SAN JOAQUIN COUNTY to 2017 Capital Improvement Program. General Services 44 N. San Joaquin Street, Suite 590 Stockton, CA 95202

Size: px
Start display at page:

Download "SAN JOAQUIN COUNTY to 2017 Capital Improvement Program. General Services 44 N. San Joaquin Street, Suite 590 Stockton, CA 95202"

Transcription

1 SAN JOAQUIN COUNTY 2012 to 2017 Capital Improvement Program General Services 44 N. San Joaquin Street, Suite 590 Stockton, CA March 2013

2 San Joaquin County Board of Supervisors Carlos Villapudua First District Larry Ruhstaller Second District Ken Vogel Fourth District Steve J. Bestolarides Third District Bob Elliott Fifth District

3 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 PAGE NEW CONSTRUCTION AND FACILITY PLANNING 5 Public Health Bio-Safety Level 3 Modular Laboratory 6 Hospital Replacement Phase 2 Project 7 South County Government Center 8 New Morgue & Forensic Pathology Facility 9 Jail Expansion 10 Countywide Animal Shelter 11 Downtown Plaza and Underground Parking 12 District Attorney Building 13 Fleet Services Facility Replacement 14 Short Stop Permit Center 15 Public Health Facility Replacement 16 EXISTING FACILITY IMPROVEMENTS 17 Americans With Disabilities Act (ADA) Building Upgrades 18 Micke Grove Regional Park Improvements 19 Hospital Underground Utility Realignment 20 Human Services Agency Building Structural Upgrade 21 Courthouse-Courts Wing and Administration Wing 22 APPENDIX 23 Chart 1 - Expenditures by Fiscal Year 24 Chart 2 - New Construction and Facility Planning 25 Chart 3 - Existing Facility Improvements 26 Table 1 - Anticipated Project Expenditures 27 Table 2 - Anticipated Appropriations 28 Table 3 - Project Revenue Sources 29 Cover: Rendering of Administration Building, Weber and San Joaquin Streets, Stockton, California

4 Rendering of Administration Building Weber Avenue, Stockton, California EXECUTIVE SUMMARY

5 CAPITAL IMPROVEMENT PROGRAM EXECUTIVE SUMMARY Background The Capital Improvement Program (CIP) is the spending plan anticipated to be undertaken by the County for County-owned facilities over the next five years. The CIP is the County s plan for infrastructure development of new building construction projects generally defining the specific projects, their cost, and timing. The CIP also includes a separate listing of major repairs and renovations for existing facilities and park projects, including the Micke Grove Zoo. The CIP is a planning document that does not, by itself, appropriate funds for projects. It does however, present funding previously provided by the Board of Supervisors, identifies future funding needs, and the possible sources of funding. The CIP will be implemented, as presented, and updated as circumstances warrant by the General Services Director. Any significant changes will be presented to the Board of Supervisors for subsequent consideration in conjunction with the County s annual Public Improvement. The CIP is composed of two major categories: The first category is New Construction and Facilities Planning which is defined, for the purpose of this report, as new major capital construction, facilities planning projects, and projects to expand upon existing facilities. Projects in this category are subject to funding availability, which is difficult to judge at this time. The second category is Existing Facility Improvements, which includes remodeling/refurbishment of office spaces, building mechanical systems maintenance and upgrades, and park improvements. Maintaining the County s existing facilities often becomes the higher priority when funding resources are limited. The importance of keeping existing deficiencies from getting worse and precluding deficiencies on new facilities must be acknowledged in order to preserve the County s infrastructure and meet the facility needs of County departments. Park improvement projects, which include projects that expand, improve, or maintain County parks, are very dependent upon grant funding. The CIP is a useful tool for documenting project priorities, managing funding resources, making budget recommendations, establishing staffing levels for project management, and providing a budget-level estimate of capital requirements. The CIP also provides project schedules to indicate the time-frame for land acquisition, if necessary, and the time-frames for project development and implementation phases. The CIP also provides a forum to inform interested parties of proposed capital improvements. The CIP is the County s blueprint for foreseeable capital needs; as such, it should be evaluated periodically, updated, and refined as new information, needs, and resources are identified. On September 4, 2007, the Board of Supervisors adopted the CIP (B ). The CIP anticipated expenditures totaled approximately $384.5 million. The following CIP projects have been completed: Agricultural Center Administration Building South County Government Center land option purchase agreement Secured $80 million State grant for the Jail expansion 1

6 Acquired South County Park Land Phase 1 of the Micke Grove Park Master Plan On May 26, 2009, the Board of Supervisors approved the Master Plan Update (B ). The projects noted below are related to the Master Plan Update and the CIP: Purchased the former Bank of the West Building, remodeled, and then relocated the Public Defender from the Human Services Agency Building. Remodeled the former University of California Cooperative Extension office and relocated Public Health staff from leased space. Remodeled vacant Courthouse-Administration Wing floors and relocated the District Attorney Investigators from leased space. Relocated Adult Probation to the Canlis Building from leased space. Remodeled vacant office space at the Canlis Building for the Adult Probation Day Reporting Center. Sold surplus County-owned property located at 212 and 220 North San Joaquin Street. Remodeled the former Agricultural Commissioner s building and relocated Environmental Health Services staff to that site. Since , over $72 million of previously allocated funds for public improvements have been diverted to help address General Fund budget shortfalls. The shortfalls were primarily due to the prolonged recession coupled with increased labor costs. These one-time budget solutions severely eroded the County s CIP. Replacement or improvement of outdated and aging County facilities has either been suspended or drastically reduced. On October 5, 2010, the Board of Supervisors adopted a general allocation formula for the one-time uses of Tobacco Settlement Trust Funds through (B ). Public Improvement Projects are to receive a 20% allocation of such funds during this period. In addition, the Board of Supervisors adopted the funding guidelines for the County s CIP noted below (B ). 1. Appropriate up to $10 million of the year-end General Fund balance to the CIP annually. The year-end fund balance should be considered a one-time resource and be dedicated for one-time uses rather than for ongoing operations. 2. Direct the County Administrator, through the General Services Department, to prepare and prioritize a project list and incorporate funding recommendations as part of the annual budget process. These actions are intended to establish a funding plan so that the County can start to accumulate capital funds, rebuild the CIP, and re-fund viable construction and improvement projects Capital Improvement Program Please note, all projects listed in the CIP are subject to available funding. The anticipated CIP expenditure totals approximately $151.3 million. The first year of the CIP, totaling approximately $3 million, is incorporated into the County s

7 New Construction and Facility Planning accounts for approximately $146.8 million or approximately 97% of the CIP. The anticipated CIP project revenues reflect previously budgeted revenue amounts and proposed, but as yet, unbudgeted revenue amounts. Anticipated project expenditures with budgeted revenue amounts are associated with Jail Expansion, Public Health Bio-Safety Level 3 Modular Laboratory, South County Government Center, Hospital Replacement Phase 2 Project, Countywide Animal Shelter, Americans With Disabilities Act (ADA) Facility Improvements, Micke Grove Regional Park Improvements, and Hospital Underground Utility Realignment. The remaining projects in the CIP are not funded. In future years, revenues will be dependent upon continued planning, grant applications, budget programming, and the practicable pursuit of these funds. As noted above, the CIP is an anticipated spending plan. appropriations for these projects would need to occur in the CIP planning period in order to have sufficient appropriations to award contracts and fund other project costs. Below are the anticipated budget appropriations by fiscal year for the CIP. Please note that the includes appropriations for some projects that anticipate spending in that year and project phases that will carry over into the CIP planning period. Projected Appropriations ($2013) (approximate millions) $38.6 $91.8 $17.8 $1.7 $43.2 $193.1 Funding for the CIP projects could consist of County funds such as General Funds, County Facilities Fee (CFF) Program, Tobacco Settlement Trust Fund, bond indebtedness, Enterprise and Internal Service Funds, and other County funds. County funds that are used to finance these projects are general-purpose revenues that include, among others, tax dollars, interest income, and fund balances. On June 14, 2005, the CFF Program was adopted by the Board of Supervisors (Ordinance No and R ). The CFF Program authorizes the collection of development fees to offset a portion of facility costs required to respond to urban development that is projected within the County. CFF Program funds identified for specific projects within the CIP will be subject to the findings of the CFF Program Nexus Report Update that is currently underway but, at this time, has not been completed. Debt Financing funds are a form of capital project financing whereby certificates of participation, bonds, or other debt securities are issued to finance facility construction. The bonds or certificates are then repaid over time out of the County s operating revenues. Other funds, consisting of miscellaneous revenues such as Gas Franchise Fees and Trust Funds, fall outside of the previously described categories. On May 8, 2008, the Jail Expansion Project received a conditional award of State AB 900 funding in the amount of $80 million. However, annual operating costs remain unfunded. These costs will be evaluated in the context of the proposed Jail expansion. Efforts to secure 3

