1 3218 Fannin Road Melissa, TX (972) TEL Firm Reg. No F PROPERTY EVALUATION AND RESERVE FUND STUDY LOWE S FARM MANSFIELD, TEXAS Prepared for: LOWE S FARM HOMEOWNERS ASSOCIATION C/o Ms. Jessica Sedgwick FirstService Residential 1240 Keller Parkway, Suite 200 Keller, TX Project Number: C Date of Investigation: June 16, 2015 Investigator: Phillip Nieman, P.E. Review: David Dotson, P.E., RS July 2015

2 CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY PURPOSE & SCOPE PURPOSE SCOPE SOURCES OF INFORMATION STANDARDS OF REFERENCE DESCRIPTION SITE IMPROVEMENTS TOPOGRAPHY STORM DRAINAGE PAVING & CURBING FLATWORK LANDSCAPING & APPURTENANCES CABANA STRUCTURE VENTILATION ROOFING SYSTEMS EXTERIOR FINISHES MECHANICAL SYSTEMS ELECTRICAL SYSTEMS PLUMBING SYSTEMS POOL AND MISCELLANEOUS AMENITIES CONCLUSION LIMITATIONS APPENDIX A: RESERVE FUND PROJECTIONS APPENDIX B: PROJECT PHOTOGRAPHS APPENDIX C: EXECUTIVE SUMMARY Lowe s Farm Mansfield, TX

3 1.0 INTRODUCTION LOWE S FARM HOMEOWNERS ASSOCIATION, through FirstService Residential, authorized Criterium Dotson Engineers to conduct a Property Evaluation and Reserve Fund Study the property located along E. Broad Street east of S.H.-360 in Mansfield, TX. Studies of this nature are important to ensure a community has sufficient funds for long-term, periodic capital expenditure requirements. Anticipating large expenditures over an extended period of time through a structured analysis and scheduling process assists the Association in meeting financial requirements without increasing the service fees above permitted maximums, borrowing the funds, or levying special financial assessments to the home owners. Typically, a community Association has two broad cash requirements: the general operating reserves and the capital repair and replacement reserves. In this report, we will focus on those items falling under the capital repair and replacement reserve criteria. We have projected a capital repair and replacement reserve for thirty years. The first ten years are the most reliable. Such a study should be updated approximately every four years. This report is structured to analyze components of the community for which the Association is responsible and to assess a useful expected life and useful remaining life to those components. The anticipated scheduled repair or replacement of the component and the anticipated expense for the activity are then analyzed in conjunction with the current capital reserves funding program for the community. Funding program recommendations are made with the objective of limiting substantial cash excesses while minimizing financial burdens that can result from significant cash inadequacies. This report is intended to be used as a tool to determine reserve fund allocation requirements for the community, to manage future Association obligations, and to inform the community of future financial needs in general. The report that follows has been prepared from the perspective of what an owner of this property would benefit from knowing. Some items, beyond those of immediate concern, may be discussed. Therefore, the report should be read in its entirety in order to fully understand all of the information that has been obtained. Lowe s Farm Mansfield, TX Page 1

4 2.0 EXECUTIVE SUMMARY The cabana and site are, generally, in good condition. In this section of the report, we will address those issues that, in our opinion, will require immediate repair or replacement. For a more detailed discussion of all of our findings and any other material deficiencies that will require repair or replacement over the term of this study, refer to the appropriate sections of this report. Based on our evaluation, the current level of funding of the reserve for this project is not adequate. A more detailed analysis of the reserve fund has been provided in Appendix A. Based on our observations, there are immediate material deficiencies. Those items are as follows: Wood fence stain Playground mulch replacement There are, of course, other capital expenditures to be expected over the next thirty years. Those items that will require attention are discussed in detail in this report and can be found in their appropriate sections. For your convenience, we have prepared the following summary of the condition of the major systems of the property. Please refer to the appropriate sections of this report for a more detailed discussion of these systems. Lowe s Farm Mansfield, TX Page 2

5 3.0 PURPOSE & SCOPE 3.1 Purpose The purpose of this study is to perform a reserve fund analysis and to determine a capital needs plan. It is intended to be used as a tool for the LOWE S FARM HOMEOWNERS ASSOCIATION in determining the allocation requirements into the reserve fund in order to meet future anticipated capital expenditures for the community. This report forecasts obligations for the community thirty years into the future. It should be noted that events might occur that could have an effect on the underlying component or system useful life assumptions used in this study. Likewise, inevitable market fluctuations can have an impact on component or system replacement and repair costs. Therefore, a study such as this should be updated from time to time, usually on a three to fiveyear cycle, in order to reflect the most accurate needs and obligations of the community. 3.2 Scope This study has been performed according to the scope as generally defined by FirstService Residential and Criterium Dotson Engineers. The findings and recommendations are based on a review of available documents; and an investigation of the recreation area and site. The investigation involved, in particular, the cabana, storage building, pools, pool equipment, pavilions, arbor, playground equipment, and concrete parking lot. Also included in the property evaluation were the entrance monuments, perimeter fencing, and other common areas within the community. The report contains the following: A description of the overall condition of components and systems that are the responsibility of the Association, and conditions that may limit the expected useful life of the components. Information about significant deficiencies, deferred maintenance items, and material code violations based on a visual survey of the recreation area and site, research of documents, and conversations with people who have knowledge about the community. A reserve fund analysis including a component inventory, anticipated remaining component useful life, anticipated component repair or replacement costs, and forecasted fund levels as a result of those anticipated costs. The statements in this report are opinions about the present condition of the subject community. They are based on visual evidence available during a diligent investigation of all reasonably accessible areas falling under the responsibility of the Association. We did not remove any surface materials, perform any destructive testing, or move any furnishings. This study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort. For Lowe s Farm Mansfield, TX Page 3

6 additional limitations, see Section Sources of Information Onsite inspections of the property occurred on the following date: June 16, 2015 The following people were interviewed during our study: Ms. Jessica Sedgwick, FirstService Residential Property Manager The following documents were made available to us and reviewed: No construction documents were available Financial data 3.4 Standards of Reference For your reference, the following definitions may be helpful: Excellent: Component or system is in "as new" condition, requiring no rehabilitation and should perform in accordance with expected performance. Good: Component or system is sound and performing its function, although it may show signs of normal wear and tear. Some minor rehabilitation work may be required. Fair: Component or system falls into one or more of the following categories: a) Evidence of previous repairs not in compliance with commonly accepted practice, b) Workmanship not in compliance with commonly accepted standards, c) Component or system is obsolete, d) Component or system approaching end of expected performance. Repair or replacement is required to prevent further deterioration or to prolong expected life. Poor: Component or system has either failed or cannot be relied upon to continue performing its original function as a result of having exceeded its expected performance, excessive deferred maintenance, or state of disrepair. Present condition could contribute to or cause the deterioration of other adjoining elements or systems. Repair or replacement is required. Adequate: A component or system is of a capacity that is defined as enough for what is required, sufficient, suitable, and/or conforms to standard construction practices. All ratings are determined by comparison to other structures of similar age and construction type. Further, some details of workmanship and materials will be examined more closely in higher quality structures where such details typically become more relevant. All directions (left, right, rear, etc.), when used, are taken from the viewpoint of an observer standing in front of an item and facing it. Lowe s Farm Mansfield, TX Page 4

7 Repair/Replacement Reserves - Non-annual maintenance items that will require significant expenditure over the life of the structure. Included are items that will reach the end of their estimated useful life during the course of this forecast, or, in the opinion of the investigator, will require attention during that time. 4.0 DESCRIPTION LOWE S FARM was constructed in/around The community consists of 438 single family homes. The community is located on a 127-acre parcel that slopes generally to the north. There are three entrances into the community. The entrances at Lowe s Farm Parkway and Volk Lane provide access to E. Broad Street Woodcrest Lane provides access to S.H The main entrance at Lowe s Farm Parkway has monuments that are lighted, landscaped, and irrigated. Other monuments are located within the community and at the recreation center. Brick perimeter fence borders the community to the south along E. Broad Street and along portions of Lowe s Farm Parkway. Wrought iron fencing surrounds the recreation center, and stained boardon-board fencing runs east and west along the recreation area border. A recreation area is located 1401 Parkside Drive and includes a swimming pool, splash pool, cabana, pavilions, playground equipment, and a parking lot. 5.0 SITE IMPROVEMENTS 5.1 Topography Description Evaluation & Recommendations 5.2 Storm Drainage Description Evaluation & Recommendations The ground slopes generally to the north toward Lynn Creek. No issues were noted. Drainage in the community is handled over the surface with curb inlets and underground storm drainage at the streets. Most storm drainage is conveyed to Lynn Creek and eventually to Joe Pool Lake. No issues were noted with storm drainage. 5.3 Paving & Curbing PAVING & CURBING Type of Paving Type of Curbing Number of Parking Spaces Table 5.1: Parking Area Cast-in -Place Concrete Type II, Cast-in-Place Concrete 14 Spaces Lowe s Farm Mansfield, TX Page 5

