CASE No. 32 of 2016 CORAM. Shri Azeez M. Khan, Member Shri Deepak Lad, Member

Size: px
Start display at page:

Download "CASE No. 32 of 2016 CORAM. Shri Azeez M. Khan, Member Shri Deepak Lad, Member"

Transcription

1 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai Tel: /65/69 Fax: Website: / CASE No. 32 of 2016 In the matter of Petition of Tata Power Company Ltd. (Generation) for Truing-up of FY , Provisional Truing-up for FY and ARR and Tariff for the 3rd Control Period FY to FY CORAM Shri Azeez M. Khan, Member Shri Deepak Lad, Member ORDER Date: 8 August, 2016 The Tata Power Company Limited (Generation Business) (TPC-G) has, under Regulation 5 of the MERC (Multi Year Tariff (MYT)) Regulations ( MYT Regulations ), 2015, filed its Petition for Truing-up of FY , Provisional Truing-up of FY and Aggregate Revenue Requirement (ARR) and Tariff for the 3 rd Control Period from FY to FY The Truing-up for FY and Provisional Truing-up for FY is approved under the MYT Regulations, 2011, while the ARR forecast and Tariff for FY to FY are as per MYT Regulations, The original Petition was filed on 11 February, TPC-G filed a revised Petition on 24 March, The Commission, in exercise of its powers under Sections 61 and 62 of the Electricity Act (EA), 2003 and all other powers enabling it in this behalf, and after considering the submissions made by TPC-G, suggestions and objections received, issues raised during the Public Hearing and other relevant material, issues the following Order. MERC Order in Case No. 32 of 2016 Page 1 of 224

2 TABLE OF CONTENTS 1 BACKGROUND AND REGULATORY PROCEEDINGS Background MYT Regulations, Business Plan Order for MYT 2 nd Control Period Truing-up of FY and ARR for 2 nd Control Period FY to FY Truing-up of FY and FY , Provisional Truing-up of FY and Projection of ARR and Tariff for FY MYT Regulations, Admission of the Petition and Public Consultation Process Organisation of the Order SUGGESTIONS/ OBJECTIONS RECEIVED, TPC-G S RESPONSE AND COMMISSION S VIEW Fuel Prices Competitive Bidding for Power Purchase Blended Tariff for Unit GT Losses Colony Consumption Unit-7 PLF for 3 rd Control Period Foreign Exchange Loss Income Tax Capital Expenditure and Capitalisation O&M Expenses Sharing of Unit-6 Fixed Cost Delayed Payment Charges Force Majeure in case of Units 7 and Incentive for Backing Down of Units Property Tax Recovery of Fixed Cost for Bhira Hydro Station Submissions for 3 rd Control Period Shortcomings in Petition Filing MERC Order in Case No. 32 of 2016 Page 2 of 224

3 3 IMPACT OF ATE JUDGMENTS ON PREVIOUS YEARS TRUE-UP Appeal challenging MTR Order dated 26 June, 2015 in Case 6 of TRUING-UP FOR FY Background Performance Parameters Performance of Units-4 to 7 and Hydro Stations Availability and Gross Generation Auxiliary Energy Consumption Gross Station Heat Rate Fuel Cost Fuel Cost of Unit-6 under MSLDC Directions Entry Tax Operation and Maintenance Expenses Capital Expenditure and Capitalisation Non-DPR Capitalisation for FY to FY Depreciation Interest on Long-term Loans Return on Equity Interest on Working Capital Income Tax Non-Tariff Income Revenue from Sale of Power PLF Incentive for Thermal Station and Hydro Incentive for Hydro Stations Reduction of Fixed Charges on account of lower Availability of Unit Sharing of Gains / Losses for FY Gains / Losses on account of fuel costs Gains / Losses on account of Auxiliary Consumption Gains / Losses on account of O&M Expenses Net Entitlement, and resultant Gap/ Surplus for Units 4 to 7 and Hydro Stations Performance of Unit Gross Generation Auxiliary Energy Consumption Gross Station Heat Rate MERC Order in Case No. 32 of 2016 Page 3 of 224

4 4.4.4 Fuel Cost Operation and Maintenance Expenses Capital Expenditure and Capitalisation Non-DPR Capitalisation for FY to FY Depreciation Interest on Long-term Loan Return on Equity Interest on Working Capital Income Tax Non-Tariff Income Revenue from Sale of Power Reduction of Fixed Charges on account of lower Availability of Unit Sharing of Gains / Losses for FY Gains / Losses on account of fuel cost Efficiency Gains / Losses on account of Auxiliary Energy Consumption Efficiency Gains / Losses on account of O&M Expenses Net Entitlement, and resultant Revenue Gap/ Surplus for Unit PROVISIONAL TRUE-UP OF ARR FOR FY Background Performance Parameters Performance Parameters of TPC-G s Generating Station/ Units Availability Gross Generation Auxiliary Energy Consumption Gross Station Heat Rate Design Energy for Hydro Generating Stations Fuel Price and Calorific Value Fuel Cost Fuel Cost of Unit-6 operating under MSLDC Directions Entry Tax Operation and Maintenance Expenses Capital Expenditure and Capitalisation Depreciation MERC Order in Case No. 32 of 2016 Page 4 of 224

5 Interest on Long-term Loan Return on Equity Interest on Working Capital Income Tax Non-Tariff Income PLF Incentive for Thermal Station Provisional Truing-up for FY Past Recoveries from Distribution Licensees Incentive for backing down instructions from MSLDC for FY to FY Fuel Cost of Unit-6 under MSLDC Directions Other Past Recoveries from Distribution Licensees ARR FOR 3RD CONTROL PERIOD FROM FY TO FY Background Performance Parameters Generating Stations Performance Parameters Availability Gross Generation Auxiliary Energy Consumption Gross Station Heat Rate Fuel Cost Operation and Maintenance Expenses Capital Expenditure and Capitalisation Depreciation Interest on Long-term Loan Return on Equity Interest on Working Capital Income Tax Non-Tariff Income Fixed Cost of Unit Summary of Annual Fixed Charges MULTI-YEAR TARIFF FOR 3RD CONTROL PERIOD FROM FY TO FY AFC for TPC-G MERC Order in Case No. 32 of 2016 Page 5 of 224

6 7.2 Energy Charges for Thermal Generating Units Capacity Charges and Energy Charges for Hydro Generating Units COMPLIANCE OF DIRECTIVES IN MTR ORDER Non-DPR Capitalisation Section 80 IA of Income Tax Act BHEL Circular Replacement of Blades Operating Conditions SUMMARY OF THE RULINGS Carrying Cost on impact of ATE Judgment True-up For FY Performance of Unit Provisional True-up for FY Past Recoveries from Distribution Licensees ARR for the 3 RD Control Period from FY TO FY DIRECTIVES Imported Coal Purchase Expiry of PPA APPLICABILITY OF ORDER MERC Order in Case No. 32 of 2016 Page 6 of 224