8 funds necessary for the additional operating costs associated with the proposed Jail expansion have been discussed, but no specific direction has been identified. Such efforts may include a County-wide sales and use tax, special tax under a County-wide Community Facilities District, a parcel tax, or a combination of the aforementioned options. Two projects listed in the CIP are related to the Hospital: Hospital Replacement Phase 2 and Hospital Underground Utility Realignment. The Hospital has previously experienced unbudgeted operating losses and funding has been problematic for the Hospital s short-term and long-term infrastructure maintenance projects and new building construction projects. On December 7, 2010, the Board of Supervisors approved the reorganization of the Health Care Services Agency to establish San Joaquin General Hospital as a stand-alone department (B ). Establishing the Hospital as a stand-alone department could possibly be the first step to transitioning to another governance structure. In the future, if the Hospital becomes an independent hospital district, public hospital authority, or a non-profit corporation, then the Hospital s two projects and perhaps others would need to be reevaluated for inclusion in the CIP. A new courthouse is planned to be constructed by the State with construction anticipated to be complete by The Master Plan Update identifies two projects related to the re-use of the existing County-owned Courthouse site and they are in the CIP: 1) Downtown Plaza and Underground Parking Project ($11.8 million). Master planning, design, and engineering for this project is anticipated in the CIP, however, construction will take place outside of this planning period. 2) Courthouse-Courts Wing & Administration Wing Demolition ($3.6 million). Engineering for demolition plans and bid documents is planned for , however, demolition will take place outside of this planning period. Although growth has been slow lately, south County population has risen sharply over the last several years. An Option Agreement with the City of Manteca was approved in September 2009 to secure available property for a South County Government Center. Planning, design and engineering, and the start of construction for this project are anticipated in the CIP. The County is also applying for Federal Energy Grants. If funding is awarded, staff will develop several energy projects, such as solar (photovoltaic) systems and existing building controls and lighting retrofits. Also, if additional funding becomes available, then other projects such as those unfunded projects listed in the Public Improvement could be considered for prioritization and funding. The following pages present a project summary for each project, which includes project description, justification, and estimated costs. Charts and tables are at the end of this document that summarize the entire CIP. The project cost estimates in the CIP are presented in 2013 dollars. 4

9 NEW CONSTRUCTION AND FACILITY PLANNING Public Defender Building East Main Street, Stockton, CA New major capital construction, facilities planning projects, and projects that expand upon existing facilities are subject to funding availability, which is difficult to judge at this time. Since , over $72 million of previously allocated project funds have been diverted to help address General Fund budget shortfalls. 5

10 PROJECT SUMMARY Title Public Health Bio-Safety Level 3 Modular Laboratory Category New Construction & Facility Planning Location 1601 E. Hazelton Avenue, Stockton, CA Start FY Department Public Health Services Finish FY Project Description The project consists of the acquisition of a bio-safety level 3 (BSL-3) modular laboratory including engineering, fabrication, transport, miscellaneous site work, and installation at the current main Public Health Services facility at 1601 E. Hazelton Ave, Stockton. The development of the BSL-3 modular laboratory specifications and bidding were completed in The contract award and the completion of BSL-3 modular laboratory occurred in Justification / Project Need The Public Health laboratory is designated a local response network laboratory that serves a nine county region. As such, the laboratory is a Select Agent Laboratory and works with biological agents that require increased safety levels and protective safety practices. The previous laboratory only had bio-safety level 2 capabilities, but handled biological agents that need BSL-3 containment for optimum safety. In February 2011, the Board of Supervisors approved the budget appropriation of $950,000 for the BSL-3 modular laboratory (B and B11-111). The project was funded by an Emergency Preparedness Grant with the State Department of Public Health in the amount of $950,000, State funding from the Impact Mitigation Agreement in the amount of $346,800, and County funds in the amount of $55,879. Prior Costs 271,415 ($2013) CIP 1,081,264 Future Costs 0 Costs 1,352,679 Projected CIP Expenditures Costs 1,081, ,081,264 Funding Sources State 1,081, ,081,264 Appropriations 1,081, ,081,264 6

11 PROJECT SUMMARY Title Hospital Replacement Phase 2 Project Category New Construction & Facility Planning Location 500 W. Hospital Road, French Camp, CA Start FY Department San Joaquin General Hospital Finish FY Project Description The project consists of the design and construction of a new two-story building abutting the newer existing Hospital building. As part of the master planning process, the Hospital will review its business operating model and determine the appropriate new or existing patient services that might be relocated from the Old Towers building to the new building. Design began in and construction documents are anticipated to be completed no later than January 1, 2015 per SB 90. The complete funding sources for project construction have not been identified. Justification / Project Need The Old Towers building is approximately an 80-year old, un-reinforced brick and masonry construction that has badly deteriorated. Under SB 1953, all general acute care hospitals are required to retrofit, replace, or remove from acute care services all hospital buildings that pose a significant risk of collapse during an earthquake. The Hospital applied for and received an extension under AB 306 to remain in the non-conforming Old Towers building through In December 2009, the Hospital submitted to the State an SB 306 Master Plan with the intent to replace the Old Towers building by January 1, 2020 (B ). In February 2012, the Board authorized the Hospital to submit SB 90 documentation, which will allow the Hospital to defer the submittal of construction documents to the State until January 1, 2015 (B ). Prior Costs 200,951 ($2013) CIP 3,100,000 Future Costs 37,699,049 Costs 41,000,000 Projected CIP Expenditures Costs 400,000 1,800, , ,100,000 Funding Sources General Hospital 400,000 1,800, , ,100,000 Appropriations 17,050,000 2,320, ,370,000 7

12 PROJECT SUMMARY Title South County Government Center Category New Construction & Facility Planning Location Manteca, CA Start FY Department General Services Finish FY Project Description An option agreement for land acquisition was approved on September 8, 2009, to secure available property for a government center in the south County area. Possible uses could include satellite facilities for Community Development, Public Works, Public Health, Human Services Agency, Sheriff, District Attorney, Outpatient Clinic, and Public Defender. Ongoing discussion with the State Administrative Office of the Courts (AOC) might result in the integration of a courts building on the same site as the County Government Center (with associated costs borne by the State). Planning is anticipated for and Design and engineering is planned for to Bidding for the construction contractor and the start of construction is planned for and the completion of construction is planned for Justification / Project Need South County population has risen sharply over the last several years. Although growth has been slow recently, steady increases are expected in the future. Consolidated South County court facilities and satellite government offices will be evaluated to serve this growing population. The Board of Supervisors approved an Option Agreement with the City of Manteca to purchase a 10-acre parcel for potential future development on this Project (B and A ). The County has up to 10 years to exercise its option to purchase. Prior Costs 6,116 ($2013) CIP 22,590,000 Future Costs 38,403,884 Costs 61,000,000 Projected CIP Expenditures Costs 440, ,000 1,130,000 1,130,000 19,450,000 22,590,000 Funding Sources County 440, , ,000 OXY Resources Trust 0 150, ,000 County Facilities Fees 0 0 1,130,000 1,130,000 19,450,000 21,710, , ,000 1,130,000 1,130,000 19,450,000 22,590,000 Appropriations 667, ,400 2,260, ,070,000 41,210,000 8

13 PROJECT SUMMARY Title New Morgue & Forensic Pathology Facility Category New Construction & Facility Planning Location French Camp Start FY Department Sheriff-Coroner Finish FY Project Description The project consists of the design and construction of a new morgue and forensic pathology facility at the Sheriff's Office Complex in French Camp. Design is planned for Bidding for a construction contractor and the start of construction is planned for , and the completion is planned for Assumption: 15,000 square foot, single story building at $500 per square foot. Justification / Project Need The existing morgue is too small and the main building and temporary storage facilities are past their current life-cycle requiring more frequent and costly repairs to maintain operation. Prior Costs 0 ($2013) CIP 7,500,000 Future Costs 0 Costs 7,500,000 Projected CIP Expenditures Costs 375, ,000 2,250,000 4,500, ,500,000 Funding Sources County 0 0 2,250,000 4,500, ,750,000 Tobacco Settlement 375, , , , ,000 2,250,000 4,500, ,500,000 Appropriations 750, ,750, ,500,000 9

