and Decision Making Processes Using Safety Data Washington State Department of Transportation
|
|
- Mae Parks
- 5 years ago
- Views:
Transcription
1 The Institutionalization of Safety and Decision Making Processes Using Safety Data John Milton, Ph.D., P.E. Washington State Department of Transportation 27 July 2010 New Orleans, Louisiana Policy & Paradigm Shift Safety Performance Goals Institutionalization of the HSM Technical Processes & Procedures 2 1
2 TARGET ZERO A strategic plan for highway safety HOW DO WE MEET OUR GOALS? 3 Integrate safety Policy Procedures Methods 4 2
3 Incorporating safety in decision-making at all levels Programming and prioritization System planning Program administration Policy development Public Affairs Interagency coordination Project development Design Construction Operations and Maintenance 5 How do you currently account for Safety (pre HSM)? Our design standards tell us what to do. I don t because I have no basis for doing so. I don t know how. I do sometimes but frankly I don t trust the results. I don t because I don t believe you can predict safety. I don t because I don t have to and there are too many other things that are required of me. I don t because if I do, I will get sued if something goes wrong. That statistical stuff is too complicated for me. 6 3
4 Implementing the HSM PARADIGM SHIFT 7 Policy Driver for change across the agency Clear message to give direction 8 4
5 Nominal Safety Examined in reference to compliance with standards, warrants, guidelines and design procedures Substantive Safety The expected or actual crash hfrequency and severity for a highway or roadway 9 vs Crash Reduction & Prediction
6 INCREASE Nominal safety is an ABSOLUTE CRASH RISK Substantive safety is a CONTINUUM INCREASE DESIGN DESIGN DIMENSION DIMENSION (Lane width, curve radius, stopping sight distance, etc.) The HSM provides insights to designers faced with design exception decisions 11 Implementing the HSM INSTITUTIONALIZATION PROCESS 12 6
7 Institutionalize Proficiency Compliance Initiation Institutionalization of the 13 Initiation Identify individuals across agency and establish functional expert groups Assess Organizational Readiness Develop policy Develop mission, vision, goals, performance measures 14 7
8 Align resources Compliance Cascading vision & strategies agency-wide 15 Training Proficiency Updating business processes to support institutionalization 16 8
9 Institutionalize Implementation of tools (SafetyAnalyst, IHSDM, integration ti into existing tools) Monitor progress Review results Update & refine 17 Implementing the HSM PROJECT DEVELOPMENT PROCESS 18 9
10 System Evaluate System Needs Identify Potential Projects Quantify Safety Benefits Systemwide Prioritize Projects System Project Design & Construction Operations & Maintenance 19 Systemwide Safety Improvement Programs 20 10
11 Proje ect -EIS >> 0 >> 1 >> 2 >> 3 >> 4 >> Project Define problem(s) /assist scoping Identify potential solutions Evaluate alternatives & expected quantitative safety effects ID preferred alternative System Project Design & Construction Operations & Maintenance 22 11
12 Design Existing Conditions Alternative 1 Alternative 2 Alternative 3 >> 0 >> 1 >> 2 >> 3 >> 4 >> Design and Construction Evaluate safety of alternative designs Review & document design exceptions, variances and waivers Inform construction decisions System Project Design & Construction Operations & Maintenance 24 12
13 Operations >> 0 >> 1 >> 2 >> 3 >> 4 >> Operations and Maintenance Monitor operations balance - safety, mobility and access Evaluate improvement effectiveness System Project Design & Construction Operations & Maintenance 26 13
14 Using the HSM in the design process EXAMPLES 27 Two-lane to Four-lane Corridor Studies Part C -- Chapter 10 Establish purpose and need Assess performance of no-build Part C Chapter 11 Evaluate and compare safety performance of alignment and cross section alternatives Estimate performance of the preferred build Calculate benefits (crash reductions) of preferred 28 14
