1 Central Transmission Utility Grant of long Term Access from NEW Grid to Southern Region Dat e: 22 September 2014 Subje ct : Grant of Long Term Access fo r th e eligible ap plicatio ns received in t he month of No vember, 2013 for transfer of power f rom NEW grid to SR grid., 1. Pursuant to the power vested to -Central Transmission Utility under Section - 38 of the Electricity Act, 2003 and Regulation - 4 of the Central Electricity Regulato ry Commission (Grant of Connectivity, Long Term and Medium Term Open Access in Inter-State Transmission and related matters) Regulations 2009, CTU hereby inform in t he matter of grant of long term access for the transfer of power from various IPPs genera tion projects in Chhattisgarh in NEW grid to SR grid. 2. During November, 2013 CTU had received four nos. of applications totaling to 1208MW from M/s KSK Mahanadi Power Company Ltd. (KSK Mahanadi) 500MW, M/s Jindal Power - 400MW, M/s DB Power Ltd. (DB Power) - 208MW and M/s BALCO - 100MW. Prior to receipt of above applications, request from few IPPs received for allocation of LTA to SR against their earlier applica tions and LTA granted for the target beneficiaries of WR & NR. However during the meetings held in March, 2014 and May, 2014, it was advised that since in the above cases there is a change in region for the LTA quantum sought, a fresh applica tion is required as per CERC Regulations. Accordingly, only the fresh applications submitt ed in November, 2013 are being considered for allocation of LTA. 3. The presen t Available Transfer Capability (ATC) between NEW grid and SR grid has been assessed as 4000MW, which shall enhance to 4900MW subject to commissioning of iden tified transmission system lines in WR and SR. Out of the present ATC of 4000MW, the 3577MW has already been allocated to various LTA and MTOA cust omers (LTA MW, MTOA - 903MWL thereby leaving ATC of 423MW available for allocation under LTA/ MTOA. Further, as per CERC order dated 08/08/2014 and 05/09/2014 in petition no. 92/MP/2014, MTOA has been re-processed for the applications received in the month of June, 2013, und er which 208M W has been allocated to eligible applicant(s). Considering 208MW allocated to MTOA applicant(s) of June, 2013, the 'balance ATC of 215 MW ( MW) shall be available for allocation from 1 st October, 2014 onwards. In addition, ATC of 150MW was vacated by Corporate Power, making a total of Page 1 of 4

2 365MW available for allocation of LTA applicants of November, Out of the above 365 MW, 150MW ATC has already been allocated to Mis Jindal Power Limited (Jindal Power) against their application for 400 MW in the month of November, 2013 based on the decision during the meeting held on zo" March, In the meeting of constituents of SR &WR, CEA, WRPC, SPRC, POSOCO on zi" May, 2014 different aspects have been discussed with respect to the issue of grant of LTA. Few issues raised during the meeting like grant of LTA for part capacity, Inter-se priority between LTA and MTOA, when both are being processed simultaneously, quantum of compensation to be paid on account of relinquishment of LTA for the target region have been referred to CERC and in its order dated CERC have stated that these issues will be dealt in the order to be issued subsequently. However CERCI in the referred order, have confirmed that there is no stay on processing of LTA applications, accordingly CTU has decided to allocate the ATC to the eligible LTA applicants on pro-rata basis. 5. At this juncture, while processing the case for granting LTA, it was found that though the application from Mis DB Power was received in the month of November, 2013, as per the CERC regulations the requisite application fee was submitted in the month of January, Accordingly the application of DB Power to be treated as an application filed in the month of January, Accordingly, for the month of November, 2013, Mis Jindal Power, Mis KSK Mahanadi, Mis BALCO are being considered for the grant of LTA against the present available ATC as mentioned above in para Accordingly, taking cognizance of deliberations held with the different stakeholders and keeping in view the provisions of Connectivity Regulations, 2009/CTU issues the following intimation subject to conditions in para b. and c. below: a. Out of ATC of 365 MW as mentioned in para-s, 150 MW ATC has already been allocated to Jindal Power which is already under operation. As such the remaining 215 MW ( MW) are being allocated among KSK Mahanadi & BALCO on pro-rata basis as below SI. LTA Applicant LTA Sought Allocation No. (MW) (MW) i. Mis Jindal Power ii. Mis KSK Mahanadi SOD 179 iii. Mis BALCD Total Page 2 of4

