UP, UP, AND AWAY. The Impact of Restrictive Tendering ON MUNICIPAL CONTRACTING IN ONTARIO DECEMBER 2017

Size: px
Start display at page:

Download "UP, UP, AND AWAY. The Impact of Restrictive Tendering ON MUNICIPAL CONTRACTING IN ONTARIO DECEMBER 2017"

Transcription

1 UP, UP, AND AWAY The Impact of Restrictive Tendering ON MUNICIPAL CONTRACTING IN ONTARIO DECEMBER 2017 DR. MORLEY GUNDERSON DR. TINGTING ZHANG BRIAN DIJKEMA

2 ABOUT CARDUS CARDUS IS A THINK TANK dedicated to the renewal of North American social architecture. Headquartered in Hamilton, ON, Cardus has a track record of delivering original research, quality events, and thoughtful publications which explore the complex and complementary relationships between virtues, social structures, education, markets, and a strong society. Cardus is a registered charity. cardus.ca

3 Cardus Construction Competitiveness Monitor: Research Paper UP, UP, AND AWAY THE IMPACT OF RESTRICTIVE TENDERING IN MUNICIPAL CONTRACTING IN ONTARIO DECEMBER 2017 DR. MORLEY GUNDERSON DR. TINGTING ZHANG BRIAN DIJKEMA

4 AUTHORS DR. MORLEY GUNDERSON holds the CIBC Chair in Youth Employment at the University of Toronto, where he is a professor at the Centre for Industrial Relations and Human Resources, and the Department of Economics. DR. TINGTING ZHANG is an assistant professor, College of Business, Western New England University. BRIAN DIJKEMA is Program Director, Work and Economics, at Cardus. CONTACT BRIAN DIJKEMA bdijkema@cardus.ca DOWNLOAD DOWNLOAD A COPY of this report at go.cardus.ca/competition

5 TABLE OF CONTENTS 9 How Restricted Tendering Occurs in Municipal Construction Contracts in Ontario 11 Methodology 14 Data 17 Results: Winning Bid Less Runner-Up Bid 19 Results: Winning Bid Less the Average Bid 20 Results: Winning Bid Less the Maximum Bid 21 Results: Coefficient of Variation 22 Summary of Results Across Different Benchmarks 24 Discussion Regarding Data Needs 25 Policy Implications

6 EXECUTIVE SUMMARY The empirical results of this paper, which compiles bidding data from a variety of Ontario municipalities over time, suggest that restricting tendering to a select group of firms on the basis of their workers affiliations will lead to higher costs for municipalities than if they tendered their projects to all qualified bidders, with the strong possibility that municipalities will pay a substantial magnitude more. Theoretical considerations as well as results from the general literature suggest that restrictive bidding should widen the gap between the lowest winning bid and the benchmark bids as well as increasing the dispersion across bids. Conversely, the competitive pressures from open bidding should reduce the gap between the lowest winning bid and the benchmark bids as well as reducing the dispersion across bids essentially fostering the law of one price. Our empirical analysis confirms these expectations. No matter which benchmark is used (the runner-up bid, the average bid, the maximum bid) or the coefficient of variation, in the period when Hamilton was on restricted bidding, that restricted bidding was associated with a statistically significant wider gap between Hamilton and the various open bidding regimes, as well as greater dispersion across bids (row 4 in table 3). The magnitude was also very large, effectively doubling the gap that prevailed in the open bidding regimes. These substantial impacts highlight that restricted bidding reduces the competitive pressures that can otherwise discipline the bidding process toward a competitive norm that provides municipalities with best value. Our results support the theory that restricting competition on public projects leads to upward pressure on prices paid for construction by municipal governments. It lends further support to the rationale behind the almost universal adoption of procurement and policies by public bodies that encourage or require open competition on public projects. 6 Cardus: Work & Economics cardus.ca/research/workandeconomics

7 THE IMPACT OF RESTRICTIVE TENDERING IN MUNICIPAL CONTRACTING IN ONTARIO This report is the fifth in a series of Cardus Construction Competitiveness Monitor (CCCM) reports, which examines the effect of restrictive tendering on public construction projects in Ontario. The particular type of restriction studied is one whereby bidding on public construction projects is limited, by law, to firms associated with a particular union. As noted in the first paper, by Brian Dijkema, Ontario Municipal Construction Markets (2012), a clause in the construction section of Ontario s Labour Relations Act inadvertently restricted tendering on many construction contracts in cities and municipalities, school boards, and Crown corporations to a small subset of unionized contractors. The second paper, by Stephen Bauld and Brian Dijkema with James Ton, Hiding in Plain Sight: Evaluating Closed Tendering in Construction Markets (2014), noted how such restrictions work counter to widely accepted procurement practices and public policies governing procurement more generally. It focused on the negative aspects of the restrictions on competition associated with restricted tendering and on the positive aspects of the enhanced competition associated with a more open bidding process. The third paper, by Brian Dijkema, Tuning Up Ontario s Economic Engine: Competitive Construction in the City of Toronto (2015), provides a critical assessment of a 2008 staff report for the city of Toronto that provided an estimate of only a 1.7 percent cost increase from the tendering that was restricted to union contracts in construction in Toronto. Their paper discussed related studies that suggest the cost increase for Toronto would be more in the neighbourhood of 20 to 30 percent and perhaps as high as 40 percent. The fourth report, Restrictive Tendering: Protection for Whom?, By Brian Dijkema and Morley Gunderson (2016), reviewed the literature on the impact of restrictive tendering as well as outlining the methodologies and data requirements that would be necessary to estimate the impact of restricted tendering. This fifth report builds on that previous report by providing empirical evidence on the impact of restricted tendering in municipal government contracts in construction in Ontario. The earlier report by Dijkema and Gunderson (2016) highlighted a wide range of factors that motivate the empirical analysis of this report. They discussed the importance of cost containment in public tendering arising from various factors: TUNING UP ONTARIO S ECONOMIC ENGINE: Competitive Construction in the City of Toronto A CARDUS CONSTRUCTION COMPETITIVENESS MONITOR BRIEF Brian Dijkema April 9, 2015 Cardus Construction Competitiveness Monitor: Ontario Municipal Construction Markets Brian Dijkema October 11, 2012 RESTRICTIVE TENDERING: PROTECTION FOR WHOM? Pressures to reduce deficits. Increased infrastructure spending fuelled by increased pressures on existing infrastructure, including the age of infrastructure and population growth. CARDUS CONSTRUCTION COMPETITIVENESS MONITOR White Paper January 2017 BRIAN DIJKEMA DR. MORLEY GUNDERSON Recent corruption scandals in the tendering process including in Toronto. Growing public attention to the importance of an open, transparent bidding process to offset collusive behaviour among contractors. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 7

8 They also highlighted the negative consequences of restrictions on the bidding process that give monopoly or oligopoly power to a small number of bidders. These include the following: Higher prices (i.e., higher bids) knowing that there are fewer competitors that may bid lower. Fewer of the services consumed (e.g., construction infrastructure projects) given the higher prices. Less innovation and efficient practices because of less incentive to cut costs since they can be awarded the contracts at their higher costs. There is need for more infrastructure, but limited funds constrain growth. More discrimination because the contractors are under less pressure to cut costs by hiring the best people for the job. Devoting resources toward protecting their privileged positions and deterring new entry. Engaging in collusive bid-rigging. Expensive litigation in situations where tenders have not been conducted under an open, fair, and transparent basis. Extensive resources devoted to defensive bulletproofing RFPs (adding criteria that transfer greater risk onto contractors) and the tendering process to protect against potential liability. More complex contracting process caused by bulletproofing RFPs, which in turn can deter smaller contractors from bidding. Dijkema and Gunderson (2016) also documented that the negative consequences of tendering not being conducted on an open, transparent, and competitive basis have been recognized extensively in public documents, the general academic literature on competition, and both domestic and international procurement guidelines. Because of these concerns and the importance of these issues, they called for empirical evidence of the effect of restrictions on the public tendering process. This report is a response to that call. It provides evidence of the effect of restrictions on tendering in municipal government contracts in construction in southern Ontario. The report is organized as follows: We begin with brief discussion as to how restricted tendering in municipal government affects public construction contracts in Ontario. We then discuss the methodology used to estimate the impact of restricted tendering on various outcomes of the bidding process, before discussing the data used to estimate those impacts. Following this, we present the empirical results and discuss the implications of the evidence. 8 Cardus: Work & Economics cardus.ca/research/workandeconomics

9 HOW RESTRICTED TENDERING OCCURS IN MUNICIPAL CONSTRUCTION CONTRACTS IN ONTARIO As discussed in Dijkema (2012) the restrictive tendering we describe is the inadvertent consequence of labour law that forces governments to receive bids only from contractors affiliated with a particular subset of construction unions that are organized on a craft basis. These differ from non-union firms as well as other construction unions that are organized on an industrial or wall-to-wall basis (e.g., the Building Union of Canada, CUPE, CLAC, or Unifor, which also represent workers in the trades). These industrial unions bargain for all trades within a company, and they bargain on a company-by-company basis. In contrast, the craft unions and their contractors are subject to separate province-wide collective agreements that prevail for each trade, and which contain centralized wage schedules. Further, these province-wide collective agreements contain subcontracting clauses that prevent those who are signatory from contracting or subcontracting work to firms that have a different affiliation from the general contractor even if they are unionized with another union. This situation occurs because labour relations in construction in Ontario are governed under a separate construction section of the Ontario Labour Relations Act. Labour Board decisions have interpreted the meaning of a construction employer broadly to include government bodies that contract out their projects through the tendering process, as virtually all do. This allows unions to organize a government entity (e.g., a municipality like Hamilton, Toronto, or the Region of Waterloo; a Crown corporation like Ontario Power Generation; or the Toronto District School Board) as if it were a private, for-profit contractor like, for instance, Ellis Don. This gives rise to restricted tendering not simply because they are now unionized, but because they become subject to the province-wide collective bargaining agreement, which contains clauses that disallow a given contractor from contracting or subcontracting to firms that are not associated with that particular union. For example, the city of Hamilton, which is organized by the Carpenters Union, can only tender projects for which carpentry work is involved to firms affiliated with the Carpenters Union. In effect this prevents firms whose workers affiliate with other unions like the Labourers International Union, as well as companies whose workers affiliate with alternative construction unions, or those whose workers choose not to affiliate with any union. The ultimate effect is that vast swaths of public construction work are placed under restrictions that are imposed not for procurement best practices, but because of an unrelated piece of labour law intended to achieve a separate and unrelated objective. Workers who exercise their right to affiliate with other unions, or no union, are forbidden to work on a public project because of that choice. In effect, only a subset of the population is able to bid on work that is paid for, and built on behalf of, the whole population. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 9

