22 Feb 16 Expires: 22 Feb 18 SUBJECT: Interim Risk Reduction Measures (IRRMs) for Levee Safety CATEGORY: Directive and Policy

More information

USACE Policy Guidance on Contributed Funds and Section 408

USACE Policy Guidance on Contributed Funds and Section 408 USACE Policy Guidance on Contributed Funds and Section 408 Jessica Burton Evans Navigation Program Manager Presentation to California Marine Affairs & Navigation Conference (CMANC) 16 January 2014 Redondo

More information

Subject: USACE Implementation of Building Energy Efficiency Tax Deduction Policy for Army Programs

Subject: USACE Implementation of Building Energy Efficiency Tax Deduction Policy for Army Programs ENGINEERING AND CONSTRUCTION BULLETIN No. 2013-9 Issuing Office: CECW-CE Issued: 21 Mar 2013 Expires: 21 Mar 2015 Subject: USACE Implementation of Building Energy Efficiency Tax Deduction Policy for Army

More information

USACE Planning 101 Planning Basics for Partners

USACE Planning 101 Planning Basics for Partners USACE Planning 101 Planning Basics for Partners Bret Walters (901-544-0777) bret.l.walters@usace.army.mil Conservation Partnering Conference Memphis, TN November 2011 US Army Corps of Engineers Topics

More information

Achieve PMP Exam Success Five-Day Course Syllabus

Achieve PMP Exam Success Five-Day Course Syllabus Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course

More information

REVIEW PLAN. Swope Park Industrial Area Flood Damage Reduction Project Kansas City, Missouri

REVIEW PLAN. Swope Park Industrial Area Flood Damage Reduction Project Kansas City, Missouri REVIEW PLAN Swope Park Industrial Area Flood Damage Reduction Project Kansas City, Missouri Post Authorization Change Report/ Limited Reevaluation Report Decision Document Kansas City District Northwestern

More information

TAC 216 Companion Guide

TAC 216 Companion Guide IT Project Management Best Practices The Texas A&M University System Version 2018 Last Revised 09/01/2017 Page 1 of 31 Table of Contents Introduction... 4 The A&M System s Approach to Help Members Achieve

More information

Strategy and Integration

Strategy and Integration Regulation No. 5-1-15 DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 Strategy and Integration U.S. ARMY CORPS OF ENGINEERS STRATEGIC MANAGEMENT Distribution Restriction Statement

More information

Frequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development)

Frequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development) U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG What is Civil Works budget development transformation? Civil Works budget development transformation seeks to: 1) improve the justification and defense of budget

More information

Sustaining the Civil Works Program

Sustaining the Civil Works Program Sustaining the Civil Works Program Presentation to Planning Community of Practice Meeting Steven L. Stockton, P.E. Director of Civil Works 2 June 2015 US Army Corps of Engineers 1 A society grows great

More information

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps Presentation to USACE 2012 Flood Risk Management and Silver Jackets Joint Workshop, Harrisburg, Pennsylvania Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain

More information

DEPARTMENT OF DEFENSE FINANCIAL MANAGEMENT REGULATION. VOLUME llb REIMBURSABLE OPERATIONS, POLICY AND PROCEDURES-- DEFENSE BUSINESS OPERATIONS FUND

DEPARTMENT OF DEFENSE FINANCIAL MANAGEMENT REGULATION. VOLUME llb REIMBURSABLE OPERATIONS, POLICY AND PROCEDURES-- DEFENSE BUSINESS OPERATIONS FUND DOD 7000.14-R DEPARTMENT OF DEFENSE FINANCIAL MANAGEMENT REGULATION VOLUME llb REIMBURSABLE OPERATIONS, POLICY AND PROCEDURES-- DEFENSE BUSINESS OPERATIONS FUND DECEMBER 1994 UNDER SECRETARY OF DEFENSE

More information

Quality Assurance Checklist Review Plans

Quality Assurance Checklist Review Plans Quality Assurance Checklist Review Plans Originating District: Project/Study Title: District POC: PCXIN Reviewer: Any evaluation boxes checked 'No' indicate the RP may not comply with ER 11 05-2-41 0 and

More information

Project Management Guidebook, 2015

Project Management Guidebook, 2015 Description of document: Department of Commerce (DOC) Scalable Acquisition Project Management Guidebook, 2015 Requested date: 2017 Released date: Posted date: Source of document: 19-June-2017 02-October-2017

More information

Financial Administration. Distribution Restriction Statement Approved for public release; distribution is unlimited.