14 PROJECT SUMMARY Title Jail Expansion Category New Construction & Facility Planning Location 7000 Michael N. Canlis Blvd., French Camp, CA Start FY Department Sheriff-Coroner Finish FY Project Description The jail project includes the addition of ten 128-bed housing units including secure corridors and perimeters, a custody administration annex building including a jail central control room, and a video visitation building. The goal is to obtain a total of 1,280 net-beds and the infrastructure to support the expansion. Bidding for the construction contract and the start of construction is planned for The completion of construction is planned for The Board of Supervisors allocated $25 million in matching funds for the project ($16 million in and $9 million in ). In and , a total of $3.1 million was loaned to the General Fund. Approximately $4 million has been expended, $7.3 million is encumbered, and $11.6 million is available. Justification / Project Need As reported by Sheriff staff, the current existing maximum bed count total is 1,411. The current estimated cost of the project is approximately $105 million. The Jail Expansion project is dependent on obtaining State AB 900 financing for construction in the amount of $80 million (conditional award received May 8, 2008). Continued development of the project is also dependent upon securing funds required for operations. The Board has previously stated that funding ongoing operational costs is needed before committing to construction of the expansion. Efforts related to securing funds necessary for the additional operating costs may include a County-wide sales and use tax, special tax under a County-wide Community Facilities District, and parcel tax. Prior Costs 4,000,000 ($2013) CIP 76,080,000 Future Costs 24,920,000 Costs 105,000,000 Projected CIP Expenditures Costs 0 0 2,955,000 26,790,000 46,335,000 76,080,000 Funding Sources State ,000,000 40,000,000 60,000,000 County 0 0 2,955,000 6,790,000 6,335,000 16,080,000 County Facilities Fees ,955,000 26,790,000 46,335,000 76,080,000 Appropriations 17,756,980 87,243, ,000,000 10

15 PROJECT SUMMARY Title Countywide Animal Shelter Category New Construction & Facility Planning Location To Be Determined Start FY Department General Services Finish FY Project Description The project consists of the construction of a regional animal shelter (20,750 square feet at $250 per square foot); and also includes design and engineering, permitting and environmental studies, construction oversight and inspection, and contingencies. For the project, County or Stockton owned land is assumed to be used. Preconstruction activities, i.e., design and engineering, permitting and environmental studies, etc. are planned for Bidding for the construction contractor and the start of construction are planned for and the completion of construction is planned for A $237,300 loan from this project will be paid back in Justification / Project Need In August 2011, the Board accepted a Countywide Animal Services Study (B ). In December 2011, the Board accepted a report relative to potential Joint Animal Services between the County and the City of Stockton and authorized the County Administrator to continue discussions with the City regarding the development of a Joint Powers Authority (JPA). It is anticipated that a fully developed JPA will identify the funding mechanisms for City's capital and operating contribution for the regional animal shelter. TBD Prior Costs 0 ($2013) CIP 9,160,000 Future Costs 0 Costs 9,160,000 Projected CIP Expenditures Costs 0 725,000 4,315,000 4,120, ,160,000 Funding Sources County 0 254,000 1,510,000 1,442, ,206,000 OXY Resources Trust 0 471,000 2,805,000 2,678, ,954, ,000 4,315,000 4,120, ,160,000 Appropriations 562, ,300 8,360, ,160,000 11

16 PROJECT SUMMARY Downtown Plaza and Underground Title Parking Category New Construction & Facility Planning Location Courthouse Start FY Department General Services Finish FY Project Description The project consists of the master planning, design, and engineering for construction of a Downtown Plaza with underground parking. The project also includes engineering for demolition of the Courthouse-Courts Wing (three-story building) and Courthouse-Administration Wing (seven story building). Master planning would start in and design and engineering would be complete in Construction will follow demolition activities under a separate project work effort anticipated for Justification / Project Need Note: These projects were identified in the Board approved Master Plan Update (B ) to coincide with the then-known completion schedule of the new Courthouse being planned through the State Office of Court Construction and Management. Subsequent to approval of the Update, the Courthouse project completion was extended to 2016 necessitating a commensurate delay for this project. Projected CIP expenditures of $1.3 million include the master planning, design, and engineering portion of this project. Prior Costs 0 ($2013) CIP 1,300,000 Future Costs 10,500,000 Costs 11,800,000 Projected CIP Expenditures Costs ,300, ,300,000 Funding Sources County , ,000 County Facilities Fees ,000, ,000, ,300, ,300,000 Appropriations ,300, ,300,000 12

17 PROJECT SUMMARY Title District Attorney Building Category New Construction & Facility Planning Location Downtown Stockton Start FY Department General Services Finish FY Project Description This project consists of the construction of a 40,000 square foot building space for the District Attorney. Planning and design is planned for and , respectively. Bidding for the construction contractor and the start of construction is planned for and the completion of construction is planned for TBD Justification / Project Need This project was identified in the Board-approved Master Plan Update (B ) for funding in to coincide with the then-known completion schedule of the new Courthouse being planned through the State Office Court Construction and Management. Subsequent to approval of the Update, the Courthouse project completion has been extended necessitating a commensurate delay for this project. Prior Costs 0 ($2013) CIP 125,000 Future Costs 13,375,000 Costs 13,500,000 Projected CIP Expenditures Costs , ,000 Funding Sources County , ,000 Appropriations , ,000 13

18 PROJECT SUMMARY Title Fleet Services Facility Replacement Category New Construction & Facility Planning Location Hazelton Corporate Yard Start FY Department Fleet Services Finish FY Project Description Design and architectural plans for a Fleet Services replacement facility at the Hazelton Corporate Yard. Justification / Project Need Fleet Services would be consolidated with Public Works yard-related related operations at a site that overall has an industrial character. Prior Costs 0 ($2013) CIP 130,000 Future Costs 14,370,000 Costs 14,500,000 Projected CIP Expenditures Costs , ,000 Funding Sources County , ,000 Appropriations , ,000 14

19 PROJECT SUMMARY Title Short Stop Permit Center Category New Facility Construction & Planning Location Wilson Way, Stockton, CA Start FY Department General Services Finish FY Project Description Design and architectural plans for a Short Stop Permit Center for the Community Development Department, Environmental Health Department, and Public Works Department (non-yard related) at existing County-owned land located at Wilson Way, Stockton, CA. Environmental review and architectural and engineering is planned for Bidding for the construction contractor and the start of construction is planned for The completion of construction is planned for Justification / Project Need Provides better customer service for clients involved in the County permit process, better operational efficiencies by consolidating multiple departments into a single structure, and provides potential improvement of neighborhood image along Wilson Way compatible with site/use characterstics. Prior Costs 0 ($2013) CIP 415,000 Future Costs 49,585,000 Costs 50,000,000 Projected CIP Expenditures Costs , ,000 Funding Sources County Facilities Fees , ,000 Appropriations , ,000 15

20 PROJECT SUMMARY Title Public Health Facility Replacement Category New Construction & Facility Planning Location 1601 E. Hazelton Avenue, Stockton, CA Start FY Department General Services Finish FY Project Description Replacement facility for Public Health Programs, excluding the laboratory facility. This project proposes an expansion of the existing Public Health Services building with the construction of a new building space. Design and engineering is planned for Bidding for the construction contractor and the start of construction planned for The completion of construction is planned for Justification / Project Need The main facility located at 1601 E. Hazelton Avenue, Stockton, CA was constructed in the 1960's. The facility requires significant upgrade. Prior Costs 0 ($2013) CIP 415,000 Future Costs 50,585,000 Costs 51,000,000 Projected CIP Expenditures Costs , ,000 Funding Sources County Facilities Fees , ,000 Appropriations , ,000 16

21 EXISTING FACILITY IMPROVEMENTS San Joaquin County Agricultural Center 2101 E. Earhart Avenue, Stockton, California Maintaining the County s existing facilities often becomes the higher priority when funding resources are limited. The importance of keeping existing deficiencies from getting worse and precluding deficiencies on new facilities must be acknowledged in order to preserve the County s infrastructure and meet the facility needs of County departments. 17

