1 ASBPA PARTNERING COMMITTEE S GUIDANCE ON INCORPORATING SURFING CONCERNS INTO PLANNING AND DESIGN OF FEDERAL SHORE PROTECTION AND NAVIGATION PROJECTS PURPOSE This document is intended to succinctly outline how Surfrider, SEA members and other local surfing interest groups can participate in feasibility/planning studies for U.S. Army Corps of Engineers Shore Protection and Navigation Projects. INTRODUCTION Various coastal engineering projects have been implemented by the federal government at project sites around the country to restore, stabilize and maintain healthy beaches for shore protection and navigation. Projects of this nature are most often authorized through a long planning and design process undertaken by the U.S. Army Corps of Engineers (Corps). The majority of such projects are initiated at the request of a non-federal sponsor who partners with the Corps in funding, planning and implementing the project. During planning, an array of alternatives is evaluated on their economic, environmental, and social impacts, resulting in a plan which addresses these concerns while maximizing national benefits. The Corps is required to follow particular guidelines during this process, but coordination between the Corps, the local sponsor, and all stakeholders are paramount to guiding the plan selection. At times, a locally preferred plan can address additional local sponsor and stakeholder concerns that may have a more regional, rather than national, benefit. Federal projects of this nature come under scrutiny from the surfing community as they are often performed in close proximity to local surfing areas. This can lead to strong opposition in implementing the planned project. By the time the opposition arises, it is often difficult to make substantial changes to the project due to federal authorizations, approval of design documents and issuance of permits. This document will stress the importance of coordination between surfers, the local sponsor, and the Corps during project development to ensure that local concerns are addressed to the maximum extent possible. Further description of a locally preferred plan will highlight a further avenue for the local sponsor and surfers to have their voices heard in the project development phase. PARTNERSHIPS, RIGHTS AND RESPONSIBILITIES A professional partnership exists between the Corps and local sponsors on projects where the costs are shared between the federal government and the local sponsor. In order for a partnership to be successful, each party must understand and respect the rights and responsibilities of each other, and themselves. The local sponsor may include the State, County, local municipality, private entity, or a combination thereof. The local sponsor has a right and a duty to take an active role in the project development. In doing so the process allows for public input and may present the opportunity to

2 interject local concerns in the Corps process. The key to being successful in this process is to get involved early and to be pro-active (rather than re-active) with a focus on mutual respect, integrity, cooperation, flexibility and sincerity. Surfers, as an active user group of the beach, can play an integral role in this process. FEDERAL FUNDING PARTICIPATION The cost of shore protection and federal navigation projects is increasing due to new design complexities, extensive studies for regulatory review, permitting requirements, and rising construction costs. Towns, municipalities, and counties are therefore looking for additional funding sources to assist with these costs. One such funding source is the federal government, which requires a long and complex planning and design process. The result of the process is a series of authorizations, feasibility studies, economic analyses and design evaluations, which ultimately result in a decision document that defines the project to be implemented. Cost-sharing agreements are then codified through a project cooperation (partnership) agreement between the federal government and local sponsor(s). Any changes to the project that require consideration of additional project alternatives or a change in authorization cause the process to enter a re-evaluation phase. This can delay a project significantly and is not looked at favorably by project sponsors, which can result in a conflict between project planners and those seeking modifications or other alternatives. By better understanding the timelines of federal process and documents required, surfers can enter the process early and avoid these conflicts. PROJECT DEVELOPMENT During its lifetime, a project passes through five basic phases: (1) reconnaissance, (2) feasibility, (3) preconstruction engineering and design, (4) construction, and (5) operation, maintenance, repair, replacement and rehabilitation. All projects originate with a request from a local community for assistance. This initial request is the beginning of a process that could eventually result in construction of the project. The following excerpt from the Corps Project Partnership Kit (USACE IWR Report No. 96-R-10, January 2001) outlines the six steps to initiate the process: 1. The first step occurs when a local community, or some particular element of a community, perceives or experiences a water resources problem that is beyond their ability to solve. Examples of problems are major flooding, hazardous or inadequate navigation conditions in a harbor or waterway, and/or degraded environmental conditions. 2. The second step occurs when community representatives that often may be or include members of the potential sponsoring agency, meet with their local Corps district staff to discuss available forms of help, including Federal programs. If it is agreed that a reconnaissance analysis is the appropriate tool to address the identified water resources Page 2 of 10

3 problem(s), it will then be determined IF there is an existing and appropriate congressional study authority (a study authority authorizes the conduct of an investigation into the identified problems). IF there is an existing and appropriate study authority, the process would go directly to step five. 3. In certain cases, the Corps can provide technical assistance or relief through some other authorities without further congressional authorization (i.e., Continuing Authorities Program). The third step occurs only IF there is no existing and appropriate study authority for the Corps to investigate the problem. In this step, community representatives contact their congressional delegation to request a study authority. 4. The fourth step occurs when a member of Congress asks the Senate Committee on Environment and Public Works, Subcommittee on Transportation and Infrastructure, or the House of Representatives Committee on Transportation and Infrastructure, Subcommittee on Water Resources and Environment, for an authority for the Corps to study the problem. The subcommittee(s) then sends a Docket Letter to the Corps requesting information about the study area, problems, and potential solutions. If the Corps has previously investigated and reported on water resource problems in the area, the committee may adopt a study resolution to provide the necessary authority to take another look at the area and review the earlier study. If the Corps has not previously investigated problems in the area, legislation containing a study authority is usually required. Your local Corps district staff can show you examples of previous study authorities. 5. The fifth step occurs once a congressional study authority is available. The study will be assigned to the local Corps district. The district may then, through the normal Federal budget process, ask for money to conduct the first phase of the study, called the reconnaissance phase. 6. The last step occurs when Federal funds to conduct the reconnaissance study are included in an annual Energy and Water Development Appropriations Act. The local district may then begin the Corps study of the community's water resource problems. Development Phases The reconnaissance phase is the first step in the project development process (Figure 1). The reconnaissance phase is paid for by the Corps and no sponsor funds are required. Reconnaissance phase reports, called "905(b) analyses," are based on the authority provided in Section 905(b) of the Water Resources Development Act of The primary purpose of the reconnaissance phase is to determine if there is Federal interest in proceeding with the second, or feasibility phase. Determination of Federal interest is based largely on potential benefits exceeding costs to the nation if a project is implemented. An example of this would be providing protection to coastal infrastructure prior to damage by coastal storms rather than having to respond and rebuild after damage and a need for national assistance. The reconnaissance phase is a low budget portion, limited to 1 year and $100,000 expense. The local sponsor can help in the reconnaissance phase by providing information and expressing opinions needed to define the problem, and identify and evaluate solutions. It is at this juncture that it is absolutely critical for surfing concerns to be identified and made known for inclusion in the feasibility phase. Page 3 of 10