7 LIST OF TABLES Table 1: Potential Impact of ATE Appeal 244 of 2015 as submitted by TPC-G Table 2: Potential Impact of ATE Appeal 244 of 2015 as submitted by TPC-G Table 3: Potential Impact of ATE Appeal 244 of 2015 including carrying cost as submitted by TPC-G. 45 Table 4: Revised Tax Computation for FY as submitted by TPC-G Table 5: Gross Generation and Availability certified by MSLDC for FY Table 6: Summary of Availability for Units 4 to 7 and Hydro Stations for FY as approved by Commission Table 7: Summary of Gross Generation for Units 4 to 7 and Hydro Stations for FY as approved by Commission Table 8: Auxiliary Energy Consumption for FY as submitted by TPC-G Table 9: Unit-4Auxiliary Energy Consumption for FY as submitted by TPC-G Table 10: Auxiliary Energy Consumption of Hydro Stations for FY as submitted by TPC-G Table 11: Auxiliary Energy Consumption for nallah diversion as submitted by TPC-G for FY Table 12: Actual GT Losses for FY as submitted by TPC-G Table 13: Headworks consumption as submitted by TPC-G Table 14: Hydro Auxiliary Energy Consumption for FY as submitted by TPC-G Table 15: Normative Auxiliary Energy Consumption for Hydro Generating Stations as approved by Commission for FY Table 16: Auxiliary Energy Consumption for FY as approved by Commission Table 17: SHR for Unit-6 for FY as submitted by TPC-G Table 18: Actual SHR for Unit-6 under different modes of operation, as submitted by TPC-G for FY Table 19: Unit-wise SHR for approved by Commission Table 20: Break-up of Fuel Cost, as submitted by TPC-G for FY Table 21: Fuel Parameters as approved by Commission for FY Table 22: Fuel Cost Reconciliation as submitted by TPC-G for FY Table 23: Fuel Cost for Units 4 to 7 for FY as approved by Commission Table 24: Impact of Entry Tax as submitted by TPC-G for FY Table 25: Recovery of Entry Tax, as approved by Commission Table 26: Employee Expenses for Trombay Units 4-7 &Hydro Stations for FY Table 27: Summary of O&M Expenses for FY as approved by Commission Table 28: Non-DPR Schemes not considered for Capitalisation Table 29: Capitalisation approved by Commission for FY Table 30: Summary of Merged DPRs, as submitted by TPC-G Table 31: Summary of Merged Non-DPR Capitalisation now approved by Commission for Units 4 to 7 and Hydro Generating Stations Table 32: Non-DPR Capitalisation for Units 4 to 7 and Hydro Generating Stations as approved by Commission for FY to FY Table 33: Depreciation as approved by Commission for FY Table 34: Details of Fresh Loans for FY Table 35: Allocation of Loans as submitted by TPC-G Table 36: Interest on Long-term Loans as approved by the Commission for FY MERC Order in Case No. 32 of 2016 Page 7 of 224

8 Table 37: Return on Equity as approved by the Commission for FY Table 38: Interest on Working Capital as approved by Commission for FY Table 39: Income Tax as approved by Commission for FY Table 40: Non-Tariff Income as approved by Commission for FY Table 41: Revenue from Sale of Power for FY Table 42: Approved Reduction in AFC for Unit-7 for FY Table 43: Gains and Losses due to variation in Fuel Cost, as approved by Commission for FY Table 44: Gain/Loss due to variation in Auxiliary Energy Consumption as approved by Commission for FY Table 45: Property Tax Summary as submitted by TPC-G for FY Table 46: Gains due to variation in O&M Expenses for Units 4 to 7 and Hydro Stations for FY as approved by Commission Table 47: Truing-up for FY for Units 4 to 7 and Hydro Stations, including sharing of efficiency gains/ losses Table 48: Unit-8 Performance in FY as submitted by TPC-G Table 49: Availability of Unit-8 as approved by Commission for FY Table 50: Gross Generation of Unit-8 as approved by the Commission for FY Table 51: Summary of Auxiliary Energy Consumption of Unit-8 as approved by Commission for FY Table 52: Summary of SHR of Unit-8 as approved by Commission for FY Table 53: Fuel Cost of Unit-8 for FY as submitted by TPC-G Table 54: Fuel Parameters as approved by Commission for Unit-8 for FY Table 55: Fuel Cost as approved by Commission for Unit-8 for FY Table 56: Summary of O&M Expenses approved by Commission for Unit-8 for FY Table 57: Capitalisation of Unit-8 as approved by Commission for FY Table 58: Summary of Non-DPR Capitalisation now approved by Commission for Unit Table 59: Non-DPR Capitalisation for Unit-8 as approved by Commission for FY to FY Table 60: Depreciation for Unit-8 as approved by Commission for FY Table 61: Interest on Long-term Loan as approved by Commission for FY Table 62: Return on Equity for Unit-8 as approved by Commission for FY Table 63: Income Tax for Unit-8 for FY as approved by Commission Table 64: Revenue from GenerationofUnit-8 for FY , as submitted by TPC-G Table 65: Summary of Reduction of AFC for Unit-8 for FY as approved by Commission Table 66: Gains/Losses in Fuel Cost as approved by Commission for FY Table 67: Efficiency Gains/ Losses due to variation in Auxiliary Energy Consumption of Unit-8 in FY , as approved by Commission Table 68: Efficiency Gains/ Losses due to variation in O&M Expenses for Unit-8 for FY Table 69: Truing-up for FY for Unit 8, including sharing of Efficiency Gains/ (Losses) Table 70: Availability of Generating Units as submitted by TPC-G for FY Table 71: Availability of Generating Units as submitted by TPC-G (revised submission) for FY Table 72: Availability as approved by the Commission for FY Table 73: Gross Generation and PLF as submitted by TPC-G for FY MERC Order in Case No. 32 of 2016 Page 8 of 224

9 Table 74: Gross Generation and PLF as submitted by TPC-G in revised submission for FY Table 75: Gross Generation and PLF as approved by Commission for FY Table 76: Auxiliary Energy Consumption as submitted by TPC-G for FY Table 77: Auxiliary Energy Consumption as submitted by TPC-G in its revised submission for FY Table 78: Auxiliary Energy Consumption as approved by Commission for FY Table 79: SHR for FY as submitted by TPC-G Table 80: SHR as submitted by TPC-G in its revised submission for FY Table 81: Revised Normative SHR for Unit-6 for FY Table 82: SHR as approved by the Commission for FY Table 83: Fuel Prices in FY , as submitted by TPC-G Table 84: Fuel Prices and Calorific Value as approved by Commission for FY Table 85: Impact of Entry Tax as submitted by TPC-G for FY Table 86: Recovery of Entry Tax, as approved by Commission for FY Table 87: O&M Expenses as approved by Commission for FY Table 88: Schemes with major impact on Capitalisation, as submitted by TPC-G Table 89: Summary of disallowed DPR Capitalisation for restricted cumulative Capitalisation Table 90: Summary of Capitalisation disallowed by Commission for FY Table 91: Capitalisation as approved by Commission for FY Table 92: Depreciation as approved by Commission for FY Table 93: Interest on Long-term Loan as approved by Commission Table 94: Return on Equity as approved by Commission for FY Table 95: IoWC for Units 4 to 7 and Hydro Stations as approved by Commission for FY Table 96: IoWC for Unit-8 as approved by Commission for FY Table 97: Income Tax as approved by Commission for FY Table 98: Non-Tariff Income as approved by Commission for FY Table 99: Incentive as claimed by TPC-G on account of Backing Down in FY Table 100: Provisional Truing-up for FY as approved by Commission Table 101: PLF Incentive on account of Backing Down for FY to FY , as submitted by TPC-G Table 102: Fuel Cost for Unit-6 under MSLDC Directions Table 103: Amounts Recoverable from Distribution Licensees as submitted by TPC-G Table 104: Amounts Recoverable from Distribution Licensees as approved by Commission Table 105: Break up of recoverable amount as approved by the Commission Table 106: Carrying Cost on recovery as approved by the Commission Table 107: Net Amount to be recovered from Distribution Licensees in FY Table 108: Monthly recovery from Distribution Licensees in FY Table 109: Existing Generation Capacity of TPC-G Table 110: Availability of Generating Units in 3 rd Control Period as submitted by TPC-G Table 111: Availability of Generating Units in 3 rd Control Period as approved by Commission Table 112: Summary of Gross Generation and PLF as submitted by TPC-G for 3 rd Control Period Table 113: Summary of Gross Generation and PLF as approved by the Commission for 3 rd Control Period MERC Order in Case No. 32 of 2016 Page 9 of 224