8 Description The recreation center has a cast-in-place concrete paved parking lot with fourteen striped parking spaces, including two accessible spaces for the disabled. All streets and curbs within the community are cast-in-place concrete and are owned and maintained by the City. Evaluation & Recommendations Parking lot concrete is generally in good condition. Minor hairline cracks were observed. Most cracks and joints appeared well-sealed. Any cracks in the concrete paving should be sealed to prevent seepage of water below the paving, causing premature failure. 5.4 Flatwork Description Evaluation & Recommendations Periodic pavement patching, repairs, and replacement will be required in the future. Sidewalks run throughout the community. With the exception of the common area walkways, all sidewalks are owned and maintained by the City. The concrete walkways are in good general condition at this time; however, one area of minor cracking was observed on the west side of the lot. Walkways will require periodic repairs and replacement due to the expansive nature of soils in this area. 5.5 Landscaping & Appurtenances Description Entrance monuments at Lowe s Farm Parkway are composed of a stone and brick clad walls with custom cast stone signage. The monuments are lit by incandescent accent lights. The community entrances are attractively landscaped with perennial flowers and shrubs. Another monument is located at the recreation center. It is approximately twenty-five in length and stands roughly four and half feet tall. The wall contains a large cast stone sign that measures 12 by 2. The monument is lit by three accent lights. A tower with stone veneer, wrought iron accents, and a small shingle roof is located on Lowe s farm Parkway and is also lit with accent lights. The irrigation controllers for the landscaped areas are located at the main entrance, behind the tower and with the pool equipment. There are two areas of stone walls within the property. One wall forms a partial circle around the tower. The other wall is located at the recreation area. Lowe s Farm Mansfield, TX Page 6

9 The south border of the property, portions of Lowe s Farm Parkway, and the west side of the recreation area are lined with a prefabricated brick fence with brick pilasters (5,200 lin. ft.). Brick fencing consists of single pane brick panels spaced between stone pilasters; brick fencing is constructed with a concrete footer at the bottom of fencing panels. Board-on-board cedar fencing with steel pipe supports is located along the north side of recreation area (~190 lin. ft.). Wrought iron fencing encircles the cabana and pool deck and playground equipment (~600 lin. ft.). Street lighting is provided throughout the community by good quality, pole-mounted lights that are maintained by City or Utility provider. There are two lights that illuminate the parking lot. Evaluation & Recommendations The entrance monuments are in good condition and will also require periodic repairs on an approximate 10 year cycle. Monument accent lights are scheduled for an upgrade in the near term. Landscaping is in good condition - routine maintenance and replacement will always be required. Landscaping is assumed to be accounted for under the annual operating budget. Irrigation controllers and system appeared to be in good condition and working order. Stone walls are also in good condition; they will require periodic repairs on an approximate 12 year cycle. Any cracks that develop in the retaining walls should be sealed immediately to avoid further damage to the wall due to freeze / thaw cycles. Brick perimeter fencing is in good condition. Periodic repairs will be required. Historically, single pane brick fences tend to deteriorate around 20 years in this area. We recommend planning for replacement in the future. Given that concrete footers are present at the bottom of the brick panels, the fence will likely last about 30 years. Cleaning, priming, and painting of the wrought iron fencing including the pool area is recommended approximately four years to help realize its maximum design life. It will require repainting approximately every 5 to 6 years. The wood fence is in good condition however it is due for staining. 6.0 CABANA 6.1 Structure Description The foundation is a cast-in-place concrete slab. It has exposed wood Lowe s Farm Mansfield, TX Page 7

10 framing and columns that support a gable roof. Evaluation & Recommendations 6.2 Ventilation Description Evaluation & Recommendations 6.3 Roofing Systems Description Evaluation & Recommendations 6.4 Exterior Finishes Description No visible indications of structural problems were observed. The structure is naturally ventilated. No signs of excess moisture were observed at the time of inspection. Cabana, pavilions, and storage buildings roofing are covered with standing seam metal panels (~3,850 sq. ft.) Roofing surfaces are in good condition. Standing seam metal roofs generally have an average lifespan of forty 40 years. The exterior of the cabana is clad in brick veneer, hardboard lap siding, and painted trim. The storage building exterior is covered with a brick veneer as well. The two pavilions and arbor have stained wood columns and rood decks. Hollow metal doors are located at the restrooms and storage building. Evaluation & Recommendations The hardboard siding and trim will require periodic painting in order to provide weather protection to the material. The cabana was recently painted and is very good condition. Painting of the doors and trim on the cabana has been accomplished on an 8 year cycle. The pavilion framing and arbor will require periodic washing and staining in order to provide complete weather protection to the product. The brick veneer is in good condition and should only require minimal periodic joint maintenance throughout the life of the structure. 7.0 MECHANICAL SYSTEMS 7.1 Electrical Systems CABANA ELECTRICAL SYSTEMS Amperage 200 Amp Voltage/Phase 120 / 240 Service Entrance Underground Branch Wiring Copper Table 8.1: Electrical System Summary Description Two electrical panels are located at the west exterior wall of the cabana. All power is distributed from this point by copper wiring. There are also small electrical panels powering the irrigation Lowe s Farm Mansfield, TX Page 8

11 controllers/monument lighting at each irrigation controller location. Incandescent spotlights are located at the eaves of cabana, and florescent fixtures are located under the roofs and at the restrooms. The pavilion north of the main pool is lit by fluorescent fixtures and high pressure sodium fixture mounted at the south and east eaves. Evaluation & Recommendations 7.2 Plumbing Systems Description The visible portions of the electrical system are generally in good condition. Water and sewer service is provided by the City of Mansfield. Water distribution piping is copper. Sewage collection piping is PVC. The plumbing fixtures are vitreous china, of commercial quality, with good quality accessories. Men s Restroom -One lavatory -One urinal -One toilet Women s Restroom -One lavatory -Two toilets There is a shower fixture between the restrooms of the cabana. Evaluation & Recommendations 8.0 POOL AND MISCELLANEOUS AMENITIES Description The system and fixtures are generally in good condition. The pool area is enclosed by ornamental iron fencing and has controlled access provided by a DXS card reader mechanism. The pool and wading pool (~4,000 sq. ft.) are surfaced with gunite pool surfacing and have tile coping and tile at the waterline. Pool apron/decking is cast-in-place concrete with a Kool-Deck coating. Pool equipment is located in a fenced area at the west side of the cabana. Pool equipment consists of two (2) pumps and two (2) sand filters. Pool furnishings consist of 28 plastic sling chaises 36 plastic sling chairs 9 plastic tables 12 plastic side tables 1 wrought iron table 4 wrought iron sling chairs Lowe s Farm Mansfield, TX Page 9

12 There are two thermoplastic coated steel picnic tables, and five park benches. Metal and plastic playground equipment set is located just south of the pool area. Evaluation & Recommendations The pool should be planned for periodic resurfacing in approximately seven years. The wading pool was reportedly resurfaced in The pool equipment is generally in good condition. Routine maintenance and replacement of pool equipment can be expected. The deck was also repaired in 2014 and is in very good condition. Minor surface cracking repairs were observed and more cracks can be expected in the future. Regular patching/sealing should be anticipated. The decking to coping joint will require periodic resealing (Deck-O-Seal), on a 4 year cycle. The chaises and chairs are of good quality and should be expected to last another 3 seasons. Playground equipment is of good quality and condition. Park benches, picnic tables, and trash receptacles are of good quality and condition. 9.0 CONCLUSION In summary, we consider the community assets to be in generally good condition when compared to others of similar age and construction type. While some components are in need of a repair and replacement program, the program can be prioritized and planned in conjunction with reserve strategies. We feel that the reserve financials included with this report outline several possible strategies for the community to adopt given the current condition of the project as a whole. As time passes, it may become necessary to reestablish financial priorities and capital expenditure schedules given any unforeseen circumstances. We recommend and encourage this activity LIMITATIONS The observations described in this study are valid on the date of the investigation and have been made under the conditions noted in the report. We prepared this study for the exclusive use of FirstService Residential and LOWE S FARM HOMEOWNERS ASSOCIATION. Criterium Dotson Engineers does not intend any other individual or party to rely upon this study without our express written consent. If another individual or party relies on this study, they shall indemnify and hold Criterium Dotson Engineers harmless for any damages, losses, or expenses they may incur as a result of its use. This study is limited to the visual observations made during our inspection. We did not remove surface materials, conduct any destructive or invasive testing, move furnishings or equipment, or undertake any digging or Lowe s Farm Mansfield, TX Page 10

13 excavation. Accordingly, we cannot comment on the condition of systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not within the scope of our services at the time of the investigation. We did not undertake to completely assess the stability of the structures or the underlying soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment. We did not investigate the following areas: Buried utilities or infrastructure Concealed structural members or systems We do not render an opinion on uninvestigated portions of the community. We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code compliance investigation. This study is not to be considered a warranty of condition, and no warranty is implied. The appendices are an integral part of this report and must be included in any review. In our Reserve Fund Analysis, we have provided estimated costs. These costs are based on our general knowledge of building systems and the contracting and construction industry. When appropriate, we have relied on standard sources, such as Means Building Construction Cost Data, to develop estimates. However, for items that we have developed costs (e.g.: structural repairs), no standard guide for developing such costs exists. Actual costs can vary significantly, based on the availability of qualified contractors to do the work, as well as many other variables. We cannot be responsible for the specific cost estimates provided. We have performed no design work as part of this study, nor have we obtained competitive quotations or estimates from contractors as this also is beyond the scope of the project. The actual cost to remedy deficiencies and deferred maintenance items that we have identified may vary significantly from estimates and competitive quotations from contractors. If you have any questions about this study or the reserve fund analysis, please feel free to contact us. Thank-you for the opportunity to be of assistance to you. Respectfully submitted, CRITERIUM-DOTSON ENGINEERS Lowe s Farm Mansfield, TX Page 11