4 Figure 1. Project Development Phases (USACE IWR Report No. 96-R-10, January 2001). Project Documentation A variety of different types of documents are prepared during the development of a Corps project, and the local sponsor is involved with many of them. Some documents are reports about work that was done, some are agreements concerning responsibilities, and some serve other important purposes. Most of the documents required for every project are summarized below (USACE IWR Report No. 96-R-10, January 2001): Reconnaissance Phase: Study Authority Section 905(b) Analysis Feasibility Cost Sharing Agreement Management Plan Letter of Intent Feasibility Phase: Feasibility Report Environmental Impact Statement (or Environmental Assessment) Management Plan (update as needed) Page 4 of 10

5 Preconstruction Engineering and Design Phase: Management Plan (update as needed) Certificate of Lobbying Disclosure of Lobbying Activities Authority (Project Construction) Decision Document (typically a feasibility report) Design Agreement Design Documentation Report Financing Plan Statement of Financial Capability Project Cooperation Agreement Escrow Agreement Letter of Credit Construction Phase: Management Plan (update as needed) Construction Contract Documents Operation and Maintenance Manual Physical Closeout Documents Fiscal Closeout Documents Operations and Maintenance Phase: Management Plan (update as needed) Operation and Maintenance Manual (revise as needed) These are some of the generally standardized reports, agreements and other documents that are likely to be used over the life of a project. The list presents the documents in the appropriate project phase or type of activity as defined in the Corps Project Partnership Kit. Not all of these documents are used in all cases, and the order of when they are needed may vary for any given study or project. However, it is to be noted that this process occurs over the course of at least 5 years prior to the construction phase (Figure 1) and any input or concerns from the surfing community need to be addressed early in the reconnaissance or feasibility phases. The feasibility phase is the most important portion of the planning process, as this is where the project is really shaped and the outcome can be influenced with surfing related input. Surfing typically falls into environmental resource and local constraints, so any consideration of impacts to surfing will need to be included in these portions of the analysis. It is imperative to impress upon the Corps via the local sponsor that surfing resources are highly valued in your community and that impacts need to be minimized. Federal Authorization The Federal authorization process requires that the project have the greatest net economic benefit and follow the National Economic Development (NED) plan. To follow this, the project must have a benefit to cost ratio (BCR) greater than 1, though the NED plan does not have to have the highest BCR or the lowest cost. Corps policy requires that at least 50 percent of the cost of the project be covered by storm damage reduction benefits. An equal amount of recreation benefits can be used for project justification as long as the recreation benefits are incidental. In other Page 5 of 10

6 words, there can be no separable construction costs that are required to realize the recreational benefits (ER , p5). Environmental costs are not part of this calculation, only actual design and construction costs. Such separable construction costs can be addressed in a Locally Preferred Plan. Recreational benefits from surfing are quantified in the same way as all other benefits from beach user groups, by the demand for public use of a beach area. However, concerns specific to surfing are not currently quantified within monetary portion of the recreational benefits. Surfing and impacts to surfing are typically considered as part of the environment and typically addressed through the impacts analysis in the Environmental Impact Statement. While there are attempts being made by groups such as ASBPA to alter the policy with regard to recreational benefits, the current planning guidelines for federal authorization do not factor surfing into the benefits analysis beyond inclusion in the beach user demand. However, consideration of effects on surfing resources can help to guide the planning process if coordination between the local sponsor, surfing groups, and the Corps begins early. Surfing specific considerations can be further considered in the project development phase through development of a locally preferred plan requiring collaboration between surf groups and the local sponsor. It is ideal to have all (or some) surfing related concerns contained within the NED plan. If the NED plan is not the recommended plan, due to high environmental impacts or local concerns, then there is an option for a Locally Preferred Plan. Locally Preferred Plan Section 221 of the 1970 Flood Control Act defines a local sponsor for a Corps water resources project as a non-federal interest that is "a legally constituted public body with full authority and capability to perform the terms of its agreements and to pay damages, if necessary, in the event of failure to perform". A local (non-federal) sponsor has the legal and financial capability to provide the cash and real estate requirements needed for a project. On beach related projects, the local sponsor is typically a state, county, city, or port authority. A non-profit entity can serve as a local sponsor with the consent of the affected local government. Stakeholders who coordinate local interests with the non-federal sponsor and Corps are environmental groups, community and citizen groups, developers, and others. Resource agencies such as U.S. Fish and Wildlife Service, U.S. Environmental Protection Agency, NOAA Fisheries, and others also collaborate on plan selection. The people involved can represent local, state, and Federal government agencies, homeowner's associations, sporting clubs, industrial plants and businesses, and others such as surfers. These groups and individuals provide a wide range of professional opinions, political positions, and personal views, which can result in some conflict among participants. It is important to be proactive in this process and understanding of other stakeholder s needs and concerns to avoid reactions that could result in conflicts. The Corps is required to recommend the NED plan unless there are reasons to not recommend it, which could be many (cost, environmental, etc), in which case the Corps can consider a locally preferred plan (LPP) where the local sponsor would fund project features with costs in addition to the NED plan. While surfing related considerations can help to guide plan selection, the LPP is a local sponsor preferred alternative to the NED plan, which is where surfing specific considerations with additional costs could be included if they were not incorporated into the Page 6 of 10

