1 ITEM 7a REFERRAL FROM COUNCIL - 12 OCTOBER 2010 BLETCHLEY SOUTHERN BY-PASS RESOLVED - 1. That this Council will recall that in agreeing planning application No. 02/01337/OUT Proposed Mixed use of Development (Outline Planning) at land known as Newton Leys, West of Railway, South of Bletchley, Landfill Site, Drayton Road, Bletchley the Development Control Committee agreed that a corridor should be left open for a road from the A421 (H8) to connect with the Fenny Stratford Bypass. 2. That this Council notes that the existing traffic and highways infrastructre of Bletchley, particularly the A421 (Standing Way) and roads such as Shenley Road and Buckingham Road are de facto grid roads, but were never designed to deal with the current volumes of traffic and are struggling to cope. 3. That this Council believes that new developments in the Newton Leys area will place a considerable further burden upon the overloaded infrastructure in Bletchley and this should be addressed as a matter of urgency. 4. That this Council therefore calls upon the Cabinet to take immediate steps to improve Bletchley's transport infrastructure and to ease the burden of increased traffic upon local communities. The Cabinet should give urgent consideration of all measures that could achieve this, including construction of a southern bypass, improvement of the highways infrastructure in the old roads of Bletchley, traffic calming in residential areas and active steps to encourage a shift to more sustainable forms of transport such as buses, cycling or walking. (16)

2

3 ITEM 7b REFERRAL FROM AUDIT COMMITTEE - 27 OCTOBER 2010 INTERNATIONAL FINANCIAL REPORTING STANDARDS UPDATE RESOLVED - 1. That the report be noted and the delivery of the authority s accounts be endorsed. 2. That the Committee s nomination of Councillor Dransfield to adopt an interest in the project be maintained. 3. That the Committee monitors the risks identified within the project. 4. That the Committee recognises that the changes and tight timescale involved with this project will require extra work and draws Corporate Leadership Team (CLT) and Cabinet s attention to ensure that adequate resources are provided. (17)

4

5 ITEM 7c REFERRAL FROM PARTNERSHIPS AND GROWTH SELECT COMMITTEE - 28 OCTOBER 2010 LOW CARBON The Committee considered a briefing paper on the Council s Low Carbon Strategy. An updated Milton Keynes Low Carbon Living Programme Management Structure was circulated. The Committee noted the following: A project co-ordinator for the Strategy was now in place. Collaborative work on the Smart Grid scheme included work with colleges, the Open University, Milton Keynes Partnership and the business community. A Low Carbon prospectus for a Low Carbon MK had been published. Cabinet had approved the strategy at its meeting on 27 October Comments from Members included: Cabinet s adoption of the Low Carbon Strategy was welcomed. The projects within the Low Carbon Strategy should be coordinated with matching timescales and reporting systems. Though project management had improved somewhat in the Council there was still improvement to be made. The Portfolio Office should have involvement in ensuring projects in the Strategy were satisfactorily delivered. The Council should provide leadership and facilitate networking. Work in the area of transport including LTP should not be carried out in isolation. Housing stock should be at the core of the project work being carried out. Design of houses for example to promote energy efficiency was a key issue. Retrofitting was also an important element in energy efficiency. The Council should keep up-to-date with technological innovations. (18)

6 All strategies should have relation to, and fit in to, the Core Strategy. The Committee noted the work that had been carried out by staff from within the Council to assist with the Low Carbon Strategy and the need for staff resources to ensure its continued success. RESOLVED: That Cabinet be requested, as part of the budget making process, to redeploy sufficient resources to ensure the success of the Low Carbon Strategy. (19)

7 ITEM 7d REFERRAL FROM PARTNERSHIPS AND GROWTH SELECT COMMITTEE - 28 OCTOBER 2010 REGIONAL STRUCTURES OPPORTUNITIES AND ISSUES The Committee considered a report and received a presentation on the current issues for Milton Keynes following the abolition of regional structures and work in progress. The Committee considered, in particular, issues related to housing growth, the Strategic Housing Market Assessment (SHMA) and the Core Strategy. The Committee noted that Councillor Hopkins (Chair, Overview and Scrutiny Management Committee) had contacted every local authority in England requesting information on their methodology of calculating local housing need (and the replies he had received to date). The Committee also noted that Central Government had granted approval for Milton Keynes Council together with neighbouring councils and businesses to create the South East Midlands Local Enterprise Partnership (SEMLEP). The Committee was informed of the publication of the White Paper on Local Growth which provided detail on the role of the Local Enterprise Partnerships which had now been confirmed and the Regional Growth Fund. Comments from Members included: The need to assess and update the Strategic Housing Market Needs Assessment methodology in relation to housing needs prior to the independent examination stage of the Core Strategy in early 2011.This would entail a detailed discussion on the methodology used in SHMAs. The Strategic Housing Market Assessment should provide a robust, shared evidence base. All strategies should relate to the Core Strategy and be consistent and not contradictory to it. A Task and Finish Group should be set up on a 1:1:1 basis with a formal focus around Housing Needs Methodology based on evidence from expert witnesses and the content of the Core Strategy (to fulfil its aims and objectives). (20)

8 Key issues to be addressed in the SHMA include the housing needs of both a very young and an ageing population and the continued growth of the city. The impact caused by failing to meet housing needs included rising house prices, increases in HIMOs and people living in the family home for longer as they were unable to purchase their own property as house prices were out of their reach. The Local Enterprise Partnerships should be business-led and should not be the sub region re-invented. The key drivers that keep the Milton Keynes economy successful should be protected and focused on to ensure continued prosperity avoiding the decline some new towns had experienced over time. The reason for any change in key drivers should be understood. Engagement with the business community is crucial. Consideration should be given to how areas could be regenerated rather than concentrating development on greenfield sites. There was a need to ensure engagement with the development community to work together in ensuring future housing needs are met. The need for skills to match jobs as the MK economy begins to grow. RESOLVED 1. That the Strategic Housing Market Assessment (SHMA) should provide a robust shared evidence base to be considered alongside other evidence. 2. That the Overview and Scrutiny Management Committee be requested to set up a Task and Finish Group to be appointed on a 1:1:1 basis (to comprise Councillors P Geary, Long and Tamagnini-Barbosa) to review and, where necessary, develop the SHMA evidence base. 3. That Cabinet be requested to provide the appropriate resources to enable a review/update of the SHMA methodology to be carried out as soon as possible. (21)

9 ITEM 7e REFERRAL FROM COUNCIL - 9 NOVEMBER 2010 SOUTHERN BLETCHLEY (DUAL CARRIAGEWAY) BY-PASS RESOLVED - That the following matter be referred to the Cabinet to allow it to be considered alongside the referral from the Council meeting on 12 October 2010, requesting the Cabinet to consider taking steps to improve Bletchley s transport infrastructure, as set out at Minute CL64: That this Council takes into account the under-mentioned summary of events and in the interest of Milton Keynes looks forward to the necessity of dual carriageway bypass from the A421 (H8) to the A4146 roads. Furthermore the Council considers this development to be a matter of urgency in minimising the volume of traffic in Bletchley and alleviate the traffic congestion on the A421 (H8): (a) Borough of Milton Keynes Local Plan Inquiry 1992 The Inspector dealt with objections from the owners of the Newton Longville Brickworks site to Milton Keynes Borough Council s policy requiring the prior construction of the whole of the link road from the A4146 Fenny Stratford bypass to the A421 Buckingham Road (referred to locally as the Bletchley Southern bypass). The need for the prior construction of the link road was fundamental to the Council s commitment to a comprehensive redevelopment of the Newton Longville Brickworks site. The Transport Policies and Programme ( ) listed the Bletchley Southern bypass as a major scheme to be constructed during the 10 years beyond 1997/8 and to be funded by the developers of the Newton Longville Brickworks. (b) Aylesbury Vale District Council - Salden Chase Protected Link to A As requested, further amendments are to be made to facilitate the provision of the primary street along the protected link (strategic reserve) to the A4146. The Consortium are unsure as to what type of street the local authority wishes to see proposed- a grid road with no direct access or frontage, or a primary street with both direct frontage and access. Both have completely different characters and impacts on the design solutions for the locality. (22)

10 (c) Milton Keynes Council Special Development Control Committee 23 September Salden Chase Proposed Development 5.12 Bletchley Southern By-pass: Milton Keynes Council has, in its objections to the Aylesbury Vale District Council s Core Strategy and draft SPD for Salden Chase, asked for consideration to be given to the provision of the Bletchley southern by-pass in connection with this application. Whilst the inclusion of a reserve of land to protect a route for a possible future by-pass is welcomed, the Transport Assessment accompanying the planning application does not come to the conclusion that the construction of the bypass would deliver such benefits as to justify its delivery. (23)

11 ITEM 7f REFERRAL FROM COUNCIL - 9 NOVEMBER 2010 INCOMES POLICY RESOLVED - That the Policy be referred back to the Cabinet for further consideration alongside the Council Plan and a suite of other financial management policies. (24)

12

13 Democratic Services EXECUTIVE SCRUTINY PANEL THURSDAY 18 NOVEMBER PM ROOM 2, CIVIC OFFICES CENTRAL MILTON KEYNES Members of the Panel: Councillor Bint (Chair) Councillors Brackenbury, Coventry, P Geary, Hoyle, Klein, Lloyd, Maric, I McCall and Shafiq If you have any enquires about this agenda please contact Gavin Lane (Senior Committee Manager) on (01908) or Gavin.Lane@milton-keynes.co.uk Milton Keynes Council Strategy and Partnerships Directorate, Civic Offices 1 Saxon Gate East Milton Keynes MK9 3EJ Tel: Milton Keynes (01908) Fax: (01908) Hays DX Milton Keynes 1 (25)