22 PROJECT SUMMARY Title Americans With Disabilities Act (ADA) Building Upgrades Category Existing Facility Improvements Location Various County Facilities Start FY Department General Services Finish Ongoing Project Description The project consists of Americans With Disabilities Act (ADA) improvements at various existing County-owned facilities. VARIOUS Justification / Project Need When first occupied, County-owned buildings were compliant with the ADA requirements of the California Building Code (CBC) in effect at that time. The CBC is subject to revisions every three years, including ADA requirements. An ongoing, thorough review of County facilities needs to continue to ensure compliance with the CBC revisions. Prior Costs 81,707 ($2013) CIP 1,382,310 Future Costs Costs 1,464,017 Projected CIP Expenditures Costs 382, , , , ,000 1,382,310 Funding Sources County 32, , , , ,000 1,032,310 Tobacco Settlement 350, , , , , , ,000 1,382,310 Appropriations 382, , , , ,000 1,382,310 18

23 PROJECT SUMMARY Title Micke Grove Regional Park Improvements Category Park Improvements Location Micke Grove Road Start FY Department Parks & Recreation Finish FY Project Description The first phase of construction, completed in 2008, created a 2-acre lake, picnic pavilion, water play area, children's play area, and a restroom. The second phase will add picnic areas, turf, irrigation, and boat docks for paddle boat rentals. Improvements under consideration for the final phase of development at the northeast corner of the site includes a recreational vehicle campground. Justification / Project Need The project improves approximately 23 acres of undeveloped park property bounded by the Union Pacific Railroad and Armstrong Road. Note: The Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Acts of 2000 and 2002 Per Capita Program provided partial funding of the project with no matching requirements in prior years. Prior Costs 5,795,000 ($2013) CIP 800,000 Future Costs 1,700,000 Costs 8,295,000 Projected CIP Expenditures Costs 250, , , , , ,000 Funding Sources OXY Resources Trust 250, , , , , ,000 Appropriations 250, , , , , ,000 19

24 PROJECT SUMMARY Title Hospital Underground Utility Realignment Category Existing Facility Improvements Location 500 W. Hospital Road, French Camp, CA Start FY Department San Joaquin General Hospital Finish FY Project Description The project consists of constructing a new section of underground Hospital utilities and diverting or reconfiguring high pressure steam piping and water distribution. The project will also provide, as an alternate item of work, the installation of empty electrical conduit in a joint trench with the steam piping to construct an alternate alignment should the electrical distribution in the older tunnel section become compromised. Justification / Project Need At the Hospital complex, steam, domestic water, and electrical services are routed to various buildings via underground utility tunnels. Portions of the utility tunnels are circa 1930 and in late 2007 one of the older portions developed a substantial steam leak. Upon investigation, it has been determined that the tunnel walls are deteriorating with concrete crumbling and reinforcements exposed and severely rusted. In 2009, options were studied to provide alternatives to the dependence upon this older utility tunnel section and its aged piping and wiring. Prior Costs 19,645 ($2013) CIP 780,355 Future Costs 0 Costs 800,000 Projected CIP Expenditures Costs 80, , ,355 Funding Sources Hospital Enterprise 80, , ,355 Appropriations 80, , ,355 20

25 PROJECT SUMMARY Title Human Services Agency Building Structural Upgrade Category Existing Facility Improvements Location Sutter & San Joaquin Streets Start FY Department Human Services Agency Finish FY Project Description The project consists of schematic slab strengthening to existing slabs to provide additional strength to resist the slab loads, as well as mitigate future slab deflections on various floors of the Human Services Agency (HSA) Building. Justification / Project Need Slab loads (weight) on various floors of the HSA Building exceed the Building's design/constructed limits and is causing deflection, such as the vertical and horizontal shifting of the Building. This project will provide long-term stability to the HSA Building's structure. Prior Costs 0 ($2013) CIP 750,000 Future Costs Costs 750,000 Projected CIP Expenditures Costs 0 750, ,000 Funding Sources State 0 750, ,000 Appropriations 0 750, ,000 21

26 PROJECT SUMMARY Courthouse-Courts Wing and Administration Wing Title Demolition Category Existing Facility Improvements Location Courthouse-Courts Wing Start FY Department General Services Finish FY Project Description This project consists of the demolition of the Courthouse-Courts Wing (three-story building) and the Courthouse- Administration Wing (seven-story building). Demolition will take place after occupation of the new Courthouse constructed by the State, which is slated for completion in Engineering for demolition plans and bid documents is planned for Justification / Project Need This project was identified in the Board approved Master Plan Update (B ) for funding in to coincide with the then-known completion schedule of the new Courthouse being planned through the State Office of Court Construction and Management. Subsequent to approval of the Update, the Courthouse project completion was extended to necessitating a commensurate delay for this project. This project is subject to availability of funding and upon completion of the new State Courthouse Building. Prior Costs 0 ($2013) CIP 800,000 Future Costs 2,800,000 Costs 3,600,000 Projected CIP Exp[enditures Costs , ,000 Funding Sources County Facilities Fees , ,000 Appropriations ,600,000 3,600,000 22

27 APPENDIX Canlis Building 24 S. Hunter Street, Stockton, CA 23

28 Chart 1 Expenditures by Fiscal Year Projected Expendit tures (millions) 10 0 $ ,008,929 8,095,000 35,785,000 57,785,000 46,655,000 $8.1 $35.8 $57.8 $

29 Chart 2 New Construction and Facility Planning $146,816,264 Hospital Replacement Phase 2 Project, $3.1 South County Government Center, $22.6 Countywide Animal Shelter, $9.2 District Attorney Building, $0.1 Downtown Plaza and Underground Parking, $1.3 Short Stop Permit Center, $0.4 Public Health Bio Safety Modular Laboratory, $1.1 Public Health Facility Replacement, $0.4 New Morgue & Forensic Pathology Facility, $7.5 Jail Expansion, $101.0 Fleet Services Facility Replacement, $0.1 25

30 Chart 3 Existing Facilities Improvements - $4,512,665 Courthouse Courts Wing & Administration Wing Demolition, $0.8 Human Services Agency Building Structural Upgrade, $0.8 Hospital Underground Utility Realignment, $0.8 ADA Improvement Projects, $1.4 Micke Grove Regional Park Improvements, $0.8 26

31 TABLE 1 ANTICIPATED PROJECT EXPENDITURES ($2013) New Construction & Facility Planning Public Health Bio-Safety Modular Laboratory 1,081, ,081,264 Hospital Replacement Phase 2 Project 400,000 1,800, , ,100,000 South County Government Center 440, ,000 1,130,000 1,130,000 19,450,000 22,590,000 New Morgue & Forensic Pathology Facility 375, ,000 2,250,000 4,500, ,500,000 Jail Expansion 0 2,955,000 26,790,000 46,335,000 24,920, ,000,000 Countywide Animal Shelter 0 725,000 4,315,000 4,120, ,160,000 Downtown Plaza and Underground Parking ,300, ,300,000 District Attorney Building , ,000 Fleet Services Facility Replacement , ,000 Short Stop Permit Center , ,000 Public Health Facility Replacement , ,000 2,296,264 6,295,000 35,385,000 57,385,000 45,455, ,816,264 Existing Facility Improvements ADA Facility Improvements 382, , , , ,000 1,382,310 Micke Grove Regional Park Improvements 250, , , , , ,000 Hospital Underground Utility Realignment 80, , ,355 Human Service Agency Building Structural Upgrade 0 750, ,000 Courthouse-Courts Wing & Administration Wing Demolition , , ,665 1,800, , ,000 1,200,000 4,512,665 CIP 3,008,929 8,095,000 35,785,000 57,785,000 46,655, ,328,929 27