7 NED plan. The selection of an alternative other than the NED Plan must be fully documented and the incremental cost to implement the LPP (if any) must be paid for by the local sponsor. Project Formulation Steps The major steps to be followed in formulating a project are described in the Corps Project Partnership Kit (USACE IWR Report No. 96-R-10, January 2001), which are provided below: Specify the problems and opportunities which are relevant to the planning setting, and are associated with the Federal objective and specific state, tribe, and local concerns. Inventory, forecast, and analyze conditions in the area that are relevant to the identified problems and opportunities. Formulate alternative plans that would resolve the identified problems and realize the identified opportunities. Evaluate the economic, environmental, and other effects, both beneficial and adverse, of each alternative plan. Compare alternative plans and their effects. Select a recommended plan. The Corps recommends and encourages that the local sponsor and all stakeholders take a very active role in the feasibility phase work as a variety of solutions are investigated during this time and the project takes shape. They specifically encourage participation as a member of the study team and the Study Executive Committee, which oversees study costs, schedules and other aspects of work progress. Decisions made during this phase, including selection of the recommended project, are based in part on the views of the local sponsor and stakeholders, and determine what takes place during the rest of the project s life. It is critical that the surfing community take action early in this process to engage local government officials. In particular, a positive relationship should be developed with whoever will be representing the local sponsor as described above in order to ensure surfing concerns will be addressed. Lastly, the recommended plan can be influenced by elected officials who will be listening to their local constituents, so it is important to maintain good relations on all fronts. Page 7 of 10

8 RECOMMENDATIONS The following recommendations are provided as guidance on how surfing interest groups can participate in feasibility/planning studies for U.S. Army Corps of Engineers Shore Protection and Navigation Projects: 1. Address surfing considerations and coordinate their inclusion in the planning process. Surfing specific components with costs in addition to the National Economic Development plan can be incorporated as a component in project design through inclusion in the NED plan or development of a Locally Preferred Plan. 2. Get involved early in the process by providing information during the reconnaissance phase and input for the feasibility analysis. 3. Be involved with the Corps Project Manager on a continual and consistent basis, and keep in touch with your local sponsor for the project. 4. Be proactive during the process and understanding of other stakeholder concerns to avoid reactions that could result in conflicts. 5. Become part of the stakeholder s team that receive all key documents and notices. 6. Understand the key points in the process that are optimal for surfing-related public input. 7. Be prepared for a long process. 8. Conduct yourself in a professional manner. Page 8 of 10

9 REFERENCES U.S. Army Corps of Engineers, IWR Report No. 96-R-10, Project Partnership Kit, prepared by Paul R. Blakey, Planning and Policy Division, and Richard W. Whittington, Institute for Water Resources, Revision B, January U.S. Army Corps of Engineers, ER , Water Resources Policies and Authorities Federal Participation in Shore Protection, Department Of The Army, Office of the Chief of Engineers, Washington, DC , Regulation No , June These last two sections are good reference straight from a Feasibility Report. 4.1 National Objective Federal and Federally-assisted water and related planning activities attempt to achieve increases in National Economic Development (NED), while preserving environmental resources consistent with established laws and policies. Contributions to NED are increases in the net value of the national output of goods and services, expressed in monetary units. The NED objective is differentiated from Regional Economic Development (RED) benefits, which only apply to a given region, often at the expense of another region in the U.S. NED benefits accrue nationally for a net gain in Gross Domestic Product. They represent return on the investment of Federal funds, and are a useful tool in comparing the efficiency and effectiveness of alternative projects on a nationwide basis. Plans are formulated to take advantage of opportunities in ways that contribute to the NED objective. In accordance with ER , it is Corps policy to provide Federal assistance in the prevention or reduction of damages caused by wind and tidal generated waves and currents along the Nation s shoreline. The standard period of analysis is based on a 50 year functional project life. Damages (which may be financial costs or actual structural/infrastructure damages) and lost opportunities (recreational, etc.) are projected for the future without project and for the future with an array of different alternatives. The benefits of each alternative are expressed in dollar amounts of damages prevented and opportunities preserved or created. 4.4 Planning Constraints Unlike planning objectives that represent desired positive changes, planning constraints represent restrictions that should not be violated. The constraints identified include those public concerns that if violated by an alternative plan would result in the plan not being acceptable to most public interests. It also includes those aspects of the study area generally regulated by government agencies that if adversely impacted would result in the plan being unacceptable. In general, the planning process needs to consider measures to avoid or mitigate any significant adverse impacts associated with the planning constraints. The planning constraints identified in this study should follow the general guidelines listed below. Engineering and Physical Constraints. The recommended plan presented should be complete and sound, and in sufficient detail to allow development of engineering plans and specifications. Economic Constraints. Any potential project that is in the Federal interest must display feasibility by satisfying benefit-cost (B/C) criteria. Generally, this ratio must be greater than one to allow Federal participation in continued study and any project proposal. For Environmental Restoration projects, an incremental analysis must be performed to compare cost effectiveness of the alternatives. Financial Constraints. The sponsoring agency is required to show their ability and willingness to fund their share of any recommended project as required by the Principals and Guidelines. Page 9 of 10

10 Environmental Resource and Agency Constraints. Applicable environmental requirements must be met for a feasibility level study. Environmental acceptability must be ascertained; adverse impacts should be avoided if possible or minimized, if avoidance is not possible. An Environmental Impact Statement (EIS) is included with this Report. Local Constraints (Public Acceptability). The alternative options and plans should be acceptable to the local residents, agencies, organization, and the non-federal sponsor(s), as well as the interested State and Federal agencies. The local sponsor has indicated that they are severely constrained by public opinion and cannot support any recommendation that meets with severe public opposition. Unacceptable plans include any visible offshore structure and any structure that significantly impedes beach access, such as rock revetments. Page 10 of 10

DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS

DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS ER-1105-2-100 DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Regulation 31 January 2007 ER 1105-2-100 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS

More information

Position Statement on a 2018 Water Resources Development Act (WRDA)

Position Statement on a 2018 Water Resources Development Act (WRDA) Position Statement on a 2018 Water Resources Development Act (WRDA) In order to maintain the safety and resilience of our nation s coastlines, Congress must continue a twoyear cycle for passing Water Resource

More information

USACE Planning 101 Planning Basics for Partners

USACE Planning 101 Planning Basics for Partners USACE Planning 101 Planning Basics for Partners Bret Walters (901-544-0777) bret.l.walters@usace.army.mil Conservation Partnering Conference Memphis, TN November 2011 US Army Corps of Engineers Topics

More information

REAL ESTATE A GUIDE FOR PROJECT PARTNERS

REAL ESTATE A GUIDE FOR PROJECT PARTNERS REAL ESTATE A GUIDE FOR PROJECT PARTNERS WHO PAYS, AND WHERE DOES THE MONEY COME FROM? Corps and Sponsor Roles in Sharing and Financing Project Costs INTRODUCTION The Water Resources Development Act of

More information

FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM

FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT ADDENDUM FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MARCH 2014 U.S. Army Corps of Engineers

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-PA Engineer Regulation 1165-2-122 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resource Policies and Authorities STUDIES OF HARBOR OR INLAND HARBOR PROJECTS

More information

APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS

APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS ER-1105-2-100 Appendix F, Revised xx August 2018 APPENDIX F CONTINUING AUTHORITIES PROGRAM TABLE OF CONTENTS Paragraph Page SECTION I - PROGRAM OVERVIEW Purpose and Applicability.. F-1 F-1 References..

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance

More information

National Flood Insurance Program Final Nationwide Programmatic Environmental Impact Statement

National Flood Insurance Program Final Nationwide Programmatic Environmental Impact Statement Final Nationwide Programmatic Environmental Impact Statement EXECUTIVE SUMMARY Action Agency: Federal Emergency Management Agency Cooperating Agency: U.S. Environmental Protection Agency September 2017

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &

More information

GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters..

GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters.. GOALS, OBJECTIVES, AND POLICIES GOAL 1: Protect coastal resources and human life and limit public expenditures in areas that are subject to destruction by natural disasters.. OBJECTIVE 1.1: The City will

More information

Puyallup Shoreline Master Program FINAL, JAN

Puyallup Shoreline Master Program FINAL, JAN CHAPTER 1 INTRODUCTION A. PURPOSE AND INTENT 1. The purposes of this Shoreline Master Program are: a. To guide the future development of shorelines in the City of Puyallup in a positive, effective, and

More information

COASTAL HAZARD MITIGATION TOOLS AND TECHNIQUES

COASTAL HAZARD MITIGATION TOOLS AND TECHNIQUES COASTAL HAZARD MITIGATION TOOLS AND TECHNIQUES Beach Nourishment Responsible Agency/Party: Mitigation for: Management Effort: Federal and/or State sponsored projects Long- and short-term erosion Flood

More information

Upper Mississippi River Basin Association

Upper Mississippi River Basin Association Upper Mississippi River Basin Association ILLINOIS, IOWA, MINNESOTA, MISSOURI, WISCONSIN The Honorable Mitchell McConnell The Honorable Kevin McCarthy The Honorable Harry Reid The Honorable Nancy Pelosi

More information

The Breadth of the Planning Portfolio

The Breadth of the Planning Portfolio The Breadth of the Planning Portfolio Travis Creel, Planner, Regional Planning and Environmental Division South, MVD Eric Halpin, Special Assistant for Dam and Levee Safety, HQUSACE Lisa Kiefel, PCoP,

More information

ASFPM RECOMMENDED TASK FORCE ACTIONS

ASFPM RECOMMENDED TASK FORCE ACTIONS Association of State Floodplain Managers, Inc. 2809 Fish Hatchery Road, Suite 204, Madison, WI 53713 Phone: 608-274-0123 Fax: 608-274-0696 Website: www.floods.org Email: asfpm@floods.org Federal Interagency

More information

SUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed

SUBJECT: Amite River and Tributaries, Louisiana, East Baton Rouge Parish Watershed DEPARTMENi OF THE ARMY OFFICE OF 'rhe CHIEF OF ENGINEERS WASHINGTON. D.C. 20314-1000 REPLY TO AT1'~NTIQN OF: (lo-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on East

More information

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees

More information

DAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project

DAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project per year. In addition to the above, the Navajo County Flood Control District would be fully responsible for performing the investigation, cleanup, and response of hazardous materials on the project sites.

More information

Issue Paper 3: Michigan s Great Lakes Bottomlands and Wind Energy

Issue Paper 3: Michigan s Great Lakes Bottomlands and Wind Energy Issue Paper 3: Michigan s Great Lakes Bottomlands and Wind Energy Development of offshore wind energy in Michigan requires placement of wind turbines on or over the bottomlands 1 within the state-owned

More information

ASCE Federal Project BCR and Scoring Information Paper 27 April 2018

ASCE Federal Project BCR and Scoring Information Paper 27 April 2018 ASCE Federal Project BCR and Scoring Information Paper 27 April 2018 This paper provides basic information about the Federal project planning process and associated Benefit Cost Ratio (BCR) calculations,

More information

FINAL INTEGRATED GENERAL REEVALUATION REPORT AND ENVIRONMENTAL IMPACT STATEMENT SHORE PROTECTION

FINAL INTEGRATED GENERAL REEVALUATION REPORT AND ENVIRONMENTAL IMPACT STATEMENT SHORE PROTECTION FINAL INTEGRATED GENERAL REEVALUATION REPORT AND ENVIRONMENTAL IMPACT STATEMENT SHORE PROTECTION WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH) NORTH CAROLINA February 2009 Revised April 2009 US