15 Urban Arterial Corridor Studies Part C -- Chapter 12 Establish purpose and need (safety problem?) Assess safety performance of no-build Part C Chapter 12 Evaluate safety performance of cross section and access alternatives Estimate safety performance of preferred build Calculate benefits (crash reductions) of preferred vs no-build 29 Multi-objective resource allocation is a common decision tool for complex projects Where Where does does the the input input for for this this criterion criterion come come from? from? ALTERNATIVE C C Criterion Criterion Performance Measured Weight ALTERNATIVE B Measures B Value Score Criterion Criterion Affordability Performance Measured ALTERNATIVE A A Score = 125 Measures Value Criterion Performance Measured C Weight Criterion 3 X 3 Affordability Economic 4 X 25 Measures Value X Score = Development 40 = 1205 C 3 X 3 Economic Affordability 4 X Score for Alternative 5 A Reduce 6 25 X = Development = X 35 Congestion C = 70 Score 3 X for Alternative 3 Improve A Reduce 7 9X X 35 = 5 Safety 40 = 280 Congestion 315 Reduce Congestion Score Score for for Alternative Alternative C A Score 6 X for Alternative 35 = B Score for Alternative A
16 Interchange Warrant Studies (Rural Multilane Highways) Part C -- Chapter 11 Establish purpose and need Assess performance of nobuild Part D Chapter 15 Estimate performance of conversion Estimate performance of preferred build Calculate benefits (crash reductions) of conversion 31 Resources & Contacts Highway Safety Manual Website AASHTO Kelly Hardy: khardy@aashto.org AASHTO JOINT TASK COMMITTEE FOR THE HSM: Don Vaughn, ALDOT, vaughnd@dot.state.al.us Priscilla Tobias, IDOT, Priscilla.Tobias@illinois.gov FHWA Mike Griffith, mike.griffith@dot.gov Ray Krammes, Ray.Krammes@dot.gov TRB HSM Task Force/ TRB Committee on Highway Safety Performance John Milton, WSDOT, miltonj@wsdot.wa.gov
SafetyAnalyst TM : Software Tools for Safety Management of Specific Highway Sites
SafetyAnalyst TM : Software Tools for Safety Management of Specific Highway Sites July 2010 NTIS Accession No. PB2010-111996 FHWA Publication No. FHWA-HRT-10-063 FOREWORD This report provides a detailed
More informationHouse Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.
House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation
More informationCorridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017
Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project
More informationEconomic Appraisal Objectives
Network Screening HSM Vol. 1 (Part B) Chapters 7 & 8 MODULE 10. ECONOMIC APPRAISAL AND PRIORITIZATION Roadway Safety Management Process Diagnosis and Countermeasure Selection Economic Appraisal and Prioritization
More informationMn/DOT Scoping Process Narrative
Table of Contents 1 Project Planning Phase...3 1.1 Identify Needs...4 1.2 Compile List of Needs = Needs List...4 1.3 Define Project Concept...5 1.4 Apply Fiscal/Other Constraints...5 1.5 Compile List of
More informationEXCELLENCE INNOVATION SERVICE VALUE
Incorporation of Geotechnical Elements as an Asset Class within Transportation Asset Management and Development of Risk Based and Life Cycle Cost Performance Strategies by Mark Vessely, P.E. Shannon &
More informationFY 2011 Continuing Appropriations Act. TIGER Discretionary Grant Program
FY 2011 Continuing Appropriations Act TIGER Discretionary Grant Program Highway 167 Improvement Project Appendices A Benefit Cost Analysis B Federal Wage Rate Certifications Submitted by Arkansas State
More informationIn addition to embarking on a new dialogue on Ohio s transportation priorities,
Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by
More informationStrengthening Vermont s Economy by Integrating Transportation and Smart Growth Policy
Strengthening Vermont s Economy by Integrating Transportation and Smart Growth Policy Technical Memorandum #4: Short List of Recommended Alternatives May 21, 2013 Tech Memo #4: Short List of Recommended
More informationDeveloping a Transportation Asset Management Plan
Developing a Transportation Asset Management Plan A Workshop for the NCDOT July 2, 2015 Conducted By: Katie Zimmerman, P.E., Applied Pavement Technology, Inc. (APTech) And Lacy Love, Volkert, Inc. Workshop
More informationPrioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016
Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization
More informationTAM ETG Webinar Series Webinar 5: Optimization and Cross-Asset Allocation
TAM ETG Webinar Series Webinar 5: Optimization and Cross-Asset Allocation Sponsored by the TAM Expert Task Group Submit questions and comments using the webinar s Q&A feature Webinar 6 January 20, 2016
More informationHRTPO TTAC RECOMMENDATIONS ON THE HB2 PRIORITIZATION PROCESS