10 RESTRICTED MUNICIPALITIES IN ONTARIO SAULT STE. MARIE GEORGIAN BAY MUSKOKA HALIBURTON LAKE HURON GREY SIMCOE VICTORIA PETER- BOROUGH BRUCE DUFFERIN YORK DURHAM HURON WELLINGTON PEEL TORONTO PERTH WATERLOO HALTON LAKE ONTARIO LAMBTON MIDDLESEX ELGIN OXFORD BRANT HAMILTON WENTWORTH HALDIMAND - NORFOLK NIAGARA LEGEND Open KENT Restricted LAKE ERIE 10 Cardus: Work & Economics cardus.ca/research/workandeconomics

11 METHODOLOGY As indicated in Dijkema and Gunderson (2016), our ideal comparison between restricted and open contracting regimes would involve comparing a measure of cost per unit of standardized or homogeneous output in the two regimes. An example of such a cost comparator would be public schools where there exist widely accepted standards for the cost of construction per square foot. This would allow us to cleanly test our expectation that costs would be higher under restricted regimes than those with open bidding regimes. Unfortunately, such standardized cost information is not available to us, at least at this stage. The recent Ontario Labour Board decision in 2016 whereby the Greater Essex County District School Board was deemed a non-construction employer may provide the possibility of such measurement in the future. As an alternative, we use a number of measures that are available to examine the effect of reduced competition on the bidding process. We discuss those measures below. Competition should foster bids that are closer to each other effectively, the law of one price. In a competitive bidding environment, where equally qualified firms have equal access to a given market, bid prices will converge on the lowest price, as all firms attempt to provide the lowest price that enables them to win the job while meeting the parameters set by the project owner. This implies that competitive open bidding should lead to bids that are closer to each other and to the winning bid; conversely restrictive bidding should lead to bids that are further from each other and further from the winning bid. To test this hypothesis, we created four outcome measures that would reflect the closeness of the bids. They are as follows: (Y w Y n )/Y n where Y denotes the dollar value of the bid, the subscript w denotes the winning bid, and the subscript n denotes the benchmark of the runner-up bid, which is almost always the next-lowest bid. (Y w Y a )/Y a where Y denotes the dollar value of the bid, the subscript w denotes the winning bid, and the subscript a denotes the benchmark of the average value of the bids. (Y w Y m )/Y m where Y denotes the dollar value of the bid, the subscript w denotes the winning bid, and the subscript m denotes the benchmark of the value of the maximum or highest bid. Coefficient of Variation (CV), or the standard deviation divided by the mean, as a measure of overall dispersion or variation across all bids. Dividing the standard deviation by the mean effectively controls for the magnitude of the bids and ensures that the measure is unit free. Since Y w, the winning bid, is the lowest bid (in all but few cases), each of the measures would be negative, reflecting the percent amount that the winning bid is lower than each of the other benchmarks. All measures are in percent terms so they can be compared across contracts of different sizes. Given the law of the lowest price discussed above, the expectation is that competitive open bidding would reduce the gap or difference between the winning bid and each of the other benchmarks. Conversely, restricted bidding would increase the gaps leading to larger negative numbers. We test this hypothesis by estimating the bid gap between the winning bid and each of these benchmark bids in Hamilton, a municipality that shifted from open to restricted bidding, and remained on restricted bidding for a time period that was sufficiently long for its impact to be detected (October 2005 to December 2011). These bid gaps are then compared to the gaps in twelve other open-bidding comparison group municipalities The Impact of Restrictive Tendering in Municipal Contracting in Ontario 11

12 LAW OF ONE PRICE Open bidding should lead to bids that are closer to each other and to the winning bid. $ $ $ $ $ $ winning bid winning bid $ $ $ $ $ $ Restrictive bidding should lead to bids that are further from each other and further from the winning bid combined over the same time period. The twelve comparison group jurisdictions are contiguous or close to Hamilton with its restricted bidding. They are Brantford, Durham/Dufferin, Elgin, Guelph, Haldeman/ Norfolk, Halton, Niagara, Oxford, Peel, Perth, York, and Middlesex. Figure XYZ visualizes the geographical locations of these regions. Hamilton is the only municipality in our data set that has restricted bidding over a time period that could reasonably reflect its effect on bid gaps. The Region of Waterloo also shifted from open to restricted bidding, but the post-restricted bidding period was insufficiently long (only eighteen contracts in the first eighteen months after shifting to restricted bidding) for its effect to be detected. Toronto and Sault Ste. Marie also have restricted bidding, but sufficient information on it was not available to us. Our methodology involves comparing the various gaps between the winning bid and the various benchmark bids (runner-up, average, and maximum) as well as the CV, under the restricted bidding regime in Hamilton, compared to the gaps in the twelve comparison-group open bidding regimes in that time period. The expectation is that the gaps would be smaller in the open regimes since competition should reduce the gaps the law of one price. The differences in the bid gaps could be due to factors other than their being an open versus restricted bidding regime. To control for this possibility, we also estimate the gaps between Hamilton and the twelve open comparator jurisdiction in the pre-treatment time period when neither are affected by restricted bidding. This should capture the effect of factors other than restricted bidding that could affect the gaps. This pre-treatment gap that is affected by factors other than restricted bidding is then subtracted from the post-treatment gap that can affect both these factors and restricted bidding to get a purer estimate of the effect of restricted bidding alone. We have less confidence in this netting out procedure for two reasons. First, the pre-intervention period in Hamilton is less than two years (January 2004 to August 2005) and involves few contract observations (twenty-six in the restricted jurisdiction of Hamilton and fifteen in the comparison jurisdictions). Second, 12 Cardus: Work & Economics cardus.ca/research/workandeconomics

13 it assumes that whatever factors affect the restricted jurisdiction and the open jurisdictions in the short pre-treatment period will continue to have their same effect in the post-treatment period. This could be reasonable if there was a longer pre-treatment period and their patterns were similar over that longer period, but it is not reasonable based on such a short pre-treatment time period. In essence, our ability to use the pre-treatment period to net out the effect of other factors will have to wait the availability of data for a longer pre-treatment period, which, because of the nature of public record keeping is very difficult to procure. As such, we will rely more heavily on the post-treatment-period data for comparisons between the restricted jurisdiction of Hamilton and the open-bidding comparison jurisdictions, recognizing fully the possibility that those differences could be due to other factors that we cannot control for at this stage. An alternative way to present the analysis is to compare the difference in outcomes in the restricted jurisdictions after it shifted to restricted bidding compared to the period before they shifted, with this difference compared to the change in outcomes in the jurisdictions with open bidding. This is the conventional before-and-after comparison between jurisdictions that received a treatment (in this case moving to restricted bidding) compared to a comparison group of jurisdictions that remained on open bidding and did not move to restricted bidding. In our presentation of the results we prefer the comparison based on the difference in the outcomes in the restricted jurisdictions minus the open bidding jurisdictions in the post-treatment period when restricted bidding is in place, less the difference in the pre-treatment period. This is so because in the case of Hamilton our data provides a reasonable time period when restricted bidding is in place (October 2005 to December, 2011), but a very short time period (January 2004 to September 2005) when both Hamilton and the comparison jurisdictions had open bidding. In essence, our pre-treatment-period differences are likely measured with considerable imprecision, while our post-treatment period is measured with more precision. As such, we have more confidence in the differences in the post-treatment period, and hence it is informative to have them measured on their own, recognizing that this difference may reflect the effect of other factors that are netted out by other factors that can only be measured with imprecision by the differences in the short pre-treatment periods. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 13

14 TIMELINE OF MUNICIPAL RESTRICTIONS Region of Waterloo July 4, 2014 (Carpenters, ICI) City of Hamilton September 12, 2005 (Carpenters all sectors) City of Sault Ste. Marie August 7, 1987 (Carpenters, LIUNA) City of Toronto 1970's-80's (multiple trades) DATA The restricted jurisdiction Hamilton had information on the winning bid and each of the benchmark bids for 227 contracts spread over the six-plus-year post-treatment period October 2005 to December 31, The comparison group with open bidding had 53 contracts over that same period. As such, our comparison of restricted versus open bidding in the post-treatment period involved 280 contracts as observations. Prior to that period, Hamilton was on open bidding, but we have information for only 26 contracts in Hamilton and 15 in the comparison jurisdictions in the less-than-two-year pre-treatment period of January 2004 to August The post-treatment period refers to when Hamilton was on restricted bidding (the treatment), and the pre-treatment period refers to when it was on open bidding. The treatment or shift from open to restricted bidding occurred in September That month was left off the analysis since the shift to restricted bidding occurred in that month. The small number of contracts in the short pre-treatment period for Hamilton means that we have little confidence in the before-and-after comparisons for that jurisdiction. For a small number of projects, information was missing on some of the middle bids. This was relevant only for our calculation of the average of the bids and the CV; they did not affect our calculation of the runner-up bid or the maximum-bid benchmarks. To provide an estimate of the missing bids to use in our calculation of the mean and CV, we conducted the following steps (done for only fourteen of our observations): 1. Estimate the missing interval by subtracting the lowest bid for which information is available from the highest bid for which information is available. 2. Divide by the number of missing bids plus 1. This is the same as the number of missing sub-intervals. 3. Add that to the lowest bid available to estimate the first missing bid. 4. Again, add that to the first missing bid to get an estimate of the second missing bid. 5. Continue the process until all missing bids are estimated. Table 1 provides a summary picture of the number of contracts in Hamilton both before (26 contracts) and after it shifted to restricted bidding (227 contracts in the shaded area) compared to the number of contracts in the twelve comparison-group jurisdictions both before (15 contracts) and after the time period September 2005 (53 contracts) when Hamilton shifted to restricted bidding. As indicated, the small number of contracts in the brief pre-treatment period means that we have little confidence in using them as a comparison group for before-and-after comparisons for Hamilton or to compare Hamilton and the comparison groups in the pre-treatment period. 14 Cardus: Work & Economics cardus.ca/research/workandeconomics

