1 Information Disclosure For the year ended Pursuant to the Electricity Distribution Information Disclosure Determination 2012

2 TABLE OF CONTENTS Schedule 1: Analytical Ratios Schedule 2: Report on Return on Investment Schedule 3: Report on Regulatory Profit Schedule 4: Report on Regulatory Asset Base (Rolled Forward) Schedule 5a: Report on Regulatory Tax Allowance Schedule 5b: Report on Related Party Transactions Schedule 5c: Report on Term Credit Spread Differential Allowance Schedule 5d: Report on Cost Allocations Schedule 5e: Report on Asset Allocations Schedule 6a: Report on Capital Expenditure for the Disclosure Year Schedule 6b: Report on Operational Expenditure for the Disclosure Year Schedule 7: Comparison of Forecasts to Actual Expenditure Schedule 8: Report on Billed Quantities and Line Charge Revenues Total Business Schedule 8: Report on Billed Quantities and Line Charge Revenues Dunedin Schedule 8: Report on Billed Quantities and Line Charge Revenues Central Otago Schedule 9a: Asset Register Total Business Schedule 9a: Asset Register Dunedin Schedule 9a: Asset Register Central Otago Schedule 9b: Asset Age Profile Total Business Schedule 9b: Asset Age Profile Dunedin Schedule 9b: Asset Age Profile Central Otago Schedule 9c: Report on Overhead Lines & Underground Cables Total Business Schedule 9c: Report on Overhead Lines & Underground Cables Dunedin Schedule 9c: Report on Overhead Lines & Underground Cables Central Otago Schedule 9d: Report on Embedded Networks Schedule 9e: Report on Network Demand Total Business Schedule 9e: Report on Network Demand Dunedin Schedule 9e: Report on Network Demand Central Otago Schedule 10: Report on Network Reliability Total Business Schedule 10: Report on Network Reliability Dunedin Schedule 10: Report on Network Reliability Central Otago Schedule 14: Mandatory Explanatory Notes Schedule 15: Voluntary Explanatory Notes Schedule 18: Certification for Year-end Disclosures Independent Auditor s Report

3 SCHEDULE 1: ANALYTICAL RATIOS 7 1(i): Expenditure metrics 8 Expenditure per GWh energy delivered to ICPs ($/GWh) Expenditure per average no. of ICPs ($/ICP) Expenditure per MW maximum coincident system demand ($/MW) Expenditure per km circuit length ($/km) Expenditure per MVA of capacity from EDBowned distribution transformers ($/MVA) 9 Operational expenditure 27, ,884 5,289 39, Network 12, ,989 2,422 18, Non network 14, ,895 2,867 21, Expenditure on assets 52, ,128 10,369 77, Network 52, ,939 10,226 76, Non network , , (ii): Revenue metrics 18 Revenue per GWh energy delivered to ICPs ($/GWh) Revenue per average no. of ICPs ($/ICP) 19 Total consumer line charge revenue 73,331 1, Standard consumer line charge revenue 73,160 1, Non standard consumer line charge revenue 94,329 52, (iii): Service intensity measures Demand density 45 Maximum coincident system demand per km of circuit length (for supply) (kw/km) 26 Volume density 196 Total energy delivered to ICPs per km of circuit length (for supply) (MWh/km) 27 Connection point density 13 Average number of ICPs per km of circuit length (for supply) (ICPs/km) 28 Energy intensity 14,768 Total energy delivered to ICPs per average number of ICPs (kwh/icp) (iv): Composition of regulatory income 31 ($000) % of revenue 32 Operational expenditure 35, % 33 Pass through and recoverable costs excluding financial incentives and wash ups 36, % 34 Total depreciation 13, % 35 Total revaluations 3, % 36 Regulatory tax allowance 3, % 37 Regulatory profit/(loss) including financial incentives and wash ups 10, % 38 Total regulatory income 96, (v): Reliability This schedule calculates expenditure, revenue and service ratios from the information disclosed. The disclosed ratios may vary for reasons that are company specific and, as a result, must be interpreted with care. The Commerce Commission will publish a summary and analysis of information disclosed in accordance with the ID determination. This will include information disclosed in accordance with this and other schedules, and information disclosed under the other requirements of the determination. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section Interruption rate Interruptions per 100 circuit km Copy of 2. Schedules S1.Analytical Ratios

4 SCHEDULE 2: REPORT ON RETURN ON INVESTMENT This schedule requires information on the Return on Investment (ROI) for the EDB relative to the Commerce Commission's estimates of post tax WACC and vanilla WACC. EDBs must calculate their ROI based on a monthly basis if required by clause of the ID Determination or if they elect to. If an EDB makes this election, information supporting this calculation must be provided in 2(iii). EDBs must provide explanatory comment on their ROI in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (i): Return on Investment CY 2 CY 1 Current Year CY 8 31 Mar Mar Mar 18 9 ROI comparable to a post tax WACC % % % 10 Reflecting all revenue earned 4.99% 5.52% 2.48% 11 Excluding revenue earned from financial incentives 4.99% 5.52% 2.59% 12 Excluding revenue earned from financial incentives and wash ups 4.99% 5.52% 2.72% Mid point estimate of post tax WACC 5.37% 4.77% 5.04% 15 25th percentile estimate 4.66% 4.05% 4.36% 16 75th percentile estimate 6.09% 5.48% 5.72% ROI comparable to a vanilla WACC 20 Reflecting all revenue earned 5.63% 6.07% 3.04% 21 Excluding revenue earned from financial incentives 5.63% 6.07% 3.16% 22 Excluding revenue earned from financial incentives and wash ups 5.63% 6.07% 3.29% WACC rate used to set regulatory price path 7.19% 7.19% 7.19% Mid point estimate of vanilla WACC 6.02% 5.31% 5.60% 27 25th percentile estimate 5.30% 4.59% 4.92% 28 75th percentile estimate 6.74% 6.03% 6.29% (ii): Information Supporting the ROI ($000) Total opening RAB value 353, plus Opening deferred tax (18,897) 34 Opening RIV 334, Line charge revenue 96, Expenses cash outflow 72, add Assets commissioned 50, less Asset disposals add Tax payments less Other regulated income Mid year net cash outflows 121, Term credit spread differential allowance Total closing RAB value 393, less Adjustment resulting from asset allocation 0 49 less Lost and found assets adjustment 50 plus Closing deferred tax (22,611) 51 Closing RIV 371, ROI comparable to a vanilla WACC 3.04% Leverage (%) 42% 56 Cost of debt assumption (%) 4.80% 57 Corporate tax rate (%) 28% ROI comparable to a post tax WACC 2.48% 60 Copy of 2. Schedules S2.Return on Investment

5 SCHEDULE 2: REPORT ON RETURN ON INVESTMENT This schedule requires information on the Return on Investment (ROI) for the EDB relative to the Commerce Commission's estimates of post tax WACC and vanilla WACC. EDBs must calculate their ROI based on a monthly basis if required by clause of the ID Determination or if they elect to. If an EDB makes this election, information supporting this calculation must be provided in 2(iii). EDBs must provide explanatory comment on their ROI in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (iii): Information Supporting the Monthly ROI Opening RIV N/A Line charge revenue Expenses cash outflow Assets commissioned Asset disposals Other regulated income Monthly net cash outflows 67 April 68 May 69 June 70 July 71 August 72 September 73 October 74 November 75 December 76 January 77 February 78 March 79 Total Tax payments N/A Term credit spread differential allowance N/A Closing RIV N/A Monthly ROI comparable to a vanilla WACC N/A Monthly ROI comparable to a post tax WACC N/A (iv): Year End ROI Rates for Comparison Purposes Year end ROI comparable to a vanilla WACC 3.35% Year end ROI comparable to a post tax WACC 2.78% * these year end ROI values are comparable to the ROI reported in pre 2012 disclosures by EDBs and do not represent the Commission's current view on ROI (v): Financial Incentives and Wash Ups Net recoverable costs allowed under incremental rolling incentive scheme 103 Purchased assets avoided transmission charge 104 Energy efficiency and demand incentive allowance 105 Quality incentive adjustment (565) 106 Other financial incentives 107 Financial incentives (565) Impact of financial incentives on ROI 0.12% Input methodology claw back 112 Recoverable customised price quality path costs 113 Catastrophic event allowance 114 Capex wash up adjustment (636) 115 Transmission asset wash up adjustment NPV wash up allowance 117 Reconsideration event allowance Copy of 2. Schedules S2.Return on Investment

6 SCHEDULE 2: REPORT ON RETURN ON INVESTMENT This schedule requires information on the Return on Investment (ROI) for the EDB relative to the Commerce Commission's estimates of post tax WACC and vanilla WACC. EDBs must calculate their ROI based on a monthly basis if required by clause of the ID Determination or if they elect to. If an EDB makes this election, information supporting this calculation must be provided in 2(iii). EDBs must provide explanatory comment on their ROI in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section Other wash ups 119 Wash up costs (636) Impact of wash up costs on ROI 0.13% Copy of 2. Schedules S2.Return on Investment

7 SCHEDULE 3: REPORT ON REGULATORY PROFIT This schedule requires information on the calculation of regulatory profit for the EDB for the disclosure year. All EDBs must complete all sections and provide explanatory comment on their regulatory profit in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (i): Regulatory Profit ($000) 8 Income 9 Line charge revenue 96, plus Gains / (losses) on asset disposals (562) 11 plus Other regulated income (other than gains / (losses) on asset disposals) 1, Total regulatory income 96, Expenses 15 less Operational expenditure 35, less Pass through and recoverable costs excluding financial incentives and wash ups 36, Operating surplus / (deficit) 24, less Total depreciation 13, plus Total revaluations 3, Regulatory profit / (loss) before tax 14, less Term credit spread differential allowance less Regulatory tax allowance 3, Regulatory profit/(loss) including financial incentives and wash ups 10, (ii): Pass through and Recoverable Costs excluding Financial Incentives and Wash Ups ($000) 34 Pass through costs 35 Rates Commerce Act levies Industry levies CPP specified pass through costs 39 Recoverable costs excluding financial incentives and wash ups 40 Electricity lines service charge payable to Transpower 27, Transpower new investment contract charges System operator services 43 Distributed generation allowance 7, Extended reserves allowance 45 Other recoverable costs excluding financial incentives and wash ups 46 Pass through and recoverable costs excluding financial incentives and wash ups 36, Copy of 2. Schedules S3.Regulatory Profit

