Interim relief for stranded gas based plants though long term viability hinges on improved domestic gas avaliability:care Ratings
|
|
- Carmel Walker
- 5 years ago
- Views:
Transcription
1 May 19, 2015 CARE Ratings - update Interim relief for stranded gas based plants though long term viability hinges on improved domestic gas avaliability:care Ratings Ministry of Power (MoP) has devised the scheme for utilization of stranded gas based power plants by providing the subsidized fuel and tariff subsidy to improve availability of power and arrest deterioration in the credit quality for banks/financial institutions. Accordingly on May 12 and May 13, 2015 the e-auction was conducted and power plants with aggregate capacity of 10.2 Giga Watts (GW) have been selected based on the lowest quantum of subsidy per unit quoted. However, in CARE Ratings opinion the success of entire scheme is critically dependent on softer prices of regasified liquefied natural gas (R-LNG) and favourable USD/INR exchange rate. Based on CARE ratings assessment at current subsidy per unit and fuel prices (net of necessary deductions as per the scheme) the project companies would be able to meet the O&M expenses and service the interest on term loans and would require moratorium on principal repayments. While the scheme is intended for interim relief the long term viability of the gas based projects would depend on improvement in domestic gas availability. In March 2015, the Ministry of Power (MoP) announced e-auction based allocation of imported R-LNG to underperforming gas based capacity of 27.1GW (22.9 GW commissioned GW ready for commissioning as on Jan-15). The scheme has considered separate e-auction for Stranded power plants (SGP) and Plants Receiving Limited Domestic Gas Supply (DGP). Thus, the Scheme has identified Stranded Power plants of ~14.3 GW and ~9.8GW of plants with limited domestic gas availability (operating at <35% PLF). The Scheme provides for a per-unit tariff subsidy from the Power System Development Fund (PSDF). Further the tariff paid by power distribution company (maximum of Rs.5.5 per unit) and PLF levels (maximum 35%) of individual plant is also fixed as per the bidding criteria. The subsidy would be disbursed based on a reverse auction mechanism - to the stranded gas-based power plants first and then to plants already receiving domestic gas. According to the scheme the subsidy would be provided for two financial years i.e and and maximum support is capped at Rs.3,500 crore for FY16 (Rs. 3,000 crore for SGP and Rs. 500 crore for DGP) and Rs.4,000 crore (Rs. 3,500 crore for SGP and Rs. 500 crore for DGP) for FY17. Accordingly in the auction conducted on May 12 and May , the scheme has allotted support equivalent to Rs (Rs crores for SGP + Rs120 crores for DGP) for plants to operational between 1 st June 2015 to 30 th September 2015 (refer to Annexure-II for details). The bids would be conducted for eligible plants till the gas availability or PSDF support would be fully exhausted. 1
2 The success of this scheme will hinge upon 1) ability of power generators to find buyers for electricity generated as net sale price of electricity sale to DISCOMs has been fixed at Rs /kWh for SGP and Rs3.39/KWh for DGP, 2) ability of power IPP to get a moratorium on principal repayments of two years from the lenders 3) R-LNG availability at reasonable rates and support from respective state governments. Impact and Sensitivity Analysis Our calculations suggest that the scheme offers a pass-through fuel charges (made available by R-LNG sourcing player) and a cap on fixed charges to the extent of O&M expenses and interest cost for the project. Illustration below explains the tariffs bidded for SGP scheme would only suffice to cover the above two costs and left over funds of about Rs.0.13/KWh would not be sufficient to cover the depreciation for the plant. This would necessitate moratorium on principal payments for two years. Particulars of 1000 MW plant to be operated under SGP scheme Capital cost (Rs.mn per MW) 45 Debt: Equity Ratio (x) 70:30 Plant size (MW) 1000 Fuel Type Gas PLF (%) 35 Units generated (mn KWh) 2772 Net tariff offered ( by discom) 4.70 Subsidy cap 1.42 Gross tariff offered 6.12 Less: Variable costs/kwh 4.23 Less: O&M costs/kwh 0.45 Interest coverage/kwh 1.31 Left over Funds available/kwh 0.13 Source: CARE Ratings estimates Key assumptions for 1000 MW plant R-LNG price USD $/mmbtu (landed) 9.00 INR/USD exchange rate Station Heat Rate (Kcal per unit) 1850 Net calorific value of fuel (Kcal per SCM) 8700 Interest rate on term loan 11.5% Source: CARE Ratings 2