More information

Frequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development)

Frequently Asked Questions: Civil Works Budget Development Transformation (Watershed / System-Based Budget Development) U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG What is Civil Works budget development transformation? Civil Works budget development transformation seeks to: 1) improve the justification and defense of budget

More information

Proposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC

Proposed Report 1 DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC Proposed Report 1 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 DAEN THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my

More information

CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS

CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS South Atlantic Division CONTINUING AUTHORITIES PROGRAM REGIONAL PROGRAMMATIC REVIEW PLAN FOR DECISION DOCUMENTS US Army Corps of Engineers April 2015 1. Overview. This document serves as the South Atlantic

More information

Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management

Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management and other words of encouragement for my friends in the Planning CoP Eric Halpin, PE Special Assistant for Dam

More information

SUBJECT: Flagler County, Florida, Hurricane and Storm Damage Reduction Project

SUBJECT: Flagler County, Florida, Hurricane and Storm Damage Reduction Project DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, DC 20310-2600 REPLY TO ATTENTION OF DAEN B3 DEC 2014 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report

More information

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California 1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20310-2600 REPLY TO ATTENTION OF CECW-P (1105-2-10a) 0 2 JUN 2003 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress

More information

Dredged Material Management Plans (DMMPs)

Dredged Material Management Plans (DMMPs) Dredged Material Management Plans (DMMPs) Theodore A. Brown, P.E. SES Chief, Planning and Policy Division Headquarters, USACE 12 February 2014 Planning- Construction- Operations & Maintenance Current Guidance

More information

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012 National Association of Flood & Stormwater Management Agencies 1333 H Street, NW, 10th Floor West Tower, Washington, DC 20005 Phone: 202-289-8625 www.nafsma.org Testimony of the National Association of

More information

Norfolk Flood Risk Management Study

Norfolk Flood Risk Management Study Old Dominion University ODU Digital Commons May 18, 2016: The Economic Impacts of Sea-Level Rise in Hampton Roads Hampton Roads Intergovernmental Pilot Project: Meetings 5-18-2016 Norfolk Flood Risk Management

More information

REVIEW PLAN USING THE NWD MODEL REVIEW PLAN

REVIEW PLAN USING THE NWD MODEL REVIEW PLAN REVIEW PLAN USING THE NWD MODEL REVIEW PLAN for Continuing Authorities Program Section 103, 205 and projects directed by guidance to use CAP procedures Alki Seawall Erosion Control Project Seattle, WA

More information

SIPOA Comprehensive Plan. January 1

SIPOA Comprehensive Plan. January 1 SIPOA Comprehensive Plan January 1 2019 Table of Contents Introduction... Page 2 Seabrook Island Vision Statement Page 3 The 3 Essentials for Sustainability on Seabrook Island.. Page 4 Goals.. Page 4 Comprehensive

More information

Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual

Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual W. Thomas Hawkins, Adjunct Faculty, University of Florida, Levin College of Law

More information

Joint Recommendations on Levee Policy. Association of State Floodplain Managers. National Association of Flood and Stormwater Management Agencies

Joint Recommendations on Levee Policy. Association of State Floodplain Managers. National Association of Flood and Stormwater Management Agencies Joint Recommendations on Levee Policy developed by the Association of State Floodplain Managers and the National Association of Flood and Stormwater Management Agencies from discussions at the Flood Risk

More information

US Army Corps of Engineers South Pacific Division. CMANC Eureka, CA October 2008

US Army Corps of Engineers South Pacific Division. CMANC Eureka, CA October 2008 US Army Corps of Engineers South Pacific Division CMANC Eureka, CA 13-15 October 2008 Most Important to the Corps is to continue our positive relationship with CMANC Current Initiatives with CMANC Regional

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C .t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY

More information

Decision-makers Barriers to Climate and Extreme Weather Adaptation for Seaports

Decision-makers Barriers to Climate and Extreme Weather Adaptation for Seaports Decision-makers Barriers to Climate and Extreme Weather Adaptation for Seaports ELIZABETH L MCLEAN, PHD AUSTIN BECKER, PHD DUNCAN MCINTOSH, PHD DEPARTMENT OF MARINE AFFAIRS UNIVERSITY OF RHODE ISLAND Chris

More information

15 Plan Implementation Requirements

15 Plan Implementation Requirements 14.4.1 Advance Maintenance The increase in inner harbor shoaling due to the closing of the sediment basin will change operations and maintenance dredging requirements. With the increase in shoaling, dredges

More information

Reducing Coastal Risk

Reducing Coastal Risk Reducing Coastal Risk Committee on U.S. Army Corps of Engineers Water Resources Science, Engineering, and Planning: Coastal Risk Reduction National Research Council Rick Luettich, Committee Chair Committee

More information

ECONOMIC AND ENVIRONMENTAL PRINCIPLES AND GUIDELINES FOR WATER AND RELATED LAND RESOURCES IMPLEMENTATION STUDIES

ECONOMIC AND ENVIRONMENTAL PRINCIPLES AND GUIDELINES FOR WATER AND RELATED LAND RESOURCES IMPLEMENTATION STUDIES ECONOMIC AND ENVIRONMENTAL PRINCIPLES AND GUIDELINES FOR WATER AND RELATED LAND RESOURCES IMPLEMENTATION STUDIES March 10, 1983 This page is intentionally blank. ii Foreword These Economic and Environmental

More information

Discount Rates in the Economic Evaluation of U.S. Army Corps of Engineers Projects

Discount Rates in the Economic Evaluation of U.S. Army Corps of Engineers Projects Discount Rates in the Economic Evaluation of U.S. Army Corps of Engineers Projects name redacted Specialist in Natural Resources Policy name redacted Analyst in Natural Resources Policy August 15, 2016

More information

APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS

APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS APPENDIX C COOPERATION AGREEMENTS, REHABILITATION OF FEDERAL AND NON-FEDERAL FLOOD CONTROL WORKS EP 500-1-1 C-1. Purpose. This Appendix provides the format for Cooperation Agreements for rehabilitation

