1 Price-based Offers > $1,000/MWh Susan Kenney Sr. Consultant, Real-time Market Ops Market Implementation Committee July 11, 2018

2 Brief History of Energy Market Offer Caps Pre-Feb 2014: All offers capped at $1,000 Jan 2015 Mar 2015 Offers able to be submitted <= $1,800/MWh EL April 12, 2018 Order 831 Effective Cost-based and pricebased offers above $1000 subject to ex-ante validation Feb 2014 Mar 2014 Offers able to be submitted > $1,000/MWh ER Dec 2015* Cost-based offer able to be submitted <= $2,000/MWh Price-based Offers less than or equal to costbased offer, but no more than $2,000/MWh ER *Solution resulted from extensive Cap Review Senior Task Force discussion 2

3 Incongruous Governing Documents Operating Agreement permits price-based offers to exceed $1,000/MWh as long as they are less than or equal to a verified cost-based offer Price-based offers permitted to rise to cost-based offers as part of December 2015 filing Manual 11 caps price-based offers at $1,000/MWh Directly conflicts with OA language above Contradictory language introduced with 831 revisions 3

4 Short-term Approach: Align Manual 11 with Tariff/OA provisions Path Forward Provide ability for price-based offers to exceed $1,000/MWh but be capped at cost-based offer PJM and IMM are not in agreement on short-term price-based offer validation approach Long-term Approach: Implement more robust system controls to improve price-based offer validation Maintains 2015 compromise from Cap Review Senior Task Force PJM and IMM are in agreement on long-term approach 4

5 Short-term Implementation* All price-based offers capped at $1,000/MWh by default If a cost-based offer is verified to be over $1,000/MWh, price-based offers may: PJM Approach: Price-based Offers may choose to: 1) Switch to Cost 2) Submit price-based offers above $1,000/MWh in line with verified cost-offer MA Approach: Price-based Offers must: 1) Switch to Cost Strongly Suggested *before automated price-based offer validation is implemented 5

6 Short-term Implementation Details PJM has a process for verifying market-based offers above $1000 in the short-term Market Seller must submit template with intended price-based offer information: Reference cost-based offer Proposed price-based offer curve PJM will verify the intended price-based offer is less than or equal to cost-based offer (including startup and no-load). PJM will override Markets Gateway cap to accept the verified price-based offer Override in effect for one hour Market Seller must update price-based offer no greater than PJM verified offer PJM will manually verify the submitted offer aligns with the offer submitted via the template 6

7 Short-term Implementation Risk Assessment Manual process is burdensome and not timely: Likelihood of high fuel prices during summer months is low Winter poses the greatest risk of > $1,000/MWh offers (long-term solution targeted by November 1) Market Seller can enter offer in excess of manually verified offer This risk is mitigated since the window of opportunity is time-boxed to one hour and will be cross-checked by PJM before offer becomes effective (T-65 min deadline applies) Risk for non-compliant price-based offer mainly exists if costbased offer is decreased after price-based offer is entered 7

8 Next Steps MIC endorsement - May 2 MRC endorsement July 26 8

9 Appendix M-11 Updates Endorsed at May 2 Meeting

10 M11 - Section Section 2.3.3: Market Seller Rules October 2017 Approved Language (Remove): Generation resource market based incremental energy offers may not exceed $1,000/MWh. Reinstate Original Price-Based Language: Generation resource market based incremental energy offers may not exceed $1,000/MWh unless cost based incremental energy offer is greater than $1,000/MWh then the market based incremental energy offer is capped at the lesser of the cost based incremental energy offer or $2,000/MWh. 10

11 Section 2.3.3: Market Seller Rules October 2017 Approved Language (Remove): M11 - Section cont. If a Market Seller wishes to have its resource evaluated in the Day-Ahead Market or the Real-time Market on an offer above $1000/MWh, the Market Seller must select the Switch to Cost Schedule flag in Markets Gateway. Selecting this flag will make the price-based schedule(s), which is capped at $1000/MWh, unavailable for the entire Operating Day if selected prior to the Operating Day. If selected during the Operating Day, the price-based schedule(s) is unavailable for the remainder of the current Operating Day, beginning with the next operating hour that begins 65 minutes after the selection. The switch to cost selection will ensure that any future commitments for the Operating Day are made on an available cost-based schedule. Once the Switch to Cost Schedule option is selected, the Market Seller will not have the option to resume using the pricebased schedule for the remainder of the Operating Day. The Switch to Cost Schedule option will not automatically carry forward beyond the Operating Day selected. 11

12 M11 - Section cont. Section 2.3.3: Market Seller Rules Reinstate Original Switch to Cost Language with a minor correction: Market Sellers can select the Switch to Cost Schedule flag in Markets Gateway (Detail Updates tab) between beginning on the day prior to the operating day until 10:30 and again starting at 18:30 through and 65 minutes prior to the operating hour. Selecting this flag will make the price-based schedule(s) unavailable for the remainder of the operating day selected and will ensure any future commitments for the operating day are made on an available cost-based schedule. Once the Switch to Cost Schedule option is selected, the Market Seller will not have the option to resume using the price-based schedule for the remainder of the operating day. 12