10 Table 114: Normative Auxiliary Energy Consumption for Thermal Generating Stations for 3 rd Control Period as submitted by TPC-G Table 115: Auxiliary Energy Consumption for Nallah Diversion as submitted by TPC-G for 3 rd Control Period Table 116: Auxiliary Energy Consumption for Thermal Generating Units for 3 rd Control Period as approved by Commission Table 117: Auxiliary Energy Consumption for Nallah Diversion as approved by Commission for 3 rd Control Period Table 118: Auxiliary Energy Consumption for Hydro Generating Stations as approved by Commission for 3 rd Control Period Table 119: Normative SHR for Thermal Generating Stations for 3 rd Control Period as submitted by TPC- G Table 120: SHR as approved by Commission for 3 rd Control Period Table 121: Fuel proposed for Thermal Generating Stations in 3 rd Control Period as submitted by TPC-G Table 122: Existing Contracts for APM Gas as submitted by TPC-G Table 123: Fuel Parameters as projected by TPC-G for 3 rd Control Period Table 124: Summary of Fuel Parameters as approved by Commission for 3 rd Control Period Table 125: Summary of Energy Charges as approved by Commission for 3 rd Control Period Table 126: O&M Expenses for Base Year as submitted by TPC-G for 3 rd Control Period Table 127: O&M Expenses as submitted by TPC-G for Units 4 to 7 and Hydro for 3 rd Control Period. 173 Table 128: O&M Expenses as submitted by TPC-G for Unit-8 for 3 rd Control Period Table 129: Summary of O&M Expense escalation computation for 3 rd Control Period Table 130: Summary of O&M Expense escalation computation for 3 rd Control Period Table 131: O&M Expenses as approved by Commission for Units 4 to 7 and Hydro Generating Stations for 3 rd Control Period Table 132: O&M Expenses as approved by Commission for 3 rd Control Period for Unit Table 133: Capitalisation for Units 4 to 7 and Hydro Generating Stations for 3 rd Control Period as submitted by TPC-G Table 134: Capital Expenditure and Capitalisation as submitted by TPC-G for Unit-8 during 3 rd Control Period Table 135: Capitalisation disallowed by Commission for FY Table 136: Capitalisation approved by Commission for 3 rd Control Period Table 137: Depreciation for Units 4 to 7 and Hydro Stations as submitted by TPC-G for 3 rd Control Period Table 138: Depreciation for Unit-8 as submitted by TPC-G for 3 rd Control Period Table 139: Depreciation approved by Commission for Units 4 to 7 and Hydro Stations for 3 rd Control Period Table 140: Summary of Depreciation approved by Commission for Unit-8 for 3 rd Control Period Table 141: Interest on Long-term Loan for Units 4 to 7 and Hydro Stations as submitted by TPC-G for 3 rd Control Period Table 142: Interest on Long-term Loan for Unit-8 as submitted by TPC-G for 3 rd Control Period Table 143: Interest on Long-term Loan for Units 4 to 7 and Hydro Stations as approved by Commission for 3 rd Control Period MERC Order in Case No. 32 of 2016 Page 10 of 224

11 Table 144: Interest on Long-term Loan for Unit-8 as approved by Commission for 3 rd Control Period 184 Table 145: Return on Equity as submitted by TPC-G for 3 rd Control Period for Units 4 to 7 and Hydro Stations Table 146: Return on Equity as submitted by TPC-G for 3 rd Control Period for Unit Table 147: Return on Equity as approved by the Commission for Units 4 to 7 and Hydro Generating Stations for 3 rd Control Period Table 148: Return on Equity as approved by the Commission for Unit-8 for 3 rd Control Period Table 149: Interest on Working Capital as submitted by TPC-G for Units 4 to 7 and Hydro Stations for 3 rd Control Period Table 150: Interest on Working Capital as submitted by TPC-G for Unit-8 for 3 rd Control Period Table 151: Interest on Working Capital as approved by the Commission for Units 4 to 7 and Hydro for 3 rd Control Period Table 152: Interest on Working Capital as approved by Commission for Unit-8 for 3 rd Control Period 189 Table 153: Income Tax for Units 4 to 7 and Hydro Stations as submitted by TPC-G for 3 rd Control Period Table 154: Income Tax for Unit-8 as submitted by TPC-G for 3 rd Control Period Table 155: Income Tax for Units 4 to 7 and Hydro Stations as approved by TPC-G for 3 rd Control Period Table 156: Income Tax for Unit-8 as approved by TPC-G for 3 rd Control Period Table 157: Non-Tariff Income as submitted by TPC-G for Units 4 to 7 and Hydro Stations for 3 rd Control Period Table 158: Non-Tariff Income as submitted by TPC-G for Units 4 to 7 and Hydro Stations for 3 rd Control Period Table 159: Non-Tariff Income as submitted by TPC-G for Unit-8 for 3 rd Control Period Table 160: Non-Tariff Income as approved by the Commission for Units 4 to 7 and Hydro Stations for 3 rd Control Period Table 161: Non-Tariff Income as approved by the Commission for Unit-8 for 3 rd Control Period Table 162: Annual Fixed Charges for Units 4 to 7 and Hydro Stations for 3 rd Control Period Table 163: Annual Fixed Charges for Unit-8 for 3 rd Control Period Table 164: Annual Fixed Charges as approved by Commission for FY Table 165: Annual Fixed Charges as approved by Commission for FY Table 166: Annual Fixed Charges as approved by Commission for FY Table 167: Annual Fixed Charges as approved by Commission for FY Table 168: Energy Charges as approved by Commission for Thermal Stations for 3 rd Control Period Table 169: Capacity and Energy Charges for Khopoli Hydro Generating Station as submitted by TPC-G for 3 rd Control Period Table 170: Capacity and Energy Charges for Bhira Hydro Generating Station as submitted by TPC-G for 3 rd Control Period Table 171: Capacity and Energy Charges for Bhivpuri Hydro Generating Station as submitted by TPC-G for 3 rd Control Period Table 172: Capacity and Energy Charges for Khopoli Hydro Generating Station as approved by Commission for 3 rd Control Period Table 173: Capacity and Energy Charges for Bhira Hydro Generating Station as approved by Commission for 3 rd Control Period MERC Order in Case No. 32 of 2016 Page 11 of 224

12 Table 174: Capacity and Energy Charges for Bhivpuri Hydro Generating Station as approved by Commission for 3 rd Control Period Table 175: Disallowed Capitalisation towards Non-DPR Schemes as submitted by TPC-G for FY Table 176: Disallowed Capitalisation towards Non-DPR Schemes for FY Table 177: Past recoveries from Distribution Licensees as approved by Commission Table 178: Net Amount to be recovered from Distribution Licensees in FY Table 179: Monthly recovery from Distribution Licensees in FY MERC Order in Case No. 32 of 2016 Page 12 of 224