Financial Administration. Distribution Restriction Statement Approved for public release; distribution is unlimited. CEMP-CEP Engineer Regulation 37-5-3 Department of the Army U.S. ARMY CORPS OF ENGINEERS Washington, DC 20314-10000 ER 37-5-3 31 December 2009 Financial Administration EPA/USACE SUPERFUND PROGRAM FINANCIAL

More information

EC Civil Works Review Policy

EC Civil Works Review Policy EC 1165-2-209 Civil Works Review Policy Wilbert V. Paynes Director, Deep Draft Navigation Planning Center of Expertise Chief, Planning and Policy American Association of Port Authorities 27 January 2010

More information

Toronto District School Board

Toronto District School Board Toronto District School Board Governance Procedure PR501 Title: POLICY DEVELOPMENT AND MANAGEMENT Adopted: October 8, 2002 Effected: October, 8, 2002 Revised: November 10, 2015; October 26, 2016 Reviewed:

More information

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES SEPTEMBER 2018 Submit proposal to: Tony Williams, Principal Civil Engineer Marin County Flood Control & Water Conservation

More information

U.S. Army Corps of Engineers Charleston District APPENDIX D CHARLESTON HARBOR POST 45 CHARLESTON, SOUTH CAROLINA. Cost Engineering

U.S. Army Corps of Engineers Charleston District APPENDIX D CHARLESTON HARBOR POST 45 CHARLESTON, SOUTH CAROLINA. Cost Engineering U.S. Army Corps of Engineers Charleston District APPENDIX D CHARLESTON HARBOR POST 45 CHARLESTON, SOUTH CAROLINA Cost Engineering 03 October 2014 THIS PAGE INTENTIONALLY LEFT BLANK 2 TABLE OF CONTENTS

More information

USACE Infrastructure Strategy: UIS Overview and P3 Review

USACE Infrastructure Strategy: UIS Overview and P3 Review USACE Infrastructure Strategy: UIS Overview and P3 Review Edward E. Belk, Jr P.E. Chief, Operations and Regulatory Division Directorate of Civil Works Headquarters, US Army Corps of Engineers Washington,

More information

REVIEW PLAN USING THE NWD MODEL REVIEW PLAN

REVIEW PLAN USING THE NWD MODEL REVIEW PLAN REVIEW PLAN USING THE NWD MODEL REVIEW PLAN for Continuing Authorities Program Section 103, 205 and projects directed by guidance to use CAP procedures Alki Seawall Erosion Control Project Seattle, WA

More information

MANHATTAN KANSAS LOCAL PROTECTION

MANHATTAN KANSAS LOCAL PROTECTION PROJECT REVIEW PLAN MANHATTAN KANSAS LOCAL PROTECTION Flood Risk Management Feasibility Study Kansas City District Program Code = 013394 MSC Approval Date: 7 Feb 2013 Last Revision Date: 14 Jan 2013 REVIEW

More information

Policy and Procedures for Development, Approval and Issuance of Policies, Procedures, Tools and Guidance Notes

Policy and Procedures for Development, Approval and Issuance of Policies, Procedures, Tools and Guidance Notes UNFPA Policies and Procedures Manual Issuance of Policies and Procedures, tools and guidance notes Policy Title Previous title (if any) Policy objective Target audience Risk control matrix Checklist Policy

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 CE CW-EC JUN 2 7 2017 MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance

More information

Project Planning with the U.S. Army Corps of Engineers

Project Planning with the U.S. Army Corps of Engineers US Army Corps of Engineers PLANNING SMART BUILDING STRONG Project Planning with the U.S. Army Corps of Engineers Tim Kuhn Project Manager Portland District 1 February 2016 Introduction Levee Ready Columbia

More information

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2 Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2 Leaders in building public trust in civic government Audit Department TABLE OF CONTENTS History...5

More information

REVIEW PLAN. Cedar Bayou, Texas Dredged Material Management Plan

REVIEW PLAN. Cedar Bayou, Texas Dredged Material Management Plan REVIEW PLAN Cedar Bayou, Texas Dredged Material Management Plan Galveston District MSC Approval Date: 16 November 2012 Last Revision Date: none REVIEW PLAN Cedar Bayou, Texas Dredged Material Management