8 SCHEDULE 3: REPORT ON REGULATORY PROFIT This schedule requires information on the calculation of regulatory profit for the EDB for the disclosure year. All EDBs must complete all sections and provide explanatory comment on their regulatory profit in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (iii): Incremental Rolling Incentive Scheme ($000) 49 CY 1 CY Mar Mar Allowed controllable opex 52 Actual controllable opex Incremental change in year 55 Previous years' 56 Previous years' incremental change incremental change adjusted for inflation 57 CY 5 31 Mar CY 4 31 Mar CY 3 31 Mar CY 2 31 Mar CY 1 31 Mar Net incremental rolling incentive scheme Net recoverable costs allowed under incremental rolling incentive scheme 65 3(iv): Merger and Acquisition Expenditure 70 ($000) 66 Merger and acquisition expenditure Provide commentary on the benefits of merger and acquisition expenditure to the electricity distribution business, including required disclosures in accordance with section 2.7, in Schedule 14 (Mandatory Explanatory Notes) 69 3(v): Other Disclosures 70 ($000) 71 Self insurance allowance Copy of 2. Schedules S3.Regulatory Profit

9 SCHEDULE 4: REPORT ON VALUE OF THE REGULATORY ASSET BASE (ROLLED FORWARD) This schedule requires information on the calculation of the Regulatory Asset Base (RAB) value to the end of this disclosure year. This informs the ROI calculation in Schedule 2. EDBs must provide explanatory comment on the value of their RAB in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (i): Regulatory Asset Base Value (Rolled Forward) RAB RAB RAB RAB RAB 8 for year ended 31 Mar Mar Mar Mar Mar 18 9 ($000) ($000) ($000) ($000) ($000) 10 Total opening RAB value 318, , , , , less Total depreciation 11,473 11,941 12,318 12,836 13, plus Total revaluations 4, ,940 7,381 3, plus Assets commissioned 13,374 17,298 20,446 18,594 50, less Asset disposals plus Lost and found assets adjustment plus Adjustment resulting from asset allocation Total closing RAB value 324, , , , , (ii): Unallocated Regulatory Asset Base 27 Unallocated RAB * RAB 28 ($000) ($000) ($000) ($000) 29 Total opening RAB value 353, , less 31 Total depreciation 13,533 13, plus 33 Total revaluations 3,886 3, plus 35 Assets commissioned (other than below) 35,607 35, Assets acquired from a regulated supplier 37 Assets acquired from a related party 14,892 14, Assets commissioned 50,499 50, less 40 Asset disposals (other than below) Asset disposals to a regulated supplier 42 Asset disposals to a related party 43 Asset disposals plus Lost and found assets adjustment plus Adjustment resulting from asset allocation Total closing RAB value 394, , * The 'unallocated RAB' is the total value of those assets used wholly or partially to provide electricity distribution services without any allowance being made for the allocation of costs to services provided by the supplier that are not electricity distribution services. The RAB value represents the value of these assets after applying this cost allocation. Neither value includes works under construction. Copy of 2. Schedules S4.RAB Value (Rolled Forward)

10 SCHEDULE 4: REPORT ON VALUE OF THE REGULATORY ASSET BASE (ROLLED FORWARD) This schedule requires information on the calculation of the Regulatory Asset Base (RAB) value to the end of this disclosure year. This informs the ROI calculation in Schedule 2. EDBs must provide explanatory comment on the value of their RAB in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (iii): Calculation of Revaluation Rate and Revaluation of Assets CPI 4 1, CPI 4 1, Revaluation rate (%) 1.10% Unallocated RAB * RAB 59 ($000) ($000) ($000) ($000) 60 Total opening RAB value 353, , less Opening value of fully depreciated, disposed and lost assets Total opening RAB value subject to revaluation 353, , Total revaluations 3,886 3, (iv): Roll Forward of Works Under Construction Unallocated works under Works under construction preceding disclosure year construction 26,017 Allocated works under construction 26, plus Capital expenditure 64,710 64, less Assets commissioned 50,499 50, plus Adjustment resulting from asset allocation 72 Works under construction current disclosure year 40,228 40, Highest rate of capitalised finance applied 75 Copy of 2. Schedules S4.RAB Value (Rolled Forward)

11 SCHEDULE 4: REPORT ON VALUE OF THE REGULATORY ASSET BASE (ROLLED FORWARD) This schedule requires information on the calculation of the Regulatory Asset Base (RAB) value to the end of this disclosure year. This informs the ROI calculation in Schedule 2. EDBs must provide explanatory comment on the value of their RAB in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section (v): Regulatory Depreciation 77 Unallocated RAB * RAB 78 ($000) ($000) ($000) ($000) 79 Depreciation standard 13,533 13, Depreciation no standard life assets 81 Depreciation modified life assets 82 Depreciation alternative depreciation in accordance with CPP 83 Total depreciation 13,533 13, (vi): Disclosure of Changes to Depreciation Profiles ($000 unless otherwise specified) 86 Asset or assets with changes to depreciation* Reason for non standard depreciation (text entry) * include additional rows if needed Depreciation charge for the period (RAB) Closing RAB value under 'nonstandard' depreciation Closing RAB value under 'standard' depreciation 96 4(vii): Disclosure by Asset Category 97 ($000 unless otherwise specified) 98 Subtransmission lines Subtransmission cables Zone substations Distribution and LV lines Distribution and LV cables Distribution substations and transformers Distribution switchgear Other network assets Non network assets Total 99 Total opening RAB value 15,138 8,898 63,741 56, ,887 52,189 20,512 9, , less Total depreciation ,490 2,657 4,126 1,868 1, , plus Total revaluations , , plus Assets commissioned 1, ,234 3,048 3,014 2,442 1, , less Asset disposals plus Lost and found assets adjustment 105 plus Adjustment resulting from asset allocation 106 plus Asset category transfers 107 Total closing RAB value 15,815 8,811 62,434 92, ,205 53,909 22,089 10, , Asset Life 110 Weighted average remaining asset life (years) 111 Weighted average expected total asset life (years) Copy of 2. Schedules S4.RAB Value (Rolled Forward)

12 SCHEDULE 5a: REPORT ON REGULATORY TAX ALLOWANCE 7 5a(i): Regulatory Tax Allowance ($000) 8 Regulatory profit / (loss) before tax 14, plus Income not included in regulatory profit / (loss) before tax but taxable 3,393 * 11 Expenditure or loss in regulatory profit / (loss) before tax but not deductible 188 * 12 Amortisation of initial differences in asset values 4, Amortisation of revaluations 1, , less Total revaluations 3, Income included in regulatory profit / (loss) before tax but not taxable * 18 Discretionary discounts and customer rebates 19 Expenditure or loss deductible but not in regulatory profit / (loss) before tax * 20 Notional deductible interest 6, , Regulatory taxable income 14, less Utilised tax losses 26 Regulatory net taxable income 14, Corporate tax rate (%) 28% 29 Regulatory tax allowance 3, * Workings to be provided in Schedule a(ii): Disclosure of Permanent Differences 33 In Schedule 14, Box 5, provide descriptions and workings of items recorded in the asterisked categories in Schedule 5a(i). This schedule requires information on the calculation of the regulatory tax allowance. This information is used to calculate regulatory profit/loss in Schedule 3 (regulatory profit). EDBs must provide explanatory commentary on the information disclosed in this schedule, in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section a(iii): Amortisation of Initial Difference in Asset Values ($000) Opening unamortised initial differences in asset values 99, less Amortisation of initial differences in asset values 4, plus Adjustment for unamortised initial differences in assets acquired 39 less Adjustment for unamortised initial differences in assets disposed Closing unamortised initial differences in asset values 94, Opening weighted average remaining useful life of relevant assets (years) Copy of 2. Schedules S5a.Regulatory Tax Allowance

13 SCHEDULE 5a: REPORT ON REGULATORY TAX ALLOWANCE This schedule requires information on the calculation of the regulatory tax allowance. This information is used to calculate regulatory profit/loss in Schedule 3 (regulatory profit). EDBs must provide explanatory commentary on the information disclosed in this schedule, in Schedule 14 (Mandatory Explanatory Notes). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section a(iv): Amortisation of Revaluations ($000) Opening sum of RAB values without revaluations 323, Adjusted depreciation 12, Total depreciation 13, Amortisation of revaluations 1, a(v): Reconciliation of Tax Losses ($000) Opening tax losses 55 plus Current period tax losses 56 less Utilised tax losses 57 Closing tax losses 58 5a(vi): Calculation of Deferred Tax Balance ($000) Opening deferred tax (18,897) plus Tax effect of adjusted depreciation 3, less Tax effect of tax depreciation 5, plus Tax effect of other temporary differences* less Tax effect of amortisation of initial differences in asset values 1, plus Deferred tax balance relating to assets acquired in the disclosure year less Deferred tax balance relating to assets disposed in the disclosure year (142) plus Deferred tax cost allocation adjustment (0) Closing deferred tax (22,611) a(vii): Disclosure of Temporary Differences In Schedule 14, Box 6, provide descriptions and workings of items recorded in the asterisked category in Schedule 5a(vi) (Tax effect of other temporary differences). 81 5a(viii): Regulatory Tax Asset Base Roll Forward 82 ($000) 83 Opening sum of regulatory tax asset values 204, less Tax depreciation 21, plus Regulatory tax asset value of assets commissioned 62, less Regulatory tax asset value of asset disposals plus Lost and found assets adjustment 88 plus Adjustment resulting from asset allocation 89 plus Other adjustments to the RAB tax value 90 Closing sum of regulatory tax asset values 245,711 Copy of 2. Schedules S5a.Regulatory Tax Allowance