3 Further, additional LTA to the above IPPs as well as other IPPs based on their priority and ATC available shall be intimated later on as and when additional transmission capacity from NEW grid to SR shall be available progressively on commissioning of identified transmission lines. b. In the event of any generator not in a position to avail this part LTA 1 the IPP shall inform CTU within 15 days of this communication. Upon receipt of such inforrnatlon, the LTA quantum shall be re-appropriated. c. The above LTA to be operationalized from 1 st October, 2014 onwards provided that the conditions stipulated below are duly fulfilled within 30 days from the date of letter through which amount of Bank Guarantee is informed: i) Payment of compensation towards relinquishment of earlier granted LTA based on the target region. Since the construction of the transmission system corresponding to the target region is still under construction, matter has been referred to CERC for directions on the procedure to be adopted for calculation of relinquishment charges. Pending CERC decision and as followed in the case of Mis Jindal Power, the applicant shall submit a Bank Guarantee corresponding to the LTA quantum indicated above. The exact amount of Bank Guarantee shall be intimated separately. ii) In addition to the Bank Guarantee, the applicant granted LTA shall also submit an undertaking on an affidavit that is the decision of CERe results in the compensation more than the amount of Bank Guarantee} LTA customer shall pay the same. In case of non-payment of such compensation. LTA granted shall be cancelled. iii) Other terms & conditions as per the CERC Regulations} 2009 and Detailed Procedure. 7. The earlier two letters of intimation dated & issued for the LTAto Mis DB Power Ltd., Mis Ind-Bharat Energy (Utkal) t.td., M/~ BALCO and MIs Jindal Power Ltd. stands null and void. It is to be stated that Ind-Barath has approached to Hon'ble Madras High Court in regard to LTA to Southern region, therefore this may undergo changes on its final outcome. Page 3 of 4

4 8. As the issues mentioned in para-4 have been referred to CERC, the LTA granted may undergo changes on its final outcome. End: Statement of Reasons. ~~ttz-~ (Y. K. Sehgal) COO(CTU) Page 4 of4

5 Central Transmission Utility In the matter of Grant of Long Term Access for the applications received for transfer of power from NEW grid to Southern Region grid for the applications received in the month of November, Statement of Reasons 1. CTU have received requests from IPPs that had earlier been granted LTA based on target region and now desirous to consider LTA with respect to firmed-up beneficiaries pursuant to signing of long term PPA with Tamil Nadu. The firmed up beneficiary with the signing of PPA in all the cases is different from the target region. For regularization of beneficiaries from target to firmed up, CTU have carried out consultation process with the CEA, constituents of SR & WR, SRPC, WRPC, POSOCO, concerned IPPs etc. The agendas for such consultation process and their minutes are duly uploaded on CTU website. These consultations also deliberated on ATC between NEW grid & SR grid as well allocation of the same to eligible LTA customers. 2. After extensive consultation, now CTU with the powers vested to it under section 38 of the Electricity Act, 2003 and Regulation 4 of the Central Electricity Regulatory Commission (Grant of Connectivity, Long Term and Medium Term Open Access in Inter- State Transmission and related matters) Regulations 2009, CTU have come out with the intimation for grant of LTA to eligible LTA applicants dated for granting LTA for transfer of power from NEW grid to SR grid for the present ATC available after commissioning of Solapur-Raichur 765kV 2xS/c lines. 3. Large number of issues had been raised by stakeholder during consultation process, which have been duly considered by CTU and arrived at the decision. Each of these issues have been discussed in subsequent paragraphs detailing therein the issue involved and rationale for the stand taken up CTU. Issue 1 : Considering those applicants, who had applied for regularization of LTA through the fresh application submitted in the month of November, As per the amended Regulation 12, Provided that a generating company after firming up the beneficiaries through signing of long term Power Purchase Agreement(s) shall be required to notify the same to the nodal agency along with the copy of the PPA ; In line with the referred amended clause, four nos of IPPs viz. Ind-Barath 500 MW, Jindal Power 400 MW, DB Power 208 MW, BALCO 100 MW notified to CTU in the month of August, 2013 that they have signed long term PPA with Tamil Nadu. CTU have considered that these requests for change of beneficiaries was in continuation of earlier granted LTA based on target region, therefore, CTU had included the same as part of agenda for determining the ATC between NEW Grid and SR Grid and for grant of LTA. CTU was of the view that the Regulation 12 deals about the fresh application for LTA, and the IPP upon grant of LTA (earlier with target region) becomes an LTA customer and Page 1 of 5