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-PR Regulation No. 1165-2-130 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resources Policies and Authorities FEDERAL PARTICIPATION IN SHORE PROTECTION Distribution

More information

January 30, HQ, U.S. Army Corps of Engineers ATTN: EO13690/CECW-HS/3G G Street N.W. Washington, DC Re: Docket COE

January 30, HQ, U.S. Army Corps of Engineers ATTN: EO13690/CECW-HS/3G G Street N.W. Washington, DC Re: Docket COE January 30, 2017 HQ, U.S. Army Corps of Engineers ATTN: EO13690/CECW-HS/3G68 441 G Street N.W. Washington, DC 20314-1000 Re: Docket COE-2016-0018 Dear Sir or Madam: Thank you for the opportunity to submit

More information

Fighting the Flood: Current Political, Regulatory and Financial Challenges

Fighting the Flood: Current Political, Regulatory and Financial Challenges Fighting the Flood: Current Political, Regulatory and Financial Challenges for Levee Owners Kansas City, Missouri January 23, 2013 Emerging Policy, Programs and Tools for the Management of Levee Systems

More information

[Letter to be printed on official Levee Sponsor letterhead]

[Letter to be printed on official Levee Sponsor letterhead] [Letter to be printed on official Levee Sponsor letterhead] [Date] COL Joel R. Cross, Commander US Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 RE: [Levee Sponsor

More information

COMMON QUESTIONS & ANSWERS CONNECTICUT RESERVE NOMINATION PUBLIC MEETING

COMMON QUESTIONS & ANSWERS CONNECTICUT RESERVE NOMINATION PUBLIC MEETING QUESTION: What is the National Estuarine Research Reserve System? ANSWER: The National Estuarine Research Reserve System (https://coast.noaa.gov/nerrs/) is a network of protected areas representative of

More information

National Coastal Outreach

National Coastal Outreach National Coastal Outreach Answering Tough Questions June 11, 2013 Why Focus on Coastal Flood Risk? 120,475,000 people or 39% of the U.S. population live in counties subject to the 1% annual chance coastal

More information

Community Incentives for Nature-Based Flood Solutions

Community Incentives for Nature-Based Flood Solutions Community Incentives for Nature-Based Flood Solutions A GUIDE TO FEMA S COMMUNITY RATING SYSTEM FOR CONSERVATION PRACTITIONERS The Federal Emergency Management Agency (FEMA) uses a Community Rating System

More information

Feasibility to Closeout, the Corps Planning Process September 27, 2016

Feasibility to Closeout, the Corps Planning Process September 27, 2016 Feasibility to Closeout, the Corps Planning Process September 27, 2016 Marshall Plumley MVP @ MVR Chief, Rock Island Plan Formulation Section Mississippi Valley Rock Island District (MVR) Mississippi Valley

More information

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES SEPTEMBER 2018 Submit proposal to: Tony Williams, Principal Civil Engineer Marin County Flood Control & Water Conservation

More information

USACE Navigation FY 2014 Workplan and FY 2015 Budget

USACE Navigation FY 2014 Workplan and FY 2015 Budget USACE Navigation FY 2014 Workplan and FY 2015 Budget For American Association of Port Authorities Webinar Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers April 22, 2014 US Army Corps

More information

ADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ JACKSONVILLE DISTRICT. 9 March 2015

ADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ JACKSONVILLE DISTRICT. 9 March 2015 ADMINISTRATIVE APPEAL DECISION PRIME DEVELOPERS, S.E. FILE NO. SAJ-1996-04379 JACKSONVILLE DISTRICT 9 March 2015 Review Officer: Mike Vissichelli, U.S. Army Corps of Engineers, North Atlantic Division

More information

Association of State Wetland Managers Webinar - October 10, 2018

Association of State Wetland Managers Webinar - October 10, 2018 Feasibility of an Environmental Impact Bond for Financing Coastal Wetland Restoration in Louisiana and the Gulf: Using avoided land loss as a proxy for reduced storm damages Association of State Wetland

More information

April 3, 4, & 5, 2017 Pittsburgh, Butler, Erie Western PA

April 3, 4, & 5, 2017 Pittsburgh, Butler, Erie Western PA April 3, 4, & 5, 2017 Pittsburgh, Butler, Erie Western PA 2 Hazard Mitigation is: any cost-effective action taken to eliminate or reduce the long term risk to life and property from natural and technological

More information

CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN. December, 1998

CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN. December, 1998 CAPTIVA ISLAND EMERGENCY MAINTENANCE PLAN December, 1998 Contents Introduction... 4 Purpose... 4 Initial Restoration and Renourishment Design... 4 Emergency Maintenance Criteria... 5 Storm Damage and Response...

More information

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE-2010-00463-56-N18 Date: January 29, 2019 Expires: February

More information

Palm Beach County, Florida Shore Protection Project Jupiter Carlin Segment Integrated 934 Report & EA Economics Appendix

Palm Beach County, Florida Shore Protection Project Jupiter Carlin Segment Integrated 934 Report & EA Economics Appendix Palm Beach County, Florida Shore Protection Project Jupiter Carlin Segment Integrated 934 Report & EA Economics Appendix US Army Corps of Engineers March 2017 Jacksonville District Table of Contents Executive

More information

MEMORANDUM OF AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS

MEMORANDUM OF AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS MEMORANDUM OF AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS SUBJECT: The transfer, acceptance, and expenditure of funds for fish mitigation 1. Purpose and Authority.