14 SCHEDULE 5b: REPORT ON RELATED PARTY TRANSACTIONS This schedule provides information on the valuation of related party transactions, in accordance with section and of the ID determination. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section b(i): Summary Related Party Transactions ($000) 8 Total regulatory income 65 9 Operational expenditure 18, Capital expenditure 26, Market value of asset disposals 12 Other related party transactions b(ii): Entities Involved in Related Party Transactions 14 Name of related party 15 Delta Utility Services Ltd 16 Dunedin City Holdings Ltd 17 Dunedin City Council * include additional rows if needed Related party relationship Sister Company Provides Asset Management and Electrical Contracting services (Opex and Capex) Dunedin City Holdings Ltd holds 100% of the shares in Aurora Energy and Delta Utility Services Dunedin city Council holds 100% of the shares in Dunedin City Holdings Ltd 21 5b(iii): Related Party Transactions 22 Name of related party Related party transaction type Description of transaction Value of transaction ($000) Basis for determining value 23 Delta Utility Services Ltd Sales Recovery of Service Failure Payments 65 ID clause 2.3.7(2)(c) 24 Dunedin City Council Opex Rates Expense Dunedin Distribution Network 589 ID clause 2.3.6(1)(c)(i) Management fee recovery of share of costs running 25 Dunedin City Holdings Ltd Opex holding company 200 ID clause 2.3.6(1)(c)(i) Service Interruptions and Emergencies in accordance with Asset Management Agree ment and AMP including 26 Delta Utility Services Ltd Opex equipment damage by third parties 3,388 ID clause 2.3.6(1)(c)(i) On going vegetation Management in accordance with 27 Delta Utility Services Ltd Opex Asset Management Agreement and AMP 5,517 ID clause 2.3.6(1)(c)(i) Routine inspection and maintenance work in accordance 28 Delta Utility Services Ltd Opex with Asset Management Agreement and AMP 5,603 ID clause 2.3.6(1)(c)(i) Asset Replacement and renewal work in accordance with 29 Delta Utility Services Ltd Opex Asset Management Agreement and AMP 680 ID clause 2.3.6(1)(c)(i) System Operation, support and management in 30 Delta Utility Services Ltd Opex accordance with Asset Management Agreement 1,418 ID clause 2.3.6(1)(c)(i) Business support operations in accordance with Asset 31 Delta Utility Services Ltd Opex Management Agreement 821 ID clause 2.3.6(1)(c)(i) General management, administration and accounting 32 Delta Utility Services Ltd Opex services in accordance with Administration agreement 158 ID clause 2.3.6(1)(c)(i) Miscelanious work associated with processing of 33 Delta Utility Services Ltd Opex easements, minor offfice repairs and store operation 594 ID clause 2.3.6(1)(c)(i) 34 Delta Utility Services Ltd Opex Rental charges on buildings including outgoings 330 ID clause 2.3.6(1)(c)(i) 35 Delta Utility Services Ltd Opex For lease of CPD metering equipment 90 IM clause (5)(b)(i) Design, installationa and project management of new 36 Delta Utility Services Ltd Capex network equipment 25,465 IM clause (5)(g) Design, installationa and project management of new 37 Delta Utility Services Ltd Capex network equipment 1,047 IM clause (5)(f) 38 * include additional rows if needed Copy of 2. Schedules S5b.Related Party Transactions

15 SCHEDULE 5c: REPORT ON TERM CREDIT SPREAD DIFFERENTIAL ALLOWANCE 7 8 5c(i): Qualifying Debt (may be Commission only) 9 This schedule is only to be completed if, as at the date of the most recently published financial statements, the weighted average original tenor of the debt portfolio (both qualifying debt and non qualifying debt) is greater than five years. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section Issuing party Issue date Pricing date Original tenor (in years) Coupon rate (%) Book value at issue date (NZD) Book value at date of financial statements (NZD) Term Credit Spread Difference Cost of executing an interest rate swap Debt issue cost readjustment 16 * include additional rows if needed c(ii): Attribution of Term Credit Spread Differential Gross term credit spread differential Total book value of interest bearing debt 23 Leverage 44% 24 Average opening and closing RAB values 25 Attribution Rate (%) Term credit spread differential allowance Copy of 2. Schedules S5c.TCSD Allowance

16 SCHEDULE 5d: REPORT ON COST ALLOCATIONS This schedule provides information on the allocation of operational costs. EDBs must provide explanatory comment on their cost allocation in Schedule 14 (Mandatory Explanatory Notes), including on the impact of any reclassifications. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section d(i): Operating Cost Allocations 8 Value allocated ($000s) 9 10 Service interruptions and emergencies Arm's length deduction Electricity distribution services Non electricity distribution services 11 Directly attributable 4, Not directly attributable 13 Total attributable to regulated service 4, Vegetation management 15 Directly attributable 5, Not directly attributable 17 Total attributable to regulated service 5, Routine and corrective maintenance and inspection 19 Directly attributable 5, Not directly attributable 21 Total attributable to regulated service 5, Asset replacement and renewal 23 Directly attributable Not directly attributable 25 Total attributable to regulated service System operations and network support 27 Directly attributable 9, Not directly attributable 29 Total attributable to regulated service 9, Business support Total OVABAA allocation increase ($000s) 31 Directly attributable 32 Not directly attributable 9, , Total attributable to regulated service 9, Operating costs directly attributable 26, Operating costs not directly attributable 9, , Operational expenditure 35, Copy of 2. Schedules S5d.Cost Allocations

17 SCHEDULE 5d: REPORT ON COST ALLOCATIONS This schedule provides information on the allocation of operational costs. EDBs must provide explanatory comment on their cost allocation in Schedule 14 (Mandatory Explanatory Notes), including on the impact of any reclassifications. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section d(ii): Other Cost Allocations 40 Pass through and recoverable costs ($000) 41 Pass through costs 42 Directly attributable 1, Not directly attributable 44 Total attributable to regulated service 1, Recoverable costs 46 Directly attributable 35, Not directly attributable 48 Total attributable to regulated service 35, d(iii): Changes in Cost Alloca ons* Change in cost allocation 1 CY 1 ($000) Current Year (CY) 53 Cost category Original allocation 54 Original allocator or line items New allocation 55 New allocator or line items Difference Rationale for change Change in cost allocation 2 CY 1 ($000) Current Year (CY) 62 Cost category Original allocation 63 Original allocator or line items New allocation 64 New allocator or line items Difference Rationale for change ($000) 70 Change in cost allocation 3 CY 1 Current Year (CY) 71 Cost category Original allocation 72 Original allocator or line items New allocation 73 New allocator or line items Difference Rationale for change * a change in cost allocation must be completed for each cost allocator change that has occurred in the disclosure year. A movement in an allocator metric is not a change in allocator or component. include addi onal rows if needed Copy of 2. Schedules S5d.Cost Allocations

18 SCHEDULE 5e: REPORT ON ASSET ALLOCATIONS This schedule requires information on the allocation of asset values. This information supports the calculation of the RAB value in Schedule 4. EDBs must provide explanatory comment on their cost allocation in Schedule 14 (Mandatory Explanatory Notes), including on the impact of any changes in asset allocations. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section e(i): Regulated Service Asset Values Subtransmission lines Value allocated ($000s) Electricity distribution services 11 Directly attributable 15, Not directly attributable 13 Total attributable to regulated service 15, Subtransmission cables 15 Directly attributable 8, Not directly attributable 17 Total attributable to regulated service 8, Zone substations 19 Directly attributable 62, Not directly attributable 21 Total attributable to regulated service 62, Distribution and LV lines 23 Directly attributable 92, Not directly attributable 25 Total attributable to regulated service 92, Distribution and LV cables 27 Directly attributable 127, Not directly attributable 29 Total attributable to regulated service 127, Distribution substations and transformers 31 Directly attributable 53, Not directly attributable 33 Total attributable to regulated service 53, Distribution switchgear 35 Directly attributable 22, Not directly attributable 37 Total attributable to regulated service 22, Other network assets 39 Directly attributable 10, Not directly attributable 41 Total attributable to regulated service 10, Non network assets 43 Directly attributable Not directly attributable 45 Total attributable to regulated service Regulated service asset value directly attributable 393, Regulated service asset value not directly attributable 49 Total closing RAB value 393, e(ii): Changes in Asset Alloca ons* 52 ($000) 53 Change in asset value allocation 1 CY 1 Current Year (CY) 54 Asset category Original allocation 55 Original allocator or line items New allocation 56 New allocator or line items Difference Rationale for change ($000) 62 Change in asset value allocation 2 CY 1 Current Year (CY) 63 Asset category Original allocation 64 Original allocator or line items New allocation 65 New allocator or line items Difference Rationale for change ($000) 71 Change in asset value allocation 3 CY 1 Current Year (CY) 72 Asset category Original allocation 73 Original allocator or line items New allocation 74 New allocator or line items Difference Rationale for change * a change in asset allocation must be completed for each allocator or component change that has occurred in the disclosure year. A movement in an allocator metric is not a change in allocator or componen include addi onal rows if needed Copy of 2. Schedules S5e.Asset Allocations