13 Attachment D Title Adjustment M11 - Attachment D Attachment D: Verification of Cost Offers greater than $1,000/MWh that were not eligible to set LMP Add Language for Price-Based Offers Enable generation resources with market-based offers greater than $1,000/MWh and less than or equal to their cost-based offer to be made whole if the cost-based offer did not pass the offer screening process in time to allow the market-based offer to be greater than $1,000/MWh for all or a portion of the operating day to be paid Operating Reserve credits under certain conditions. A generation resource may be eligible for Day-Ahead Operating Reserve credit if it was scheduled by PJM and the submitted offer s corresponding cost-based offer is verified after the Day-Ahead Market closes A generation resource may be eligible for Balancing Operating Reserve credit if that resource is dispatched by PJM and the resource s submitted offer s corresponding cost-based offer is verified 13

14 Incongruous Governing Documents OA Schedule 1, Section A(d) Manual 11, Section

Intraday Offers Update & Manual 11 Revisions Review

Intraday Offers Update & Manual 11 Revisions Review Intraday Offers Update & Manual 11 Revisions Review Lisa Morelli Manager, Real-time Market Operations Market Implementation Committee June 7, 2017 Intraday Offers (Hourly Offers) Filing History FERC initiates

More information

Market Seller Offer Cap Balancing Ratio Proposal

Market Seller Offer Cap Balancing Ratio Proposal Market Seller Offer Cap Balancing Ratio Proposal Patrick Bruno Sr. Engineer, Capacity Market Operations Markets and Reliability Committee September 27, 2018 Overview PJM raised the issue regarding the

More information

Balancing Ratio Proposals

Balancing Ratio Proposals Balancing Ratio Proposals Patrick Bruno Sr. Engineer, Capacity Market Operations MIC Special Session June 19, 2018 Background PJM raised the issue regarding the Balancing Ratio (B) used in the RPM default

More information

Balancing Ratio Determination Issue

Balancing Ratio Determination Issue Balancing Ratio Determination Issue Patrick Bruno Sr. Engineer, Capacity Market Operations Markets Implementation Committee April 4, 2018 Issue Recap 1. The current rules set the default Market Seller

More information

California ISO October 1, 2002 Market Design Elements

California ISO October 1, 2002 Market Design Elements California October 1, 2002 Market Design Elements California Board of Governors Meeting April 25, 2002 Presented by Keith Casey Manager of Market Analysis and Mitigation Department of Market Analysis 1

More information

FERC Order Minute Settlements Manual Revisions

FERC Order Minute Settlements Manual Revisions FERC Order 825 5 Minute Settlements Manual Revisions Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee October 30, 2017 Impacted Settlement Manuals M-27 Open Access

More information

Balancing Ratio Determination

Balancing Ratio Determination Balancing Ratio Determination Patrick Bruno Sr. Engineer, Capacity Market Operations Markets Implementation Committee March 7, 2018 www.pjm.com Issue Recap The current rules set the default Market Seller

More information

Five-Minute Settlements Education

Five-Minute Settlements Education Five-Minute Settlements Education Disclaimer PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not supersede the PJM Operating

More information

Standard Market Design: FERC Process and Issues

Standard Market Design: FERC Process and Issues Standard Market Design: FERC Process and Issues Richard O Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission IEEE PES

More information

Order Minute Settlements

Order Minute Settlements Order 825 5 Minute Settlements Ray Fernandez Manager, Market Settlements Development Market Implementation Committee December 14, 2016 PJM Open Access Transmission Tariff 2 Tariff Changes PJM conducting

More information

Comverge Qualifications

Comverge Qualifications Comverge Commercial Group National Demand Response Presentation Comverge Qualifications Public Company listed on the NASDAQ (Ticker: COMV) Largest Demand Response Provider 6.1 GW enabled through 5 million

More information

Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology. Technical Appendix

Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology. Technical Appendix Commitment Cost Enhancements Phase 3 Opportunity Cost Methodology Technical Appendix April 22, 2016 Table of Contents 1. Introduction... 3 2. Overview of opportunity cost... 3 3. Opportunity cost model

More information

{TEXT OMITTED} 6. MARKET POWER MITIGATION. Sixth Revised Volume No. 1

{TEXT OMITTED} 6. MARKET POWER MITIGATION. Sixth Revised Volume No. 1 PJM Interconnection, L.L.C. FERC Electric Tariff First Revised Sheet No. 604A Superseding Original Sheet No. 604A {TEXT OMITTED} 6. MARKET POWER MITIGATION 6.1 Applicability The provisions of the Market

More information

Balance-of-Period TCC Auction

Balance-of-Period TCC Auction Balance-of-Period TCC Auction Proposed Credit Policy Sheri Prevratil Manager, Corporate Credit New York Independent System Operator Credit Policy Working Group May 29, 2015 2000-2015 New York Independent

More information

Tier 1 Compensation Education

Tier 1 Compensation Education Tier 1 Compensation Education January 5, 2015 Problem Statement Tier 1 synch reserves are credited at the synch reserve market clearing price when the non-synch reserve market clearing price is above $0.

