1 Securing Options Through Strategic Development of North Seas Grid Infrastructure Simon Skillings and Jonathan Gaventa July 2014

2 About E3G E3G is an independent, non-profit European organisation operating in the public interest to accelerate the global transition to sustainable development. E3G builds cross-sectoral coalitions to achieve carefully defined outcomes, chosen for their capacity to leverage change. E3G works closely with like-minded partners in government, politics, business, civil society, science, the media, public interest foundations and elsewhere. More information is available at E3G (Third Generation Environmentalism) Imperial College London About E3G 47 Great Guildford Street, London SE1 0ES Tel: +44 (0) Fax: +44 (0) South Kensington Campus, London SW7 2AZ Tel: 44 (0) Fax: +44 (0) www3.imperial.ac.uk E3G 2014 This work is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 2.0 License. You are free to: Copy, distribute, display, and perform the work. Make derivative works. Under the following conditions: You must attribute the work in the manner specified by the author or licensor. You may not use this work for commercial purposes. If you alter, transform, or build upon this work, you may distribute the resulting work only under a license identical to this one. For any reuse or distribution, you must make clear to others the license terms of this work. Any of these conditions can be waived if you get permission from the copyright holder. Your fair use and other rights are in no way affected by the above.

3 Acknowledgments The authors are grateful for the generous support of the Children s Investment Fund Foundation, the Oak Foundation and the European Climate Foundation. In addition the authors wish to thank Duncan Stone, Markus Steigenberger and Antina Sander who served as external reviewers. We note that the reviewers do not necessarily endorse the report findings and are not responsible for any factual errors or inaccuracies. The report also benefited greatly from the research efforts of Luca Bergamaschi and Taylor Dimsdale. This summary and list of recommendations is based on the technical analysis conducted by our partners at Imperial College London and detailed in Strategic Development of North Sea Grid Infrastructure to Facilitate Least-Cost Decarbonisation. The full technical report can be accessed at: 3 Acknowledgments

4 Summary The North Seas contain vast and largely untapped renewable energy resources. The extent to which these resources are ultimately exploited remains a matter of great uncertainty. However, important decisions on network infrastructure development in the North Seas will need to be taken before these uncertainties are fully resolved. The current nationally-focused, and largely incremental, approach to planning the offshore electricity network risks foreclosing the option for high levels of offshore wind deployment over the coming decades. Summary 4 E3G and Imperial College London have explored the risks and opportunities associated with designing the North Seas electricity grid using leading-edge computer modelling. This analysis has demonstrated the significant advantages of taking a more strategic and co-ordinated approach to network planning in the North Seas region. In particular, new approaches to network design can ensure that the costs associated with creating the option for significant levels of renewables deployment will be far less than the costs of reducing short term investment costs and restricting future options. The modelling suggests: > Judicious use of anticipatory investments can keep offshore wind options open at relatively low cost with the worst case economic regret restricted to around 1 billion even if significant volumes of offshore wind fail to materialise. > Moving to a regional strategic approach to grid planning with full resource sharing could save billion in the period to 2040, compared to the current incremental member-state approach. A proactive approach that co-optimises offshore wind locations with grid planning could increase these benefits to billion. > Even the most basic approach to strategic grid design, involving the clustering of offshore wind parks into offshore hubs, would still save 8-40 billion to 2040, depending on levels of offshore wind deployment. This is an opportunity that demands the attention of Energy Ministries of the North Seas countries. The existing fragmented landscape of national policies and regulatory approaches and the current loose level of coordination are not well suited to capturing the full scale of the potential benefits. North Seas countries should, therefore, establish a joint ministerial level body charged with defining political direction, targets and objectives for the exploitation of energy resources in the North Seas. It is also important to establish a new institution with strategic network design oversight. This body would need to establish the future scenarios that will enable TSOs to plan grid development in the North Seas during the 2020s and be charged with giving particular attention to minimising the cost associated with retaining the option of high levels of offshore wind deployment.

5 Rationale Energy policy aims to deliver multiple objectives in an uncertain and evolving world and to avoid policy failure whereby one policy objective must be sacrificed in order to deliver the remaining objectives. Policy must therefore be viewed as an exercise in managing unforeseen risks and this requires that optimism bias is avoided and emphasis is placed on securing a range of options. The extent of future deployment of offshore renewable resources in the North Seas is an issue of both great significance and great uncertainty. We have applied leading edge modelling techniques to explore whether the current approach to the design of the offshore grid network represents good policy or whether alternative approaches are more appropriate given the potential importance of offshore resources. 5 Rationale

6 Context North Seas resources There is a huge potential resource of low carbon electricity in the North Seas. Estimates point to a potential overall deployment of offshore wind in Europe of up to 150 GW by 2030 and 460 GW by , with the majority of this potential in the North Seas region. For comparison, the European Commission estimates that total European power generation capacity from all sources will reach 1138 GW in 2030 and 1382 GW by However, the extent to which this is ultimately required to help meet Europe s energy needs is not yet known. Future deployment of offshore wind will depend on how the costs of offshore resources (primarily wind) compare to onshore low carbon resources and the extent to which these two alternatives are amenable to exploitation 2. Context 6 A key element of the cost of offshore resources is associated with the network infrastructure required to transport the energy produced to centres of demand. However, decisions on volume and location of offshore wind are unlikely to be made with sufficient lead time to enable an optimal grid to be designed. Network planning must therefore be done against a background of uncertainty. There is currently a large project pipeline for both offshore wind and interconnection: 124 far offshore wind farms (further than 50km from shore) with 70 GW of capacity are under different stages of development 3, and a total of 421 potential project sites representing a maximum of 204 GW of capacity have been identified 4. However both the timing and overall eventual level of realisation of these projects remains uncertain, both as a result of significant political and regulatory risks and as a reflection of the early-stage nature of many of the projects. 1 EWEA (2013) Deep Water: The next step for offshore wind energy 2 This is complicated by the fact that the cost trajectory is likely to be influenced by levels of deployment. (see Crown Estate [2013] Offshore Wind Cost Reduction: Pathways Study) 3 E3G/Baringa (2013) North Seas Grid: Project Pipeline Analysis 4 Imperial College analysis.