19 SCHEDULE 6a: REPORT ON CAPITAL EXPENDITURE FOR THE DISCLOSURE YEAR This schedule requires a breakdown of capital expenditure on assets incurred in the disclosure year, including any assets in respect of which capital contributions are received, but excluding assets that are vested assets. Information on expenditure on assets must be provided on an accounting accruals basis and must exclude finance costs. EDBs must provide explanatory comment on their expenditure on assets in Schedule 14 (Explanatory Notes to Templates). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section a(i): Expenditure on Assets ($000) ($000) 8 Consumer connection 8,494 9 System growth 6, Asset replacement and renewal 50, Asset relocations 1, Reliability, safety and environment: 13 Quality of supply 14 Legislative and regulatory 15 Other reliability, safety and environment 1, Total reliability, safety and environment 1, Expenditure on network assets 68, Expenditure on non network assets Expenditure on assets 69, plus Cost of financing 22 less Value of capital contributions 4, plus Value of vested assets Capital expenditure 64, a(ii): Subcomponents of Expenditure on Assets (where known) ($000) 27 Energy efficiency and demand side management, reduction of energy losses 28 Overhead to underground conversion 29 Research and development 30 6a(iii): Consumer Connection 31 Consumer types defined by EDB* ($000) ($000) 32 All consumers 8, * include additional rows if needed 38 Consumer connection expenditure 8, less Capital contributions funding consumer connection expenditure 4, Consumer connection less capital contributions 4, a(iv): System Growth and Asset Replacement and Renewal System Growth Asset Replacement and Renewal ($000) ($000) 45 Subtransmission 224 3, Zone substations 5 7, Distribution and LV lines 41 32, Distribution and LV cables 391 1, Distribution substations and transformers 150 2, Distribution switchgear 352 1, Other network assets 5,180 1, System growth and asset replacement and renewal expenditure 6,343 50, less Capital contributions funding system growth and asset replacement and renewal 54 System growth and asset replacement and renewal less capital contributions 6,343 50, a(v): Asset Relocations 57 Project or programme* ($000) ($000) 58 CFR 9086 Chorus Changeovers 2017/ CFR 8685 Moving Works Oban Cole Street Glenorchy CFR 8462 Chorus Changeover 2016/ CFR 8584 Willowridge Luggate Park 66kv/11kv Poe Relocations * include additional rows if needed 64 All other projects or programmes asset relocations Asset relocations expenditure 1, less Capital contributions funding asset relocations Asset relocations less capital contributions 769 Copy of 2. Schedules S6a.Actual Expenditure Capex

20 SCHEDULE 6a: REPORT ON CAPITAL EXPENDITURE FOR THE DISCLOSURE YEAR This schedule requires a breakdown of capital expenditure on assets incurred in the disclosure year, including any assets in respect of which capital contributions are received, but excluding assets that are vested assets. Information on expenditure on assets must be provided on an accounting accruals basis and must exclude finance costs. EDBs must provide explanatory comment on their expenditure on assets in Schedule 14 (Explanatory Notes to Templates). This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section a(vi): Quality of Supply 70 Project or programme* ($000) ($000) * include additional rows if needed 77 All other projects programmes quality of supply 78 Quality of supply expenditure 79 less Capital contributions funding quality of supply 80 Quality of supply less capital contributions 81 6a(vii): Legislative and Regulatory 82 Project or programme* ($000) ($000) * include additional rows if needed 89 All other projects or programmes legislative and regulatory 90 Legislative and regulatory expenditure 91 less Capital contributions funding legislative and regulatory 92 Legislative and regulatory less capital contributions 93 6a(viii): Other Reliability, Safety and Environment 94 Project or programme* ($000) ($000) 95 CFR 9028 Scientific Pole Testing Equipment CFR kV Hawea Intertie CFR 7453 Omakau Parking Bay and Network Connections for Mobile Substation * include additional rows if needed 101 All other projects or programmes other reliability, safety and environment Other reliability, safety and environment expenditure 1, less Capital contributions funding other reliability, safety and environment 104 Other reliability, safety and environment less capital contributions 1, a(ix): Non Network Assets 107 Routine expenditure 108 Project or programme* ($000) ($000) * include additional rows if needed 115 All other projects or programmes routine expenditure 116 Routine expenditure 117 Atypical expenditure 118 Project or programme* ($000) ($000) 119 Office Furniture Desks, Screens, Chairs, Cabinets Sundry Computer Equipment Laptops and Associated Equipment Halsey St, Upgrade Power and Generator Power Factory Upgrade IT Asset Management Software * include additional rows if needed 125 All other projects or programmes atypical expenditure Atypical expenditure Expenditure on non network assets 956 Copy of 2. Schedules S6a.Actual Expenditure Capex

21 SCHEDULE 6b: REPORT ON OPERATIONAL EXPENDITURE FOR THE DISCLOSURE YEAR This schedule requires a breakdown of operational expenditure incurred in the disclosure year. EDBs must provide explanatory comment on their operational expenditure in Schedule 14 (Explanatory notes to templates). This includes explanatory comment on any atypical operational expenditure and assets replaced or renewed as part of asset replacement and renewal operational expenditure, and additional information on insurance. This information is part of audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section b(i): Operational Expenditure ($000) ($000) 8 Service interruptions and emergencies 4,251 9 Vegetation management 5, Routine and corrective maintenance and inspection 5, Asset replacement and renewal Network opex 16, System operations and network support 9, Business support 9, Non network opex 19, Operational expenditure 35, b(ii): Subcomponents of Operational Expenditure (where known) 19 Energy efficiency and demand side management, reduction of energy losses 20 Direct billing* 21 Research and development 22 Insurance * Direct billing expenditure by suppliers that directly bill the majority of their consumers Copy of 2. Schedules S6b.Actual Expenditure Opex

22 SCHEDULE 7: COMPARISON OF FORECASTS TO ACTUAL EXPENDITURE This schedule compares actual revenue and expenditure to the previous forecasts that were made for the disclosure year. Accordingly, this schedule requires the forecast revenue and expenditure information from previous disclosures to be inserted. EDBs must provide explanatory comment on the variance between actual and target revenue and forecast expenditure in Schedule 14 (Mandatory Explanatory Notes). This information is part of the audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section 2.8. For the purpose of this audit, target revenue and forecast expenditures only need to be verified back to previous disclosures. 7 7(i): Revenue Target ($000) ¹ Actual ($000) % variance 8 Line charge revenue 93,778 95,653 2% 9 7(ii): Expenditure on Assets Forecast ($000) ² Actual ($000) % variance 10 Consumer connection 6,806 8,494 25% 11 System growth 8,507 6,343 (25%) 12 Asset replacement and renewal 39,727 50,767 28% 13 Asset relocations 1,034 1,037 0% 14 Reliability, safety and environment: 15 Quality of supply 2,252 (100%) 16 Legislative and regulatory 17 Other reliability, safety and environment 1,974 1,700 (14%) 18 Total reliability, safety and environment 4,227 1,700 (60%) 19 Expenditure on network assets 60,300 68,341 13% 20 Expenditure on non network assets Expenditure on assets 60,300 69,297 15% 22 7(iii): Operational Expenditure 23 Service interruptions and emergencies 3,273 4,251 30% 24 Vegetation management 6,064 5,517 (9%) 25 Routine and corrective maintenance and inspection 9,770 5,783 (41%) 26 Asset replacement and renewal % 27 Network opex 19,614 16,187 (17%) 28 System operations and network support 4,604 9, % 29 Business support 3,836 9, % 30 Non network opex 8,440 19, % 31 Operational expenditure 28,054 35,344 26% 32 7(iv): Subcomponents of Expenditure on Assets (where known) 33 Energy efficiency and demand side management, reduction of energy losses 34 Overhead to underground conversion 35 Research and development (v): Subcomponents of Operational Expenditure (where known) 38 Energy efficiency and demand side management, reduction of energy losses 39 Direct billing 40 Research and development 41 Insurance From the nominal dollar target revenue for the disclosure year disclosed under clause 2.4.3(3) of this determination 44 2 From the CY+1 nominal dollar expenditure forecasts disclosed in accordance with clause for the forecast period starting at the beginning of the disclosure year (the second to last disclosure of Schedules 11a and 11b) Copy of 2. Schedules S7.Actual vs Forecast

23 SCHEDULE 7: COMPARISON OF FORECASTS TO ACTUAL EXPENDITURE This schedule compares actual revenue and expenditure to the previous forecasts that were made for the disclosure year. Accordingly, this schedule requires the forecast revenue and expenditure information from previous disclosures to be inserted. EDBs must provide explanatory comment on the variance between actual and target revenue and forecast expenditure in Schedule 14 (Mandatory Explanatory Notes). This information is part of the audited disclosure information (as defined in section 1.4 of the ID determination), and so is subject to the assurance report required by section 2.8. For the purpose of this audit, target revenue and forecast expenditures only need to be verified back to previous disclosures. Copy of 2. Schedules S7.Actual vs Forecast