15 Table 1. Number of contracts in Hamilton and twelve comparison jurisdictions in pre- and post-treatment periods Pre-Treatment Post-Treatment Jurisdiction 2004:1 2005:8 2005: :12 Hamilton (Restricted) 12 Comparison (Open) The data are drawn from a variety of sources, including public bidding websites such as biddingo.com (a procurement portal used by most, if not all, municipalities in Ontario, as well as the provincial government, and Crown corporations), municipal procurement office records, and the records of contractors who agreed to share historical bidding data. All data (including those from contractors) are part of the public record, and the vast majority of the observations are from municipal procurement offices. Prior to discussing the empirical results, it is useful to define some of the symbols that will be used in the subsequent presentation of the results. They are set out in table 2. Table 2. Definitions and symbols: illustration for comparison of winning bid and runner-up benchmark bid Symbol Concept 1. Mean Average % difference between winning bid Y w and benchmark bid 2. B r a % gap between winning bid and runner up in restricted jur. in post-restricted period 3. B o a % Gap between winning bid and runner up in open jur. in post-restricted period 4. B r a-b o a Difference in the restricted and open % gap in the post-restricted period 5. B r b % gap between winning bid and runner up in restricted jur. in pre-restricted period 6. B o b % gap between winning bid and runner up in open jur. in pre-restricted period 7. B r b-b o b Difference in the restricted and open % gap in the pre-restricted period 8. (B r a-b o a) Difference in the difference in the restricted and open % gap in the postrestricted period less the difference in the restricted and open % gap in the (B r b-b o b) pre-restricted period, i.e., the difference-in-difference or DD estimate The Impact of Restrictive Tendering in Municipal Contracting in Ontario 15

16 Note: B denotes % difference in the winning bid and benchmark, for example, runner-up (since the winning bid is lower than the runner-up the gap is negative); subscript r denotes restricted jurisdiction; subscript o denotes open bidding jurisdiction; subscript a denotes the post-treatment period when restricted bidding was in place for the restricted jurisdiction; subscript b denotes the pre-treatment period when open bidding was in place for all jurisdictions. Table 3 gives our results for the different benchmarks: column 1 for the winning bid less the runner-up bid; column 2 for the winning bid less the average bid; column 3 for the winning bid less the maximum bid; and column 4 for the CV as a measure of overall dispersion. The presentation is complicated by the fact that the bid gaps are negative numbers since the winning bid is lower than the benchmark bids (runner-up, average, maximum). Table 3. Estimates of various bid gaps in Hamilton restricted bidding versus twelve open-bidding comparison jurisdictions Bid gap by restricted (r) vs. open (o) and before (b) and after (a) % difference between winning bid Y w and benchmarks (Y w Y n )/Y n Y n = runner-up (Y w Y a )/Y a Y a = average (Y w Y m )/Y m Y m = max bid Coefficient of Variation (1) (2) (3) (4) 1. Overall Mean Bra Boa Bra Boa [2 3] *** *** *** 0.134*** 5. Brb Bob Brb Bob [5 6] * ** 0.102*** 8. DD or (Bra-Boa) (Brb-Bob) [4 7] *** 1%, ** 5%, * 10%. Based on a t-test of the difference for restricted versus open in the post-restricted period for row 4 and in the pre-restricted period for row 7 and for the difference-in-difference for row Cardus: Work & Economics cardus.ca/research/workandeconomics

17 RESULTS: WINNING BID LESS RUNNER-UP BID We will discuss our results from column 1 in table 3 in considerable detail, since once that pattern is outlined it tends to apply to the other outcomes. The first row of the first column of table 3 indicates that on average, across all bids, the winning bid was 11.4 percent lower than the runner up (i.e., mean (Y w Y n )/Y n = ). This includes the time period when Hamilton was on open bidding as well as on restricted bidding, as well as the comparison jurisdictions that were on open bidding over that same time period (January 2004 to December 2011). The second row of the first column indicates that when Hamilton shifted to restricted bidding, the post-treatment gap between the lowest bid and runner-up bid was an above-average (i.e., 13.1 percent). This is consistent with the expectation that restricted bidding reduces the competitive pressures that otherwise would make the runner up closer to the winning bid. In this case, the gap between the winning bid and the runner up became above average. The third row indicates that in the comparison jurisdictions where open bidding prevailed in that same time period when Hamilton was under restricted bidding, the gap between the winning and runner-up bid was considerably below average, at This is consistent with the expectation that open bidding fosters the competitive pressures that make the runner up closer to the winning bid that is, the law of one price where competition fosters movement to a competitive norm. Open bidding is associated with gaps that are smaller, consistent with competitive bidding fostering a move to a competitive norm the law of one price. The fourth row indicates that in the post-treatment period when Hamilton was on restricted bidding, the difference in the bid gaps between the restricted bidding of Hamilton versus the open bidding regimes was a statistically significant (i.e., the restricted bid gap of in row 2 minus the open bid gap of in row 3). That is, in the Hamilton projects where bidding was restricted, the gap between the lowest bid and the runner up was , which was more than (i.e., twice) the gap of in the open-bid projects of the comparison group. This difference in the bid gaps of being greater in the restricted jurisdiction is a substantial magnitude, essentially being equal to the gap itself in the open jurisdictions, and therefore leading to a doubling of the gap in the restricted jurisdiction. Since the bid gaps are negative numbers, a negative difference means it increases the negative gap. As expected, restricted bidding is associated with wider gaps between the lowest and runner-up bids. Conversely, open bidding is associated with gaps that are smaller, consistent with competitive bidding fostering a move to a competitive norm the law of one price. The fifth row indicates that in the pre-treatment or before period when all bids were open, the winning bids in Hamilton (the jurisdiction that later became restricted) were 10.5 percent lower than the next-lowest bid. This is close to the average of 11.4 percent lower across all bids. The sixth row indicates that in the pre-treatment or before period when all bids were open, the winning bids in the open-bidding comparison jurisdictions were 6.3 percent lower than the next-lowest or runner-up bid. In essence, the comparison-group open-bidding jurisdictions had a smaller gap between the winning bid and the runner-up compared to Hamilton even when both had open bidding. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 17

18 The gap between the price of the winning bid and runner up is 105% higher in the restricted jurisdiction. The seventh row indicates that in the pre-treatment period when all jurisdictions were on open bidding, the difference in the bid gaps between Hamilton (which later shifted to restricted bidding) and the open bidding regimes was a statistically insignificant (i.e., the bid gap of in row 5 minus the bid gap of in row 6). That is, in the Hamilton projects in the pre-treatment period before it shifted to restricted bidding, the gap between the lowest bid and the runner up was , which was more than the gap of in the comparison-group jurisdictions that had open bidding throughout the period. In essence, the bid gaps were wider in Hamilton even when it was not on restricted bidding, compared to the gaps in the comparison group that was on open bidding throughout the period. This suggests that there is something in the Hamilton jurisdiction that yields a larger gap between the winning bid and the runner up even when all jurisdictions are on open bidding. However, that gap of is smaller than the gap of in the post-intervention period when Hamilton shifted to restricted bidding. It is also statistically insignificantly different from zero and measured with imprecision given the small pre-intervention time period of less than two years. The eighth row indicates the difference-in-difference estimate. As indicated previously, the difference in the bid gap between restricted bidding in Hamilton and the open bidding of the comparison jurisdictions in the post-treatment or after period when Hamilton shifted to restricted bidding was a statistically significant This highlighted that the negative gap between the winning bid and the runner up was greater in Hamilton compared to the open bidding jurisdictions. However, in the pre-intervention period there was also a difference in the gap that was larger in Hamilton compared to the comparator jurisdictions, suggesting that there was something in Hamilton that made it less competitive even though both it and the comparison groups were under competitive bidding. That pre-intervention estimate, however, was not statistically significantly different from zero, likely reflecting the small pre-intervention period of less than two years. If it is taken as an accurate measure of the differences between Hamilton and the other jurisdictions, then subtracting it from the post-intervention difference would yield a difference-in-difference estimate of (-0.042) = As indicated previously, we have reasonable confidence in our estimate of the gap between the winning bid and runner up being twice as high (or a statistically significant greater) in the restricted jurisdiction of Hamilton (-0.131) compared to the open jurisdictions (-0.064) in the post-treatment period when Hamilton was on restricted bidding. That confidence arises because those estimates are based on a substantial number of contracts (280 in both Hamilton and the comparison jurisdictions) over a reasonably long period of time (October 2005 to December 2011). We have less confidence in our estimates in the pre-treatment period of a statistically insignificant difference of in the pre-treatment period since it was based on information for only 41 contracts in both Hamilton and in the open jurisdictions, and a less-than-two-year period (January 2004 to August 2005). 18 Cardus: Work & Economics cardus.ca/research/workandeconomics

19 Based on this reasoning we estimate the effect of restricted bidding as increasing the gap between the winning bid and the runner up by (essentially doubling the gap) if based on the post-treatment period and not netting out any difference from the pre-treatment period. The rationale for not netting out the difference from the pre-treatment period is based on its being estimated from a small number of contracts and a short time period that yielded estimates that are insignificantly different from zero. If those less reliable estimates of the difference in the gap of in the pre-treatment period when all jurisdictions were on open bidding is used to net out possible differences between Hamilton and the comparison jurisdictions, then the effect of restricted bidding is to increase that bid gap by (-0.042) = This difference-in-difference estimate, however, is statistically insignificant. Overall, the effect of restricted bidding is to increase the gap between the winning bid and the next-lowest runner up by a range of to with our preferred estimates being at or closer to the higher estimate. Based on a gap of in the open jurisdictions in the post-treatment period, this implies that restricted bidding increases the gap by a range of one-third to a doubling of the gap. In whatever manner it is estimated, the effect of restricted bidding on increasing the gap between the winning bid and the runner up is substantial. RESULTS: WINNING BID LESS THE AVERAGE BID Column 2 presents the results of using the average bid as a benchmark. As indicated in the first row, the gap between the winning bid and the average bid was , indicating that on average the winning bid across all jurisdictions over the full time period was 18.2 percent lower than the average bid. Obviously this will be larger than the gap between the winning bid and the runner up bid of column 1. Since in order to explain the pattern the results of column 1 were discussed in considerable detail, the exposition here will be brief. The gap between the price of the winning and average bid is 114% higher in restricted jurisdictions. As indicated in column 2, in the post-intervention period the gap between the winning bid and the average bid was (row 2) in the restricted bidding regime of Hamilton, compared to less than half that amount of (row 3) in the competitive open jurisdictions, for a statistically significant difference of (-0.098) = (row 4). Competitive open bidding is associated with reducing the gap between the winning bid and the average bid by about one-half (i.e., from to ); conversely restricted bidding is associated with roughly doubling the gap between open and restricted bidding, from to In the pre-intervention period when all jurisdictions were on open bidding, the gap was also higher in Hamilton (-0.167, row 5) compared to the open jurisdictions (-0.088, row 6) for a difference of (-0.079, row 7), suggesting that there are other factors in Hamilton that foster a larger gap between the winning bid and the average bid over and above restricted bidding. As indicated, we have less confidence in pre-intervention bid differences, however, given the short time period (2004:1 to 2005:8) and the small number of projects (twenty-six in Hamilton and fifteen in the open jurisdictions). If those less reliable estimates of the difference in the gap of in the pre-treatment period when all jurisdictions were on open bidding is used to net out possible differences between Hamilton and the comparison jurisdictions, then the effect of restricted bidding is to increase that bid gap by (-0.079) = This difference-in-difference estimate, however, is statistically insignificant. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 19