6 they are no more LTA applicant. Therefore this regulation is applicable till the processing of application i.e. prior to grant of LTA. Accordingly, the requests from aforesaid mentioned applicants were covered in the agenda circulated in September, 2013 for the meeting held on 3 rd October, Based on the decision arrived at meeting the aforesaid mentioned four IPPs were issued intimation letter for grant of LTA in December, However there is another provisio in the CERC Regulations (12) which states Provided also that in cases where there is any material change in location of the applicant or change by more than 100 MW in the quantum of power to be interchanged using the inter-state transmission system or change in the region from which electricity is to be procured or to which supplied, a fresh application shall be made, which shall be considered in accordance with these regulations. 6. CTU approached Hon ble CERC for clarification on requirement of new application in case of change of region from target to firm. Response from CERC is awaited. In the meantime fresh applications were also received from the above mentioned four (4) IPPs as well as from KSK Mahanadi. Subsequently, some of the stakeholders in meeting held on 28 th March, 2014 insisted that fresh application should be taken by CTU in case of change of region. 7. The applications received in the month of Nov, 2013 were made by four applicants viz. KSK Mahanadi Power Company Ltd. (KSK Mahanadi) 500 MW, Jindal Power Ltd. (Jindal Power) 400 MW, DB Power Ltd. (DB Power) 208 MW, BALCO 100 MW. Notably, Ind-Barath who had earlier notified CTU about signing of Long term PPA in August 2013 applied in the month of December, Based on the views of the stakeholders and considering that the priority among LTA applications, as per CERC regulation 10 of relative priority, is guided on the first-cum-first serve basis with the proviso that the applications received during a month shall be construed to have arrived concurrently. CTU had decided to consider month of LTA application as the criteria for giving priority with regard to grant of LTA, the same was also informed to constituents of SR, WR & concerned IPPs during the meeting held on At this juncture, while processing the case for granting LTA, it was found that though the application from M/s DB Power was received in the month of November, 2013, as per the CERC regulations the requisite application fee was submitted in the month of January, Accordingly the application of DB Power to be treated as an application filed in the month of January, Accordingly, for the month of November, 2013, M/s Jindal Power, M/s KSK Mahanadi, M/s BALCO are being considered for the grant of LTA against the present available ATC. Issue 2 : Grant of Part capacity of LTA. 9. During the consultation process, some of the stakeholders had opined that if the ATC available in the existing/planned system is not adequate to accommodate entire capacity of all the LTA applicants under consideration, then ATC cannot be allocated on pro-rata Page 2 of 5

7 basis. In such cases, they were of the opinion that LTA to such applicants should be granted associated with additional network augmentation which may take 3-4 years for completion. 10. The provisions of Regulations (specifically regulation 9 & 12) allows grant of LTA with or without system strengthening based on the likelihood of accommodating the power flows in the existing and under construction/planned transmission system. 11. Now the question is, can LTA be granted for part capacity if cumulative transfer of power envisaged by LTA applicants with equal priority is more than the available ATC. Under such situation, should all applications be denied LTA on available ATC or CTU should arbitrary choose few of these applications whose cumulative can be accommodated within available ATC. The spirit of the Electricity Act, 2003 is to accord nondiscriminatory approach in open access. Going by the same, CTU is of the view that for a given quantum of ATC, the LTA should be granted on pro-rata basis amongst the LTA applicants with equal priority. 12. The above issue was also referred to CERC for amendment in approved procedure so as to give clarity. On advice of CERC, the draft amendment was kept on CTU website inviting comments. The comments so obtained and CTUs views was submitted to CERC. Final decision on the same is awaited. 13. Given the fact that (i) the generation projects seeking LTA have achieved COD, (ii) the ATC is available for transfer of power which shall enhance progressively, (iii) the long term PPA has been signed between these IPPs and Tamil Nadu, therefore, nonfinalisation of LTA in absence of the CERC direction shall not be appropriate. Keeping in view the non-discriminatory approach in allocation of LTA and also CERC in their order dated have confirmed that there is no stay on processing of LTA application, CTU has decided to allocate the ATC to the eligible LTA applicants on pro-rata basis. Issue 3: Inter-se priority between LTA & MTOA when both of these are under process. 14. During the consultation process, it has been pointed out by KSEBLtd. that application for MTOA made by them in October, 2013 should be given more priority compared to LTA applications received in the month of November, It has been argued that as per the regulations, the LTA and MTOA queues are to be processed separately so MTOA queue of October, 2013 gets more priority than LTA queue of November, The regulations 7, 9, 10 and 25 deals with different aspects of LTA and MTOA. Following can be inferred from the regulations a. The spirit of the regulation on open access is that the LTA has priority over MTOA. b. Regulation 10 defines that two separate queues are to be maintained for medium term and long term applications based on first-cum-first-served basis. Thus, priority Page 3 of 5