14 The Terms of Reference of the Executive Scrutiny Panel 1. Consideration of all called-in Cabinet, individual Cabinet Member or officer decisions in accordance with the Overview and Scrutiny Procedure Rules. 2. The assessment of the effectiveness of existing policies and practices. Types of Call-In Considered by the Executive Scrutiny Panel 1. Procedural Call-In: When a decision is called-in on the basis of an alleged procedural anomaly. 2. Policy Call-In: When a decision is called-in on the basis that a decision is allegedly flawed in policy terms. (26)

15 1. Welcome and Introductions 2. Apologies 3. Minutes To approve, and the Chair to sign as a correct record, the Minutes of the meeting of the Panel held on 24 September 2010 (Item 3) (Pages 6 to 8). 4. Disclosure of Interests Members to disclose any personal or prejudicial interests they may have in the business to be transacted, and officers to disclose any interests they may have in any contract. 5. Policy Call-Ins of Cabinet Decision C089 Revisions to the Capital Programme and Spend Approvals At its meeting on 26 October 2010, the Cabinet considered proposed changes to the Council s Capital Programme and spend approvals. Following consideration of the item, the Cabinet resolved: 1. That the resource allocation and spend approval for additions to the Capital Programme be approved. 2. That the amended resource allocation and spend approval to the Capital Programme be approved. 3. That the reductions in resource allocation and spend approval to the Capital Programme be approved, subject to the deletion of the reference to the Improvements to Queensway Town Centre, Bletchley pending further consultation with Bletchley and Fenny Stratford Town Council, with the 56K identified to be held in abeyance. 4. That the revised spend approval and resource allocations for the Capital Programme be noted. 5. That the funding position for the Capital Programme be noted. 6. That the Newton Blossomville Bridleway Bridge Replacement be guaranteed funding next year. Two elements of this decision have been called-in by the following parties: (a) Councillor P Geary has called-in the decision to reduce the Newton Blossomville Bridleway Bridge Replacement project on policy grounds. The reasons provided by Councillor P Geary for the call-in are that assurances given at the Cabinet meeting about when the item would re-enter the capital scheme were subsequently not possible to honour and the delay to this project would not be in the interests of either the communities of Newton Blossomville, Cold Brayfield or the residents and taxpayers of Milton Keynes as a whole. (27)

16 (b) Councillor A Geary has called-in the decision to draw funds from the Haversham Floodspan Troughing Bridges project to support the J14 Area Improvements/Transport Multi-Modal Model on policy grounds. The reason provided by Councillor A Geary for the call-in is Unlike [Councillor] Peter [Geary], I received no such assurances [that the item would re-enter the capital scheme next year], only that the Cabinet Member would look into it and come back to me. So far I have only been sent the costs and the value of the scheme, but no assurances. The report considered by Cabinet is considered at Item 5a (Pages 9 to 20). The Panel is requested to consider the item considered by the Cabinet and the reasons for the call-in, in accordance with the Council s Constitution, and either: (a) (b) (c) refer the item back to the Cabinet, setting out the nature of the Panel s concerns; not refer the item back; or refer its views directly to the Council. (28)

17 Health and Safety Any persons attending meetings in the Council Offices are requested to take a few moments to familiarise themselves with the nearest available fire exit, indicated by the fire evacuation signs. In the event of a continuous alarm sounding during the meeting you must evacuate the building immediately and follow all instructions provided by the fire evacuation officer who will identify him/herself should the alarm sound. You will be assisted to the nearest designated assembly point until it is safe to return to the building. Any persons unable to use the stairs will be assisted to the nearest safe refuge. The yellow call point alarm will be sounded to alert the fire service as to your presence. Mobile Phones Please ensure that your mobile phone is switched to silent or is switched off completely during the meeting. Agenda Agendas and reports for the majority of the Council s public meetings can be accessed via the Internet at: Comments, Complaints and Compliments Milton Keynes Council welcomes comments, complaints and compliments from members of the public in order to make its services as efficient and effective as possible. We would appreciate any suggestions regarding the usefulness of the paperwork for this meeting, or the conduct of the meeting you have attended. Please detach the slip below and return it to the Committee Manager Meeting Attended: Executive Scrutiny Panel Date of Meeting: 18 November 2010 Comments Milton Keynes Council Strategy and Partnerships Directorate, Civic Offices 1 Saxon Gate East Milton Keynes MK9 3EJ Tel: Milton Keynes (01908) Fax: (01908) Hays DX Milton Keynes 1 (29)

18

19 ITEM 3 Minutes of the meeting of the EXECUTIVE SCRUTINY PANEL held on FRIDAY 24 SEPTEMBER 2010 at 5.30 PM Present: Councillor Lloyd (Chair) Councillors Coventry, A Geary (substituting for Councillor Bint), P Geary, Klein, Maric, I McCall, A Morris (substituting for Councillor Hoyle), Richards (substituting for Councillor Brackenbury) and Shafiq. Officers: D Hill (Chief Executive), B Sandom (Corporate Director Environment) and A Constantinides (Assistant Director of Transport), B Matthews (Head of Transport Strategy & Programmes) and L Sung (Senior Committee Manager) Also Present: Councillors Mallyon, McPake and Crooks Number of Public Present: 17 ES07 ES08 ES09 MINUTES RESOLVED - That the Minutes of the meetings of the Executive Scrutiny Panel held on 17 August 2010, be approved and signed by the Chair as a correct record. DISCLOSURE OF INTERESTS Councillors P Geary and I McCall declared a personal interest in Item 5 (Procedural and Policy Call-In of Cabinet Decision C044 A5130 Access Improvement (MK Busway)) as both were trustees of the Parks Trust. CALL-IN OF CABINET DECISION C044 A5130 ACCESS IMPROVEMENT (MK BUSWAY) The Panel considered a call-in of Cabinet Decision C044 pertaining to the A5130 improvement scheme (MK Busway) and associated contract. At its meeting on 25 August 2010, the Cabinet considered a report on the above and subsequently resolved that: EXECUTIVE SCRUTINY PANEL 24 SEPTEMBER 2010 (30)

20 1. That the outcome of the consultation on the A5130 busways scheme be noted. 2. That the changes proposed to the originally designed scheme be approved. 3. That spend approval of 4,824,729 for the purpose of the A5130 Improvement Scheme construction contract and associated project costs be approved, amounting to the balance of funds available from the Community Infrastructure Fund. 4. That it be agreed that the scheme will include and fund appropriate measures to mitigate noise and visual intrusion, with the final design of these measures subject to the completion of the assessment work. 5. That the preferred contractor selected using the Midland Highways Alliance framework be awarded the contract to construct the scheme based on the target cost price of 4,227,000. The Panel noted that the decision made by the Cabinet had been called-in on procedural and policy grounds by twenty residents of the Borough. The reasons cited for the call-in were as follows: 1. Section 151 and stage 2 complaints outstanding relating to how the money was obtained. 2. Dean Forest Way not included in CIF documentation and the CIF bid is being used to justify the scheme. 3. No proven benefit of the scheme. 4. Incomplete design being put forward, design elements that will affect Dean Forest Way residents are yet to be decided. 5. Fails to consider how existing residents of Broughton will access the city street and the likely delays residents are going to face. The Panel received comments from S Allbright. answered questions from the Panel. S Allbright The Panel received comments from M Lynch. M Lynch answered questions from the Panel. The Panel received comments from R Tetlow. R Tetlow answered questions from the Panel. EXECUTIVE SCRUTINY PANEL 24 SEPTEMBER 2010 (31)

21 The Panel received comments from P Bains. P Bains answered questions from the Panel. The Panel received comments from Councillor McPake. Councillor McPake answered questions from the Panel The Panel was requested to consider the item considered by the Cabinet and the reasons for the call-in, in accordance with the Council s Constitution, and either: (a) (b) (c) RESOLVED refer the item back to the Cabinet, setting out the nature of the Panel s concerns; not refer the item back; or refer its views directly to the Council. 1. That, in order to prevent further delay in the delivery of the A5130 Access Improvement Works (MK Busway), the decision not be referred back to the Cabinet. 2. That the Council be made aware of the Executive Scrutiny Panel s significant concerns regarding (a) (b) the inadequate length of the public consultation process in respect of the A5130 improvement works; and the Council s management of its contract, consultation and planning procurement processes, specifically in relation to the A5130 Improvement Works and the recent works at Granby Roundabout to ensure that these same issues do not re-occur in the future. THE CHAIR CLOSED THE MEETING AT 8.05 PM EXECUTIVE SCRUTINY PANEL 24 SEPTEMBER 2010 (32)

22

23 Wards Affected: All Wards ITEM 5a EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 REVISIONS TO CAPITAL PROGRAMME AND SPEND APPROVALS Author: Tim Hannam (Corporate Director of Finance & Risk Management) Tel: (01908) Nicole Jones (Assistant Director Financial Management) Tel: (01908) Purpose: This report sets out the proposed changes to the Capital Programme for. Background: This report forms part of the new capital arrangements which will help facilitate improved governance of the capital programme. This report is included within the Forward Plan as a Key Decision. All issues covered within the report are within agreed policy. 1. Recommendation(s) 1.1 That the resource allocation and spend approval for additions to the Capital Programme as detailed in Paragraph 2.2 be approved. 1.2 That the amended resource allocation and spend approval to the Capital Programme as detailed in Paragraph 2.3 be approved. 1.3 That the reductions in resource allocation and spend approval to the Capital Programme as detailed in Paragraph 2.4 be approved. 1.4 That the revised spend approval and resource allocations for the Capital Programme as detailed in the Annex be noted. 1.5 That the funding position for the Capital Programme as detailed in Paragraph 3.1 table 2 be noted. Comments and Recommendations from the responsible Cabinet Member, Councillor Crooks: I recommend that the resource allocation and spend approval additions and adjustments proposed in paragraphs be approved and that the resource allocations in the Annex and the funding position in Paragraphs 3.1 table 2 be noted. EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 (33)