14 Appendix A: RESERVE FUND PROJECTIONS

15 INTRODUCTION The following is a projected reserve fund analysis for non-annual items as discussed in the report. This projection takes into consideration a reasonable return on invested moneys and inflation. Please review this thoroughly and let us know of any changes that may be desired. The intent of this reserve fund projection is to help the Association develop a reserve fund to provide for anticipated repair or replacements of various system components during the next thirty years. The capital items listed are those that are typically the responsibility of the association. However, Association by-laws vary and, therefore, which components are the responsibilities of the owner and which are the responsibilities of the Association can vary. The Association should confirm that the items listed should be financed by the Association reserve fund. This projection provides the following: An input sheet that defines all the criteria used for the financial alternatives, including the assumed inflation rate and rate of return on deposited reserve funds. A table that lists anticipated replacement and/or repair items complete with estimated remaining life expectancies, projected costs of replacement and/or repair, a frequency in years of when these items require replacement and/or repair, and a projection based on this frequency. A table and graph that represent end of year balances versus capital expenditures based on your current funding program and reserve balances, and alternatives to your current program. The provided graphs illustrate what effects the funding methods will have over the presented thirty-year period versus the anticipated capital expenditures. Care should be taken in analyzing the graphs due to varying graphic scales that occur within each graph and between graphs. Based on our developed list of capital items and accounting for inflation, the current funding is not adequate. The Association should bear in mind that unanticipated expenditures can always arise and maintenance of a significant reserve fund balance can be viewed as a way to avoid special assessments. Our objective is to maintain positive funding levels over 30 years without building up excessive reserves. At the end of 30 years, we look to maintain a balance at least equal to the average annual reserve requirement unless we are anticipating additional major expenditures following quickly after 30 years. To achieve this goal we have projected anticipated maintenance/replacement costs, interest earned on investments, an assumed inflation factor and the estimated current fund balance to determine the required level of funding for capital needs. Please remember this does not include any allowance for routine maintenance and operations costs. Only capital costs are included.

16 We have included three alternatives to your current funding program and recommend that the board adopt an alternative that best reflects the objectives of the community: EXISTING FUNDING LEVEL: We have assessed current Capital Reserve Fund balance and current level of contribution into capital reserves and determined that the Associations current financial status is adequate to meet the Association s short-term needs, but is NOT adequate to meet the long-term financial needs of the community. ALTERNATIVE # 1: Minimum required funding for capital reserves over the duration without special assessments. This alternative maintains the initial funding combined with a periodic increase every 2 years for the next 15 years. This alternative creates an adequate fund balance throughout the study period*. *Note that the projected brick fence replacements must be accrued for in the next 19 years. This will require a large amount of funding to be created. Following fence replacements, the funding levels shown could actually be decreased back to a smaller amount in about year 20, but we would suggest waiting until closer to that time to make that decision, as future requirements can certainly change. ALTERNATIVE # 2: Minimum required contribution together with annual escalation in dues for capital reserves over the duration. This alternative also maintains the current annual contribution combined with annual increases in contribution over the next 17 years. This alternative creates an adequate fund balance throughout the study period and also represents a solid approach*. ALTERNATIVE # 3; Alternative 3 reviews maintaining minimum level funding at current level over the duration of the funding period. This alternative requires large special assessments at years 18, 24 and year 28, but holds annual dues for capital reserve to a minimum. This alternative is not recommended but shows what the financial impact will be without long-term planning. Please note that the reserve fund study does not include typical annual maintenance items. Our assumption is that you already have an annual operating budget that provides for these typical, repetitive items. This includes miscellaneous repairs, lawn and grounds maintenance, routine minor painting, etc. We have focused on those significant, non-annual items where careful financial planning is important. Finally, please note that the estimates we have developed are based on 2015 dollars. Our reserve fund study does adjust for an estimated annual inflation and a given return on investment assuming that the indicated fund balances are maintained.

17 Reserve Study Worksheet - Existing Funding Levels General Information: 1 Organization: Lowe's Farm Homeowners Association 2 Address: 1401 Parkside Drive Mansfield, TX Number of Homes 438 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 13 Res. Fund Contrib. (First Year)... $2,705 $16,230 $6.18 $37.05 Years Out Total/Year Per Unit 5a Study Period (in years) 30 Res. Fund Contrib. (Remaining Years)... $2,705 $32,460 $6.18 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: July 1, d Partial Year Length: 6 months Final Balance Computed... ($1,600,376) 6 Site Inspection Date June 15, 2015 Average Capital Expenditure per year... $90,811 7 Reserve Funds at start $136,547 8 Rate of Return on invested Reserve Funds (%) 1.0% 9 Inflation Rate (%) 3.0% 10 Yearly Threshold $0 11 Annual Maintenance Budget $0 12 Annual Maintenance Escalation Rate 0.0% 13 Target Funding Percentage 0.0% Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $136,547 $141,215 $171,251 $199,051 $222,100 $234,472 $229,880 $254,049 $221,011 $241,152 $166,639 $182,834 $133,954 $109,131 $132,995 $16,230 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,398 $1,696 $1,971 $2,199 $2,322 $2,276 $2,515 $2,188 $2,388 $1,650 $1,810 $1,326 $1,081 $1,317 $1,366 $12,960 $4,120 $6,631 $11,610 $22,409 $39,328 $10,806 $67,686 $14,707 $108,622 $18,076 $82,666 $58,364 $9,913 $28,890 $141,215 $171,251 $199,051 $222,100 $234,472 $229,880 $254,049 $221,011 $241,152 $166,639 $182,834 $133,954 $109,131 $132,995 $137,930 Ending Reserve Balance: Percent Funded: 40.99% 44.29% 45.47% 45.63% 44.14% 40.58% 43.23% 34.88% 38.05% 24.60% 28.16% 19.39% 15.86% 18.85% 18.32% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $137,930 $78,979 $84,985 $23,465 $49,606 ($1,186,341) ($1,188,125) ($1,164,874) ($1,234,676) ($1,370,208) ($1,377,408) ($1,395,094) ($1,402,962) ($1,450,368) ($1,441,954) $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $782 $841 $232 $491 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $92,193 $27,296 $94,212 $6,810 $1,268,407 $34,244 $9,208 $102,262 $167,992 $39,660 $50,146 $40,328 $79,866 $24,046 $190,882 $78,979 $84,985 $23,465 $49,606 ($1,186,341) ($1,188,125) ($1,164,874) ($1,234,676) ($1,370,208) ($1,377,408) ($1,395,094) ($1,402,962) ($1,450,368) ($1,441,954) ($1,600,376) Ending Reserve Balance: Percent Funded: 9.91% 10.60% 2.79% 5.92% % % % % % % % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Criterium Engineers Page 1 of 21 8/17/2015

18 Reserve Study Worksheet - Alternative 1, Level Funding with Steps *For the first 15 years of the study General Information: 1 Organization: Lowe's Farm Homeowners Association 2 Address: 1401 Parkside Drive Mansfield, TX Number of Homes 438 CURRENT FUNDING Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 13 Res. Fund Contrib. (First Year)... $2,705 $16,230 $6.18 $37.05 Years Out Total/Year Per Unit 5a Study Period (in years) 30 Res. Fund Contrib. (Remaining Years)... $2,705 $32,460 $6.18 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: July 1, d Partial Year Length: 6 months Final Balance Computed... ($1,600,376) 6 Site Inspection Date June 15, 2015 Average Capital Expenditure... $90,811 7 Reserve Funds at start $136,547 8 Rate of Return on invested Reserve Funds (%) 1.0% ALTERNATIVE 1 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 9 Inflation Rate (%) 3.0% Monthly Amount, (First Year)... $2,705 $32,460 $6.18 $74.11 Years Out Total/Year Per Unit 10 Yearly Threshold $0 Monthly Amount, (Last Year)... $11,465 $137,580 $26.18 $ Annual Maintenance Budget $0 Balance Required Final Year... $90, Annual Maintenance Escalation Rate 0.0% 13 Target Funding Percentage 0.0% Final Balance Computed... $725,263 Average Capital Expenditure... $90,811 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $136,547 $141,215 $171,251 $212,323 $248,776 $287,958 $310,444 $375,233 $383,221 $458,070 $438,812 $524,086 $544,975 $603,891 $712,331 $16,230 $32,460 $45,600 $45,600 $58,740 $58,740 $71,880 $71,880 $85,020 $85,020 $98,160 $98,160 $111,300 $111,300 $124,440 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,398 $1,696 $2,102 $2,463 $2,851 $3,074 $3,715 $3,794 $4,535 $4,345 $5,189 $5,396 $5,979 $7,053 $8,079 $12,960 $4,120 $6,631 $11,610 $22,409 $39,328 $10,806 $67,686 $14,707 $108,622 $18,076 $82,666 $58,364 $9,913 $28,890 $141,215 $171,251 $212,323 $248,776 $287,958 $310,444 $375,233 $383,221 $458,070 $438,812 $524,086 $544,975 $603,891 $712,331 $815,960 Ending Reserve Balance: Percent Funded: 40.99% 44.29% 48.50% 51.12% 54.21% 54.81% 63.86% 60.47% 72.27% 64.78% 80.73% 78.88% 87.78% % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $815,960 $856,689 $976,643 $1,030,211 $1,172,591 $42,182 $146,973 $278,098 $316,550 $289,000 $390,790 $483,006 $586,061 $650,212 $771,384 $124,440 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $137,580 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,482 $9,670 $10,200 $11,610 $418 $1,455 $2,753 $3,134 $2,861 $3,869 $4,782 $5,803 $6,438 $7,637 $7,181 $92,193 $27,296 $94,212 $6,810 $1,268,407 $34,244 $9,208 $102,262 $167,992 $39,660 $50,146 $40,328 $79,866 $24,046 $190,882 $856,689 $976,643 $1,030,211 $1,172,591 $42,182 $146,973 $278,098 $316,550 $289,000 $390,790 $483,006 $586,061 $650,212 $771,384 $725,263 Ending Reserve Balance: Percent Funded: % % % % 4.82% 64.40% 99.47% 95.99% 89.63% % % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Criterium Engineers Page 2 of 21 8/17/2015