8 of Long term applications within themselves and priority of medium term applications within themselves has been defined. c. As per the regulation, the processing period for the medium term access application is 40 days and that for Long term application is 120/180 days. Thus, there may be scenario when MTOA and LTA applications received in different months are under process simultaneously. d. If two applications, one for MTOA and another for LTA are under process simultaneously, even if received during different months, the question is whether the priority be accorded to the access that is intending to use the transmission system for one to three years or to the access which intends to use the transmission system for 12 to 25 years. Going by spirit of the regulation that LTA has priority over MTOA and at the same time, both are to be processed in different queues, it is prudent that as long as MTOA is under process and LTA request is received then the LTA should have priority as it gives more certainty to the grid operation and opportunity for network utilization over longer period. 16. The above issue was also referred to CERC for amendment in approved procedure so as to give clarity. On advice of CERC, the draft amendment was kept on CTU website inviting comments. The comments so obtained and CTUs views was submitted to CERC. Final decision on the same is awaited. 17. Subject to the outcome of the CERC decision, CTU is of the view that priority is accorded to LTA applicant over MTOA applicant when both of these are under process, even if the LTA application has been received one month later i.e. in the period when MTOA application is still under process. Issue 4 :Whether long term access can be provided on LILO of existing lines. 18. As per CERC regulations, CTU has to specify the inter-state transmission system that would be required to grant long term access based on the system studies. Though in some of the initial cases Long Term Access was provided on LILO of existing lines, care was taken to avoid similar LILO later on, particularly when large quantum of power and number of generating stations are involved. However when there was a mismatch in implementation of dedicated transmission system, interim arrangement through LILO of nearby lines was provided. 19. Generally LTA on LILO of existing lines is discouraged. However in certain cases LTA on LILO may have to be allowed as a special case after ascertaining that adequate margins are available in the system for allowing LTA, particularly when part quantum of power is to be given access. 20. In the present case, KSK Mahanadi Power Company Ltd. has commissioned 2 units of 600 MW each out of total 3600MW capacity. The generation developer has been granted LTA with dedicated transmission system comprising of 2 nos. of 400 kv quad D/c line (to be implemented by Generation developer) from their switchyard to Champa Pooling Page 4 of 5

9 station (being implemented by POWERGRID) considering the full capacity of the generation project. Commissioning of Champa s/s has been delayed due to issues in acquisition of land, change in location from the earlier identified site and contractual issues. Anticipating the delay in commissioning of Champa s/s, KSK was provided connectivity through 2 nos of LILO lines to two circuits of Raipur-Raigarh 400 kv line. Both these LILOs are in operation. In view of unavailability of Champa Pooling station, studies have been carried out to examine adequacy of transmission system for transfer of 900 MW of power(400 MW MTOA & 500 MW LTA) through the existing system wherein it has been seen that power upto 900 MW can be evacuated over 4 nos of 400 kv lines. These studies have been carried out considering the status of other IPPs in the vicinity and their status of LTA and MTOA. 21. Therefore CTU is of the view that LTA to KSK should be provided on LILO of 2 ckts of Raipur-Raigarh 400 kv line as a special case, particularly when KSK has declared COD of its generation project and also have long term PPA. The case of providing LTA on LILO arrangement shall not be considered as a precedence. However, KSK need to commission their dedicated line upto Champa pooling station matching with the commissioning schedule of Champa pooling station, otherwise the LTA granted to KSK would be discontinued x x x Page 5 of 5

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON 31.07.2013 1. INTRODUCTION 1.1 The 22 nd Meeting of the Commercial Sub-

More information

(Collective Transaction) Procedure for Scheduling

(Collective Transaction) Procedure for Scheduling Annexure-II Short-Term Open Access in Inter-State Transmission (Collective Transaction) Procedure for Scheduling [As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations,

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

No. 14/1/2016-Trans Government of India Ministry of Power. Office Memorandum

No. 14/1/2016-Trans Government of India Ministry of Power. Office Memorandum No. 14/1/2016-Trans Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi, dated s" December, 2016 Office Memorandum Subject: Guidelines on Cross Border Trade of Electricity At

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON 27.09.2012 1. INTRODUCTION 1.1 The 19 th meeting of Technical Coordination

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI 1 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO:.OF 2014 Petition under section 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the Central Electricity

More information

Procedure for Scheduling

Procedure for Scheduling Short-Term Open Access in Inter-State Transmission (Bilateral Transaction) Procedure for Scheduling (As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations, 2009

More information

TARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division)

TARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division) TARIFF ORDER True-up of FY 2014-15, FY 2015-16 and FY 2016-17, Annual Performance Review of FY 2017-18 and Approval of Aggregate Revenue Requirement (ARR) and determination of tariff for FY 2018-19 Petition

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI New Delhi, the 20 th of June 2013 NOTIFICATION (DRAFT) No.L-1/132/2013/CERC.- In exercise of the powers conferred under Section 178 of the Electricity

More information

Percentage (%) 9.05% 19.24% 20.66% 20.93% 21.87% N.A.

Percentage (%) 9.05% 19.24% 20.66% 20.93% 21.87% N.A. Name the Issuer POWER GRID CORPORATION OF INDIA LIMITED 1 Type issue (IPO/ FPO) FPO 2 Issue size (Rs crore) 7,442.34* *includes Offer for Sale Rs.3,713.94 Crore 3 Grade issue alongwith name the rating

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner Maharashtra Electricity Regulatory Commission intends to enact MERC (Forecasting, Scheduling and Deviation. Accordingly, the Hon ble Commission has circulated the draft of the proposedmerc

More information

C10. Request of TRN Energy Limited for change of Beneficiary

C10. Request of TRN Energy Limited for change of Beneficiary Minutes of 19 th Meeting of WR Constituents regarding Connectivity & Longterm Access applications in ISTS for Generation Projects in WR held on 05.09.2014 at NTPC Western Region Headquarters, Andheri (E),