24 2. Amendments to the Capital Programme 2.1 The capital programme is administered through the MK Approach, the council s agreed process for managing projects. This means that while schemes are included in the capital programme, project documentation has to be updated and appraised at a series of set review points to ensure projects deliver outcomes and provide value for money. One of these review points is the spend approval stage, where members agree to commit funds to individual projects. 2.2 Approval is sought for the new capital projects summarised below to be included in the Capital Programme. Bletchley Conservation Area Partnership Scheme Resource Allocation and Spend Approval of 200k is being requested for improvements to the historic site/buildings of the conservation area to secure its future. This is to be funded from 100k Heritage Lottery Grant, 60k Supported Borrowing, 20k Capital Receipts and 20k from S106 (developer contributions). Plugged in Places Resource Allocation and Spend Approval of 386k is being requested for the construction and implantation of charging points/posts. This is to be funded from a 286k Office for Low Emission Vehicles contribution, a 30k HCA contribution and a virement of 70k from the A421 project as detailed below. 2.3 Approval is sought for the changes to existing projects within the capital programme. The significant areas are summarised below. A421 Design of the A421 dualling project is on hold pending the conclusion of the Comprehensive Spending Review, meaning that work will not commence until early A reduction in Resource Allocation of 70k is being requested in the current year to enable the Plugged in Places project to proceed. Funding would need to be allocated to the A421 project in future years, if Government funding becomes available. Bradwell Abbey A feasibility study is currently being carried out to determine the full extent of works required at Bradwell Abbey and possible funding sources. Current Resource Allocation assumed 500k grant and MKC match funding. Until the feasibility study has been completed this resource allocation is not required. An overall reduction in Resource Allocation of 650k is being requested, 150k to enable the purchase of the Hanson Environmental Study Centre and Associated Land and the removal of 500k Grant funding which cannot be applied for at this stage. J14 Area Improvements/Transport Multi Modal model the overspend of 660k, as previously reported to Cabinet (June 2010) requires Resource Allocation and Spend Approval. The funding for this scheme is to be drawn from other Road Safety Schemes, Collision Remedial Measures, miscellaneous bus projects, Traffic Management and Haversham Floodspan Troughing Bridges projects. EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 (34)

25 Surestart (Children s Centres) Additional Resource Allocation of 124k and Spend Approval of 131k is being requested for the increased final account costs due to the inclement weather at the start of the year. This is to be funded from Sure Start Capital and Extended Schools. Children s Centres A Reduction of Extended Schools funding and removal of the ability to claim for Surestart funding carried forward from previous years as resulted in the withdrawal of Rural Children s Centre, Pebble s Children Centre, Woodlands Toilet Provision and the Art Room Remodelling from the capital programme. Resource Allocation and Spend Approval is being sought for 20k on Windmill Children s Centre to be funded from Quality & Access grant. MK Busways (A5130) A reduction in Resource Allocation and Spend Approval of 350k is being requested due to a reduction in the funding available from Community Infrastructure Funding. The scheme can be delivered within the reduced funding envelope. Second Crematorium A rephasing of funding is being requested. 500k Prudential Borrowing is to be delayed until 2011/12 and 750k of Tariff funding to be brought forward to. This is due to work accelerating on the project and it is forecast that spend will occur ahead of schedule. Education AMP Reductions in Resource Allocation and Spend Approval for Slated Row Windows, Cedars Combined School Flooring, Holne Chase Primary School Skylights, and Penwith Fire Alarm and Emergency Lighting are requested due to works being completed at a lower cost than originally planned. This funding will be returned to the AMP Contingency. Resource allocation and Spend Approval is requested for new AMP projects providing Fire Alarms and Emergency Lighting works to Howe Park, Olney Infants and Stantonbury Campus. These will be funded from the AMP Contingency. 2.4 In addressing the national budget deficit, Government announced reductions in certain grants to Local Authorities. These reductions resulted in 840k loss of non ring fenced funding to MKC s capital programme for. 2.5 Approval is sought for the reductions to existing projects within the capital programme to enable the shortfall to be absorbed. These reductions are where either spend approval had not yet been granted, and will not be required this financial year, or the projects will not require the spend approval currently granted. Where projects need to continue in the future, submissions have been made for consideration as part of the 2011/12 Capital Programme. The projects to be reduced are summarised below. Bradwell Abbey 401k CMK Primary 104k Newton Blossomville Bridleway Bridge Replacement 150k Structural Upgrades to Bridge Dec, Bridge Edges, Parapets & Bridge Joints 70k EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 (35)

26 Western Expansion Area Land Value Enhancement Property Surveyors 122k Improvements to Queensway Town Centre Bletchley 56k 2.6 Table 1 below shows how the adjustments highlighted in the sections above amend the Capital Programme. Table 1: Summary of Proposed Revisions to Capital Programme for Directorate Capital Programme as agreed at the 28 th September Cabinet Meeting Resource Allocation & Spend Approval requests for New Projects Resource Allocation Amendments & Spend Approval Requests for Existing Projects Reductions to existing projects as a result of decrease in non ring fenced funding Revised Capital Programme after Adjustments Resource Allocation Spend Approval Spend Approval not yet Requested m m m (75.414) (0.586) (1.533) (0.278) (1.811) (0.903) (0.842) (76.217) The capital programme spend approvals are requested monthly, where project managers satisfy the Capital Programme Review Panel (Corporate Director Finance and Risk Management, colleagues from Finance and the Portfolio Office, and a representative of the Corporate Leadership Team) that the project is well controlled and managed, and that funding is confirmed as available. While some projects have been through this process and been allocated spend approval, there are a number of schemes where spend approval has not been requested or where the Capital Programme Review Panel has requested further work / assurance before the scheme can be brought to Members. The value of schemes still to be given spend approval is shown in the fourth column in the Annex. The Annex Shows the revised resource allocation and spend approval, and the resource allocation where spend approval has not been requested. The forecast position for all schemes is included as part of the Revenue and Capital Budget Monitoring Report elsewhere on this agenda. The annexes EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 (36)

27 to the Revenue and Capital Budget Monitoring Report show the detailed changes to spend approval referred to in this report. 3. Financing of the Capital Programme 3.1 Table 2 below shows the funding position for the Capital Programme. Table 2: Financing of the Capital Programme Funding Type Capital Programme m Capital Reserve Capital Receipts Supported Borrowing - Single Capital Pot Single Capital Pot - Grants Supported Borrowing - Separate Programme Element Prudential Borrowing (1.449) Government Grants S Planning Gain Other Third Party Contributions Parking Income Other Revenue Contributions Total Implications 4.1 Policy The recommendations of this report are consistent with the Council s Capital Strategy. 4.2 Resources and Risk Capital implications are fully considered throughout the report. Revenue implications may arise from capital schemes in respect of: a) Borrowing to fund capital expenditure (principal and interest), b) Running costs associated with capital schemes, and c) Efficiency savings (e.g. reduced maintenance costs). These are built into the Council s debt financing and other revenue budgets as appropriate through the Medium Term Planning process. Y Capital Y Revenue N Accommodation EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 (37)

28 N IT Y Medium Term Plan N Asset Management 4.3 Carbon and Energy Management 4.4 Legal All capital schemes consider Carbon and Energy Management implications at the capital appraisal stage before they are added to the capital programme. There are no further implications as a result of this report. Legal implications may arise in relation to specific capital schemes. In particular a capital scheme may be needed to meet a specific legal requirement. These implications are addressed in the individual project appraisals. There are no significant legal implications arising as a result of this report. 4.5 Other Implications There are no other implications arising as a result of this report. N Equalities / Diversity Y Sustainability N Human Rights N E-Government N Stakeholders N Crime and Disorder N Carbon and Energy Policy Background Papers: Officer Working Papers, report to all Members Previous reports to both Cabinet and Council as mentioned within the body of the report EXECUTIVE SCRUTINY PANEL 18 NOVEMBER 2010 (38)

29 Schemes in the Current Capital Programme ANNEX Scheme Title Total Resource Allocation (All Years) Resource Allocation Spend Approval Spend Approval not Requested 000's 000's 000's 000's Children and Young People Children's Centre Contingency Oxley Park Children's Centre Phase Three Children's Centre Programme CC304 East Flank Children's Centre CC305 Furzton Children's Centre CC306 Grange Farm Children's Centre Simpson Children's Centre Rural Children's Centre CC309 - Pebble's Children's Centre CC310 - The Art Room Remodelling CC312 - Woodlands Toilet Provision Galley Hill Education Centre Hall & Heating The Windmill Children's Centre Giles Brook Combined School 6, Shenley Brook End School Final Phase 7, Oakgrove Secondary Phase 1a 15, Hazeley Secondary School Phase 1 15, Lord Grey-SSR Extension 2, Ousedale -SSR Extension 15, New Walnut (Special School) 8, Oakgrove Secondary School - Phase 2 10, Hazeley Secondary School Phase 2 6, CMK Primary (SRQ) New Tattenhoe Park Primary School 8, Walton High (Phase 1a) 8, Extension for Furze House Brooklands Farm Primary School (New Eastern Expansion 1) 8,122 3,789 3,789 0 Non School Education Priorities Leon (New Library Block) TCF Scheme 1, Lord Grey School TCF 7, New Waterhall School Targeted Capital Scheme 6, Capitalise significant element of Development Teams Budget 10% Giffard Park Primary - Rextension & Adaptation Wellsmead Primary 3, Oakgrove Secondary Phase 3 9, Hazeley Secondary School Phase 3 11, The Base Relocation 1, Integrated Children's Services Grant Stantonbury Windows and Doors Brooksward Windows and Doors Knowles Infant Windows and Doors School Security Holne Chase PIP Walton High School (Additional 1 Form Of Entry) 6,587 4,822 4,822 0 Schools Access Initiative 2008/09 1,447 1,060 1,060 0 West Bletchley Review (Rickley) 7,971 3,544 3,544 0 ICT Capital Grant for Mobile Technology to Support Children's Social Workers Radcliffe Replacement Heating Chestnuts PIP Hanslope Heating Cold Harbour Boilers Brooksward Boilers (39)

