1

2 CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY PURPOSE & SCOPE PURPOSE SCOPE SOURCES OF INFORMATION DESCRIPTION OBSERVATIONS RESERVE FUND ANALYSIS CONCLUSION LIMITATIONS APPENDIX A: TOWNHOMES RESERVE FUND PROJECTIONS... APPENDIX B: COMMON AREA RESERVE FUND PROJECTIONS... APPENDIX C: PROJECT PHOTOGRAPHS... Greens at Lochmere Cary, NC

3 1.0 INTRODUCTION The Greens at Lochmere Homeowners Association authorized Criterium Giles Engineers to conduct a Reserve Study for the Greens at Lochmere community located in Cary, North Carolina. Studies of this nature are important to ensure a community has sufficient funds for long-term, periodic capital expenditure requirements. Anticipating large expenditures over an extended period of time through a structured analysis and scheduling process assists the Association in meeting financial requirements without increasing the service fees above permitted maximums, borrowing the funds, or levying special financial assessments to the home owners. Typically, a community association has two broad cash requirements: the general operating reserves and the capital repair and replacement reserves. In this report, we will focus on those items falling under the capital repair and replacement reserve criteria. We have projected a capital repair and replacement reserve for twenty (20) years. The first ten years are the most reliable. Such a study should be updated every five years. This report is structured to analyze components of the community for which the Association is responsible and to assess a useful expected life and useful remaining life to those components. The anticipated scheduled repair or replacement of the component and the anticipated expense for the activity are then analyzed in conjunction with the current capital reserves funding program for the community. Funding program recommendations are made with the objective of limiting substantial cash excesses while minimizing financial burdens that can result from significant cash inadequacies. This report is intended to be used as a tool to determine reserve fund allocation requirements for the community, to manage future Association obligations, and to inform the community of future financial needs in general. The report that follows has been prepared from the perspective of what an owner of this property would benefit from knowing. Some items, beyond those of immediate concern, may be discussed. Therefore, the report should be read in its entirety in order to fully understand all of the information that has been obtained. Greens at Lochmere Cary, NC Page 1

4 2.0 EXECUTIVE SUMMARY The Greens at Lochmere is a community in Cary, North Carolina that is comprised of 16 townhome units contained within 3 buildings and 22 single family homes. Based on Wake County tax records, the townhome buildings were originally constructed in The association has responsibility for the exterior of the townhome buildings including roofs, gutters, and siding on the townhome buildings. The association is also responsible for maintaining common area site improvements including common area drainage systems, concrete flatwork at townhome driveways/sidewalks, a section of walking trail, retaining walls, entrance signs and brick pavers at the entrance to the community. The buildings, common areas and grounds are generally in good condition. Based on our evaluation, the current level of funding does not maintain a positive balance through the term of this study. We have provided recommendations for annual reserve contribution schedules that provide sufficient funding to meet capital expenditure requirements in the next twenty years. A more detailed analysis of the reserve fund has been provided in Appendices A & B. Some significant expenditures are expected over the term of the study. Some of the more notable examples are listed below: Replace building roofs and gutters Paint and repair siding and trim There are, of course, other capital expenditures to be expected over the next twenty years. Those items that will require attention are discussed later in this report. Note that we have divided the reserve analysis to reflect two separate accounts for the townhomes and the common areas. Greens at Lochmere Cary, NC Page 2

5 3.0 PURPOSE & SCOPE 3.1 Purpose The purpose of this study is to perform a reserve fund analysis and to determine a capital needs plan. It is intended to be used as a tool for the Greens at Lochmere in determining the allocation requirements into the reserve fund in order to meet future anticipated capital expenditures for the community. This report forecasts obligations for the community twenty years into the future. It should be noted that events might occur that could have an effect on the underlying component or system useful life assumptions used in this study. Likewise, inevitable market fluctuations can have an impact on component or system replacement and repair costs. Therefore, a study such as this should be updated from time to time, usually on a three to five-year cycle, in order to reflect the most accurate needs and obligations of the community. 3.2 Scope This study has been performed according to the scope as generally defined by the Greens at Lochmere, Criterium-Giles Engineers Inc., Sentry Management, and the standards of the Community Associations Institute. The findings and recommendations are based on interviews with the community s management personnel; a review of available documents; and an investigation of the buildings and site. The Cash Flow Method of calculating reserves has been utilized, whereby contributions to the reserve fund are designed to offset the variable annual expenditures. Funding alternates are recommended which are designed to achieve a Baseline Funding goal by maintaining a positive balance for the term of the study. The guidelines used to determine which physical components within the community are to be included in the component inventory are based on the following general criteria: 1. The component must be a common element, or otherwise noted to be the responsibility of the Association to replace. 2. The component must have an estimated remaining useful life of twenty years or less. As the site ages, additional components may need to be added. 3. The funding for replacement should be from one source only, not funded from another area of the budget or through a maintenance contract. 4. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget. Our reserve study analysis included evaluating the following association property: Buildings: The HOA is responsible for maintenance and replacement of the exterior of the buildings including the roofing and gutters, siding and trim. Greens at Lochmere Cary, NC Page 3

6 Mechanical Systems: The Association is responsible for the buried common area plumbing supply and sewer system components serving the townhomes. Site and Grounds: The HOA is responsible for the entrance signs, a section of walking trail, small retaining wall with steps, common area drainage systems and a section of common area site fencing. The above list was obtained from the site inspection and discussions with the management firm prior to the inspection. This study estimates the funding levels required for maintaining the longterm viability of the facility. Our approach involves: 1. Examining association managed equipment, building and site facilities. 2. Predicting their remaining service life and, approximating how frequently they will require repair or replacement. 3. Estimating repair or replacement costs (in 2016 dollars) for each capital item. 4. Using data developed in Steps 1, 2 and 3 to project Capital Reserve balances for Years 1 through 20. The statements in this report are opinions about the present condition of the subject community. They are based on visual evidence available during a diligent investigation of all reasonably accessible areas falling under the responsibility of the Association. We did not remove any surface materials, perform any destructive testing, or move any furnishings. This study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort. For additional limitations, see Section Sources of Information Onsite inspections of the property occurred on the following date: September 6, 2016 October 31, 2016 The following people were interviewed during our study: Letitia Rodrigues, Community Manager, Sentry Management Board members at meeting, 10/14/16 The following documents were made available to us and reviewed: Wake County real estate records Financial statements (income/balance sheet) Governing documents Recorded plat maps Greens at Lochmere Cary, NC Page 4

7 We based our cost estimates on some or all of the following: R.S. Means Our data files on similar projects Local contractor estimates For your reference, the following definitions may be helpful: Excellent: Component or system is in "as new" condition, requiring no rehabilitation and should perform in accordance with expected performance. Good: Component or system is sound and performing its function, although it may show signs of normal wear and tear. Some minor rehabilitation work may be required. Fair: Component or system falls into one or more of the following categories: a) Evidence of previous repairs not in compliance with commonly accepted practice, b) Workmanship not in compliance with commonly accepted standards, c) Component or system is obsolete, d) Component or system approaching end of expected performance. Repair or replacement is required to prevent further deterioration or to prolong expected life. Poor: Component or system has either failed or cannot be relied upon to continue performing its original function as a result of having exceeded its expected performance, excessive deferred maintenance, or state of disrepair. Present condition could contribute to or cause the deterioration of other adjoining elements or systems. Repair or replacement is required. Adequate: A component or system is of a capacity that is defined as enough for what is required, sufficient, suitable, and/or conforms to standard construction practices. All ratings are determined by comparison to other buildings of similar age and construction type. Further, some details of workmanship and materials will be examined more closely in higher quality buildings where such details typically become more relevant. All directions (left, right, rear, etc.), when used, are taken from the viewpoint of an observer standing in front of a building and facing it. Repair/Replacement Reserves - Non-annual maintenance items that will require significant expenditure over the life of the buildings. Included are items that will reach the end of their estimated useful life during the course of this forecast, or, in the opinion of the investigator, will require attention during that time. Greens at Lochmere Cary, NC Page 5