More information

Generation Production Costs, Scheduling & Operating Rate

Generation Production Costs, Scheduling & Operating Rate Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.

More information

FTR Forfeiture Implementation

FTR Forfeiture Implementation FTR Forfeiture Implementation MIC March 6, 2013 Joe Bowring Seth Hayik Objective If a holder of an FTR has an inc or a dec with delivery or receipt points at or near delivery or receipt points of the FTR

More information

Tier 1 Compensation Proposal Request for Endorsement

Tier 1 Compensation Proposal Request for Endorsement Tier 1 Compensation Proposal Request for Endorsement Lisa Morelli Manager, Real Time Market Operations October 22, 2015 Tier 1 Compensation Problem Statement Tier 1 synch reserves are credited at the synch

More information

Real-Time Reserves. Vince Stefanowicz Sr. Lead Engineer, Generation Operating Committee May 1, PJM 2018

Real-Time Reserves. Vince Stefanowicz Sr. Lead Engineer, Generation Operating Committee May 1, PJM 2018 Real-Time Reserves Vince Stefanowicz Sr. Lead Engineer, Generation Operating Committee May 1, 2018 Timeline / Work Plan OC (3/6/18) Education OC (4/3/18) Education Feedback OC (5/1/18) Review Analysis

More information

Price Formation and Reserve Markets

Price Formation and Reserve Markets Price Formation and Reserve Markets MMUAC December 7, 2018 Joe Bowring Catherine Tyler $140 Historic LMPs $120 Yearly Average Load-Weighted LMP Monthly Average Load-Weighted LMP $100 $80 $60 $40 $20 $0

More information

REPORT TO THE PUBLIC UTILITIES BOARD

REPORT TO THE PUBLIC UTILITIES BOARD REPORT TO THE PUBLIC UTILITIES BOARD CURTAILABLE RATE PROGRAM APRIL 1, 2011 MARCH 31, 2012 JULY 2012 TABLE OF CONTENTS Page No. SUMMARY... 1 BACKGROUND... 1 PERFORMANCE FOR 2011/12... 3 Curtailment Options...3

More information

Commitment Cost Enhancements Second Revised Straw Proposal

Commitment Cost Enhancements Second Revised Straw Proposal Commitment Cost Enhancements Second Revised Straw Proposal July 15, 2014 Table of Contents 1. Changes from the Revised Straw Proposal... 3 2. Background... 3 3. Schedule for policy stakeholder engagement...

More information

MMU Redline. Cost Development Guidelines. PJM Manual 15: Revision: XX. Effective Date: XX. Prepared by Cost Development Task Force

MMU Redline. Cost Development Guidelines. PJM Manual 15: Revision: XX. Effective Date: XX. Prepared by Cost Development Task Force MMU Redline PJM Manual 15: Cost Development Guidelines Revision: XX Effective Date: XX Prepared by Cost Development Task Force Section 8a: Welcome to the section of the PJM Manual for Cost Development

More information

MISO PJM IPSAC. August 26, PJM IPSAC Meeting, August 26,

MISO PJM IPSAC. August 26, PJM IPSAC Meeting, August 26, MISO PJM IPSAC August 26, 2016 1 Agenda 2 Targeted Market Efficiency Project (TMEP) Study TMEP Proposed JOA Language FERC EL13-88 Filings IPSAC Work Schedule 2 3 Targeted Market Efficiency Project Study

More information

Proposed Reserve Market Enhancements

Proposed Reserve Market Enhancements Proposed Reserve Market Enhancements Energy Price Formation Senior Task Force December 14, 2018 Comprehensive Reserve Pricing Reform The PJM Board has determined that a comprehensive package inclusive

More information

FTR Forfeiture FERC Order MIC Update

FTR Forfeiture FERC Order MIC Update FTR Forfeiture FERC Order MIC Update Asanga Perera Manager, Market Simulation Market Implementation Committee February 8, 2017 Overview On June 10, 2013 PJM filed revisions to its Tariff to define UTC

More information

MARKET PARTICIPANT GUIDE: SPP 2016 CONGESTION HEDGING

MARKET PARTICIPANT GUIDE: SPP 2016 CONGESTION HEDGING MARKET PARTICIPANT GUIDE: SPP 2016 CONGESTION HEDGING Published: December 16, 2015 By: Congestion Hedging Team; TCR Markets REVISION HISTORY VERSION NUMBER AUTHOR CHANGE DESCRIPTION COMMENTS 1.0 Congestion