More information

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C Circular No May 2011

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C Circular No May 2011 DEPARTMENT OF THE ARMY EC 11-2-201 U.S. Army Corps of Engineers CECW-I Washington, D.C. 20314-1000 Circular No. 11-2-201 31 May 2011 EXPIRES 30 SEPTEMBER 2011 Programs Management EXECUTION OF THE ANNUAL

More information

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490 REPLY TO ATTENTION OF: CESAD-PDP : 1 SEP 2012 MEMORANDUM FOR Commander,

More information

Child Welfare Digital Services Project. Cost Management Plan

Child Welfare Digital Services Project. Cost Management Plan Child Welfare Digital Services Project Cost Management Plan January 2017 CWDS Cost Management Plan January 2017 Revision History Revision / Version # Date of Release Author Summary of Changes V 1.0 4/22/14

More information

LRD IWTF Projects Update Inland Waterway Users Board

LRD IWTF Projects Update Inland Waterway Users Board LRD IWTF Projects Update Inland Waterway Users Board MS. JEANINE HOEY, PE, PMP CHIEF, E&C Division Pittsburgh District 13 Dec 2016 The views, opinions and findings contained in this report are those of

More information

POLICY FOR PROPRIETARY REFERENCES IN RTCA DOCUMENTS

POLICY FOR PROPRIETARY REFERENCES IN RTCA DOCUMENTS RTCA, Inc. 1150 18 th Street, NW, Suite 910 Washington, DC 20036 Phone: (202) 833-9339 Fax: (202) 833-9434 www.rtca.org RTCA Paper No. 085-15/PMC-1323 March 24, 2015 POLICY FOR PROPRIETARY REFERENCES IN

More information

DEPARTMENT OF THE ARMY. u.s. ARMY CORPS OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY. u.s. ARMY CORPS OF ENGINEERS WASHINGTON, D.C DEPARTMENT OF THE ARMY u.s. ARMY CORPS OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO ATTENTION OF: NOV 1 7 2008 CECW-PB MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Clarification Guidance on the Policy

More information

CAPITAL PROJECT MANAGEMENT

CAPITAL PROJECT MANAGEMENT ASSETWORKS, INC. CAPITAL PLANNING & PROJECT MANAGEMENT TRAINING GUIDE STATE CAPITAL PROJECT MANAGEMENT REV MARCH 17 STATE CAPITAL PROJECT STANDARD OPERATING PROCEDURE PROJECT INITIATION... 3 PHASE 1...

More information

SECTION Watershed Informed Approach to FY 2016 Budget Development

SECTION Watershed Informed Approach to FY 2016 Budget Development SECTION 2 This section provides information and guidance regarding three new initiatives by the Civil Works Integration within USACE to make the budget formulation more streamlined, our investments more

More information

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3 Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3 To be leaders in building public trust in our civic government Audit Department TABLE OF CONTENTS History...5

More information

Jefferson Science Associates, LLC Earned Value Management System 2013 Surveillance Plan

Jefferson Science Associates, LLC Earned Value Management System 2013 Surveillance Plan Jefferson Science Associates, LLC Earned Value Management System 2013 Surveillance Plan 4-5 December, 2013 V1 Earned Value Management System Surveillance Plan The Department of Energy (DOE) certified the

More information

ASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS

ASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS ASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS PURPOSE This document is intended to succinctly outline

More information

The PRINCE2 Practitioner Examination. Sample Paper TR. Answers and rationales

The PRINCE2 Practitioner Examination. Sample Paper TR. Answers and rationales The PRINCE2 Practitioner Examination Sample Paper TR Answers and rationales For exam paper: EN_P2_PRAC_2017_SampleTR_QuestionBk_v1.0 Qu Correct Syll Rationale answer topic 1 A 1.1a a) Correct. PRINCE2

More information

THE CORPORATION OF THE CITY OF WINDSOR POLICY

THE CORPORATION OF THE CITY OF WINDSOR POLICY THE CORPORATION OF THE CITY OF WINDSOR POLICY Service Area: Office of the Chief Administrative Officer Policy No.: CR252/2014 Department: Approval Date: October 6, 2014 Division: Corporate Initiatives

More information

This procedure applies to the Facilities & Safety Business Office (FSBO) and Facilities Planning & Construction (FP&C).