3 The plant s profitability would be sensitive upon the R-LNG prices and exchange rate as the maximum support as per the scheme is capped for each financial year. As per the sensitivity below any increase in R- LNG prices above 9 US $ per MMBTU (landed) or exchange rate above INR/USD of 64 would adversely impact the cash flows. Sensitivity of Average cost of sale over FY16 & FY17 to R-LNG spot price & exchange rate Exchange rate (INR/USD) Imported R-LNG spot price in USD/mmBtu Impact on the Sector and banks/financial institutions (FI): In both these auctions, the gas based capacity of GW is likely to be revived. Consequently, these power plants would add ~31.49 BUs power in primarily three states of Andhra Pradesh, Gujarat and Maharashtra. CARE Ratings believes that the scheme would help increasing availability of power in above mentioned states. However, considering the persistent high levels of energy deficits witnessed in the Southern region the power projects located in AP would find it relatively easier to secure PPA at the rate prescribed in the scheme. This scheme is also likely to help easing power deficit scenario in the Southern region. Further, if the lenders offer two year of moratorium, CARE estimates asset quality slippages of about Rs.25,000 crore can be restricted for banks/fi. Gas based capacity 1 and scheme coverage (SGP+DGP) PLF trend for gas based capacity (%) 2973; 11% 9845; 36% 14305; 53% 80% 60% 40% 20% 66.15% 59.94% 40.33% 24.85% 20.79% 0% SGPs DGPs Other Plants (not included in scheme) Overall Central State Private Source: CEA, CARE Ratings 1 Gas based capacity includes commissioned as well as plants ready for commissioning 3
4 Impact on DISCOMs The capacity of projects under the scheme is primarily restricted to three states Andhra Pradesh, Gujarat and Maharashtra with share of 38.8%, 37.6% and 19.2% respectively. The discovered price bids in the auctions are Rs.4.70/KWh in SGP and Rs3.39/KWh in DGP. Electricity supply available after scheme implementation 100% 80% 60% 40% 20% 0% 10.62% 11.17% 4.66% Gujarat Andhra Maharashtra FY15E -Total power supply additional power supply under the scheme Trend of average power purchase cost FY12 FY13 FY14 Maharashtra Gujarat Andhra Pradesh Source: CEA, Various state DISCOMs, CARE Rating estimates CARE Ratings notes that the average cost of power purchase for the DISCOMs in these states are likely to increase between paisa per unit in FY16 after implementation of the scheme. As the tariff as per the scheme is higher than the average power purchase cost for distribution entities in these states and states like Gujarat and Maharashtra where power deficit levels are negligible the ability to tie up PPAs would be crucial. 4
5 Annexure-I Salient features of Scheme of importing RLNG for stranded power projects The Government of India (GoI) has come out with a bailout package for unutilized and under-utilized gasbased power generation companies on March 27, The scheme is applicable for FY16 and FY17 and will be reviewed after that seeing its feasibility then. An Empowered Pool Management Committee (EPMC) has been constituted under the chairmanship of special secretary in the power ministry. The committee would draw up the list of eligible gas-based plants, based on target plant load factor, for taking part in the bidding. The committee would also fix the target PLF and price for power. It has differential subsidy mechanism and separate bidding for plants receiving limited domestic gas supply and plants not receiving domestic gas supply. All the stakeholders are expected to share the burden of this subsidy in various forms like taking a cut in margins, tax exemptions and waivers, etc. Salient features: Only two e-bid R-LNG operators have been appointed i.e. Gujarat State Petronet Limited (GSPL) for plants in Gujarat and GAIL for plants in Rest of India. Of the two e-bid R-LNG operators, GAIL will be the only agency for the procurement of e-bid R-LNG under the proposed mechanism. The eligible bidders while participating in the reverse e-auction will be required to indicate during the online bidding process, the total incremental electricity they would generate using the e-bid RLNG. They would also need to quote the support or subsidy they require in order to ensure the net purchase price for the distribution companies is not more than the target price decided by EPMC, without exceeding the target PLF. Stakeholders to share the subsidy burden along with the central government by providing concession or foregoing revenue by means of: Customs duty, VAT, CST, and service Tax wavier. Reduction in Pipeline charges (50%), Re-gasification charges (50%) and marketing margin (75%) too. Fixed cost recovery limited to obligation towards O&M and debt servicing. EPMC will fix the upper ceiling of per unit support required from PSDF. PSDF Support Ceiling Price (Rs. per unit) Scheme/Year FY FY SGPs DGPs The EPMC is empowered to modify this ceiling price for successful conduct of reverse e-bidding. If there is surplus at cut-off level, EPMC will have the flexibility to either reduce further target price of power and/or to increase the target PLF without exceeding the total amount of PSDF support and the entire bidding process will be repeated again. It will also have freedom to decide the period covered under the bidding. 5