More information

Installed Capacity (ICAP) Market

Installed Capacity (ICAP) Market Installed Capacity (ICAP) Market Amanda Carney Associate Market Design Specialist, Capacity Market Design, NYISO New York Market Orientation Course (NYMOC) October 16-19, 2018 Rensselaer, NY 1 ICAP Market

More information

Department of Market Monitoring White Paper. Potential Impacts of Lower Bid Price Floor and Contracts on Dispatch Flexibility from PIRP Resources

Department of Market Monitoring White Paper. Potential Impacts of Lower Bid Price Floor and Contracts on Dispatch Flexibility from PIRP Resources Department of Market Monitoring White Paper Potential Impacts of Lower Bid Price Floor and Contracts on Dispatch Flexibility from PIRP Resources Revised: November 21, 2011 Table of Contents 1 Executive

More information

Long-Term Reliability Assessment

Long-Term Reliability Assessment Long-Term Reliability Assessment Key Findings and Long-Term Issues John Moura, Director of Reliability Assessment Topics Covered Today Background on NERC s Long-Term Reliability Assessment Emerging and

More information

Market Power Screens and Mitigation

Market Power Screens and Mitigation Market Power Screens and Mitigation September 13, 2017 www.poweradvisoryllc.com AESO Workgroup Energy Market Prices Offer Flexibility Common Elements of Mitigation An offer cap of $1000/MWh is in place

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1

More information

RC_2017_06 REDUCTION OF THE PRUDENTIAL EXPOSURE IN THE RESERVE CAPACITY MECHANISM OUTSTANDING AMOUNT CALCULATION

RC_2017_06 REDUCTION OF THE PRUDENTIAL EXPOSURE IN THE RESERVE CAPACITY MECHANISM OUTSTANDING AMOUNT CALCULATION RC_2017_06 REDUCTION OF THE PRUDENTIAL EXPOSURE IN THE RESERVE CAPACITY MECHANISM OUTSTANDING AMOUNT CALCULATION 26 October 2017 PRESENTED BY STUART MACDOUGALL & MARK KATSIKANDARAKIS SLIDE 1 AGENDA 1.

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent Of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions For The Imposition Of Mitigation Measures... 2 39.2.1

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 39. Market Power Mitigation Procedures... 2 39.1 Intent of CAISO Mitigation Measures; Additional FERC Filings... 2 39.2 Conditions for the Imposition of Mitigation Measures... 2 39.2.1

More information

GT Pricing in RTD. Presented by Andrew P. Hartshorn Principal, LECG. Market Structures Working Group. DRAFT: For Discussion Purposes Only

GT Pricing in RTD. Presented by Andrew P. Hartshorn Principal, LECG. Market Structures Working Group. DRAFT: For Discussion Purposes Only GT Pricing in RTD Presented by Andrew P. Hartshorn Principal, LECG Market Structures Working Group Albany, NY May 17 th, 2005 AGENDA Today s presentation will illustrate the revised approach for the scheduling

More information

Reliability Must Run and Capacity Procurement Mechanism Enhancements

Reliability Must Run and Capacity Procurement Mechanism Enhancements Reliability Must Run and Capacity Procurement Mechanism Enhancements Draft Final Proposal January 23, 2019 Market & Infrastructure Policy Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder

More information

THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer

THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer EXECUTIVE SUMMARY Purpose and Conclusions of the Study This report presents the results of an investigative

More information

Tier 2 Synchronized Reserves Performance Educational Materials. May 29, 2013

Tier 2 Synchronized Reserves Performance Educational Materials. May 29, 2013 Tier 2 Synchronized Reserves Performance Educational Materials May 29, 2013 Agenda Education topics to be covered Problem Statement summary Reserves Overview Tier 2 Synchronized Reserves Requirements/Qualification/Penalties

More information

Scarcity Pricing Mechanism: Tier 2 Synchronized Reserve Market Structure

Scarcity Pricing Mechanism: Tier 2 Synchronized Reserve Market Structure Scarcity Pricing Mechanism: Tier 2 Synchronized Reserve Market Structure SPWG Howard J. Haas December 4, 2009 Issues for discussion Structure of the Tier 2 Market: Hour ahead scheduling vs. full 5 minute

More information

The Future of Nodal Trading.