20 Overall, the effect of restricted bidding is to increase the gap between the winning bid and the average bid by a range of to , with our preferred estimates being at or closer to the higher estimate. Based on a gap of in the open jurisdictions in the post-treatment period, this implies that restricted bidding increases the gap by a range of one-third (-0.033/-0.098) to more than 100 percent (-0.112/-0.098). In whatever manner estimated, the effect of restricted bidding on increasing the gap between the winning bid and the average bid is substantial. RESULTS: WINNING BID LESS THE MAXIMUM BID Column 3 presents the results of using the maximum bid as a benchmark. As indicated in the first row, the gap between the winning bid and the maximum bid was , indicating that on average the winning bid across all jurisdictions over the full time period was 31.3 percent lower than the maximum bid. Obviously, this will be larger than the gap between the winning bid and the runner-up bid of column 1 or between the winning bid and the average bid of column 2. Restricted bidding is associated with increasing the gap between winning and high bids, by 92%. We regard this benchmark as the least informative since the maximum bid could well be an outlier and not representative of the bidding process. Subject to that caveat, the same pattern basically prevails as with the previous two benchmarks. In the post-intervention period the gap between the winning bid and the maximum bid was (row 2) in the restricted bidding regime of Hamilton, compared to about half that amount of (row 3) in the competitive open jurisdictions, for a statistically significant difference of (-0.184) = (row 4). Competitive open bidding is associated with reducing the gap between the winning bid and the maximum bid by about one-half (i.e., from to ); conversely restricted bidding is associated with roughly doubling the gap between open and restricted bidding, from to In the pre-intervention period when all jurisdictions were on open bidding, the gap was also higher in Hamilton (-0.304, row 5) compared to the open jurisdictions (-0.163, row 6) for a difference of (-0.141, row 7) suggesting that there are other factors in Hamilton over and above restricted bidding that foster a larger gap between the winning bid and the maximum bid. As discussed previously, however, we have less confidence in pre-intervention bid differences given the short time period (2004:1 to 2005:8) and small number of projects (twenty-six in Hamilton and fifteen in the open jurisdictions). If those less reliable estimates of the difference in the gap of in the pre-treatment period when all jurisdictions were on open bidding is used to net out possible differences between Hamilton and the comparison jurisdictions, then the effect of restricted bidding is to increase that bid gap by (-0.141) = This difference-in-difference estimate, however, is statistically insignificant. Overall, the effect of restricted bidding is to increase the gap between the winning bid and the maximum bid by a range of to , with our preferred estimates being at or closer to the higher estimate. Based on a gap of in the open jurisdictions in the post-treatment period, this implies that restricted bidding increases the gap by a range of one-sixth (-0.029/-0.184) to almost 100 percent (-0.170/-0.184). In whatever manner it is estimated, the effect of restricted bidding on increasing the gap between the winning bid and the maximum bid is substantial. 20 Cardus: Work & Economics cardus.ca/research/workandeconomics

21 RESULTS: COEFFICIENT OF VARIATION Column 4 gives the results based on the benchmark of the coefficient of variation (CV). As indicated previously, the CV is a measure of overall dispersion of the bids, calculated as the standard deviation divided by the mean. Dividing by the mean ensures that the measure is not affected by the magnitude of the measures; that is, it is unit free. Restricted bidding is associated with increasing the dispersion by 156%. The expected signs are the opposite of those based on the other benchmarks. That is, restricted bidding is expected to increase the dispersion of the bids while open bidding is expected to decrease the dispersion by fostering the competition that will yield bids closer to the competitive norm that is, the law of one price. As indicated in the second row of column 4, in the post-intervention period the CV in the restricted bidding regime of Hamilton of was about two and a half times the CV in the competitive open jurisdictions of (row 3), for a statistically significant difference of = (row 4). Competitive open bidding is associated with reducing the dispersion of the bids to less than one-half of the original variation (i.e., from to 0.086); conversely, restricted bidding is associated with more than doubling the dispersion, from to In the pre-intervention period when all jurisdictions were on open bidding, the CV was also higher in Hamilton (0.177, row 5) compared to the open jurisdictions (0.075, row 6) for a difference of (0.102) suggesting that there are factors other than restricted bidding in Hamilton that foster greater dispersion in the bidding process. As with the other benchmarks, however, we have less confidence in pre-intervention bid differences given the short time period (2004:1 to 2005:8) and small number of projects (twenty-six in Hamilton and fifteen in the open jurisdictions). If those less reliable estimates of the difference in the CV of in the pre-treatment period when all jurisdictions were on open bidding is used to net out possible differences between Hamilton and the comparison jurisdictions, then the effect of restricted bidding is to increase the CV by = This difference-in-difference estimate is statistically insignificant. Overall, the effect of restricted bidding is to increase the CV by a range of to 0.134, with our preferred estimates being at or closer to the higher estimate. Based on a gap of in the open jurisdictions in the post-treatment period, this implies that restricted bidding increases the gap by a range of almost one-third (0.032/0.086) to more than 150 percent (0.134/0.086). In whatever manner estimated, the effect of restricted bidding on increasing the dispersion of bids and away from the competitive norm is substantial. In whatever manner estimated, the effect of restricted bidding on increasing the dispersion of bids and away from the competitive norm is substantial. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 21

22 SUMMARY OF RESULTS ACROSS DIFFERENT BENCHMARKS The following generalizations emerge from the empirical analysis: Theoretical considerations as well as results from the general literature suggest that restricted bidding should widen the gap between the lowest winning bid and the benchmark bids as well as increasing the dispersion across bids. Conversely, the competitive pressures from open bidding should reduce the gap between the lowest winning bid and the benchmark bids as well as reducing the dispersion across bids essentially fostering the law of one price. Our empirical analysis confirms these expectations. No matter which benchmark is used (the runner-up bid, the average bid, the maximum bid) or the coefficient of variation, in the period when Hamilton was on restricted bidding, that restricted bidding was associated with a statistically significant wider gap between Hamilton and the various open bidding regimes, as well as greater dispersion across bids (row 4 in table 3). The magnitude was also very large, generally in the neighbourhood of doubling the gap that prevailed in the open bidding regimes. It is the case, however, that such a gap (albeit smaller) also existed in the pre-intervention time period between Hamilton when it was not on restricted bidding and the various open bidding comparison jurisdictions (row 7 in table 3). This could suggest that there is something other than restricted bidding that could affect the outcomes. We caution against the use of this information, however, to net out the effect of these other factors to get an estimate of the effect of restricted bidding given the short time period of less than two years (2004:1 to 2005:8) and small number of projects (twenty-six in Hamilton and fifteen in the open jurisdictions) over which this was estimated. If this pre-intervention time period is used to net out the effect of factors other than restricted bidding, the net effect of restricted bidding is still to widen the gap between the lowest winning bid and the various benchmark bids as well as to widen the dispersion across all bids, albeit the magnitude of the effect is much smaller and is statistically insignificant compared to the differences in the post-intervention period. Conversely, open bidding narrows the gaps as well as the dispersion, consistent with the notion that greater competition should foster movement toward a competitive norm the law of one price. Our preferred estimate is based on the bid gap between the lowest winning bid and the next-lowest runner-up bid (column 1) on the grounds that the next-lowest runner up is likely to be a meaningful bid that can credibly discipline the winning bid to be competitive. For that benchmark, in the post-intervention period, the winning bid was (13.1 percent) lower than the runner up in the restricted bidding regime of Hamilton, compared to a gap of half that size (-0.064) in the open-bidding jurisdictions, for a statistically significant difference of the gap being (-0.064) = greater under restricted bidding. In effect, restricted bidding was associated with a gap between the lowest winning bid and the next-lowest runner up that was twice the gap (-0.131) that prevailed in the competitive open bidding regimes (-0.064) for a difference of Netting out the less reliable difference of in the pre-intervention period that might reflect factors other than restricted bidding yields a difference-in-difference increase in the bid gap of , which is still substantial, being a one-third increase over the gap in the open bidding regimes in the post-intervention period. Netting out that difference is questionable, however, since it is insignificantly different from zero and is based on a short time period of less than two years (2004:1 to 2005:8) and small number of projects (twenty-six in Hamilton and fifteen in the open jurisdictions). 22 Cardus: Work & Economics cardus.ca/research/workandeconomics

23 Overall, our estimates yield a range of effects of restricted bidding increasing the gap between the lowest winning bid and the next-lowest runner up, ranging from a low of to a high of , with our preferred estimates closer to the higher end for reasons outlined. Relative to the gap of in the open jurisdictions in the post-intervention period, these substantially increase the gap by one-third based on the low estimate and a doubling of the gap based on the higher estimate. These substantial impacts highlight that restricted bidding reduces the competitive pressures that can otherwise discipline the bidding process toward a competitive norm effectively toward the law of one price. While this does not prove that the resulting winning bid is lower under restricted compared to open bidding regimes, it is suggestive of that effect in that the runners up (and the other benchmark bids) are closer to the winning bid and thereby induce more effective competitive pressure on the winning bid. No matter which benchmark is used or the coefficient of variation, in the period when Hamilton was on restricted bidding, that restricted bidding was associated with a statistically significant wider gap between Hamilton and the various open bidding regimes, as well as greater dispersion across bids. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 23