8 4.0 DESCRIPTION The Greens at Lochmere is a community in Cary, North Carolina that is comprised of 16 townhome units contained within 3 buildings and 22 single family homes. Based on Wake County tax records, the townhome buildings were originally constructed in The association has responsibility for the exterior of the townhome buildings including roofs, gutters, and siding on the townhome buildings. The association is also responsible for maintaining common area site improvements including common area drainage systems, concrete flatwork at townhome driveways/sidewalks, a section of walking trail, retaining walls, entrance signs and brick pavers at the entrance to the community. The townhome buildings throughout the community are of wood frame construction on crawl spaces. The exterior of the townhome buildings are predominately clad in wood siding with wood trim components. The roofs of the townhome buildings are predominately clad in architectural grade asphaltic fiberglass shingles with gutters and downspouts. Site drainage is provided via landscaped swales that drain towards catch basins in the paved and landscaped areas. These systems direct water flow offsite. 5.0 OBSERVATIONS The following key observations were made about the current condition of the more significant and costly common elements of the property. Site and Grounds Common Area Allocations: The asphalt paved streets throughout the community are public and maintained by the Town of Cary. However, the association (common area) is responsible for maintaining the brick pavers at the entrance to the community. The brick pavers generally appeared to be in good condition and include concrete apron borders. We noted limited deterioration and cracking developing in individual brick pavers. However, no significant areas of depressions or other significant concerns were observed. We have allocated funds for repairing approximately 10% of the brick paved area on an 8 year cycle beginning in This fund allocation is applied to the common area master reserve analysis. The main entrance includes masonry monument structures with brick veneer. The entrance sign inlay is comprised of a painted engraved wood sign that appeared to be in good condition. We have allocated funds to replace the entrance sign inlay on a 15 year cycle beginning in We have assumed minor repairs and painting of the sign inlay would be funded from an annual maintenance budget. The brick veneer and masonry structures appeared to be in good condition and have an expected useful life beyond the term of this study. However, it is likely that sections of the brick veneer will require periodic mortar re-pointing and repairs. We have allocated funds for repairing the monument structures on a 15 year cycle beginning in These fund allocations are applied to the common area master reserve analysis. Greens at Lochmere Cary, NC Page 6

9 The main entrance includes a limited landscape lighting system with approximately 3 light fixtures. We have allocated funds in the common area master reserve analysis for refurbishing the landscape lighting system at the entrance on a 15 year cycle beginning in A section of brick paved walking trail is located at the entrance to the community. The association plans to complete repairs to the walking trail in the near term. We have allocated funds to repair the walking trail on a 15 year cycle beginning in Townhome Allocations: Fencing is installed behind the townhome building lots adjacent to the golf course. The fencing is comprised of painted white wooden posts with a decorative chain between posts. Fence repairs were in process during the inspection and several fence posts were laying down and noted to be deteriorated. We have assumed minor repairs would be funded from an annual maintenance budget. We have allocated funds for replacing the fencing on a 20 year cycle beginning in Storm water on the site drains via surface flow or via landscaped swales toward catch basins and inlet pipes in the paved and landscaped areas. Inlets in the roadway gutters and the grassed areas collect stormwater that flows to an adjacent creek. The swales tend to accumulate sediment that settles out during storm events and will need to be periodically removed and re-graded. In addition, over time, small landscape drainage systems will likely need to be installed in flat areas of the community to address concerns. We recommend maintaining adequate soil stabilizing ground cover to reduce erosion concerns. We have allocated funds to repair the drainage systems on a 5 year cycle beginning in Repairs will likely include retrenching of swales to improve flow, adding rip rap or vegetation to stabilize exposed or steep areas, repairing erosion concerns, extending gutter downspouts to underground systems, installing french drains or other types of minor drainage systems. Mailboxes are installed in brick structures along the road at the townhomes. The mailbox inserts are moderately protected from the elements and appeared to be in good condition. We have allocated funds to replace the mailbox inserts on a 20 year cycle beginning in In addition to the brick structures enclosing the mail boxes, brick accent walls are located around the front and rear of the townhome buildings. The brick accent walls and brick structures at the mail boxes generally appeared to be in good condition. It is likely that repairs to sections of the brick structures will be periodically required. This would include repointing sections of mortar and other brick repairs. We have allocated funds for repairing sections of the brick accent wall structures and mailbox enclosures on a 10 year cycle beginning in Greens at Lochmere Cary, NC Page 7

10 Concrete flatwork in common areas includes the driveways and sections of walkways at the townhome buildings. Note that the association is not responsible for repairing rear concrete patios or sections of brick or concrete flatwork in the front courtyard areas at the townhome buildings. The concrete driveways and sidewalks generally appeared to be in good to fair condition. We noted sections of cracking and settlement/upheaval developing in concrete driveways. Specifically, we observed moderate cracking developing in the driveway at unit 109. We have allocated funds to repair sections of the concrete flatwork in the common area on a 5 year cycle beginning in Repairs would likely include saw-cutting and removing sections of concrete and installing new concrete. The association is responsible for maintaining the common area buried sanitary sewer system piping. Considering the age of the infrastructure, we recommend the association conduct routine video borescope inspections of the buried piping. This will greatly assist in determining the condition of the piping and developing pro-active repair plans. We have provided an allocation of funds to repair common buried piping on a 4 year cycle beginning in Repairs would likely include excavating and replacing sections of the piping or possibly root treatment and hydrojetting to remove debris as a less invasive alternative. Sections of the common area landscaped areas are served by a landscape irrigation system with control systems and a backflow preventer. We observed irrigation heads in several areas of the common area. We have assumed repairs to the landscape irrigation systems would be funded from an annual maintenance budget. A timber retaining wall with timber framed steps and a section of asphalt paved trail is located on association owned property at the north end of the community between the main entrance and the golf course. The section of trail appears to have been abandoned in place. We have assumed that the section of trail is no longer used and any limited repairs/maintenance and eventual removal would be funded from an annual maintenance budget. For reference, we estimate the cost to replace the retaining wall and steps to be approximately $10,800. We estimate the cost to resurface the asphalt paved trail to be approximately $4,000. However, we have not included these funds in our capital reserve analysis. Common Building Exteriors The predominant pitched roof surfaces over the buildings are covered in architectural grade asphaltic fiberglass shingles. Roof surfacing is applied over wood roof sheathing, and generally appears to be in good condition. The roofs include ridge and soffit vents with powered ventilators also observed. The buildings also include gutters and downspouts. The shingles generally appeared to be in good condition with no significant concerns observed in our limited inspection. We are unaware of any concerns with current roof leaks. We noted a section of gutter that was loose at the rear of unit 110. We anticipate minor improvements including replacing vent boots, flashing and drip edge repairs, and gutter repairs will begin to be required in the near term. We have assumed minor repairs Greens at Lochmere Cary, NC Page 8

11 would be funded from an annual maintenance budget. This type of roofing has an expected useful life of approximately years. We strongly recommend that any re-roofing project closely follow procedures outlined by the National Roofing Contractors Association s Roofing and Waterproofing Manual. A re-roofing sequence should include removal of the existing roofing material, replacement of any inadequate roof sheathing, replacement of any damaged flashing, and replacement of drip edge components. We have allocated funds to replace the roofs on all of the buildings in Note that we observed sections of the community with trees extending over the roofs and debris accumulation on the roofs of the buildings. We recommend trimming trees away from building roofs to help prolong the life of the roof surfacing. Gutters and downspouts are in generally good condition. We strongly recommend periodic cleaning and repairs/adjustments of gutters and downspouts to allow adequate flow of stormwater. We have included funds for repairing sections of gutters and downspouts during the roof replacement. Skylights are installed in several areas of the roofing. Skylights have an expected useful life similar to the roof surfacing and are typically replaced in conjunction with roof replacement. We have allocated funds to replace the skylights on a 20 year cycle beginning in Metal chimney caps are installed on top of the chimneys on the buildings. We observed evidence of surface rust developing on the chimney caps and have allocated funds for replacing the chimney caps on a 20 year cycle beginning in The buildings throughout the community are predominately clad in wood siding and trim. Limited areas of brick veneer are also installed on the buildings. Windows appeared to be of varying types with some original wood windows observed. The association is not responsible for replacing windows and doors. However the association is responsible for painting the windows and doors. The exterior surfaces of the buildings generally appeared to be in fair condition. We observed sections of rotted wood components in the community, specifically including a section of fascia at the front of unit 110, window trim on the left side of unit 101 and the fascia above the garage at unit 119. We also observed minor areas of warping siding. A section of damage was observed on the chimney at unit 115. We also noted areas of flaking paint around window trim in several areas of the community. We typically recommend painting and repairing exterior wood siding and trim components on a 7 year cycle. The painting cycles should include repairing deteriorated/damaged siding and trim components, repairing or replacing sections of deteriorated caulking as needed, a thorough cleaning of the exterior surfaces and the application of two coats of a high-quality exterior paint. We have allocated funds to repair and paint the exterior surfaces on a 7 year cycle beginning in We have deferred the Greens at Lochmere Cary, NC Page 9