19 Reserve Study Worksheet - Alternative 2, Escalating Funding at 10% per Year *For the first 17 years of the study General Information: 1 Organization: Lowe's Farm Homeowners Association 2 Address: 1401 Parkside Drive Mansfield, TX Number of Homes 438 CURRENT FUNDING Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 13 Res. Fund Contrib. (First Year)... $2,705 $16,230 $6.18 $37.05 Years Out Total/Year Per Unit 5a Study Period (in years) 30 Res. Fund Contrib. (Remaining Years)... $2,705 $32,460 $6.18 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: July 1, d Partial Year Length: 6 months Final Balance Computed... ($1,600,376) 6 Site Inspection Date June 15, 2015 Average Capital Expenditure... $90,811 7 Reserve Funds at start $136,547 8 Rate of Return on invested Reserve Funds (%) 1.0% ALTERNATIVE 2 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 9 Inflation Rate (%) 3.0% Monthly Amount, (First Year)... $2,705 $32,460 $6.18 $74.11 Years Out Total/Year Per Unit 10 Yearly Threshold $0 Monthly Amount, (Last Year)... $13,672 $164,069 $31.22 $ Annual Maintenance Budget $0 Balance Required Final Year... $90, Annual Maintenance Escalation Rate 0.0% Base Escalation % % 13 Target Funding Percentage 0.0% Final Balance Computed... $996,739 Average Capital Expenditure... $90,811 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $136,547 $141,215 $174,529 $209,247 $243,250 $271,050 $286,839 $336,873 $335,767 $394,548 $366,090 $436,529 $450,940 $499,395 $607,559 $16,230 $35,706 $39,277 $43,204 $47,525 $52,277 $57,505 $63,256 $69,581 $76,539 $84,193 $92,613 $101,874 $112,061 $123,267 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,398 $1,728 $2,072 $2,408 $2,684 $2,840 $3,335 $3,324 $3,906 $3,625 $4,322 $4,465 $4,945 $6,015 $7,019 $12,960 $4,120 $6,631 $11,610 $22,409 $39,328 $10,806 $67,686 $14,707 $108,622 $18,076 $82,666 $58,364 $9,913 $28,890 $141,215 $174,529 $209,247 $243,250 $271,050 $286,839 $336,873 $335,767 $394,548 $366,090 $436,529 $450,940 $499,395 $607,559 $708,956 Ending Reserve Balance: Percent Funded: 40.99% 45.14% 47.79% 49.98% 51.03% 50.64% 57.33% 52.98% 62.25% 54.05% 67.24% 65.27% 72.59% 86.13% 94.15% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $708,956 $759,881 $890,556 $970,017 $1,138,549 $34,552 $166,021 $324,091 $389,756 $389,692 $519,242 $639,497 $770,870 $863,623 $1,013,683 $135,594 $149,154 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $164,069 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $7,524 $8,817 $9,604 $11,273 $342 $1,644 $3,209 $3,859 $3,858 $5,141 $6,332 $7,632 $8,551 $10,036 $9,869 $92,193 $27,296 $94,212 $6,810 $1,268,407 $34,244 $9,208 $102,262 $167,992 $39,660 $50,146 $40,328 $79,866 $24,046 $190,882 $759,881 $890,556 $970,017 $1,138,549 $34,552 $166,021 $324,091 $389,756 $389,692 $519,242 $639,497 $770,870 $863,623 $1,013,683 $996,739 Ending Reserve Balance: Percent Funded: 95.36% % % % 3.95% 72.75% % % % % % % % % % Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Criterium Engineers Page 3 of 21 8/17/2015

20 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments General Information: 1 Organization: Lowe's Farm Homeowners Association 2 Address: 1401 Parkside Drive Mansfield, TX Number of Homes 438 CURRENT FUNDING Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 4 Age of Development (in years) 13 Res. Fund Contrib. (First Year)... $2,705 $16,230 $6.18 $37.05 Years Out Total/Year Per Unit 5a Study Period (in years) 30 Res. Fund Contrib. (Remaining Years)... $2,705 $32,460 $6.18 $ b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: July 1, d Partial Year Length: 6 months Final Balance Computed... ($1,600,376) 6 Site Inspection Date June 15, 2015 Average Capital Expenditure... $90,811 7 Reserve Funds at start $136,547 8 Rate of Return on invested Reserve Funds (%) 1.0% ALTERNATIVE 3 Total/Month Total Annual Per Unit/Month Per Unit/Year Special Assessments 9 Inflation Rate (%) 3.0% Monthly Amount, (First Year)... $2,705 $32,460 $6.18 $74.11 Years Out Total/Year Per Unit 10 Yearly Threshold $0 Monthly Amount, (Last Year)... $2,705 $32,460 $6.18 $ ,250, , Annual Maintenance Budget $0 Balance Required Final Year... $90, , Annual Maintenance Escalation Rate 0.0% Base Escalation % % , Target Funding Percentage 0.0% Final Balance Computed... $112,139 Average Capital Expenditure... $90,811 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $136,547 $141,215 $171,251 $199,051 $222,100 $234,473 $229,881 $254,050 $221,013 $241,153 $166,641 $182,836 $133,956 $109,133 $132,997 $16,230 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,398 $1,696 $1,971 $2,199 $2,322 $2,276 $2,515 $2,188 $2,388 $1,650 $1,810 $1,326 $1,081 $1,317 $1,366 $12,960 $4,120 $6,631 $11,610 $22,409 $39,328 $10,806 $67,686 $14,707 $108,622 $18,076 $82,666 $58,364 $9,913 $28,890 $141,215 $171,251 $199,051 $222,100 $234,473 $229,881 $254,050 $221,013 $241,153 $166,641 $182,836 $133,956 $109,133 $132,997 $137,933 Ending Reserve Balance: Percent Funded: 40.99% 44.29% 45.47% 45.63% 44.14% 40.58% 43.23% 34.88% 38.05% 24.60% 28.16% 19.39% 15.86% 18.85% 18.32% Special Assessment Cost per Unit: $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fiscal Years: Normal: Jan Partial: Jul 2015 (6 months) Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: $137,933 $78,982 $84,988 $1,285,968 $1,324,735 $89,675 $88,771 $113,143 $43,774 $84,075 $77,644 $60,557 $53,216 $258,368 $269,450 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $32,460 $0 $0 $1,250,000 $0 $0 $0 $0 $0 $175,000 $0 $0 $0 $250,000 $0 $0 $782 $841 $12,732 $13,116 $888 $879 $1,120 $433 $832 $769 $600 $527 $2,558 $2,668 $1,110 $92,193 $27,296 $94,212 $6,810 $1,268,407 $34,244 $9,208 $102,262 $167,992 $39,660 $50,146 $40,328 $79,866 $24,046 $190,882 $78,982 $84,988 $1,285,968 $1,324,735 $89,675 $88,771 $113,143 $43,774 $84,075 $77,644 $60,557 $53,216 $258,368 $269,450 $112,139 Ending Reserve Balance: Percent Funded: 9.91% 10.61% % % 10.25% 38.90% 40.47% 13.27% 26.07% 24.31% 16.50% 12.83% 56.36% 55.94% 22.09% Special Assessment Cost per Unit: $0 $0 $2,854 $0 $0 $0 $0 $0 $400 $0 $0 $0 $571 $0 $0 Criterium Engineers Page 4 of 21 8/17/2015