13 List of Abbreviations Abbreviations A&G AFC APR ARR ATE BEST BHEL BPCL CAGR CAPEX CAT CERC CFR COD CPI CPRI CRZ Cu. M GCV DPC DPR EA FAC FCCB FGD FOB FY GAIL GFA GoI GoM GT HBA Index HOSS HPCL IDC IOC IWC Definitions Administrative and General Annual Fixed Charges Annual Performance Review Aggregate Revenue Requirement Appellate Tribunal for Electricity BEST Undertaking Bharat Heavy Electricals Limited Bharat Petroleum Corporation Limited Compounded Annual Growth Rate Capital Expenditure Conservation Action Trust Central Electricity Regulatory Commission Cost and Freight Commercial Operation Date Consumer Price Index Central Power Research Institute Coastal Regulation Zone Cubic meter Gross Calorific Value Delayed Payment Charges Detailed Project Report Electricity Act Fuel Adjustment Charge Foreign Currency Convertible Bond Flue Gas De-sulphurisation Free On Board Financial Year Gas Authority India Limited Gross Fixed Assets Government of India Government of Maharashtra Generator Transformer Harga Patokan Batubara Index Head Office and Support Services Hindustan Petroleum Corporation Limited Interest During Construction Indian Oil Corporation Limited Interest on Working Capital MERC Order in Case No. 32 of 2016 Page 13 of 224

14 Abbreviations IDBI IDFC kcal kw kwh LCC LSHS MAT MbPT MCGM MCM MERC or the Commission MoD MoEF MoPNG MPCB MT MTR MU MW MWRRA MYT NAPAF NGT OEM O&M ONGC PLF PPA RBI RLNG RTL RoE RPM R&M SBAR SBI SBI-PLR SHR SLP Definitions Industrial Development Bank of India Limited Infrastructure Development Finance Company Limited kilo Calories kilo Watt kilo Watt hour Load Control Centre Low Sulphur Heavy Stock Minimum Alternative Tax Mumbai Port Trust Municipal Corporation of Greater Mumbai Million Cubic Meters Maharashtra Electricity Regulatory Commission Merit Order Despatch Ministry of Environment & Forest Ministry of Petroleum and Natural Gas Maharashtra Pollution Control Board Metric Tonnes Mid-Term Review Million Units Mega Watt Maharashtra Water Resources Regulatory Authority Multi Year Tariff Normative Annual Plant Availability Factor National Green Tribunal Original Equipment Manufacturer Operation and Maintenance Oil and Natural Gas Corporation Limited Plant Load Factor Power Purchase Agreement Reserve Bank of India Re-gasified Liquefied Natural Gas Rupee Term Loan Return on Equity Rotations Per Minute Repair and Maintenance State Bank of India Advance Rate State Bank of India State Bank of India-Prime Lending Rate Station Heat Rate Special Leave Petition MERC Order in Case No. 32 of 2016 Page 14 of 224

15 Abbreviations STU SBAR TPC TPC-D TPC-G TPC-T TVS UMPP USD WPI Definitions State Transmission Utility State Bank Advance Rate The Tata Power Company Ltd. Tata Power Company-Distribution Tata Power Company-Generation Tata Power Company-Transmission Technical Validation Session Ultra Mega Power Project US Dollar Wholesale Price Index MERC Order in Case No. 32 of 2016 Page 15 of 224

16 1 BACKGROUND AND REGULATORY PROCEEDINGS 1.1. Background TPC is a Company with its registered office at Bombay House, 24, Homi Mody Street, Fort, Mumbai. TPC has various regulated and non-regulated business verticals. TPC (Distribution Business) (TPC-D), TPC (Transmission Business) (TPC-T) and TPC-G (Generation Business) are regulated businesses under the provisions of the EA, TPC-G s installed generation capacity is 2027 MW, comprising 447 MW of Hydro Generation and 1580 MW of Thermal Generation. However, the 150 MW Unit-4 Generating Capacity is no longer in use, and hence the operational Thermal Generation Capacity is 1430 MW. The entire generation capacity of TPC-G is tied up on a longterm basis with two Distribution Licensees of Mumbai, namely TPC-D and Brihanmumbai Electric Supply and Transport Undertaking (BEST) This Order relates to TPC-G s Petition for Truing-up of FY , Provisional Truing-up of FY and approval of ARR and determination of Tariff for the 3 rd Control Period from FY to FY MYT Regulations, 2011 The Commission notified its MYT Regulations, 2011 on 4 February, 2011, applicable for determination of Tariff for the 2 nd Control Period from FY to FY Business Plan Order for MYT 2 nd Control Period In its Order dated 9 August, 2012 in Case No. 166 of 2011 on TPC-G s Business Plan Petition, the Commission directed TPC-G to file a MYT Petition for the 2 nd Control Period from FY to FY However, for FY , the Commission directed it to file the ARR as per the Tariff Regulations, On TPC-G s Appeal against that directive, the Appellate Tribunal for Electricity (ATE), in its Order dated 28 November, 2013, entitled it to claim ARR based on the MYT Regulations, 2011 for FY Truing-up of FY and ARR for 2 nd Control Period FY to FY In its Order dated 5 June, 2013 in Case No. 177 of 2011 ( previous MYT Order ), the Commission undertook the Truing-up of FY and approved the Tariff for FY to FY Aggrieved on issues relating to wrongful computation of Operation and Maintenance (O&M) expenses, considering income from gain/losses on MERC Order in Case No. 32 of 2016 Page 16 of 224

17 Foreign Exchange as a part of Non-Tariff Income, disallowance of Auxiliary Energy Consumption of Unit-6 and non-allowance of carrying cost on past recovery, TPC-G filed an Appeal No. 212 of In its Judgment dated 27 October, 2014, the ATE entitled TPC-G to claim some of the earlier disallowed expenditure Truing-up of FY and FY , Provisional Truing-up of FY and Projection of ARR and Tariff for FY On TPC-G s Mid-Term Review (MTR) Petition for the 2 nd Control Period (Case No. 6 of 2015) for Truing-up of FY and FY , Provisional Truing-up of FY and projection of ARR and Tariff for FY , the Commission issued its Order on 26 June, 2015 ( MTR Order ) MYT Regulations, The Commission notified the MYT Regulations, 2015 on 8 December, These Regulations are applicable for determination of Tariff for the 3 rd Control Period, i.e., FY to FY TPC-G requested the Commission to extend the time for filing of MYT Petition stating its difficulties in collecting the data and preparation of MYT Petition within the due date. Considering the requests of various Generating Companies and Licensees, including TPC-G, vide Order dated 15 January, 2016 the Commission allowed TPC-G to file its Petition by 31 January, Admission of the Petition and Public Consultation Process TPC-G filed its MYT Petition on 11 February, Preliminary data gaps were forwarded to TPC-G on 24 and 29 February and 4 March, TPC-G stated its replies on 3 March, The Commission conducted a Technical Validation Session (TVS) on 4 March, The list of persons who participated in the TVS is at Appendix - 1. TPC-G made a presentation on the salient features of the Petition The Commission sought additional information and clarifications on the issues raised during the TVS. TPC-G stated replies to the pending data gaps and issues raised during the TVS vide its letters dated 10, 17, and 18 March Thereafter, TPC-G filed a revised Petition on 24 March, 2016 incorporating the changes pointed out through data gaps TPC-G s prayers are as follows: MERC Order in Case No. 32 of 2016 Page 17 of 224

