1 B-3 Janet P. Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. 950, 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) Fax: (604) Via August 7, 2015 B.C. Utilities Commission File No.: 4.2 (2015) 6 th Floor Howe Street Vancouver, B.C. V6Z 2N3 Attention: Erica M. Hamilton Commission Secretary Dear Ms. Hamilton: Re: Pacific Northern Gas (N.E.) Ltd. Dawson Creek Division Application for Approval of AltaGas Ltd. Industrial Firm Transportation Service Agreement and Proposed RS7 Industrial LNG Firm Transportation Service Tariff Supplemental Information AltaGas Costs for Bypass Scenario Accompanying this letter, please find the additional information requested by the Commission under Order G , specifically, a fulsome response to Directive 3(iii) of Order G The requested information on a bypass scenario has been provided by AltaGas Ltd. in the appended correspondence and includes: Estimated capital costs; Estimated operating costs; Calculation of estimated per gigajoule rate based on the estimated capital and operating costs; and Assumptions made in developing the foregoing estimates. Please direct any questions regarding the contents of this letter and the appended information to my attention. Yours truly, Janet P. Kennedy cc: Registered Interveners
2 AltaGas Ltd. 1700, 355 4th Ave SW Calgary, Alberta T2P 0J1 main fax August 7, 2015 Janet Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. 950, 1185 West Georgia Street Vancouver, BC V6E 4E6 RE: PNG(NE) PROPOSED RS7 INDUSTRIAL LNG FIRM TRANSPORTATION SERVICE TARIFF SUPPLEMENTAL ALTAGAS COST INFORMATION Dear Ms. Kennedy, In response to the British Columbia Utilities Commission ( BCUC ) request for Pacific Northern Gas (N.E.) Ltd. ( PNG ) to provide detailed supplemental information regarding AltaGas s cost of connecting its proposed LNG facility directly to Spectra s transmission system at an alternative location to the proposed Dawson Creek location, please consider the information that follows. Estimated Capital and Operating Costs to Bypass Capital Costs AltaGas reviewed several locations in northeast British Columbia for siting the proposed LNG facility and has compiled a summary of estimated interconnection costs that reflect current market conditions in the region and are considered to be applicable and representative for the various locations under consideration. This capital cost summary is provided in Exhibit 1 that follows. Exhibit 1 RLNG Interconnection Capital Cost Summary Preliminary Work $ 72,417 Land $ 78,476 Contractor $ 68,522 Land $ 78,476 Land/ROW $ 3,895 Spectra Interconnection $ 500,000 Pipeline $ 292,827 Interconnection $ 500,000 Contractor $ 173,970 Land/ROW $ 57,078 Facility Total: $ 1,228,619 Materials $ 58,683 Other $ 3,096 Facility Excl Land/ROW: $ 1,089,171 Regulator Station/Meter Set $ 284,899 Materials $ 174,173 Contractor $ 89,674 Other $ 21,051 Page 1 of 4
3 AltaGas notes that these capital costs reflect a scenario assuming locations up to 1 km away from a Spectra interconnection point. AltaGas observes that it has reviewed the possibilities of locating directly adjacent to the Spectra transmission line and within the footprint of existing owned and operated gas processing facilities whereby some of the identified interconnection costs would be reduced. Operating Costs Annual operations and maintenance costs of the pipeline facilities in a standalone scenario as contemplated in this analysis would be included in the operations and maintenance budget for the LNG facility. Generally a facility of this nature, due to its small size and integration with the LNG facility, would not require significant operations and maintenance budget