32 TABLE 2 ANTICIPATED BUDGET APPROPRIATIONS ($2013) New Construction & Facility Planning Public Health Bio Safety Modular Laboratory 1,081, ,081,264 Hospital Replacement Phase 2 Project 17,050,000 2,320, ,370,000 South County Government Center 667, ,400 2,260, ,070,000 41,210,000 New Morgue & Forensic Pathology Facility 750, ,750, ,500,000 Jail Expansion 17,756,980 87,243, ,000,000 Countywide Animal Shelter 562, ,300 8,360, ,160,000 Downtown Plaza and Underground Parking ,300, ,300,000 District Attorney Building , ,000 Fleet Services Facility Replacement , ,000 Short Stop Permit Center , ,000 Public Health Facility Replacement , ,000 37,868,544 90,012,720 17,370,000 1,300,000 39,155, ,706,264 Existing Facility Improvements ADA Facility Improvements 382, , , , ,000 1,382,310 Micke Grove Regional Park Improvements 250, , , , , ,000 Hospital Underground Utility Realignment 80, , ,355 Human Services Agency Building Structural Upgrade 0 750, ,000 Courthouse-Courts Wing & Administration Wing Demolition ,600,000 3,600, ,665 1,800, , ,000 4,000,000 7,312,665 CIP 38,581,209 91,812,720 17,770,000 1,700,000 43,155, ,018,929 28

33 TABLE 3 PROJECT REVENUE SOURCES ($2013) Projected CIP Revenues Debt County State County Financing Facilities Fee Other New Construction & Facility Planning Public Health Bio-Safety Modular Laboratory 1,081, ,081,264 Hospital Replacement Phase 2 Project 0 3,100, ,100,000 South County Government Center 0 730, ,710, ,000 22,590,000 New Morgue & Forensic Pathology Facility 0 6,750, ,000 7,500,000 Jail Expansion 80,000,000 18,600, ,400, ,000,000 Countywide Animal Shelter 0 3,206, ,954,000 9,160,000 Downtown Plaza and Underground Parking 0 300, ,000, ,300,000 District Attorney Building 0 125, ,000 Fleet Services Facility Replacement 0 130, ,000 Short Stop Permit Center , ,000 Public Health Facility Replacement , ,000 81,081,264 32,941, ,940,000 6,854, ,816,264 Existing Facility Improvements ADA Facility Improvements 0 1,032, ,000 1,382,310 Micke Grove Regional Park Improvements , ,000 Hospital Underground Utility Realignment 0 780, ,355 Human Services Agency Building Structural Upgrade 750, ,000 Courthouse-Courts Wing & Administration Wing Demolition , , ,000 1,812, ,000 1,150,000 4,512,665 CIP 81,831,264 34,753, ,740,000 8,004, ,328,929 29

Proposed Budget. June 12, 2018

Proposed Budget. June 12, 2018 2018-2019 Proposed Budget June 12, 2018 1 Development of the 2018-2019 Budget Board Strategic Priorities Board-established fiscal/budget/reserve policies Ongoing Revenues = or > Ongoing Expenses Reserve

More information

o-Public. Improvement. Capital Maintenance & Improvements. Purpose. Program Discussion

o-Public. Improvement. Capital Maintenance & Improvements. Purpose. Program Discussion Monica Nino, County Administrator 2012-13 2013-14 2014-15 2014-15 Increase/ Capital Outlay Fund Actual Approved Requested Recommended (Decrease) Expenditures Fixed Assets $6,225,260 $11,289,212 $39,064,737

More information

Budget Summary FISCAL YEAR BUDGET HEARINGS

Budget Summary FISCAL YEAR BUDGET HEARINGS FISCAL YEAR 2018-19 BUDGET HEARINGS AGENDA Budget Hearing Materials Recommended Service Level Reductions Restorations and Expansions Functional Group Summaries and Departmental Presentations (if necessary)

More information

CAPITAL IMPROVEMENT COUNTY CAPITAL IMPROVEMENT PROGRAM (CIP) Department/Agency Description. Funding Sources

CAPITAL IMPROVEMENT COUNTY CAPITAL IMPROVEMENT PROGRAM (CIP) Department/Agency Description. Funding Sources COUNTY PROGRAM (CIP) Department/Agency Description The Capital Improvement Program (CIP) is the capital planning mechanism for new facilities, major facility expansions, and purchases of large capital

More information

Northern Branch Jail Project

Northern Branch Jail Project BUDGET & FULL-TIME EQUIVALENTS SUMMARY & BUDGET PROGRAMS CHART Operating $ 24,071,489 Capital $ - FTEs - Northern Branch Jail Team (General Services and Sheriff's Office) Northern Branch Jail Project (AB900)

More information

SUMMARY OF PROJECT COSTS AND FUNDING SOURCES

SUMMARY OF PROJECT COSTS AND FUNDING SOURCES A Healthy Community Area Agency on Aging/Veterans Services Behavioral Health and Recovery Services Child Support Services Community Services Agency Health Services Agency A HEALTHY COMMUNITY A healthy

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Earthquake Safety and Emergency Response Bond Program. Citizens General Obligation Bond Oversight Committee

Earthquake Safety and Emergency Response Bond Program. Citizens General Obligation Bond Oversight Committee Bond Oversight Committee Prepared by Charles Higueras, Program Manager December 31, 2010 TABLE OF CONTENTS Executive Summary... Page 1 Program Summary and Status Auxiliary Water Supply System (AWSS)...

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

County of Orange. Chairwoman Lisa A. Bartlett, Supervisor, Fifth District Members, Board of Supervisors. Fiscal Year Recommended Budget

County of Orange. Chairwoman Lisa A. Bartlett, Supervisor, Fifth District Members, Board of Supervisors. Fiscal Year Recommended Budget TRANSMITTAL LETTER County of Orange TRANSMITTAL LETTER County Executive Office May 9, 2016 To: From: Subject Chairwoman Lisa A. Bartlett, Supervisor, Fifth District Members, Board of Supervisors Frank

More information

PUBLIC WORKS. FY 17 Recommended Public Works Budget $4,937,107

PUBLIC WORKS. FY 17 Recommended Public Works Budget $4,937,107 PUBLIC WORKS FY 17 Recommended Public Works Budget $4,937,107 RSWA Contribution 11% Facilities And Environmental Services 89% FY15 FY16 FY16 FY17 FY17 FY17 $ % EXPENDITURES ACTUAL ADOPTED PROJECTED REQUEST

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

TAUSSIG DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON. Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds

TAUSSIG DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON. Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds DAVID TAUSSIG & ASSOCIATES, INC. DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON B. C. SEPTEMBER 12, 2016 Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds Prepared

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 16, 2018

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 16, 2018 SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 16, 2018 1 PROJECTS Dunlap Hall Renovation - Completed Central Plant & Infrastructure - Completed Johnson Student Center & Demolition Science Center

More information

LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203

LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203 SAN JOAQUIN LOCAL AGENCY FORMATION COMMISSION AGENDA ITEM NO. 2 LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203 REVISED EXECUTIVE OFFICER S REPORT March 10, 2016 TO: FROM: SUBJECT: LAFCo Commissioners

More information

Allegan County Courthouse Square

Allegan County Courthouse Square Allegan County Courthouse Square Master Plan Charrette Report Draft Executive Summary Date: August 4, 2014 Prepared By: Index to Report Executive Summary A. Introduction 1. Charrette Goals and Objectives.

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

State of the County 2013

State of the County 2013 State of the County 2013 February 13, 2013 Orange County Public Affairs Association Supervisor Shawn Nelson Chairman Employee Pensions Non-safety: For new hires the formula is 1.62% @ 65 (Formerly 2.7%

More information

CITY OF BURBANK FINANCIAL SERVICES DEPARTMENT STAFF REPORT

CITY OF BURBANK FINANCIAL SERVICES DEPARTMENT STAFF REPORT CITY OF BURBANK FINANCIAL SERVICES DEPARTMENT STAFF REPORT DATE: July 17, 2018 TO: FROM: Ron Davis, City Manager Cindy Giraldo, Financial Services Director SUBJECT: Burbank Infrastructure and Community

More information

Contra Costa County Update. Budget & Key Issues. Presentation to Board of Supervisors January 30, 2018

Contra Costa County Update. Budget & Key Issues. Presentation to Board of Supervisors January 30, 2018 Contra Costa County Update Budget & Key Issues Presentation to Board of Supervisors January 30, 2018 1 2 Contra Costa County Familiar Budget Drivers and Challenges for 2018 and Beyond Economic Forecast

More information

Civic Center Facilities Master Plan

Civic Center Facilities Master Plan Agenda Item #26 Attachment A Civic Center Facilities Master Plan Presentation to the Board of Supervisors February 23, 2016 - C o u n t y O c c u p a n c y i n C i v i c C e n t e r 10 County-owned Buildings