This procedure applies to the Facilities & Safety Business Office (FSBO) and Facilities Planning & Construction (FP&C). SUBJECT: Effective Date: Procedure Number: Financial Procedures for the following: 3/4/2016 FS 2016 FPC0021 Requisition Creation and Approval Schedule of Values Professional Service Invoices Additional

More information

Mn/DOT Scoping Process Narrative

Mn/DOT Scoping Process Narrative Table of Contents 1 Project Planning Phase...3 1.1 Identify Needs...4 1.2 Compile List of Needs = Needs List...4 1.3 Define Project Concept...5 1.4 Apply Fiscal/Other Constraints...5 1.5 Compile List of

More information

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 I. Contents Introduction... 2 Purpose... 2 Scope... 2 Rationale... 2 Acronyms... 2 I. Funding Mechanisms... 3 A. Eligibility... 3 B. Standard Allocation...

More information

DECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic Review Plan Model

DECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic Review Plan Model Continuing Authorities Program Section 14, Flood Control Act of 1946, as amended Emergency Streambank and Shoreline Protection Projects DECISION DOCUMENT REVIEW PLAN Consistent with the National Programmatic

More information

PRESQUE ISLE ERIE, PENNSYLVANIA CG CAP SECTION 204 REGIONAL SEDIMENT MANAGEMENT BENEFICIAL USE OF DREDGED MATERIAL. Project No.

PRESQUE ISLE ERIE, PENNSYLVANIA CG CAP SECTION 204 REGIONAL SEDIMENT MANAGEMENT BENEFICIAL USE OF DREDGED MATERIAL. Project No. DECISION DOCUMENT REVIEW PLAN USING THE PROGRAMMATIC REVIEW PLAN MODEL for Continuing Authorities Program Section 14, 107, 111, 204, 206, 208 and 1135 Projects PRESQUE ISLE ERIE, PENNSYLVANIA CG CAP SECTION

More information

Version 2.0- Project. Q: What is the current status of your project? A: Completed

Version 2.0- Project. Q: What is the current status of your project? A: Completed Baker College, MI Project: Develop an institutional quality assurance framework to measure institutional effectiveness and drive continuous quality improvement efforts Version 2.0- Project What is the

More information

GUIDE FOR COMPLETING CO-PLAN DD 2794: COST AND SOFTWARE DATA REPORTING (CSDR) & EARNED VALUE MANAGEMENT (EVM) CO-PLAN

GUIDE FOR COMPLETING CO-PLAN DD 2794: COST AND SOFTWARE DATA REPORTING (CSDR) & EARNED VALUE MANAGEMENT (EVM) CO-PLAN GUIDE FOR COMPLETING CO-PLAN DD 2794: COST AND SOFTWARE DATA REPORTING (CSDR) & EARNED VALUE MANAGEMENT (EVM) CO-PLAN JANUARY 2017 The CSDR/EVM Co-Plan is a joint effort between the Office of the Secretary

More information

Update to the PL Rehabilitation Program

Update to the PL Rehabilitation Program Update to the PL 84-99 Rehabilitation Program Richard J. Varuso, Ph.D., P.E. Senior Program Manager Risk Management Center New Orleans November 2, 2015 US Army Corps of Engineers PL 84-99 The USACE Emergency

More information

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices. ESG / CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com September 2017 Introduction This ESG / CSR / Sustainability Governance

More information

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon Abstract- Project Cost Management includes the processes involved in planning, estimating, budgeting,

More information

BYLAWS OF THE STUDENT ASSOCIATION: SEGREGATED UNIVERSITY FEE ALLOCATION COMMITTEE

BYLAWS OF THE STUDENT ASSOCIATION: SEGREGATED UNIVERSITY FEE ALLOCATION COMMITTEE BYLAWS OF THE STUDENT ASSOCIATION: SEGREGATED UNIVERSITY FEE ALLOCATION COMMITTEE ARTICLE I: COMMITTEE STRUCTURE Section I: Name and Purpose A. Name The name of this committee shall be the Segregated University

More information

PMI - Dallas Chapter. Sample Questions. March 22, 2002

PMI - Dallas Chapter. Sample Questions. March 22, 2002 PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