18 I. Accept the Truing-up for FY , Provisional Truing-up of FY and past Gap / (Surplus) thereof in accordance with the guidelines & principles outlined in MYT Regulations, 2011; II. III. IV. Accept the Projections for FY to FY in accordance with the guidelines & principles outlined in MYT Regulations, 2015; Allow determination of normative Auxiliary Energy Consumption in Standby Mode for Unit 6. Allow Heat Rate and Auxiliary Energy Consumption for Unit 6 under Technical Minimum operation. V. Allow Heat Rate and Auxiliary Energy Consumption for Unit 7 in open cycle mode for the Third Control Period, similar to that approved in the Business Plan Order in Case 166 of 2011 for the Second Control Period. VI. VII. VIII. To treat the release of 30 MCM water from Mulshi dam for drinking water purpose as uncontrollable over and above that of low rainfall during FY and allow us to apply the appropriate regulatory mechanisms provided in the Regulations in the future years to enable the recovery of the entire fixed cost of the Generating Stations. Condone any inadvertent omissions / errors / rounding off differences / shortcomings and permit Tata Power- G to add / change / modify / alter this filing and make further submissions as may be required at a future date; Pass such further and other orders, as the Hon ble Commission may deem fit and proper, keeping in view the facts and circumstances of the case The Commission admitted the revised Petition on 29 March, 2016, directed TPC-G to publish it Petition in an abridged form by 1 April, 2016, and to reply expeditiously to all suggestions and objections received on its Petition TPC-G published the Public Notice in the daily newspapers Hindustan Times and Indian Express (English), and Loksatta and Saamna (Marathi) on 31 March, Copies of the Petition and its Executive Summary were made available at TPC s offices and on TPC-G s website ( The Public Notice and Executive Summary of the Petition were also made available on the websites of the Commission ( / in downloadable format A Public Hearing was held on 26 April, 2016 in the Office of the Commission, 13th Floor, Centre No. 1, World Trade Centre, Cuffe Parade, Colaba, Mumbai. The list of persons at the Public Hearing is atappendix-2. MERC Order in Case No. 32 of 2016 Page 18 of 224

19 1.7.8 Two more sets of data gaps were sent to TPC-G on 20 and 25 April, 2016, seeking additional information relating to fuel purchase and revised actual unaudited data of FY (since the year was over). TPC-G stated its replies vide letters dated 5, 6, 10 and 13 May, TPC-G made additional submission on Plant Load Factor (PLF) incentive on account of backing down instructions for FY to FY vide letters dated 25 April and 23 May, The Commission has ensured that the due process contemplated under the law to ensure transparency and public participation was followed at every stage, and adequate opportunity was given to all to submit their views The Commission received written suggestions and objections, and oral submissions at the Public Hearing Organisation of the Order This Order is organised in the following Sections: Section 1 provides a brief history of the quasi-judicial regulatory process undertaken by the Commission. A list of abbreviations with their expanded forms has been included. Section 2 discusses the suggestions and objections given in writing as well as those presented during the Public Hearing. The suggestions and objections have been summarised, followed by the response of TPC-G and the views of the Commission on each issue. Section 3 details the impact of ATE Judgments on the previous years' Truing-up. Section 4 details the Truing-up of the ARR for FY , including sharing of efficiency gains/ losses. Section 5 details the approval of the Provisional Truing-up for FY Section 6 details the ARR and Tariff for the 3 rd Control Period. Section 7 deals with summary of approved Tariff for the 3 rd Control Period Section 8 covers the directives given in the MTR Order, TPC-G's responses and new directives. MERC Order in Case No. 32 of 2016 Page 19 of 224

20 Section 9 summarises the rulings of the Commission. Section 10 deals with Directives to TPC-G. Section 11 sets out the applicability of this Order MERC Order in Case No. 32 of 2016 Page 20 of 224

21 2 SUGGESTIONS/ OBJECTIONS RECEIVED, TPC-G S RESPONSE AND COMMISSION S VIEW 2.1 Fuel Prices Suggestions/Objections The Indian Hotel and Restaurant Association, Shri Kamlakar Shenoy, Shri Guruprasad Shetty and Shri Lalit Vashista stated that TPC-G has inflated the purchase price of fuel. TPC-G has projected LSHS price of Rs per MT for the 3 rd Control Period, while the same is sold by Bharat Petroleum at Rs per MT. Similarly TPC-G has projected coal purchase price as Rs per MT, while it is being sold by Coal India Ltd. (CIL) at Rs per MT. TPC-G has projected purchase of Administered Pricing Mechanism (APM) Gas at Rs per MT, while the APM rate of Gas Authority of India Ltd. (GAIL) is $2.32 MMBTU which works out to Rs per MT. TPC-G has also projected the price of imported coal as Rs 4747 per MT, which has in fact crashed to $ 45 per MT or Rs 2992 per MT. Thus, TPC-G has inflated fuel prices by almost 3 times, thereby inflating the ARR. TPC-G is able to inflate its costs as it has the monopoly of supplying to two major power Distribution Licensees, namely BEST and TPC-D, who in turn charge high Tariff to their consumers Shri Kamlakar Shenoy and Shri Lalit Vashista further stated that this act of inflating the fuel costs on affidavit filed before the Commission is a gross misrepresentation of facts, and that such false declaration is an offence under the Indian Penal Code, IPC and hence the Commission is duty bound to register a First Information Report (FIR) against TPC s Directors and concerned officials. Such deterrent actions are required to stop such Companies from inflating expenses and thereby causing wrongful loss to consumers They also questioned why the cost of electricity has not come down as expected after the enactment of the EA, The cost in the neighboring States is almost one third of what is paid by electricity consumers of Mumbai. Further, verification by the Commission of the cost of raw materials and expenses incurred was necessary before fixing the Tariff. TPC-G s Response TPC-G has projected the fuel prices based on its analysis of the market and to the best of its knowledge. As per the Regulations, the fuel price gets charged at actuals by way of the Fuel Adjustment Charge (FAC). The assumptions for fuel-wise price projections are as below: MERC Order in Case No. 32 of 2016 Page 21 of 224

22 Oil The fuel oil prices have gone down recently, and thus the projections of future prices are in line with this trend. TPC-G uses oil in its 500 MW Unit-6, which is operated intermittently. This intermittent operation requires it to maintain a certain inventory of fuel oil in order to be available for generation as per requirements. As the Unit was under economic shutdown, the fuel oil procured earlier is part of the inventory. Accordingly, the price of fuel oil includes the weighted price of fuel oil procured earlier at the then prevailing rates. Hence, the fuel oil price projections for the 3 rd Control Period appear to be slightly higher As per Bharat Petroleum Corporation Ltd. (BPCL), the current price of LSHS with Low Sulphur content of % is Rs per MT, which is higher than the projected oil prices of future purchases, i.e., Rs per MT indicated in the MYT Petition. Coal For the Trombay Generating Station, TPC-G has to abide by the stringent emission norms on Sulphur and Ash stipulated by the Maharashtra Pollution Control Board (MPCB). Accordingly, TPC-G has to use coal with Sulphur content below 0.3% and Ash below 5%, which is sourced from Indonesia as Indian coal of the required specifications is not available. Even washed domestic coal has an ash content of 34% It is not stated whether the imported coal price of USD 42 per MT cited by the objectors is Free On Board (FOB) or Cost and Freight (CFR), and the type of coal has also not been mentioned. Thus, TPC-G is not in a position to comment on the price of coal cited. It appears that the price referred to is the FOB price and does not include sea freight, local logistics, taxes and duties to arrive at the landed cost. TPC-G s projections of FOB price is also in the range of USD 35 to 37.5 per MT, based on the market view on imported coal and the current FOB prices. Considering this FOB price, the landed cost of coal works out to Rs per MT for FY , as stated in the Petition. APM Gas The price of APM gas is governed by the Ministry of Petroleum & Natural Gas (MoPNG), and the gas prices indicated in the MYT Petition are based on its pricing guidelines Thus, the projections of fuel prices are not inflated. MERC Order in Case No. 32 of 2016 Page 22 of 224