More information

CITY OF BLUE ASH Interoffice Memo City Manager's Office

CITY OF BLUE ASH Interoffice Memo City Manager's Office TO: FROM: SUBJECT: CITY OF BLUE ASH Interoffice Memo City Manager's Office City Council City Manager and Department Directors Agenda Items for the November 9 th Council Meeting DATE: November 7, 2017 COPIES:

More information

Monterey County Financial Forecast

Monterey County Financial Forecast Monterey County Financial March 2018 Introduction The County Administrative Office is pleased to present the financial forecast for the County of Monterey. The forecast is the first step of the annual

More information

Water Conservation project at 196 Memorial. Rebudget transfer to General Services for

Water Conservation project at 196 Memorial. Rebudget transfer to General Services for 12 SCHEDULE A Fiscal Year 2016-17 s to the Recommended Budget Fund 0010 4600000 Agriculture Commissioner 594000 4,100 4,100 Agriculture Subtotal: 4,100 - - 4,100 0010 0800000 Assessor 594000 4,200 4,200

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

Human Services and Public Health

Human Services and Public Health Human Services and Public Health The Human Services line of business encompasses the administration of categorical assistance programs to eligible, needy individuals and families. The program also includes

More information

Public Health & Safety Bond Program 2016

Public Health & Safety Bond Program 2016 Public Health & Safety Bond Program 2016 Quarterly Status Report Presented to the Citizens General Obligation Bond Oversight Committee as of March 2018 1 Public Health & Safety Bond Program 2016 Overview

More information

Accumulative Capital Outlay Fund RECOMMENDED BUDGET FY

Accumulative Capital Outlay Fund RECOMMENDED BUDGET FY MISSION This program directs funding for the project development and construction of facilities and parks that support County functions. In addition, the program performs major maintenance projects on

More information

University of Virginia Status Report on the Plan to Address Deferred Maintenance

University of Virginia Status Report on the Plan to Address Deferred Maintenance Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 552 buildings and related infrastructure, encompassing

More information

Earthquake Safety and Emergency Response Bond Program 2010 & 2014

Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Quarterly Status Report Presented to the Citizens General Obligation Bond Oversight Committee as of March 2017 Overview of ESER 2010 Scope

More information

Budget Summary. FY17 Total County Revenue Sources. Misc 1.1% Federal 5.2% Gen Prop Taxes 40.3% $2,037,947,949

Budget Summary. FY17 Total County Revenue Sources. Misc 1.1% Federal 5.2% Gen Prop Taxes 40.3% $2,037,947,949 Revenue vs. Expenditure Comparison The pie charts show the expenditure and revenue budgets for all Countywide funds. The detail for these charts is displayed in the Combined Statement of Projected Revenues,

More information

MID-YEAR FISCAL REVIEW - FISCAL YEAR

MID-YEAR FISCAL REVIEW - FISCAL YEAR County Executive Office 1195 Third Street Suite 310 Napa, CA 94559 www.countyofnapa.org Main: (707) 253-4421 Fax: (707) 253-4176 Minh C. Tran County Executive Officer MEMORANDUM TO: FROM: Board of Supervisors

More information

County of Santa Barbara

County of Santa Barbara County of Santa Barbara Capital Improvement Program Five Year 07 01 2013 06 30 2018 CIP Presentation Recommended Actions Description of the CIP CIP Summary Project Summaries by Departments General Services

More information

TABLE OF CONTENTS CAPITAL BUDGET

TABLE OF CONTENTS CAPITAL BUDGET TABLE OF CONTENTS BUDGET Capital Organization Chart... 569 Capital Items Defined as Fixed Assets... 569 Programs... 571 Summary of Programs (schedule)... 571 Buildings and Building Improvements Program...

More information

Capital Project Plan Academic Ambulatory Care Centre October 27, 2004

Capital Project Plan Academic Ambulatory Care Centre October 27, 2004 Capital Project Plan Academic Ambulatory Care Centre October 27, 2004 1. Objectives of the Project The Academic Ambulatory Care Centre (AACC) is a state-of-the-art health care facility planned for the

More information

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual SOUTH DAKOTA BOARD OF REGENTS Policy Manual SUBJECT: NUMBER: A. PURPOSE To provide guidance on what constitutes maintenance and repair and the process used to document and approve projects. B. DEFINITIONS

More information

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements To improve service delivery, the Proposed Budget continues a focus on improvements in: Core infrastructure Vital services

More information

CITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager

CITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager CITY OF WILLIAMSBURG MEMORANDUM To: Mayor and City Council Planning Commission From: Andrew O Trivette, Assistant City Manager Date: Thursday, January 11, 2018 RE: Capital Improvements for FY18 Status

More information

Lompoc Redevelopment Agency Seismic Retrofit Loan Fund Guidelines

Lompoc Redevelopment Agency Seismic Retrofit Loan Fund Guidelines Lompoc Redevelopment Agency Seismic Retrofit Loan Fund Guidelines I. Statement of Purpose The Seismic Retrofit Program is an endeavor of the Lompoc Redevelopment Agency to assist owners of un-reinforced

More information

COUNTY ADMINISTRATIVE OFFICE

COUNTY ADMINISTRATIVE OFFICE County of Yolo VICTOR SINGH County Administrative Officer COUNTY ADMINISTRATIVE OFFICE 25 Court Street, Room 202 Woodland, CA 9595 (530) -8150 FAX (530) -8147 www.yolocounty.org To: From: The Honorable

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

PUBLIC WORKS. FY 17 Recommended Public Works Budget $5,277,276

PUBLIC WORKS. FY 17 Recommended Public Works Budget $5,277,276 PUBLIC WORKS FY 17 Recommended Public Works Budget $5,277,276 FES Project Management Div, General Fund Portion 4% RSWA Contribution 12% Facilities And Environmental Services* 84% FY16 FY17 FY17 FY18 FY18

More information

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Rules Stand-Alone Earthquake

PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA. Underwriting Rules Stand-Alone Earthquake PACIFIC SPECIALTY INSURANCE COMPANY STATE OF CALIFORNIA Underwriting Rules Stand-Alone Earthquake Comprehensive and Comprehensive Plus Protection Policy Edition 3 Table of Contents 1. POLICY FORMS AND

More information

Frequently Asked Questions - Dickinson County Justice Center

Frequently Asked Questions - Dickinson County Justice Center Frequently Asked Questions - Dickinson County Justice Center Why should I have to pay for this project? A county jail is the property of the people. It is the first line of defense in detaining those people

More information

Fire Chief. Fire Suppression and Rescue

Fire Chief. Fire Suppression and Rescue Fire Chief Govt/community/public relations Policy Administration Interagency relations Negotiation Fire Department Issues Staff Development Finance Administration Operations Fire Prevention Emergency Communications

More information

Budget Summary. FY2018 Total County Revenue Sources. Other Localities 2.8% Misc 0.7% Charges For Serv 13.2%

Budget Summary. FY2018 Total County Revenue Sources. Other Localities 2.8% Misc 0.7% Charges For Serv 13.2% Revenue vs. Expenditure Comparison The pie charts show the expenditure and revenue budgets for all Countywide funds. The detail for these charts is displayed in the Combined Statement of Projected Revenues,

More information

WORKPLACE 29. The non-residential tax contributions of the North U.S. 29 commercial corridor

WORKPLACE 29. The non-residential tax contributions of the North U.S. 29 commercial corridor WORKPLACE 29 The non-residential tax contributions of the North U.S. 29 commercial corridor Natasha Sienitsky Research Associate Free Enterprise Forum 550 Hillsdale Drive Charlottesville, VA 22901 www.freeenterpriseforum.org

More information

HETCH HETCHY WATER AND POWER AND CLEANPOWERSF. Table of Contents. Independent Auditors Report 1. Management s Discussion and Analysis (Unaudited) 3

HETCH HETCHY WATER AND POWER AND CLEANPOWERSF. Table of Contents. Independent Auditors Report 1. Management s Discussion and Analysis (Unaudited) 3 Table of Contents Independent Auditors Report 1 Management s Discussion and Analysis (Unaudited) 3 Financial Statements: Statements of Net Position 30 Statements of Revenues, Expenses, and Changes in Net