24 SCHEDULE 8: REPORT ON BILLED QUANTITIES AND LINE CHARGE REVENUES This schedule requires the billed quantities and associated line charge revenues for each price category code used by the EDB in its pricing schedules. Information is also required on the number of ICPs that are included in each consumer group or price category code, and the energy delivered to these ICPs. Network / Sub Network Name Total Business 8 8(i): Billed Quantities by Price Component Billed quantities by price component Transformer Capacity Control Perod Control Period Fixed Fixed Energy Delivery Capacity Lease. Other Fixed Energy Delivery Capacity (Passthrough) Price component Distance Demand Demand (Distribution) (Distribution) (Distribution) (Distribution) Charges & Rebates (Pass through) (Pass through) (Distribution) (Distribution) (Pass through) 12 (Distribution) Add extra columns for additional Unit charging basis (eg, days, kw of demand, LS Lamp kwh kva kva x km kw kva LS kwh kva kw billed quantities Consumer group name or price Consumer type or types (eg, Standard or non standard Average no. of ICPs in Energy delivered to ICPs kva of capacity, etc.) by price 13 category code residential, commercial etc.) consumer group (specify) disclosure year in disclosure year (MWh) component as 14 necessary 15 Residential Residential Standard 74, ,632 27,053, ,631, ,987, Load Group 0 General Standard , , Load Group 0A General Standard 750 1, ,613 50, Load Group 1A General Standard 843 2, ,631 2,461, ,667 2,458, , Load Group 1 General Standard 5,722 44,567 2,088,482 31,323,660 4,992,412 31,323,660 4,992, Load Group 2 General Standard 6, ,548 2,293, ,940,828 16,565,782 (511) 114,917,103 16,563, Load Group 2 General Non standard ,095 80,300 80, Load Group 3 General Standard ,937 79,826 15,287, ,721,841 3,313,816 15,287,349 3,313, Load Group 3 General Non standard ,000 1,887,050 (280) 146,000 24A Load Group 3A General Standard ,387 62,184 18,908, ,494,657 4,859,492 (263) 18,908,144 4,859,492 24B Load Group 3A General Non standard 2 1, ,000 7,099,980 (280) 292,000 24C Load Group 4 General Standard ,979 47,437 33,920, ,084,984 9,326,636 80,561 33,920,250 9,326,636 24D Load Group 4 General Non standard 1 3, E Load Group 5 General Standard 8 59,172 2,920 8,754, ,716,197 2,268,095 8,167 8,754,300 2,268,095 24F Load Group 5 General Non standard 1 5, G Street Lighting General Standard 11 10, ,520,478 3,014, ,987,153 24H DUML, excl Street Lighting General Standard ,509 3,509 24I Distributed Generation (Large) General Non standard 10 N/A 10 N/A N/A 25 Add extra rows for additional consumer groups or price category codes as necessary 26 Standard consumer totals 88,569 1,297,730 32,324,436 2,520, ,649, ,595,579 1,046,017,679 41,623,900 87, , ,977, ,568,934 41,621, Non standard consumer totals 19 10,563 3, ,300 8,987,030 (560) , Total for all consumers 88,588 1,308,293 32,327,731 2,520, ,649, ,113,879 1,055,004,709 41,623,900 87, , ,977, ,087,234 41,621, Copy of 2. Schedules S8.Billed Quantities+Rev (Tot)

25 SCHEDULE 8: REPORT ON BILLED QUANTITIES AND LINE CHARGE REVENUES This schedule requires the billed quantities and associated line charge revenues for each price category code used by the EDB in its pricing schedules. Information is also required on the number of ICPs that are included in each consumer group or price category code, and the energy delivered to these ICPs. Network / Sub Network Name Total Business 31 8(ii): Line Charge Revenues ($000) by Price Component Line charge revenues ($000) by price component Transformer Capacity Control Perod Control Period Fixed Fixed Energy Delivery Capacity Lease. Other Fixed Energy Delivery Capacity (Passthrough) Price component Distance Demand Demand (Distribution) (Distribution) (Distribution) (Distribution) Charges & Rebates (Pass through) (Pass through) (Distribution) (Distribution) (Pass through) 34 (Distribution) Add extra columns Total pass through for additional line Notional revenue Total distribution line charge Rate (eg, $ per day, $ per $ / annum $ / lamp $ / kwh $ / kva $ / kva x km $ / kw $ / kva $ / annum $ / kwh $ / kva $ / kw charge revenues Consumer group name or price Consumer type or types (eg, Standard or non standard Total line charge revenue foregone from posted line charge revenue (if kwh, etc.) by price 35 category code residential, commercial etc.) consumer group (specify) in disclosure year discounts (if applicable) revenue available) component as 36 necessary 37 Residential Residential Standard $55,344 $35,700 $19,644 $4,029 $31,671 $19, Load Group 0 General Standard $71 $45 $26 $45 $26 39 Load Group 0A General Standard $363 $223 $140 $223 $ Load Group 1A General Standard $387 $235 $152 $10 $133 $92 $62 $90 41 Load Group 1 General Standard $5,249 $3,033 $2,216 $67 $1,508 $1,458 $701 $1, Load Group 2 General Standard $16,297 $10,667 $5,629 $147 $5,895 $4,632 $6 $850 $4, Load Group 2 General Non standard $5 $5 $0 $0 $5 $0 $0 $0 44 Load Group 3 General Standard $3,353 $2,281 $1,073 $100 $1,214 $234 $732 $195 $ Load Group 3 General Non standard $11 $11 $0 $1 $11 $2 $3 $0 46A Load Group 3A General Standard $4,249 $2,693 $1,557 $76 $1,388 $235 $997 $3 $272 $1,285 46B Load Group 3A General Non standard $25 $24 $1 $1 $20 $7 $3 $1 46C Load Group 4 General Standard $7,568 $4,376 $3,191 $147 $1,473 $406 $1,680 $671 $736 $2,456 46D Load Group 4 General Non standard $141 $72 $69 $72 $69 46E Load Group 5 General Standard $1,394 $636 $759 $9 $240 $100 $214 $73 $118 $641 46F Load Group 5 General Non standard $230 $84 $146 $84 $146 46G Street Lighting General Standard $667 $463 $204 $284 $94 $85 $149 $56 46H DUML, excl Street Lighting General Standard $0 $0 $0 $0 $0 $0 46I Distributed Generation (Large) General Non standard $584 $584 $ Add extra rows for additional consumer groups or price category codes as necessary 48 Standard consumer totals $94,942 $60,351 $34,591 $5,136 $94 $31,757 $11,851 $974 $9,805 $734 $315 $19,699 $2,934 $11, Non standard consumer totals $996 $780 $216 $742 $36 $9 $0 ($7) $215 $1 $0 50 Total for all consumers $95,939 $61,131 $34,807 $5,878 $94 $31,757 $11,887 $983 $9,805 $728 $530 $19,699 $2,935 $11, (iii): Number of ICPs directly billed Check OK 53 Number of directly billed ICPs at year end 19 Copy of 2. Schedules S8.Billed Quantities+Rev (Tot)

Information Disclosure

Information Disclosure Information Disclosure For the year ended Pursuant to the Electricity Distribution Information Disclosure Determination 2012 TABLE OF CONTENTS Schedule 1: Analytical Ratios Schedule 2: Report on Return

More information

EDB Information Disclosure Requirements Information Templates for

EDB Information Disclosure Requirements Information Templates for EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2017 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

EDB Information Disclosure Requirements Information Templates for

EDB Information Disclosure Requirements Information Templates for EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2018 Disclosure Year (year ended) Templates for Schedules 1 10 Template Version 4.1. Prepared

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 28 August 2013 Disclosure Year (year ended) Templates for Schedules 1 10 Template Version 2.0. Prepared

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 30 August 2013 Disclosure Year (year ended) 31 March 2013 Templates for Schedules 1 10 Template Version

More information

INFORMATION DISCLOSURE PREPARED IN ACCORDANCE WITH ELECTRICITY INFORMATION DISCLOSURE DETERMINATION UNDER PART 4 OF THE COMMERCE ACT 1986

INFORMATION DISCLOSURE PREPARED IN ACCORDANCE WITH ELECTRICITY INFORMATION DISCLOSURE DETERMINATION UNDER PART 4 OF THE COMMERCE ACT 1986 PREPARED IN ACCORDANCE WITH ELECTRICITY DETERMINATION UNDER PART 4 OF THE COMMERCE ACT 1986 FOR THE YEAR ENDED 31 MARCH 2013 CONTENTS 1. Introduction... 3 2. Disclaimer... 3 3. Schedules... 4 i. Schedule

More information

INFORMATION DISCLOSURE PREPARED

INFORMATION DISCLOSURE PREPARED PREPARED IN ACCORDANCE WITH ELECTRICITY DETERMINATION UNDER PART 4 OF THE COMMERCE ACT 1986 FOR THE YEAR ENDED 31 MARCH 2013 CONTENTS 1. Introduction... 3 2. Disclaimer... 3 3. Schedules... 4 i. Schedule

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2016 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

GDB Information Disclosure Requirements Information Templates for Schedules 1 10

GDB Information Disclosure Requirements Information Templates for Schedules 1 10 GDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 9 December 2016 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2013 Disclosure Year (year ended) 31 March 2013 Templates for Schedules 1 10 Template Version

More information

EDB Information Disclosure Requirements Information Templates for

EDB Information Disclosure Requirements Information Templates for EDB Information Disclosure Requirements Information Templates for Schedules 110 Disclosure Date 31 August 2016 Disclosure Year (year ended) Sch 110 2016f.xlsx 1 CoverSheet SCHEDULE 1: ANALYTICAL RATIOS

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2016 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2018 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986

Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986 Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986 For the Year Ended CONTENTS INTRODUCTION REPORTS DESCRIPTION 1 ANALYTICAL RATIOS 2 REPORT ON RETURN ON INVESTMENT 3

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2014 Disclosure Year (year ended) Templates for Schedules 1 10 Template Version 3.0. Prepared

More information

GDB Information Disclosure Requirements Information Templates for Schedules 1 10

GDB Information Disclosure Requirements Information Templates for Schedules 1 10 GDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 23 December 2015 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

Orion New Zealand Limited

Orion New Zealand Limited Orion New Zealand Limited Information for disclosure for year ended Electricity distribution Information disclosure determination 2012 Approved 15 August 2017 SCHEDULE 1: ANALYTICAL RATIOS 7 1(i): Expenditure

More information

GDB Information Disclosure Requirements Information Templates for Schedules 1 10

GDB Information Disclosure Requirements Information Templates for Schedules 1 10 GDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 19 December 2018 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2017 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