12 painting and repair cycle a couple of years to allow time to accumulate adequate funds in the reserve account. We have assumed minor repairs to the damaged areas noted above would be completed in the interim and funded from an annual maintenance budget. We do not anticipate significant expenses will be required for repairing or repointing the brick veneer in the community. Brick veneer has an expected useful life of 50+ years. Many of the townhomes include rear decks. Reportedly, the association is not responsible for maintaining these components. Note that replacement of the doors and windows on the buildings are the responsibility of the individual unit owner. We have also assumed replacement of exterior light fixtures mounted on the buildings would be the responsibility of the individual unit owner. 6.0 RESERVE FUND ANALYSIS Using software developed by Criterium Engineers and KPMG Peat Marwick, we have analyzed capital reserves draw-down for the projected capital expenditures to determine the amount needed. The following is a projected reserve fund analysis for non-annual items as discussed in the report. This projection takes into consideration a reasonable return on invested moneys and inflation. Please review this thoroughly and let us know of any changes that may be desired. The intent of this reserve fund projection is to help the Association develop a reserve fund to provide for anticipated repair or replacements of various system components during the next twenty years. The capital items listed are those that are typically the responsibility of the Association and are derived from a list provided the Association with several items added as a result of the inspection. However, association bylaws vary, and therefore, which components are the responsibilities of the owner and which are the responsibilities of the Association can vary. The Association should confirm that the items listed should be financed by the reserve fund. This projection provides the following: An input sheet that defines all the criteria used for the financial alternatives, including the assumed inflation rate of 3% annually and rate of return on deposited reserve funds of 1.5% annually. A table that lists anticipated replacement and/or repair items complete with estimated remaining life expectancies, projected costs of replacement and/or repair, a frequency in years of when these items require replacement and/or repair, and a projection based on this frequency. A table and graph that represent end of year balances versus capital expenditures based on your current funding program and reserve balances, and alternatives to your current program. The provided graphs illustrate what effects the funding methods will have over the Greens at Lochmere Cary, NC Page 10

13 presented twenty-year period versus the anticipated capital expenditures. Note that based on our developed list of capital items and taking inflation into account; the current funding level is not adequate. The Association should bear in mind that unanticipated expenditures can always arise and maintenance of a significant reserve fund balance can be viewed as a way to avoid special assessments. We have included alternatives to your current reserve funding program and recommend that the board adopt an alternative that best reflects the objectives of the community. In summary they are as follows: TOWNHOMES Current Reserve Funding Rate: $6,000/year ($31.25/unit/month) Current Reserve Balance: $26,599 (projected 2017 starting balance) Alternative 1: Beginning in 2017, increase the reserve contribution each year for the next 9 years. The amount of the increase should be $3,600 per year ($18.75 per unit per month). This alternative is projected to maintain a positive balance through the term of this study. Alternative 2: Increase the annual contribution in 2017 to $20,400 per year ($ per unit per month). Then, increase the reserve contribution every year for the next 10 years by 5.5%. This alternative is projected to maintain a positive balance through the term of this study. COMMON AREA MASTER Current Reserve Funding Rate: $0.00 Current Reserve Balance: $16,404 Alternative 1: Beginning in 2017, set the annual reserve contribution rate to $180 per year. Then increase the reserve contribution rate by $180 per year every 3 years for the next 10 years. This alternative is projected to maintain a positive balance over the term. Alternative 2: In 2017, set the annual reserve contribution rate to $600 per year and maintain this contribution rate for the next 20 years. This alternative is projected to maintain a positive balance over the term. Please note that the reserve fund study does not include typical annual maintenance items. Our assumption is that you already have an annual operating budget that provides for these typical, repetitive items. This includes miscellaneous repairs, lawn and grounds maintenance, routine minor painting, etc. We have focused on those significant, non-annual items where careful financial planning is important. Greens at Lochmere Cary, NC Page 11

14 Finally, please note that the estimates we have developed are based on 2016 dollars. Our reserve fund study does adjust for an estimated annual inflation and a given return on investment assuming that the indicated fund balances are maintained. 7.0 CONCLUSION The alternatives provided above should provide sufficient funding to meet estimated capital expenditures during the next twenty years. Further detail of the reserve fund analysis is provided in Appendices A and B. 8.0 LIMITATIONS The observations described in this study are valid on the date of the investigation and have been made under the conditions noted in the report. We prepared this study for the exclusive use of the Greens at Lochmere. Criterium-Giles Engineers Inc. does not intend any other individual or party to rely upon this study without our express written consent. If another individual or party relies on this study, they shall indemnify and hold Criterium-Giles Engineers Inc. harmless for any damages, losses, or expenses they may incur as a result of its use. This study is limited to the visual observations made during our inspection. We did not remove surface materials, conduct any destructive or invasive testing, move furnishings or equipment, or undertake any digging or excavation. Accordingly, we cannot comment on the condition of systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not within the scope of our services at the time of the investigation. We did not undertake to completely assess the stability of the buildings or the underlying foundation soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment. We did not investigate the following areas: Buried utilities or infrastructure Concealed structural members or systems Unit interiors We do not render an opinion on uninvestigated portions of the community. We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code compliance investigation. This study is not to be considered a warranty of condition, and no warranty is implied. The appendices are an integral part of this report and must be included in any review. Members of the Criterium-Giles Engineers team working on this reserve study are not members of, or otherwise associated with the association. Criterium-Giles Engineers has disclosed any other involvement with the association that could result in conflicts of interest. Information provided by the official representative of the association regarding financial, physical, quantity, or historical issues, will be deemed reliable by Criterium-Giles Engineers. The reserve balance presented in the Reserve Study is based upon information provided and was not audited. Greens at Lochmere Cary, NC Page 12

15

16 Appendix A: TOWNHOME RESERVE FUND PROJECTIONS

17 Itemized Worksheet Capital Item Reserve Frequency Remaining To Be Replaced Quantity Unit cost Requirement (*) (yrs**) Life (yrs) Information Source Site Common area drainage improvements 1 LS $4, $4, Repair sections of concrete flatwork 1 LS $4, $4, Replace fencing at rear of townhomes 300 LF $15.00 $4, Replace mailboxes 19 EA $ $2, Repair brick accent wall structures and mailboxes 1 LS $4, $4, Allocation for common area buried utility repairs 1 LS $3, $3, Building Exterior Replace building roofs, repair gutters 450 SQ $ $132, Replace skylights 31 EA $ $23, Repair/paint exterior siding and trim 16 EA $2, $38, Replace chimney caps 10 EA $ $7, Building Interior Mechanical Amenities Other Totals $225, * Costs are typically 10%± ** Reserve study is based on a 20 year projection of non-annual maintenance Total Over Term $345, Criterium Engineers Page 1 of 14 11/2/2016

18 Annual Expense By Year Year: Year Number: Site Common area drainage improvements , , ,500 0 Repair sections of concrete flatwork 0 4, , , Replace fencing at rear of townhomes 0 4, Replace mailboxes , Repair brick accent wall structures and mailboxes , Allocation for common area buried utility repairs , , , Building Exterior Replace building roofs, repair gutters , Replace skylights , Repair/paint exterior siding and trim , , Replace chimney caps , Building Interior Mechanical Amenities Other Total Costs 0 9,250 38,400 7,000 8, , ,500 47,400 2,375 4, , ,500 0 Total Costs Adjusted For 3% Inflation 0 9,528 40,739 7,649 9, , ,434 61,846 3,192 6, , ,807 0 Criterium Engineers Page 2 of 14 11/2/2016

19 Annual Expense By Year Year: Year Number: Site Common area drainage improvements Repair sections of concrete flatwork Replace fencing at rear of townhomes Replace mailboxes Repair brick accent wall structures and mailboxes Allocation for common area buried utility repairs Building Exterior Replace building roofs, repair gutters Replace skylights Repair/paint exterior siding and trim Replace chimney caps Building Interior Mechanical Amenities Other Total Costs Total Costs Adjusted For 3% Inflation ,500 4, ,500 3, , , ,000 74, ,782 Criterium Engineers Page 3 of 14 11/2/2016