30 Scheme Title Total Resource Allocation (All Years) Resource Allocation Spend Approval Spend Approval not Requested 000's 000's 000's 000's Milton Keynes Academy 30, Walton High Roof Replacement Music Centre - New Build 1, Hazeley Secondary School Phase 4 2, Green Park Drainage Works Diplomas / SEN Accomodation Scheme - Stantonbury School Accomodation Scheme - Denbigh School Accomodation Scheme - MK College School 1,500 1,500 1, Accomodation Scheme - Ousedale School Accomodation Scheme - Shenley Brook End School Provision of Kitchen and Dining Facilities Stanton Middle School W/D Falconhurst Primary School Heating Ousedale School Windows and Doors Holne Chase Primary School Skylights Sir Frank Markham Alterations Slated Row Windows Cedars Combined School Flooring Greenleys First School Windows Simpson Fire Alarm Russell First School Windows and Doors Brooksward Fire Alarm and Lighting Drayton Park Fire Alarm Tickford Park Fire Alarm Summerfield Fire Alarm Germander Park Fire Alarm Penwith Fire Alarm and Emergency Lighting Oxley Park Primary School - Additional Form of Entry Harnessing Technology AMP Programme 2010/2011 1,257 1, ,257 Galley Hill Education Centre: Extension of Large Car Park Galley Hill Education Centre: Resurfacing of Access Road / Small Carpark and Renovation of Footpaths Cedars Stonework Castlethorpe School Ceiling Summerfield School Boiler Stantonbury Block 1 Boiler Lavendon School Roofing Hanslope School Roofing Alterations and Adaptations to Wellsmead Infants School Two Mile Ash Heating Knowles Junior School Heating Loughton School Heating Heronsgate School Heating Penwith School Roofing Heelands Fire Alarm and Emergency Lighting Wood End Fire Alarm and Emergency Lighting Glastonbury Thorn Fire Alarm and Emergency Lighting Hanslope Fire Alarm and Emergency Lighting Merebrook Fire Alarm and Emergency Lighting Heronshaw Fire Alarm and Emergency Lighting St Mary's Wavendon Fire Alarm and Emergency Lighting Howe Park Fire Alarm and Emergency Lighting Olney Infant Fire Alarm and Emergency Lighting (40)

31 Scheme Title Total Resource Allocation (All Years) Resource Allocation Spend Approval Spend Approval not Requested 000's 000's 000's 000's Stantonbury Campus Fire Alarm and Emergency Lighting Bushfield School Heating Ashbrook School Heating Germander Park Fencing Green Park Fencing Gatehouse Special School 1, Romansfield Special School White Spire Special School 1, Aiming High for Disabled Children (AHDC) : Short Breaks Programme Adoptions & Fostering Service - Building Adaptations and Car Purchase for Children in Care & Placed for Adoption Bletchley Youth Centre Redevelopment Permanence for Children in Care - Adaptation to Carer Property (Extension to Carer Property - A) Permanence for Children in Care - Adaptation to Carer Property (Annex to Adoptive Carer Proporty - B) Permanence for Children in Care - Adaptation to Carer Property (Loft Conversion on Carer Property - C) Aids to Daily Living for Children with Severe Disabilities Music Service-Relocation of Modular Classrooms Resurface Play Area MK Intervention Centre Palace Day Nursery-Garden and Patio King Edwards Nursery-Canopy World Class Primary-Knowles Primary School Amalgamation World Class Primary-Oldbrook Infant School Newton Leys Primary School 9, Western Expansion Primary 1 9, Western Expansion Area Secondary 1 22, Middleton Primary 2 Classroom Extention 5, Total Children and Young People Capital Programme 276,820 33,442 29,357 4,085 Environment A428 Warrington (West of A509 Warrington Roundabout) Carriageway Reconstruction Theatre Car Park Refurbishment Stoke Goldington flood alleviation scheme Renewal of Highway surface water drains Unclassified/Estate Road Resurfacing - Various Locations Surface Dressing Footway Reconstruction Works - Various Locations 1, Bus Information Infrastructure Haversham Floodspan Troughing Bridges - Structural Improvements Western Underwood Bridge Pedestrian Access Bridge Loughton Footpath 23 Bridge and path rebuild Central Milton Keynes Public Transport Access Improvements 5,000 5, ,000 A5130 Access Improvements (MK Busway) 5,250 4,825 4,825 0 Milton Keynes Multi Modal Model Urban Traffic Calming - New Bradwell Community Transport - Additional minibuses B&Q - Junction Improvements Scheme 1, Granby Roundabout - 4th Arm 1,178 1,138 1,138 0 CMK Station Square Approach 3,848 2, ,959 Wolverton Station 2,170 1,683 1,683 0 Road Safety Route Actions Newport Pagnell Riverside Meadow-Footpath Reconstruction Collision Remedial Measures 2008/09 Cluster Sites (1) Lorry Management Pedestrian Facilities - Various (41)

32 Scheme Title Total Resource Allocation (All Years) Resource Allocation Spend Approval Spend Approval not Requested 000's 000's 000's 000's Vehicle Parapet Upgrades Phase Street Light Column Replacement Weak Bridge Deck Edges / Parapet Supports Newton Blossomville BW Bridge Interchange Building (Coachway) 2, Footway Construction / Reserfacing Schemes - Various Locations Structural Upgrades to Bridge Decs, Bridge Edges, Parapets & Bridge Joints 1,110 1,110 1,110 0 Underpass Pump / Control Boxes Renewal - Various Locations Non-Principle Roads - Carriageway Resurfacing Schemes - Various Locations Principle Roads - Carriageway Resurfacing Schemes - Various Locations Unclassified Rd & Town C - Carriageway Resurfacing Schemes - Various Locations Improvements and Contruction of Community Wellbeing Roads and Footways 1, Stoke Goldington & Tathall End Flood Alleviation Schemes The Upgrade of Grid Road, Estate & Redway Street Lighting Columns Renewal of Highway Carrier Drains - Various Locations Redway Construction Schemes - Various Locations Bus Service Information Rural & Urban Bus Passenger Access Quality Bus Initiative - Bus Routes Newton Blossomville Bridleway Bridge Replacement Monkston & Brinklow (V11) Improvements 3,000 1, ,500 A421 Dualling (M1 J13 to MK) 27, Traffic Management Road Safety Schemes Car Parking Improvements Cycle & Pedestrian Facilities Provision of New Covered Salt Dome at Bleak Hall Depot Improved Rural Bus Passenger Access Improved Urban Bus Passenger Access Redway Improvements-Wayfinding Traffic Management Works (Safety Related) Cycle Routes School Zig Zags Casualty Reduction Measures Adjustment required re 2009/10 J14 Overspend 25, Second Crematorium at Crownhill 6,058 3,997 3,997 0 Stacey Bushes ERLAS path reconstruction Green Space Provision 3,380 1,871 1,871 0 MK Play Builder Project 1, Western Expansion Area Land Value Enhancement Urban Design New Waste Depot at Colts Holm Road, Old Wolverton 2,117 2, ,917 Linear Park/Hanson Centre Renewable Energy Improvements to Emberton Park:Toilets and Access Roads Emberton Park Improvements Carbon Managemnet Programme - Phase Community Parking Fund Play Area Enhancement for Areas of High Deprivation Biomass Installation at Synergy Park Biomass Installation at Central Library MK Anaerobic Digester Gas Injection Plant 1,500 1,500 1,500 0 Railway walk lost track of time Bradwell Abbey Improvements Programme (42)

33 Scheme Title Total Resource Allocation (All Years) Resource Allocation Spend Approval Spend Approval not Requested 000's 000's 000's 000's Community Parking Fund Refurb Saxon Court Play Area Improvement Fund Play Area Improvement Fund Heelands Local Centre Heelands Improvement Project Development Control Improvement Programme Plugged in Places Bletchley Conservation Area Partnership Scheme Total Environment Capital Programme 109,170 37,681 25,129 12,552 Finance and Risk Management Western Expansion Area Common Infrastructure 27,700 2, ,987 Western Expansion Area Land Value Enhancement Property Surveyors Replacements and Improvements Saxon Court Upgrade of Chillers at Civic Offices Improvement of the Council Chamber Local Land and Property Gazetteer EDRMS Essential Works on Computer Rooms Corporate GIS Mobile Computing Care First System Upgrade or Replacement New Call Management System MK Digital / Telehealth Saxon Court 'Building Management System' Unix Systems Resilience Employee Authentication Scheme (EAS) Telephone Resiliency Project Total Finance and Risk Management Capital Programme 29,350 2, ,312 Strategy and Partnerships Elections and Electoral Registration Software Replacement Improvements to Queensway Town Centre Bletchley Total Strategy and Partnerships Capital Programme (43)

34 Scheme Title Total Resource Allocation (All Years) Resource Allocation Spend Approval Spend Approval not Requested 000's 000's 000's 000's Community Wellbeing GF Medbourne Pavilion Playing Fields & Facilities Tattenhoe District Park Pavilion & Drainage Willen Village Extension Bletchley Leisure Centre Redevelopment and Town Centre Living Project 21,340 1,093 1,093 0 Emerson Valley Sports Pavilion 2,455 1,377 1,377 0 Olney Library Extension of Public Space Bletchley Leisure Centre Fit Out Westcroft Pavilion Central Library Dome Replacement and Refurbishment of Heating and Ventilation Broughton Pavilion (EEA 1 LC14) 2,200 2, ,850 Westcroft Library - Relocation and Expansion Kingston Library - Internal Fittings & Fixtures Oxley Park Community Centre Wolverton Pool & Associated Facilities 7,900 4, ,500 Libraries MIS Replacement CMK Library: Meet DDA Requiremnets Great Linford Barn Roof Building Enhancements Trinity Centre Fishermead Hodge Lea Pavilion Build a new CCTV Monitoring Room at the CMK Police Headquarters Health & Safety Aids & Adaptations Health & Safety St, Giles Centre of Excellence Replace and Upgrade Heating Distribution System at St. Giles Re-Development of Calverton Traveller's Site 1, Disabled Facilities Grant 1, Development Of Fenny Lock Traveller's Site 1,821 1,681 1,681 0 Disabled Facilities Grant 1,083 1,083 1,083 0 Improving Information Systems for S.C Total Community Wellbeing GF Capital Programme 43,018 14,167 8,722 5,445 Community Wellbeing HRA IT Business Improvements 2007/ IT Business Improvements 2008/ Estate Improvement Grants Heating Replacements 4, Loft & Cavity Wall Insulation Asbestos Management-Housing Stock Urgent Failing Components Urgent Failing Components Asbestos Management Decent Homes Programme 4, Decent Homes Programme 4,790 4,790 4,790 0 Disabled Adaptations Heating Installation 5,679 5,679 5,679 0 Loft & Cavity Wall Insulation Total Community Wellbeing HRA Capital Programme 22,634 12,328 12,328 0 Re-engineering of GAF projects (1,910) Total Capital Programme 479, ,613 76,219 24,394 (44)