21 Reserve Study Worksheet - Itemized Worksheet Percent Funded Capital Item Reserve Beginning Frequency Amount Remaining Reserve Funding Required To Be Replaced Quantity Unit cost Requirement (*) Balance (yrs**) Per Year Life (yrs) Monthly Annual Comments Site Accent Monuments Replacement 13 ea. $ $2, $ $ $32.53 $ Accent Pilasters 5 ea. $ $1, $ $ $16.36 $ Brick Fencing Repairs (Periodic) 5,200 lin. ft. $13.00 $67, $2, $6, $ $7, Performed '14 Brick Fencing Replacement 5,200 lin. ft. $ $624, $90, $20, $2, $28, Concrete Parking Lot - Seal Cracks 1 lot $4, $4, $ $ $84.40 $1, Invoice Concrete Parking Lot Repairs (Periodic) 1,010 sq. ft. $9.50 $9, ($760.62) 10 $ $71.91 $ % of total Concrete Walkway Repairs (Periodic) 450 sq. ft. $5.00 $2, $ $ $67.21 $ % of total (7) Entrance Monument Repairs 4 ea. $ $2, $ $ $26.73 $ Entry Lighting / Electrical Upgrade 1 lot $3, $3, $1, $ $0.00 $0.00 Flag Pole Replacement 1 ea. $2, $2, $ $ $10.13 $ Approved project Parking Area Luminaire Replacement 2 ea. $1, $2, $ $ $10.61 $ Stone Wall Repairs (Nom 2') 205 lin. ft. $6.00 $1, $ $ $12.22 $ Wood Fencing Replacement (Board-On-Board) 190 lin. ft. $32.00 $6, $1, $ $53.73 $ ' tall Wood Fencing Stain & Repair 190 lin. ft. $4.00 $ $ $ $0.00 $0.00 Wrought Iron Fencing - Clean/Prime/Paint (Periodic) 600 lin. ft. $7.50 $4, $ $ $75.00 $ Includes 3' fence at playground Wrought Iron Fencing - Preplacement 600 lin. ft. $55.00 $33, $4, $ $ $1, Building Exterior Door Replacement 3 ea. $ $1, $ $ $7.01 $84.15 Exterior Wood - Paint & Repair 1 lot $10, $10, $ $1, $ $1, Based on invoice Gutter and Downspout Replacement 260 lin. ft. $7.00 $1, $ $ $10.03 $ Lighting Fixture Replacement - Flood 7 ea. $ $1, $ $ $8.71 $ Lighting Fixture Replacement - Fluorescent 15 ea. $80.00 $1, $ $ $14.27 $ Roof Replacement - Standing Seam Metal 3,850 sq. ft. $5.00 $19, $2, $ $51.76 $ Wood Arbor Replacement 504 sq. ft. $15.00 $7, $1, $ $41.68 $ Wood Arbor / Pavilions - Stain 1 lot $5, $5, $ $1, $95.91 $1, Building Interior Restroom Fixture Replacement 1 lot $2, $2, $ $ $15.32 $ Includes shower Restroom Partition Replacement 3 ea. $ $2, $ $ $8.14 $97.64 Vinyl Wall Covering 1,100 sq.ft. $5.00 $5, $1, $ $49.62 $ Mechanical Card Reader Pool Gate Control Replacement 2 ea. $2, $4, $ $ $28.46 $ DSX Ceiling Fan Replacement 6 ea. $ $2, $ $ $23.80 $ Condition varies Drinking Fountain Replacement 2 ea. $ $ $ $ $10.06 $ Halsey Taylor Electrical Panel Replacement - Cabana 2 ea. $2, $4, $ $ $23.16 $ Electrical Panel Replacement - Site 2 ea. $1, $2, $ $ $28.55 $ Irrigation Controller Replacement 5 ea. $ $3, $ $ $49.82 $ Pool Filter Replacement 2 ea. $1, $3, $ $ $40.09 $ Triton II Commercial Pool Pump Replacement (2 HP) 1 ea. $1, $1, $ $ $18.77 $ Stealth Pool Pump Replacement (3.45 HP) 1 ea. $5, $5, $1, $ $ $1, Century Amenities BBQ Grill Replacement 1 ea. $1, $1, $ $ $4.67 $56.10 Decking Repairs - Kool Deck (Periodic) 6,880 sq. ft. $4.00 $27, $ $2, $ $2, Includes milling cracks, invoice Park Bench Replacement - Vinyl Coated Steel 5 ea. $ $2, $ $ $14.27 $ W/O back Picnic Table Replacement - Vinyl Coated Steel 2 ea. $ $1, $ $ $7.86 $94.35 Playground Equipment Replacement 1 lot $53, $53, $9, $1, $ $2, Playground Equipment/A.C. Concrete - Paint 1 lot $6, $6, $ $ $48.71 $ Invoice Playground Mulch Replacement 3,300 cu. ft. $1.50 $4, $1, $ $0.00 $0.00 Pool Coping/Tile Replacement 325 lin. ft. $25.00 $8, $1, $ $48.34 $ Pool Furniture Replacement 1 lot $10, $10, $1, $1, $ $1, Pool Re-Surface (Gunite) 4,000 sq. ft. $6.50 $26, $1, $3, $ $3, Re-Seal Coping to Decking Joint (Seal-O-Deck) 325 lin. ft. $5.00 $1, $ $ $40.67 $ Trash Receptacle Replacement - Metal 3 ea. $ $1, $ $ $12.73 $ Other Reserve Study Updates 1 ea. $2, $2, $ $ $52.08 $ Criterium Engineers Page 5 of 21 8/17/2015

22 Reserve Study Worksheet - Itemized Worksheet Percent Funded Capital Item Reserve Beginning Frequency Amount Remaining Reserve Funding Required To Be Replaced Quantity Unit cost Requirement (*) Balance (yrs**) Per Year Life (yrs) Monthly Annual Comments Contingency 1 ea. $4, $4, $1, $4, $0.00 $0.00 Total Over Term $1,599, * Costs are typically 10%± ** Reserve study is based on a 30 year projection of non-annual maintenance Totals $1,005, $136, $55, $5, $64, Criterium Engineers Page 6 of 21 8/17/2015

23 Reserve Study Worksheet - Itemized Graph Categories Totals Site $982,565 Building Exterior $96,080 Building Interior $15,850 Mechanical $68,250 Amenities $298,890 Other $137,500 Total $1,599,135 Reserve Study Worksheet - Itemized Graph Site Building Exterior Building Interior Mechanical Site, $982,565 Amenities Other Other, $137,500 Amenities, $298,890 Building Exterior, $96,080 Building Interior, $15,850 Mechanical, $68,250 Criterium Engineers Page 7 of 21 8/17/2015

24 Reserve Study Worksheet - Itemized Funding Monthly Annual Balance Reserve Reserve Reserve Beginning Requiring Funding Funding Categories Requirement Balance Funding Required Required Site $767,815 $103,319 $664,496 $3,508 $42,092 Building Exterior $48,680 $5,993 $42,687 $349 $4,192 Building Interior $10,350 $2,207 $8,143 $73 $877 Mechanical $27,350 $5,628 $21,722 $327 $3,926 Amenities $145,220 $17,815 $127,405 $1,043 $12,521 Other $6,500 $1,585 $4,915 $52 $625 Totals $1,005,915 $136,547 $869,368 $5,353 $64,233 Criterium Engineers Page 8 of 21 8/17/2015

25 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Site Accent Monuments Replacement , ,600 Accent Pilasters , Brick Fencing Repairs (Periodic) , Brick Fencing Replacement Concrete Parking Lot - Seal Cracks , , ,400 Concrete Parking Lot Repairs (Periodic) , Concrete Walkway Repairs (Periodic) 0 0 2, , Entrance Monument Repairs , Entry Lighting / Electrical Upgrade 3, Flag Pole Replacement Parking Area Luminaire Replacement Stone Wall Repairs (Nom 2') , Wood Fencing Replacement (Board-On-Board) , Wood Fencing Stain & Repair Wrought Iron Fencing - Clean/Prime/Paint (Periodic) , , Wrought Iron Fencing - Preplacement Building Exterior Door Replacement Exterior Wood - Paint & Repair , Gutter and Downspout Replacement , Lighting Fixture Replacement - Flood Lighting Fixture Replacement - Fluorescent , Roof Replacement - Standing Seam Metal Wood Arbor Replacement , Wood Arbor / Pavilions - Stain , , ,000 Building Interior Restroom Fixture Replacement , Restroom Partition Replacement Vinyl Wall Covering , Mechanical Card Reader Pool Gate Control Replacement , Ceiling Fan Replacement , Drinking Fountain Replacement Electrical Panel Replacement - Cabana , Electrical Panel Replacement - Site , Irrigation Controller Replacement , Pool Filter Replacement , Pool Pump Replacement (2 HP) , ,500 Pool Pump Replacement (3.45 HP) , , Amenities BBQ Grill Replacement Decking Repairs - Kool Deck (Periodic) , Park Bench Replacement - Vinyl Coated Steel ,750 0 Picnic Table Replacement - Vinyl Coated Steel ,600 Playground Equipment Replacement Playground Equipment/A.C. Concrete - Paint , Playground Mulch Replacement 4, , , Pool Coping/Tile Replacement , Pool Furniture Replacement , , Criterium Engineers Page 9 of 21 8/17/2015