More information

Captive Power Generation In India

Captive Power Generation In India Captive Power Generation In India Structure, Requirement, Important Judicial Decisions and Proposed Draft Amendment Matrugupta Mishra & Hemant Singh, Partners Praxis Counsel Advocates and Solicitors New

More information

Procedure for Scheduling

Procedure for Scheduling Short-Term Open Access in Inter-State Transmission (Collective Transaction) Procedure for Scheduling (As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent(amendment) Regulations, 2009

More information

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

1.1 These regulations shall extend to whole of the State of Punjab.

1.1 These regulations shall extend to whole of the State of Punjab. THE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION The, 2018 No.PSERC/Secy/Regu. - In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other

More information

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA ETERNITY LEGAL 1207, Dalamal Tower, Free Press Journal Road, Nariman Point, Mumbai 400021 Tel: +91 22 6747 9001 Email: legalupdates@eternitylegal.com

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : /

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : / CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi 110 001 : 011-23353503/23752958 Public Notice No. : L-1/94/CERC/2011 Dated: 26 th June, 2015

More information

Rajasthan Electricity Regulatory Commission

Rajasthan Electricity Regulatory Commission Rajasthan Electricity Regulatory Commission Vidyut Viniyamak Bhawan, Near State Motor Garage, Sahkar Marg, JAIPUR -302001 Phone: EPBX 0141-2741299, Fax: 0141-2741018 Website: www.rerc.rajasthan.gov.in

More information

Advance Ruling treating EPC contracts for construction of solar power plants as works contract

Advance Ruling treating EPC contracts for construction of solar power plants as works contract Advance Ruling treating EPC contracts for construction of solar power plants as works contract Executive Summary This tax alert summarises a recent advance ruling of the Maharashtra Bench of the Authority

More information

Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission Øekad 62] jk;iqj]] 'kqøokj] fnukad 4 ekpz 2011 & QkYxqu 13] 'kd 1932 Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated March 04, 2011 No. 36/CSERC/2011

More information

Bhopal, Dated:

Bhopal, Dated: Bhopal, Dated: 08.12.2015 No. /MPERC /2015 - In exercise of powers conferred under sub-section zp of Section 181 of the Electricity Act, 2003 (36 of 2003), and all other powers enabling it in this behalf,

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order:

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order: Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 27.11.2015 IN THE MATTER OF: AND IN THE MATTER OF M/s Lalitpur Power Generation

More information

TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16

TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16 1 TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16 TSPCC on behalf of TSDISCOMs (TSSPDCL & TSNPDCL) intends to purchase 2000 MW power for the

More information

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 S No. Existing provision/ Draft amended proposed Modified proposed

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 and all powers enabling it in this behalf, the Uttar Pradesh Electricity

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

Case No. 125 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member

Case No. 125 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

Procedure for. Sharing of Inter-State Transmission System Losses. In compliance of

Procedure for. Sharing of Inter-State Transmission System Losses. In compliance of Procedure for Sharing of Inter-State Transmission System Losses In compliance of Central Electricity Regulatory Commission (Sharing of inter-state Transmission Charges and Losses) Regulations, 2010 June,

More information

IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI. Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018

IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI. Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018 IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018 Jharkhand Bijli Vitran Nigam Limited...... Petitioner CORAM: HON BLE MR. (DR)

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 51 of 2017 Date of Order:16.03.2018 Present: Ms. Kusumjit Sidhu, Chairperson Sh. S.S. Sarna, Member

More information

Exposure Draft SECRETARIAL STANDARD DIVIDEND

Exposure Draft SECRETARIAL STANDARD DIVIDEND Exposure Draft SECRETARIAL STANDARD ON DIVIDEND The following is the text of the Secretarial Standard-3 (SS-3) on Dividend, issued by the Council of the Institute of Company Secretaries of India. Adherence

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005 GUJARAT ELECTRICITY REGULATORY COMMISSION OPEN ACCESS REGULATION Notification No. 13 of 2005 In exercise of the powers conferred on it by Section 181 read with Sections 39(2)(d), 40(c), 42 (2)(3)(4), 86(1)(c)

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 1 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 IN THE MATTER OF: Petition under Section 86 read with Section 181 of the Electricity Act, 2003 for amendment of

More information

Green Day Ahead Market (Petition no. 187/MP/2016) CERC Hearing I December 1, 2016

Green Day Ahead Market (Petition no. 187/MP/2016) CERC Hearing I December 1, 2016 Green Day Ahead Market (Petition no. 187/MP/2016) CERC Hearing I December 1, 2016 Brief Introduction IEX since last 8 years has been successfully operating markets in: Day Ahead Market (DAM) [based on

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre No. 1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E mail: mercindia@merc.gov.in Website:

More information

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website: www.mercindia.org.in;

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting regarding issues pertaining to Tamil Nadu

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting regarding issues pertaining to Tamil Nadu SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Record Notes of the Meeting regarding issues pertaining to Tamil Nadu A Meeting on issues pertaining to Tamil Nadu was held on 25 th TANTRANSCO, Chennai. The