7 Figure 1: Projects in the North Seas Grid Pipeline Source: Baringa Partners LLP List of interconnection projects: 1. Skagerrak 4 (DK-NO) 2. ElecLink (FR-GB) 3. Nemo Link (BE-GB) 4. Cobra (DK-NL) 5. Nord Link, NordGer (DE-NO) 6. IFA2 (FR-GB) 7. FABLink (FR-GB) 8. North Sea Network (GB-NO) 9. NorthConnect (GB-NO) 10. DK GB project 11. FR IE project 12. NorNed2 (NL-NO) 13. EW1 (GB-IE) 14. Energy Bridge (GB-IE) 15. ISLES (GB-IE) 16. Kriegers Flak (DK-DE) In addition to grid investments for offshore wind connection, a number of point-to-point interconnections are being planned in the North Seas (see Figure 1). A total of 13 bilateral interconnectors are currently under development, representing approximately 10 GW (with 2 projects not yet having declared capacity) 5. Countries in the region differ in terms of current levels of interconnection, with interconnection capacity representing less than 5% of installed production capacity in the UK and Ireland, but over 30% of production capacity in Denmark. The likely increase in interconnection in the region is driven by the cost efficiencies enabled by cross-border trading, and by the increasing need for system flexibility resulting from the expected increase in variable wind and solar generation. However, with a few exceptions, interconnection development is considered as an entirely separate exercise from the connection of offshore wind assets. Combined solutions (or multi-purpose projects) that incorporate both offshore wind and interconnection remain relatively rare, due to the additional challenges of combining infrastructure types, working across differing regulatory and policy regimes and overcoming potential inconsistencies such as that between priority dispatch for renewables and open access to interconnection capacity. There are currently 3 combined solution projects in the pipeline (up to 19 GW of capacity), and a further two renewables trading projects. Context 7 5 E3G/Baringa project pipeline analysis

8 Regulatory and institutional context Development of offshore resources in the North Seas region remains a primarily national responsibility, with no agreed objectives for the region as a whole, and considerable differences between different national regulatory regimes and support structures. In most countries, moreover, offshore grid investments occur on an incremental rather than strategic basis. Context 8 For the foreseeable future, development of offshore wind will depend on financial support mechanisms. Currently, individual member states seek to attract developers of offshore projects through offering additional revenue support according to national targets (which are generally derivative of the overarching 2020 EU renewables target), and support mechanisms are generally only open to generation physically located within a country s geographical boundaries. While the design of the EU 2020 renewables target does allow countries to engage in cross-border renewables trading, progress in negotiating bilateral agreements (e.g. between Ireland and the UK) has been slow. Future prospects for renewables trading within a new EU-level renewables target for 2030 are not yet clear. Offshore grid design and development regimes vary considerably between countries. Most existing wind farms are connected directly to shore rather than via offshore hubs, and there are no examples of offshore wind connections currently operating that are combined with interconnection. In most countries, TSOs are responsible for developing offshore transmission, while generators are responsible for financing grid connection 6. The UK where over half of current offshore wind capacity is located is a notable exception to this. The UK regulator appoints an offshore transmission operator through a competitive tender process, and the offshore transmission assets are typically neither owned nor operated by the TSO. In each of these countries the offshore grid development regime is predominantly national. There are efforts in some jurisdictions to move towards more planned approaches to offshore wind connection. Belgian TSO Elia is in the planning stages of developing an offshore hub to connect future wind farms which will also enable future interconnection links to connect to the offshore hub. In Germany, an offshore grid development plan has been produced to define offshore wind clusters and route corridors for offshore wind transmission and interconnection 7. In the UK by contrast the key design decisions are largely within the remit of the individual project developers 8. Although the regulator in the UK will assess the economics of the connection assets on the basis of overall system efficiency (including onshore reinforcement and potential for offshore to offshore connections) and this However, the potential for moving to a more strategic design approach has been under consideration for some time, including in the ITPR process.

9 does in principle give the opportunity for a more strategic approach, in practice it has operated as an incremental approach with limited potential for separate projects to share connection assets. System operation is managed by TSOs, with balancing happening on a national basis. Countries across North Western Europe have embarked on a market coupling aimed at aligning price formation for day-ahead power markets and establishing a common basis for allocation of interconnector capacity. The implementation of the Internal Energy Market has included moves to increase the co-ordination of network planning by national TSOs through the requirement on ENTSO-E to produce Ten Year Development Plans for the EU transmission network. However, nationally-fragmented policy regimes and differences in asset classification 9 means that to date a truly strategic development plan for a North Seas offshore grid has not been produced. A number of collaboration initiatives are underway in the North Seas region aimed at creating greater alignment between national regimes. These include: > the Northern European Energy Dialogue, a ministerial-level political forum discussion of shared energy challenges > the North Seas Countries Offshore Grid Initiative (NSCOGI), a 10-country multilateral initiative which has conducted in depth studies on design options and regulatory barriers. NSCOGI brings together governments, regulators and TSOs, but lacks decision-making powers > the North Seas Regional Group, which assesses infrastructure Projects of Common Interest that may be eligible for European financial support > the Pentalateral Forum, set up to promote collaboration on market coupling and cross-border electricity exchange. Despite this range of collaboration initiatives, the regulatory and institutional landscape remains fragmented between countries, with no shared objectives on the volume of offshore resources to be developed and currently no clear means for aligning decision-making on regulatory approaches. 9 For example, offshore transmission in German territorial waters is included in the TYNDP, while offshore transmission in UK waters is not. Context 9

10 Key findings of analysis The analysis has explored the potential benefits of a more strategic approach to network design along with varying levels of market integration amongst countries surrounding the North Seas. Both of these aspects have been considered in light of significant uncertainty over the extent of the deployment of offshore wind generators in the coming decades. This uncertainty has been represented by the adoption of four scenarios covering a wide range of potential deployment levels (Figure 2). Figure 2: Scenario tree capturing possible paths of future offshore wind deployment in the North Seas. Key findings of analysis 10 Strategic approaches The context section above illustrates that power networks are currently designed in response to largely known future requirements from network users on both the supply and demand side of the market. It is possible to replace what is essentially a reactive and incremental approach with varying levels of proactivity - anticipating, or even prescribing, the needs of future network users. At a basic level, this could involve the development of connection corridors to offshore hub locations providing the potential for many offshore projects to effectively share connection assets (see Figure 3). This involves predictions of the potential number and capacity of wind-farms that will be built in any particular vicinity and has the potential to avoid significant duplication of costs. However, this approach risks over-investment and stranded network assets if sufficient offshore projects do not materialise.

11 Figure 3: Schematic of grid design options Source: North Seas Countries Offshore Grid Initiative The risk of over-investment can be managed by designing the grid by exploring a range of potential future scenarios. For example, it is possible to optimise the network design such that the level of system redundancy in the worst case scenario is minimised. This so-called minimising the maximum regret or min-max approach effectively retains the option of pursuing a wide range of future offshore wind deployment scenarios at least additional cost to consumers. It may result in the development of assets that would not be required under any single scenario optimisation but which create the option to pursue a range of alternatives at least cost. Central to these strategic approaches to grid design is the requirement for some form of central network planning function that is capable of identifying future scenarios, the policy choices available and the cost of retaining flexibility in future policy positions. Indeed, it is possible for such a planning authority to go beyond simply planning the network and to co-optimise the location of generation resources along with grid development. Our results show that even the most basic approach to strategic grid design, involving the creation of connection hubs, has the potential to save 8bn in the period out to 2040 and this may extend to several 10bns in high deployment scenarios (see Figure 4). Key findings of analysis 11

12 Figure 4: Savings in operation and network investment costs of a hub network when compared to the optimal Radial solution (with and without the adoption of significant demand side management). Key findings of analysis 12 * In Figure 4, S1 = Scenario 1, S2 = Scenario 2, etc. Scenario 1 is the highest wind future, Scenario 4 is the lowest wind future. We have also explored the extent of system redundancy in the circumstances that the outturn level of offshore wind deployment differs from expectation. This analysis suggests that the economic regret associated with over-building the grid in expectation of high levels of deployment is much lower than the regret associated with under-building the grid on the basis of overly conservative deployment expectations. Also, we have demonstrated how network assets that would not be built under any single scenario optimisation are required in the situation where the network is designed to minimise the worst case economic regret (see Figure 5).