other than the scheduled annual inspections and any resulting maintenance which is not expected to be significant. Therefore, in its internal analysis AltaGas has allocated $10,000 per annum for pipeline operations and maintenance in its general plant maintenance at the LNG facility. Bypass Toll Analysis Further to the BCUC s request for a bypass toll analysis, AltaGas has prepared a cost of service model utilizing typical financial inputs AltaGas would make use of for developing pipeline assets. This analysis and the resultant toll are presented in Exhibit 2 that follows. The resulting analysis demonstrates that AltaGas cost of interconnecting on a standalone basis and bypassing PNG results in a tariff of $0.11 per GJ. AltaGas notes that, while it has many advantages in so far as its own internal capability to provide gas service to the proposed LNG facility, by leveraging its existing assets and gas supply agreements with producers and transporters in British Columbia, its final decision to locate in Dawson Creek was predicated on the intangible benefits that AltaGas receives by working with the local utility. These include: 1) Proximity to skilled labor. 2) Proximity to AltaGas existing facilities in Taylor and proposed facilities in Fort St. John. 3) Availability of serviced industrial land versus un-surveyed Crown land despite the significant savings of the latter. 4) Central location to a variety of markets including the far north, central BC and Alberta. 5) Excellent transportation corridors and road access. 6) Maintaining relationships with local communities and generating economic activity. 7) Social license and responsibility to the communities we impact. Page 2 of 4
4 Exhibit 2 Cost of Service and Bypass Toll Analysis Bypass Toll Calculation YEAR: Capital ($000) Gross Capex Opening $ - $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 Additions (Land) $ 139 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Additions (Pipeline and Facilities) $ 1,089 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Closing $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 Depreciation (Facilities) Opening $ - $ (9) $ (30) $ (50) $ (71) $ (91) $ (112) $ (132) $ (153) $ (173) $ (194) $ (214) $ (235) $ (255) $ (276) $ (296) $ (317) $ (337) $ (358) $ (378) Additions $ (9) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) Closing $ (9) $ (30) $ (50) $ (71) $ (91) $ (112) $ (132) $ (153) $ (173) $ (194) $ (214) $ (235) $ (255) $ (276) $ (296) $ (317) $ (337) $ (358) $ (378) $ (399) Net Capex Opening $ - $ 1,220 $ 1,199 $ 1,178 $ 1,158 $ 1,137 $ 1,117 $ 1,096 $ 1,076 $ 1,055 $ 1,035 $ 1,014 $ 994 $ 973 $ 953 $ 932 $ 912 $ 891 $ 871 $ 850 Additions $ 1,229 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Depreciation/Amortizartion $ (9) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) Closing $ 1,220 $ 1,199 $ 1,178 $ 1,158 $ 1,137 $ 1,117 $ 1,096 $ 1,076 $ 1,055 $ 1,035 $ 1,014 $ 994 $ 973 $ 953 $ 932 $ 912 $ 891 $ 871 $ 850 $ 830 Revenue Requirement ($000) Operating and Maintenance Expenses $ 10.0 $ 10.2 $ 10.3 $ 10.5 $ 10.6 $ 10.8 $ 10.9 $ 11.1 $ 11.3 $ 11.4 $ 11.6 $ 11.8 $ 12.0 $ 12.1 $ 12.3 $ 12.5 $ 12.7 $ 12.9 $ 13.1 $ 13.3 Allocation from A&G and Corp O/H $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total OMAG $ 10 $ 10 $ 10 $ 10 $ 11 $ 11 $ 11 $ 11 $ 11 $ 11 $ 12 $ 12 $ 12 $ 12 $ 12 $ 13 $ 13 $ 13 $ 13 $ 13 Depreciation & Amortization $ 9 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 Property Taxes $ 0.6 $ 1.2 $ 1.1 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 Interest $ 12 $ 24 $ 24 $ 23 $ 23 $ 23 $ 22 $ 22 $ 21 $ 21 $ 20 $ 20 $ 20 $ 19 $ 19 $ 18 $ 18 $ 18 $ 17 $ 17 Return on Equity $ 30 $ 60 $ 59 $ 58 $ 57 $ 56 $ 55 $ 54 $ 53 $ 52 $ 51 $ 50 $ 49 $ 48 $ 47 $ 46 $ 45 $ 44 $ 43 $ 42 Income Tax $ - $ - $ 1 $ 3 $ 4 $ 6 $ 7 $ 8 $ 9 $ 10 $ 11 $ 12 $ 13 $ 13 $ 14 $ 14 $ 15 $ 15 $ 15 $ 15 Total Revenue Required $ 62 $ 116 $ 116 $ 117 $ 117 $ 117 $ 117 $ 117 $ 117 $ 117 $ 116 $ 116 $ 115 $ 114 $ 114 $ 113 $ 112 $ 111 $ 110 $ 109 Volumes (TJ) Average Rate Impact ($/GJ) $ 0.06 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.11 $ 0.11 $ 0.11 $ 0.11 Levelized Rate Calculation (All Costs and Volumes) Discount Rate 7.00% 20-Year NPV Revenue Requirement ($000) $ 1, Year NPV Volumes 10,382 TJ Levelized Rate $ 0.11 /GJ Inputs & Assumptions Capital Costs ($000) Pipeline $ 236 Interconnection, Regulation and Metering $ 853 Land $ 139 OMAG & Taxes O&M ($000) $ 10 A&G Corporate Allocation Factor - Property Taxes and Taxes in Lieu 1.00% Financial Portion Equity 50.00% Return on Equity (before tax) 10.00% Return on Debt 4.00% WACC 7.00% Depreciation Rate 1.67% Effective Income Tax Rate 26.00% Capital Cost Allowance Rate Pipeline, Interconnection, Regulation and Metering 8.00% Inflation 1.50% Customer Volume (GJ/year) 980,000 Page 3 of 4
5 AltaGas is of the belief that the resulting negotiated tariff is fair and reasonable for both parties given that AltaGas is capable, both physically and financially, of bypassing PNG. AltaGas is cognizant of the value in working with PNG and believes that the agreed tariff is a fair compromise which provides long term benefits, both financial and intangible, to PNG customers, and which also affords valuable intangible benefits to AltaGas. Further, the negotiated arrangements are considered commercially reasonable for AltaGas in what is seen as a very competitive market for the new LNG business. Truly, Wayne Geis Divisional Vice President Regional LNG AltaGas Ltd. direct line main Page 4 of 4
Exhibit B-3, pp. 1-2, Exhibit 1; Exhibit B-1, p. 3 Capital costs
Page 1 B-7 BRITISH COLUMBIA UTILITIES COMMISSION INFORMATION REQUEST ON BYPASS COSTS TO PACIFIC NORTHERN GAS (N.E.) LTD. [PNG (N.E.)] Dawson Creek Division Application for Approval of AltaGas Ltd. Industrial
More informationB.C. Utilities Commission File No.: 4.2.7(2013) 6th Floor Howe Street Vancouver, BC V6Z 2N3
Janet P. Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5680 Fax: (604) 697-6210 Email: jkennedy@png.ca
More informationRe: Project No Pacific Northern Gas (N.E.) Ltd Revenue Requirements Application Update for Fort St. John/Dawson Creek Division
B-7 Craig P. Donohue Director, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5673 Tel: (604) 697-6210 Email: cdonohue@png.ca
More informationRe: Pacific Northern Gas (N.E.) Ltd. Project No /Order G Revenue Requirements Application
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationPNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationPacific Northern Gas Ltd. (PNG-West)
(PNG-West) #2550-1066 West Hastings Street Vancouver, B.C. V6E 3X2 2016 ANNUAL REPORT TO THE BRITISH COLUMBIA UTILITIES COMMISSION For the period January 1, 2016 to December 31, 2016 LIST OF SCHEDULES
More informationNovember 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3
Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. November 22, 2012 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey,
More informationPACIFIC NORTHERN GAS (N.E.) LTD. (Fort St. John/Dawson Creek Division) 2005 Revenue Requirements Application to the B.C. Utilities Commission
PACIFIC NORTHERN GAS (N.E.) LTD. (Fort St. John/Dawson Creek Division) 2005 Revenue Requirements Application to the B.C. Utilities Commission December 17, 2004 Pacific Northern Gas (N.E.) Ltd. (Fort St.