26 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Pool Re-Surface (Gunite) , Re-Seal Coping to Decking Joint (Seal-O-Deck) , , , Trash Receptacle Replacement - Metal , Other Reserve Study Updates , , , Contingency 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 Total Costs 12,960 4,000 6,250 10,625 19,910 33,925 9,050 55,035 11,610 83,250 13,450 59,720 40,935 6,750 19,100 Total Costs Adjusted For 3% Inflation 12,960 4,120 6,631 11,610 22,409 39,328 10,806 67,686 14, ,622 18,076 82,666 58,364 9,913 28,890 Criterium Engineers Page 10 of 21 8/17/2015

27 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Site Accent Monuments Replacement , Accent Pilasters , Brick Fencing Repairs (Periodic) , ,600 Brick Fencing Replacement , Concrete Parking Lot - Seal Cracks , , ,400 Concrete Parking Lot Repairs (Periodic) , Concrete Walkway Repairs (Periodic) 0 2, , Entrance Monument Repairs 2, , Entry Lighting / Electrical Upgrade Flag Pole Replacement , Parking Area Luminaire Replacement 0 2, Stone Wall Repairs (Nom 2') , Wood Fencing Replacement (Board-On-Board) , Wood Fencing Stain & Repair Wrought Iron Fencing - Clean/Prime/Paint (Periodic) 4, , , Wrought Iron Fencing - Preplacement , Building Exterior Door Replacement 1, Exterior Wood - Paint & Repair 10, , Gutter and Downspout Replacement Lighting Fixture Replacement - Flood 0 1, Lighting Fixture Replacement - Fluorescent , Roof Replacement - Standing Seam Metal , Wood Arbor Replacement Wood Arbor / Pavilions - Stain , , ,000 Building Interior Restroom Fixture Replacement Restroom Partition Replacement , Vinyl Wall Covering , Mechanical Card Reader Pool Gate Control Replacement , Ceiling Fan Replacement , Drinking Fountain Replacement Electrical Panel Replacement - Cabana Electrical Panel Replacement - Site , Irrigation Controller Replacement 0 3, ,250 0 Pool Filter Replacement 3, , Pool Pump Replacement (2 HP) , Pool Pump Replacement (3.45 HP) , , Amenities BBQ Grill Replacement 1, Decking Repairs - Kool Deck (Periodic) , Park Bench Replacement - Vinyl Coated Steel Picnic Table Replacement - Vinyl Coated Steel Playground Equipment Replacement , Playground Equipment/A.C. Concrete - Paint , Playground Mulch Replacement 4, , , Pool Coping/Tile Replacement Pool Furniture Replacement , , Criterium Engineers Page 11 of 21 8/17/2015

28 Reserve Study Worksheet - Annual Expense By Year Year: Year Number: Pool Re-Surface (Gunite) 26, , Re-Seal Coping to Decking Joint (Seal-O-Deck) 1, , , , Trash Receptacle Replacement - Metal , Other Reserve Study Updates 0 2, , , ,500 0 Contingency 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 Total Costs 59,175 17,010 57,000 4, ,355 18,960 4,950 53,370 85,120 19,510 23,950 18,700 35,955 10,510 81,000 Total Costs Adjusted For 3% Inflation 92,193 27,296 94,212 6,810 1,268,407 34,244 9, , ,992 39,660 50,146 40,328 79,866 24, ,882 Criterium Engineers Page 12 of 21 8/17/2015

29 Reserve Study Worksheet - Current Funding Levels Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,547 $16,230 $0 $1,398 $17,628 $12,960 $141, $141,215 $32,460 $0 $1,696 $34,156 $4,120 $171, $171,251 $32,460 $0 $1,971 $34,431 $6,631 $199, $199,051 $32,460 $0 $2,199 $34,659 $11,610 $222, $222,100 $32,460 $0 $2,322 $34,782 $22,409 $234, $234,472 $32,460 $0 $2,276 $34,736 $39,328 $229, $229,880 $32,460 $0 $2,515 $34,975 $10,806 $254, $254,049 $32,460 $0 $2,188 $34,648 $67,686 $221, $221,011 $32,460 $0 $2,388 $34,848 $14,707 $241, $241,152 $32,460 $0 $1,650 $34,110 $108,622 $166, $166,639 $32,460 $0 $1,810 $34,270 $18,076 $182, $182,834 $32,460 $0 $1,326 $33,786 $82,666 $133, $133,954 $32,460 $0 $1,081 $33,541 $58,364 $109, $109,131 $32,460 $0 $1,317 $33,777 $9,913 $132, $132,995 $32,460 $0 $1,366 $33,826 $28,890 $137, $137,930 $32,460 $0 $782 $33,242 $92,193 $78, $78,979 $32,460 $0 $841 $33,301 $27,296 $84, $84,985 $32,460 $0 $232 $32,692 $94,212 $23, $23,465 $32,460 $0 $491 $32,951 $6,810 $49, $49,606 $32,460 $0 $0 $32,460 $1,268,407 ($1,186,341) ($1,186,341) $32,460 $0 $0 $32,460 $34,244 ($1,188,125) ($1,188,125) $32,460 $0 $0 $32,460 $9,208 ($1,164,874) ($1,164,874) $32,460 $0 $0 $32,460 $102,262 ($1,234,676) ($1,234,676) $32,460 $0 $0 $32,460 $167,992 ($1,370,208) ($1,370,208) $32,460 $0 $0 $32,460 $39,660 ($1,377,408) ($1,377,408) $32,460 $0 $0 $32,460 $50,146 ($1,395,094) ($1,395,094) $32,460 $0 $0 $32,460 $40,328 ($1,402,962) ($1,402,962) $32,460 $0 $0 $32,460 $79,866 ($1,450,368) ($1,450,368) $32,460 $0 $0 $32,460 $24,046 ($1,441,954) ($1,441,954) $32,460 $0 $0 $32,460 $190,882 ($1,600,376) Criterium Engineers Page 13 of 21 8/17/2015

30 Reserve Study Worksheet - Current Funding Levels Beginning Balance as of start of year beginning Jan 2016: $136,547 CONTRIBUTIONS FIRST YR REM YRS $16, $32, per year $37.05 $74.11 per unit per year $2, $2, per month $6.18 $6.18 per unit per month Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 141, , , , , , , , , , , , , , ,930 Capital Expenditures: 12,960 4,120 6,631 11,610 22,409 39,328 10,806 67,686 14, ,622 18,076 82,666 58,364 9,913 28,890 Special Assessment Total Revenue (all sources) 17,628 34,156 34,431 34,659 34,782 34,736 34,975 34,648 34,848 34,110 34,270 33,786 33,541 33,777 33,826 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 78,979 84,985 23,465 49,606 (1,186,341) (1,188,125) (1,164,874) (1,234,676) (1,370,208) (1,377,408) (1,395,094) (1,402,962) (1,450,368) (1,441,954) (1,600,376) Capital Expenditures: 92,193 27,296 94,212 6,810 1,268,407 34,244 9, , ,992 39,660 50,146 40,328 79,866 24, ,882 Special Assessment Total Revenue (all sources) 33,242 33,301 32,692 32,951 32,460 32,460 32,460 32,460 32,460 32,460 32,460 32,460 32,460 32,460 32,460 Target Funding Requirement Reserve Study Worksheet - Current Funding Levels 260, ,682 6, (119,756) (246,476) (373,195) (499,914) (626,633) Dollars (753,352) (880,071) (1,006,790) (1,133,509) (1,260,229) (1,386,948) (1,513,667) (1,640,386) Funding Years Criterium Engineers Page 14 of 21 8/17/2015

31 Reserve Study Worksheet - Alternative 1, Level Funding with Steps Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,547 $16,230 $0 $1,398 $17,628 $12,960 $141, $141,215 $32,460 $0 $1,696 $34,156 $4,120 $171, $171,251 $45,600 $0 $2,102 $47,702 $6,631 $212, $212,323 $45,600 $0 $2,463 $48,063 $11,610 $248, $248,776 $58,740 $0 $2,851 $61,591 $22,409 $287, $287,958 $58,740 $0 $3,074 $61,814 $39,328 $310, $310,444 $71,880 $0 $3,715 $75,595 $10,806 $375, $375,233 $71,880 $0 $3,794 $75,674 $67,686 $383, $383,221 $85,020 $0 $4,535 $89,556 $14,707 $458, $458,070 $85,020 $0 $4,345 $89,365 $108,622 $438, $438,812 $98,160 $0 $5,189 $103,349 $18,076 $524, $524,086 $98,160 $0 $5,396 $103,556 $82,666 $544, $544,975 $111,300 $0 $5,979 $117,279 $58,364 $603, $603,891 $111,300 $0 $7,053 $118,353 $9,913 $712, $712,331 $124,440 $0 $8,079 $132,519 $28,890 $815, $815,960 $124,440 $0 $8,482 $132,922 $92,193 $856, $856,689 $137,580 $0 $9,670 $147,250 $27,296 $976, $976,643 $137,580 $0 $10,200 $147,780 $94,212 $1,030, $1,030,211 $137,580 $0 $11,610 $149,190 $6,810 $1,172, $1,172,591 $137,580 $0 $418 $137,998 $1,268,407 $42, $42,182 $137,580 $0 $1,455 $139,035 $34,244 $146, $146,973 $137,580 $0 $2,753 $140,334 $9,208 $278, $278,098 $137,580 $0 $3,134 $140,714 $102,262 $316, $316,550 $137,580 $0 $2,861 $140,442 $167,992 $289, $289,000 $137,580 $0 $3,869 $141,449 $39,660 $390, $390,790 $137,580 $0 $4,782 $142,362 $50,146 $483, $483,006 $137,580 $0 $5,803 $143,383 $40,328 $586, $586,061 $137,580 $0 $6,438 $144,018 $79,866 $650, $650,212 $137,580 $0 $7,637 $145,218 $24,046 $771, $771,384 $137,580 $0 $7,181 $144,761 $190,882 $725,263 Criterium Engineers Page 15 of 21 8/17/2015