24 DISCUSSION REGARDING DATA NEEDS Our results indicate that restricted bidding has a negative effect on the competitive bidding process by increasing the negative gap between the winning bid and the next-lowest runner up as well as the average and maximum bid, and it increases the overall dispersion of bids. Additional data, however, would help in extending our estimates. In rough descending order of importance, the additional data would include the following: Additional data for the restricted bidding regime of Hamilton from January 2012 onward to extend our post-intervention data that currently ends at December 2011 for that jurisdiction. We have information on the winning bids only, but not on the next-lowest or average or maximum for Hamilton. While information on all benchmarks would be useful, and they would enable a calculation of the coefficient of variation, the most important would be information on the next-lowest or runner-up bid since we regard it as the most informative for determining the effect of restricted bidding on the competitive bidding process. We do have data for the comparison group of open bidding regimes over that period that would enable meaningful comparisons with the restricted regime. Additional information for Hamilton when it was on open bidding prior to September 2005, when it shifted to restricted bidding. As indicated, we currently only have information for a short time period of less than two years (January 2004 to August 2005) and small number of projects (twenty-six in Hamilton and fifteen in the open jurisdictions) in the pre-intervention period for Hamilton. Prior to that we do have information for forty-four projects in the comparison open jurisdiction back to 2000, but none for Hamilton. Having a longer pre-intervention period would facilitate a more meaningful difference-in-difference analysis, including an examination as to whether they exhibited common trends in the pre-intervention period (with common trends indicating that the differences between the treatment and comparison groups reflect a stable pattern to facilitate netting out that difference from the difference in the post-treatment period). Waterloo is a jurisdiction that also changed from open bidding to restricted bidding, in this case in July In this situation, the opposite problem prevails many projects in the pre-intervention open period, but few in the post-intervention period (i.e., only fifteen between August 2014 and December 2017). Even the pre-intervention period in Waterloo only goes back as far as January 2008 to June 2014, with thirty projects, so information prior to that period for Waterloo would be helpful not only to provide more observations but also to compare for common trends with the comparison group of other open jurisdictions. Information from the restricted jurisdiction of Toronto would also be helpful, especially given the large number of projects in that jurisdiction and the fact that it is contiguous to the jurisdictions used in this analysis. The same could be said of the restricted jurisdiction of Sault Ste. Marie, although it is not contiguous to the jurisdictions used in this analysis nor is it likely to have a large number of projects. Last, and in a different vein, information from a standardized set of projects that would enable standardized cost comparisons would enable more direct comparisons of the effect of restricted versus open bidding on project costs. Information on any or all of these factors would facilitate evidence-based policy-making in this area of growing importance. 24 Cardus: Work & Economics cardus.ca/research/workandeconomics

25 IMPLICATIONS FOR POLICY While the limitations of our data do not allow us to claim that our results conclusively prove that restricted tendering leads to higher costs, the empirical results strongly suggest that restricting tendering to a select group of firms on the basis of their workers affiliations will lead to higher costs for municipalities than if they tendered their projects to all qualified bidders, with the strong possibility that municipalities will pay a substantial magnitude more. Further, as noted by Dijkema (2012), there is concern that restricted tendering can lead to continued upward pressure on bids over time as firms adjust to having to bid against fewer competitors. Our results, which showed both an increase in the gaps between the winning bid and our benchmarks, as well as an increase in the dispersion of bids, seem to offer support for this possibility as well. If competition serves to concentrate bids around the lowest price, restricting competition seems to have an effect akin to a hot air balloon the introduction of less dense bids is likely to have the effect of causing prices to rise. As noted by Bauld and Dijkema (2014), the vast preponderance of evidence and practice suggests that restricting public bidding in this way is not only far outside of the norm, but can have significant and deleterious consequences for the public interest. Gunderson and Dijkema (2017) noted that the practice of restricting tendering to companies affiliated with a particular union was likely to increase corruption and costs, and lead to distortions in the healthy functioning of construction markets. Both papers noted how public procurement policies and directives, including those in Ontario, are premised on a consensus among procurement experts that fair, open, and transparent, competition among qualified bidders is the best way to ensure value for tax dollars and to prevent a host of negative social consequences. The results of this paper support that consensus, which implies that policy-makers should either maintain, or return to, the norm of fair, open, and competitive tendering on public projects. The empirical results strongly suggest that restricting tendering to a select group of firms on the basis of their workers affiliations will lead to higher costs for municipalities than if they tendered their projects to all qualified bidders, with the strong possibility that municipalities will pay a substantial magnitude more. The Impact of Restrictive Tendering in Municipal Contracting in Ontario 25

26 cardus.ca

27

28 BUILDING COMPETITIVE AND LIVABLE COMMUNITIES requires effective procurement policies for construction. Cardus's Work and Economics research program includes developing an understanding of how a competitive labour pool model can improve on some of the bidding policies employed by buyers of construction, including municipalities. As municipalities face increased infrastructure construction, maintenance, and repair costs, they will be forced to find innovative ways to ensure that their projects are completed in a cost-effective and sustainable way. cardus.ca/research/workandeconomics

Overview of Ontario Agriculture, Population and Labour Statistics

Overview of Ontario Agriculture, Population and Labour Statistics Overview of Ontario Agriculture, Population and Labour Statistics Prepared for: Ontario Pork Industry Council Prepared by: Lynn Marchand Ken McEwan June 2008 Acknowledgements The report Human Resource

More information

Highlights. Ontario. Retirement Homes Report. Canada Mortgage and Housing Corporation. Table of Contents. subscribe NOW! Date Released: 2008

Highlights. Ontario. Retirement Homes Report. Canada Mortgage and Housing Corporation. Table of Contents. subscribe NOW! Date Released: 2008 Housing Market Information Retirement Homes Report Ontario Canada Mortgage and Housing Corporation Date Released: 2008 Figure 1 Highlights The vacancy rate for private retirement homes in Ontario declined

More information

LibraryCo Inc. Annual Report Osgoode Hall, 130 Queen Street West, Toronto, Ontario, M5H 2N6.

LibraryCo Inc. Annual Report Osgoode Hall, 130 Queen Street West, Toronto, Ontario, M5H 2N6. Osgoode Hall, 130 Queen Street West, Toronto, Ontario, M5H 2N6 www.libraryco.ca Message from the board 2014 was a busy year for LibraryCo Inc., with continuing activity and interaction between and amongst

More information

TREIM 2017: ONTARIO TOURISM REGIONAL ECONOMIC IMPACT MODEL USER MANUAL

TREIM 2017: ONTARIO TOURISM REGIONAL ECONOMIC IMPACT MODEL USER MANUAL TREIM 2017: ONTARIO TOURISM REGIONAL ECONOMIC IMPACT MODEL USER MANUAL Prepared for: Tourism Policy and Research Branch Ontario Ministry of Tourism, Culture and Sport 400 University Avenue th 5 Floor Toronto,

More information

Committee Report. Report FR-CW Recommendation. Background

Committee Report. Report FR-CW Recommendation. Background Report FR-CW-12-17 Committee Report To: Warden Barfoot and Members of Grey County Council From: Kevin Weppler, Director of Finance Meeting Date: April 27, 2017 Subject: SWIFT Municipal Capital Agreement

More information

MEASURING IMPACT ACROSS VIBRANT COMMUNITIES CANADA S CITIES REDUCING POVERTY NETWORK

MEASURING IMPACT ACROSS VIBRANT COMMUNITIES CANADA S CITIES REDUCING POVERTY NETWORK THE CANADIAN COUNCIL ON SOCIAL DEVELOPMENT COMMUNITY DATA PROGRAM MEASURING IMPACT ACROSS VIBRANT COMMUNITIES CANADA S CITIES REDUCING POVERTY NETWORK PRESENTATION AT TAMARACK S NATIONAL POVERTY SUMMIT

More information

8 OMBI 2005 PERFORMANCE BENCHMARKING REPORT

8 OMBI 2005 PERFORMANCE BENCHMARKING REPORT 8 OMBI 2005 PERFORMANCE BENCHMARKING REPORT The Finance and Administration Committee recommends: 1. the presentation from Kelly Strueby, Manager, Business Planning & Performance Measurement, be received;

More information

Executive Director Financial Analysis and Accountability Branch. EPO Funding Supports for Labour Implementation

Executive Director Financial Analysis and Accountability Branch. EPO Funding Supports for Labour Implementation Ministry of Education Ministère de l Éducation Financial Analysis and Direction de l analyse et de la Accountability Branch responsabilité financières 21 st Floor, Mowat Block 21 e étage, édifice Mowat

More information

THE GROWTH OUTLOOK FOR THE GREATER GOLDEN HORSESHOE

THE GROWTH OUTLOOK FOR THE GREATER GOLDEN HORSESHOE THE GROWTH OUTLOOK FOR THE GREATER GOLDEN HORSESHOE Simcoe Grey Dufferin Wellington Peel Halton erth Waterloo Hamilton Oxford Brant Haldimand Norfolk Kawartha Peterborough Lakes Northumberland Durham York

More information

SENSITIVITY OF THE INDEX OF ECONOMIC WELL-BEING TO DIFFERENT MEASURES OF POVERTY: LICO VS LIM

SENSITIVITY OF THE INDEX OF ECONOMIC WELL-BEING TO DIFFERENT MEASURES OF POVERTY: LICO VS LIM August 2015 151 Slater Street, Suite 710 Ottawa, Ontario K1P 5H3 Tel: 613-233-8891 Fax: 613-233-8250 csls@csls.ca CENTRE FOR THE STUDY OF LIVING STANDARDS SENSITIVITY OF THE INDEX OF ECONOMIC WELL-BEING

More information

to the Growth Plan for the Greater Golden Horseshoe, 2006

to the Growth Plan for the Greater Golden Horseshoe, 2006 Proposed Amendment 2 to the Growth Plan for the Greater Golden Horseshoe, 2006 November 2012 Population and Employment Forecasts Policies and Implementation Proposed Amendment 2 to the Growth Plan for

More information

To report back on the results of the external review of compensation for elected officials.

To report back on the results of the external review of compensation for elected officials. STAFF REPORT April 24, 2006 To: From: Subject: Employee and Labour Relations Committee City Manager Compensation Review: Elected Officials Purpose: To report back on the results of the external review

More information

COMMITTEE OF THE WHOLE MEETING JANUARY 15, 2018

COMMITTEE OF THE WHOLE MEETING JANUARY 15, 2018 REPORT #PD-2018-01 COMMITTEE OF THE WHOLE MEETING JANUARY 15, 2018 COUNTY OF SIMCOE MUNICIPAL COMPREHENSIVE REVIEW RECOMMENDATION That Report #PD-2018-01 be received. OBJECTIVE The purpose of this report

More information

Monetary policy and the yield curve

Monetary policy and the yield curve Monetary policy and the yield curve By Andrew Haldane of the Bank s International Finance Division and Vicky Read of the Bank s Foreign Exchange Division. This article examines and interprets movements

More information

Canada-Ontario Affordable Housing Program (AHP) 2009 Extension. Homeownership Component

Canada-Ontario Affordable Housing Program (AHP) 2009 Extension. Homeownership Component Canada-Ontario Affordable Housing Program (AHP) 2009 Extension Program Guidelines Ministry of Municipal Affairs and Housing Queen s Printer for Ontario, 2009 ISBN 978-1-4435-0782-0 (PDF) Disponible en

More information

Financial Position Per Capita (County and Member Municipalities)

Financial Position Per Capita (County and Member Municipalities) COMMITTEE REPORT To: Chair and Members of the Administration, Finance and Human Resources Committee From: Ken DeHart, County Treasurer Date: Tuesday, March 15, 2016 Subject: BMA Municipal Study Financial

More information

Assessing the reliability of regression-based estimates of risk

Assessing the reliability of regression-based estimates of risk Assessing the reliability of regression-based estimates of risk 17 June 2013 Stephen Gray and Jason Hall, SFG Consulting Contents 1. PREPARATION OF THIS REPORT... 1 2. EXECUTIVE SUMMARY... 2 3. INTRODUCTION...