6 EPMC is authorized to appropriately design and finalize the bidding process Once the bidding process is complete, the winning gas based plants will be allowed a limited time frame, as decided by EPMC, during which various stakeholders will have to fulfil the conditions/formalities including entering into Take or Pay contractual agreement for the e-bid R-LNG with the e-bid R-LNG operator. The power producers, who are allotted R-LNG, are supposed to open a Trust Retention account which shall work as follows: Revenue from sale of electricity to be deposited in TRA SGP DGP Money to be utilized only for payments towards variable cost, O&M and debt servicing after capping fixed cost Money to be utilized only for payments towards the variable cost of generation EPMC to ensure no payments are made towards Return on Equity The individual gas based plants will have to improve their efficiency i.e. perform at better PLF in order to compete with CCP (combined Cycle Plant) who has both gas turbine and steam turbine in operation to produce electricity. Gas based plants will be free to produce additional power by acquiring additional R-LNG separately from the market on their own and sell such additional power so generated in the market. 6
7 Annexure-II Bidding outcome On 12 th May reverse auction bidding for SGP and on 13 th May, 2015 DGP was completed. Of the total capacity 10.2 GW under SGP, 10 bidders comprising of 6.8GW have been technically and subsequently financially qualified under SGP scheme and 5 bidders consisting of ~3.4GW under DGP scheme. List of winning bidders for Stranded Gas based Power Producers (SGP) Power IPPs State Capacity installed (MW) Torrent Energy (DGEN Mega CCPP) Gujarat Torrent Power UNOSUGEN CCPP) Gujarat Gujarat State Electricity Corp (UTRAN) Gujarat Lanco-Kondapalli (Kondapalli Extn CCPP (366) & Kondapalli Ext. St-III (742) Andhra Pradesh RVK energy Andhra Pradesh 28.0 GMR Rajahmundry Energy (GMR Vemagiri Ext) Andhra Pradesh GVK industries (JEGURUPADU CCP) Andhra Pradesh GMR Vemagiri Power (Vemagiri CCPP) Andhra Pradesh 370 Sravanthi Energy (Kashipur Sravanthi ST-I &II) Uttarakhand 450 Ratnagiri Gas and power (DHABHOL) Maharashtra 1967 Total 6,868 List of winners for Gas based power producers receiving limited domestic gas supply (DGP) Power IPPs State Capacity installed (MW) Torrent Power ( SUGEN CCPP) Gujarat Gujarat State Electricity Corp (DHUVARAN CCPP) Gujarat CLP India (PEGUTHAN CCPP) Gujarat 655 NTPC Auraiya CCPP Andhra Pradesh NTPC Dadri CCPP Andhra Pradesh Total Source: Ministry of Power, Press Information Bureau, CARE Ratings N.B. CCCP Combined Cycle Power Plant 7
8 Contact: Revati Kasture Dhaval Patel Piyush Nimgaonkar Chief General Manager Asst. General Manager Manager Disclaimer This report is prepared by Credit Analysis & Research Limited (CARE Ratings). CARE Ratings has taken utmost care to ensure accuracy and objectivity while developing this report based on information available in public domain. However, neither the accuracy nor completeness of information contained in this report is guaranteed. CARE Ratings is not responsible for any errors or omissions in analysis/inferences/views or for results obtained from the use of information contained in this report and especially states that CARE Ratings has no financial liability whatsoever to the user of this report. 8
TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE 1)
TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE 1) Tender Document No. 4/2/2015-Th-I (SGP) dated April 24, 2015 Nodal Authority Ministry of Power Government of India New Delhi 24 April
More informationCompensatory Tariff Orders...A Fine Balancing Act by CERC
Impact Analysis: Compensatory Tariff Orders...A Fine Balancing Act by CERC March 11, 2014 CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra
More informationJune 08, 2017 Ratings
POWER Solar Parks: A new Sunrise? Contact: Sanjay Agarwal Senior Director sanjay.agarwal@careratings.com 91-22- 6754 3582 Rajashree Murkute Associate Director rajashree.murkute@careratings.com 91-22-6754
More informationPower T&D Sector The catch up game begins
December 03, 2013 Industry Update Power T & D Sector Power T&D Sector The catch up game begins Demand at decade low, though early signs visible, gradual recovery expected All-India power demand has tapered-off
More informationPower Procurement Strategy
Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed
More informationTENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE II)
TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE II) Tender Document No. 4/33/ 2015-Th-I (SGP)dated August 31, 2015 Nodal Authority Ministry of Power Government of India New Delhi 02
More informationDISCOMs, the weakest link in the Power value chain Can it be strengthened? A reality check
Impact analysis: DISCOMs, the weakest link in the Power value chain Can it be strengthened? A reality check... August 02, 2016 DISCOMs, the weakest link in the Power value chain Can it be strengthened?