More information

Exhibit 1 Hawaiian Electric Companies Development of the Proposed Final Variable RFPs

Exhibit 1 Hawaiian Electric Companies Development of the Proposed Final Variable RFPs Exhibit 1 Hawaiian Electric Companies Development of the Proposed Final Variable RFPs The Hawaiian Electric Companies 1 process for developing their draft request for proposals ( RFP ) for Firm Capacity

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the 30 th Meeting of Commercial Sub Committee of SRPC held at Bengaluru on 4 th February 2016 1. Introduction The 30 th Meeting of Commercial Sub-Committee

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION No. UPERC/Secy/Regulation/10-787 Lucknow : Dated, 17 th August, 2010 In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity

More information

Press Meet August 2, 2013 Mumbai

Press Meet August 2, 2013 Mumbai POWER GRID CORPORATION OF INDIA LIMITED Press Meet August 2, 2013 Mumbai Disclaimer By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be bound

More information

TENDER SPECIFICATION. Procurement of Emergency Power for Vedanta Limited, Jharsuguda

TENDER SPECIFICATION. Procurement of Emergency Power for Vedanta Limited, Jharsuguda TENDER SPECIFICATION For Procurement of Emergency Power for Vedanta Limited, Jharsuguda This Document Contains: 1. NIT 2. General Terms and Conditions 3. BIDDERS COMPANY DATA (Annexure-A) 4. PERFORMA FOR

More information

RfS & Rs with compare to other states, there is no such charge

RfS & Rs with compare to other states, there is no such charge Replies to Queries of 1000 MW Solar Power Tender discussed during Pre-Bid Meeting on 19.12.2018 Sl. No. Clause No. Existing Clause Bidders' Query MSEDCL's Reply 1 Bid information sheet 2 Clause 1.2.2 of

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM RP 6/2017 In the matter of : Review petition filed by M/s Kanan Devan Hill Plantations Company Private Limited (KDHPCL) seeking review

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

CONSUMER GRIEVANCE REDRESSAL FORUM KOLHAPUR

CONSUMER GRIEVANCE REDRESSAL FORUM KOLHAPUR CONSUMER GRIEVANCE REDRESSAL FORUM KOLHAPUR Phones : 0231-2666001 & Kolhapur Zone, 2666002 Vidyut Bhavan, 2 nd floor, Fax No. 0231-2666001 Tarabai Park, Kolhapur 416 003. e-mail-cgrfkolhapur@mahadiscom.in

More information

Tariff based bidding process for transmission: The first Indian experience

Tariff based bidding process for transmission: The first Indian experience Tariff based bidding process for transmission: The first Indian experience Ajay Talegaonkar and Ravinder Abstract There is policy shift towards private investment in the electricity supply industry. In

More information

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

CHAPTER I: PRELIMINARY Short title, commencement and interpretation Notification dated 20.2.2009 Bhopal: dated 31 st January, 2009 No. 254-MPERC-2009. In exercise of the powers conferred by Section 181 read with Subsection (b) of Section 86 of the Electricity Act 2003

More information

POWER GRID CORPORATION OF INDIA LIMITED

POWER GRID CORPORATION OF INDIA LIMITED POWER GRID CORPORATION OF INDIA LIMITED Analysts Meet October 24, 2013 Mumbai Disclaimer By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be

More information

CASE NO. 55 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. M/s Shah Promoters and Developers

CASE NO. 55 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. M/s Shah Promoters and Developers Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Case No. 30 of In the matter of Petition filed by MSETCL for approval of SLDC Budget for FY and FY

Case No. 30 of In the matter of Petition filed by MSETCL for approval of SLDC Budget for FY and FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

SS-3 SECRETARIAL STANDARD ON DIVIDEND

SS-3 SECRETARIAL STANDARD ON DIVIDEND SS-3 SECRETARIAL STANDARD ON DIVIDEND November, 2017 Price : Rs. 50/- (Exluding postage) Issued by : THE INSTITUTE OF COMPANY SECRETARIES OF INDIA ICSI House, 22, Institutional Area, Lodi Road, New Delhi

More information

JSW Energy Limited Acquisition of 1,000 MW Tamnar Power Plant

JSW Energy Limited Acquisition of 1,000 MW Tamnar Power Plant JSW Energy Limited Acquisition of 1,000 MW Tamnar Power Plant May 04, 2016 Agenda Acquisition Rationale Target Overview Acquisition Overview 2 Acquisition Rationale for JSWEL Enhances Operational Capacity

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017 GUJARAT ELECTRICITY REGULATORY COMMISSION -------- No. ---/---/---/GERC Dated: 13/01/2017 NOTIFICATION No. of 2017 In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 (36

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna 800 021 In the matter of: Case No.:- 27/2016 Signing of fresh PPA on reduced Tariff for 5 MW Solar Power Plant of M/s Sri