More information

Ontario Home Builders Association

Ontario Home Builders Association Ontario Home Builders Association 20 Upjohn Rd., Suite 101 (416) 443-1545 North York, Ontario Toll Free 1-800-387-0109 M3B 2V9 Fax: (416) 443-9982 www.ohba.ca info@ohba.ca January 8, 2016 Mr. David Marshall

More information

HANDBOOK OUR MISSION. To institute and regulate the game of slo-pitch softball

HANDBOOK OUR MISSION. To institute and regulate the game of slo-pitch softball 1 2 3 4 HANDBOOK OUR MISSION To institute and regulate the game of slo-pitch softball To foster and improve the game of slo-pitch softball across the Province To protect and promote the mutual interests

More information

Region of Waterloo Planning, Development and Legislative Services Community Planning

Region of Waterloo Planning, Development and Legislative Services Community Planning Region of Waterloo Planning, Development and Legislative Services Community Planning To: Chair Tom Galloway and Members of the Planning and Works Committee Date: April 4, 217 File Code: D7-4(A) Subject:

More information

Risk-Adjusted Futures and Intermeeting Moves

Risk-Adjusted Futures and Intermeeting Moves issn 1936-5330 Risk-Adjusted Futures and Intermeeting Moves Brent Bundick Federal Reserve Bank of Kansas City First Version: October 2007 This Version: June 2008 RWP 07-08 Abstract Piazzesi and Swanson

More information

Ministère de l Éducation. Direction des politiques et des programmes d immobilisations 900, rue Bay 19 e étage, Édifice Mowat

Ministère de l Éducation. Direction des politiques et des programmes d immobilisations 900, rue Bay 19 e étage, Édifice Mowat Ministry of Education Capital Policy and Programs Branch 900 Bay Street 19 th Floor, Mowat Block Toronto ON M7A 1L2 Ministère de l Éducation Direction des politiques et des programmes d immobilisations

More information

Central West Ontario Social and Economic Inclusion Project. Brant County Profile. Prepared by:

Central West Ontario Social and Economic Inclusion Project. Brant County Profile. Prepared by: Central West Ontario Social and Economic Inclusion Project Brant County Profile Prepared by: December, 2003 1.0 Introduction to Brant County Brant County is located between Hamilton to the east and London

More information

Municipal Eligible Investment Reforms

Municipal Eligible Investment Reforms Municipal Eligible Investment Reforms September 18, 2018 Presentation to: MFOA Investment Workshop Ministry of Municipal Affairs and Housing 1 MUNICIPAL INVESTMENTS: AN INCREASINGLY IMPORTANT REVENUE TOOL

More information

2017 Financial Information Return Instructions Ministry of Municipal Affairs Municipal Finance Policy Branch

2017 Financial Information Return Instructions Ministry of Municipal Affairs Municipal Finance Policy Branch 2017 Financial Information Return Instructions Ministry of Municipal Affairs Municipal Finance Policy Branch FIR2017 Introduction INTRO - 1 Table of Contents 1. Introduction... 4 2. Municipal Services

More information

Accounting for Capital Assets in Municipalities

Accounting for Capital Assets in Municipalities Accounting for Capital Assets in Municipalities Val Sequeira Finance Department, York Region Presentation to AMCTO Zone 4 September 15, 2006 Presentation Outline What is capital asset accounting and how

More information

THE UNIVERSITY OF TEXAS AT AUSTIN Department of Information, Risk, and Operations Management

THE UNIVERSITY OF TEXAS AT AUSTIN Department of Information, Risk, and Operations Management THE UNIVERSITY OF TEXAS AT AUSTIN Department of Information, Risk, and Operations Management BA 386T Tom Shively PROBABILITY CONCEPTS AND NORMAL DISTRIBUTIONS The fundamental idea underlying any statistical

More information

2ND SESSION, 41ST LEGISLATURE, ONTARIO 66 ELIZABETH II, Bill 134. An Act to implement 2017 Budget measures

2ND SESSION, 41ST LEGISLATURE, ONTARIO 66 ELIZABETH II, Bill 134. An Act to implement 2017 Budget measures 2ND SESSION, 41ST LEGISLATURE, ONTARIO 66 ELIZABETH II, 2017 Bill 134 An Act to implement 2017 Budget measures The Hon. C. Sousa Minister of Finance Government Bill 1st Reading May 17, 2017 2nd Reading

More information

Cost Containment Principles, Policies and Practices. Efficiency and Effectiveness Policies and Practices. Small Business Measures

Cost Containment Principles, Policies and Practices. Efficiency and Effectiveness Policies and Practices. Small Business Measures Cost Containment Principles, Policies and Practices Efficiency and Effectiveness Policies and Practices Small Business Measures Waste Diversion Ontario July 12, 2004 Table of Contents Executive Summary

More information

March 20, Dear Mr. Bédard,

March 20, Dear Mr. Bédard, March 20, 2015 Real Property Contracting Directorate Public Works and Government Services Canada Alain Bédard Manager of Procurement 185 Sparks Street Ottawa, Ontario K1A 0S5 Dear Mr. Bédard, Thank you

More information

Guelph s Financial Strategy 2014

Guelph s Financial Strategy 2014 Guelph s Financial Strategy 2014 GUELPH S FINANCIAL STRATEGY Guelph is one of Canada s most livable cities - a testament to this community s commitment to Guelph s vision: Be a city that makes a difference

More information

Do Domestic Chinese Firms Benefit from Foreign Direct Investment?

Do Domestic Chinese Firms Benefit from Foreign Direct Investment? Do Domestic Chinese Firms Benefit from Foreign Direct Investment? Chang-Tai Hsieh, University of California Working Paper Series Vol. 2006-30 December 2006 The views expressed in this publication are those

More information

How Investment Managers Use Active Share to Win New Business, Retain Clients and Justify Fees

How Investment Managers Use Active Share to Win New Business, Retain Clients and Justify Fees How Investment Managers Use Active Share to Win New Business, Retain Clients and Justify Fees Including graphics that illustrate eight different ways active share can help managers make the case for their

More information

INFORMATION REPORT. Update Respecting Multi Residential Taxation (FCS18002) (City Wide) (Outstanding Business List Item)

INFORMATION REPORT. Update Respecting Multi Residential Taxation (FCS18002) (City Wide) (Outstanding Business List Item) INFORMATION REPORT TO: COMMITTEE DATE: April 4, 2018 SUBJECT/REPORT NO: WARD(S) AFFECTED: Mayor and Members General Issues Committee Update Respecting Multi Residential Taxation (FCS18002) (City Wide)

More information

Key Objectives. Module 2: The Logic of Statistical Inference. Z-scores. SGSB Workshop: Using Statistical Data to Make Decisions

Key Objectives. Module 2: The Logic of Statistical Inference. Z-scores. SGSB Workshop: Using Statistical Data to Make Decisions SGSB Workshop: Using Statistical Data to Make Decisions Module 2: The Logic of Statistical Inference Dr. Tom Ilvento January 2006 Dr. Mugdim Pašić Key Objectives Understand the logic of statistical inference

More information

Morningstar Style Box TM Methodology

Morningstar Style Box TM Methodology Morningstar Style Box TM Methodology Morningstar Methodology Paper 28 February 208 2008 Morningstar, Inc. All rights reserved. The information in this document is the property of Morningstar, Inc. Reproduction

More information

Toward Better Accountability Quality of Annual Reporting

Toward Better Accountability Quality of Annual Reporting Toward Better Accountability Quality of Annual Reporting Each year, our Annual Report addresses issues of accountability and initiatives to help improve accountability in government and across the broader

More information

Speech at WRAFT Annual Meeting November 5, 2005 By Bob Topp, Executive Director

Speech at WRAFT Annual Meeting November 5, 2005 By Bob Topp, Executive Director Speech at WRAFT Annual Meeting November 5, 2005 By Bob Topp, Executive Director Welcome to WRAFT s second Annual Meeting. What a time for a meeting. The assessments are arriving and the Ombudsman is investigating.

More information

University Sustainability: Signal Data

University Sustainability: Signal Data 3333 University Sustainability: Signal Data Harvey P. Weingarten, Martin Hicks, Linda Jonker & Greg Moran Higher Education Quality Council of Ontario January 24, 2017 Published by The Higher Education

More information

Overlapping ETF: Pair trading between two gold stocks

Overlapping ETF: Pair trading between two gold stocks MPRA Munich Personal RePEc Archive Overlapping ETF: Pair trading between two gold stocks Peter N Bell and Brian Lui and Alex Brekke University of Victoria 1. April 2012 Online at https://mpra.ub.uni-muenchen.de/39534/

More information

Canadian Housing Market Trends Bob Dugan, Chief Economist September 2018 CANADA MORTGAGE AND HOUSING CORPORATION

Canadian Housing Market Trends Bob Dugan, Chief Economist September 2018 CANADA MORTGAGE AND HOUSING CORPORATION Canadian Housing Market Trends Bob Dugan, Chief Economist September 218 Housing Market Assessment (HMA) Degree of vulnerability Low Moderate High Key Insight: For the eighth consecutive quarter, the HMA

More information

THE BEHAVIOUR OF GOVERNMENT OF CANADA REAL RETURN BOND RETURNS: AN EMPIRICAL STUDY

THE BEHAVIOUR OF GOVERNMENT OF CANADA REAL RETURN BOND RETURNS: AN EMPIRICAL STUDY ASAC 2005 Toronto, Ontario David W. Peters Faculty of Social Sciences University of Western Ontario THE BEHAVIOUR OF GOVERNMENT OF CANADA REAL RETURN BOND RETURNS: AN EMPIRICAL STUDY The Government of

More information

Census Research Paper Series

Census Research Paper Series 2006 Census Research Paper Series #6 The Changing Industrial Structure of Northern Ontario by Chris Southcott, Ph.D. Lakehead University April, 2008 Prepared for the Local Boards of Northern Ontario Far

More information

HIGHLIGHTS. Ontario Labour Relations Board. Editors: Voy Stelmaszynski, Solicitor May 2017 Leonard Marvy, Solicitor

HIGHLIGHTS. Ontario Labour Relations Board. Editors: Voy Stelmaszynski, Solicitor May 2017 Leonard Marvy, Solicitor ISSN 1712 4506 (Online) Ontario Labour Relations Board HIGHLIGHTS Editors: Voy Stelmaszynski, Solicitor May 2017 Leonard Marvy, Solicitor JOB POSTINGS The Board has posted ads on the OPS Careers website

More information

ADVERSE CONSEQUENCES OF PROPOSED INCREASES IN MINIMUM WAGE

ADVERSE CONSEQUENCES OF PROPOSED INCREASES IN MINIMUM WAGE ADVERSE CONSEQUENCES OF PROPOSED INCREASES IN MINIMUM WAGE JANUARY 29, 2008 EMPLOYERS COUNCIL -- ADVERSE CONSEQUENCES OF PROPOSED INCREASES IN MINIMUM WAGE PAGE 1 OF 8 I. INTRODUCTION The Newfoundland

More information

The Benefits of P3s. Why do P3s work?