23 Commission s View The Commission has examined the data stated by TPC-G and sought additional information, viz. imported coal contracts and bills, details of quantity, price and Gross Calorific Value (GCV) of fuel, details of process followed for competitiveness, etc. The GCV, price and quantity of fuel have been approved based on scrutiny, as summarized below a. Regarding imported coal, the Commission asked for the Letter of Award (LoA) for contracts relating to imported coal and asked TPC-G to clarify whether the procurement was through competitive bidding. TPC-G has provided all the bills for imported coal for FY and FY The Commission analyzed these contracts, bills and submissions. The Commission found that the payments for coal-related invoices were made to the agencies with whom the LoAs were signed. The quantity of fuel claimed in the Petition matched the totals of the quantity in the bills for imported coal. The Commission sought details of the process followed for entering into supply agreements for imported coal for the Trombay Station. TPC-G stated that the annual coal requirement is about 2.70 MMT. The Trombay Station requires low sulphur, low ash and medium GCV coal to meet the stringent environment norms. TPC-G had existing contracts for 1.3 MMT per annum with P. T Adaro, Indonesia. For the balance 1.4 MMT, global competitive bids were invited on 25 March, 2015 in EXIM (Weekly newsletter) and Platts International Coal Trader (Daily News Letter). In response, three bidders submitted their interest: i. P.T. Adaro, Indonesia ii. iii. Samtan Co. Ltd., Korea P.T. Mitrabara, Indonesia b. After technical evaluation and quality checks, two bidders, viz. P.T. Adaro and Samtan Co. were found to be technically suitable and were invited for price negotiations. Thereafter, in order to have two sources for better operational flexibility, the contract was awarded to both these bidders at the same negotiated price (P.T. Adaro 0.6 MMT per annum and Samtan 0.8 MMT per annum). The Commission noted that the negotiated price was linked the international coal index. c. The Commission sought details of month-wise opening stock (quantity and price), procurement and closing stock of each fuel. The Commission has also considered MERC Order in Case No. 32 of 2016 Page 23 of 224

24 the month-wise weighted average price calculations for fuel based on existing stock and new purchases. d. The Commission also cross-checked the fuel cost claim for FY with the audited allocation statement of accounts The Commission has approved the fuel prices and GCV for the 3 rd Control Period as per the MYT Regulations, 2015, i.e., considering the actual weighted average fuel price as considered above and the GCV of the past three months. The landed price of coal is also adjusted for the variation in Clean Environment Cess (earlier known as Clean Energy Cess). The Commission has not allowed any year-wise escalation in fuel prices as the future variations upwards or downwards are taken into account through the FAC charges. 2.2 Competitive Bidding for Power Purchase Suggestions/Objections The Indian Hotel and Restaurant Association and Shri Guruprasad Shetty stated that the object of the EA, 2003 is to bring in competition. The Govt. of India (GoI) has issued guidelines that power procured by the Distribution Licensees should be through competitive bidding. Many Licensees, i.e., from Gujarat, Goa, Madhya Pradesh, Karnataka, etc. have benefited by competitive bidding, lowering their power purchase cost. M/s Torrent, Adani, National Thermal Power Corporation (NTPC), Videocon, Reliance Infrastructure Ltd. (RInfra) and TPC have opted for competitive bidding and have obtained at lower cost. RInfra s Sasan Ultra Mega Power Project (UMPP) has publicized the cost of Rs 1.19/ kwh. To be fair to the consumers, TPC-G should not be given the comfort of monopoly supply and Distribution Utilities should undertake transparent competitive bidding for price discovery. Further, if electricity generation and distribution are two separate businesses of the same Company, it should be ensured that there is no conflict of interest Shri Guruprasad Shetty further stated that, in the recent past, the prices of raw material required for power generation have substantially decreased. Coal, oil and gas are now amply available at rates which are one third of the rates prevailing a few years back. The electricity prices in the open market have crashed, and electricity in the open market is now available at around Rs per Unit whereas the Tariff proposed by TPC-G is nearly double that. As TPC-G s cost of generation is more than the rates at which power is being sold through competitive bidding and in the open market, TPC should buy power from the open market instead of generating itself. Alternatively, the Distribution Licensee can buy power through competitive bidding from the open market. Further, Comptroller & Auditor General (CAG) audits have revealed that some of the biggest MERC Order in Case No. 32 of 2016 Page 24 of 224

25 scams occurred when competitive bidding was bypassed. Even the Supreme Court has reprimanded the authorities for not calling for competitive tenders Shri Kamlakar Shenoy and Shri Lalit Vashista also stated that Sections 61(c) and (d) of the EA, 2003 regarding encouraging competition and safeguarding of consumers' interest have not been complied with while determining Tariff in the past. The final cost borne by electricity consumers in neighboring States is around Rs. 4.00/kWh to Rs. 5.00/kWh whereas it is around Rs /kWh for Mumbai consumers. Hence, gross injustice is caused to the electricity consumers of Mumbai due to non-compliance of Section 61. TPC-G s Response The objections pertain to the Distribution Business, and hence no response is required from TPC-G. Commission s View The issues raised relate to the procurement modalities of the Mumbai Distribution Licensees in general and TPC-D in particular, and whether at all they should buy apparently costly power from TPC-G. TPC-D and BEST, both Mumbai Distribution Licensees, have entered into a long-term Power Purchase Agreements (PPA) for power procurement from TPC-G (in addition to sourcing a smaller quantum from elsewhere). This PPA procurement is at Tariffs approved by the Commission from time to time after examination and in accordance with Section 62 and other provisions of the EA, 2003 and the MYT Regulations Long-term power procurement through PPA and short-term power procurement from the open market both have certain merits and demerits. While short-term power procurement from the open market appears to be beneficial and cheaper at present (and is, indeed, being resorted to from time to time), Distribution Licensees cannot depend upon it for the bulk of their requirements considering variations in availability and price (which is also influenced by the extent of their purchases), and stable long-term arrangements are required which also enable better transmission system planning Moreover, sourcing of power from outside for Mumbai, in particular, is still constrained by transmission availability. This also limits the quantum of power which can be procured through competitive bidding. Hence, the power purchase costs of Distribution Licensees in other States cannot be compared with that of Licensees in Mumbai. On the other hand, along with stand-by arrangements with Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL), sourcing from Mumbai s embedded generation also provides security advantages by facilitating the islanding of Mumbai. MERC Order in Case No. 32 of 2016 Page 25 of 224