The Future of Nodal Trading. The Future of Nodal Trading. Moderator: Jim Krajecki, Director with Customized Solutions Panel: - Noha Sidhom, General Counsel for Inertia Power LP. - Shawn Sheehan, Principal with XO - Wes Allen, CEO

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 33 Hour-Ahead Scheduling Process (HASP)... 2 33.1 Submission Of Bids For The HASP And RTM... 2 33.2 The HASP Optimization... 3 33.3 Treatment Of Self-Schedules In HASP... 3 33.4 MPM For

More information

Operating Reserves Educational Session Part B

Operating Reserves Educational Session Part B Operating Reserves Educational Session Part B Energy Market Uplift Senior Task Force September 17, 2013 Joseph Bowring Joel Romero Luna Operating Reserves Operating reserves can be grouped into five categories:

More information

Review of Registered Charites Compliance Rates with Annual Reporting Requirements 2016

Review of Registered Charites Compliance Rates with Annual Reporting Requirements 2016 Review of Registered Charites Compliance Rates with Annual Reporting Requirements 2016 October 2017 The Charities Regulator, in accordance with the provisions of section 14 of the Charities Act 2009, carried

More information

MISO Revenue Sufficiency Guarantee Analysis. PJM Energy Market Uplift Senior Task Force Meeting April 1, 2015

MISO Revenue Sufficiency Guarantee Analysis. PJM Energy Market Uplift Senior Task Force Meeting April 1, 2015 MISO Revenue Sufficiency Guarantee Analysis PJM Energy Market Uplift Senior Task Force Meeting April 1, 2015 Purpose: Discuss analysis undertaken to address various Revenue Sufficiency Guarantee proceedings

More information

RMR and CPM Enhancements Stakeholder Conference Call December 20, 2018

RMR and CPM Enhancements Stakeholder Conference Call December 20, 2018 RMR and CPM Enhancements Stakeholder Conference Call December 20, 2018 Keith Johnson Infrastructure & Regulatory Policy Manager Agenda Time Item Presenter 10:00-10:15 1. Stakeholder process and general

More information

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS The following is a summary of the key terms and conditions of the proposed standard form electricity

More information

Historical Pricing PJM COMED, Around the Clock. Cal '15 Cal '16 Cal '17 Cal '18 Cal '19 Cal '20 Cal '21 Cal '22

Historical Pricing PJM COMED, Around the Clock. Cal '15 Cal '16 Cal '17 Cal '18 Cal '19 Cal '20 Cal '21 Cal '22 $50 Historical Pricing PJM COMED, Around the Clock $48 $46 $44 $42 $40 $38 $36 $34 $32 $30 $28 $26 Cal '15 Cal '16 Cal '17 Cal '18 Cal '19 Cal '20 Cal '21 Cal '22 The information presented above was gathered

More information

FTR Alignment. Joint Stakeholder Meeting June 6, 2008

FTR Alignment. Joint Stakeholder Meeting June 6, 2008 FTR Alignment Joint Stakeholder Meeting June 6, 2008 Introduction Joint Common Market Initiative As part of the of the Midwest ISO and PJM Joint and Common Market (JCM) process, the Midwest ISO stakeholders

More information

Local Market Power Mitigation Enhancements discussion

Local Market Power Mitigation Enhancements discussion Local Market Power Mitigation Enhancements discussion Donald Tretheway Sr. Advisor- Market Design Policy Market Surveillance Committee General Session September 28, 2018 Work accomplished prior to issue/straw

More information

PUCT Staff Schedules Disconnect Workshop, Issues Questions

PUCT Staff Schedules Disconnect Workshop, Issues Questions September 18, 2009 PUCT Staff Proposal Maintains Webcasting Assessment Based on REP Customer Count PUCT Staff recommended making no changes to the proposed assessment on REPs with more than 250,000 customers

More information

Both the ISO-NE and NYISO allow bids in whole MWh increments only.

Both the ISO-NE and NYISO allow bids in whole MWh increments only. Attachment D Benchmarking against NYISO, PJM, and ISO-NE As the CAISO and stakeholders consider various design elements of convergence bidding that may pose market manipulation concerns, it is useful to

More information

Opportunity Cost Calculator

Opportunity Cost Calculator Opportunity Cost Calculator MRC January 20, 2010 Joe Bowring Vik Modi Bill Dugan Opportunity Cost Definition Opportunity costs are the value of a foregone opportunity. Opportunity costs may result when

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation ) ) ) Docket No. ER13-872-000 MOTION TO INTERVENE AND COMMENTS OF SOUTHERN CALIFORNIA

More information

Application Terms & Conditions and Final Payment Agreement

Application Terms & Conditions and Final Payment Agreement Prescriptive, Self-Direct Custom Program & Self-Direct Application Terms & Conditions and Final Payment Agreement Version: January 1, 2015 January 2017 TERMS AND CONDITIONS AEP Ohio offers Efficient Products

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 3rd Revised SHEET NO. 90 CANCELLING MO.P.S.C. SCHEDULE NO. 6 2nd Revised SHEET NO. 90 ENERGY EFFICIENCY INVESTMENT CHARGE For MEEIA CYCLE 1 Plan APPLICABILITY This Rider EEIC Energy

More information

Illinois Power Agency. Ameren Illinois Company

Illinois Power Agency. Ameren Illinois Company REQUEST FOR PROPOSALS FOR STANDARD WHOLESALE ENERGY PRODUCTS Levitan & Associates, Inc. Procurement Administrator on behalf of Illinois Power Agency for ISSUE DATE: April 15, 2011 DUE DATE: May 5, 2011

More information

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study California ISO Report Regional Surplus Allocation Impact Study October 6, 2010 Regional Surplus Allocation Impact Study Table of Contents Executive Summary... 3 1 Issue and Background... 3 2 Study Framework...