More informationAugust 29, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3
Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. August 29, 2012 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey, B.C.
More informationFEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,
More informationAttention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support
B-2 10 th Floor 1111 West Georgia Street Vancouver, BC, V6E 4M3 April 21, 2017 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Mr. Patrick Wruck, Commission
More informationFORTISBC ENERGY CEC ROE 2016 EXHIBIT A-7
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationDiane Roy Director, Regulatory Services
Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationIN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and
BRITI SH COLUM BI A UTILITIE S COMMISSIO N OR DER NUMBER G-103-10 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationSeptember 26, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.
B-8 Diane Roy Director, Regulatory Affairs FortisBC Energy 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@fortisbc.com www.fortisbc.com
More informationDiane Roy Director, Regulatory Services
Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationJuly 7, 2015 File No.: /14797 BY . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3
C7-3 July 7, 2015 File No.: 240148.00782/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com BY E-MAIL British Columbia Utilities Commission 6 th floor, 900 Howe Street
More informationBC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8
ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL bchydroregulatorygroup@bchydro.com March 31, 2011 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,
More informationSTARGAS APPLICATION TO ALTER RATES. Re: Stargas Utilities Ltd. Application to Alter Rates and Refinance
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL FREE:
More informationORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and
Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter
More informationParties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014)
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationFortisBC Inc. Application for an Exempt Residential Rate
B-1 Corey Sinclair Manager, Regulatory Affairs FortisBC Inc. Suite 100-1975 Springfield Road Kelowna, BC V1Y 7V7 Ph: (250) 469-8038 Fax: 1-866-335-6295 electricity.regulatory.affairs@fortisbc.com www.fortisbc.com
More information1.0 Reference: Exhibit B-1, Tab Application, page 3, Cost of Service Comparison
B-6 BCPSO IR No. 1 Page 1 REQUESTOR NAME: BCPSO et al. INFORMATION REQUEST ROUND NO: #1 TO: Pacific Northern Gas (N.E.) Ltd ( PNG ) Tumbler Ridge Division DATE: February 8, 2013 PROJECT NO: 3698698 / BCPSO
More informationVIA October 27, 2005
ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL
More informationBC HYDRO CONTRACTED GBL EXHIBIT A-6
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationRe: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL August 22, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604)
More informationMarch 4, RE: EXPERIMENTAL SCHEME APPROVAL, AMENDMENT #1 TATTOO AREA HORN RIVER FORMATION
March 4, 2009 9000-8285-59240-15 Eugene Wasylchuk, P.Eng. Consultant Stone Mountain Resources Ltd. Sun Life Plaza, West Tower 2800, 144 4 th Avenue SW Calgary, Alberta T2P 3N4 Dear Mr. Wasylchuk: RE: EXPERIMENTAL
More informationJanuary 23, Via Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3
3700 2 nd Avenue Burnaby, BC V5C 6S4 January 23, 2014 Via Email Original via Mail 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica M. Hamilton, Commission Secretary Dear Ms. Hamilton:
More informationPACIFIC NORTHERN GAS LTD.