More informationStrategic Partnership with Tenaga Nasional Berhad. 09 May 2016
Strategic Partnership with Tenaga Nasional Berhad 09 May 2016 0 DISCLAIMER The materials being shown in this presentation is solely for information and not to be reproduced, retransmitted, further distributed
More informationSecond Quarter 2018 Ended September 30, 2017 Earnings Presentation
India s first private grid connected MW solar plant India s first distributed rooftop solar project over one megawatt Pan India portfolio of solar assets in 22 States Issued India s first solar Green Bond
More informationJSW Energy Limited. Q2 FY 2016 Results Presentation October 28, 2015
JSW Energy Limited Q2 FY 2016 Results Presentation October 28, 2015 Agenda Business Environment Operational and Financial Performance Status updates 2 Capacity profile and PLF s Sector-wise Installed Capacity
More informationEarnings Call 22 nd November 2016 Q2 FY 17
Picture: 100 MW, Jodhpur, Rajasthan Largest Solar Power Plant under National Solar Mission policy Earnings Call 22 nd November 2016 Q2 FY 17 India s first private grid connected MW Solar plant India s
More informationFebruary 08, 2017 I Research
Uttarakhand Uttar Pradesh Delhi Haryana Rajasthan Maharashtra Punjab Madhya Pradesh India Karnataka Gujarat Kerela Chhattisgarh Jharkhand West Bengal Tamil Nadu Demonetization: A pause for sustainable
More informationCompensatory Tariff Orders and Fine Balancing Act by CERC
CARE RESEARCH Compensatory Tariff Orders and Fine Balancing Act by CERC CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra projects. With
More informationSOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS
SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SYSTEM SCHEME
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865
More informationState Government Borrowing: April September 2015
November 5, 2015 Economics State Government Borrowing: April September 2015 State Development Loans (SDL) are debt issued by state governments to fund their fiscal deficit. States in India like the centre,
More informationPress Release Q October 26, 2013 JSW ENERGY LTD
Press Release Q2 2013-14 October 26, 2013 JSW ENERGY LTD The Board of JSW Energy Ltd., at its meeting held today at Mumbai, approved the results for the quarter ended September 30, 2013. Key highlights
More informationValue Pick. Neyveli Lignite (A GOI Enterprise) A.K.Prabhakar CMP 102 BUY Target 130
Neyveli Lignite (A GOI Enterprise) A.K.Prabhakar akprabhakar@rathi.com CA Vivek Gujrati vivekgujrati@rathi.com Shweta Prabhu shwetaprabhu@rathi.com CMP 102 BUY Target 130 Neyveli Lignite (NLC) possesses
More informationF. No. 53/15/2016 -WE Ministry of New & Renewable Energy. Evaluation of Generation Based Incentives Scheme for Wind Power Projects
F. No. 53/15/2016 -WE Ministry of New & Renewable Energy Evaluation of Generation Based Incentives Scheme for Wind Power Projects The GBI scheme was initially introduced in 11th Plan on 17.12.2009 with
More informationFourth Quarter & Full Year Ended March 31, 2018 Earnings Presentation
India s first private grid connected MW solar plant India s first distributed rooftop solar project over one megawatt Pan India portfolio of solar assets in 23 States Issued India s first solar Green Bond
More informationInvestor Presentation May 2018
India s first private grid connected MW solar plant India s first distributed rooftop solar project over one megawatt Pan India portfolio of solar assets in 20+ States Issued India s first solar Green
More informationConsultant report on EBITDA projections prepared by Greenko
Consultant report on EBITDA projections prepared by Greenko Prepared for: Greenko Investment Company Also provided to: Deutsche Bank AG, Singapore Branch Investec Bank plc J.P. Morgan Securities plc Morgan
More informationINOX WIND LIMITED Q2FY18 INVESTOR UPDATE