More information

Kareo Feature Guide Real-Time Patient Eligibility November 2009

Kareo Feature Guide Real-Time Patient Eligibility November 2009 Kareo Feature Guide Real-Time Patient Eligibility November 2009 1. Overview You can perform real-time patient eligibility checks for hundreds of the nation's largest government and commercial insurance

More information

Opportunity Cost Issues

Opportunity Cost Issues Opportunity Cost Issues MIC Special Session: Opportunity Cost Calculator September 25, 2018 John Hyatt Devendra Canchi Joe Bowring Standard Model of Review for OC Adders 1. A market participant requests

More information

Intertie Deviation Settlement: Draft Final Proposal

Intertie Deviation Settlement: Draft Final Proposal Intertie Deviation Settlement: Draft Final Proposal Megan Poage & Danielle Tavel Market Design Policy Stakeholder Call December 19, 2018 IDS Draft Final Proposal, Stakeholder Call December 19, 2018 9:00

More information

Historical Pricing PJM PSEG, Around the Clock. Cal '15 Cal '16 Cal '17 Cal '18 Cal '19 Cal '20 Cal '21 Cal '22

Historical Pricing PJM PSEG, Around the Clock. Cal '15 Cal '16 Cal '17 Cal '18 Cal '19 Cal '20 Cal '21 Cal '22 $70 Historical Pricing PJM PSEG, Around the Clock $65 $60 $55 $50 $45 $40 $35 $30 $25 Cal '15 Cal '16 Cal '17 Cal '18 Cal '19 Cal '20 Cal '21 Cal '22 The information presented above was gathered and compiled

More information

BANK OF AMERICA 401(k) PLAN LOAN POLICY Updated December 1, 2017

BANK OF AMERICA 401(k) PLAN LOAN POLICY Updated December 1, 2017 This document describes some of the main features of participant loans available under the Bank of America 401(k) Plan (the Plan ). This updated policy is effective December 1, 2017 and applies to all

More information

Profiling Analysis for EUC Bands 01 and 02 - Gas Year 2007/08 Performance Evaluation. DESC 20 th January 2009

Profiling Analysis for EUC Bands 01 and 02 - Gas Year 2007/08 Performance Evaluation. DESC 20 th January 2009 Profiling Analysis for EUC Bands 01 and 02 - Gas Year 2007/08 Performance Evaluation DESC 20 th January 2009 Profiling Analysis - Background Action DE1045: xoserve to consider carrying out analysis on

More information

COSME Financial Instruments for SMEs

COSME Financial Instruments for SMEs COSME Financial Instruments for SMEs 5 February 2014 George Lemonidis (Deputy Head of Unit) Unit D3: SME Access to Finance Directorate General for Enterprise and Industry 1 COSME financial Instruments

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

Application No.: A Exhibit No.: SCE-1, Vol. 3. S. DiBernardo S. Samiullah D. Hopper G. Golden (U 338-E) Before the

Application No.: A Exhibit No.: SCE-1, Vol. 3. S. DiBernardo S. Samiullah D. Hopper G. Golden (U 338-E) Before the Application No.: A.1-01- Exhibit No.: SCE-1, Vol. Witnesses: R. Thomas S. DiBernardo S. Samiullah D. Hopper G. Golden (U -E) SOUTHERN CALIFORNIA EDISON COMPANY S (U - E) TESTIMONY IN SUPPORT OF ITS APPLICATION

More information

BC Hydro s Clean Power Call

BC Hydro s Clean Power Call BC Hydro s Clean Power Call November 27, 2007 Housekeeping Details Morning break at 9:45 for 15 minutes Lunch is at 12:30 for 30 minutes Break out groups at 1:30 for 1 hour Meeting ends at 4:00 Washrooms

More information

Technical Conference. August 3, 2009

Technical Conference. August 3, 2009 Technical Conference August 3, 2009 1 2 Agenda Welcome Background and Overview Considerations for Participation by Third- Party Sellers Survey Results Next Steps 3 Background and Overview 4 Background

More information

ARR/FTR Market Update: ATC Customer Meeting. August 20, 2009

ARR/FTR Market Update: ATC Customer Meeting. August 20, 2009 ARR/FTR Market Update: ATC Customer Meeting August 20, 2009 Agenda ARR Allocation FTR Annual/Monthly Auction Challenge 2 Allocation Overview 101 Market Participants took part in the 2009-2010 Annual ARR

More information

NYISO s Compliance Filing to Order 745: Demand Response. Wholesale Energy Markets

NYISO s Compliance Filing to Order 745: Demand Response. Wholesale Energy Markets NYISO s Compliance Filing to Order 745: Demand Response Compensation in Organized Wholesale Energy Markets (Docket RM10-17-000) Donna Pratt NYISO Manager, Demand Response Products Market Issues Working

More information

March 13, Provisions, Docket No. ER (filed December 13, 2013) ( FCA 9 ORTP Filing ).