The Benefits of P3s. Why do P3s work? The Benefits of P3s Why do P3s work? P3s are a long-term performance-based approach for procuring public infrastructure where the private sector assumes a major share of the responsibility in terms of

More information

IN THE MATTER OF THE POLICE SERVICES ACT. -and- IN THE MATTER OF AN ARBITRATION THE NORTH BAY POLICE SERVICES BOARD. - and -

IN THE MATTER OF THE POLICE SERVICES ACT. -and- IN THE MATTER OF AN ARBITRATION THE NORTH BAY POLICE SERVICES BOARD. - and - IN THE MATTER OF THE POLICE SERVICES ACT -and- IN THE MATTER OF AN ARBITRATION BETWEEN: THE NORTH BAY POLICE SERVICES BOARD - and - - The Employer THE NORTH BAY POLICE ASSOCIATION - The Union AND IN THE

More information

WORKING PAPER MASSACHUSETTS

WORKING PAPER MASSACHUSETTS BASEMENT HD28.M414 no. Ibll- Dewey ALFRED P. WORKING PAPER SLOAN SCHOOL OF MANAGEMENT Corporate Investments In Common Stock by Wayne H. Mikkelson University of Oregon Richard S. Ruback Massachusetts

More information

in the province due to differences in their economic makeup or base. External macro factors play an

in the province due to differences in their economic makeup or base. External macro factors play an Summary dependent on mining and resources but face a weak outlook for metal Ontario s economic performance markets, where growth will remain is not shared equally in all regions low and possibly negative.

More information

Financial Markets I The Stock, Bond, and Money Markets Every economy must solve the basic problems of production and distribution of goods and

Financial Markets I The Stock, Bond, and Money Markets Every economy must solve the basic problems of production and distribution of goods and Financial Markets I The Stock, Bond, and Money Markets Every economy must solve the basic problems of production and distribution of goods and services. Financial markets perform an important function

More information

Basel Committee on Banking Supervision

Basel Committee on Banking Supervision Basel Committee on Banking Supervision Basel III Monitoring Report December 2017 Results of the cumulative quantitative impact study Queries regarding this document should be addressed to the Secretariat

More information

Analysing the IS-MP-PC Model

Analysing the IS-MP-PC Model University College Dublin, Advanced Macroeconomics Notes, 2015 (Karl Whelan) Page 1 Analysing the IS-MP-PC Model In the previous set of notes, we introduced the IS-MP-PC model. We will move on now to examining

More information

CABARRUS COUNTY 2008 APPRAISAL MANUAL

CABARRUS COUNTY 2008 APPRAISAL MANUAL STATISTICS AND THE APPRAISAL PROCESS PREFACE Like many of the technical aspects of appraising, such as income valuation, you have to work with and use statistics before you can really begin to understand

More information

The Case for TD Low Volatility Equities

The Case for TD Low Volatility Equities The Case for TD Low Volatility Equities By: Jean Masson, Ph.D., Managing Director April 05 Most investors like generating returns but dislike taking risks, which leads to a natural assumption that competition

More information

BRUCE GREY CHILD & FA MILY SERVICES (BGCFS) POVERTY REPORT

BRUCE GREY CHILD & FA MILY SERVICES (BGCFS) POVERTY REPORT BRUCE GREY CHILD & FA MILY SERVICES (BGCFS) POVERTY REPORT MAY 20, 2015 2 Contents 1. INTRODUCTION... 1 1.1 Background... 1 1.2 Data Sources and Limitations... 2 1.3 Bruce Grey Child & Family Services...

More information

Secretary-Treasurers of School Authorities (Isolate Boards) Business Administrators (Section 68 School Authorities)

Secretary-Treasurers of School Authorities (Isolate Boards) Business Administrators (Section 68 School Authorities) Ministry of Education Benefits Trust Branch 2 Carlton Street 7 th Floor, Suite 710 Toronto, ON M5B 1J3 Ministère de l Éducation Direction des fiducies des avantages sociaux 2, rue Carlton 7e étage, Suite

More information

The Peterborough Census Metropolitan Area (CMA) spans the city of Peterborough and six other jurisdictions. The area is

The Peterborough Census Metropolitan Area (CMA) spans the city of Peterborough and six other jurisdictions. The area is PETERBOROUGH CENSUS METROPOLITAN AREA Presented by the Credit Unions of Ontario and the Ontario Chamber of Commerce 1 Peterborough s housing market saw a banner year in 2015. The Peterborough Census Metropolitan

More information

AN ANNOTATED BIBLIOGRAPHY OF RECENT RESEARCH ON LABOUR RELATIONS POLICY, UNIONIZATION, AND CANADA-U.S. LABOUR MARKET PERFORMANCE

AN ANNOTATED BIBLIOGRAPHY OF RECENT RESEARCH ON LABOUR RELATIONS POLICY, UNIONIZATION, AND CANADA-U.S. LABOUR MARKET PERFORMANCE Sran 140 AN ANNOTATED BIBLIOGRAPHY OF RECENT RESEARCH ON LABOUR RELATIONS POLICY, UNIONIZATION, AND CANADA-U.S. LABOUR MARKET PERFORMANCE Garry Sran Ph.D. Student, Department of Economics, York University,

More information

Employment Status of the Civilian Noninstitutional Population by Educational Attainment, Age, Sex and Race

Employment Status of the Civilian Noninstitutional Population by Educational Attainment, Age, Sex and Race Employment Status of the Civilian Noninstitutional Population by Educational Attainment, Age, Sex and Race David G. Tucek Value Economics, LLC 13024 Vinson Court St. Louis, MO 63043 David.Tucek@valueeconomics.com

More information

Advanced Topic 7: Exchange Rate Determination IV

Advanced Topic 7: Exchange Rate Determination IV Advanced Topic 7: Exchange Rate Determination IV John E. Floyd University of Toronto May 10, 2013 Our major task here is to look at the evidence regarding the effects of unanticipated money shocks on real

More information

BETHESDA COMMUNITY SERVICES INC. Financial Statements

BETHESDA COMMUNITY SERVICES INC. Financial Statements Financial Statements March 31, 2017 Financial Statements March 31, 2017 Table of Contents Page Independent Auditors' Report 1-2 Statement of Financial Position 3 Statement of Changes in Net Assets 4 Statement

More information

Comparison of OLS and LAD regression techniques for estimating beta

Comparison of OLS and LAD regression techniques for estimating beta Comparison of OLS and LAD regression techniques for estimating beta 26 June 2013 Contents 1. Preparation of this report... 1 2. Executive summary... 2 3. Issue and evaluation approach... 4 4. Data... 6

More information

ONTARIO CHAMBER OF COMMERCE 2014 PRE-BUDGET SUBMISSION

ONTARIO CHAMBER OF COMMERCE 2014 PRE-BUDGET SUBMISSION ONTARIO CHAMBER OF COMMERCE 2014 PRE-BUDGET SUBMISSION [ March 12, 2014 ] Dear Minister Sousa, Ontario s Business Advocate We are pleased to have this opportunity to present our recommendations to you

More information

Catalogue no XIE. Income in Canada. Statistics Canada. Statistique Canada

Catalogue no XIE. Income in Canada. Statistics Canada. Statistique Canada Catalogue no. 75-202-XIE Income in Canada 2000 Statistics Canada Statistique Canada How to obtain more information Specific inquiries about this product and related statistics or services should be directed

More information

The Golub Capital Altman Index

The Golub Capital Altman Index The Golub Capital Altman Index Edward I. Altman Max L. Heine Professor of Finance at the NYU Stern School of Business and a consultant for Golub Capital on this project Robert Benhenni Executive Officer

More information

Monitoring the Performance of the South African Labour Market

Monitoring the Performance of the South African Labour Market Monitoring the Performance of the South African Labour Market An overview of the South African labour market from 3 of 2010 to of 2011 September 2011 Contents Recent labour market trends... 2 A brief labour

More information

The Vasicek adjustment to beta estimates in the Capital Asset Pricing Model

The Vasicek adjustment to beta estimates in the Capital Asset Pricing Model The Vasicek adjustment to beta estimates in the Capital Asset Pricing Model 17 June 2013 Contents 1. Preparation of this report... 1 2. Executive summary... 2 3. Issue and evaluation approach... 4 3.1.

More information

Poverty in the United Way Service Area

Poverty in the United Way Service Area Poverty in the United Way Service Area Year 4 Update - 2014 The Institute for Urban Policy Research At The University of Texas at Dallas Poverty in the United Way Service Area Year 4 Update - 2014 Introduction

More information

The Danish Experience With A Financial Activities Tax

The Danish Experience With A Financial Activities Tax The Danish Experience With A Financial Activities Tax Presentation to the Brussels Tax Forum 28-29 March 2011 by Peter Birch Sørensen Assistant Governor Danmarks Nationalbank Thank you, Mr. Chairman, and

More information

Economic Impacts of Suits

Economic Impacts of Suits Economic Impacts of Suits Prepared for the Motion Picture Association Canada October 2015 TABLE OF CONTENTS Introduction... 2 Study Purpose... 2 Season 5 Production Spending... 3 Economic Impacts of Production

More information

These notes essentially correspond to chapter 13 of the text.