IN THE MATTER OF PACIFIC NORTHERN GAS LTD. APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AND OPERATE AND INTERCONNECTING PIPELINE BETWEEN KITIMAT AND DOUGLAS CHANNEL DECISION
More information444 Seventh Avenue S.W. Calgary, Alberta T2P 0X8. Attention: Ms. Anne-Marie Erikson, Acting Secretary of the Board
450-1 st Street S.W. Calgary, Alberta, Canada T2P 5H1 Tel: (403) 920-2046 Fax: (403) 920-2347 Email: murray_sondergard@transcanada.com February 26, 2010 National Energy Board 444 Seventh Avenue S.W. Calgary,
More informationBRITISH COLUMBIA UTILITIES COMMISSION Commission Information Request No. 2
B-6 BCUC IR No. 2 Page 1 BRITISH COLUMBIA UTILITIES COMMISSION Commission Information Request No. 2 Pacific Northern Gas Ltd. (PNG West Division) and Pacific Northern Gas (N.E.) Ltd. (Fort St John/Dawson
More informationPACIFIC NORTHERN GAS LTO and PACIFIC NORTHERN GAS (N.E.) LTO. GAS SALES TARIFF. Explanation of Symbols on Tariff Sheets. A - Signifies Increase
~ Northem PacifiC Gas PACIFIC NORTHERN GAS LTO and PACIFIC NORTHERN GAS (N.E.) LTO. GAS SALES TARIFF Explanation of Symbols on Tariff Sheets A - Signifies Increase C - Signifies Change D - Signifies Decrease
More informationNovember 8, Dear Mr. Wruck:
B-23 Fred James Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com November 8, 2017 Mr. Patrick Wruck Commission Secretary and Manager Regulatory Support
More informationFORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL rhobbs@shaw.ca January 16, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z
More informationIN THE MATTER OF AND DECISION. July 29, Before:
IN THE MATTER OF PACIFIC NORTHERN GAS LTD. AND AN APPLICATION TO RECAPITALIZE UNDER AN INCOME TRUST OWNERSHIP STRUCTURE DECISION July 29, 2004 Before: L.A. Boychuk, Panel Chair and Commissioner N.F. Nicholls,
More informationTerasen Gas Inc. ( Terasen Gas ) Extension of the Multi-Year Performance Based Rate Plan 2007 Annual Review
Scott A. Thomson Vice President, Regulatory Affairs and Chief Financial Officer 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 592-7784 Fax: (604) 576-7074 Email: scott.thomson@terasengas.com www.terasengas.com
More informationMs. Erica M. Hamilton, Commission Secretary. FortisBC Energy Utilities ("FEU") Common Delivery Rates Methodology Application, Project No.
D Bff!-,~y B L:ghtfoot' Cbnstopher P \\'e
More informationPNG-West 2011 Revenue Requirements Application Response to BCOAPO Information Request No. 1 Project No
B-6 Craig P. Donohue Director, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5673 Tel: (604) 697-6210 Email: cdonohue@png.ca
More informationFORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3
Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 00 Howe Street Vancouver, BC Canada VZ N TEL: (0) 0-00 BC Toll Free: -00-- FAX: (0) 0- Log No. VIA
More informationNorthern Gateway is directed to submit its response with the Panel and send a copy to the OH Parties by noon, Mountain Time, 25 January 2012.
File OF-Fac-Oil-N304-2010-01 01 8 December 2011 Mr. Kenneth MacDonald VP, Law and Regulatory Affairs Northern Gateway Pipelines Inc. Suite 3000, 425 1st Street SW Calgary, Alberta T2P 3L8 Facsimile 403-718-3525
More informationbuilding trust. driving confidence.
~ building trust. driving confidence. January 29, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica Hamilton, Commission Secretary and Director
More informationFEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com July 24, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,
More informationForm F6 British Columbia Report of Exempt Distribution
Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt distribution in British Columbia. Issuer/underwriter
More informationINVESTOR PRESENTATION. January, 2019
INVESTOR PRESENTATION January, 2019 Forward Looking Information Certain statements contained in this presentation constitute forward-looking statements or forward-looking information (collectively, forward-looking
More informationJune 22, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. V6Z 2N3. Ms. Erica M. Hamilton, Commission Secretary
Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. B1-7 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@fortisbc.com
More informationForm F6 British Columbia Report of Exempt Distribution
Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt in British Columbia. Issuer/underwriter information
More informationCLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1
Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX:
More informationThe following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application.