March 13, Provisions, Docket No. ER (filed December 13, 2013) ( FCA 9 ORTP Filing ). VIA etariff FILING The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 March 13, 2014 Re: ISO New England Inc., Docket No. ER14-616-001;

More information

Cost Development Guidelines

Cost Development Guidelines PJM Manual 15: Cost Development Guidelines Revision: 1718 Effective Date: June 1, 2011 Prepared by Cost Development Subcommittee PJM 2011 1.7.3 No Load Cost Section 1: Introduction No-Load Fuel (MBTU/hour)

More information

Power Supplier Energy Settlements

Power Supplier Energy Settlements Power Supplier Energy Settlements Gina E. Craan Manager, Market Training New York Independent System Operator Accounting & Billing Workshop October 18 20, 2016 Latham, New York 2016 New York Independent

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 28. Inter-SC Trades... 2 28.1 Inter-SC Trades Of Energy... 2 28.1.1 Purpose... 2 28.1.2 Availability Of Inter-SC Trades Of Energy... 2 28.1.3 Submission Of Inter-SC Trades Of Energy...

More information

Forward Contracts and Capacity Markets: High Powered Incentives or Assets to be Stranded?

Forward Contracts and Capacity Markets: High Powered Incentives or Assets to be Stranded? Forward Contracts and Capacity Markets: High Powered Incentives or Assets to be Stranded? March 2, 2006 Jim Sheffield Vice President James.Sheffield@MorganStanley.com 404-949-4263 Overview Morgan Stanley

More information

Con Edison Performance-Based Gas Demand Response Pilot Guidelines

Con Edison Performance-Based Gas Demand Response Pilot Guidelines Con Edison Performance-Based Gas Demand Response Pilot Guidelines 2018/19 Capability Period Last updated: 09/10/2018 Performance-Based Gas DR Pilot Guidelines Consolidated Edison Contents Acronyms and

More information

Proposed Implementation of Traditional Commercial Paper Program. Finance/Administration Committee November 24, 2015

Proposed Implementation of Traditional Commercial Paper Program. Finance/Administration Committee November 24, 2015 Proposed Implementation of Traditional Commercial Paper Program Finance/Administration Committee November 24, 2015 Agenda What is Commercial Paper ( CP ) Traditional vs Extendable CP Risks in Extendable

More information

If there are any questions concerning this filing, please contact the undersigned.

If there are any questions concerning this filing, please contact the undersigned. California Independent System Operator Corporation June 13, 2008 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: One Hundred

More information

May 3, Dear Ms. Bordelon:

May 3, Dear Ms. Bordelon: Entergy Services, Inc. 639 Loyola Avenue (70113) P.O. Box 61000 New Orleans, LA 70161-1000 Tel 504 576 4122 Fax 504 576 5579 Michael J. Plaisance Senior Counsel Legal Services - Regulatory May 3, 2018

More information

Operating Agreement Redlines

Operating Agreement Redlines Option J1 Proposed OA and OATT Revisions for FTR Defaults Operating Agreement Redlines OPERATING AGREEMENT, SCHEDULE 1 PJM INTERCHANGE ENERGY MARKET 7.3 Auction Procedures. 7.3.1 Role of the Office of

More information

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor Potomac Economics, Ltd. 9990 Fairfax Boulevard, Suite 560 Telephone: 703-383-0720 Fairfax, Virginia 22030 Facsimile: 703-383-0796 Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

Long Term FTR Market Education

Long Term FTR Market Education Long Term FTR Market Education February 7, 2018 Jointly developed and supported by Exelon, DC Energy, and Vitol Agenda Forward Markets Commercial Usage of Long Term FTRs Indications of a Healthy Long Term

More information

August 24, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

August 24, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation August 24, 2007 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: One Hundred

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

SE-109: Outage Management Process Redesign Interim Process & Online Outage Form Training. Mark Gojmerac, IESO January 15, 2014

SE-109: Outage Management Process Redesign Interim Process & Online Outage Form Training. Mark Gojmerac, IESO January 15, 2014 SE-109: Outage Management Process Redesign Interim Process & Online Outage Form Training Mark Gojmerac, IESO January 15, 2014 Agenda 1. Interim Process Review: Market Rule & Market Manual Changes: 3-day