REVISIONS TO CAPITAL PROGRAMME AND SPEND APPROVALS REPORT

REVISIONS TO CAPITAL PROGRAMME AND SPEND APPROVALS REPORT Wards Affected: All Wards ITEM 10 CABINET 12 SEPTEMBER 2017 REVISIONS TO CAPITAL PROGRAMME AND SPEND APPROVALS REPORT Responsible Cabinet Member: Report Sponsor: Author and contact: Councillor Middleton

More information

SUMMONS TO A MEETING of MILTON KEYNES COUNCIL

SUMMONS TO A MEETING of MILTON KEYNES COUNCIL Democratic Services SUMMONS TO A MEETING of MILTON KEYNES COUNCIL TUESDAY 21 FEBRUARY 2012 7.30 PM COUNCIL CHAMBER, CIVIC OFFICES CENTRAL MILTON KEYNES John Moffoot Assistant Director (Democratic Services)

More information

Tariff Risk Management Plan

Tariff Risk Management Plan Tariff Risk Management Plan June 2012 Table of Contents EXECUTIVE SUMMARY... PRINCIPLES OF THE TARIFF...2 SUCCESS OF THE TARIFF...4 LEGAL REQUIREMENTS FOR DELIVERY...7 CURRENT HEADLINE TARIFF POSITION...7

More information

ITEM 5(c) MKDP Quarterly Update June Executive Summary

ITEM 5(c) MKDP Quarterly Update June Executive Summary ITEM 5(c) MKDP Quarterly Update June 2018 Executive Summary Milton Keynes Development Partnership (MKDP) is an independent legal entity wholly owned and accountable to Milton Keynes Council. The publication

More information

Minutes of the meeting of the CABINET held on TUESDAY 7 NOVEMBER 2017 at 6.30 pm

Minutes of the meeting of the CABINET held on TUESDAY 7 NOVEMBER 2017 at 6.30 pm ITEM 3 Minutes of the meeting of the CABINET held on TUESDAY 7 NOVEMBER 2017 at 6.30 pm Present: Officers: Councillor Marland (Chair) Councillors Gifford, Gowans, Long, and O Neill C Mills (Chief Executive),

More information

MILTON KEYNES SCHOOLS FORUM

MILTON KEYNES SCHOOLS FORUM MILTON KEYNES SCHOOLS FORUM Margaret Powell House, 401 Midsummer Boulevard MINUTES OF THE MEETING HELD ON 14 JUNE 2018 AT 3.00 PM PRESENT: Primary School Governors Paul Hussey Bradwell Village Primary

More information

S M A L L S T E P S B I G C H A N G E S

S M A L L S T E P S B I G C H A N G E S page 1 S M A L L S T E P S B I G C H A N G E S 1 CONTENTS PAGE 2 INTRODUCTION 3 SCOPE 2. INTRODUCTION 2 3. SCOPE 2 4. IDEAL LAYOUT 3 5. BASIS FOR BUDGETARY ANALYSIS 4 6. WARD LOCATIONS 5 7. WARD URBAN

More information

DARTFORD BOROUGH COUNCIL CABINET. MINUTES of the meeting of the Cabinet held on Thursday 28 July 2016 at 7.00 pm

DARTFORD BOROUGH COUNCIL CABINET. MINUTES of the meeting of the Cabinet held on Thursday 28 July 2016 at 7.00 pm DARTFORD BOROUGH COUNCIL CABINET MINUTES of the meeting of the Cabinet held on Thursday 28 July 2016 at 7.00 pm PRESENT: Councillor J A Kite, MBE (Chairman) Councillor Mrs A D Allen, MBE Councillor P F

More information

CITY OF EDINBURGH COUNCIL KEY FACTS and FIGURES

CITY OF EDINBURGH COUNCIL KEY FACTS and FIGURES CITY OF EDINBURGH COUNCIL KEY FACTS and FIGURES 2 0 1 4-2 0 1 5 C O N T E N T S Page Introduction 2 2014-2015 Revenue Budget The Funding of the City Council Services 3 Summary of Charges to be Levied 4

More information

MILTON KEYNES SCHOOLS FORUM

MILTON KEYNES SCHOOLS FORUM MILTON KEYNES SCHOOLS FORUM Margaret Powell House, 401 Midsummer Boulevard MINUTES OF THE MEETING HELD ON 11 JANUARY 2018 AT 3.00 PM PRESENT: Primary School Representatives Kirk Hopkins Oldbrook School

More information

Minutes of the DEVELOPMENT CONTROL COMMITTEE held on THURSDAY 01 OCTOBER 2015 at 7.00 pm.

Minutes of the DEVELOPMENT CONTROL COMMITTEE held on THURSDAY 01 OCTOBER 2015 at 7.00 pm. ITEM 3(b) Minutes of the DEVELOPMENT CONTROL held on THURSDAY 01 OCTOBER 2015 at 7.00 pm. Present: Officers: Apologies: Councillor A Geary (Chair) Councillors: Baume, Bint, Buckley, Green, Gowans, Lewis,

More information

Wards affected: All Wards ITEM 12 CABINET 6 DECEMBER 2016 DRAFT COUNCIL BUDGET 2017/18

Wards affected: All Wards ITEM 12 CABINET 6 DECEMBER 2016 DRAFT COUNCIL BUDGET 2017/18 Wards affected: All Wards DRAFT COUNCIL BUDGET 2017/18 ITEM 12 CABINET 6 DECEMBER 2016 Responsible Cabinet Member: Councillor b Middleton (Cabinet member for Resources and Innovation) Report Sponsor: Nicole

More information

Democratic Services CABINET TUESDAY 4 DECEMBER PM COUNCIL CHAMBER, CIVIC CENTRAL MILTON KEYNES AGENDA Members of the Cabinet: Councillor Cou

Democratic Services CABINET TUESDAY 4 DECEMBER PM COUNCIL CHAMBER, CIVIC CENTRAL MILTON KEYNES AGENDA Members of the Cabinet: Councillor Cou Democratic Services CABINET TUESDAY 4 DECEMBER 2018 6.30 PM COUNCIL CHAMBER, CIVIC CENTRAL MILTON KEYNES AGENDA Members of the Cabinet: Councillor Councillors Marland (Leader of the Council) Gowans, Legg,

More information

Flitwick Leisure Centre

Flitwick Leisure Centre Meeting: Executive Date: 14 May 2013 Subject: Flitwick Leisure Centre Report of: Cllr Spurr, Executive Member for Sustainable Communities Services Summary: To procure a consultant in project management

More information

2 nd March, 2017 Corporate Report Format. To the Chair and Members of the COUNCIL CAPITAL PROGRAMME 2017/18 TO 2020/21 EXECUTIVE SUMMARY

2 nd March, 2017 Corporate Report Format. To the Chair and Members of the COUNCIL CAPITAL PROGRAMME 2017/18 TO 2020/21 EXECUTIVE SUMMARY 2 nd March, 2017 Corporate Report Format To the Chair and Members of the COUNCIL CAPITAL PROGRAMME 2017/18 TO 2020/21 EXECUTIVE SUMMARY Capital Programme Budget Proposal 1. Doncaster Council continues

More information

Draft for Consultation

Draft for Consultation Draft for Consultation Road Asset Management Plan RAMP DRAFT 2018-2024 2 F o r e w o r d This plan sets out the council s plans for the management of the council s road asset for the next 6 years and beyond.

More information

Cabinet. Tuesday, 07 November :30. Council Chamber. Civic Offices. Members of the Cabinet:

Cabinet. Tuesday, 07 November :30. Council Chamber. Civic Offices. Members of the Cabinet: Democratic Services Cabinet Tuesday, 07 November 2017 18:30 Council Chamber Civic Offices Members of the Cabinet: Councillor Marland (Leader of the Council), Gifford, Gowans, Legg, Long, Middleton, O Neill

More information

Winchester District Councillor Annual Report - March 2019

Winchester District Councillor Annual Report - March 2019 Winchester District Councillor Annual Report - March 2019 Cllr Vicki Weston s Annual Report Winchester City Council Freezes Council Tax There will be more money in the pockets of residents as Winchester

More information

Section 4 C: Corporate and Managed Services Overview. Services to be provided

Section 4 C: Corporate and Managed Services Overview. Services to be provided Section 4 C: Corporate and Managed Services Overview Services to be provided Customer Service and Transformation is focused on fuelling the change that the Council is going through. We deliver some of

More information

CORONATION HALL HIRING AGREEMENT FOR SINGLE EVENTS

CORONATION HALL HIRING AGREEMENT FOR SINGLE EVENTS CORONATION HALL HIRING AGREEMENT FOR SINGLE EVENTS BOOKING FORM Full name of Hirer:.. Address: Email:...Phone: Mobile:. Date of Function: Type of Function*: *Please tick to confirm that this is not an