More information

POWER PURCHASE AGREEMENT

POWER PURCHASE AGREEMENT POWER PURCHASE AGREEMENT 1 Sl. Clarifications Sought No. 1 Section-3 information and Instructions to Bidders, Para C, Section 2: Guidelines for Selection of Solar PV Projects Para 2.5 C:, It is amply clear

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: ) HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 16 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta,

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 ELECTRICITY ACT, 2003 No. MERC/Legal/2017/1771 - In exercise of

More information

TENDER SPECIFICATION

TENDER SPECIFICATION TENDER SPECIFICATION For Procurement of RTC Power by Vedanta Limited, Jharsuguda This Document Contains: 1. NIT 2. General Terms and Conditions 3. BIDDERS COMPANY DATA (Annexure-A) 4. PERFORMA FOR PRICE

More information

Order Under Section 29A of the National Housing Bank Act, 1987 in respect of M/s Kerala Housing Finance Limited

Order Under Section 29A of the National Housing Bank Act, 1987 in respect of M/s Kerala Housing Finance Limited 1. Background Order Under Section 29A of the National Housing Bank Act, 1987 in respect of M/s Kerala Housing Finance Limited Kerala Housing Finance Limited, a company having its registered office at II

More information

GMR Chhattisgarh Energy Limited

GMR Chhattisgarh Energy Limited Sr. GMR Chhattisgarh Energy Limited 1 RfS - Bid Informati on Sheet 2 RfS - 1.2.2 Ceiling tariff of Rs. 2.82/kWh 1.2.2: The Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to

More information

Case No. 62 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member

Case No. 62 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal (M.P.) - 462 016 Petition No. 62 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok

More information

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 34 / IN RE THE TARIFF PETITION OF WEST BENGAL

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 34 / IN RE THE TARIFF PETITION OF WEST BENGAL TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO: TP 34 / 07-08 IN RE THE TARIFF PETITION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED UNDER SECTION 64(3)(a)

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Implementation of Solar Based Projects in MP Dated 20 July, 2012

Implementation of Solar Based Projects in MP Dated 20 July, 2012 86 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects GOVERNMENT OF MADHYA PRADESH Implementation of Solar Based Projects in MP Dated 20 July, 2012 1. Title

More information

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No.

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

CASE No. 28 of Dr Pramod Deo, Chairman Shri A. Velayutham, Member ORDER

CASE No. 28 of Dr Pramod Deo, Chairman Shri A. Velayutham, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005. Tel. 22163964 / 22163965, Fax No. 22163976 E-mail mercindia@mercindia.com

More information

GOVERNMENT OF MADHYA PRADESH

GOVERNMENT OF MADHYA PRADESH 206 Compendium of State Government Policies on Renewable Energy Sector in India GOVERNMENT OF MADHYA PRADESH Wind Power Project Policy of Madhya Pradesh, 2012 (As Amended on 21 st February 2013) 1. Order

More information

BEFORE THE HON BLE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA-2

BEFORE THE HON BLE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA-2 BEFORE THE HO BLE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSIO, SHIMLA-2 M.A.o. in the Petition o: 140/2013 I THE MATTER OF: Revised Aggregate Revenue Requirement (ARR) for the 3 rd Control Period

More information

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************ ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR - 751 012 ************ Present: Shri S. P. Nanda Chairperson Shri B. K. Misra, Member Shri S. P. Swain, Member Case

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member No. L-1/44/2010-CERC Date of Order: 29.6.2013 In the matter of: Determination of Point

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Proposal of Government of Maharashtra Consultant s detailed note on Power Purchase Rate etc. of Small Hydro Power Projects Abbreviations BEST BOT CERC CPP

More information

ALSTOM T&D India Quarter ended September 2012 Results. 15 th November, 2012

ALSTOM T&D India Quarter ended September 2012 Results. 15 th November, 2012 ALSTOM T&D India Quarter ended September 2012 Results 15 th November, 2012 Disclaimer Forward-looking statements This document contains forward-looking statements and information. These statements include

More information

TRANSMISSION LICENCE NO. 2 OF 2009 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 2 OF 2009 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

NATIONAL ALUMINIUM CO. LIMITED POLICY ON RELATED PARTY TRANSACTIONS

NATIONAL ALUMINIUM CO. LIMITED POLICY ON RELATED PARTY TRANSACTIONS NATIONAL ALUMINIUM CO. LIMITED POLICY ON RELATED PARTY TRANSACTIONS 1. PREAMBLE The Companies Act, 2013 ( Act ) and Equity Listing Agreement have stipulated various conditions to be fulfilled in case of

More information

Procedure for Handling of Specie Dividend Transaction through CDS

Procedure for Handling of Specie Dividend Transaction through CDS Procedure for Specie Dividend Procedure for Handling of Specie Dividend Transaction through CDS The procedure covers the requirement of chapter 8G of the CDC Regulations which deals in distribution of

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

KSK Power Ventur PLC - KSK Audited Results for the year ended 31 March 2015 Released 07:00 21-Jul-2015

KSK Power Ventur PLC - KSK Audited Results for the year ended 31 March 2015 Released 07:00 21-Jul-2015 Regulatory Story Go to market news section KSK Power Ventur PLC - KSK Audited Results for the year ended 31 March 2015 Released 07:00 21-Jul-2015 RNS Number : 5803T KSK Power Ventur PLC 21 July 2015 KSK

More information

Regulation of the Stock Exchange of Thailand Re: Listing, Disclosure of Information and Delisting of Derivative Warrants B.E.