20 Reserve Study Worksheet General Information: 1 Organization: Greens at Lochmere - Townhomes 2 Address: Cary, NC 3 Number of Units 16 4 Age of Building (in years) 30 5a Study Period (in years) 20 5b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months 6 Site Inspection Date September 6, Reserve Funds at start $23,494 8 Rate of Return on invested Reserve Funds (%) 1.5% 9 Inflation Rate (%) 3.0% 10 Current Funding Levels Existing Funding Levels Total/Month Total Annual Per Unit/Month Per Unit/Year Reserve Fund Contribution... $500 $6,000 $31.25 $ Years Out Total Annual Per Unit Planned Special Assessment... 0 $0 $0 Balance Computed... ($329,142) 11 Alternative Reserve Fund Contribution Alternative 1 Level Funding with Steps Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $800 $9,600 $50.00 $ Monthly Amount, (Last Year)... $3,200 $38,400 $ $2, Balance Required Final Year... $23,675 Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... $221,617 Alternative 2 Escalating Funding at 5.5% per Year Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $1,700 $20,400 $ $1, Monthly Amount, (Last Year)... $2,752 $33,030 $ $2, Balance Required Final Year... $23,675 Base Escalation % % Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... $176,797 Alternative 3 Escalating Funding with Special Assessments (NOT USED) Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $500 $6,000 $31.25 $ Monthly Amount, (Last Year)... $500 $6,000 $31.25 $ Balance Required Final Year... $23,675 Base Escalation % % Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... Criterium Engineers ($329,142) Page 4 of 14 11/2/2016

21 Reserve Fund Worksheet Fiscal Years: Normal: Jan Partial: Jan 2017 (12 months) Existing Funding Levels Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $23,494 $29,936 $26,805 ($7,934) ($9,583) ($12,587) ($6,587) ($6,258) ($258) $1,327 ($54,519) ($51,711) ($52,286) ($273,695) ($267,695) ($268,501) $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $442 $396 $0 $0 $0 $0 $0 $0 $20 $0 $0 $0 $0 $0 $0 $0 $0 $9,528 $40,739 $7,649 $9,004 $0 $5,672 $0 $4,434 $61,846 $3,192 $6,575 $227,409 $0 $6,807 $0 $29,936 $26,805 ($7,934) ($9,583) ($12,587) ($6,587) ($6,258) ($258) $1,327 ($54,519) ($51,711) ($52,286) ($273,695) ($267,695) ($268,501) ($262,501) Alternative 1, Level Funding with Steps Average Cap. Expenditure $23,675 Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $23,494 $33,590 $37,822 $14,092 $27,245 $42,875 $71,532 $98,516 $135,316 $171,821 $150,601 $188,596 $223,727 $35,239 $74,744 $107,932 $9,600 $13,200 $16,800 $20,400 $24,000 $27,600 $31,200 $34,800 $38,400 $38,400 $38,400 $38,400 $38,400 $38,400 $38,400 $38,400 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $496 $559 $208 $403 $634 $1,057 $1,456 $2,000 $2,539 $2,226 $2,787 $3,306 $521 $1,105 $1,595 $2,195 $0 $9,528 $40,739 $7,649 $9,004 $0 $5,672 $0 $4,434 $61,846 $3,192 $6,575 $227,409 $0 $6,807 $0 $33,590 $37,822 $14,092 $27,245 $42,875 $71,532 $98,516 $135,316 $171,821 $150,601 $188,596 $223,727 $35,239 $74,744 $107,932 $148,527 Alternative 2, Escalating Funding at 5.5% per Year Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $23,494 $44,552 $57,395 $39,953 $57,102 $74,471 $102,649 $126,983 $159,008 $188,670 $162,251 $194,970 $224,746 $30,822 $64,810 $92,398 $20,400 $21,522 $22,706 $23,955 $25,272 $26,662 $28,128 $29,675 $31,308 $33,030 $33,030 $33,030 $33,030 $33,030 $33,030 $33,030 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $658 $848 $590 $844 $1,101 $1,517 $1,877 $2,350 $2,788 $2,398 $2,881 $3,321 $456 $958 $1,365 $1,881 $0 $9,528 $40,739 $7,649 $9,004 $0 $5,672 $0 $4,434 $61,846 $3,192 $6,575 $227,409 $0 $6,807 $0 $44,552 $57,395 $39,953 $57,102 $74,471 $102,649 $126,983 $159,008 $188,670 $162,251 $194,970 $224,746 $30,822 $64,810 $92,398 $127,309 Alternative 3, Escalating Funding with Special Assessments (NOT USED) Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $23,494 $29,936 $26,805 ($7,934) ($9,583) ($12,587) ($6,587) ($6,258) ($258) $1,327 ($54,519) ($51,711) ($52,286) ($273,695) ($267,695) ($268,501) $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $442 $396 $0 $0 $0 $0 $0 $0 $20 $0 $0 $0 $0 $0 $0 $0 $0 $9,528 $40,739 $7,649 $9,004 $0 $5,672 $0 $4,434 $61,846 $3,192 $6,575 $227,409 $0 $6,807 $0 $29,936 $26,805 ($7,934) ($9,583) ($12,587) ($6,587) ($6,258) ($258) $1,327 ($54,519) ($51,711) ($52,286) ($273,695) ($267,695) ($268,501) ($262,501) Criterium Engineers Page 5 of 14 11/2/2016

22 Reserve Fund Worksheet Fiscal Years: Normal: Jan 2017 Partial: Jan 2017 (12 months) Existing Funding Levels Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: ($262,501) ($331,361) ($325,361) ($319,361) $6,000 $6,000 $6,000 $6,000 $0 $0 $0 $0 $0 $0 $0 $0 $74,860 $0 $0 $15,782 ($331,361) ($325,361) ($319,361) ($329,142) Alternative 1, Level Funding w Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $148,527 $113,748 $154,431 $195,723 $38,400 $38,400 $38,400 $38,400 $0 $0 $0 $0 $0 $0 $0 $0 $1,681 $2,282 $2,892 $3,275 $74,860 $0 $0 $15,782 $113,748 $154,431 $195,723 $221,617 Alternative 2, Escalating Fundi Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $127,309 $86,761 $121,587 $156,936 $33,030 $33,030 $33,030 $33,030 $0 $0 $0 $0 $0 $0 $0 $0 $1,282 $1,797 $2,319 $2,613 $74,860 $0 $0 $15,782 $86,761 $121,587 $156,936 $176,797 Alternative 3, Escalating Fundi Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: ($262,501) ($331,361) ($325,361) ($319,361) $6,000 $6,000 $6,000 $6,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $74,860 $0 $0 $15,782 ($331,361) ($325,361) ($319,361) ($329,142) Criterium Engineers Page 6 of 14 11/2/2016

23 Itemized Graph Categories Totals Site $66,875 Building Exterior $278,200 Building Interior $0 Mechanical $0 Amenities $0 Other $0 Total $345,075 Amenities, $0 Other, $0 Mechanical, $0 Building Interior, $0 Site, $66,875 Itemized Graph Building Exterior, $278,200 Site Building Exterior Building Interior Mechanical Amenities Other Criterium Engineers Page 7 of 14 11/2/2016

24 Itemized Funding Monthly Annual Balance Reserve Reserve Full Reserve Beginning Requiring Funding Funding Funding Percent Categories Requirement Balance Funding Required Required Balance Funded Site $66,875 $2,344 $64,531 $843 $10,117 $10,613 Building Exterior $278,200 $21,150 $257,050 $2,493 $29,919 $95,779 Building Interior $0 $0 $0 $0 $0 $0 Mechanical $0 $0 $0 $0 $0 $0 Amenities $0 $0 $0 $0 $0 $0 Other $0 $0 $0 $0 $0 $0 Totals $345,075 $23,494 $321,581 $3,336 $40,036 $106, % Criterium Engineers Page 8 of 14 11/2/2016