HRTPO TTAC RECOMMENDATIONS ON THE HB2 PRIORITIZATION PROCESS February 4, 2015 BACKGROUND The Office of the Secretary of Transportation is coordinating stakeholder input during the development of the House
More informationTransportation Improvement Program Project Priority Process White Paper
Transportation Improvement Program Project Priority Process White Paper Pierce County Public Works- Office of the County Engineer Division Introduction This paper will document the process used by the
More information2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION
2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION HGAC Transportation Policy Council Meeting Current Initiatives On-going efforts to address performance-based planning and programming processes
More informationEmpirical Bayes Analysis For Safety. Larry Hagen, P.E., PTOE
Empirical Bayes Analysis For Safety Larry Hagen, P.E., PTOE Disclaimer: The following interviews and commentaries are for informational exchange only. The views and opinions expressed therein are those
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationChapter 10 Equity and Environmental Justice
Chapter 10 Equity and Environmental Justice Introduction An important consideration for the 2040 Transportation Policy Plan is its impact on all populations in the Minneapolis-Saint Paul region, particularly
More informationMoDOT Dashboard. Measurements of Performance
MoDOT Dashboard Measurements of Performance 1997 1998 1999 2000 2001 2002 MoDOT Dashboard Executive Summary Performance measurement is not new to MoDOT. In July 2001, MoDOT staff began completing quarterly
More information2012 AASHTO Washington Briefing February 27, Jeff Paniati Jeff Paniati Executive Director Federal Highway Administration
Moving Towards a Performance- Based Federal Highway Program 2012 AASHTO Washington Briefing February 27, 2012 Jeff Paniati Jeff Paniati Executive Director Federal Highway Administration Outline Comparison
More informationCITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Transportation Division
CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transportation Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: February 4, 2013 SUBJECT/REPORT NO: Transit Bus
More informationChapter 12: Programming/Resource Allocation
Chapter 12: Programming/Resource Allocation What is works programming? Works programming refers to the preparation of annual and multi-annual works programs in which road assets requiring treatment are
More informationAdvances in Safety Program Practices in Zero-Fatalities States
SCAN TEAM REPORT NCHRP Project 20-68A, Scan 12-03 Advances in Safety Program Practices in Zero-Fatalities States Supported by the National Cooperative Highway Research Program March 2016 The information
More informationDMP (Decision Making Process)
DMP (Decision Making Process) Office of Systems Analysis Planning Road School March 7, 2007 Driving Indiana s Economic Growth *** Please note: This is derived from the United States Military Decision Making
More informationComplying with the MUTCD in the Absence of Specific Compliance Dates
Complying with the MUTCD in the Absence of Specific Compliance Dates Road & Street Supervisors Traffic Solutions October 15, 2013 James W. Ellison, P.E. Consulting Traffic Engineer Rick Mowlds, P.E. WSDOT
More informationI-64 Capacity Improvements Segment III Initial Financial Plan
I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/
More informationI-81 Corridor Improvement Plan. October 2018 Public Meetings
I-81 Corridor Improvement Plan October 2018 Public Meetings I-81 Corridor Improvement Plan Overview of I-81 Corridor Improvement Plan purpose Summary of public feedback Prioritization of potential improvements
More informationVARIABILITY: Range Variance Standard Deviation
VARIABILITY: Range Variance Standard Deviation Measures of Variability Describe the extent to which scores in a distribution differ from each other. Distance Between the Locations of Scores in Three Distributions
More informationA Guide for Applying AASHTO Policies to Achieve Flexibility in Highway Design. Timothy R. Neuman, PE Chief Highway Engineer CH2M HILL
A Guide for Applying AASHTO Policies to Achieve Flexibility in Highway Design Timothy R. Neuman, PE Chief Highway Engineer CH2M HILL Acknowledgements AASHTO Joint Task Force for Aesthetic Design Task Force
More informationA New Federal Performance Framework