INOX WIND LIMITED Q2FY18 INVESTOR UPDATE DISCLAIMER This presentation and the following discussion may contain forward looking statements by Inox Wind Limited ( IWL or the Company ) that are not historical
More informationUDAY Scheme: Perspective and Progress
UDAY Scheme: Perspective and Progress Contact: Madan Sabnavis Chief Economist 91-022-67543489 Darshini Kansara Research Associate Darshini.Kansara@careratings.com 91-022-67543679 Mradul Mishra (Media Contact)
More informationGMR Chhattisgarh Energy Limited
Sr. GMR Chhattisgarh Energy Limited 1 RfS - Bid Informati on Sheet 2 RfS - 1.2.2 Ceiling tariff of Rs. 2.82/kWh 1.2.2: The Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to
More informationRATING METHODOLOGY June Rating Methodology for Solar Power Producers. ICRA Rating Feature. Overview
RATING METHODOLOGY June 2017 ICRA Rating Feature This rating methodology describes ICRA s approach towards assessing credit risk of solar power producers. It aims to help issuers, investors and other interested
More informationTariff Regulation in India
Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July, 2011 Forum of Regulators
More informationE T E R N I T Y : L AW A P P R I S E
E T E R N I T Y : L AW A P P R I S E I N S I D E T H I S I S S U E : * P r i v a t e C i r c u l a t i o n O n l y Risk management & inter-bank Dealings. 1 RESERVE BANK OF INDIA Guidelines about Streamlining
More informationCoal India Limited. Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy
Coal India Limited Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy Pre Bid Presentation This presentation is for ease of understanding
More informationEnabling Public-Private Partnerships in Renovation and Modernisation of Coal-fired Power Plants in India
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Information Note October 2009 Enabling Public-Private Partnerships in Renovation and
More informationExpression of Interest. Procurement of Renewable Energy Under Short Term basis. Reliance Industries Limited In Gujarat and Maharashtra
Expression of Interest for Procurement of Renewable Energy Under Short Term basis To Reliance Industries Limited In Gujarat and Maharashtra Reliance Industries Limited Reliance Corporate Park, Thane-Belapur
More informationPress Release Q JSW ENERGY LTD
Press Release Q3 12-13 23.01.2013 JSW ENERGY LTD The Board of JSW Energy Ltd., at its meeting held today at Mumbai, approved the results for the quarter and nine months ended December 31, 2012. Key highlights
More informationCASE No. 73 of hours for a period of six months from 1 April, 2019 to 30 September, Coram. I. M. Bohari, Member Mukesh Khullar, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationSummary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar
Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale
More informationPTC INDIA LTD. INVESTOR UPDATE MAY 2014
PTC INDIA LTD. INVESTOR UPDATE MAY 2014 DISCLAIMER This presentation and the accompanying slides (the Presentation ), which have been prepared by PTC India Limited (the Company ), have been prepared solely
More informationAgenda. Enel: Introduction Auctions: Enel experience and key factors Case study: India Closing remarks
Agenda Enel: Introduction Auctions: Enel experience and key factors Case study: India Closing remarks 1 Enel today 1 Global and diversified operator 40 bn Regulated Asset Base 62 mn distribution end users
More informationIN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI. Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018
IN THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION AT RANCHI Case No. 12 of 2018, 13 of 2018, 14 of 2018 & 15 of 2018 Jharkhand Bijli Vitran Nigam Limited...... Petitioner CORAM: HON BLE MR. (DR)
More informationBEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016