13 Figure 5: Optimal network design under high wind deployment scenario (top left) and low wind deployment scenario (top right) compared with min-max network (bottom). Additional connections that do not appear in either of the optimal designs are shown in red. NO1 NO NO2 SE NO2 SE DK1 UK DK UK IR DE2 DE1 NL UK DE BE DE4 7 FR DK1 UK UK IR DE2 NL UK DE BE FR NO SE 1610 NO DE DK DE1 Key findings of analysis 31 IR UK UK UK FR Finally, we have demonstrated that additional savings of approximately 5bn (depending on the scenario) might be achievable in the circumstances in which the central planning function can also prescribe the location of new offshore wind-farms. However, such savings are likely to be greatest in the circumstances in which the optimisation covers a wide geographical area leading to material differences in offshore wind resource potential (see Figure 6 below) NL BE DE3 900 DE2 620 DK DE DK DE1 13

14 Market integration The EU has been pursuing an agenda of market integration for many years and has agreed three legislative packages in pursuit of this objective. Despite this effort, member state markets operate as largely independent and loosely coupled systems with relatively little sharing of resources. The European Commission has recently published data 10 to show that Member States surrounding the North Seas do not rely on electricity produced elsewhere to meet a significant proportion of domestic demand (net annual energy transfers typically lie in the range of 5-15%). This includes the production of renewable electricity where Member States prefer to deliver targets purely through domestically produced renewable energy. This reality is often termed energy neutrality. Key findings of analysis 14 Numerous studies have shown that full market integration and sharing of resources amongst Member States can deliver significant cost savings 11. Our study has explored the benefit of pursuing strategic grid design on a collective regional basis around the North Seas (see Figure 3 for schematic representation). This analysis shows that at least 8bn of additional costs can be saved purely by planning the network on a regional level particularly by connecting offshore assets between jurisdictions to replace separate bespoke interconnection and to avoid onshore grid reinforcement. Indeed, public acceptance obstacles to building the onshore grid reinforcements necessary to accommodate offshore wind generation may be a significant constraining factor on offshore wind deployment and minimising this requirement is therefore extremely important. The overall cost savings associated with regional strategic approaches to grid planning and full sharing of resources can be extremely significant. Our analysis shows that between 25bn and 75bn can be saved in the period out to 2040 compared to the current incremental Member State approach depending on the level of offshore wind deployment. The majority of the savings arise through the ability to operate conventional assets more efficiently, thereby avoiding significant operational costs. Figure 6 shows the level of savings achievable using regional strategic approaches to grid planning and full sharing of resources. 10 European Commission (2014) Commission Staff Working Document: In-depth study of European Energy Security. 11 See Booz & Company et al (2013) Benefits of an Integrated Energy Market; and European Climate Foundation et al (2011) Power Perspectives 2030

15 Figure 6: Savings in operation and network investment costs of different grid design options when compared to the optimal Radial solution. Key findings of analysis * In Figure 6 the categories on the x-axis represent the various policy choices. INT (EN) = Integrated Energy Neutral. INT (FI) = Fully Integrated. INT (FI) PRO = Fully Integrated Proactive. See the Annex for detailed descriptions. The strategic and integrated planning and operation of the grid network around the North Seas not only delivers significant savings but allows the option to deploy significant volumes of offshore wind generation to be retained at relatively low cost. Figure 7 shows the cost of system redundancy for networks optimally designed to deliver each scenario but where either the highest deployment scenario (scenario 1), or the lowest deployment scenario (scenario 4), actually arise. This is compared with a network optimised to minimise the worst case cost of system redundancy. This analysis shows that a suitably designed network can limit the worst case cost of retaining the option to deploy significant volumes of offshore wind to around 1bn during the period even in the circumstances that significant volumes of offshore wind ultimately fail to materialise. It also demonstrates that the highest regret is experienced in scenario 4, where the network is designed with an expectation of low levels of wind, but significant volumes of wind materialise. In practise, network planners would be expected to repeat this analysis periodically on the basis of scenarios that include updated assumptions for key future uncertainties. 15

16 Figure 7: Min-max Regret Analysis Fully Integrated grid design option Key findings of analysis 16 However, the integration of regional planning and operations requires major changes in system governance and a shared responsibility amongst Member States to deliver energy policy objectives. For example, it involves full trading of renewable energy and this would be easiest to achieve if accompanied by joint targets for delivery of renewables and a sharing of the support costs across all consumers. Similarly, there would be a need for highly co-ordinated grid planning and a common position on future scenarios and the policy choices available. This might ultimately require the creation of an organisation similar to the regional independent system operators seen in other jurisdictions.

17 Recommendations The strategic and integrated planning and operation of the North Seas grid region presents the opportunity to robustly deliver policy objectives at a vastly reduced cost compared to the current incremental and Member State centric approaches. The extent of these potential savings is too large to be ignored and it must be a high priority for energy ministries around the North Seas to consider how these benefits can be realised. New approaches for strategic grid planning can be developed within Member State jurisdictions. However, if the introduction of such approaches is not co-ordinated then it is possible that this could delay, or even prevent, delivery of the larger benefits associated with integrated planning and market operation. It is, therefore, vital that Member States ensure that sufficient consistency exists between the various approaches adopted such that the move towards fully co-ordinated regional network planning is not delayed. The potential benefits of both strategic investment and of resource sharing will not be realised under current arrangements. The North Seas countries should, therefore, establish a joint ministerial level body charged with defining political direction, targets and objectives for the exploitation of energy resources in the North Seas. This could be a new regional institution or a development of the existing NSCOGI forum with an enhanced mandate. Importantly, it should have a specific requirement to set out a North Seas development strategy, including both offshore grid and interconnection aspects. This should include targets and objectives for the exploitation of resources in the North Seas that are clearly linked to the EU level 2030 climate and energy process and associated governance mechanisms. It will also need to include a process for driving the necessary convergence in policy and regulatory design. For example, it will be necessary to develop common approaches for accessing offshore renewables support schemes and mechanisms for allocating the associated costs. An important early task for the strategic ministerial level body would be to establish a new institution with strategic network design oversight. This body would need to establish the future scenarios that will enable TSOs to plan grid development in the North Seas during the 2020s with particular attention to minimising the cost associated with retaining the option of high levels of offshore wind deployment. This strategic network design function could be undertaken by a new co-operative of regional regulatory authorities or be part of an expanded role for ACER, but it should be independent of transmission and generation ownership interests. It would, in any case, be necessary to create a new regional regulatory function to evaluate and approve investment plans developed by TSOs. Recommendations 17