32 Reserve Study Worksheet - Alternative 1, Level Funding with Steps Beginning Balance as of start of year beginning Jan 2016: $136,547 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $74.11 $32, $137, per year Increment by ($): $30.00 $74.11 $ per unit per year Every 2 year $2, $11, per month Frequency: 8 time $6.18 $26.18 per unit per month Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 141, , , , , , , , , , , , , , ,960 Capital Expenditures: 12,960 4,120 6,631 11,610 22,409 39,328 10,806 67,686 14, ,622 18,076 82,666 58,364 9,913 28,890 Special Assessment Total Revenue (all sources) 17,628 34,156 47,702 48,063 61,591 61,814 75,595 75,674 89,556 89, , , , , ,519 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 856, ,643 1,030,211 1,172,591 42, , , , , , , , , , ,263 Capital Expenditures: 92,193 27,296 94,212 6,810 1,268,407 34,244 9, , ,992 39,660 50,146 40,328 79,866 24, ,882 Special Assessment Total Revenue (all sources) 132, , , , , , , , , , , , , , ,761 Target Funding Requirement Reserve Study Worksheet - Alternative 1, Level Funding with Steps 1,201,907 1,124,522 1,047, , , , , ,210 Dollars 582, , , , , , ,512 41, Funding Years Criterium Engineers Page 16 of 21 8/17/2015

33 Reserve Study Worksheet - Alternative 2, Escalating Funding at 10% per Year Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,547 $16,230 $0 $1,398 $17,628 $12,960 $141, $141,215 $35,706 $0 $1,728 $37,434 $4,120 $174, $174,529 $39,277 $0 $2,072 $41,349 $6,631 $209, $209,247 $43,204 $0 $2,408 $45,613 $11,610 $243, $243,250 $47,525 $0 $2,684 $50,209 $22,409 $271, $271,050 $52,277 $0 $2,840 $55,117 $39,328 $286, $286,839 $57,505 $0 $3,335 $60,841 $10,806 $336, $336,873 $63,256 $0 $3,324 $66,580 $67,686 $335, $335,767 $69,581 $0 $3,906 $73,488 $14,707 $394, $394,548 $76,539 $0 $3,625 $80,164 $108,622 $366, $366,090 $84,193 $0 $4,322 $88,515 $18,076 $436, $436,529 $92,613 $0 $4,465 $97,077 $82,666 $450, $450,940 $101,874 $0 $4,945 $106,818 $58,364 $499, $499,395 $112,061 $0 $6,015 $118,077 $9,913 $607, $607,559 $123,267 $0 $7,019 $130,287 $28,890 $708, $708,956 $135,594 $0 $7,524 $143,118 $92,193 $759, $759,881 $149,154 $0 $8,817 $157,971 $27,296 $890, $890,556 $164,069 $0 $9,604 $173,673 $94,212 $970, $970,017 $164,069 $0 $11,273 $175,342 $6,810 $1,138, $1,138,549 $164,069 $0 $342 $164,411 $1,268,407 $34, $34,552 $164,069 $0 $1,644 $165,713 $34,244 $166, $166,021 $164,069 $0 $3,209 $167,278 $9,208 $324, $324,091 $164,069 $0 $3,859 $167,928 $102,262 $389, $389,756 $164,069 $0 $3,858 $167,927 $167,992 $389, $389,692 $164,069 $0 $5,141 $169,210 $39,660 $519, $519,242 $164,069 $0 $6,332 $170,401 $50,146 $639, $639,497 $164,069 $0 $7,632 $171,701 $40,328 $770, $770,870 $164,069 $0 $8,551 $172,620 $79,866 $863, $863,623 $164,069 $0 $10,036 $174,105 $24,046 $1,013, $1,013,683 $164,069 $0 $9,869 $173,938 $190,882 $996,739 Criterium Engineers Page 17 of 21 8/17/2015

34 Reserve Study Worksheet - Alternative 2, Escalating Funding at 10% per Year Beginning Balance as of start of year beginning Jan 2016: $136,547 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $74.11 $32, $164, per year Increment by (%): 10 $74.11 $ per unit per year Step (%): 0 $2, $13, per month Every 1 year $6.18 $31.22 per unit per month Frequency: 17 time Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 141, , , , , , , , , , , , , , ,956 Capital Expenditures: 12,960 4,120 6,631 11,610 22,409 39,328 10,806 67,686 14, ,622 18,076 82,666 58,364 9,913 28,890 Special Assessment Total Revenue (all sources) 17,628 37,434 41,349 45,613 50,209 55,117 60,841 66,580 73,488 80,164 88,515 97, , , ,287 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 759, , ,017 1,138,549 34, , , , , , , , ,623 1,013, ,739 Capital Expenditures: 92,193 27,296 94,212 6,810 1,268,407 34,244 9, , ,992 39,660 50,146 40,328 79,866 24, ,882 Special Assessment Total Revenue (all sources) 143, , , , , , , , , , , , , , ,938 Target Funding Requirement Reserve Study Worksheet - Alternative 2, Escalating Funding at 10% per Year 1,167,013 1,091,458 1,015, , , , , ,128 Dollars 562, , , , , , ,243 33, Funding Years Criterium Engineers Page 18 of 21 8/17/2015

35 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments Beginning Year Reserve Fund Fee Special Investment Total Capital Ending Year Number Balance Revenue Assessments Earnings Revenue Expenditures Balance $136,547 $16,230 $0 $1,398 $17,628 $12,960 $141, $141,215 $32,460 $0 $1,696 $34,156 $4,120 $171, $171,251 $32,460 $0 $1,971 $34,431 $6,631 $199, $199,051 $32,460 $0 $2,199 $34,659 $11,610 $222, $222,100 $32,460 $0 $2,322 $34,782 $22,409 $234, $234,473 $32,460 $0 $2,276 $34,736 $39,328 $229, $229,881 $32,460 $0 $2,515 $34,976 $10,806 $254, $254,050 $32,460 $0 $2,188 $34,648 $67,686 $221, $221,013 $32,460 $0 $2,388 $34,848 $14,707 $241, $241,153 $32,460 $0 $1,650 $34,110 $108,622 $166, $166,641 $32,460 $0 $1,810 $34,270 $18,076 $182, $182,836 $32,460 $0 $1,326 $33,786 $82,666 $133, $133,956 $32,460 $0 $1,081 $33,541 $58,364 $109, $109,133 $32,460 $0 $1,317 $33,777 $9,913 $132, $132,997 $32,460 $0 $1,366 $33,826 $28,890 $137, $137,933 $32,460 $0 $782 $33,242 $92,193 $78, $78,982 $32,460 $0 $841 $33,302 $27,296 $84, $84,988 $32,460 $1,250,000 $12,732 $1,295,193 $94,212 $1,285, $1,285,968 $32,460 $0 $13,116 $45,576 $6,810 $1,324, $1,324,735 $32,460 $0 $888 $33,348 $1,268,407 $89, $89,675 $32,460 $0 $879 $33,339 $34,244 $88, $88,771 $32,460 $0 $1,120 $33,580 $9,208 $113, $113,143 $32,460 $0 $433 $32,894 $102,262 $43, $43,774 $32,460 $175,000 $832 $208,293 $167,992 $84, $84,075 $32,460 $0 $769 $33,229 $39,660 $77, $77,644 $32,460 $0 $600 $33,060 $50,146 $60, $60,557 $32,460 $0 $527 $32,987 $40,328 $53, $53,216 $32,460 $250,000 $2,558 $285,018 $79,866 $258, $258,368 $32,460 $0 $2,668 $35,128 $24,046 $269, $269,450 $32,460 $0 $1,110 $33,570 $190,882 $112,139 Criterium Engineers Page 19 of 21 8/17/2015