Information Disclosure prepared in accordance with the. Electricity Distribution Information Disclosure Determination 2012

Information Disclosure prepared in accordance with the. Electricity Distribution Information Disclosure Determination 2012 Information Disclosure prepared in accordance with the Electricity Distribution Information Disclosure Determination 2012 For the Year Ended 31 March 2013 COUNTIES POWER LIMITED Information Disclosure

More information

SCHEDULE 1: ANALYTICAL RATIOS

SCHEDULE 1: ANALYTICAL RATIOS SCHEDULE 1: ANALYTICAL RATIOS This schedule calculates expenditure, revenue and service ratios from the information disclosed. The disclosed ratios may vary for reasons that are company specific and, as

More information

Maui Development Limited. Annual disclosures for the disclosure year ending 31 December 2014

Maui Development Limited. Annual disclosures for the disclosure year ending 31 December 2014 Annual disclosures for the disclosure year ending 1 December 2014 June 2015 Annual disclosures for the year ending 1 December 2014 This document contains our annual disclosures for our disclosure year

More information

Orion New Zealand Limited. Information for disclosure for the year ended 31 March 2018

Orion New Zealand Limited. Information for disclosure for the year ended 31 March 2018 Orion New Zealand Limited Information for disclosure for the year ended Electricity distribution information disclosure determination 2012 Approved 17 August 2018 SCHEDULE 1: ANALYTICAL RATIOS 7 1(i):

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 31 August 2017 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

GDB Information Disclosure Requirements Information Templates for Schedules 1 10

GDB Information Disclosure Requirements Information Templates for Schedules 1 10 GDB Information Disclosure Requirements Information Templates for Schedules 1 10 Vector gas distribution business Disclosure Date 4 December 2014 Disclosure Year (year ended) Templates for Schedules 1

More information

EDB Information Disclosure Requirements Information Templates for Schedules 1 10

EDB Information Disclosure Requirements Information Templates for Schedules 1 10 EDB Information Disclosure Requirements Information Templates for Schedules 1 10 Disclosure Date 29 August 2018 Disclosure Year (year ended) Templates for Schedules 1 10 excluding 5f 5g Template Version

More information

Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2008

Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2008 Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2008 Pursuant to the ELECTRICITY DISTRIBUTION (INFORMATION DISCLOSURE) REQUIREMENTS 2008 INDEX Page A Statutory Declaration for Publicly

More information

OtagoNet Joint Venture INFORMATION DISCLOSURE PREPARED IN ACCORDANCE WITH SUBPART 3 OF PART 4A OF THE COMMERCE ACT 1986

OtagoNet Joint Venture INFORMATION DISCLOSURE PREPARED IN ACCORDANCE WITH SUBPART 3 OF PART 4A OF THE COMMERCE ACT 1986 OtagoNet Joint Venture INFORMATION DISCLOSURE PREPARED IN ACCORDANCE WITH SUBPART 3 OF PART 4A OF THE COMMERCE ACT 1986 FOR THE YEAR ENDED 31 MARCH 2010 CONTENTS 1. Introduction... 3 2. Disclaimer... 3

More information

OtagoNet Joint Venture

OtagoNet Joint Venture OtagoNet Joint Venture INFORMATION DISCLOSURE PREPARED IN ACCORDANCE WITH SUBPART 3 OF PART 4A OF THE COMMERCE ACT 1986 FOR THE YEAR ENDED 31 MARCH 2011 CONTENTS 1. Introduction... 3 2. Disclaimer... 3

More information

Information Disclosure prepared according to. subpart 3 of the Part 4A Commerce Act 1986

Information Disclosure prepared according to. subpart 3 of the Part 4A Commerce Act 1986 Information Disclosure prepared according to subpart 3 of the Part 4A Commerce Act 1986 For the Assessment Period: 1 April 2007-31 March 2008 I. Contents I. Introduction... 4 II. Structure of Eastland

More information

Information Disclosure prepared according to subpart 3 of Part 4A of the Commerce Act 1986

Information Disclosure prepared according to subpart 3 of Part 4A of the Commerce Act 1986 Information Disclosure prepared according to subpart 3 of Part 4A of the Commerce Act 1986 For the Year Ended 31 March 2011 SUPPLEMENTARY UNAUDITED INFORMATION EXPLANATORY NOTE (UNAUDITED) This is an explanatory

More information

Information Disclosure

Information Disclosure Electricity Ashburton Limited trading as EA Networks Information Disclosure Prepared according to subpart 3 of the Part 4A Commerce Act 1986 Assessment Period: 1 April 2011 31 March 2012 Date: 11 December

More information

MainPower New Zealand Limited. Asset Management Plan

MainPower New Zealand Limited. Asset Management Plan MainPower New Zealand Limited. Asset Management Plan 2015 2025 MAINPOWER NEW ZEALAND LIMITED ASSET MANAGEMENT PLAN UPDATE 2015-2025 MainPower New Zealand Limited Asset Management Plan Update 2015-2025

More information

Nelson Electricity Ltd Asset Management Plan Update

Nelson Electricity Ltd Asset Management Plan Update Nelson Electricity Ltd Asset Management Plan Update April 2017 March 2027 April 2017 Nelson Electricity Ltd central Nelson city view In accordance with the Commerce Act Electricity Distribution Information

More information

ELECTRA LIMITED 2010 INFORMATION FOR DISCLOSURE. Pursuant to Secton 57T of the Commerce Act 1986

ELECTRA LIMITED 2010 INFORMATION FOR DISCLOSURE. Pursuant to Secton 57T of the Commerce Act 1986 ELECTRA LIMITED 2010 INFORMATION FOR DISCLOSURE Pursuant to Secton 57T of the Commerce Act 1986 - - Table of contents Certificate for Disclosed Information 2 Statutory Declaration for Publicly Disclosed

More information

Mandatory Explanatory Notes

Mandatory Explanatory Notes Schedule 14 Company Name Westpower Limited For Year Ended 31 March 2015 Mandatory Explanatory Notes (In this Schedule, clause references are to the Electricity Distribution Information Disclosure Determination

More information

Mandatory Explanatory Notes

Mandatory Explanatory Notes Schedule 14 Company Name EA Networks For Year Ended 31 March 2018 Mandatory Explanatory Notes 1. This schedule requires EDBs to provide explanatory notes to information provided in accordance with clauses

More information

Electricity Distribution Services Input Methodologies Determination 2012

Electricity Distribution Services Input Methodologies Determination 2012 ISSN 1178-2560 Decision Series Project no. 16104 Public version Electricity Distribution Services Input Methodologies Determination 2012 This consolidated determination consolidates the principal determination

More information

Electricity Distribution Information Disclosure Determination 2012 (consolidated in 2015)

Electricity Distribution Information Disclosure Determination 2012 (consolidated in 2015) ISBN 978-1-869454-39-5 Project no. 14.09:15.01/14700:14699 Public version Electricity Distribution Information Disclosure Determination 2012 (consolidated in 2015) Date of consolidation: 24 March 2015

More information

For Year Ended 31 March (In this Schedule, clause references are to the Electricity Distribution Information Disclosure Determination 2012)

For Year Ended 31 March (In this Schedule, clause references are to the Electricity Distribution Information Disclosure Determination 2012) Schedule 14 Company Name Vector For Year Ended 31 March 2014 Mandatory Explanatory Notes (In this Schedule, clause references are to the Electricity Distribution Information Disclosure Determination 2012)

More information

Electricity Distribution Information Disclosure Amendments Determination 2017 [2017] NZCC 33

Electricity Distribution Information Disclosure Amendments Determination 2017 [2017] NZCC 33 ISSN 1178-2560 Project no. 16104: 16275 Public version Electricity Distribution Information Disclosure Amendments Determination 2017 [2017] NZCC 33 The Commission: Sue Begg Dr Stephen Gale Dr Mark Berry

More information

Gas Distribution Services Input Methodologies Determination 2012

Gas Distribution Services Input Methodologies Determination 2012 ISSN 1178-2560 Decision Series Project no. 16104 Public version Gas Distribution Services Input Methodologies Determination 2012 This consolidated determination consolidates the principal determination

More information

ELECTRICITY AND GAS INFORMATION DISCLOSURE SEMINAR JAMES COOK HOTEL GRAND CHANCELLOR, WELLINGTON MARCH, MARCH 2013

ELECTRICITY AND GAS INFORMATION DISCLOSURE SEMINAR JAMES COOK HOTEL GRAND CHANCELLOR, WELLINGTON MARCH, MARCH 2013 ELECTRICITY AND GAS INFORMATION DISCLOSURE SEMINAR JAMES COOK HOTEL GRAND CHANCELLOR, WELLINGTON 21 22 MARCH, 25 26 MARCH 2013 Regulatory Tax A Primer Presentation to Information Disclosure Seminar March

More information

Electricity Distribution (Information Disclosure) Requirements October 2008

Electricity Distribution (Information Disclosure) Requirements October 2008 Electricity Distribution (Information Disclosure) Requirements 2008 31 October 2008 ELECTRICITY DISTRIBUTION (INFORMATION DISCLOSURE) REQUIREMENTS 2008 1. Title, commencement, and application Contents

More information

Transpower Individual Price-Quality Path Determination 2015

Transpower Individual Price-Quality Path Determination 2015 ISBN 978-1-869456-27-6 Project no. 14.11/14120 Public version Transpower Individual Price-Quality Path Determination 2015 This consolidated version of the principal determination and amendment determinations

More information

GDB Information Disclosure Requirements Information Templates for Schedules 11 12c

GDB Information Disclosure Requirements Information Templates for Schedules 11 12c GDB Information Disclosure Requirements Information Templates for Schedules 11 12c Disclosure Date 30 June 2014 Start Date (first day) 1 July 2014 Templates for Schedules 11a 13 (Asset Management Plan)

More information

Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2006

Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2006 Information Disclosure by Aurora Energy Ltd for the year ended 31 March 2006 Pursuant to the ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004 INDEX A Page Statutory Declaration in Respect of Statements

More information

Default Price-Quality Path Compliance Statement

Default Price-Quality Path Compliance Statement Default Price-Quality Path Compliance Statement For the Assessment Date 31 March 2017 13 June 2017 Pursuant to the requirements of clause 11.1 of the Electricity Distribution Services Default Price-Quality

More information

The Requirements require the information to be disclosed in the manner it is presented.