C5-2 KIRSTEN B. JARON Director, Regulatory BC Pipeline and Field Services Divisions Duke Energy Gas Transmission Fifth Avenue Place, East Tower Suite 2600, 425 1 st Street SW Calgary, AB T2P 3L8 Telephone:
More informationINFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017
Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report
More informationALTAGAS CANADA INC. ANNOUNCES THIRD QUARTER 2018 RESULTS AND DECLARES ITS FIRST DIVIDEND
FOR IMMEDIATE RELEASE ALTAGAS CANADA INC. ANNOUNCES THIRD QUARTER 2018 RESULTS AND DECLARES ITS FIRST DIVIDEND Calgary, Alberta (October 31, 2018) AltaGas Canada Inc. ( ACI ) (TSX: ACI) today announced
More informationDoug Slater Director, Regulatory Affairs
B- Doug Slater Director, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationApril 29, Filed Electronically Original via Mail
Suite 1500, Bow Valley Square 4 250-6 th Ave SW Calgary, Alberta T2P 3H7 Declan Russell Manager, Regulatory Affairs April 29, 2016 Filed Electronically Original via Mail Ms. Sheri Young Secretary of the
More informationApril 13, Via
ENMAX Corporation 141 50 Avenue SE Calgary, AB T2G 4S7 Tel (403) 514-3000 enmax.com April 13, 2007 Via Email Ms. Brenda Ambrosi Vancouver, BC V7X 1V5 Dear Ms. Ambrosi: Re: Network Economy Business Practices
More informationIf you have any questions or concerns, please do not hesitate to contact the Commission.
August 23, 2017 Enforcement File: 2017-184FSJ Pembina NGL Corporation 4000, 585, 8th Avenue SW Calgary, Alberta T2P 1G1 Attention: Peter Miles, Supervisor of Regulatory Re: General Order 2017-086 Dear
More informationOur File: Date: April 22, 2015
B-2 BY E-MAIL British Columbia Utilities Commission 6th Floor - 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Erica Hamilton, Commission Secretary Dear Ms. Hamilton: Re: Reply Attention of: Matthew
More informationNational Energy Board. Reasons for Decision. Westcoast Energy Inc. RH-2-97 Part II. August 1997
National Energy Board Reasons for Decision Westcoast Energy Inc. RH-2-97 Part II August 1997 Multi-year Incentive Toll Settlement 1 January 1997 to 31 December 2001 National Energy Board Reasons for Decision
More informationVIA March 18, 2010 BCTC F2011 CAPITAL PLAN UPDATE EXHIBIT A 4
ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL Janet.fraser@bctc.com bctc.regulatory@bctc.com March 18, 2010 SIXTH FLOOR, 900 HOWE STREET,
More information1. Background. March 7, 2014
Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com March 7, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission
More informationMs. Laurel Ross, Acting Commission Secretary and Director
Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationFortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1
Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 September 6, 2017 Sent
More informationFor further information, please contact Guy Leroux at
BChydro m R GENE IONS Joanna Sofield Chief Regulatory Officer Phone: (604 623-4046 Fax: (604 623-4407 bchyd roregulatorygroup@bchydro.com July 13 2009 Ms. Erica M. Hamilton Commission Secretary British
More informationSeptember 10, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.