More information

PROPOSED PUBLICATION AND SUBMISSION OF SITE ALLOCATIONS PLAN

PROPOSED PUBLICATION AND SUBMISSION OF SITE ALLOCATIONS PLAN Wards Affected: All Wards ITEM 10 CABINET 6 SEPTEMBER 2016 PROPOSED PUBLICATION AND SUBMISSION OF SITE ALLOCATIONS PLAN Responsible Cabinet Member: Report Sponsor: Author and contact: Councillor Gifford,

More information

CABINET ALLOCATION OF FUNDING FOR SCHOOL PLACES

CABINET ALLOCATION OF FUNDING FOR SCHOOL PLACES Report No: 219/2016 PUBLIC REPORT CABINET 20 December 2016 ALLOCATION OF FUNDING FOR SCHOOL PLACES Report of the Director of Places (Development and Economy) Strategic Aim: To deliver sustainable growth

More information

COUNCIL CHAMBER, CIVIC OFFICES

COUNCIL CHAMBER, CIVIC OFFICES Democratic Services BUDGET REVIEW GROUP MONDAY 30 MARCH 2015 6.30 PM COUNCIL CHAMBER, CIVIC OFFICES A G E N D A www.milton-keynes.gov.uk/scrutiny Councillor Councillors Councillors Brackenbury (Chair)

More information

INVITATION TO TENDER PROVISION OF HOUSING RELATED SUPPORT SERVICES FOR VULNERABLE PEOPLE (REF: ASC0016)

INVITATION TO TENDER PROVISION OF HOUSING RELATED SUPPORT SERVICES FOR VULNERABLE PEOPLE (REF: ASC0016) Wards Affected: All Wards. ITEM 6 PROCUREMENT & COMMISSIONING 15 DECEMBER 2015 INVITATION TO TENDER PROVISION OF HOUSING RELATED SUPPORT SERVICES FOR VULNERABLE PEOPLE (REF: ASC0016) Responsible Cabinet

More information

Overview. Appendix No. Description. Appendix B1

Overview. Appendix No. Description. Appendix B1 Appendix B1 Overview Appendix No B1 B2 Description Overview Capital Monitoring Summary This report takes each Directorate in turn, in the format : a) capital budget changes b) forecast variations from

More information

Draft Development Contribution Scheme Carlow County Council DRAFT. Development Contribution Scheme

Draft Development Contribution Scheme Carlow County Council DRAFT. Development Contribution Scheme Carlow County Council DRAFT Development Contribution Scheme 2016-2021 Section 48 Planning & Development Act 2000 (as amended) Draft: November, 2016 Page 1 Carlow County Council Contents 1. Introduction

More information

This report will be made public on 19 May 2014.

This report will be made public on 19 May 2014. This report will be made public on 19 May 2014. Report Number C/14/01 To: Cabinet Date: 28 th May 2014 Status: Key Decision Director: Jeremy Chambers, Policy and Strategic Initiatives Cabinet Member: Councillor

More information

Minutes of the Hanslope Parish Council Monthly Meeting held in the Village Hall, Newport Road, Hanslope on Monday 12 th June 2017 at 7.

Minutes of the Hanslope Parish Council Monthly Meeting held in the Village Hall, Newport Road, Hanslope on Monday 12 th June 2017 at 7. Hanslope Parish Council Clerk: Juliet Lewis Telephone: 07874 824806 hanslopeparishcouncil@hotmail.com Minutes of the Hanslope Parish Council Monthly Meeting held in the Village Hall, Newport Road, Hanslope

More information

Appendix J Western Corridor Regeneration Scheme. Benefits Realisation Plan & Monitoring and Evaluation Plan

Appendix J Western Corridor Regeneration Scheme. Benefits Realisation Plan & Monitoring and Evaluation Plan Appendix J Western Corridor Regeneration Scheme Benefits Realisation Plan & Monitoring and Evaluation Plan April 2014 [Final Report] Strategic Transportation Planning Torbay Council 2nd Floor Electric

More information

A421 Dualling Project - Memorandum of Understanding and Compulsory Purchase Order

A421 Dualling Project - Memorandum of Understanding and Compulsory Purchase Order Central Bedfordshire Council Executive Tuesday 2 August 2016 A421 Dualling Project - Memorandum of Understanding and Compulsory Purchase Order Joint Report of Cllr Brian Spurr, Executive Member for Community

More information

BOROUGH OF POOLE CABINET 12 JUNE 2018 BOROUGH OF POOLE CABINET. 12 June 2018

BOROUGH OF POOLE CABINET 12 JUNE 2018 BOROUGH OF POOLE CABINET. 12 June 2018 Present: BOROUGH OF POOLE CABINET 12 June 2018 Councillor Mrs Janet Walton (Chairman) (Leader of the Council) Councillor Mrs May Haines (Vice Chairman) (Deputy Leader of the Council) Councillors: Challinor,

More information

Environment and Sustainability Committee

Environment and Sustainability Committee Student and Academic Services Environment and Sustainability Committee 12/21 A meeting of the Environment and Sustainability Committee was held on Friday 15 June 2012 in Room 201, Henley Business School.

More information

Dublin City Council Development Contribution Scheme (under Section 48, Planning & Development Act, 2000 as amended)

Dublin City Council Development Contribution Scheme (under Section 48, Planning & Development Act, 2000 as amended) Dublin City Council Development Contribution Scheme 2010-2017 (under Section 48, Planning & Development Act, 2000 as amended) 1 of 10 INTRODUCTION 1. Sub-section (1) of section 48 of the Planning and Development

More information

Smarter Green. accelerating people s transition out of reablement or into. are entitled to. Charging for reablement services after

Smarter Green. accelerating people s transition out of reablement or into. are entitled to. Charging for reablement services after -88 0 0 0 0.0 Sustainable Green -100 0 0 0 1.0 Smarter Green Total Care -3,065-80 -1,800-2,000 3.0 ANNEX C(ii) DRAFT - Medium Term Income Rob Middleton Resources S156 Kamran Rashid Charge all capital development

More information

COMMITTEE PARKS DEVELOPMENT HALF-YEAR REVIEW KEY DECISION NO

COMMITTEE PARKS DEVELOPMENT HALF-YEAR REVIEW KEY DECISION NO ENCLOSURE 11.1 CANNOCK CHASE COUNCIL CABINET 20 NOVEMBER 2008 REPORT OF THE DIRECTOR OF ORGANISATIONAL IMPROVEMENT RESPONSIBLE PORTFOLIO LEADER CHILDREN & YOUNG PEOPLE POLICY DEVELOPMENT 1. Purpose of

More information

(a) Bicycle Storage Facility: 26,150. (b) Camley Street Natural Park Centre: 176,550. (c) Community Meeting Facilities: 448,500

(a) Bicycle Storage Facility: 26,150. (b) Camley Street Natural Park Centre: 176,550. (c) Community Meeting Facilities: 448,500 King s Cross Development Forum Extracts from the Section 106 Agreement for King s Cross Central The relevant Facilities and the amount of the Facility Bond for each such Facility are as follows: (a) Bicycle

More information

WOKING BOROUGH COUNCIL BUDGET STATEMENT

WOKING BOROUGH COUNCIL BUDGET STATEMENT WOKING BOROUGH COUNCIL BUDGET STATEMENT 2012/13 COUNCILLOR JOHN KINGSBURY LEADER OF THE COUNCIL 16 FEBRUARY 2012 WOKING BOROUGH COUNCIL BUDGET STATEMENT BY THE LEADER OF THE COUNCIL Mr Mayor, fellow Councillors,

More information

Northern Corridor Area Transport Plan. Contents

Northern Corridor Area Transport Plan. Contents Northern Corridor Area Transport Plan Page 1 of 16 Northern Corridor Area Transport Plan Contents 1. Introduction... 3 Strategic Transport Schemes... 4 2. Policy Background... 4 3. The Northern Corridor

More information

Council. Date: Monday 12 February Council Chamber, County Hall, Norwich. Supplementary Agenda

Council. Date: Monday 12 February Council Chamber, County Hall, Norwich. Supplementary Agenda Council Date: Monday 12 February 2018 Time: Venue: 10.00 a.m Council Chamber, County Hall, Norwich Supplementary Agenda 4. Supplementary Information to Item 4 Revenue and Capital Budget 2018-22. Report

More information

Community Infrastructure Levy Neighbourhood Planning Toolkit

Community Infrastructure Levy Neighbourhood Planning Toolkit Community Infrastructure Levy Neighbourhood Planning Toolkit Written by Lorraine Hart, Community Land Use Table Of Contents Introduction... 3 Essential background... 4 The links between neighbourhood planning

More information

North Ayrshire Council

North Ayrshire Council NORTH AYRSHIRE COUNCIL North Ayrshire Council 28 February 2018 Title: Capital Investment Programme 2018/19 to 2027/28 Purpose: To advise Council on the draft Capital Investment Programme to 2027/28 Recommendation:

More information

CENTRAL BEDFORDSHIRE COUNCIL PRESENT. Cllr J G Jamieson (Chairman) Cllr R D Wenham (Vice-Chairman) K M Collins Mrs T Stock

CENTRAL BEDFORDSHIRE COUNCIL PRESENT. Cllr J G Jamieson (Chairman) Cllr R D Wenham (Vice-Chairman) K M Collins Mrs T Stock CENTRAL BEDFORDSHIRE COUNCIL At a meeting of the EXECUTIVE held in the Council Chamber, Priory House, Monks Walk, Shefford on Tuesday, 7 August 2018. PRESENT Cllr J G Jamieson (Chairman) Cllr R D Wenham

More information

achieving results in the public sector Kāpiti Coast District Council Financial Investigation of a Kāpiti Coast Unitary April 2013

achieving results in the public sector Kāpiti Coast District Council Financial Investigation of a Kāpiti Coast Unitary April 2013 AUCKLAND SYDNEY BRISBANE PERTH Kāpiti Coast District Council Financial Investigation of a Kāpiti Coast Unitary achieving results in the public sector TABLE OF CONTENTS 1. INTRODUCTION... 1 2. METHODOLOGY...