The Requirements require the information to be disclosed in the manner it is presented. ELECTRICITY INVERCARGILL LIMITED LINE BUSINESS FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 MARCH Prepared for the Purposes of the Electricity Information Disclosure Requirements 2004. INFORMATION DISCLOSURE

More information

THE POWER COMPANY LIMITED LINE BUSINESS STATEMENT OF FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2004

THE POWER COMPANY LIMITED LINE BUSINESS STATEMENT OF FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2004 THE POWER COMPANY LIMITED LINE BUSINESS STATEMENT OF FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2004 Note 31 March 2004 31 March 2003 Operating Revenue (2) 25,128 23,341 Operating Expenses (3) 21,149

More information

The Requirements require the information to be disclosed in the manner it is presented.

The Requirements require the information to be disclosed in the manner it is presented. THE POWER COMPANY LIMITED LINE BUSINESS FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 MARCH Prepared for the Purposes of the Electricity Information Disclosure Requirements 2004. INFORMATION DISCLOSURE DISCLAIMER

More information

Wellington Electricity CPP assessment of 2010/21 capex

Wellington Electricity CPP assessment of 2010/21 capex Commerce Commission P O Box 2351 Wellington 6140 For the Attention of: Kade Sheely 18th January 2018 Dear Kade Wellington Electricity CPP assessment of 2010/21 capex I am pleased to provide this briefing

More information

HORIZON ENERGY DISTRIBUTION LIMITED

HORIZON ENERGY DISTRIBUTION LIMITED HORIZON ENERGY DISTRIBUTION LIMITED THRESHOLD COMPLIANCE STATEMENT FOR THE ASSESSMENT DATE, 31 MARCH 2010 Pursuant to the Commerce Act (Electricity Distribution Thresholds) Notice 2004 and Amendment Notice

More information

Orion New Zealand Limited

Orion New Zealand Limited Orion New Zealand Limited Information for Disclosure Pursuant to the Electricity Information Disclosure Requirements 2 August Orion New Zealand Limited The following public disclosures are made by Orion

More information

(Transpower) Reasons paper December 2010

(Transpower) Reasons paper December 2010 Individual price-quality path (Transpower) Reasons paper December 2010 Regulation Branch Commerce Commission Wellington NEW ZEALAND 22 December 2010 ISBN: 978-1-869450-95-3 Commerce Commission i Table

More information

Transpower Individual Price-Quality Path Determination NZCC XX

Transpower Individual Price-Quality Path Determination NZCC XX 1 Project no. 14.11/14120 Public version Transpower Individual Price-Quality Path Determination NZCC XX The Commission: S Begg P Duignan Dr S Gale Summary of the determination: Pursuant to Part 4 of the

More information

Orion New Zealand Limited

Orion New Zealand Limited Orion New Zealand Limited Information for Disclosure Pursuant to the Electricity Information Disclosure Requirements 2004 7 November Orion New Zealand Limited The following public disclosures are made

More information

OTAGONET JOINT VENTURE LINES BUSINESS STATEMENT OF FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2005

OTAGONET JOINT VENTURE LINES BUSINESS STATEMENT OF FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2005 OTAGONET JOINT VENTURE LINES BUSINESS STATEMENT OF FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 MARCH 2005 Note 31 March 2005 31 March 2004 Operating Revenue (1) 13,559 13,524 Operating Expenses (2) (10,809)

More information

Transpower Information Disclosure Amendments Determination 2017 NZCC 25

Transpower Information Disclosure Amendments Determination 2017 NZCC 25 ISSN 1178-2560 Project no. 16275 Public version Transpower Information Disclosure Amendments Determination 2017 NZCC 25 The Commission: Sue Begg Graham Crombie Dr Stephen Gale Elisabeth Welson Date of

More information

Orion New Zealand Limited

Orion New Zealand Limited Orion New Zealand Limited Information for Disclosure Pursuant to the Electricity Information Disclosure Requirements 2004 5 December Orion New Zealand Limited The following public disclosures are made

More information

Gas Distribution Asset Management Plan Update

Gas Distribution Asset Management Plan Update Gas Distribution Asset Management Plan Update Information Disclosure 2014 Date: 30 June 2014 Vector Gas Distribution Page 1 of 33 CONTENTS 1. Introduction... 3 2. Update to Network Development Planning...

More information

Explanatory notes to one-page performance summary of electricity distributors

Explanatory notes to one-page performance summary of electricity distributors ISBN no. 978-1-869455-88-0 Project no. 14.20/13107 Public version Explanatory notes to one-page performance summary of electricity distributors Date: 4 October 2017 CONTENTS 2 PURPOSE OF THIS EXPLANATORY

More information

Aurora Energy Limited

Aurora Energy Limited Aurora Energy Limited Statement of Intent for the year ending 30 June 2016 CONTENTS Page 1 INTRODUCTION... 1 2 STRATEGIC DIRECTION... 1 2.1 Vision... 1 2.2 Mission... 1 2.3 Corporate Goals... 1 2.4 Specific

More information

TRANSMISSION CHARGING STATEMENT

TRANSMISSION CHARGING STATEMENT TRANSMISSION CHARGING STATEMENT 1 September 2016 1 September 2016 TABLE OF CONTENTS Page 1 Introduction... 1 2 General System Charges... 4 3 Site Specific Charges... 5 4 Connection Assets... 8 5 Least

More information

ELECTRICITY ASSET MANAGEMENT PLAN 31 March 2014

ELECTRICITY ASSET MANAGEMENT PLAN 31 March 2014 ELECTRICITY ASSET MANAGEMENT PLAN 31 March 2014 1 INTRODUCTION 1.1 Purpose Powerco is New Zealand s second largest electricity distribution company by customer numbers, supplying around one of every six

More information

Capital Contributions. Effective: 24 May 2016

Capital Contributions. Effective: 24 May 2016 Effective: 24 May 2016 TABLE OF CONTENTS 1 Purpose and Scope of this Document... 1 2 Definitions... 1 3 References... 1 4 General... 1 5 Policy for Small Connections... 2 5.1 Components of the Capital

More information

SINGAPORE POST LIMITED AND ITS SUBSIDIARIES (Registration number: M)

SINGAPORE POST LIMITED AND ITS SUBSIDIARIES (Registration number: M) SINGAPORE POST LIMITED AND ITS SUBSIDIARIES (Registration number: 199201623M) SGXNET ANNOUNCEMENT UNAUDITED RESULTS FOR THE FOURTH QUARTER AND FINANCIAL YEAR ENDED 31 MARCH 2015 1 PART I INFORMATION REQUIRED

More information

ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M

ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M TABLE OF CONTENTS Schedule Schedule Name Page Sch 1 Summary

More information

These notes form an integral part of and should be read in conjunction with the accompanying financial statements.

These notes form an integral part of and should be read in conjunction with the accompanying financial statements. for the financial year ended 31 December These notes form an integral part of and should be read in conjunction with the accompanying financial statements. 1. General 1 The Company is incorporated and

More information

Loss Factors. Effective 1 April 2018

Loss Factors. Effective 1 April 2018 Effective 1 April 2018 Table of Contents 1 Introduction... 3 2 Loss Factor... 3 2.1 General... 3 2.2 HV and LV Metered Installations... 3 2.3 Methodology... 3 2.4 Halfway Bush and South Dunedin GXP Areas...

More information

DELTA Utility Services Ltd

DELTA Utility Services Ltd DELTA Utility Services Ltd Statement of Intent for the Year Ending 30 June 2007 Table of Contents 1 Mission Statement 1 2 Nature and Scope of Activities 1 3 Corporate Governance Statement 1 4 Corporate

More information

Financial Statement And Distribution Announcement for the Fourth Quarter and Year ended 31 March 2015 TABLE OF CONTENTS

Financial Statement And Distribution Announcement for the Fourth Quarter and Year ended 31 March 2015 TABLE OF CONTENTS TABLE OF CONTENTS Item No. Description Page No. Introduction 1 3 1(a)(i) Consolidated Income Statement 4 1(a)(ii) Consolidated Statement of Comprehensive Income 5 1(a)(iii) Additional Information 5 1(b)(i)

More information

L 36/46 Official Journal of the European Union

L 36/46 Official Journal of the European Union L 36/46 Official Journal of the European Union 5.2.2009 GUIDELINE OF THE EUROPEAN CENTRAL BANK of 11 December 2008 amending Guideline ECB/2006/16 on the legal framework for accounting and financial reporting

More information

Connection and Use of System Charge Methodology Statement ("Condition 25 Statement")

Connection and Use of System Charge Methodology Statement (Condition 25 Statement) Connection and Use of System Charge Methodology Statement ("Condition 25 Statement") Revised Effective Date: 1 st January 2016 Approved by the Authority for Electricity Regulation, Oman Connection and

More information

Distributed Generation Connection Standard ST B Planning Engineer. Network Planning Manager. General Manager Network

Distributed Generation Connection Standard ST B Planning Engineer. Network Planning Manager. General Manager Network Effective Date 1 May 2018 Issue Number 1.1 Page Number Page 1 of 26 Document Title Distributed Generation Connection Standard Document Number ST B1.1-001 Document Author Planning Engineer Document Reviewer