More information

Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015

Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015 Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015 TO: FROM: CONTACT: SUBJECT: Mayor and Councilmembers Jennifer Carman, Planning and Environmental Review Director Anne Wells, Advance Planning

More information

USACE Infrastructure Strategy: UIS Overview and P3 Review

USACE Infrastructure Strategy: UIS Overview and P3 Review USACE Infrastructure Strategy: UIS Overview and P3 Review Edward E. Belk, Jr P.E. Chief, Operations and Regulatory Division Directorate of Civil Works Headquarters, US Army Corps of Engineers Washington,

More information

ADVISORY BASE FLOOD ELEVATIONS (ABFEs)

ADVISORY BASE FLOOD ELEVATIONS (ABFEs) The Department of Homeland Security s Federal Emergency Management Agency is committed to helping communities that were impacted by Hurricanes Katrina and Rita rebuild safer and stronger. Following catastrophic

More information

Western Dredging Association Eastern Chapter Annual Meeting Infrastructure Strategy Overview and P3/P4 Review

Western Dredging Association Eastern Chapter Annual Meeting Infrastructure Strategy Overview and P3/P4 Review Western Dredging Association Eastern Chapter Annual Meeting Infrastructure Strategy Overview and P3/P4 Review Edward J Hecker Senior Policy Advisor Institute for Water Resources US Army Corps of Engineers

More information

REVIEW PLAN. Cedar Bayou, Texas Dredged Material Management Plan

REVIEW PLAN. Cedar Bayou, Texas Dredged Material Management Plan REVIEW PLAN Cedar Bayou, Texas Dredged Material Management Plan Galveston District MSC Approval Date: 16 November 2012 Last Revision Date: none REVIEW PLAN Cedar Bayou, Texas Dredged Material Management

More information

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination Date: 8 May 2013 Division: Great Lakes and Ohio River Division District: Nashville District CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination 1. Project: Cumberland River, Metropolitan

More information

Federal Emergency Management Agency

Federal Emergency Management Agency Page 1 of 3 COMMUNITY AND MAP PANEL INFORMATION COMMUNITY CITY OF MARGATE CITY, ATLANTIC COUNTY, NEW JERSEY LEGAL PROPERTY DESCRIPTION A parcel of land, as described in Deed recorded in Book 4826, page

More information

Understanding the Federal Budget Process

Understanding the Federal Budget Process Quick Guide for Community Forestry Practitioners Understanding the Federal Budget Process Each year the federal government must establish a budget from which federal programs and agencies are funded. Both

More information

Update to the PL Rehabilitation Program

Update to the PL Rehabilitation Program Update to the PL 84-99 Rehabilitation Program Richard J. Varuso, Ph.D., P.E. Senior Program Manager Risk Management Center New Orleans November 2, 2015 US Army Corps of Engineers PL 84-99 The USACE Emergency

More information

- Wanda Thornton (Accomack County) provided opening remarks - COL Olsen, US Army Corps of Engineers (USACE)

- Wanda Thornton (Accomack County) provided opening remarks - COL Olsen, US Army Corps of Engineers (USACE) Eastern Shore Navigation Partnership Meeting Welcome - Wanda Thornton (Accomack County) provided opening remarks - COL Olsen, US Army Corps of Engineers (USACE) o Provided state of the Corps as affected

More information

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-CP Washington, DC Circular No July 2014 DEPARTMENT OF THE ARMY EC 1165-2-216 US Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Circular No. 1165-2-216 31 July 2014 EXPIRES 31 July 2016 Water Resource Policies and Authorities POLICY

More information

Hudson Raritan- Estuary Ecosystem Restoration Feasibility Study

Hudson Raritan- Estuary Ecosystem Restoration Feasibility Study Hudson Raritan- Estuary Ecosystem Restoration Feasibility Study Appendix M: COST EFFECTIVENESS AND INCREMENTAL COST ANALYSIS Draft Integrated Feasibility Report & Environmental Assessment February 2017

More information

Project Planning with the U.S. Army Corps of Engineers

Project Planning with the U.S. Army Corps of Engineers US Army Corps of Engineers PLANNING SMART BUILDING STRONG Project Planning with the U.S. Army Corps of Engineers Tim Kuhn Project Manager Portland District 1 February 2016 Introduction Levee Ready Columbia

More information

CHAPTER 3. Corps Civil Works Missions

CHAPTER 3. Corps Civil Works Missions CHAPTER 3 Corps Civil Works Missions 3-1. Purpose and Authorities. Federal interest in water resources development is established by law. Within the larger Federal interest in water resource development,

More information

Governmental Laws, Rules and Policies, Are They Keeping Up With Restoration Objectives? INTERCOL 9 June 6, 2012

Governmental Laws, Rules and Policies, Are They Keeping Up With Restoration Objectives? INTERCOL 9 June 6, 2012 Governmental Laws, Rules and Policies, Are They Keeping Up With Restoration Objectives? INTERCOL 9 June 6, 2012 Kenneth G. Ammon, P.E. Senior Vice President WRScompass Presentation Overview Background

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C. 20314'1000 REPLY TO ATTENTION OF: CECW-PE (l0-1-7a) THE SECFETARY OF THE ARMY 1. I submit for transmission to Congress my report

More information

H 7250 S T A T E O F R H O D E I S L A N D

H 7250 S T A T E O F R H O D E I S L A N D LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO WATERS AND NAVIGATION -- THE OFFSHORE OIL AND GAS DRILLING AND EXPLORATION ACTIVITIES

More information

On March 21, 2014, President Obama signed the Homeowner Flood Insurance Affordability Act of 2014 into law.

On March 21, 2014, President Obama signed the Homeowner Flood Insurance Affordability Act of 2014 into law. On March 21, 2014, President Obama signed the Homeowner Flood Insurance Affordability Act of 2014 into law. This law repeals and modifies certain provisions of the Biggert-Waters Flood Insurance Reform

More information

Section 2. Introduction and Purpose of the LMS

Section 2. Introduction and Purpose of the LMS Section 2. Introduction and Purpose of the LMS 2.1 Introduction The Disaster Mitigation Act of 2000 (DMA 2000), signed into law by the President of the United States on October 30, 2000 (P.L. 106-390),

More information

TABLE OF CONTENTS. Introduction to the Economic Development Element 1

TABLE OF CONTENTS. Introduction to the Economic Development Element 1 TABLE OF CONTENTS Section Page Introduction to the Economic Development Element 1 Purpose of the Economic Development Element 1 Economic Factors Affecting the City 1 Scope and Content of the Economic Development

More information

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C DEPARTMENT OF THE ARMY EC 5-2-01 U.S. Army Corps of Engineers CECW-I Washington, D.C. 20314-1000 Circular No. 5-2-01 31 March 2016 EXPIRES 30 MARCH 2018 Management EXECUTION OF CHANGE CONTROL BOARDS 1.