25 Existing Funding Levels Beginning Year Reserve Fund Fee Special Investment Capital Ending Year Number Balance Revenue Assessments Earnings Expenditures Balance $23,494 $6,000 $0 $442 $0 $29, $29,936 $6,000 $0 $396 $9,528 $26, $26,805 $6,000 $0 $0 $40,739 ($7,934) ($7,934) $6,000 $0 $0 $7,649 ($9,583) ($9,583) $6,000 $0 $0 $9,004 ($12,587) ($12,587) $6,000 $0 $0 $0 ($6,587) ($6,587) $6,000 $0 $0 $5,672 ($6,258) ($6,258) $6,000 $0 $0 $0 ($258) ($258) $6,000 $0 $20 $4,434 $1, $1,327 $6,000 $0 $0 $61,846 ($54,519) ($54,519) $6,000 $0 $0 $3,192 ($51,711) ($51,711) $6,000 $0 $0 $6,575 ($52,286) ($52,286) $6,000 $0 $0 $227,409 ($273,695) ($273,695) $6,000 $0 $0 $0 ($267,695) ($267,695) $6,000 $0 $0 $6,807 ($268,501) ($268,501) $6,000 $0 $0 $0 ($262,501) ($262,501) $6,000 $0 $0 $74,860 ($331,361) ($331,361) $6,000 $0 $0 $0 ($325,361) ($325,361) $6,000 $0 $0 $0 ($319,361) ($319,361) $6,000 $0 $0 $15,782 ($329,142) Criterium Engineers Page 9 of 14 11/2/2016

26 Existing Funding Levels Beginning Balance as of start of year beginning Jan 2017: $23,494 CONTRIBUTIONS SPECIAL ASSESSMENTS AMOUNT Totals $6, per year Per Year $0 Per Unit $0 $ per unit per year $ per month $31.25 per unit per month Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 29,936 26,805 (7,934) (9,583) (12,587) (6,587) (6,258) (258) 1,327 (54,519) (51,711) (52,286) (273,695) (267,695) (268,501) Capital Expenditures: - 9,528 40,739 7,649 9,004-5,672-4,434 61,846 3,192 6, ,409-6,807 Total Revenue (all sources) 6,442 6,396 6,000 6,000 6,000 6,000 6,000 6,000 6,020 6,000 6,000 6,000 6,000 6,000 6,000 Year: Year Number: End of Year Reserve Fund Balance (262,501) (331,361) (325,361) (319,361) (329,142) Capital Expenditures: - 74, ,782 Total Revenue (all sources) 6,000 6,000 6,000 6,000 6,000 Existing Funding Levels 50, (50,000) (100,000) Dollars (150,000) (200,000) (250,000) (300,000) (350,000) Funding Years Criterium Engineers Page 10 of 14 11/2/2016

27 Alternative 1: Level Funding with Steps Beginning Year Reserve Fund Fee Special Special Investment Capital Ending Year Number Balance Revenue Assessments 1 Assessments 2 Earnings Expenditures Balance $23,494 $9,600 $0 $0 $496 $0 $33, $33,590 $13,200 $0 $0 $559 $9,528 $37, $37,822 $16,800 $0 $0 $208 $40,739 $14, $14,092 $20,400 $0 $0 $403 $7,649 $27, $27,245 $24,000 $0 $0 $634 $9,004 $42, $42,875 $27,600 $0 $0 $1,057 $0 $71, $71,532 $31,200 $0 $0 $1,456 $5,672 $98, $98,516 $34,800 $0 $0 $2,000 $0 $135, $135,316 $38,400 $0 $0 $2,539 $4,434 $171, $171,821 $38,400 $0 $0 $2,226 $61,846 $150, $150,601 $38,400 $0 $0 $2,787 $3,192 $188, $188,596 $38,400 $0 $0 $3,306 $6,575 $223, $223,727 $38,400 $0 $0 $521 $227,409 $35, $35,239 $38,400 $0 $0 $1,105 $0 $74, $74,744 $38,400 $0 $0 $1,595 $6,807 $107, $107,932 $38,400 $0 $0 $2,195 $0 $148, $148,527 $38,400 $0 $0 $1,681 $74,860 $113, $113,748 $38,400 $0 $0 $2,282 $0 $154, $154,431 $38,400 $0 $0 $2,892 $0 $195, $195,723 $38,400 $0 $0 $3,275 $15,782 $221,617 Criterium Engineers Page 11 of 14 11/2/2016

28 Alternative 1: Level Funding with Steps Beginning Balance as of start of year beginning Jan 2017: $23,494 CONTRIBUTIONS SPECIAL ASSESSMENTS SETTINGS (analyzed by year) FIRST YR LAST YR Totals Starting amount ($): 800 $9, $38, per year First Per Year $0 Per Unit $0 Increment by ($): 300 $ $2, per unit per year Second Per Year $0 Per Unit $0 Every 1 year $ $3, per month Frequency: 8 time $50.00 $ per unit per month Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 33,590 37,822 14,092 27,245 42,875 71,532 98, , , , , ,727 35,239 74, ,932 Capital Expenditures: - 9,528 40,739 7,649 9,004-5,672-4,434 61,846 3,192 6, ,409-6,807 Total Revenue (all sources) 10,096 13,759 17,008 20,803 24,634 28,657 32,656 36,800 40,939 40,626 41,187 41,706 38,921 39,505 39,995 Year: Year Number: End of Year Reserve Fund Balance 148, , , , ,617 Capital Expenditures: - 74, ,782 Total Revenue (all sources) 40,595 40,081 40,682 41,292 41,675 Alternative 1: Level Funding with Steps 250, , ,000 Dollars 100,000 50, Funding Years Criterium Engineers Page 12 of 14 11/2/2016

29 Alternative 2: Escalating Funding at 5.5% per Year Beginning Year Reserve Fund Fee Special Special Investment Capital Ending Year Number Balance Revenue Assessments 1 Assessments 2 Earnings Expenditures Balance $23,494 $20,400 $0 $0 $658 $0 $44, $44,552 $21,522 $0 $0 $848 $9,528 $57, $57,395 $22,706 $0 $0 $590 $40,739 $39, $39,953 $23,955 $0 $0 $844 $7,649 $57, $57,102 $25,272 $0 $0 $1,101 $9,004 $74, $74,471 $26,662 $0 $0 $1,517 $0 $102, $102,649 $28,128 $0 $0 $1,877 $5,672 $126, $126,983 $29,675 $0 $0 $2,350 $0 $159, $159,008 $31,308 $0 $0 $2,788 $4,434 $188, $188,670 $33,030 $0 $0 $2,398 $61,846 $162, $162,251 $33,030 $0 $0 $2,881 $3,192 $194, $194,970 $33,030 $0 $0 $3,321 $6,575 $224, $224,746 $33,030 $0 $0 $456 $227,409 $30, $30,822 $33,030 $0 $0 $958 $0 $64, $64,810 $33,030 $0 $0 $1,365 $6,807 $92, $92,398 $33,030 $0 $0 $1,881 $0 $127, $127,309 $33,030 $0 $0 $1,282 $74,860 $86, $86,761 $33,030 $0 $0 $1,797 $0 $121, $121,587 $33,030 $0 $0 $2,319 $0 $156, $156,936 $33,030 $0 $0 $2,613 $15,782 $176,797 Criterium Engineers Page 13 of 14 11/2/2016

30 Alternative 2: Escalating Funding at 5.5% per Year Beginning Balance as of start of year beginning Jan 2017: $23,494 CONTRIBUTIONS SPECIAL ASSESSMENTS SETTINGS (analyzed by year) FIRST YR LAST YR Totals Starting amount ($): 1700 $20, $33, per year First Per Year $0 Per Unit $0 Increment by (%): 5.5 $1, $2, per unit per year Second Per Year $0 Per Unit $0 Step (%): $1, $2, per month Every 1 year $ $ per unit per month Frequency: 9 time Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 44,552 57,395 39,953 57,102 74, , , , , , , ,746 30,822 64,810 92,398 Capital Expenditures: - 9,528 40,739 7,649 9,004-5,672-4,434 61,846 3,192 6, ,409-6,807 Total Revenue (all sources) 21,058 22,370 23,296 24,798 26,373 28,179 30,005 32,025 34,096 35,427 35,911 36,351 33,485 33,987 34,395 Year: Year Number: End of Year Reserve Fund Balance 127,309 86, , , ,797 Capital Expenditures: - 74, ,782 Total Revenue (all sources) 34,911 34,312 34,826 35,349 35,642 Alternative 2: Escalating Funding at 5.5% per Year 250, , ,000 Dollars 100,000 50, Funding Years Criterium Engineers Page 14 of 14 11/2/2016