C- Email: electricity.regulatory.affairs@fortisbc.comemail: electricity.regulatory.affairs@fortisbc.com Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 00 Springfield Road Kelowna, BC VY
More informationFor further information, please contact Fred James at or by at
Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com February 28, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission
More informationFEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,
More informationDecision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding
Decision 22394-D01-2018 Rebasing for the 2018-2022 PBR Plans for February 5, 2018 Alberta Utilities Commission Decision 22394-D01-2018 Rebasing for the 2018-2022 PBR Plans for Proceeding 22394 February
More informationFORTISBC INC. RECONSIDERATION AND VARIANCE OF ORDER G PHASE 2 EXHIBIT A-4
Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX: (604)
More informationRequested Amendment to the National Energy Board Cost Recovery Regulations (Regulation)
File Ad-GA-RG-CR-03e 18 March 2011 To: Gas pipeline companies regulated by the National Energy Board, Canadian Association of Petroleum Producers, Canadian Energy Pipeline Association and Canadian Gas
More informationLMv CorporatJOn Also of the Yukon Bar
C1-2 D Barry Kirkha.rn, QC~ James D Burns~ Jeffrey B L1ghtfoot~ Ch1stophN P We.1fcr' \chcha '1 P \'
More informationDiane Roy Vice President, Regulatory Affairs
Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationMEMBER REGULATION. notice
MEMBER REGULATION notice W. D Silva: wdsilva@ida.ca MR0254 November 26, 2003 ATTENTION: Ultimate Designated Persons Chief Financial Officers Panel Auditors Distribute internally to: Corporate Finance Credit
More informationINVESTOR PRESENTATION JUNE 2018
INVESTOR PRESENTATION JUNE 2018 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation may be considered forward-looking
More informationSent via efile FEI 2016 RATE DESIGN EXHIBIT A2-10
Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 June 23, 2017 Sent via
More informationFor further information, please contact Fred James at or by at
Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com August 30, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission
More informationRéponse du Transporteur et du Distributeur à l'engagement 4
Demande R-3842-2013 Réponse du Transporteur et du Distributeur à l'engagement 4 Original : 2013-11-05 HQTD-6, Document 4.4 En liasse Demande R-3842-2013 Engagement 4 (Demandé par l'aqcie-cifq le 2013-11-01,
More informationCascade Pacific Power Corporation
February 7, 2008 C23-3 BC Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, BC V6B 5R3 Attention: Ms. Joanna Sofield, Chief Regulatory Officer Dear MS. Sofield RE: Standing Offer Program
More informationINVESTOR PRESENTATION JUNE 2018
INVESTOR PRESENTATION JUNE 2018 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation JUNE be considered forward-looking
More informationFor further information, please contact Sylvia von Minden at or by at
B-1 Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 24, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities
More informationForm F6 British Columbia Report of Exempt Distribution
Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt distribution in British Columbia. Issuer/underwriter
More informationAttached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012.
Janet Fraser Chief Regulatory Officer Phone: 60-6-06 Fax: 60-6-07 bchydroregulatorygroup@bchydro.com July 0, 01 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor
More information2018/19 SECOND QUARTER REPORT
2018/19 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated
More informationBRITISH COLUMBIA UTILITIES COMMISSION Annual Report
BRITISH COLUMBIA UTILITIES COMMISSION 1981 Annual Report Vancouver, B.C. December 21, 1983 To His Honour The Lieutenant Governor In Council of the Province of British Columbia MAY IT PLEASE YOUR HONOUR:
More informationSTAR GAS 2287 Selklrk Dr., Kelowna, BC. V I V 2Nh Tel. (250) i Fax: (250)
B-1 STAR GAS 2287 Selklrk Dr., Kelowna, BC. V I V 2Nh Tel. (250) 260-53 1 i Fax: (250) 763-6764 Robert J. Pellatt Commission Secretary Sixth Floor, 900 Howe Street, Box 250 Vancouver B.C. V6Z 2N3 August
More informationAugust 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
August 1, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher
More informationBritish Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc.