26 2.2.8 In this background, and as explained above, the Commission has approved the Tariff after due examination. Further, with the PPAs of TPC-D and BEST with the embedded generation of TPC-G expiring in March, 2018, the Commission would be addressing the issue of their future procurements in its forthcoming MYT Orders in respect of those Distribution Licensees. 2.3 Blended Tariff for Unit-7 Suggestions/Objections With regard to TPC-G s justification for a blended rate for Unit-7 despatch, Shri R. G. Sonawane stated that TPC-G has considered an average power purchase rate of Rs. 3.49/kWh. The Commission should verify the proposed rates with the actual short-term power purchase cost, and accept the proposal only if TPC-G commits not to charge more than the rate cited in its cost-benefit analysis Shri Ashok Pendse, for Thane-Belapur Industries Association (TBIA), an authorised Consumer Representative (CR) stated that Unit-7 generation from RLNG comes at Rs. 3.49/kWh and hence is not likely to come within the Merit Order Despatch (MOD). Some Units of National Thermal Power Corporation (NTPC) are also facing a similar situation (Kawas and Gandhar). Due to the high cost of RLNG-based generation and lower position in MOD, they are not able to generate around 3800 MU yearly. No different treatment should be given to Unit-7, which should be operated as per the MOD criteria. TPC-G s Response TPC-G has proposed that Unit-7 run with blended gas for the following benefits: Unit-7 will run to its full capacity and, thus, be efficient on account of Heat Rate and Auxiliary Consumption being within the normative parameters. On account of higher generation, the fixed cost of the Generating Unit will be spread over a larger generation quantum, reducing the overall per Unit cost. The probability of running Unit-6 under the directions of Maharashtra State Load Despatch Centre (with significantly higher cost of generation) may reduce, as Unit-7 RLNG generation will become available Further, this blending will ensure assured demand, providing better leverage to TPC-G for tying up fuel gases at better contractual terms. MERC Order in Case No. 32 of 2016 Page 26 of 224

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case No.

More information

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre No. 1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E mail: mercindia@merc.gov.in Website:

More information

CASE No. 150 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Vidarbha Industries Power Limited ORDER

CASE No. 150 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Vidarbha Industries Power Limited ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

MERC (MULTI YEAR TARIFF) (FIRST AMENDMENT) REGULATIONS, 2017 STATEMENT OF REASONS

MERC (MULTI YEAR TARIFF) (FIRST AMENDMENT) REGULATIONS, 2017 STATEMENT OF REASONS MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Websites: www.mercindia.org.in

More information

MERC Order on TPC-T s Petition for Truing up of ARR for FY and FY , and MTR for 3 rd Control Period. Before the

MERC Order on TPC-T s Petition for Truing up of ARR for FY and FY , and MTR for 3 rd Control Period. Before the Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

CASE No. 105 of Coram Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Transmission Co. Ltd.

CASE No. 105 of Coram Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Transmission Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/ 65/ 69 Fax No. 022 22163976 Email: mercindia@merc.gov.in

More information

ORDER. Case No. 112 of 2008

ORDER. Case No. 112 of 2008 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/6569 Fax 022-22163976 Email: mercindia@mercindia.org.in

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

Case No. 27 of In the matter of

Case No. 27 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CASE No. 69 of In the matter of

CASE No. 69 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 22163964/ 65/ 69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CASE NO. 196 OF In the matter of

CASE NO. 196 OF In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/65/69 Fax No. 022-22163976 Email: mercindia@merc.gov.in

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case No.

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

Case No. 100 of 2009 MERC Order for RInfra-T for APR of FY and ARR for FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Case No. 100 of 2009 MERC Order for RInfra-T for APR of FY and ARR for FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

CASE No. 107 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maharashtra Veej Grahak Sanghatana

CASE No. 107 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maharashtra Veej Grahak Sanghatana Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

Case No. 67 of Dr. Pramod Deo, Chairman Shri A. Velayutham, Member Shri S. B. Kulkarni, Member O R D E R

Case No. 67 of Dr. Pramod Deo, Chairman Shri A. Velayutham, Member Shri S. B. Kulkarni, Member O R D E R Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case No.

More information

CASE No. 2 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maharashtra Veej Grahak Sanghatana

CASE No. 2 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maharashtra Veej Grahak Sanghatana Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Before the Appellate Tribunal for Electricity (Appellate Jurisdiction) Appeal no. 212 of 2013

Before the Appellate Tribunal for Electricity (Appellate Jurisdiction) Appeal no. 212 of 2013 Before the Appellate Tribunal for Electricity (Appellate Jurisdiction) Dated: 27 th October, 2014 Appeal no. 212 of 2013 Present: Hon ble Mr. Justice M. Karpaga Vinayagam, Chairperson Hon ble Mr. Rakesh

More information

Petition for Final Truing-up of FY , FY & FY Provisional Truing up of FY and MYT Petition for Third MYT Control Period

Petition for Final Truing-up of FY , FY & FY Provisional Truing up of FY and MYT Petition for Third MYT Control Period Petition for Final Truing-up of FY 2012-13, FY 2013-14 & FY 2014-15 Provisional Truing up of FY 2015-16 and MYT Petition for Third MYT Control Period FY 2016-17 to FY 2019-20 (Case No. 33 of 2016) Brihan

More information

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No.

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No. 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

CASE No. 121 of and. M. A. No. 11 of 2015

CASE No. 121 of and. M. A. No. 11 of 2015 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS,

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, Approach Paper for MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, 2014 Issued By: Maharashtra Electricity Regulatory

More information

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) EXECUTIVE SUMMARY OF Annual Performance Review for FY 2008-09 & ARR for FY 2009-10 along with Truing Up of Accounts for FY 2007-08 TO Maharashtra

More information

(i) ARR for FY as per MERC (Terms and Conditions of Tariff) Regulations, 2005, and (ii) MYT

(i) ARR for FY as per MERC (Terms and Conditions of Tariff) Regulations, 2005, and (ii) MYT THE TATA POWER COMPANY LIMITED Bombay House, 24, Homi Mody Street, Mumbai 400 001 Website: www.tatapower.com PUBLIC NOTICE Objections / Comments on Tata Power-Distribution Business' (Tata Power-D) Petition

More information

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 RInfra-Distribution (RInfra-D) Wire and Retail Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 Executive Summary Filed with Maharashtra

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd.

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

ARR & Tariff Order for-fy under MYT for BEST Case No. 66 of 2006

ARR & Tariff Order for-fy under MYT for BEST Case No. 66 of 2006 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel No: 22163964 / 22163965, Fax: 22163976 Email: mercindia@mercindia.org.in

More information

Case No. 66 of Smt. Chandra Iyengar, Chairperson Shri Vijay L. Sonavane, Member

Case No. 66 of Smt. Chandra Iyengar, Chairperson Shri Vijay L. Sonavane, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16 KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 OF HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16 & REVISION OF ANNUAL REVENUE REQUIREMENT FOR FY18 & REVISION OF RETAIL SUPPLY TARIFF FOR FY18

More information

Case No. 3 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member. Reliance Infrastructure Ltd.

Case No. 3 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member. Reliance Infrastructure Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/ 65/ 69 Fax 022 22163976 Email: mercindia@mercindia.org.in

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17 KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 OF BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17 & REVISION OF ANNUAL REVENUE REQUIREMENT FOR FY19 & REVISION OF RETAIL SUPPLY TARIFF FOR FY19

More information

TARIFF ORDER. TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY

TARIFF ORDER. TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUE-UP FOR FY 2014-15 & FY 2015-16 AND ARR FOR FY 2016-17 to FY 2018-19 AND TARIFF FOR FY 2017-18 Assam Power Generation Corporation Limited

More information

Torrent Power Limited Distribution Dahej

Torrent Power Limited Distribution Dahej g- GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY and Determination of Tariff for FY 2018-19 For Torrent Power Limited Distribution Dahej Case No. 1698 of 2018 4 th April, 2018

More information

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Case No.168 of 2011 MERC Order for TPC-T MYT Business Plan for FY to FY

Case No.168 of 2011 MERC Order for TPC-T MYT Business Plan for FY to FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case No.168

More information

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL) BIHAR ELECTRICITY REGULATORY COMMISSION Case 54 of 2015 Tariff Order Truing-up for FY 2014-15, Annual Performance Review (APR) for FY 2015-16, Annual Revenue Requirement (ARR) for FY 2016-17 to FY 2018-19

More information

Shri Azeez M. Khan, Member Shri Deepak Lad, Member. The Tata Power Company Ltd. Maharashtra State Electricity Distribution Co. Ltd.