More information

Balanced year end position Remain within overall resources. Monthly Indicators Red Amber Green Total Year-end actual (Number of.

Balanced year end position Remain within overall resources. Monthly Indicators Red Amber Green Total Year-end actual (Number of. Appendix A Assets and Investment Finance and Performance Report Final Report 2016/17 1. SUMMARY 1.1 Finance Previous Status N/A N/A Category Income and Expenditure Capital Programme Target Balanced year

More information

14 March 2017 Corporate Report Format

14 March 2017 Corporate Report Format 14 March 2017 Corporate Report Format To the Chair and Members of Cabinet APPROVAL TO ENTER INTO A FUNDING AGREEMENT WITH SHEFFIELD CITY REGION TO BE ABLE DRAW DOWN SCRIF APPROVED FUNDING FOR THE DELIVERY

More information

Housing) Duncan Sharkey (Corporate Director Place) Michael Kelleher (Service Director Housing and Regeneration) Tel:

Housing) Duncan Sharkey (Corporate Director Place) Michael Kelleher (Service Director Housing and Regeneration) Tel: Wards Affected: All Wards ADDITIONAL ITEM CABINET 3 OCTOBER 2017 PROPOSED HOUSING AND REGENERATION RESTRUCTURE Responsible Cabinet Member: Report Sponsor: Author and contact: Councillor Long (Cabinet Member

More information

COUNCIL MEETING. 25 February 2016

COUNCIL MEETING. 25 February 2016 COUNCIL MEETING 25 February 2016 Present The Chairman (Councillor Mason) and Councillors Barrett, Brockbank, Dawson, English, Mrs Fairbank, Foster, Harbron, Heseltine, Hull, Jaquin, Kerwin-Davey, Madeley,

More information

146. Apologies for absence, declarations of interest or any other communications from Members

146. Apologies for absence, declarations of interest or any other communications from Members At a meeting of the Cabinet held on Tuesday, 26 April 2016 at 7:00 pm in the Council Chamber, Civic Centre, Lampton Road, Hounslow. Present: Councillor Steve Curran (Chair) Councillors Tom Bruce, Theo

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Budget Savings Proposal Summary 2018/19 for Consultation. Saving. Budget. Other Spend. Employee Costs. Risk Analysis. Income TBC 2018/19

Budget Savings Proposal Summary 2018/19 for Consultation. Saving. Budget. Other Spend. Employee Costs. Risk Analysis. Income TBC 2018/19 CONSULT 1 Improved Charging Income Generation Projects Generate additional income through an increase in fees charges across in addition to maximising opportunities for recharging for services, particularly

More information

BRICKENDON LIBERTY PARISH COUNCIL

BRICKENDON LIBERTY PARISH COUNCIL BRICKENDON LIBERTY PARISH COUNCIL MINUTES of the Brickendon Liberty Parish Council meeting held on Thursday, 22 January 2015, at 7.30 pm in the Fanshaws Room, Brickendon. *Cllr Mrs L Ashley *Cllr Mrs A

More information

East Lothian Council budget

East Lothian Council budget East Lothian Council budget Every year the council agrees Council Tax charges and allocations of funding to council service areas for the 12 months ahead. Funding for council services is mainly provided

More information

BOURNEMOUTH, CHRISTCHURCH AND POOLE JOINT COMMITTEE 20 MARCH 2018

BOURNEMOUTH, CHRISTCHURCH AND POOLE JOINT COMMITTEE 20 MARCH 2018 Public Question from Councillor Claire Bath As a Christchurch Borough Councillor, I believe that the new Conurbation Council for Bournemouth, Christchurch and Poole should be structured to attract future

More information

City of Wolverhampton Council Decisions taken by the Cabinet on Wednesday, 13 September 2017

City of Wolverhampton Council Decisions taken by the Cabinet on Wednesday, 13 September 2017 Part 1 items open to the press and public Item 5 Wolverhampton Interchange Programme 1. That Council be recommended to approve the utilisation of the existing borrowing provision to support the Interchange

More information

EAST AYRSHIRE LEISURE TRUST BOARD OF TRUSTEES

EAST AYRSHIRE LEISURE TRUST BOARD OF TRUSTEES EAST AYRSHIRE LEISURE TRUST BOARD OF TRUSTEES MINUTES OF MEETING HELD ON TUESDAY 1 MARCH 2016 AT 1800 HOURS IN THE RECEPTION ROOM, GRAND HALL, LONDON ROAD, KILMARNOCK PRESENT: Councillors Douglas Reid

More information

Policy and Resources Committee Minutes of the Meeting Held on 31 October :00am Edwards Room, County Hall, Norwich

Policy and Resources Committee Minutes of the Meeting Held on 31 October :00am Edwards Room, County Hall, Norwich Present: Mr C Jordan (Chairman) Policy and Resources Committee Minutes of the Meeting Held on 31 October 2016 10:00am Edwards Room, County Hall, Norwich Mr M Castle Mr T Coke Mrs H Cox Mr A Dearnley Mrs

More information

Annual Report

Annual Report Annual Report 2007 08 I have highlighted some of the major issues from a vast array of activities undertaken by Gloucestershire County Council, an organisation with over 17,000 employees (including teachers)

More information

BOROUGH OF POOLE CABINET 14 JUNE 2016 COUNCIL BUDGET MONITORING FINANCIAL OUTTURN (1 APRIL MARCH 2016)

BOROUGH OF POOLE CABINET 14 JUNE 2016 COUNCIL BUDGET MONITORING FINANCIAL OUTTURN (1 APRIL MARCH 2016) BOROUGH OF POOLE AGENDA ITEM 10 CABINET 14 JUNE 2016 COUNCIL BUDGET MONITORING FINANCIAL OUTTURN (1 APRIL 2015 31 MARCH 2016) PART OF THE PUBLISHED FORWARD PLAN: YES 1 PURPOSE OF THE REPORT 1.1 This report

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Balanced year end position Remain within overall resources

Balanced year end position Remain within overall resources Appendix A Commercial and Investment Finance and Performance Report December 2018 1. SUMMARY 1.1 Finance Previous Status Red Green Category Income and Expenditure Capital Programme Target Balanced year

More information

Chairman of the Policy and Resources Committee. Appendix 1 - Draft Local Implementation Plan Enclosures. Summary

Chairman of the Policy and Resources Committee. Appendix 1 - Draft Local Implementation Plan Enclosures. Summary Policy & Resources Committee 23 October 2018 Title Report of Wards Status Urgent Key Local Implementation Plan submission of draft to TfL and public consultation Chairman of the Policy and Resources Committee

More information

Adaptation Resource Pack

Adaptation Resource Pack Adaptation Resource Pack Step-by-step guidance for Local Authorities with case studies from around the North West of England. Climate Change Adaptation Risk Assessment in Detail Service Area: Capital Assets

More information

York North Yorkshire & East Riding Local Enterprise Partnership. Infrastructure & Joint Assets Board Meeting

York North Yorkshire & East Riding Local Enterprise Partnership. Infrastructure & Joint Assets Board Meeting York North Yorkshire & East Riding Local Enterprise Partnership Infrastructure & Joint Assets Board Meeting Minutes of the Meeting held on Wednesday 14 June 2017 At 2.00pm in the De Grey Building Room

More information

South Dublin County Council Development Contribution Scheme

South Dublin County Council Development Contribution Scheme South Dublin County Council (under Section 48, Planning & Development Act, 2000 as amended) 1 of 9 INTRODUCTION 1. Sub-section (1) of section 48 of the Planning and Development Act, 2000 enables a planning

More information

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

A loyal three made stronger in one. Loyalist Township Strategic Plan ( ) A loyal three made stronger in one Loyalist Township Strategic Plan (2012-2015) Adopted by Council on August 13, 2012 Loyalist Township Strategic Plan I. Community Profile As prescribed by the Ministry

More information

3.0 SERVICE AIMS AND OBJECTIVES The Corporate Plan (ref. 3)

3.0 SERVICE AIMS AND OBJECTIVES The Corporate Plan (ref. 3) 3.0 SERVICE AIMS AND OBJECTIVES 3.1. The Corporate Plan (ref. 3) 3.1.1. s Corporate Plan was adopted in February 2002. It outlines the aims, objectives and immediate priorities of the Council for the 3

More information

CITY AND COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 17 MAY 2016

CITY AND COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 17 MAY 2016 CITY AND COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 17 MAY 2016 HIGHWAY ASSET INVESTMENT STRATEGY Purpose of Report 1. To provide Members with the opportunity to consider the

More information

Councillor Dean Cohen, Chairman Environment Committee

Councillor Dean Cohen, Chairman Environment Committee Environment Committee 14 March 2018 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details 2018/19 Local Implementation Plan (LIP) Work Programme Councillor Dean Cohen, Chairman Environment

More information

BUCKINGHAM AND RIVER OUZEL INTERNAL DRAINAGE BOARD BOARD MEETING

BUCKINGHAM AND RIVER OUZEL INTERNAL DRAINAGE BOARD BOARD MEETING BUCKINGHAM AND RIVER OUZEL INTERNAL DRAINAGE BOARD BOARD MEETING Minutes of the meeting held at 2pm on 12 June 2012 at Longueville Hall, Newton Longville. PRESENT: N Costin (Chairman); M C Howell (Vice

More information

LABOUR GROUP AMENDMENTS TO PROPOSED 2018/19 BUDGET RBKC COUNCIL Budget Meeting

LABOUR GROUP AMENDMENTS TO PROPOSED 2018/19 BUDGET RBKC COUNCIL Budget Meeting LABOUR GROUP AMENDMENTS TO PROPOSED 218/19 BUDGET RBKC COUNCIL Budget Meeting 7.3.218 218/219 REVENUE BUDGET AMENDMENTS HOUSING & PROPERTY Establish in-house capacity for planning, developing and managing

More information

Cabinet (Resources) Panel Minutes - 20 January 2015

Cabinet (Resources) Panel Minutes - 20 January 2015 Cabinet (Resources) Panel - 20 January 2015 Attendance Members of the Cabinet (Resources) Panel Other Cabinet Members in Attendance Cllr Peter Bilson Cllr Val Gibson Cllr Steve Evans Cllr Sandra Samuels

More information

Policy and Resources Committee 21 March 2017

Policy and Resources Committee 21 March 2017 Policy and Resources Committee 21 March 2017 Title Future of Barnet Public Health Service Report of Wards Status Urgent Key Enclosures Officer contact details Dawn Wakeling, Adults and Health Commissioning

More information

Highlights From The Approved 2013 Budget Budget in Brief

Highlights From The Approved 2013 Budget Budget in Brief Highlights From The Approved 2013 Budget 2013 Budget in Brief Preparing for the FUTURE: The City of Brandon is committed to building a sustainable future. Our 2013 budget process was improved in many ways,

More information

Minutes of a meeting of the Purbeck District Council held in the Council Chamber, Westport House, Wareham on Tuesday 9 August 2016 at 7.00pm.