18 This reform agenda builds largely on the existing institutional structure (see Figure 8). However, there are already several aspects of electricity system design that are subject to centralised planning decisions, including measures to deliver a particular energy mix and overall resource adequacy. It appears sensible to co-locate the delivery of these system objectives and the strategic network design responsibility within a single organisation. Moreover, the efficient operation of fully integrated markets suggests extremely close working between the system operator functions of the national TSOs and it would seem logical to create a single regional system operator (ISO) independent of transmission ownership and asset management (see Figure 8). The formation of a regional ISO creates a natural home for the strategic planning functions associated with the power system and the joint ministerial level body should consider the merits of such an approach. Figure 8: High level schematic of current and potential future institutional design Recommendations 18 Current high level Institutional structure MS Governments individually set targets for RES and resource adequacy Potential future high level Institutional structure North Seas MS Governments collectively set targets for RES, resource adequacy and future policy scenarios for offshore resource deployment MS regulators individually set framework for network regulation and approve TSO plans TSOs develop network plans (and may have other policy delivery responsibilities) North Seas MS regulators collectively approve TO plans North Seas ISO delivers policy including strategic grid design TOs develop network plans in response to strategic grid design

19 Way forward It is important that Member State governments with a direct interest in the exploitation of North Seas renewable energy resources review and refresh their approach to developing this resource in line with emerging agreements relating to the EU climate and energy package for This report sets out the evidence on the importance of the issue and the need for a more co-ordinated and strategic approach. The changes required are significant and will not happen immediately. It is, therefore, essential that Member State governments begin to consider the issues and options as a matter of urgency. Annex: Description of Policy Choices Approach Radial Hub Integrated Energy Neutral Fully Integrated Fully Integrated Proactive Key Characteristics > Incremental connection of offshore wind projects to shore. > Offshore-to-offshore connections not considered. > Member states are net energy neutral and self secure. > Strategic connection of offshore wind clusters to shore. > Offshore-to-offshore connections not considered. > Member states are net energy neutral and self secure. > Offshore-to-offshore connections considered. > Member states are net energy neutral and self secure. > Offshore-to-offshore connections considered. > Unconstrained cross-border electricity trade. > EU wide security. > Offshore-to-offshore connections considered. > Co-optimization of network and generation investment. > Unconstrained cross-border electricity trade. > EU wide security. Way forward and Annex 19

20

The North Seas Countries Offshore Grid Initiative

The North Seas Countries Offshore Grid Initiative The North Seas Countries Offshore Grid Initiative NSCOGI 2013/2014 progress report August 2014 1 Objectives of the North Seas Countries Offshore Grid Initiative In December 2012, Ministers of the North

More information

Offshore transmission investments How to regulate these investments? Who should act?

Offshore transmission investments How to regulate these investments? Who should act? Offshore transmission investments How to regulate these investments? Who should act? North Seas Countries Offshore Grid Initiative (NSCOGI) Copenhagen, 18-19 April 2012 Leonardo Meeus (Florence School

More information

The North Seas Countries Offshore Grid Initiative

The North Seas Countries Offshore Grid Initiative The North Seas Countries Offshore Grid Initiative Deliverable 1 - final report This report identifies areas where the incompatibility of national market and regulatory regimes acts as a barrier to coordinated

More information

Brexit and electricity interconnectors. Jason Mann

Brexit and electricity interconnectors. Jason Mann Brexit and electricity interconnectors Jason Mann 12 May 2018 Expansion of UK interconnection capacity driven by strong fundamentals and benign policies - but complicated by Brexit Mounting political pressures

More information

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan October 2012 1 Copyright This report has been prepared by Redpoint

More information

Vision. A A a. Possible offshore development Phase 1 Phase 2 Phase januar

Vision. A A a. Possible offshore development Phase 1 Phase 2 Phase januar Offshore grid developments 20 jan. 2011 Kjartan Hauglum, Statnettt tt Phase 1 Phase 2 Phase 3 A A a Vision Possible offshore development 2020-2040 24. januar 2011 2 Statnetts mission towards 2030 -To build

More information

The voice of the energy industry. Brexit & the future EU-UK energy relationship

The voice of the energy industry. Brexit & the future EU-UK energy relationship The voice of the energy industry Brexit & the future EU-UK energy relationship February 2018 Executive Summary Energy UK was pleased to see the negotiations on the UK s departure from the European Union

More information

Elia Group FY2016 results. At the heart of the European Electricity grid

Elia Group FY2016 results. At the heart of the European Electricity grid Elia Group FY2016 results At the heart of the European Electricity grid Disclaimer - This presentation provides information about Elia and its activities and is provided for general information purposes

More information

Draft Outline of the 2016 Work Programme

Draft Outline of the 2016 Work Programme Draft Outline of the 2016 Work Programme This document presents an outline of the tasks that the Agency plans to perform in 2016. As such, it focuses primarily on the external deliverables the Agency expects

More information

European transmission tariff structures Cambridge Economic Policy Associates

European transmission tariff structures Cambridge Economic Policy Associates European transmission tariff structures Cambridge Economic Policy Associates 24 March 2015 Cambridge Economic Policy Associates (CEPA) We are an economic and financial policy consulting business Our energy

More information

The development of offshore wind - The case of Denmark

The development of offshore wind - The case of Denmark 9 February 2017 The development of offshore wind - The case of Denmark Camilla Holbech, Deputy Manager Danish Wind Industry Association Zooming in on the Danish wind industry More than 30,000 employees

More information

A Contestable Approach to Financing Critical Interconnection Across Europe at the Scale and Pace Needed

A Contestable Approach to Financing Critical Interconnection Across Europe at the Scale and Pace Needed A Contestable Approach to Financing Critical Interconnection Across Europe Summary Phil Baker September 2015 A robust and secure transmission network, with strong interconnection between Member States,

More information

North Seas Energy Clusters

North Seas Energy Clusters North Seas Energy Clusters Scoping paper INTRODUCTION The Political Declaration on energy cooperation between North Seas Countries, signed on 6 June 2016, set up a three-year work programme, based on voluntary

More information

Publishing date: 07/07/2017 Document title: Consolidated Report on the progress of electricity and gas Projects of Common Interest for the year 2016

Publishing date: 07/07/2017 Document title: Consolidated Report on the progress of electricity and gas Projects of Common Interest for the year 2016 Publishing date: 07/07/2017 Document title: Consolidated Report on the progress of electricity and gas Projects of Common Interest for the year 2016 We appreciate your feedback Please click on the icon