1 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 IN THE MATTER OF: Petition under Section 86 read with Section 181 of the Electricity Act, 2003 for amendment of
More informationInvestment Opportunities Track in Stressed Thermal Power Assets of India & Projects Database 2018:
Investment Opportunities Track in Stressed Thermal Power Assets of India & Projects Database 2018: Market Opportunity Analysis for Stressed Assets and Nonperforming assets vis-à-vis Investment and M&A
More informationPress Release. OPGS Power Gujarat Private Limited (OPGS) 28 September, Rating Assigned
Press Release OPGS Power Gujarat Private Limited (OPGS) 28 September, 2017 Rating Assigned Total Bank Facilities Rated* Long Term Rating Short Term Rating Rs. 2059.00 Cr (Assigned) (Assigned) *Refer Annexure
More informationPerspective on Financing Wind Energy Projects. June 16, 2016
Perspective on Financing Wind Energy Projects June 16, 2016 Agenda 2 1 Risk Matrix 3 Context Setting Way Forward KEY SEGMENTS IN THIS PRESENTATION 3 Indian Energy Sector Landscape Bank Lending Sector wise
More informationGUJARAT STATE PETRONET LTD (GSPL)
RESULT UPDATE MORNING INSIGHT Sumit Pokharna sumit.pokharna@kotak.com +91 22 6218 6438 Summary table (Rs mn) FY17 FY18E FY19E Sales 10,276 12,210 12,945 Growth (%) 3.6 18.8 6.0 EBIDTA 8,883 10,638 11,284
More informationCross Border Electricity Trade
Cross Border Electricity Trade Afghanistan Pakistan Nepal Bhutan India First meeting of core team on South Asian Regional Power Exchange (SARPEX) Bangladesh 7 th - 9 th February, 2017 New Delhi, India
More informationJSW Energy Limited Investor Presentation August 2017
JSW Energy Limited Investor Presentation August 2017 Agenda Overview Value Proposition Business Environment Appendix 2 JSW Group overview USD 11 billion group with presence across the core sectors JSW
More informationCOMPETITIVE BIDDING FRAMEWORK IN INDIA MOHAN MENON
COMPETITIVE BIDDING FRAMEWORK IN INDIA MOHAN MENON PRESENTATION OUTLINE COMPETITIVE BIDDING - CASE 1 AND CASE 2 KEY PROVISIONS OF A PPA CHALLENGES OF COMPETITIVELY BID TARIFFS TYPICAL POWER SUPPLY AGREEMENT
More informationJSW Energy Limited Investor Presentation May 2015
JSW Energy Limited Investor Presentation May 2015 Agenda Overview Value Proposition Business Environment Appendix 2 JSW Group presence across the core sectors JSW Steel*: India s leading integrated steel
More information@5}; i i,, DeeffiflE anga Comp ny Secretary. 07thAugust, 2018
Earnings IWL: N01: 37: 2018 07thAugust, 2018 The Secretary The Secretary BSE Limited National Stock Exchange of India Limited Phiroze Jeej eebhoy Towers Exchange Plaza, Bandra Kurla Complex Dalal Street,
More informationCompany Secretary; Obligations and Disclosure Requirements) Regulations, 2015 e Earnings Presentation
/ '» IWL: N01: 21: 2018 18th May, 2018 The Secretary The Secretary BSE Limited National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers Exchange Plaza, Bandra Kurla Complex Dalal Street, Mumbai
More informationCMD s Speech for 17 th AGM
Ladies and Gentlemen, CMD s Speech for 17 th AGM It is my privilege to welcome you all to the 17 th Annual General Meeting of PTC India Ltd. I express my sincere gratitude to all of you for your confidence
More informationCHAPTER X ESTIMATED POWER TARIFF MODEL
CHAPTER X ESTIMATED POWER TARIFF MODEL 10.0 INTRODUCTION It has been observed from the previous chapters that the SEBs are cash strapped. While the cost of supply of electricity has shown an increasing
More informationTORRENT POWER LIMITED. INVITATION TO OFFER For Supply Of LNG (CY-2017 To CY-2021) Dated 21st October 2016
TORRENT POWER LIMITED INVITATION TO OFFER For Supply Of LNG (CY-07 To CY-0) Dated st October 06 Response by TPL to Clarifications Uploaded on TPL's website on 7th November 06 In response to the above referred
More informationExecutive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY
Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...