31 Appendix B: COMMON AREA RESERVE FUND PROJECTIONS

32 Itemized Worksheet Capital Item Reserve Frequency Remaining To Be Replaced Quantity Unit cost Requirement (*) (yrs**) Life (yrs) Information Source Site Replace entrance sign inlay 1 EA $1, $1, Allocation to repair entrance monuments 1 LS $2, $2, Refurbish landscape lighting system at entrance 1 LS $1, $1, Repair sections of brick pavers at entrance 45 SY $95.00 $4, Approx. 10% every 8 years Repair brick paved walking trail 1 LS $2, $2, Building Exterior Building Interior Mechanical Amenities Other Totals $11, * Costs are typically 10%± ** Reserve study is based on a 20 year projection of non-annual maintenance Total Over Term $18, Criterium Engineers Page 1 of 12 10/31/2016

33 Annual Expense By Year Year: Year Number: Site Replace entrance sign inlay , Allocation to repair entrance monuments , Refurbish landscape lighting system at entrance , Repair sections of brick pavers at entrance , , Repair brick paved walking trail 2, ,500 Building Exterior Building Interior Mechanical Amenities Other Total Costs 2, , ,500 3, , ,500 Total Costs Adjusted For 3% Inflation 2, , ,845 4, , ,895 Criterium Engineers Page 2 of 12 10/31/2016

34 Annual Expense By Year Year: Year Number: Site Replace entrance sign inlay Allocation to repair entrance monuments Refurbish landscape lighting system at entrance Repair sections of brick pavers at entrance Repair brick paved walking trail Building Exterior Building Interior Mechanical Amenities Other Total Costs Total Costs Adjusted For 3% Inflation Criterium Engineers Page 3 of 12 10/31/2016

35 Reserve Study Worksheet General Information: 1 Organization: Greens at Lochmere - Common Area 2 Address: Cary, NC 3 Number of Units 38 4 Age of Building (in years) 30 5a Study Period (in years) 20 5b Normal Fiscal Year starts: January 1, c Partial Fiscal Year starts: January 1, d Partial Year Length: 12 months 6 Site Inspection Date September 6, Reserve Funds at start $16,404 8 Rate of Return on invested Reserve Funds (%) 1.5% 9 Inflation Rate (%) 3.0% 10 Current Funding Levels Existing Funding Levels Total/Month Total Annual Per Unit/Month Per Unit/Year Reserve Fund Contribution... $0 $0 $0.00 $0.00 Years Out Total Annual Per Unit Planned Special Assessment... 0 $0 $0 Balance Computed... ($5,676) 11 Alternative Reserve Fund Contribution Alternative 1 Level Funding with Steps Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $15 $180 $0.39 $4.74 Monthly Amount, (Last Year)... $60 $720 $1.58 $18.95 Balance Required Final Year... $1,195 Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... $6,550 Alternative 2 One-time increase to $600 per year Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $50 $600 $1.32 $15.79 Monthly Amount, (Last Year)... $50 $600 $1.32 $15.79 Balance Required Final Year... $1,195 Base Escalation % % Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... $7,910 Alternative 3 Escalating Funding with Special Assessments (NOT USED) Total/Month Total Annual Per Unit/Month Per Unit/Year Monthly Amount, (First Year)... $0 $0 $0.00 $0.00 Monthly Amount, (Last Year)... $0 $0 $0.00 $0.00 Balance Required Final Year... $1,195 Base Escalation % % Special Assessments: Years Out Total/Year Per Unit First Assessment... 0 $0 $0 Second Assessment... 0 $0 $0 Balance Computed... Criterium Engineers ($5,676) Page 4 of 12 10/31/2016

36 Reserve Fund Worksheet Fiscal Years: Normal: Jan Partial: Jan 2017 (12 months) Existing Funding Levels Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $16,404 $14,113 $14,324 $14,539 $14,757 $14,979 $10,173 $10,326 $8,608 $4,237 $4,300 $4,365 $4,430 $4,497 ($1,781) ($1,781) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $209 $212 $215 $218 $221 $150 $153 $127 $63 $64 $65 $65 $66 $0 $0 $0 $2,500 $0 $0 $0 $0 $4,956 $0 $1,845 $4,434 $0 $0 $0 $0 $6,278 $0 $3,895 $14,113 $14,324 $14,539 $14,757 $14,979 $10,173 $10,326 $8,608 $4,237 $4,300 $4,365 $4,430 $4,497 ($1,781) ($1,781) ($5,676) Alternative 1, Level Funding with Steps Average Cap. Expenditure $1,195 Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $16,404 $14,295 $14,692 $15,095 $15,687 $16,288 $11,868 $12,594 $11,458 $7,678 $8,524 $9,383 $10,254 $11,139 $5,664 $6,480 $180 $180 $180 $360 $360 $360 $540 $540 $540 $720 $720 $720 $720 $720 $720 $720 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $211 $217 $223 $232 $241 $175 $186 $169 $113 $126 $139 $152 $165 $84 $96 $50 $2,500 $0 $0 $0 $0 $4,956 $0 $1,845 $4,434 $0 $0 $0 $0 $6,278 $0 $3,895 $14,295 $14,692 $15,095 $15,687 $16,288 $11,868 $12,594 $11,458 $7,678 $8,524 $9,383 $10,254 $11,139 $5,664 $6,480 $3,355 Alternative 2, One-time increase to $600 per year Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $16,404 $14,722 $15,551 $16,394 $17,249 $18,116 $13,967 $14,785 $13,744 $10,059 $10,818 $11,590 $12,373 $13,167 $7,601 $8,325 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $218 $230 $242 $255 $268 $206 $219 $203 $149 $160 $171 $183 $195 $112 $123 $75 $2,500 $0 $0 $0 $0 $4,956 $0 $1,845 $4,434 $0 $0 $0 $0 $6,278 $0 $3,895 $14,722 $15,551 $16,394 $17,249 $18,116 $13,967 $14,785 $13,744 $10,059 $10,818 $11,590 $12,373 $13,167 $7,601 $8,325 $5,105 Alternative 3, Escalating Funding with Special Assessments (NOT USED) Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $16,404 $14,113 $14,324 $14,539 $14,757 $14,979 $10,173 $10,326 $8,608 $4,237 $4,300 $4,365 $4,430 $4,497 ($1,781) ($1,781) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $209 $212 $215 $218 $221 $150 $153 $127 $63 $64 $65 $65 $66 $0 $0 $0 $2,500 $0 $0 $0 $0 $4,956 $0 $1,845 $4,434 $0 $0 $0 $0 $6,278 $0 $3,895 $14,113 $14,324 $14,539 $14,757 $14,979 $10,173 $10,326 $8,608 $4,237 $4,300 $4,365 $4,430 $4,497 ($1,781) ($1,781) ($5,676) Criterium Engineers Page 5 of 12 10/31/2016

37 Reserve Fund Worksheet Fiscal Years: Normal: Jan 2017 Partial: Jan 2017 (12 months) Existing Funding Levels Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: ($5,676) ($5,676) ($5,676) ($5,676) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 ($5,676) ($5,676) ($5,676) ($5,676) Alternative 1, Level Funding w Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $3,355 $4,136 $4,929 $5,734 $720 $720 $720 $720 $0 $0 $0 $0 $0 $0 $0 $0 $61 $73 $85 $97 $0 $0 $0 $0 $4,136 $4,929 $5,734 $6,550 Alternative 2, One-time increas Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $5,105 $5,791 $6,486 $7,193 $600 $600 $600 $600 $0 $0 $0 $0 $0 $0 $0 $0 $86 $96 $106 $117 $0 $0 $0 $0 $5,791 $6,486 $7,193 $7,910 Alternative 3, Escalating Fundi Beginning Reserve Fund Balance: Revenue: Special Assessment #1: Special Assessment #2: Investment Earnings: Capital Expenditures: Ending Reserve Balance: ($5,676) ($5,676) ($5,676) ($5,676) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 ($5,676) ($5,676) ($5,676) ($5,676) Criterium Engineers Page 6 of 12 10/31/2016