REQUEST FOR PROPOSAL. Compensation and Classification Study

REQUEST FOR PROPOSAL. Compensation and Classification Study School Employees Retirement System of Ohio Request for Information Investment Manager SCHOOL EMPLOYEES RETIREMENT SYSTEM OF OHIO 300 East Broad Street, Suite 100 Columbus, Ohio 43215 REQUEST FOR PROPOSAL

More information

Audit of Grants and Contributions

Audit of Grants and Contributions Audit of Grants and Contributions May 1, 2013 Key Dates Opening conference (launch memo) May 2011 Audit plan sent to management September 2011 End of fieldwork July 2012 Audit report sent to management

More information

Risk Management Guideline July, 2017

Risk Management Guideline July, 2017 Risk Management Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents PREFACE... 1 SECTION OVERVIEW... 1 SECTION 1 - INTRODUCTION... 2

More information

Actualtests.PRINCE2Foundation.120questions

Actualtests.PRINCE2Foundation.120questions Actualtests.PRINCE2Foundation.120questions Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 4.8 http://www.gratisexam.com/ PRINCE2 Foundation PRINCE2 Foundation written Exam 1. Dump

More information

DEPARTMENT OF HOMELAND SECURITY. U.S. Customs and Border Protection. 19 CFR Part 111. [Docket No. USCBP ; CBP Dec. No ] RIN 1651-AB07

DEPARTMENT OF HOMELAND SECURITY. U.S. Customs and Border Protection. 19 CFR Part 111. [Docket No. USCBP ; CBP Dec. No ] RIN 1651-AB07 This document is scheduled to be published in the Federal Register on 06/30/2017 and available online at https://federalregister.gov/d/2017-13829, and on FDsys.gov 9111-14 DEPARTMENT OF HOMELAND SECURITY

More information

Prince2 Foundation.exam.160q

Prince2 Foundation.exam.160q Prince2 Foundation.exam.160q Number: Prince2 Foundation Passing Score: 800 Time Limit: 120 min PRINCE2 Foundation PRINCE2 Foundation written Exam Sections 1. Volume A 2. Volume B Exam A QUESTION 1 Which

More information

Project Management Certification. Multiple Choice Questions

Project Management Certification. Multiple Choice Questions Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?

More information

BEFORE THE ONTARIO ENERGY BOARD OF THE PROVINCE OF ONTARIO

BEFORE THE ONTARIO ENERGY BOARD OF THE PROVINCE OF ONTARIO BEFORE THE ONTARIO ENERGY BOARD OF THE PROVINCE OF ONTARIO NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF ITS 2012 BUSINESS

More information

GATA Major Bridge Budget Instructions

GATA Major Bridge Budget Instructions GATA Major Bridge Budget Instructions Overview: These instructions reference the highlighted Uniform Grant Budget Document that is included below. Please do not complete your budget on this form. The actual

More information

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION DATA ITEM DESCRIPTION Form Approved OMB NO. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions,

More information

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1 Audit Department Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1 To be leaders in building public trust in our civic government TABLE OF CONTENTS History...1

More information

Earned Value Management System

Earned Value Management System DEPARTMENT OF VETERANS AFFAIRS Office of Information and Technology Earned Value Management System Description Document VA-DI-MGMT-81466A RECORD OF CHANGES Change Number Date Reference (Page, Section,

More information

Inland Waterways Users Board Meeting No. 83 Charleston, West Virginia

Inland Waterways Users Board Meeting No. 83 Charleston, West Virginia Inland Waterways Users Board Meeting No. 83 Charleston, West Virginia Financial Report & Project Summaries Mr. Joseph Aldridge USACE Headquarters May 17, 2017 US Army Corps of Engineers FY 17 Status of

More information

REVIEW PLAN. For. Missouri River Bed Degradation Feasibility Study PN Kansas City District. February 11, 2013 (Supersedes all previous drafts)

REVIEW PLAN. For. Missouri River Bed Degradation Feasibility Study PN Kansas City District. February 11, 2013 (Supersedes all previous drafts) REVIEW PLAN For Missouri River Bed Degradation Feasibility Study PN 146254 Kansas City District February 11, 2013 (Supersedes all previous drafts) Page 1 REVIEW PLAN Missouri River Bed Degradation Feasibility

More information

Office of Policy & Priorities; Treasury Board Office; and Executive Council Office

Office of Policy & Priorities; Treasury Board Office; and Executive Council Office Office of Policy & Priorities; Treasury Board Office; and Executive Council Office 2010-2011 Accountability Report August 12, 2011 1 Table of Contents A. Accountability Statement...3 B. Message from the

More information

DETAILED PROJECT REPORT/ENVIRONMENTAL ASSESSMENT Little Manistee River Sea Lamprey Barrier, Manistee County, Michigan Section 506.