Regulation of the Stock Exchange of Thailand Re: Listing, Disclosure of Information and Delisting of Derivative Warrants B.E. (Bor.Jor./Ror 38-00) (UNOFFICIAL TRANSLATION) Readers should be aware that only the original Thai text has legal force and that this English translation is strictly for reference. The Stock Exchange of

More information

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012 ( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification

More information

CIRCULAR. CFD/DIL3/CIR/2017/21 March 10, All Listed Entities who have listed their equity and convertibles All the Recognized Stock Exchanges

CIRCULAR. CFD/DIL3/CIR/2017/21 March 10, All Listed Entities who have listed their equity and convertibles All the Recognized Stock Exchanges CIRCULAR CFD/DIL3/CIR/2017/21 March 10, 2017 All Listed Entities who have listed their equity and convertibles All the Recognized Stock Exchanges Dear Sir/Madam, Sub: Schemes of Arrangement by Listed Entities

More information

NOTICE INVITING TENDER FOR SHORT TERM PURCHASE OF ENERGY TENDER SPECIFICATION NO. PPR 02/2014

NOTICE INVITING TENDER FOR SHORT TERM PURCHASE OF ENERGY TENDER SPECIFICATION NO. PPR 02/2014 Specn: PPR-02/2014 Office of CHIEF ENGINEER / PP&R D-3, Shakti Vihar, PSPCL, PATIALA -147001 TEL. NO 0175-2300534, FAX NO 0175-2308698 / 2200872 e-mail: ce-ppr@pspcl.in, se-pr-ppr@pspcl.in NOTICE INVITING

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-20/2010 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD Vol I Request for Qualification for Tariff Based Bidding Process for Procurement of Power on Lo

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD Vol I Request for Qualification for Tariff Based Bidding Process for Procurement of Power on Lo MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD Vol I Request for Qualification for Tariff Based Bidding Process for Procurement of Power on Long-Term Basis from Power Stations where Location and

More information

GUIDANCE NOTE ON THE DUTY CAST ON THE AUDITORS

GUIDANCE NOTE ON THE DUTY CAST ON THE AUDITORS 9 GUIDANCE NOTE ON THE DUTY CAST ON THE AUDITORS UNDER SECTION 45-MA OF THE RESERVE BANK OF INDIA ACT, 1934 1. The Reserve Bank of India (Amendment) Act, 1974 has inserted a new Section 45-MA in the Reserve

More information

figtandoni CORPORATION POWER GRID OF INDIA LIMITED C/COS/Listing/NSE/ Dt:

figtandoni CORPORATION POWER GRID OF INDIA LIMITED C/COS/Listing/NSE/ Dt: - POWER GRID CORPORATION OF INDIA LIMITED e at (A Government of India Enterprise) 2131?: W mm: 'mm' refit: Ti. 2, film 29, genie 122 001, (ERIIIIIII)agxnm: 0124-2571700-719, 13w: 0124-2571762, 'Saudamini'

More information

CODE OF CONDUCT FOR TRADING BY INSIDERS (Pursuant to Securities Exchange Board of India, (Prohibition of Insider Trading) Regulations, 2015)

CODE OF CONDUCT FOR TRADING BY INSIDERS (Pursuant to Securities Exchange Board of India, (Prohibition of Insider Trading) Regulations, 2015) CODE OF CONDUCT FOR TRADING BY INSIDERS (Pursuant to Securities Exchange Board of India, (Prohibition of Insider Trading) Regulations, 2015) OBJECTIVE OF THE CODE This Code of Conduct ( Code ) is intended

More information

The South African Grid Code. Transmission Tariff Code. Version 9.0

The South African Grid Code. Transmission Tariff Code. Version 9.0 The South African Grid Code Transmission Tariff Code Version 9.0 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

Jawaharlal Nehru National Solar Mission

Jawaharlal Nehru National Solar Mission JNNSM: Guidelines for Selection of New Grid Connected Solar Power Projects (Phase 1, Batch 2) The present set of guidelines is applicable to the Second Batch of the photovoltaic projects to be selected

More information

Draft Consultative Paper on. Captive Generating Plants

Draft Consultative Paper on. Captive Generating Plants Draft Consultative Paper on Captive Generating Plants 1.0 Preamble Tamil Nadu Electricity Regulatory Commission Consultative Paper on Captive Generating Plants 1.1 Generating Capacity in Tamil Nadu The

More information