More information

SINGAPORE POST LIMITED AND ITS SUBSIDIARIES (Registration number: M)

SINGAPORE POST LIMITED AND ITS SUBSIDIARIES (Registration number: M) SINGAPORE POST LIMITED AND ITS SUBSIDIARIES (Registration number: 199201623M) SGXNET ANNOUNCEMENT UNAUDITED RESULTS FOR THE FOURTH QUARTER AND FINANCIAL YEAR ENDED 31 MARCH 2018 1 PART I INFORMATION REQUIRED

More information

Specified Airport Services Information Disclosure Requirements Information Templates for Schedules 18 24

Specified Airport Services Information Disclosure Requirements Information Templates for Schedules 18 24 Specified Airport Services Information Disclosure Requirements Information Templates for Schedules 1824 Company Name Disclosure Date 14 August 2017 (year ended) Disclosure year of most recent annual disclosure

More information

Default Price-Quality Path Compliance

Default Price-Quality Path Compliance Default Price-Quality Path Compliance Wellington Electricity Lines Limited Annual Compliance Statement 09 June 2014 Contents 1. INTRODUCTION... 3 1.1. Compliance with 2012 DPP Determination s price quality

More information

Handbook for Optimised. Deprival Valuation of System Fixed Assets of. Electricity Lines Businesses

Handbook for Optimised. Deprival Valuation of System Fixed Assets of. Electricity Lines Businesses Handbook for Optimised Deprival Valuation of System Fixed Assets of Electricity Lines Businesses REVISED DRAFT FOR CONSULTATION 9 July 2004 Adjusted for Transpower Comments Deleted: 15 Deleted: 14 Inserted:

More information

Input methodologies review related party transactions

Input methodologies review related party transactions ISBN no. 978-1-869456-20-7 Project no. 14.20/16104 Public version Input methodologies review related party transactions Final decision and determinations guidance Date of publication: 21 December 2017

More information

Gas Networks Ireland Transmission Tariffs and Tariff Information 2018/19

Gas Networks Ireland Transmission Tariffs and Tariff Information 2018/19 An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Gas Networks Ireland Transmission Tariffs and Tariff Information 2018/19 Information Paper Information Paper Reference: CRU/18/179

More information

Submitted by Western Power

Submitted by Western Power Final Determination on the New Facilities Investment Test for a 66/11 kv Medical Centre Zone Substation Expansion and Voltage Conversion of the Distribution Network Submitted by Western Power 19 February

More information

ASIAN PAY TELEVISION TRUST SGX QUARTERLY REPORT FOR THE QUARTER AND HALF-YEAR ENDED 30 JUNE 2015

ASIAN PAY TELEVISION TRUST SGX QUARTERLY REPORT FOR THE QUARTER AND HALF-YEAR ENDED 30 JUNE 2015 ASIAN PAY TELEVISION TRUST SGX QUARTERLY REPORT FOR THE QUARTER AND HALF-YEAR ENDED 30 JUNE CONTENTS REPORT SUMMARY... 1 REPORT SUMMARY... 2 PERFORMANCE REVIEW OF ASIAN PAY TELEVISION TRUST... 4 INTRODUCTION...

More information

European Embedded Value (EEV) basis results

European Embedded Value (EEV) basis results European Embedded Value (EEV) basis results Page Post-tax operating profit based on longer-term investment returns 1 Post-tax summarised consolidated income statement 2 Movement in shareholders equity

More information

Default price-quality paths for gas pipeline services from 1 October Final. Submission to the Commerce Commission

Default price-quality paths for gas pipeline services from 1 October Final. Submission to the Commerce Commission Date: 28 September 2016 Name of submitter: Electricity Networks Association Industry/area of interest: Utilities/infrastructure Contact details Graeme Peters, Chief Executive Address: Level 5, Legal House

More information

Half Year Result For the six months ended 31 December Half year result overview 02 Management commentary 04 Financial statements

Half Year Result For the six months ended 31 December Half year result overview 02 Management commentary 04 Financial statements Half Year Result For the six months ended 31 December 2018 01 Half year result overview 02 Management commentary 04 Financial statements Half year result overview Fixed line connections Broadband connections

More information

Financial Report

Financial Report Financial Report -17 Regional Power Corporation trading as Horizon Power Financial Statements for the year ended ABN: 57 955 011 697 Table of Contents Page Statement of Comprehensive Income.. 2 Statement

More information

PART 1 INFORMATION REQUIRED FOR QUARTERLY (Q1, Q2 & Q3), HALF-YEAR AND FULL YEAR

PART 1 INFORMATION REQUIRED FOR QUARTERLY (Q1, Q2 & Q3), HALF-YEAR AND FULL YEAR ISOTEAM LTD. (Company Registration No. 201230294M) UNAUDITED FINANCIAL STATEMENTS AND DIVIDEND ANNOUNCEMENT FOR THE FOURTH QUARTER AND TWELVE MONTHS ENDED 30 JUNE 2018 PART 1 INFORMATION REQUIRED FOR QUARTERLY

More information

Group Interim results for the six months ended 30 September Cover slide (same as IR cover)

Group Interim results for the six months ended 30 September Cover slide (same as IR cover) Group Interim results for the six months ended 30 September 2015 Cover slide (same as IR cover) 24 November 2015 Contents Overview of the period Financial review Operating performance Conclusion 1 Sustainable

More information

ASIAMEDIC LIMITED Full Year Financial Statements Announcement for the 12 months ended 31 December 2017

ASIAMEDIC LIMITED Full Year Financial Statements Announcement for the 12 months ended 31 December 2017 Co. Reg. No.: 197401556E Full Year Financial Statements Announcement for the 12 months ended 31 December 2017 PART I - INFORMATION REQUIRED FOR ANNOUNCEMENTS OF FULL-YEAR RESULTS 1(a)(i) Consolidated Income

More information

SEQ Interim Price Monitoring. Guideline for Templates for 2010/11

SEQ Interim Price Monitoring. Guideline for Templates for 2010/11 SEQ Interim Price Monitoring Guideline for Templates for 2010/11 Version 1.0 May 2010 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile

More information

ESKOM S CONNECTION CHARGES METHODOLOGY

ESKOM S CONNECTION CHARGES METHODOLOGY ESKOM S CONNECTION CHARGES METHODOLOGY 13 November 2007 This document may be updated from time to time. Please refer to www.eskom.co.za/tariffs for the latest version. Eskom s Connection Charges Methodology

More information

Alinta Sales Pty Ltd 2012 / Annual Electricity Performance Report

Alinta Sales Pty Ltd 2012 / Annual Electricity Performance Report Alinta Sales Pty Ltd 212 / 213 Annual Electricity Performance Report Page 1 Table of Contents Overview... 3 Table 8: Customers and Customer Information... 3 Table 9: Affordability and Access... 4 Table

More information

2016 INTEGRATED TRANSMISSION PLAN COMPLIANCE REPORT

2016 INTEGRATED TRANSMISSION PLAN COMPLIANCE REPORT 2016 INTEGRATED TRANSMISSION PLAN COMPLIANCE REPORT APPENDIX: ITP COMPLIANCE Introduction Our first integrated transmission plan (ITP), which we completed in 2013, was embedded within our regulatory proposal

More information

SUBMISSION TO THE COMMERCE COMMISSION ON THE DEFAULT PRICE QUALITY PATHS FOR GAS PIPELINE BUSINESSES DRAFT REASONS PAPER

SUBMISSION TO THE COMMERCE COMMISSION ON THE DEFAULT PRICE QUALITY PATHS FOR GAS PIPELINE BUSINESSES DRAFT REASONS PAPER SUBMISSION TO THE COMMERCE COMMISSION ON THE DEFAULT PRICE QUALITY PATHS FOR GAS PIPELINE BUSINESSES DRAFT REASONS PAPER CONTENTS CONTENTS... 2 Executive Summary... 3 Introduction... 5 setting expenditures...

More information

ASIAN PAY TELEVISION TRUST SGX QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH 2016

ASIAN PAY TELEVISION TRUST SGX QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH 2016 ASIAN PAY TELEVISION TRUST SGX QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH CONTENTS REPORT SUMMARY... 1 REPORT SUMMARY... 2 PERFORMANCE REVIEW OF ASIAN PAY TELEVISION TRUST... 4 INTRODUCTION... 5 SELECTED

More information

SURPLUS ENERGY PROGRAM TERMS AND CONDITIONS

SURPLUS ENERGY PROGRAM TERMS AND CONDITIONS SUR ENERGY PROGRAM TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Program Duration...1 Eligibility...1 Reference Demand...1 Billing...2 Interruptions...4 Metering

More information

A wash-up mechanism for the DPP revaluation rate

A wash-up mechanism for the DPP revaluation rate pwc.co.nz A wash-up mechanism for the DPP revaluation rate A report prepared for Vector A wash-up mechanism for the DPP revaluation rate April 2014 April 2014 Ian Ferguson Regulatory Advisor Vector Limited

More information

Contents 21 TREND STATEMENT 26 NETWORK PERFORMANCE 33 FINANCIAL CONTENTS 64 INDEPENDENT AUDITOR S REPORT WANAKA UPGRADE

Contents 21 TREND STATEMENT 26 NETWORK PERFORMANCE 33 FINANCIAL CONTENTS 64 INDEPENDENT AUDITOR S REPORT WANAKA UPGRADE ANNUAL REPORT 2O17 AURORA ENERGY Contents 4 CHAIRMAN AND CHIEF EXECUTIVE S REPORT 21 TREND STATEMENT 22 STATEMENT OF SERVICE PERFORMANCE 25 NETWORK OVERVIEW 26 NETWORK PERFORMANCE 27 DIRECTORS REPORT 31