A New Federal Framework By John M. Kamensky Staff from the Office of Management and Budget (OMB) have been visiting agencies in recent weeks to explain a new performance framework they have developed for
More informationMileage Based User Fees June 21, 2016
Mileage Based User Fees June 21, 2016 THE PATH TO STAINABLE SURFACE TRANSPORTATION REVENUE AGC Jack Basso WSP\PB SENIOR ADVISOR The Current State of the Issues The Highway Trust Fund The Future of the
More information2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION
2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required
More informationTraffic Impact Analysis Guidelines Methodology
York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS
More informationNCHRP Framework Project. Ida van Schalkwyk, CH2M HILL Tim Neuman, CH2M HILL. Crown Plaza Austin, Austin, TX
NCHRP 17-51 Framework Project Ida van Schalkwyk, CH2M HILL Tim Neuman, CH2M HILL June 15, 2011 AASHTO - Standing Committee on Highway Traffic Safety Crown Plaza Austin, Austin, TX One death is one too
More informationMUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES
MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management
More informationP r i o r i t i z a t i o n S u b c o m m i t t e e M e e t i n g A g e n d a
P r i o r i t i z a t i o n S u b c o m m i t t e e M e e t i n g A g e n d a February 6, 2018 9:00 A.M. Agenda 1. WELCOME AND HOUSEKEEPING (5 min) A. Welcome and Introductions, Approval of Agenda Josh
More informationTRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION POLICY Policies and Procedures to Streamline Project Delivery
The Transportation Improvement Program (TIP) is a staged, multi-year program of projects approved for funding with federal, State, and local funds within the Dallas-Fort Worth area. A new TIP is approved
More informationCritique of Chapter 8, Prioritize Projects, HSM 2010
Critique of Chapter 8, Prioritize Projects, HSM 2010 Robert D. Layton, PhD Oregon State University 220 Owen Hall Corvallis, Or 97331 541-737-4273 robert.layton@oregonstate.edu I. BACKGROUND These are;
More informationDraft Environmental Impact Statement. Appendix G Economic Analysis Report
Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126
More informationIntroduction. The Assessment consists of: Evaluation questions that assess best practices. A rating system to rank your board s current practices.
ESG / Sustainability Governance Assessment: A Roadmap to Build a Sustainable Board By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com November 2017 Introduction This is a tool for
More informationVIRGINIA S STATE OF THE STATE ADDRESS
VIRGINIA S STATE OF THE STATE ADDRESS TRB ADC40 Summer Session July 27, 2009 Paul M. Kohler Noise Abatement Program Manager AGENDA 1. Economic Status of Virginia 2. Reorganization of VDOT 3. Projects of
More informationThe 120VC Portfolio Management Model
The 120VC Portfolio Management Model There are several layers that contribute to achieving the Vision of Project Portfolio Management. The workflow in the figure below starts at the bottom left and flows
More informationThe Case Not Made: Local Bus-Rapid-Transit (BRT) and the Independent Transit Authority (ITA)
The Case Not Made: Local Bus-Rapid-Transit (BRT) and the Independent Transit Authority (ITA) Suburban Maryland Transportation Alliance Richard Parsons Vice Chair November 6, 2015 Traffic Congestion & Lack
More informationAdditional support documents to the resolution:
Resolution No. R2017-37 Additional support documents to the resolution: Memo from Sound Transit CEO Peter Rogoff Memorandum of Understanding between the Puget Sound Regional Council, Sound Transit, and
More informationDeveloping Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System
Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System M. Arif Beg, PhD Principal Consultant, AgileAssets Inc. Ambarish Banerjee, PhD Consultant, AgileAssets
More informationSOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania
SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationChapter 6. Transportation Planning and Programming. Chapter 6
Chapter 6 Planning and ming Chapter 6 73 Chapter 6 Planning and ming VTA prepares a variety of transportation planning and programming documents that impact Santa Clara County s future mobility. Planning
More informationFY Statewide Capital Investment Strategy... asset management, performance-based strategic direction
FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE
More informationPublic Trust in Insurance
Opinion survey Public Trust in Insurance cii.co.uk Contents 2 Foreword 3 Research aims and background 4 Methodology 5 The qualitative stage 6 Key themes 7 The quantitative stage 8 Quantitative research
More informationSafetyAnalyst: Software Tools for Safety Management of Specific Highway Sites White Paper for Module 4 Countermeasure Evaluation August 2010
SafetyAnalyst: Software Tools for Safety Management of Specific Highway Sites White Paper for Module 4 Countermeasure Evaluation August 2010 1. INTRODUCTION This white paper documents the benefits and
More informationLatin American Monitoring and Evaluation Conference
Latin American Monitoring and Evaluation Conference Institutional Arrangements for M&E Systems: Sri Lankan Experience. V. Sivagnanasothy Director General, Dept. of Foreign Aid and Budget Monitoring Ministry
More informationSafety Target Meeting Summary 10/3/2017
Safety Target Meeting Summary 10/3/2017 Recommendation: It was the recommendation of the committee that OTO support the statewide safety targets. Discussion: Natasha Longpine presented background information
More informationValue-Based Payments (VBP)
Value-Based Payments (VBP) Overview September 27, 2016 September 27, 2016 2 NYS What is Value Based Payment? NYS Timeline VBP Outcomes and Levels P4P vs. VBP VBP Overview Agenda MCTAC VBP Arrangements
More informationMetrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects
STAFF REPORT ACTION REQUIRED Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects Date: October 23, 2012 To: From: Wards: City Council City Manager All
More informationPerformance-based Planning and Programming. white paper
white paper May 2012 white paper Performance-based Planning and Programming date May 2012 NOTICE This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest
More informationThe Cost of Pavement Ownership (Not Your Father s LCCA!)
The Cost of Pavement Ownership (Not Your Father s LCCA!) Mark B. Snyder, Ph.D., P.E. President and Manager Pavement Engineering and Research Consultants, LLC 57 th Annual Concrete Paving Workshop Arrowwood
More informationForecasting More Profits For You and Your Clients
Forecasting More Profits For You and Your Clients Presenter: Christian Wielage Accountants/Business Advisors Entrepreneurs Small Businesses Non-profits Introduction: About me Christian Wielage Prior to
More informationDate of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017
Request for Qualifications For Planning Services: Gee Creek Plateau Sub Area Plan City of Ridgefield, Washington Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017 Project Overview:
More informationCreating a Highly Effective Performance Planning, Budgeting and Management System
0 Creating a Highly Effective Performance Planning, Budgeting and Management System What this presentation will cover: What many local governments are doing today. The disadvantages of this approach. A
More informationHot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary
TIGER 2017 Application Overview This project proposes to extend the Hot Springs Bypass (US 70/US 270) from US 70 to State Highway 7 in Garland County, Arkansas. The 5.5 mile facility will initially consist
More information2016 TRB Webinar. Using Asset Valuation as a Basis for Bridge Maintenance and Replacement Decisions
2016 TRB Webinar Using Asset Valuation as a Basis for Bridge Maintenance and Replacement Decisions Adam Matteo Jeff Milton Todd Springer Virginia Department of Transportation Structure and Bridge Division
More informationMobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway
Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway Today s Discussion Urban Mobility Rural Mobility and Safety Other Modes: Mass Transportation Freight and Intercity
More informationGr an t Writing Federal Non-Construction Proposal Elements
Gr an t Writing Federal Non-Construction Proposal Elements Carol Oliva Development Officer National Indian Justice Center Western Tribal Technical Assistance Program carololiva@nijc.org http://www.nijc.org/ttap.html
More informationConnected Vehicle Pooled Fund Study. Partnership and Operating Policies. August 2018
Connected Vehicle Pooled Fund Study Partnership and Operating Policies August 2018 Background A connected vehicles environment holds the potential to support a fundamental advance in surface transportation.