These notes essentially correspond to chapter 13 of the text. These notes essentially correspond to chapter 13 of the text. 1 Oligopoly The key feature of the oligopoly (and to some extent, the monopolistically competitive market) market structure is that one rm

More information

FINANCING EDUCATION IN UTTAR PRADESH

FINANCING EDUCATION IN UTTAR PRADESH FINANCING EDUCATION IN UTTAR PRADESH 1. The system of education finance in India is complicated both because of general issues of fiscal federalism and the specific procedures and terminology used in the

More information

The Retirement of Skilled Trades In Urban Southern Ontario

The Retirement of Skilled Trades In Urban Southern Ontario The Retirement of Skilled Trades In Urban Southern Ontario Prepared for Waterloo Wellington Training and Adjustment Board by Larry Smith Essential Economics Corporation June 17, 2005 WWTAB would like to

More information

Conditional convergence: how long is the long-run? Paul Ormerod. Volterra Consulting. April Abstract

Conditional convergence: how long is the long-run? Paul Ormerod. Volterra Consulting. April Abstract Conditional convergence: how long is the long-run? Paul Ormerod Volterra Consulting April 2003 pormerod@volterra.co.uk Abstract Mainstream theories of economic growth predict that countries across the

More information

DATA EXPANSION AND VALIDATION FEBRUARY 2018

DATA EXPANSION AND VALIDATION FEBRUARY 2018 DATA EXPANSION AND VALIDATION FEBRUARY 2018 Andreas Rose, Vice-President - Research 1201 415 Yonge St. Toronto, ON M5B 2E7 Phone: 1-800-665-5848 ext. 408 E-mail: a.rose@malatest.com www.malatest.com TABLE

More information

State Highway Paving Report Oman Data

State Highway Paving Report Oman Data Introduction State Highway Paving Report Oman Data Concrete s market share in paving activity, as reflected in Oman data, has increased only modestly during the past two years. Oman data refers to state

More information

Lecture 2 INTERVAL ESTIMATION II

Lecture 2 INTERVAL ESTIMATION II Lecture 2 INTERVAL ESTIMATION II Recap Population of interest - want to say something about the population mean µ perhaps Take a random sample... Recap When our random sample follows a normal distribution,

More information

Asset Valuation and The Post-Tax Rate of Return Approach to Regulatory Pricing Models. Kevin Davis Colonial Professor of Finance

Asset Valuation and The Post-Tax Rate of Return Approach to Regulatory Pricing Models. Kevin Davis Colonial Professor of Finance Draft #2 December 30, 2009 Asset Valuation and The Post-Tax Rate of Return Approach to Regulatory Pricing Models. Kevin Davis Colonial Professor of Finance Centre of Financial Studies The University of

More information

EXTENSION AGREEMENT BETWEEN: ONTARIO PUBLIC SCHOOL BOARDS' ASSOCIATION hereinafter: "OPSBA" AND

EXTENSION AGREEMENT BETWEEN: ONTARIO PUBLIC SCHOOL BOARDS' ASSOCIATION hereinafter: OPSBA AND EXTENSION AGREEMENT BETWEEN: ONTARIO PUBLIC SCHOOL BOARDS' ASSOCIATION hereinafter: "OPSBA" AND ELEMENTARY TEACHERS' FEDERATION OF ONTARIO hereinafter: "ETFO" AND AGREED TO BY: THE CROWN 1. The parties

More information

BUILDING THE NEXT GENERATION OF INFRASTRUCTURE WHAT LEADERSHIP IS. KATHLEEN WYNNE S PLAN FOR ONTARIO

BUILDING THE NEXT GENERATION OF INFRASTRUCTURE WHAT LEADERSHIP IS. KATHLEEN WYNNE S PLAN FOR ONTARIO BUILDING THE NEXT GENERATION OF INFRASTRUCTURE WHAT LEADERSHIP IS. KATHLEEN WYNNE S PLAN FOR ONTARIO KATHLEEN WYNNE S PLAN FOR ONTARIO 1 BUILDING THE NEXT GENERATION OF INFRASTRUCTURE Our 10-Year Goals:

More information

Aviva Investors response to CESR s Technical Advice to the European Commission in the context of the MiFID Review: Non-equity markets transparency

Aviva Investors response to CESR s Technical Advice to the European Commission in the context of the MiFID Review: Non-equity markets transparency Aviva Investors response to CESR s Technical Advice to the European Commission in the context of the MiFID Review: Non-equity markets transparency Aviva plc is the world s fifth-largest 1 insurance group,

More information

Fiscal Health of Ontario Large Cities: Is There Something to Worry About? 1. Enid Slack, Almos Tassonyi, and David Grad 2

Fiscal Health of Ontario Large Cities: Is There Something to Worry About? 1. Enid Slack, Almos Tassonyi, and David Grad 2 DRAFT September 2013 Fiscal Health of Ontario Large Cities: Is There Something to Worry About? 1 Enid Slack, Almos Tassonyi, and David Grad 2 Ontario cities, like many cities around the world, are concerned

More information

Key Influences on Loan Pricing at Credit Unions and Banks

Key Influences on Loan Pricing at Credit Unions and Banks Key Influences on Loan Pricing at Credit Unions and Banks Robert M. Feinberg Professor of Economics American University With the assistance of: Ataur Rahman Ph.D. Student in Economics American University

More information

Forecasting the Future. Addressing efficiencies in the future

Forecasting the Future. Addressing efficiencies in the future Forecasting the Future Addressing efficiencies in the future Forecasting the Future: Addressing efficiencies in the future Chair: Ingrid Fife, Member of CIH Influence Board Will Perry, Director of Strategy,

More information

5 Draft 2017 Development Charge Background Study and Proposed Bylaw

5 Draft 2017 Development Charge Background Study and Proposed Bylaw Clause 5 in Report No. 3 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on February 16, 2017. 5 Draft 2017 Development

More information

INDIVIDUAL CONSUMPTION and SAVINGS DECISIONS

INDIVIDUAL CONSUMPTION and SAVINGS DECISIONS The Digital Economist Lecture 5 Aggregate Consumption Decisions Of the four components of aggregate demand, consumption expenditure C is the largest contributing to between 60% and 70% of total expenditure.

More information

BUOYANCY OF GEORGIA S PERSONAL INCOME TAX

BUOYANCY OF GEORGIA S PERSONAL INCOME TAX March 2009, Number 190 BUOYANCY OF GEORGIA S PERSONAL INCOME TAX The Personal Income Tax (PIT) in Georgia accounts for the largest share of state tax revenue. In FY2007, total personal income tax revenue

More information

Econ 551 Government Finance: Revenues Winter 2018

Econ 551 Government Finance: Revenues Winter 2018 Econ 551 Government Finance: Revenues Winter 2018 Given by Kevin Milligan Vancouver School of Economics University of British Columbia Lecture 8c: Taxing High Income Workers ECON 551: Lecture 8c 1 of 34

More information

Characteristics of the euro area business cycle in the 1990s

Characteristics of the euro area business cycle in the 1990s Characteristics of the euro area business cycle in the 1990s As part of its monetary policy strategy, the ECB regularly monitors the development of a wide range of indicators and assesses their implications

More information

Financial Position per Capita County and Member Municipalities

Financial Position per Capita County and Member Municipalities COMMITTEE REPORT To: Chair and Members of the Administration, Finance and Human Resources Committee From: Ken DeHart, Treasurer Date: Tuesday, January 17, 2017 Subject: BMA Municipal Study Financial Indicators

More information

3.3-Measures of Variation

3.3-Measures of Variation 3.3-Measures of Variation Variation: Variation is a measure of the spread or dispersion of a set of data from its center. Common methods of measuring variation include: 1. Range. Standard Deviation 3.

More information

GOVERNMENT OF NUNAVUT

GOVERNMENT OF NUNAVUT Contract Activity Report Prepared by kno1i ZKm4fi9l Wp5yC6tf5 Nunalingni Kavamatkunnilu Pivikhaqautikkut Department of Community and Government Services Ministère des Services communautaires et gouvernementaux

More information

Modifying the five solitudes of Ontario / 2. How the metropolitan areas have performed the big picture / 5. Supporting the Fraser Institute / 37

Modifying the five solitudes of Ontario / 2. How the metropolitan areas have performed the big picture / 5. Supporting the Fraser Institute / 37 Contents Executive summary / iii Introduction / 1 Modifying the five solitudes of / 2 How the metropolitan areas have performed the big picture / 5 Conclusion / 29 Appendix / 30 References / 33 About the

More information

PRE-QUALIFICATION # 502 FOR ROOFING CONTRACTORS

PRE-QUALIFICATION # 502 FOR ROOFING CONTRACTORS PRE-QUALIFICATION # 502 FOR Issue Date: Tuesday, October 25, 2016 Stacey Shoemaker, Buyer Issued by: The Thames Valley District School Board Return Date: prior to 12:00:00 noon, local time, Wednesday,

More information

CHAPTER 2 Describing Data: Numerical

CHAPTER 2 Describing Data: Numerical CHAPTER Multiple-Choice Questions 1. A scatter plot can illustrate all of the following except: A) the median of each of the two variables B) the range of each of the two variables C) an indication of

More information

GOVERNMENT OF NUNAVUT

GOVERNMENT OF NUNAVUT Contract Activity Report Prepared by kno1i ZKm4fi9l Wp5yC6tf5 Nunalingni Kavamatkunnilu Pivikhaqautikkut Department of Community and Government Services Ministere des Services Communautaires et Gouvernementaux

More information

Irish Retail Interest Rates: Why do they differ from the rest of Europe?

Irish Retail Interest Rates: Why do they differ from the rest of Europe? Irish Retail Interest Rates: Why do they differ from the rest of Europe? By Rory McElligott * ABSTRACT In this paper, we compare Irish retail interest rates with similar rates in the euro area, and examine

More information

The Reform of Business Property Tax in Ontario: An Evaluation

The Reform of Business Property Tax in Ontario: An Evaluation The Reform of Business Property Tax in Ontario: An Evaluation University of Toronto Introduction in Ontario (most of Canada) are high typically 25-40% of gross rents 2 4 times residential tax rates Past

More information

Monitoring the Performance of the South African Labour Market

Monitoring the Performance of the South African Labour Market Monitoring the Performance of the South African Labour Market An overview of the South African labour market for the Year ending 2011 5 May 2012 Contents Recent labour market trends... 2 A labour market

More information

Measures of Dispersion (Range, standard deviation, standard error) Introduction

Measures of Dispersion (Range, standard deviation, standard error) Introduction Measures of Dispersion (Range, standard deviation, standard error) Introduction We have already learnt that frequency distribution table gives a rough idea of the distribution of the variables in a sample

More information