Shri Azeez M. Khan, Member Shri Deepak Lad, Member. The Tata Power Company Ltd. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

CASE NO. 142 of Suo moto proceeding in the matter of Show-Cause Notice issued in Order dated 8 February, 2017 in Case No. 89 of 2015.

CASE NO. 142 of Suo moto proceeding in the matter of Show-Cause Notice issued in Order dated 8 February, 2017 in Case No. 89 of 2015. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 And Annual Revenue Requirement & Transmission Tariff For FY 2017-18 MEGHALAYA POWER TRANSMISSION CORPORATION LIMITED

More information

CASE No. 73 of hours for a period of six months from 1 April, 2019 to 30 September, Coram. I. M. Bohari, Member Mukesh Khullar, Member

CASE No. 73 of hours for a period of six months from 1 April, 2019 to 30 September, Coram. I. M. Bohari, Member Mukesh Khullar, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

TARIFF ORDER TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY

TARIFF ORDER TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUE-UP FOR FY 2014-15 & FY 2015-16 AND ARR FOR FY 2016-17 to FY 2018-19 AND TARIFF FOR FY 2017-18 Assam Electricity Grid Corporation Limited

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED Plot No. G-9, Prakashgad, Bandra (E), Mumbai Website:

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED Plot No. G-9, Prakashgad, Bandra (E), Mumbai Website: MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED Plot G-9, Prakashgad, Bandra (E), Mumbai 400051 Website: www.mahagenco.in PUBLIC NOTICE Inviting Suggestions/Objections on Maharashtra State Power Generation

More information

Distribution Tariff Determination and Rationalization

Distribution Tariff Determination and Rationalization Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Forum of

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 E-mail: mercindia@merc.gov.in Website:

More information

Case No. 158 of 2011 IN THE MATTER OF

Case No. 158 of 2011 IN THE MATTER OF Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@merc.gov.in Website:

More information

CASE No. 48 of In the matter of Appointment of Committee for study of subsidy, and related matters.

CASE No. 48 of In the matter of Appointment of Committee for study of subsidy, and related matters. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.com

More information

Compensatory Tariff Orders and Fine Balancing Act by CERC

Compensatory Tariff Orders and Fine Balancing Act by CERC CARE RESEARCH Compensatory Tariff Orders and Fine Balancing Act by CERC CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra projects. With

More information

CASE No. 28 of Dr Pramod Deo, Chairman Shri A. Velayutham, Member ORDER

CASE No. 28 of Dr Pramod Deo, Chairman Shri A. Velayutham, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005. Tel. 22163964 / 22163965, Fax No. 22163976 E-mail mercindia@mercindia.com

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND TARIFF FOR FY 2016-17 AND TRUE UP OF ARR AND REVENUE FOR FY 2013-14

More information

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14 ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2015 2016 IN CASE NO: TP 59 / 13 14 IN RE THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Torrent Power Limited - Generation Ahmedabad

Torrent Power Limited - Generation Ahmedabad GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2014-15, Approval of Provisional ARR for FY 2016-17 and Determination of Tariff for FY 2016-17 For Torrent Power Limited - Generation

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

Case No. 47 of In the matter of

Case No. 47 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax. 022 221639761 E-mail: mercindia@merc.gov.in

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM RP 6/2017 In the matter of : Review petition filed by M/s Kanan Devan Hill Plantations Company Private Limited (KDHPCL) seeking review

More information

Compensatory Tariff Orders...A Fine Balancing Act by CERC

Compensatory Tariff Orders...A Fine Balancing Act by CERC Impact Analysis: Compensatory Tariff Orders...A Fine Balancing Act by CERC March 11, 2014 CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

CASE No. 103 of CASE No. 104 of 2016

CASE No. 103 of CASE No. 104 of 2016 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CASE No. 113 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member

CASE No. 113 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd.

CASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Tariff Order. For. True up for FY and Determination of ARR and Generation Tariff for FY

Tariff Order. For. True up for FY and Determination of ARR and Generation Tariff for FY MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 and Determination of ARR and Generation Tariff for FY 2017-18 MEGHALAYA POWER GENERATION CORPORATION LIMITED CONTENTS

More information

Case No. 125 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member

Case No. 125 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True up for FY 2015-16 and Annual Performance Review of FY 2016-17 and Determination of Annual Revenue requirement (ARR) and Tariff for FY 2017-18 for Jamshedpur Utilities & Services Company Limited

More information

The Chief Engineer Maharashtra State Load Despatch Center Phone Fax Executive Summary MSLDC s Budget

The Chief Engineer Maharashtra State Load Despatch Center Phone Fax Executive Summary MSLDC s Budget Office of The Chief Engineer Maharashtra State Load Despatch Center Thane Belapur Road, Airoli, Navi Mumbai 400 708 (INDIA) (ISO 9001 2000 certified unit of Mahatransco) Phone (022) (O) 2760 1931 (P) 2760

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 7 VAISHAKHA 1929 (S) (NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007 BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2014-15, Approval of Provisional ARR for FY 2016-17 For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1545 of

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY 2016-17 to 2020-21, and Determination of Tariff

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION Case No. TP- 41 of 2012 Order on Truing up for FY 2011-12 & Review for FY 2012-13 of erstwhile BSEB And Determination of Multi Year Aggregate Revenue Requirement

More information

Maharashtra State Power Generation Company Limited

Maharashtra State Power Generation Company Limited MSPGCL s Petition for True up of FY 2014-15, Provisional True up for FY 2015-16 and MYT Tariff Petition for the Period from FY 2016-17 to 2019-20 Maharashtra State Power Generation Company Limited Executive

More information

CASE No. 24 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

CASE No. 24 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Case No. 137 of In the matter of

Case No. 137 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 22163964/ 65/ 69 Fax 22163976 Email: mercindia@mercindia.org.in Website:

More information

CASE NO. 55 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. M/s Shah Promoters and Developers

CASE NO. 55 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. M/s Shah Promoters and Developers Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Before the. Case No. 115 of In the matter of

Before the. Case No. 115 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@merc.gov.in Website: www.mercindia.org.in/ www.merc.gov.in

More information

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC)

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC) MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC) Tariff Order For Annual Revenue Requirement & Generation Tariff For FY 2015 16 List of Contents ORDER... 1 1. Introduction... 5 1.1 1.2 1.3 1.4

More information

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY Assam Electricity Grid Corporation Limited (AEGCL)

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY Assam Electricity Grid Corporation Limited (AEGCL) ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY 2014-15 Assam Electricity Grid Corporation Limited (AEGCL) Petition No. 12/2013 Petition No. 13/2014 ASSAM ELECTRICITY REGULATORY COMMISSION

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2011-12 and For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1262 of 2012 28 th 1st Floor, Neptune Tower, Opp.:

More information

COMPONENTS OF REVENUE REQUIREMENT

COMPONENTS OF REVENUE REQUIREMENT COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)

More information

By S K Agrawal ED (Commercial) NHPC Ltd.1

By S K Agrawal ED (Commercial) NHPC Ltd.1 By S K Agrawal ED (Commercial) NHPC Ltd.1 Need for Renovation & Modernisation of HEPs Advantages of R&M of old Power Stations Govt. policies on R&M Regulatory Provisions & Commercial aspects Overview of

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK)

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information