More informationSocial capital: Measuring the community impact of corporate spending
COMPLIMENTARY ARTICLE REPRINT ISSUE 24, JANUARY 2019 Social capital: Measuring the community impact of corporate spending by Steven Ellis, Tony Siesfeld, and Darin Buelow ILLUSTRATION BY ANDREA COBB Deloitte
More informationMetropolitan Planning Organizations in North Carolina. Chris Lukasina NCAMPO
Metropolitan Planning Organizations in North Carolina Chris Lukasina NCAMPO February 1, 2016 Items to Discuss What is an MPO/RPO? Why were they established? How are they structured? What areas do they
More informationResponses to WSDOT Cost/Inflation Estimating Survey February 2007
Responses to WSDOT Cost/Inflation Estimating Survey February 2007 Questions sent out to AASHTO/RAC List Serve 1. What do you use for inflation estimating? 2. Do you use a commercial forecast or inhouse/agency
More informationWhite Paper: Performance-Based Needs Assessment
White Paper: Performance-Based Needs Assessment Prepared for: Meeting Federal Surface Transportation Requirements in Statewide and Metropolitan Transportation Planning: A Conference Requested by: American
More informationPerformance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015
Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015 Transportation has two purposes & Mobility Access Quileute Reservation La Push,
More informationMPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017
MPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017 RECOMMENDED ACTION: August 30 th Open House Matter of Kick-off for 2045 Street/Highway Element Background: The UPWP identifies that the major undertaking
More informationPresenter: And Paul, you've been quite vocal on the inadequacies of the SRRI calculation.
Morningstar - KIID Key Investor Information Document - KIID Paul Kaplan, Jeff Strazis & Neil Simmonds Presenter: I'm joined now by Neil Simmonds, Partner at Simmons & Simmons, Dr Paul Kaplan, Director
More informationCEVP Cost Estimate Validation Process
CEVP Cost Estimate Validation Process CSVA Conference 2004 Monica Bielenberg, P.E. Program Manager Why an Estimate is Not a Number Estimates are uncertain... Ultimate project cost and schedule cannot be
More informationHosten, Chowdhury, Shekharan, Ayotte, Coggins 1
Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 USE OF VDOT S PAVEMENT MANAGEMENT SYSTEM TO PROACTIVELY PLAN AND MONITOR PAVEMENT MAINTENANCE AND REHABILITATION ACTIVITIES TO MEET THE AGENCY S PERFORMANCE
More informationREPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010
REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010 SUBJECT City of Victoria Request for General Strategic Priorities Funding Application Support Johnson Street Bridge
More informationTransportation Economics and Decision Making. Lecture-11
Transportation Economics and Decision Making Lecture- Multicriteria Decision Making Decision criteria can have multiple dimensions Dollars Number of crashes Acres of land, etc. All criteria are not of
More information2010 SCoPM Performance Excellence Award Application Cover Sheet
21 SCoPM Performance Excellence Award Application Cover Sheet Team Name LA DOTD Design-Build Procurement Team Date Team Operating from May 5, 28, through May 11, 21 Organization Name Louisiana Department
More informationNEW YORK STATE DEPARTMENT OF TRANSPORTATION
2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION D015621, PIN X730.56 BROOKLYN-QUEENS EXPRESSWAY (BQE)/I-278 EIS DOWNTOWN BROOKLYN KINGS COUNTY, NEW YORK DRAFT ALTERNATIVES EVALUATION TECHNICAL MEMORANDUM
More informationFY 2011 Continuing Appropriations Act. TIGER Discretionary Grant Program
FY 2011 Continuing Appropriations Act TIGER Discretionary Grant Program Highway 92 Bridge Improvement Project Appendices A Benefit Cost Analysis B Federal Wage Rate Certification Submitted by Arkansas
More informationMassDOT Highway ACEC State Markets Conference April 5, Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer
MassDOT Highway ACEC State Markets Conference April 5, 2018 Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer About MassDOT Highway 9,561 Lane Miles of Interstate, Numbered
More informationTEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES
TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES Public Meetings June 12 and 13, 2006 Michael Morris, P.E. Director of Transportation Michael Burbank, AICP Principal Transportation Planner FOCUS
More information6d.) HB2 District Grant Program Allocation Formula