More information

BETTER EUROPEAN STAKEHOLDER WORKSHOP. Results from the EC project RES Support Schemes and Cooperation Mechanisms in Europe

BETTER EUROPEAN STAKEHOLDER WORKSHOP. Results from the EC project RES Support Schemes and Cooperation Mechanisms in Europe BETTER EUROPEAN STAKEHOLDER WORKSHOP Results from the EC project RES Support Schemes and Cooperation Mechanisms in Europe Malte Gephart 08/10/2014 Content Project overview Current status of Cooperation

More information

Ireland s. Offshore Wind Resource. An Export Opportunity. Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012

Ireland s. Offshore Wind Resource. An Export Opportunity. Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012 Ireland s Offshore Wind Resource An Export Opportunity Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012 1 Ireland s Offshore Opportunity Ireland has a number of opportunities

More information

CONNECTION OF OFFSHORE WIND ONSHORE -- Some Food for Thought to Aid the Discussion at the Post-Conference Workshop

CONNECTION OF OFFSHORE WIND ONSHORE -- Some Food for Thought to Aid the Discussion at the Post-Conference Workshop Deeper Water Offshore Wind Conference by GIC CONNECTION OF OFFSHORE WIND ONSHORE -- Some Food for Thought to Aid the Discussion at the Post-Conference Workshop Dr Chuan Zhang The Crown Estate, UK London,

More information

EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules

EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules Version 1.0 ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation

More information

Realising the benefits of European market integration

Realising the benefits of European market integration 1 EUROPEAN MARKET INTEGRATION THE REGULATORY ASSISTANCE PROJECT (RAP) MAY 2018 Realising the benefits of European market integration Philip Baker, Michael Hogan, and Christos Kolokathis Enhanced market

More information

Paving the way to a a meshed offshore grid Recommendations for an efficient policy and regulatory framework

Paving the way to a a meshed offshore grid Recommendations for an efficient policy and regulatory framework Downloaded from orbit.dtu.dk on: Apr 04, 2019 Paving the way to a a meshed offshore grid Recommendations for an efficient policy and regulatory framework Bergaentzlé, Claire; Hoffrichter, Albert; Isojärvi,

More information

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University.

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University. Review of Support Mechanisms and Policy Options for Offshore Wind Prepared by the Center for Wind Energy at James Madison University August 2012 Denmark Denmark s long-term target is to achieve complete

More information

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal Explanatory Document to all TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

Multistage grid investments incorporating uncertainty in Offshore wind deployment

Multistage grid investments incorporating uncertainty in Offshore wind deployment Multistage grid investments incorporating uncertainty in Offshore wind deployment Presentation by: Harald G. Svendsen Joint work with: Martin Kristiansen, Magnus Korpås, and Stein-Erik Fleten Content Transmission

More information

Implementation of the Political Declaration on energy cooperation between the North Seas Countries

Implementation of the Political Declaration on energy cooperation between the North Seas Countries Implementation of the Political Declaration on energy cooperation between the North Seas Countries Support Group 3 on support framework and finance for offshore wind projects Work Programme 1. Work areas

More information

Elia Group FY2017. At the interest of society

Elia Group FY2017. At the interest of society Elia Group FY2017 At the interest of society 2 Elia Group FY 2017 Chris Peeters Chief Executive Officer Disclaimer You must read the following before continuing. This presentation is only provided for

More information

Proposed methodology for the assessment of candidate projects for the 3rd PCI list. Electricity transmission and storage projects

Proposed methodology for the assessment of candidate projects for the 3rd PCI list. Electricity transmission and storage projects Proposed methodology for the assessment of candidate projects for the 3rd PCI list Electricity transmission and storage projects 1 INTRODUCTION This document describes a methodology of evaluating benefits,

More information

Offshore Grid Development in Germany

Offshore Grid Development in Germany Offshore Grid Development in Germany Hamburg, 26 September 2017 Lukas Wienholt Federal Maritime and Hydrographic Agency Content of Presentation I. Current status of offshore wind energy in the German North

More information

Draft Outline of the 2019 Work Programme

Draft Outline of the 2019 Work Programme Draft Outline of the 2019 Work Programme This document presents an outline of the tasks the Agency plans to perform in 2019. As such, it focuses primarily on the external deliverables the Agency expects

More information

Alan Duggan Department of Communications, Energy and Natural Resources By

Alan Duggan Department of Communications, Energy and Natural Resources By Alan Duggan Department of Communications, Energy and Natural Resources By e-mail Friday, 22 November 2013 Enterprise House, Kerry Technology Park, Listowel Road, Tralee, Co. Kerry TEL + 353 66 7129144

More information

User Commitment for Generator Focused Anticipatory Investment (GFAI)

User Commitment for Generator Focused Anticipatory Investment (GFAI) All Industry Parties Patrick Hynes Electricity Charging & Capacity Development Manager patrick.hynes@nationalgrid.com Direct tel.: 01926 656319 22 nd May 2015 Dear Colleagues, User Commitment for Generator

More information

CRITIQUE THE OFFSHORE WIND INDUSTRY, IRELAND S OPPORTUNITY BRIAN BRITTON, NOW IRELAND MAY 2017

CRITIQUE THE OFFSHORE WIND INDUSTRY, IRELAND S OPPORTUNITY BRIAN BRITTON, NOW IRELAND MAY 2017 CRITIQUE THE OFFSHORE WIND INDUSTRY, IRELAND S OPPORTUNITY BRIAN BRITTON, NOW IRELAND MAY 2017 Slide Index Slide 2: Ireland s Problem - Offshore Wind the Solution Slide 3: Energy is now Centre Stage -

More information

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation Annex I Capacity Allocation and Congestion Management in accordance with Article 73 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Congestion income distribution

More information

Security of Supply. Walter Boltz. 8 th EU/US Roundtable. CEER Vice President, Gas Working Group Chair October 2010, Berlin

Security of Supply. Walter Boltz. 8 th EU/US Roundtable. CEER Vice President, Gas Working Group Chair October 2010, Berlin Security of Supply Walter Boltz CEER Vice President, Gas Working Group Chair 8 th EU/US Roundtable 25-27 October 2010, Berlin Agenda Framework for Investment Planning and Security of Supply in the European

More information

PUBLIC CONSULTATION Improving offshore safety in Europe

PUBLIC CONSULTATION Improving offshore safety in Europe PUBLIC CONSULTATION Improving offshore safety in Europe Waters off EU shores are in parts intensively exploited for the production of oil and gas. In 2009, oil production in the EU and Norway amounted

More information

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON ALL TSO s PROPOSAL FOR CONGESTION INCOME DISTRIBUTION METHODOLOGY 24.01.2017 I. Introduction and legal context

More information

CORPI Klaipeda University;

CORPI Klaipeda University; Stakeholder Workshop on Offshore Energy and MSP in the Baltic Sea 12-13 November 2013, Hotel Meridien Vilnius, Lithuania Hosted by Federal Maritime and Hydrographic Agency (BSH) Author of the report: Bettina