C1-24 Reply Attention of: Ludmila B. Herbst Direct Dial Number: (604) 661-1722 Email Address: lherbst@farris.com Our File No.: 05497-0224 January 20, 2014 BY EMAIL British Columbia Utilities Commission
More informationBMO Infrastructure & Utilities Conference February 8, 2018 Toronto
BMO Infrastructure & Utilities Conference February 8, 2018 Toronto LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation
More informationDiane Roy Vice President, Regulatory Affairs
B- Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationCAPP SCOTIABANK INVESTMENT SYMPOSIUM
CAPP SCOTIABANK INVESTMENT SYMPOSIUM TORONTO APRIL 12-13, 2016 Paul Myers - President & Chief Executive Officer Rob Froese - Chief Financial Officer Forward looking information Certain statements included
More informationThe University of Calgary
Decision 23147-D01-2018 Application for an Order Permitting the Sharing of Records Not Available to the Public Between the University of Calgary and URICA Energy Real Time Ltd. January 30, 2018 Alberta
More informationRegistration Exemption for Trades in Connection with Certain Prospectus-Exempt Distributions
. IN THE MATTER OF THE SECURITIES ACT, S.N.W.T. 2008, c. 10, AS AMENDED - and - Registration Exemption for Trades in Connection with Certain Prospectus-Exempt Distributions BLANKET ORDER 32-501 WHEREAS
More informationSUBSCRIPTION AGREEMENT. THIS SUBSCRIPTION AGREEMENT is dated this day of, 20
SUBSCRIPTION AGREEMENT THIS SUBSCRIPTION AGREEMENT is dated this day of, 20 BETWEEN: ANTRIM BALANCED MORTGAGE FUND LTD., a mortgage investment corporation having an office at 9089 Glover Road Box 520 Fort
More informationFortisBC Energy Inc. (FEI) Project No Demand Side Management Expenditures Plan (the Application) Errata dated September 20, 2018
B-1-1 Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationBC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1.
Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 25, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission
More informationNEWS RELEASE ALTAGAS LTD. REPORTS THIRD QUARTER RESULTS; SIGNS DEFINITIVE PROJECT AGREEMENT FOR CANADIAN WEST COAST PROPANE EXPORT SITE
NEWS RELEASE ALTAGAS LTD. REPORTS THIRD QUARTER RESULTS; SIGNS DEFINITIVE PROJECT AGREEMENT FOR CANADIAN WEST COAST PROPANE EXPORT SITE Calgary, Alberta (October 29, 2015) Highlights 28 percent increase
More informationFEI Annual Review of 2018 Rates
B-10 FEI Annual Review of 2018 Rates Workshop October 17, 2017 Agenda PBR Overview Diane Roy Vice President, Regulatory Affairs Revenue Requirements & Rates Rick Gosselin Manager, Cost of Service Demand
More information. CANADIAN DIRECT INSURANCE Canadian Western Bank Group
. CANADIAN DIRECT INSURANCE Canadian Western Bank Group C10-3 Ms. June Elder Manager, Corporate Regulatory Affairs, Insurance Corporation of British Columbia, 151 West Esplanade, North Vancouver, BC V7M
More informationAMENDED Form F6 British Columbia Report of Exempt Distribution
AMENDED Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt distribution in British Columbia. Issuer/underwriter
More information~ LAWSON /a LUNDEL~ I
~ LAWSON /a LUNDEL~ I Suite 1600 Cathedral Pl ace 925 West Georgia Street Vancouver, BC Canada V6C 3L2 T: 604.685.3456 C1-6 ELECTRONICALLY FILED Keith Bergner D: 604.631.9119 I 403.218.7538 F: 604.694.2910
More informationRed Rock Energy Inc. Management Discussion & Analysis March 31, 2016
Management Discussion and Analysis Management s discussion and analysis of the operating results and financial condition of Red Rock Energy Inc. ( Red Rock or the Company ) for the twelve months ended
More informationINFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017
INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 Vancouver The British Columbia Utilities Commission (BCUC) has responded to the letter from
More informationFile OF-Surv-Inc May 2013
File OF-Surv-Inc-2010 02 23 May 2013 Mr. Al Monaco Chief Executive Officer Enbridge Inc. 3000 Fifth Avenue Place 425 1 st Street S.W. Calgary, AB T2P 3L8 Facsimile 403-231-3920 Dear Mr. Monaco: Enbridge
More information