More information

Update of Project Benefits

Update of Project Benefits Update of Project Benefits February 2014 Contents 1. Introduction 1 2. Purpose of the Revaluation Study 2 3. Original Project Benefits 2 4. Update of Residential Structure Benefits 3 5. Update of Non Residential

More information

LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY

LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY September 2013 SEPTEMBER 2013 LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY

More information

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name:

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name: RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name: Manatee County 1. MULTIYEAR PLAN VERSION (INITIAL OR AMENDMENT NUMBER): Initial

More information

BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION BOCA RATON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION WHEREAS the Department of Environmental Protection, in partnership with the City of Boca Raton. has sponsored a study of the

More information

EC Civil Works Review Policy

EC Civil Works Review Policy EC 1165-2-209 Civil Works Review Policy Wilbert V. Paynes Director, Deep Draft Navigation Planning Center of Expertise Chief, Planning and Policy American Association of Port Authorities 27 January 2010

More information

Making the NFIP Work for Taxpayers and Policy Holders: Reducing Flood Losses and NFIP Premiums through Mitigation

Making the NFIP Work for Taxpayers and Policy Holders: Reducing Flood Losses and NFIP Premiums through Mitigation Making the NFIP Work for Taxpayers and Policy Holders: Reducing Flood Losses and NFIP Premiums through Mitigation January 27, 2017 This paper was developed in conjunction with C. Scott Canady, owner and

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Worldwide, capture fisheries are already fully,

Worldwide, capture fisheries are already fully, U.S. Army Corps of Engineers Regulation of Offshore Aquaculture Worldwide, capture fisheries are already fully, or near fully, exploited, but seafood demand continues to increase with a growing global

More information

CRISIS MANAGEMENT AND RECOVERY SOLUTIONS. Delivering results, implementing change.

CRISIS MANAGEMENT AND RECOVERY SOLUTIONS. Delivering results, implementing change. CRISIS MANAGEMENT AND RECOVERY SOLUTIONS Delivering results, implementing change. CRISIS MANAGEMENT AND RECOVERY SOLUTIONS The threats of natural disasters and other extreme events are significant and

More information

THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER

THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER FOR IMMEDIATE RELEASE August 15, 2017 THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER - - - - - - - ESTABLISHING DISCIPLINE AND ACCOUNTABILITY IN THE ENVIRONMENTAL REVIEW AND PERMITTING PROCESS

More information

SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER MARCH 2019

SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER MARCH 2019 SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 2 USACE policy and guidance continues to evolve

More information

Financial Analysis INTRODUCTION FINDINGS AND TRENDS PAST FINANCIAL PERFORMANCE. Comparative Financial Statement

Financial Analysis INTRODUCTION FINDINGS AND TRENDS PAST FINANCIAL PERFORMANCE. Comparative Financial Statement 9 INTRODUCTION This chapter has been prepared by FCS Group to provide a financial program that enables the City of Sultan (City) to remain financially viable through the next 6-year planning period and

More information

Good people creating a good transportation value for a better quality of life.

Good people creating a good transportation value for a better quality of life. BOARD ENDS POLICIES 1.1.1 Credo 1.1.2 Vision 1.1.3 Mission and Definitions 1.2.1 Safety 1.2.2 Advertising 1.2.3 Effective Administration of Utah Transit Authority 1.2.4 Procurement 1.2.5 Private Enterprise

More information

TESTIMONY. Association of State Floodplain Managers, Inc.

TESTIMONY. Association of State Floodplain Managers, Inc. ASSOCIATION OF STATE FLOODPLAIN MANAGERS, INC. 2809 Fish Hatchery Road, Suite 204, Madison, Wisconsin 53713 www.floods.org Phone: 608-274-0123 Fax: 608-274-0696 Email: asfpm@floods.org TESTIMONY Association

More information

Frequently Asked Questions

Frequently Asked Questions The National Committee on Levee Safety Frequently Asked Questions The Context: Current State of Levees and Public Safety 1. What problem is the National Committee on Levee Safety trying to address? We

More information

PRELIMINARY DRAFT -- FOR DISCUSSION PURPOSES ONLY

PRELIMINARY DRAFT -- FOR DISCUSSION PURPOSES ONLY Agenda Number 11. PRELIMINARY DRAFT -- FOR DISCUSSION PURPOSES ONLY CAP SYSTEM USE AGREEMENT BETWEEN THE UNITED STATES AND THE CENTRAL ARIZONA WATER CONSERVATION DISTRICT 1. PREAMBLE: THIS CAP SYSTEM USE

More information

NORTH CAROLINA EMERGENCY MANAGEMENT

NORTH CAROLINA EMERGENCY MANAGEMENT NORTH CAROLINA EMERGENCY MANAGEMENT NC Association of Municipal Clerks Friday, August 18, 2017 Atlantic Beach, NC Presenters: Mary Glasscock & Brian Snell NCEM PA PUBLIC ASSISTANCE PROGRAM Emergency Work

More information

CHAPTER 16- RECREATION DEVELOPMENT POLICY FOR OUTGRANTED CORPS LANDS

CHAPTER 16- RECREATION DEVELOPMENT POLICY FOR OUTGRANTED CORPS LANDS 30 Mar09 CHAPTER 16- RECREATION DEVELOPMENT POLICY FOR OUTGRANTED CORPS LANDS 16-1. Purpose. This guidance establishes a consistent, nationwide policy that will be applied to evaluate requests for recreation