Minutes of a meeting of the Purbeck District Council held in the Council Chamber, Westport House, Wareham on Tuesday 9 August 2016 at 7.00pm. 30 Minutes of a meeting of the Purbeck District Council held in the Council Chamber, Westport House, Wareham on Tuesday 9 August 2016 at 7.00pm. Present:- Councillor Bill Trite (Chairman) Councillor Wendy

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

Democratic Services CABINET TUESDAY 6 SEPTEMBER 2016 6.30 PM COUNCIL CHAMBER, CIVIC OFFICES CENTRAL MILTON KEYNES Additional Papers If you have any enquires about this agenda please contact Shelagh Muir

More information

Facilities and Property Management Business Plan and 2015 Budget

Facilities and Property Management Business Plan and 2015 Budget Facilities and Property Management 2015-2018 Business Plan and 2015 Budget 2 Agenda Existing Core Services Vision and Mission Service Delivery Model Service Level Issues and Trends Service Area Information

More information

Planning and Growth Management Committee

Planning and Growth Management Committee Agenda Regular Planning and Growth Management Committee Meeting No. 20 Contact Merle MacDonald, Committee Administrator Meeting Date Thursday, November 13, 2008 Phone 416-392-7340 Start Time 9:30 AM E-mail

More information

Post Statutory School Age Transport Policy 2018/19

Post Statutory School Age Transport Policy 2018/19 Post Statutory School Age Transport Policy 2018/19 This policy document became effective at the start of the 2017/18 academic year and describes the support available to students of post statutory school

More information

Chief Executives Group North Yorkshire and York 8 September 2016 LEP update

Chief Executives Group North Yorkshire and York 8 September 2016 LEP update Agenda item 2 Chief Executives Group North Yorkshire and York 8 September 2016 LEP update 1 Purpose of the report 1.1 The purpose of the report is to update the Chief Executives Group on; Post Brexit EU

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Roman Heights Streethay, Lichfield. Roman Heights. Streethay, Lichfield. An exclusive development by Bovis Homes

Roman Heights Streethay, Lichfield. Roman Heights. Streethay, Lichfield. An exclusive development by Bovis Homes Roman Heights Streethay, Lichfield Roman Heights Streethay, Lichfield An exclusive development by Bovis Homes A place you ll love to live Roman Heights This attractive, new development is less than two

More information

WOKING COMMUNITY TRANSPORT LTD THE TOWN CENTRE BUGGY SERVICE - APPLICATION FOR SUPPORT

WOKING COMMUNITY TRANSPORT LTD THE TOWN CENTRE BUGGY SERVICE - APPLICATION FOR SUPPORT Agenda Item No. 37 EXECUTIVE 15 DECEMBER 2016 WOKING COMMUNITY TRANSPORT LTD THE TOWN CENTRE BUGGY SERVICE - APPLICATION FOR SUPPORT Executive Summary Woking Community Transport has applied for annual

More information

The Region s Transport Authority

The Region s Transport Authority Agenda Item No. 8 The Region s Transport Authority Meeting: Finance, Delivery & Performance Monitoring Committee Date: 31 March 2014 From: Subject: Lead Member: Head of Programme Management LTP Monitoring

More information

Report to Cabinet. 8 February Quarter 3 Council Wide Budget (Key Decision Ref. No.SMBC1661) Leader of the Council

Report to Cabinet. 8 February Quarter 3 Council Wide Budget (Key Decision Ref. No.SMBC1661) Leader of the Council Agenda Item 5 Report to Cabinet 8 February 2017 Subject: Presenting Cabinet Member: Quarter 3 Council Wide Budget (Key Decision Ref. No.SMBC1661) Leader of the Council 1. Summary Statement This report

More information

RTI Release. Project Budget Proposal Strategic Transport Planning Transport Planning & Strategy Brisbane Infrastructure

RTI Release. Project Budget Proposal Strategic Transport Planning Transport Planning & Strategy Brisbane Infrastructure 1 Project Budget Proposal Strategic Transport Planning Transport Planning & Strategy Brisbane Infrastructure SOUTH WEST CORRIDOR STUDY (OXLEY ROAD) PROJECT OWNER: GRAEME READ 2 Document Change History

More information

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180 Bond Amount: $18,470,000 Proposed I&S Tax Rate : $.3180 How was the EBISD 2017 Bond developed? The bond package was developed from K-12 academic needs identified by our fifty-member community facilities

More information

Report of Commissioning Director - Environment

Report of Commissioning Director - Environment Environment Committee 24 September 2015 Title Local Implementation Plan (LIP) 2016/17 Annual Spending Submission Report of Commissioning Director - Environment Wards All Status Urgent No Key Enclosures

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

PERTH AND KINROSS COUNCIL. Lifelong Learning School Estate Sub-Committee 7 March 2013 SCHOOL ESTATE CAPITAL PROGRAMME PROGRESS UPDATE

PERTH AND KINROSS COUNCIL. Lifelong Learning School Estate Sub-Committee 7 March 2013 SCHOOL ESTATE CAPITAL PROGRAMME PROGRESS UPDATE PERTH AND KINROSS COUNCIL 3 13/110 Lifelong Learning School Estate Sub-Committee 7 March 2013 SCHOOL ESTATE CAPITAL PROGRAMME PROGRESS UPDATE Report by Executive Director (Education and Children s Services)

More information

Powys County Council. Highway Asset Management Plan. Working Document Page 1

Powys County Council. Highway Asset Management Plan. Working Document Page 1 Powys County Council Highway Asset Management Plan 2017 Working Document Page 1 Foreword This plan sets out the council s strategy for the management of the council s highway asset for the future. It has

More information

Budget Review Group Report January 2015

Budget Review Group Report January 2015 Democratic Services ITEM 6(b) Budget Review Group Report January 2015 www.milton-keynes.gov.uk/scrutiny Budget Review Group Report January 2015 Contents Introduction & Committee Membership 3 Review Group

More information

100/17 MINUTES OF A MEETING OF FULL COUNCIL HELD ON WEDNESDAY 18 th OCTOBER 2017 AT 7PM IN THE COUNCIL CHAMBER, PICTON HOUSE, HAVERFORDWEST

100/17 MINUTES OF A MEETING OF FULL COUNCIL HELD ON WEDNESDAY 18 th OCTOBER 2017 AT 7PM IN THE COUNCIL CHAMBER, PICTON HOUSE, HAVERFORDWEST 100/17 MINUTES OF A MEETING OF FULL COUNCIL HELD ON WEDNESDAY 18 th OCTOBER 2017 AT 7PM IN THE COUNCIL CHAMBER, PICTON HOUSE, HAVERFORDWEST PRESENT: APOLOGIES: Cllr A Buckfield (Mayor) Cllr A Brooker Cllr

More information

SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government Budget. 000s

SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government Budget. 000s SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government 000s MAIN EXPENDITURE GROUP (MEG) Resource and Capital (Excluding AME) Resource Capital Total Health and Social Services

More information

Recommended Capital Budget and Plan, and Proposed Capital Forecast

Recommended Capital Budget and Plan, and Proposed Capital Forecast 2009 2018 Recommended Capital Budget, Plan & Forecast 2009 2013 Recommended Capital Budget and Plan, and 2014 2018 Proposed Capital Forecast December 10, 2008 2009 2018 Staff Recommended Capital Budget

More information

Local Development Scheme

Local Development Scheme Local Development Scheme Colchester Borough Council s Local Development Scheme 2017-2020 1 November 2017 Contents 1. Introduction... 3 2. Planning context... 4 3. Documents to be prepared during 2017 to

More information

Appendix A HRA REVENUE ACCOUNT

Appendix A HRA REVENUE ACCOUNT Appendix A HRA REVENUE ACCOUNT 1. The HRA annual expenditure budget is 22.389M and income budget is 28.580M, which allows a contribution of 6.191M to reserves to present a net budget of zero. A subjective

More information

Agenda Item 8: National Infrastructure Commission and Budget Update

Agenda Item 8: National Infrastructure Commission and Budget Update Strategic Transport Forum 15 th December 2017 englandseconomicheartland@b uckscc.gov.uk Agenda Item 8: National Infrastructure Commission and Budget Update Recommendation: It is recommended that the Forum:

More information

The service level budgetary control report for Commercial and Investment for February can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment for February can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report February 2018 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year

More information

INVITATION TO TENDER ENFORCEMENT AGENT & DEBT COLLECTION SERVICE (REF: CU2434)

INVITATION TO TENDER ENFORCEMENT AGENT & DEBT COLLECTION SERVICE (REF: CU2434) Wards Affected: All Wards. ITEM 6 CABINET PROCUREMENT COMMITTEE 20 OCTOBER 2014 INVITATION TO TENDER ENFORCEMENT AGENT & DEBT COECTION SERVICE (REF: CU2434) Responsible Cabinet Member: Councillor Middleton

More information