DETAILED PROJECT REPORT/ENVIRONMENTAL ASSESSMENT Little Manistee River Sea Lamprey Barrier, Manistee County, Michigan Section 506. DECISION DOCUMENT REVIEW PLAN USING THE REGIONAL REVIEW PLAN MODEL for Great Lakes Fisheries and Ecosystem Restoration (GLFER) Program Section 506, Water Resources Development Act of 2000, as Amended DETAILED

More information

Future Directions for Civil Works Project Delivery and Partnership

Future Directions for Civil Works Project Delivery and Partnership Future Directions for Civil Works Project Delivery and Partnership Becky Moyer Chief, Planning & Policy Southwestern Division 3 March 2016 US Army Corps of Engineers Future of the Texas Coast Shared Visioning

More information

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECO-O Washington, DC Regulation No July 2013

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECO-O Washington, DC Regulation No July 2013 DEPARTMENT OF THE ARMY ER 11-2-293 U.S. Army Corps of Engineers CECO-O Washington, DC 20314-1000 Regulation No. 11-2-293 31 July 2013 Army Programs REEMPLOYED ANNUITANT OFFICE PROGRAM 1. Purpose. This

More information

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers 441 G Street, NW CECW-I Washington, D.C

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers 441 G Street, NW CECW-I Washington, D.C DEPARTMENT OF THE ARMY EC 11-2-211 U.S. Army Corps of Engineers 441 G Street, NW CECW-I Washington, D.C. 20314-1000 Circular No. 11-2-211 29 April 2016 EXPIRES 30 SEPTEMBER 2016 Programs Management EXECUTION

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C .t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY

More information

REVIEW PLAN KEŌPŪ-HIENALOLI STREAMS FLOOD RISK MANAGEMENT PROJECT ISLAND OF HAWAI I, HAWAI I. Feasibility Study

REVIEW PLAN KEŌPŪ-HIENALOLI STREAMS FLOOD RISK MANAGEMENT PROJECT ISLAND OF HAWAI I, HAWAI I. Feasibility Study KEŌPŪ-HIENALOLI STREAMS FLOOD RISK MANAGEMENT PROJECT ISLAND OF HAWAI I, HAWAI I Feasibility Study Continuing Authorities Program (CAP) Section 205 of the Flood Control Act of 1948 Public Law 80-858 U.S.

More information

Control activities that are part of the process are detailed in the riskcontrol

Control activities that are part of the process are detailed in the riskcontrol Policy Title Previous title (if any) Cash Transfers to Implementing Partners N/A Policy objective Target audience Risk control matrix Checklist The policy and procedures outline the process for management

More information

Subj: STANDARDIZATION FOR MANAGEMENT OF UTILITY ENERGY SERVICE CONTRACTS AND ENERGY SAVINGS PERFORMANCE CONTRACTS

Subj: STANDARDIZATION FOR MANAGEMENT OF UTILITY ENERGY SERVICE CONTRACTS AND ENERGY SAVINGS PERFORMANCE CONTRACTS DEPARTMENT OF THE NAVY COMMANDER NAVY INSTALLATIONS COMMAND 716 SICARD STREET SE SUITE 1000 WASHINGTON NAVY YARD DC 20374-5140 CNICINST 4101.1A N4 CNIC INSTRUCTION 4101.1A From: Commander, Navy Installations

More information

DELAWARE RIVER JOINT TOLL BRIDGE COMMISSION

DELAWARE RIVER JOINT TOLL BRIDGE COMMISSION DELAWARE RIVER JOINT TOLL BRIDGE COMMISSION REQUEST FOR PROPOSAL (RFP) FOR INSURANCE BROKERAGE AND PROGRAM ADMINISTRATION SERVICES FOR AN OWNER-CONTROLLED INSURANCE PROGRAM () CONTRACT No. C-674A; CAPITAL

More information