38 Existing Funding Levels Beginning Year Reserve Fund Fee Special Investment Capital Ending Year Number Balance Revenue Assessments Earnings Expenditures Balance $16,404 $0 $0 $209 $2,500 $14, $14,113 $0 $0 $212 $0 $14, $14,324 $0 $0 $215 $0 $14, $14,539 $0 $0 $218 $0 $14, $14,757 $0 $0 $221 $0 $14, $14,979 $0 $0 $150 $4,956 $10, $10,173 $0 $0 $153 $0 $10, $10,326 $0 $0 $127 $1,845 $8, $8,608 $0 $0 $63 $4,434 $4, $4,237 $0 $0 $64 $0 $4, $4,300 $0 $0 $65 $0 $4, $4,365 $0 $0 $65 $0 $4, $4,430 $0 $0 $66 $0 $4, $4,497 $0 $0 $0 $6,278 ($1,781) ($1,781) $0 $0 $0 $0 ($1,781) ($1,781) $0 $0 $0 $3,895 ($5,676) ($5,676) $0 $0 $0 $0 ($5,676) ($5,676) $0 $0 $0 $0 ($5,676) ($5,676) $0 $0 $0 $0 ($5,676) ($5,676) $0 $0 $0 $0 ($5,676) Criterium Engineers Page 7 of 12 10/31/2016

39 Existing Funding Levels Beginning Balance as of start of year beginning Jan 2017: $16,404 CONTRIBUTIONS SPECIAL ASSESSMENTS AMOUNT Totals $0.00 per year Per Year $0 Per Unit $0 $0.00 per unit per year $0.00 per month $0.00 per unit per month Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 14,113 14,324 14,539 14,757 14,979 10,173 10,326 8,608 4,237 4,300 4,365 4,430 4,497 (1,781) (1,781) Capital Expenditures: 2, ,956-1,845 4, ,278 - Total Revenue (all sources) Year: Year Number: End of Year Reserve Fund Balance (5,676) (5,676) (5,676) (5,676) (5,676) Capital Expenditures: 3, Total Revenue (all sources) Existing Funding Levels 20,000 15,000 10,000 Dollars 5, (5,000) (10,000) Funding Years Criterium Engineers Page 8 of 12 10/31/2016

40 Alternative 1: Level Funding with Steps Beginning Year Reserve Fund Fee Special Special Investment Capital Ending Year Number Balance Revenue Assessments 1 Assessments 2 Earnings Expenditures Balance $16,404 $180 $0 $0 $211 $2,500 $14, $14,295 $180 $0 $0 $217 $0 $14, $14,692 $180 $0 $0 $223 $0 $15, $15,095 $360 $0 $0 $232 $0 $15, $15,687 $360 $0 $0 $241 $0 $16, $16,288 $360 $0 $0 $175 $4,956 $11, $11,868 $540 $0 $0 $186 $0 $12, $12,594 $540 $0 $0 $169 $1,845 $11, $11,458 $540 $0 $0 $113 $4,434 $7, $7,678 $720 $0 $0 $126 $0 $8, $8,524 $720 $0 $0 $139 $0 $9, $9,383 $720 $0 $0 $152 $0 $10, $10,254 $720 $0 $0 $165 $0 $11, $11,139 $720 $0 $0 $84 $6,278 $5, $5,664 $720 $0 $0 $96 $0 $6, $6,480 $720 $0 $0 $50 $3,895 $3, $3,355 $720 $0 $0 $61 $0 $4, $4,136 $720 $0 $0 $73 $0 $4, $4,929 $720 $0 $0 $85 $0 $5, $5,734 $720 $0 $0 $97 $0 $6,550 Criterium Engineers Page 9 of 12 10/31/2016

41 Alternative 1: Level Funding with Steps Beginning Balance as of start of year beginning Jan 2017: $16,404 CONTRIBUTIONS SPECIAL ASSESSMENTS SETTINGS (analyzed by year) FIRST YR LAST YR Totals Starting amount ($): 15 $ $ per year First Per Year $0 Per Unit $0 Increment by ($): 15 $4.74 $18.95 per unit per year Second Per Year $0 Per Unit $0 Every 3 year $15.00 $60.00 per month Frequency: 3 time $0.39 $1.58 per unit per month Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 14,295 14,692 15,095 15,687 16,288 11,868 12,594 11,458 7,678 8,524 9,383 10,254 11,139 5,664 6,480 Capital Expenditures: 2, ,956-1,845 4, ,278 - Total Revenue (all sources) Year: Year Number: End of Year Reserve Fund Balance 3,355 4,136 4,929 5,734 6,550 Capital Expenditures: 3, Total Revenue (all sources) Alternative 1: Level Funding with Steps 18,000 16,000 14,000 12,000 10,000 Dollars 8,000 6,000 4,000 2, Funding Years Criterium Engineers Page 10 of 12 10/31/2016

42 Alternative 2: One-time increase to $600 per year Beginning Year Reserve Fund Fee Special Special Investment Capital Ending Year Number Balance Revenue Assessments 1 Assessments 2 Earnings Expenditures Balance $16,404 $600 $0 $0 $218 $2,500 $14, $14,722 $600 $0 $0 $230 $0 $15, $15,551 $600 $0 $0 $242 $0 $16, $16,394 $600 $0 $0 $255 $0 $17, $17,249 $600 $0 $0 $268 $0 $18, $18,116 $600 $0 $0 $206 $4,956 $13, $13,967 $600 $0 $0 $219 $0 $14, $14,785 $600 $0 $0 $203 $1,845 $13, $13,744 $600 $0 $0 $149 $4,434 $10, $10,059 $600 $0 $0 $160 $0 $10, $10,818 $600 $0 $0 $171 $0 $11, $11,590 $600 $0 $0 $183 $0 $12, $12,373 $600 $0 $0 $195 $0 $13, $13,167 $600 $0 $0 $112 $6,278 $7, $7,601 $600 $0 $0 $123 $0 $8, $8,325 $600 $0 $0 $75 $3,895 $5, $5,105 $600 $0 $0 $86 $0 $5, $5,791 $600 $0 $0 $96 $0 $6, $6,486 $600 $0 $0 $106 $0 $7, $7,193 $600 $0 $0 $117 $0 $7,910 Criterium Engineers Page 11 of 12 10/31/2016

43 Alternative 2: One-time increase to $600 per year Beginning Balance as of start of year beginning Jan 2017: $16,404 CONTRIBUTIONS SPECIAL ASSESSMENTS SETTINGS (analyzed by year) FIRST YR LAST YR Totals Starting amount ($): 50 $ $ per year First Per Year $0 Per Unit $0 Increment by (%): 0 $15.79 $15.79 per unit per year Second Per Year $0 Per Unit $0 Step (%): $50.00 $50.00 per month Every 2 year $1.32 $1.32 per unit per month Frequency: 2 time Projected Annual Funding and Expenditures: Year: Year Number: End of Year Reserve Fund Balance 14,722 15,551 16,394 17,249 18,116 13,967 14,785 13,744 10,059 10,818 11,590 12,373 13,167 7,601 8,325 Capital Expenditures: 2, ,956-1,845 4, ,278 - Total Revenue (all sources) Year: Year Number: End of Year Reserve Fund Balance 5,105 5,791 6,486 7,193 7,910 Capital Expenditures: 3, Total Revenue (all sources) Alternative 2: One-time increase to $600 per year 20,000 18,000 16,000 14,000 12,000 Dollars 10,000 8,000 6,000 4,000 2, Funding Years Criterium Engineers Page 12 of 12 10/31/2016

44 Appendix C: PROJECT PHOTOGRAPHS

45 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Front entrance sign. Photo Number 1 Description: Brick pavers at entry. Photo Number 2

46 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Minor cracking noted in brick pavers. Photo Number 3 Description: Retaining wall and abandoned asphalt trail. Photo Number 4

47 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Landscape lighting control systems and irrigation control systems. Photo Number 5 Description: Exterior of townhome building, wood siding, and brick veneer. Brick accent walls. Photo Number 6

48 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Sections of warping noted in siding. Photo Number 7 Description: Flaking paint noted in areas of trim work. Photo Number 8

49 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Example of wood rot noted in sections of trim. Photo Number 9 Description: Typical rear view of townhome buildings. Photo Number 10

50 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Exterior of townhome buildings and roofs. Photo Number 11 Description: Townhome building roofs, trees in close proximity to roofs. Photo Number 12

51 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Surface rust noted on chimney caps. Photo Number 13 Description: Townhome building roofs and gutters. Photo Number 14