6d.) HB2 District Grant Program Allocation Formula Presentation to the FAMPO Policy Committee December 14, 2015 HB 2 District Grant Program Background Allocates 50% of funding available from HB2 Prioritization
More informationExisting Conditions/Studies
CAMPO Plan and Model Pesentation Presentation June 17, 2008 CAMPO 2035 Plan Timeline September 2008 Network/Modal Environmental Demographic Fiscal/Policy Needs Analysis Existing Conditions/Studies Vision/
More informationEXHIBIT A GENERAL ENGINEERING CONTRACT (GEC) - TRAFFIC AND REVENUE SCOPE OF SERVICES
EXHIBIT A GENERAL ENGINEERING CONTRACT (GEC) - TRAFFIC AND REVENUE SCOPE OF SERVICES Exhibit "A" SCOPE OF SERVICES General Engineering Contract - Traffic and Revenue FPN: TBD I. Purpose... A-1 II. Term
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering
More informationKeeping Score: Best Practices for Risk Management Reporting
Keeping Score: Best Practices for Risk Management Reporting 1/4 Keeping Score: Best Practices for Risk Management Reporting John Schaefer Risk Management Information Systems (RMIS) are designed to capture,
More informationGlossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17
Kitsap County Public Works Transportation Project Evaluation System 2017 Table of Contents Introduction... 1 Four-Tier system... 4 Tier 1 - Transportation Improvement Program (TIP)... 4 Tier 2 Prioritized
More informationEffective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW)
Effective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW) James Smith, Ph.D., E.I.T Member Services/Infrastructure Coordinator Ontario Good Roads
More informationBUDGETING 101 Basic Budgeting The What
BUDGETING 101 Basic Budgeting The What March 10, 2018 Washington, D.C. Kathie Novak University of Denver Jon Johnson Alliance for Innovation Handouts and Worksheets What is the Budget? 1. A STATEMENT of
More informationProviding Outsourced CFO Services (OCS) Presenter: Christian Wielage
Providing Outsourced CFO Services (OCS) Presenter: Christian Wielage Introduction: About Version 1 of PlanGuru was developed in 1999 to help accountants build simple financial projections for their clients.
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT
DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT Project Type: GDOT District: Federal Route Number: State Route Number: P.I. Number: County: MPO ID Number: Project Description (provide
More informationUnified Planning Work Program
Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas
More informationRISK AND CONTROL ASSESSMENT SCDOT Indirect Cost Recovery
2017 RISK AND CONTROL ASSESSMENT SCDOT Indirect Cost Recovery INTERNAL AUDIT SERVICES SOUTH CAROLINA OFFICE OF THE STATE AUDITOR December 12, 2017 ONTENTS Page 1 Foreword 1 2 Executive Summary 2 3 Internal
More informationImproving infrastructure outcomes through better capital allocation
Improving infrastructure outcomes through better capital allocation Capital Projects & Infrastructure November 2017 Jose Luis Blanco André Dua Tyler Duvall Needham Hurst Jonathan Law Ben Safran Improving
More informationAPPENDIX E: ATM MODEL TECH MEMORANDUM. Metropolitan Council Parsons Brinckerhoff
APPENDIX E: ATM MODEL TECH MEMORANDUM Metropolitan Council Parsons Brinckerhoff Metropolitan Highway System Investment Study Evaluation of Active Traffic Management Strategies Prepared by: Parsons Brinckerhoff
More informationTable of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review
Table of Contents Study Overview Corridor Needs Analysis Climbing Lanes Additional Lane I-25/I-80 Cost Estimate ITS Truck Parking Financial Strategies Legislative Review 02 Study Overview The overall goal
More informationRe: Release No , Request for Comment, Draft FY Strategic Plan for the Securities and Exchange Commission
Īll MSRB Municipal Securities Rulemaking Board The Honorable Jay Clayton Chairman 100 F Street, NE Washington, D.C. 20549 Re: Release No. 34-83463, Request for Comment, Draft FY 2018-2022 Strategic Plan
More informationIntroduction to Risk for Project Controls
Introduction to Risk for Project Controls By Eukeni Urrechaga, PE Quick view at Project Controls Project Controls, like project management, is much an art as it is a science. The secret of good project
More informationTTFAC Hearing Regarding Chesapeake Transportation System June 18, 2012
TTFAC Hearing Regarding Chesapeake Transportation System June 18, 2012 1 Chesapeake Transportation System The Chesapeake Transportation System (CTS) consists of the existing Chesapeake Expressway and the
More informationDRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0
UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH
More information