More information

RESEARCH ON THE EFFECTS OF A CARBON PRICE FLOOR

RESEARCH ON THE EFFECTS OF A CARBON PRICE FLOOR RESEARCH ON THE EFFECTS OF A CARBON PRICE FLOOR A report for Energie-Nederland 9 July 218 Frontier Economics Ltd is a member of the Frontier Economics network, which consists of two separate companies

More information

State aid and State interventions in the energy market meeting 12 April 2013

State aid and State interventions in the energy market meeting 12 April 2013 State aid and State interventions in the energy market meeting 12 April 2013 DG Bartlomiej Gurba 8 March 2013 Completing internal market for electricity and gas 2009 Third Package + implementing provisions

More information

The UK s New Trade Remedies Regime

The UK s New Trade Remedies Regime Brexit Law your business, the EU and the way ahead The UK s New Trade Remedies Regime Overview September 2018 One aspect of the UK s departure from the European Union (Brexit) that has been somewhat overshadowed

More information

INVESTING IN THE FUTURE: HOW THE UK CAN REPLACE EU FUNDING FOR LOW CARBON INFRASTRUCTURE

INVESTING IN THE FUTURE: HOW THE UK CAN REPLACE EU FUNDING FOR LOW CARBON INFRASTRUCTURE BRIEFING PAPER August 2018 INVESTING IN THE FUTURE: HOW THE UK CAN REPLACE EU FUNDING FOR LOW CARBON INFRASTRUCTURE PETER CLUTTON-BROCK, JOSEPH DUTTON Given the comparatively high ratio of capital expenditure

More information

regulation Policy Brief 26 November 2014

regulation Policy Brief 26 November 2014 Fostering Electricity transmission investments to achieve Europe s energy goals: Towards a future-looking regulation Policy Brief 26 November 2014 Executive Summary A strong and secure transmission network

More information

P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System

P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System Stage 03: Assessment Report What stage is this document in the process? Addition of Offshore Transmission System and OTSUA to the definition of the Total System Amend the BSC definition of Total System

More information

18 April 2016 Draft for consultation

18 April 2016 Draft for consultation All TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity

More information

A Scottish Hydro Electric Transmission plc project co-funded by the European Union under the European Energy Programme for Recovery (EEPR)

A Scottish Hydro Electric Transmission plc project co-funded by the European Union under the European Energy Programme for Recovery (EEPR) Offshore HVDC Hub project (2009 2012) A Scottish Hydro Electric Transmission plc project co-funded by the European Union under the European Energy Programme for Recovery (EEPR) Scottish Hydro Electric

More information

First Offshore Windfarm Project in India (FOWPI) with EU-backing

First Offshore Windfarm Project in India (FOWPI) with EU-backing First Offshore Windfarm Project in India (FOWPI) with EU-backing Presentation at FOWPI Metocean Workshop 2 June 2017 Per Vølund, COWI 1 The Project is funded by The European Union Agenda 1. Offshore Wind

More information

Pathways towards a 100% renewable electricity system

Pathways towards a 100% renewable electricity system Climate Policy Initiative Berlin February 17th, 2011 Pathways towards a 100% renewable electricity system Reform Grid Regulation Michael Weber Sachverständigenrat für Umweltfragen, Berlin 1 Special Report

More information

INVESTING IN LONG-TERM EUROPE:

INVESTING IN LONG-TERM EUROPE: INVESTING IN LONG-TERM EUROPE: RE-LAUNCHING FIXED, NETWORK AND SOCIAL INFRASTRUCTURE Conference Organized In Association With The Italian EU Presidency ROMA, 12 Dicembre 2014 Italian Energy Price Evolution

More information

UK s Offshore Transmission Regime:

UK s Offshore Transmission Regime: UK s Offshore Transmission Regime: A case study for financing a low carbon future Stephanie McGregor Director Offshore Transmission June 2011 Today s presentation 1. Big picture 2. The OFTO 3. Making the

More information

Wind Mills of the Mind Delivering large scale offshore wind. Andy Kinsella CEO, Offshore September 3rd, 2012, Ballina

Wind Mills of the Mind Delivering large scale offshore wind. Andy Kinsella CEO, Offshore September 3rd, 2012, Ballina Wind Mills of the Mind Delivering large scale offshore wind Andy Kinsella CEO, Offshore September 3rd, 2012, Ballina Mountains of the Mind Delivering large-scale offshore wind energy The mountains one

More information

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline

More information

QUEENSLAND GOVERNMENT RELEASES STATE INFRASTRUCTURE PLAN

QUEENSLAND GOVERNMENT RELEASES STATE INFRASTRUCTURE PLAN QUEENSLAND GOVERNMENT RELEASES STATE INFRASTRUCTURE PLAN After a three-year hiatus, the 2016 State Infrastructure Plan (SIP) is welcomed by the Infrastructure Association of Queensland (IAQ) as an enabler

More information

MEMBER STATE COOPERATION ON RENEWABLE ENERGY. Member State meeting 5 November 2014, Brussels Case study: Offshore wind in the North Sea

MEMBER STATE COOPERATION ON RENEWABLE ENERGY. Member State meeting 5 November 2014, Brussels Case study: Offshore wind in the North Sea MEMBER STATE COOPERATION ON RENEWABLE ENERGY Member State meeting 5 November 2014, Brussels Case study: Offshore wind in the North Sea Lena Kitzing, Henrik Klinge Jacobsen 5/11/2014 Content General introduction

More information

Publishing date: 31/05/2017. We appreciate your feedback. Share this document

Publishing date: 31/05/2017. We appreciate your feedback. Share this document Publishing date: 31/05/2017 Document title: ACER Position on Potential Improvements to the EIP We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about

More information

CYPRUS ENERGY REGULATORY AUTHORITY

CYPRUS ENERGY REGULATORY AUTHORITY CYPRUS ENERGY REGULATORY AUTHORITY METHODOLOGY AND CRITERIA FOR THE EVALUATION OF INVESTMENTS IN ELECTRICITY AND GAS INFRASTRUCTURE PROJECTS (ARTICLE 13(6) OF REGULATION (EU) No. 347/2013) 2015 WWW. C

More information

Long-term Finance: Enabling environments and policy frameworks related to climate finance

Long-term Finance: Enabling environments and policy frameworks related to climate finance Long-term Finance: Enabling environments and policy frameworks related to climate finance 10 th June, 2013, Bonn, Germany Amal-Lee Amin E3G Third Generation Environmentalism Recap of 2012 LTF Work Programme

More information

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Regulatory Framework & Incentives for Infrastructure Development Sergio Ascari VIS Consultants Gas Advisor, Florence School

More information

The Road to the I-SEM

The Road to the I-SEM The Road to the I-SEM 1 Agenda Development of power markets in Ireland and Northern Ireland Development of power markets across Europe Market coupling explained The road to the I-SEM The elements of the

More information

ALLIANZ MULTINATIONAL YOUR WORLD IS OUR BUSINESS

ALLIANZ MULTINATIONAL YOUR WORLD IS OUR BUSINESS ALLIANZ MULTINATIONAL YOUR WORLD IS OUR BUSINESS ALLIANZ MULTINATIONAL YOUR WORLD IS OUR BUSINESS ABOUT ALLIANZ MULTINATIONAL In a world where business and trade opportunities are constantly evolving,

More information

Cross border participation in the capacity mechanism. Sharing the spoils...