52 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Fencing along rear of townhome buildings at golf course. Photo Number 15 Description: Mailboxes for townhomes. Photo Number 16

53 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: General view of community. Photo Number 17 Description: Drainage inlet basin near townhome buildings. Photo Number 18

54 Location: Photo Taken by: Date: Greens At Lochmere Kevin R. Giles, RS 09/06/16 Cary, NC Description: Cracking observed in sections of concrete driveways. Photo Number 19 Description: Drainage inlet in concrete driveway. Photo Number 20

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by:

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by: FULL RESERVE STUDY JULIAN POND KERNERSVILLE, NC Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION KERNERSVILLE, NC & CAS, INC. Prepared by: CRITERIUM GILES ENGINEERS 8819 UNIVERSITY EAST DRIVE, SUITE 200

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by: DRAFT For Review FULL RESERVE STUDY SETTLERS POINTE LEXINGTON, SC Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION LEXINGTON, SC Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by: SAMPLE FULL RESERVE STUDY Prepared for: SAMPLE HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE 200 RALEIGH, NC 27607 (919) 465-3801 NC LIC. NO. C-2871 CONTENTS

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

THE RETREAT AT RIVER PARK PLACE

THE RETREAT AT RIVER PARK PLACE 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY THE RETREAT AT RIVER PARK PLACE FORT WORTH, TEXAS Prepared for:

More information

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by: RESERVE FUND STUDY ASHLAND COCKEYSVILLE, MD 21030 Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM-HARBOR ENGINEERS PO BOX 408 STEVENSON, MARYLAND 21153

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

CONTENTS. Riverwatch Gloucester, VA

CONTENTS. Riverwatch Gloucester, VA CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 7 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

DRAFT FOR BOARD REVIEW

DRAFT FOR BOARD REVIEW DRAFT FOR BOARD REVIEW FULL RESERVE FUND STUDY OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC Prepared for: OAK HALL COMMUNITY ASSOCIATION HOLLY SPRINGS, NC & PPM, INC. Prepared by: CRITERIUM GILES ENGINEERS

More information

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: WANDERMERE ESTATES HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218 (509)

More information

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for:

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for: RESERVE FUND STUDY Meadowlake Village 7410 Breda Dr. Prepared for: Meadowlake Village Homeowners Association c/o Regina Real Real Property Management PO Box 1583 Mont Belvieu, TX 77580 Prepared by: Criterium

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION 935 W. BASALT RIDGE DR. SPOKANE, WA 99224 Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: EAGLE RIDGE HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014 2014 RESERVE FUND STUDY Hill & Associates Ltd. Member APEGNB July 2014 Reserve Fund Study Prepared for Bobak Place Townhome Condominiums Prepared by Hill & Associates Ltd. Consulting Professional Engineers

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017

FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017 FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS

LOWE S FARM PROPERTY EVALUATION AND RESERVE FUND STUDY MANSFIELD, TEXAS 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY LOWE S FARM MANSFIELD, TEXAS Prepared for: LOWE S FARM HOMEOWNERS

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F 1515 Heritage Dr., Ste. 102 McKinney, TX 75069 972-562-1011 (office) Firm Registration No. F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY CROSS OAK RANCH CROSS ROADS, TEXAS Prepared

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I Prepared for: OVERLOOK AT QUALCHAN HOMEOWNERS ASSOCIATION SPOKANE, WA Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

MAINTENANCE GUIDE STRATHMORE COURT HOMEOWNERS ASSOCIATION, INC MAINTENANCE GUIDELINES

MAINTENANCE GUIDE STRATHMORE COURT HOMEOWNERS ASSOCIATION, INC MAINTENANCE GUIDELINES MAINTENANCE GUIDE STRATHMORE COURT HOMEOWNERS ASSOCIATION, INC MAINTENANCE GUIDELINES The following is a summary of the Association s responsibilities with regard to maintenance of the common area. 1.

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Retreat at Gleannloch Farms Homeowners Association Spring, TX October 14, 2014 Page 1 of 31 Pages Funding Reserve Analysis

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 www.schwindtco.com (503)227-1165 Page 1 of 49 GARDEN HOMES AT CHARBONNEAU GREEN

More information

Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by

Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by Reserve Fund Study prepared for The Greens at Pelican Point Homeowners Association February 2013 prepared by Craig Naden and John Carlson Table of Contents TABLE OF CONTENTS Page No. 1.0 EXECUTIVE SUMMARY...

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp. CAPITAL RESERVE STUDY FOR THE Providence Corner Upper Providence Twp. Management Company: The Galman Group Contact Name: Ms. Debra Lynch Date: September 28, 2016 Table of Contents Section Name Section

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions

More information

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant:

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant: Replacement Reserve Study DUNN LORING VILLAGE RSTUDY+ REPLACEMENT RESERVE STUDY DUNN LORING VILLAGE Vienna, Virginia Property Management: SEQUOIA MANAGEMENT COMPANY Craig Courtney Property Manager 13998

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012 Full Reserve Study The Ridge at Rock Creek Marysville, WA 11/13/2012 Report # 1100 Phone: 253-241-8151 E-mail: jeremy@reservesolutions.net www.reservesolutions.net The Ridge at Rock Creek Client Info:

More information

N SITE RESERVE STUDY Presented by:

N SITE RESERVE STUDY Presented by: N SITE RESERVE STUDY Presented by: PO Box 1714 Stow 44224 Akron 330.650.4318 Cleveland 330.656.3441 Fax 330.655.8957 www.karecondo.com STUDY FULL RESERVE IN THIS SECTION: NARRATIVE REPORT CONCLUSION DEFINITIONS

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

Common Component Inventory and Capital Expenditure Planning

Common Component Inventory and Capital Expenditure Planning Common Component Inventory and Capital Expenditure Planning Expected Percent Useful Life Funded Remaining Full Capital Item Quantity CapEx Beginning (or Frequency) Amount Useful Life Reserve Funding Required

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for Oak Crest Farms November 2, 2016 Page

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

FULL RESERVE STUDY Stillwood Cluster Lot Owners' Association, Inc. Stow, Ohio August 15, 2017

FULL RESERVE STUDY Stillwood Cluster Lot Owners' Association, Inc. Stow, Ohio August 15, 2017 FULL RESERVE STUDY Stillwood Cluster Lot Owners' Association, Inc. Stow, Ohio August 15, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information

Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, Bellevue Way NE, #483 Bellevue, WA

Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, Bellevue Way NE, #483 Bellevue, WA Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, 2017 227 Bellevue Way NE, #483 Bellevue, WA 98004 866 574 5115 www.rdanorthwest.com Prepared By Quality Check By Page 1 Disclosures Reserve Study

More information

Village Glen HOA P.O. Box 1537, Arroyo Grande, CA. Reserve Study

Village Glen HOA P.O. Box 1537, Arroyo Grande, CA. Reserve Study Village Glen HOA P.O. Box 1537, Arroyo Grande, CA Reserve Study As required by the state of California, it is the responsibility of the Board of Directors to create and maintain adequate reserves to provide

More information

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Level 2, Premium Reserve Analysis Report Period 01/01/16 12/31/16 Client Reference Number - 4080 Property Type Townhome Development Number of Units

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014 Financial Statements and Supplementary Information For the Year Ended December 31, 2014 Table of Contents Independent Auditor s Report..... 1 Financial Statements Balance Sheet.. 3 Statement of Revenues,

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

FIR RIDGE II CONDOMINIUM

FIR RIDGE II CONDOMINIUM FIR RIDGE II CONDOMINIUM BELLINGHAM, WASHINGTON UPDATE WITHOUT SITE VISIT FEBRUARY 2014 FOR USE WITH THE FEBRUARY 2012 RESERVE STUDY PREPARED BY: DENISE DANA, RESERVE SPECIALIST M. ARCH, REGISTERED ARCHITECT

More information

Body Corporate ten year maintenance plan example for South Africa

Body Corporate ten year maintenance plan example for South Africa Body Corporate ten year maintenance plan example for South Africa Prepared by: Date: This plan covers the period of ten years from.. Building details & report inputs Supplied information Building name

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Reserve Data Analyst

Reserve Data Analyst Kennewick, WA Account 15588 -- Version Final September 19, 2017 Reserve Data Analyst info@reservedataanalyst.com 866-574-5115 www.reservedataanalyst.com Prepared By Quality Check By Table of Contents Hansen

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information