36 Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments Beginning Balance as of start of year beginning Jan 2016: $136,547 CONTRIBUTIONS SETTINGS (analyzed by unit/year) FIRST YR LAST YR Starting amount ($): $74.11 $32, $32, per year Increment by (%): 0 $74.11 $74.11 per unit per year Step (%): 0 $2, $2, per month Every 3 year $6.18 $6.18 per unit per month Frequency: 3 time Threshold: $0.00 Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 141, , , , , , , , , , , , , , ,933 Capital Expenditures: 12,960 4,120 6,631 11,610 22,409 39,328 10,806 67,686 14, ,622 18,076 82,666 58,364 9,913 28,890 Special Assessment Total Revenue (all sources) 17,628 34,156 34,431 34,659 34,782 34,736 34,976 34,648 34,848 34,110 34,270 33,786 33,541 33,777 33,826 Target Funding Requirement Year: Year Number: End of Year Reserve Fund Balance 78,982 84,988 1,285,968 1,324,735 89,675 88, ,143 43,774 84,075 77,644 60,557 53, , , ,139 Capital Expenditures: 92,193 27,296 94,212 6,810 1,268,407 34,244 9, , ,992 39,660 50,146 40,328 79,866 24, ,882 Special Assessment - - 1,250, , , Total Revenue (all sources) 33,242 33,302 1,295,193 45,576 33,348 33,339 33,580 32, ,293 33,229 33,060 32, ,018 35,128 33,570 Target Funding Requirement Reserve Study Worksheet - Alternative 3, Escalating Funding with Special Assessments 1,357,854 1,270,176 1,182,497 1,094,819 1,007, , , ,106 Dollars 656, , , , , , ,357 42, Funding Years Criterium Engineers Page 20 of 21 8/17/2015

37 Summary of Reserve Ending Balances Year Yearly Year Number Expenditures Current Alt. 1 Alt. 2 Alt $12,960 $141,215 $141,215 $141,215 $141, $4,120 $171,251 $171,251 $174,529 $171, $6,631 $199,051 $212,323 $209,247 $199, $11,610 $222,100 $248,776 $243,250 $222, $22,409 $234,472 $287,958 $271,050 $234, $39,328 $229,880 $310,444 $286,839 $229, $10,806 $254,049 $375,233 $336,873 $254, $67,686 $221,011 $383,221 $335,767 $221, $14,707 $241,152 $458,070 $394,548 $241, $108,622 $166,639 $438,812 $366,090 $166, $18,076 $182,834 $524,086 $436,529 $182, $82,666 $133,954 $544,975 $450,940 $133, $58,364 $109,131 $603,891 $499,395 $109, $9,913 $132,995 $712,331 $607,559 $132, $28,890 $137,930 $815,960 $708,956 $137, $92,193 $78,979 $856,689 $759,881 $78, $27,296 $84,985 $976,643 $890,556 $84, $94,212 $23,465 $1,030,211 $970,017 $1,285, $6,810 $49,606 $1,172,591 $1,138,549 $1,324, $1,268,407 ($1,186,341) $42,182 $34,552 $89, $34,244 ($1,188,125) $146,973 $166,021 $88, $9,208 ($1,164,874) $278,098 $324,091 $113, $102,262 ($1,234,676) $316,550 $389,756 $43, $167,992 ($1,370,208) $289,000 $389,692 $84, $39,660 ($1,377,408) $390,790 $519,242 $77, $50,146 ($1,395,094) $483,006 $639,497 $60, $40,328 ($1,402,962) $586,061 $770,870 $53, $79,866 ($1,450,368) $650,212 $863,623 $258, $24,046 ($1,441,954) $771,384 $1,013,683 $269, $190,882 ($1,600,376) $725,263 $996,739 $112,139 Summary of Reserve Ending Balances $1,357,854 $1,157,971 $958,089 $758,206 $558,323 $358,441 Dollars $158,558 ($41,325) 1 ($241,207) ($441,090) ($640,973) ($840,855) ($1,040,738) ($1,240,621) ($1,440,503) ($1,640,386) Funding Years Current Alt. 1 Alt. 2 Alt. 3 Criterium Engineers Page 21 of 21 8/17/2015

38 Appendix B: PROJECT PHOTOGRAPHS

39 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Entrance Monument Photo Number 1 Description: Pilaster and Lantern Photo Number 2

40 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Tower Photo Number 3 Description: Brick Perimeter Fence Photo Number 4

41 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Brick Perimeter Fence Photo Number 5 Description: Board-On-Board- Wood Fence Photo Number 6

42 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Parking Lot Photo Number 7 Description: Walkway Photo Number 8

43 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Parking Light Photo Number 9 Description: Cabana Exterior and Splash Pool Photo Number 10

44 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Cabana Framing and Roof Deck Photo Number 11 Description: Cabana Siding Photo Number 12

45 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Storage Building Photo Number 13 Description: Pool Pavilion Photo Number 14

46 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Restroom Photo Number 15 Description: Pool Equipment Photo Number 16

47 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Drinking Fountains Photo Number 17 Description: Pool and Deck Photo Number 18

48 Location: Photo Taken by: Date: Lowe s Farm Phillip Nieman, P.E. June 19, 2015 Mansfield, TX Description: Pool Furniture Photo Number 19 Description: Playground Photo Number 20

THE RETREAT AT RIVER PARK PLACE

THE RETREAT AT RIVER PARK PLACE 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY THE RETREAT AT RIVER PARK PLACE FORT WORTH, TEXAS Prepared for:

More information

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F 1515 Heritage Dr., Ste. 102 McKinney, TX 75069 972-562-1011 (office) Firm Registration No. F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY CROSS OAK RANCH CROSS ROADS, TEXAS Prepared

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for:

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for: RESERVE FUND STUDY Meadowlake Village 7410 Breda Dr. Prepared for: Meadowlake Village Homeowners Association c/o Regina Real Real Property Management PO Box 1583 Mont Belvieu, TX 77580 Prepared by: Criterium

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW

DRAFT FOR BOARD REVIEW DRAFT FOR BOARD REVIEW FULL RESERVE FUND STUDY OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC Prepared for: OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC & PPM, INC. Prepared by: CRITERIUM GILES ENGINEERS

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by: RESERVE FUND STUDY ASHLAND COCKEYSVILLE, MD 21030 Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM-HARBOR ENGINEERS PO BOX 408 STEVENSON, MARYLAND 21153

More information

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by: DRAFT For Review FULL RESERVE STUDY SETTLERS POINTE LEXINGTON, SC Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION LEXINGTON, SC Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 7 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

CONTENTS. Riverwatch Gloucester, VA

CONTENTS. Riverwatch Gloucester, VA CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION 935 W. BASALT RIDGE DR. SPOKANE, WA 99224 Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by: SAMPLE FULL RESERVE STUDY Prepared for: SAMPLE HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE 200 RALEIGH, NC 27607 (919) 465-3801 NC LIC. NO. C-2871 CONTENTS

More information

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by:

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by: FULL RESERVE STUDY JULIAN POND KERNERSVILLE, NC Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION KERNERSVILLE, NC & CAS, INC. Prepared by: CRITERIUM GILES ENGINEERS 8819 UNIVERSITY EAST DRIVE, SUITE 200

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Retreat at Gleannloch Farms Homeowners Association Spring, TX October 14, 2014 Page 1 of 31 Pages Funding Reserve Analysis

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: WANDERMERE ESTATES HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218 (509)

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for The Bluffs at Ashley River August 2,

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Vallarta Community Association

Vallarta Community Association Funding Reserve Analysis Update with Site Visit for Vallarta Community Association December 18, 2012 Page 1 of 59 Pages Funding Reserve Analysis Update with Site Visit for Vallarta Community Association

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION RESERVE STUDY UPDATE SUMMARY for Vista Tassajara HOMEOWNERS ASSOCIATION Date Prepared: 10/27/2017 for fiscal year 2018 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014 2014 RESERVE FUND STUDY Hill & Associates Ltd. Member APEGNB July 2014 Reserve Fund Study Prepared for Bobak Place Townhome Condominiums Prepared by Hill & Associates Ltd. Consulting Professional Engineers

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I Prepared for: OVERLOOK AT QUALCHAN HOMEOWNERS ASSOCIATION SPOKANE, WA Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218

More information

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224 Quail Ridge THCA 11131-11167 W. 17 th Ave Lakewood, CO 80224 Level 1, Limited Reserve Analysis Report Period 5/01/16-4/30/17 Client Reference Number - 8173 Property Type Townhomes Number of Units 112 Fiscal

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Commercial Assessments

Commercial Assessments Commercial Assessments (888) 225-3755 www.commercialassessments.com Funding Reserve Analysis for Timberlake Crossing Condominium Unit Owners Association Hardy, VA January 15, 2013 Page 1 of 24 Pages Funding

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for Oak Crest Farms November 2, 2016 Page

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION

REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION Community Management by: PROPERTY MANAGEMENT ASSOCIATES Sharon Grozich

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or distributed

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

REPLACEMENT RESERVE STUDY 2006

REPLACEMENT RESERVE STUDY 2006 CLOPPERS MILL COMMUNITY ASSOCIATION REPLACEMENT RESERVE STUDY 2006 MILLER DODSON ASSOCIATES CAPITAL RESERVE CONSULTANTS 929 West Street, Suite 310 Annapolis, Maryland 21401 Tel: 800.850.2835 Fax: 410.268.8483

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Threshold (Min Balance): $ 10,400,000 Indexed for projected

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study perfo

Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study perfo Scope Criterium Engineers was hired to update a reserve study for the Reston Association. The specific tasks included: Review the previous study performed by others Consult with Reston Association management

More information