Cross border participation in the capacity mechanism. Sharing the spoils... Cross border participation in the capacity mechanism Sharing the spoils... 5 June 2015 First GB capacity auction led to payments of 1billion for c50gw of capacity Outcome of first CM auction Main recipient

More information

European Coordinator

European Coordinator European Coordinator Connection to offshore wind power in Northern Europe (North Sea Baltic Sea) European Parliament - ITRE meeting Brussels, 13 th January 2011 Mr. Georg Wilhelm Adamowitsch Former State

More information

Comments on the Commission s Public Consultation on Institutional Investors and Asset Managers Duties Regarding Sustainability

Comments on the Commission s Public Consultation on Institutional Investors and Asset Managers Duties Regarding Sustainability Comments on the Commission s Public Consultation on Institutional Investors and Asset Managers Duties Regarding Sustainability German Insurance Association ID-Number 6437280268-55 Gesamtverband der Deutschen

More information

XBID Information Package Published February 2018 Updated December 2018

XBID Information Package Published February 2018 Updated December 2018 XBID Information Package Published February 2018 Updated December 2018 1. Purpose of this document This document centralises, consolidates and comprehensively describes the necessary information which

More information

COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT. Accompanying the document. Proposal for a Regulation of the European Parliament and the Council

COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT. Accompanying the document. Proposal for a Regulation of the European Parliament and the Council EUROPEAN COMMISSION Brussels, 30.11.2016 SWD(2016) 394 final COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT Accompanying the document Proposal for a of the European Parliament and the Council on the

More information

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704 EUROPEA U IO THE EUROPEA PARLIAMT THE COU CIL Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 ER 173 CODEC 704 LEGISLATIVE ACTS A D OTHER I STRUMTS Subject: REGULATION OF THE EUROPEAN PARLIAMENT

More information

Submission by EDPR to The Scottish Parliament Devolution. (Further Powers Committee) on The Crown Estate and Offshore Wind

Submission by EDPR to The Scottish Parliament Devolution. (Further Powers Committee) on The Crown Estate and Offshore Wind Submission by EDPR to The Scottish Parliament Devolution (Further Powers Committee) on The Crown Estate and Offshore Wind 1. About EDP Renewables With headquarters in Madrid, EDPR s business consists of

More information

ENTSO-E recommendations for Market Design Trilogue negotiations

ENTSO-E recommendations for Market Design Trilogue negotiations ENTSO-E recommendations for Market Design Trilogue negotiations ENTSO-E congratulates the Bulgarian Presidency, the European Parliament and the European Commission on the successful conclusion of the first

More information

IWEA ANNUAL CONFERENCE 2012 ACTIONS TO ACCELERATE IRELAND S ENERGY FUTURE BRIAN BRITTON, GENERAL SECRETARY, NOW IRELAND

IWEA ANNUAL CONFERENCE 2012 ACTIONS TO ACCELERATE IRELAND S ENERGY FUTURE BRIAN BRITTON, GENERAL SECRETARY, NOW IRELAND IWEA ANNUAL CONFERENCE 2012 ACTIONS TO ACCELERATE IRELAND S ENERGY FUTURE Introduction BRIAN BRITTON, GENERAL SECRETARY, NOW IRELAND OFFSHORE WIND IRELAND S EXPORT OPPORTUNITY These are exciting times

More information

SUMMARY OF RESULTS PUBLIC CONSULTATION ON FINANCIAL AND INSURANCE

SUMMARY OF RESULTS PUBLIC CONSULTATION ON FINANCIAL AND INSURANCE EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Indirect Taxation and Tax administration VAT and other turnover taxes SUMMARY OF RESULTS PUBLIC CONSULTATION ON FINANCIAL AND INSURANCE

More information

How can Rathbones help universities and colleges navigate the fossil fuel divestment debate?

How can Rathbones help universities and colleges navigate the fossil fuel divestment debate? How can Rathbones help universities and colleges navigate the fossil fuel divestment debate? 1 The clear and present danger of climate change means we cannot burn our way to prosperity. We already rely

More information

Tax Strategy. March 2019.

Tax Strategy. March 2019. . March 2019. National Grid March 2019 The 2016 Finance Act introduced a requirement for large businesses to publish their tax strategy. National Grid made our first publication in March 2018 in accordance

More information

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E TSOs perspective of the CACM requirements Athanasios Troupakis Market Advisor ENTSO-E Energy Community Secretariat Energy Community Secretariat Table of contents 1. Introductory remarks 2. Elements of

More information

Agenda Item 8: National Infrastructure Commission and Budget Update

Agenda Item 8: National Infrastructure Commission and Budget Update Strategic Transport Forum 15 th December 2017 englandseconomicheartland@b uckscc.gov.uk Agenda Item 8: National Infrastructure Commission and Budget Update Recommendation: It is recommended that the Forum:

More information

S&D POSITION PAPER SUMMARY ON EUROPE 2020 STRATEGY A REVIEW FOR SUCCESS

S&D POSITION PAPER SUMMARY ON EUROPE 2020 STRATEGY A REVIEW FOR SUCCESS POSITION PAPER - SUMMARY S&D POSITION PAPER SUMMARY ON EUROPE 2020 STRATEGY A REVIEW FOR SUCCESS OUT OF THE CRISIS - A BETTER ECONOMIC MODEL FOR EUROPE Financing a better Europe Date: 16 March 2016 European

More information

The impact of Brexit on the UK energy sector

The impact of Brexit on the UK energy sector 1 The impact of Brexit on the UK energy sector An assessment of the risks and opportunities for electricity and gas in the UK 29 March 2016 2 1 Summary In the hotly contested Brexit debate, one thing is

More information

Financing a Global Deal on Climate

Financing a Global Deal on Climate Financing a Global Deal on Climate U n i t e d Na t i o n s En v i r o n m e n t Pr o g r a m m e Change A Green Paper produced by the Climate Change Working Group Executive Summary June 2009 Next steps

More information

PROPOSAL FOR AMENDMENTS

PROPOSAL FOR AMENDMENTS CEEP.2015 Orig. EN March 2015 PROPOSAL FOR AMENDMENTS Regulation on the European Fund for Strategic Investments (COM(2015) 10 final) EUROPEAN CENTER FOR EMPLOYERS AND ENTREPRISES PROVIDING PUBLIC SERVICES