More information

MJEMORANJDUM GENERAL FUND. finance Department. DATE: August 26, 2015 TO: Steven A. Preston, City Manager FROM: Thomas C. Marston, Finance Director

MJEMORANJDUM GENERAL FUND. finance Department. DATE: August 26, 2015 TO: Steven A. Preston, City Manager FROM: Thomas C. Marston, Finance Director finance Department MJEMORANJDUM DATE: August 26, 2015 TO: FROM: Steven A. Preston, City Manager Thomas C. Marston, Finance Director SUBJECT: Quarterly Budget Update- July through June (Pre-closing) 2015

More information

CANYON COUNTY TENTATIVE OPERATING BUDGET FISCAL YEAR 2014

CANYON COUNTY TENTATIVE OPERATING BUDGET FISCAL YEAR 2014 CANYON COUNTY TENTATIVE OPERATING BUDGET FISCAL YEAR 2014 Canyon County Commissioners: Steve Rule, Chairman Kathy Alder, Commissioner Craig Hanson, Commissioner Canyon County Clerk's Office: Chris Yamamoto,

More information

DEVELOPMENT PHILOSOPHY The recommended budget aligns the County s resources with the Council s identified governing priorities:

DEVELOPMENT PHILOSOPHY The recommended budget aligns the County s resources with the Council s identified governing priorities: County Administrator Joseph Kernell jkernell@greenvillecounty.org (864) 467-7105 www.greenvillecounty.org May 19, 2015 Dear Chairman Taylor and Members of County Council: I am pleased to present Greenville

More information

STATE OF ILLINOIS ILLINOIS BOARD OF HIGHER EDUCATION GUIDELINES FOR SUBMISSION OF CAPITAL RESOURCE ALLOCATION AND MANAGEMENT PROGRAM

STATE OF ILLINOIS ILLINOIS BOARD OF HIGHER EDUCATION GUIDELINES FOR SUBMISSION OF CAPITAL RESOURCE ALLOCATION AND MANAGEMENT PROGRAM STATE OF ILLINOIS ILLINOIS BOARD OF HIGHER EDUCATION GUIDELINES FOR SUBMISSION OF CAPITAL RESOURCE ALLOCATION AND MANAGEMENT PROGRAM Public Universities AUGUST 2013 CAPITAL RESOURCE ALLOCATION AND MANAGEMENT

More information

DRAFT. Comal County 2024 Facilities Plan. Adopted by: Comal County Commissioners Court. December 11, Revised September 22, 2016

DRAFT. Comal County 2024 Facilities Plan. Adopted by: Comal County Commissioners Court. December 11, Revised September 22, 2016 Comal County 2024 Facilities Plan Adopted by: Comal County Commissioners Court December 11, 2014 Revised September 22, 2016 Revised December 27, 2018 1 P a g e Purpose: This Plan is a guide for development,

More information

Third Quarter Financial Report July 2015 March 2016

Third Quarter Financial Report July 2015 March 2016 Third Quarter Financial Report July 2015 March 2016 BOARD OF SUPERVISORS Dick Monteith, Chairman William O Brien Vito Chiesa Terry Withrow Jim DeMartini Submitted by Chief Executive Officer Stan Risen

More information

FY Capital Improvement Program City of New Bedford, Massachusetts

FY Capital Improvement Program City of New Bedford, Massachusetts City of New Bedford, Massachusetts Background The Massachusetts Department of Revenue, credit agencies and the Government Accounting Standards Board recommend that localities develop a capital improvement

More information

Hayward Area Recreation and Park District 1099 E Street, Hayward, CA (510)

Hayward Area Recreation and Park District 1099 E Street, Hayward, CA (510) Hayward Area Recreation and Park District 1099 E Street, Hayward, CA 94541 (510) 881-6700 ADDENDUM DESCRIPTION OF ITEMS ON AGENDA BOARD OF DIRECTORS Monday July 28, 2014 Work Session - 5:30 p.m. Regular

More information

SUBJECT: AMENDMENTS TO FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM BUDGET, AUTHORIZE AMENDMENTS TO CONTRACTS

SUBJECT: AMENDMENTS TO FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM BUDGET, AUTHORIZE AMENDMENTS TO CONTRACTS 0 » 0 y % t &? 0 so 0»>; - s'; 0 < E TO: Honorable Mayor and City Council THROUGH: Finance Committee FROM: Department of Public Works SUBJECT: AMENDMENTS TO FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM

More information

California Stand Alone Earthquake Program

California Stand Alone Earthquake Program California Stand Alone Earthquake Program AEGIS SECURITY INSURANCE COMPANY 2407 Park Drive, Harrisburg, PA 17105 3153 California Stand Alone Earthquake Program Contents 1. POLICY FORMS AND DWELLING LIMITS...

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Report to the City Council

Report to the City Council The City of San Diego Report to the City Council DATE ISSUED: June 7, 2017 REPORT NO: ATTENTION: Honorable Members of the City Council SUBJECT: Consideration of a Proposed Ballot Measure to Authorize an

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

Debt Management DEBT MANAGEMENT

Debt Management DEBT MANAGEMENT Debt Management DEBT MANAGEMENT Introduction The County has issued debt over the last two decades primarily for the rebuilding of its facility infrastructure. Issuance of debt is managed in compliance

More information

FY Recommended and Proposed Budgets at a Glance. (in millions)

FY Recommended and Proposed Budgets at a Glance. (in millions) Page 2 of 9 Discussion of individual department work initiatives and budgets for the coming year were reviewed with the Board in April. At the June hearings, staff will provide an overview of the budget,

More information

Section F. Annual Budgetary Processes, Policies, & Fund Structure

Section F. Annual Budgetary Processes, Policies, & Fund Structure Section F Annual Budgetary Processes, Policies, & Fund Structure F-1 Introduction This section of the operating plan presents the major budget policies and long term financial management tools that guide

More information

Budget Hearing Agenda. 1. CAO Presentation 2. Public Comment 3. Board Discussion/Action

Budget Hearing Agenda. 1. CAO Presentation 2. Public Comment 3. Board Discussion/Action Budget Hearing Agenda 1. CAO Presentation 2. Public Comment 3. Board Discussion/Action 2 Budget Drivers/Challenges Recognize sacrifice by Employees that were needed to address long term structural issues

More information

According to the City s Public Procurement Purchasing Services User Guide (User Guide) published in 2009:

According to the City s Public Procurement Purchasing Services User Guide (User Guide) published in 2009: C. Facilities Construction and Maintenance In reviewing Facilities Construction and Facilities Maintenance projects, we noted that they were not always planned and managed effectively and efficiently,

More information

FY15 APPROPRIATIONS. Specific highlights for the General Fund, Special Capital

FY15 APPROPRIATIONS. Specific highlights for the General Fund, Special Capital FY15 APPROPRIATIONS The following sections will provide highlights on changes to budgeted appropriations from FY14 to FY15. OPERATING BUDGET HIGHLIGHTS The total Operating Budget for FY15 has increased

More information

THE MEMBERS OF THE BOARD OF DIRECTORS OF THE PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT

THE MEMBERS OF THE BOARD OF DIRECTORS OF THE PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT AGENDA Philadelphia Authority f or Industrial Developm ent TO: FROM: THE MEMBERS OF THE BOARD OF DIRECTORS OF THE PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT DAVID HYMAN, SECRETARY The following

More information

DEBT SERVICE BUDGET. This section is organized in the following manner: Page. Debt Service Budget 6-1. Debt Service Budget Fund Summary 6-2

DEBT SERVICE BUDGET. This section is organized in the following manner: Page. Debt Service Budget 6-1. Debt Service Budget Fund Summary 6-2 DEBT SERVICE BUDGET Local governments traditionally issue debt to pay for capital projects for several reasons. First, the cost of these projects is normally too high to absorb into an annual budget. Second,

More information

KETCHUM ESSENTIAL SERVICES FACILITIES TABLE OF CONTENTS

KETCHUM ESSENTIAL SERVICES FACILITIES TABLE OF CONTENTS TABLE OF CONTENTS TABLE OF CONTENTS 1 Introduction Existing Conditions Why New Facilities Locations Why A Central Location is Important Alternate Sites Why Now 2 City Hall Space Needs Purpose, Program,

More information

Urban Analytics FISCAL ANALYSIS FOR THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE

Urban Analytics FISCAL ANALYSIS FOR THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE FISCAL ANALYSIS FOR THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE MERGED AREA REDEVELOPMENT PROJECT FY 2015-1 6 DECEMBER 17, 2015 Urban Analytics INTRODUCTION The Successor Agency

More information

DRAFT for Typesetter Legal Text of Local Ballot Measures for November 6, 2018, Consolidated General Election

DRAFT for Typesetter Legal Text of Local Ballot Measures for November 6, 2018, Consolidated General Election Proposition A Ordinance calling and providing for a special election to be held in the City and County of San Francisco on Tuesday, November 6, 2018, for the purpose of submitting to San Francisco voters

More information

City and County of San Francisco

City and County of San Francisco City and County of San Francisco Controller s Office FY 2009-10 First Quarter General Fund Budget Status Report November 16, 2009 City and County of San Francisco FY 2009-10 First Quarter General Fund

More information

Fire. Public Safety D-75

Fire. Public Safety D-75 Public Safety D-75 Budget & Full-Time Equivalents (FTEs) Summary Operating $ 51,187,554 Capital $ 442,500 FTEs 229.0 Budget Programs Chart Michael W.Dyer Fire Chief Administration and Support Fire Prevention

More information

Section C. Summary Schedules

Section C. Summary Schedules Section C Summary Schedules C-1 C-2 Contents: 1. Introduction...C-4 2. Countywide Budget Overview...C-5 All Funds Budget Charts...C-5 All Funds Summary...C-6 General Fund Summary...C-7 Other Funds Summary...C-8

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

Investing in Our Schools:

Investing in Our Schools: Investing in Our Schools: History of Measures A & B & Potential New Bond Facilities Workshop Special Board Meeting July 13, 2010 Cindy Cathey, Superintendent Song Chin-Bendib, Assistant Superintendent,

More information

BUTTE COUNTY ADMINISTRATION Finance and Risk Management

BUTTE COUNTY ADMINISTRATION Finance and Risk Management BUTTE COUNTY ADMINISTRATION Finance and Risk Management 25 COUNTY CENTER DRIVE, SUITE 213 OROVILLE, CALIFORNIA 95965-3380 Telephone: (530) 538-2030 Fax: (530) 538-3831 MEMBERS OF THE BOARD BILL CONNELLY

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2015 * * *

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2015 * * * AUDIT REPORT * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180 SAN JOSE, CA 95129 Table of Contents Page No. FINANCIAL SECTION: Independent Auditor s Report... 1-2

More information

Butte County Board of Supervisors Agenda Transmittal

Butte County Board of Supervisors Agenda Transmittal Butte County Board of Supervisors Agenda Transmittal Clerk of the Board Use Only Agenda Item: 4.08 Subject: Financial Report for the Third Quarter of Fiscal Year 2013-14 Department: Administration Meeting

More information

Fiscal Impact Analysis

Fiscal Impact Analysis May 12, 2017 Fiscal Impact Analysis Westport Cupertino Development Prepared for: KT Urban, LLC Prepared by: Applied Development Economics, Inc. 1756 Lacassie Avenue, #100, Walnut Creek, CA 94596 925.934.8712

More information

Los Angeles Unified School District Page 1 of 3

Los Angeles Unified School District Page 1 of 3 Los Angeles Unified School District 333 South Beaudry Ave, Los Angeles, CA 90017 Board of Education Report File #: Rep-201-16/17, Version: 1 Amendment to the Facilities Services Division Strategic Execution

More information

Monthly Financials November 30, 2017

Monthly Financials November 30, 2017 Monthly Financials November 30, 2017 Combining All Fund Revenue, Expenditures & Monthly Financials Table of Contents Budget Comparison 1 Bank Account Balances 2 Summary of Government wide Statement of,

More information

VICE PRESIDENT, BUDGET AND CAPITAL RESOURCES, UNIVERSITY OF CALIFORNIA, OFFICE OF THE PRESIDENT

VICE PRESIDENT, BUDGET AND CAPITAL RESOURCES, UNIVERSITY OF CALIFORNIA, OFFICE OF THE PRESIDENT August 2014 VICE PRESIDENT, BUDGET AND CAPITAL RESOURCES, UNIVERSITY OF CALIFORNIA, OFFICE OF THE PRESIDENT AMENDMENT OF THE BUDGET, ENVIRONMENTAL HEALTH AND SAFETY EXPANSION, RIVERSIDE CAMPUS EXECUTIVE

More information

Budgeted Fund Structure

Budgeted Fund Structure I. Fund Type / Name ed Fund Structure as of Percent Change Over 3/31 General Fund and Sub Funds General Fund and Subfunds $ 917,708,943 $ 965,169,687 $ 2,311,394 $ 967,481,081 5.4 % $ 917,708,943 $ 965,169,687

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING MAY 15, 2018

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING MAY 15, 2018 FACILITIES COMMITTEE MEETING MAY 15, 2018 1 PROJECTS Dunlap Hall Renovation - Completed Central Plant & Infrastructure - Completed Johnson Student Center Johnson Demolition Science Center & Building J

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

March 1, Honorable Commissioners Jefferson County, West Virginia

March 1, Honorable Commissioners Jefferson County, West Virginia JEFFERSON COUNTY COMMISSION 124 East Washington Street, P.O. Box 250, Charles Town, WV 25414 Phone: (304) 7283284 Fax: (304) 7257916 Web: www.jeffersoncountywv.org PRESIDENT Peter Onoszko VICE PRESIDENT

More information

Attachment A. County of Orange FY Third Quarter Budget Report

Attachment A. County of Orange FY Third Quarter Budget Report County of Orange FY 2015-16 Third Quarter Budget Report Cover photo: Aliso Beach Designed by Publishing Services FY 2015-16 THIRD QUARTER BUDGET REPORT TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 BUDGET ISSUES...

More information

CITY OF LOS ANGELES. Detail of Department Programs. Supplement to the Proposed Budget. Volume I

CITY OF LOS ANGELES. Detail of Department Programs. Supplement to the Proposed Budget. Volume I CITY OF LOS ANGELES Detail of Department Programs Supplement to the 2015-16 Proposed Budget Volume I 2015-16 Prepared by the City Administrative Officer - April 2015 TABLE OF CONTENTS VOLUME I INTRODUCTION

More information

CITY OF SAN MATEO. Administrative Report

CITY OF SAN MATEO. Administrative Report CITY OF SAN MATEO City Hall 330 W. 20th Avenue San Mateo, CA 94403 www.cityofsanmateo.org Administrative Report Agenda Number: 9., Status: Passed TO: FROM: PREPARED BY: City Council Larry A. Patterson,

More information

Real estate: draft capital master plan

Real estate: draft capital master plan SIXTIETH WORLD HEALTH ASSEMBLY A60/5 Provisional agenda item 11.3 1 May 2007 Real estate: draft capital master plan Report by the Director-General BACKGROUND 1. It has become increasingly difficult for

More information

Executive Summary. Fiscal Year ($ millions) Total Department Uses by Major Service Area 2, ,

Executive Summary. Fiscal Year ($ millions) Total Department Uses by Major Service Area 2, , Executive Summary SAN FR ANCISCO S BUDGET The budget for the City and County of San Francisco (the City) for (FY) and FY is $7.3 billion and $7.6 billion, respectively. Roughly 52.3 percent of the budget

More information

FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014

FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014 FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014 I. INTRODUCTION A. Background The Sonoma County Board of Supervisors (the Board of Supervisors

More information

GLOSSARY OF BUDGET TERMS

GLOSSARY OF BUDGET TERMS 10-1 GLOSSARY OF BUDGET TERMS A-87 - A-87 is an Office of Management and Budget (OMB) circular or guideline that sets forth principles and standards for the determination of costs applicable to County

More information

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs: Vision Statement: Provide high quality public facilities that meet and exceed the minimum level of service standards. Goals, Objectives and Policies: Goal CIE-1. The City shall provide for facilities and

More information

Fiscal Year Proposed Budget

Fiscal Year Proposed Budget Fiscal Year 2017-2018 Proposed Budget GFOA Budget Presentation Award Recognizes budget documents of the very highest quality that reflect best practices for clearly communicating budget information. Recently

More information

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE Chapter VIII General Plan Implementation A. INTRODUCTION This chapter presents a variety of tools available to the (City) to help build the physical city envisioned in Chapter III. While the Modesto provides

More information