More information

Exelon Surety Bond Proposal. October 10, 2018 MIC

Exelon Surety Bond Proposal. October 10, 2018 MIC Exelon Surety Bond Proposal October 10, 2018 MIC Exelon Proposal Surety Bonds Surety Bonds Can Cover All Credit Requirements No increased risk of non-payment relative to letter of credit, so applicability

More information

AEP Ohio Competitive Bidding Process November 2017 Auction

AEP Ohio Competitive Bidding Process November 2017 Auction AEP Ohio Competitive Bidding Process November 2017 Auction Bidder Webcast Thursday, October 5, 2017 Benjamin Chee, NERA Chantale LaCasse, NERA Disclaimer Any statements herein describing or referring to

More information

ISIN. Bulk Pre-Allocation Service

ISIN. Bulk Pre-Allocation Service ISIN Bulk Pre-Allocation Service ISIN Pre-Allocation Introduction Clients who issue their own instruments, require a ISIN code within their own instrument creation workflow. To facilitate this, UnaVista

More information

Avoidable Cost Rate Template Version 14 Instructions

Avoidable Cost Rate Template Version 14 Instructions Avoidable Cost Rate Template Version 14 Instructions RPM/ACR Data Submission Monitoring Analytics The Independent Market Monitor for PJM September 2017 Monitoring Analytics 2017 www.monitoringanalytics.com

More information

Attachment G MAXIMUM START-UP AND MINIMUM LOAD VALUES UNDER THE REGISTERED AND PROXY COST OPTIONS

Attachment G MAXIMUM START-UP AND MINIMUM LOAD VALUES UNDER THE REGISTERED AND PROXY COST OPTIONS Attachment G MAXIMUM START-UP AND MINIMUM LOAD VALUES UNDER THE REGISTERED AND PROXY COST OPTIONS G Registered and Proxy Cost Options This attachment explains how Start-up and Minimum Load Costs are calculated

More information

ISG202-SPAR REPORTING ON JANUARY 2018 SYSTEM PRICE ANALYSIS REPORT 1 SYSTEM PRICES AND LENGTH

ISG202-SPAR REPORTING ON JANUARY 2018 SYSTEM PRICE ANALYSIS REPORT 1 SYSTEM PRICES AND LENGTH Count of Settlement Periods -8 - -7-7 - -6-6 - -5-5 - -4-4 - -3-3 - -2-2 - -1-1 - - 1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-1 1 + PUBLIC ISG22-SPAR REPORTING ON JANUARY 218 ISSUE 27 PUBLISHED 2 FEBRUARY 218

More information

Trading at Power Exchange - IEX

Trading at Power Exchange - IEX Trading at Power Exchange - IEX February 2016 Prasanna Rao Market Operations In this presentation Product Portfolio Trading Mechanism & Process Flow- Day-Ahead Market Trading Mechanism-Term-Ahead Market

More information

FERC EL Settlement Agreement

FERC EL Settlement Agreement FERC EL05-121-009 Settlement Agreement Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee June 14, 2018 Settlement Agreement Details Settlement Agreement Details FERC

More information

California ISO. Q Report on Market Issues and Performance. August 22, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. August 22, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q2 2016 Report on Market Issues and Performance August 22, 2016 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

January 25, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 25, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 25, 2008 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: One Hundred

More information

Chapter 18. Indebtedness

Chapter 18. Indebtedness Chapter 18 Indebtedness This Page Left Blank Intentionally CTAS User Manual 18-1 Indebtedness: Introduction The Indebtedness Module is designed to track an entity s indebtedness. By entering the principal

More information

Congestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal

Congestion Revenue Rights (CRR) Clawback Modification. Draft Final Proposal Congestion Revenue Rights (CRR) Clawback Modification Draft Final Proposal May 16, 2016 CRR Clawback Modification Draft Final Proposal Table of Contents 1 Introduction... 3 2 Stakeholder process and timeline...

More information

SEMOpx. Operating Procedures: DAM, IDA, IDC. Updated Draft: 09/03/18. Draft prepared for discussion at the BLG meeting, 14 March 2018.

SEMOpx. Operating Procedures: DAM, IDA, IDC. Updated Draft: 09/03/18. Draft prepared for discussion at the BLG meeting, 14 March 2018. SEMOpx Updated Draft: 09/03/18 Operating Procedures: DAM, IDA, IDC Draft prepared for discussion at the BLG meeting, 14 March 2018. 1 CONTENTS A. Introduction 5 A.1 General provisions 5 A.1.1 Purpose and

More information

NEAS ENERGY - Route to Market

NEAS ENERGY - Route to Market NEAS ENERGY - Route to Market Overview Wholesale Power Market developments Revenue Profiles Secured and Unsecured FIT CFD v ROC PPA Key terms and conditions PPA Backstop PPA Cash flows for CfD and ROC

More information