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE EUROPEAN COUNCIL, THE COUNCIL AND THE EUROPEAN INVESTMENT BANK

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE EUROPEAN COUNCIL, THE COUNCIL AND THE EUROPEAN INVESTMENT BANK EUROPEAN COMMISSION Brussels, 12.9.2018 COM(2018) 644 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE EUROPEAN COUNCIL, THE COUNCIL AND THE EUROPEAN INVESTMENT BANK Towards a more

More information

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report)

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report) Ref. Ares(2016)5406779-16/09/2016 «FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh (*For details on the recommendations please refer to the main report) Recommendations Response of Commission

More information

The role of electricity demand reduction in managing Levy Control Framework costs

The role of electricity demand reduction in managing Levy Control Framework costs BRIEFING PAPER, October 2013 The role of electricity demand reduction in managing Levy Control Framework costs Simon Skillings, Senior Associate, E3G 1 > There is a risk that offshore wind projects will

More information

Electricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014

Electricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Electricity market in the Baltic Sea area today Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe for,

More information

Conclusions of the European Council discussions on energy infrastructure issues

Conclusions of the European Council discussions on energy infrastructure issues Conclusions of the European Council discussions on energy infrastructure issues Slovenia Overall support for the regulation as this will allow to tackle the known problems regarding infrastructure The

More information

2017/18 Full Year Results Debt Investor Update 17 May Bring Energy to Life

2017/18 Full Year Results Debt Investor Update 17 May Bring Energy to Life 2017/18 Full Year Results Debt Investor Update 17 May 2018 Bring Energy to Life Cautionary statement This presentation contains certain statements that are neither reported financial results nor other

More information

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling Michael Schaefer Project Manager, Amprion System Operation Diploma in Information Science & Advanced Postgraduate

More information

Paying for Investment: Perspectives of an energy infrastructure investor

Paying for Investment: Perspectives of an energy infrastructure investor Paying for Investment: Perspectives of an energy infrastructure investor Mathew Rose British Institute of Energy Economics. St John s College Oxford. 20 September 2012 Cautionary statement This presentation

More information

Work package 2. Analysis of national MSP Instruments. Planning for Offshore RES in the North Sea Regional Workshop. Brussels, 16 March 2011

Work package 2. Analysis of national MSP Instruments. Planning for Offshore RES in the North Sea Regional Workshop. Brussels, 16 March 2011 Planning for Offshore RES in the North Sea Regional Workshop Brussels, 16 March 2011 Work package 2 Analysis of national MSP Instruments Andreas Wagner Stiftung OFFSHORE-WINDENERGIE German Offshore Wind

More information

NordREG Activities 2008

NordREG Activities 2008 NordREG Activities 2008 NordREG Activities 2008 NordREG c/o Norwegian Water Resources and Energy Directorate P.O. Box 5091, Majorstua N-0301 Oslo Norway Telephone: +47 22 95 95 95 Telefax: +47 22 95 90

More information

Organisation strategy for Sweden s cooperation with the Green Climate Fund for

Organisation strategy for Sweden s cooperation with the Green Climate Fund for Organisation strategy for Sweden s cooperation with the Green Climate Fund for 2016 2018 Appendix to Government Decision 22 June 2016 (UD2016/11355/GA) Organisation strategy for Sweden s cooperation with

More information

Promotion of New Gas Infrastructure Projects Including Elaboration of Criteria to Define Projects of Mutual Interest Between Russia and EU

Promotion of New Gas Infrastructure Projects Including Elaboration of Criteria to Define Projects of Mutual Interest Between Russia and EU Promotion of New Gas Infrastructure Projects Including Elaboration of Criteria to Define Projects of Mutual Interest Between Russia and EU New Gas Infrastructure Projects of Mutual Interest: Key Problems

More information

The barriers to renewable energy project investment in Wales

The barriers to renewable energy project investment in Wales Response to recommendations presented in the Institute of Welsh Affairs Re-energising Wales report Funding Renewable Energy Projects in Wales The barriers to renewable energy project investment in Wales

More information

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance with Article 57 of the Commission Regulation (EU) 2015/1222

More information

Regional Flow-based allocations. State-of-play

Regional Flow-based allocations. State-of-play Page 1 of 15 Regional Flow-based allocations State-of-play March 2007 ETSO Final paper Page 2 of 15 Contents 1. Introduction... 3 2. Flow-based allocations... 3 3. Status of flow-based allocations... 6

More information

Where does the money come from? Financing challenges for a Meshed Offshore Grid

Where does the money come from? Financing challenges for a Meshed Offshore Grid Where does the money come from? Financing challenges for a Meshed Offshore Grid Presentation at Baltic InteGrid Seminar, 15-05-2018, Bremerhaven Alexandra Armeni, Deutsche WindGuard Contents 1. The principle

More information

How EU Cohesion Policy is helping to tackle the challenges of CLIMATE CHANGE and ENERGY SECURITY

How EU Cohesion Policy is helping to tackle the challenges of CLIMATE CHANGE and ENERGY SECURITY September 2014 How EU Cohesion Policy is helping to tackle the challenges of CLIMATE CHANGE and ENERGY SECURITY A paper by the European Commission s Directorate-General for Regional and Urban Policy Regional

More information

September 2014 Pagham Neighbourhood Plan

September 2014 Pagham Neighbourhood Plan September 2014 Pagham Neighbourhood Plan 2014-2029 Basic Conditions Statement Published by Pagham Parish Council for Consultation under the Neighbourhood Planning (General) Regulations 2012. 1 Pagham Neighbourhood

More information

Brexit: potential impacts on energy markets and regulation

Brexit: potential impacts on energy markets and regulation Brexit: potential impacts on energy markets and regulation November 2016 Overview This briefing note reviews the possible impacts of the UK s Brexit vote on energy regulation in the UK, in two scenarios:

More information

POWER cluster The Northern European competence network for offshore wind energy

POWER cluster The Northern European competence network for offshore wind energy POWER cluster competence network Martin Schmidt, windcomm schleswig-holstein POWER cluster Agenda 1. Partner Consortium 2. Project Aims 3. Contents & Innovation 4. Offshore wind energy in Germany POWER

More information

Cooperation under the RES Directive

Cooperation under the RES Directive Cooperation under the RES Directive Case study on a joint project: An offshore wind park in the North Sea (cooperation between the Netherlands, Belgium, UK, and Luxembourg) Cooperation under the RES Directive

More information

Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy

Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy 1. ABOUT THE SACN The South African Cities Network (SACN) as established in 2002, is a network of the nine

More information

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES ACER DECISION OF THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 04/2018 of24 April 2012 ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL

More information

Draft. COMMISSION REGULATION (EU) No /

Draft. COMMISSION REGULATION (EU) No / EN EN EN EUROPEAN COMMISSION Brussels, C(2010) XXX final Draft COMMISSION REGULATION (EU) No / of on laying down guidelines relating to the inter-transmission system operator compensation mechanism and

More information