More informationPackage Scheme of Incentive 2013 (PSI 2013)
Package Scheme of Incentive 2013 (PSI 2013) Incentives to Large Scale Units, Mega Projects & Ultra Mega Projects 1 1) PSI 2013 is governed by following Government Resolutions/Circulars: a) Main GR dated
More informationRating Methodology for Wind Power Producers
RATING METHODOLOGY April 2017 ICRA Rating Feature ICRA Rating Feature This rating methodology describes ICRA s approach towards assessing credit risk of wind power producers. It aims to help issuers, investors
More informationTangedco reduces losses, produces surplus power The Hindu: April 2, 2016
(Energy Conservation : It Doesn t Cost. It saves) 11.04.2016 Tangedco reduces losses, produces surplus power The Hindu: April 2, 2016 In addition to ensuring surplus power for the State, the Tamil Nadu
More informationRegional Power Market Challenges and Opportunities from Nepalese perspective
Regional Power Market Challenges and Opportunities from Nepalese perspective Hitendra Dev Shakya Director, Power Trade Department, Nepal Electricity Authority Outline of the Presentation 1. Energy sector
More informationLeading Diversified Renewable Energy Generation Company
Leading Diversified Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects are forward looking statements, which involve a number
More information9M FY16 Results. Leading Diversified Renewable Energy Generation Company
9M FY16 Results Leading Diversified Renewable Energy Generation Company Disclaimer Certain statements in this presentation concerning our future growth prospects are forward looking statements, which involve
More informationCase No. 27 of In the matter of
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationGOVERNMENT OF KERALA
183 GOVERNMENT OF KERALA Kerala Small Hydro Power Policy 2012 1. Order G.O.(P) 25/2012/PD Dated: Thiruvananthapuram, 03.10.2012 2. Title Kerala Small Hydro Power Policy 2012 3. Objective To increase the
More informationGOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010
GOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010 No. 1/17/09-EB(PR)/450.- Whereas the State of Punjab is presently facing acute power shortages. And therefore,
More informationROBUST OPERATIONAL PERFORMANCE
ROBUST OPERATIONAL PERFORMANCE Results presentation: H1 FY18 Half year ended 30 September 2017 13 December 2017 DISCLAIMER NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN OR INTO
More informationNTPC Limited. B U Y CMP ( ) : Rs Target : Rs Upside Potential : 19% Horizon : 6-8 mths. Key Investment Arguments
Vol. 02/09-10 May 11, 2009 Analyst: Abhishek Gupta abhishekg@bajajcapital.com Reviewed by: Alok Agarwala aloka@bajajcapital.com B U Y CMP (08.05.09) : Rs. 189.80 Target : Rs. 225.00 Upside Potential :
More informationPerformance Highlights
Power Finance Corporation Limited A Navratna PSU Performance Highlights Quarter ended 31 st March 2018 Funding for a Brighter Tomorrow. Disclaimers The presentation is prepared based on stand-alone audited
More informationIndia Tax Workshop Strategic Tax Incentives September 2014
India Tax Workshop 2014 Strategic Tax Incentives 11-13 September 2014 Transforming India Tax as a growth catalyst Type of Investor 01 and Incentives Incentives Available to Investors across States MSME
More informationBEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018
No. S/01/18 BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU Present: Dated 16 th, May,2018 Sri. M.K. Shankaralinge Gowda - Chairman Sri. H.D. Arun Kumar - Member Sri. D.B. Manival Raju
More informationNovember 15, 2017 I Ratings. Hybrid Annuity Model The journey so far. Introduction:
Hybrid Annuity Model The journey so far Contact: Maulesh Desai Associate Director Maulesh.desai@careratings.com 91-79- 4026 5605 91-8511190079 Ravina Deopura Analyst Ravina.deopura@careratings.com 91-79-4026
More informationSuzlon Energy Limited Q1 FY August 2017
Suzlon Energy Limited Q1 FY18 11 August 2017 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company ), have been prepared
More informationScheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)
Government of India Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL) Published by The Secretariat for the Committee on Infrastructure Planning Commission,
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Proposal of Government of Maharashtra Consultant s detailed note on Power Purchase Rate etc. of Small Hydro Power Projects Abbreviations BEST BOT CERC CPP
More informationPress Release Q
Press Release Q3 11-12 21.01.2012 JSW ENERGY LTD ACHIEVES COD OF 4 TH UNIT AT BARMER The Board of JSW Energy Ltd at its meeting held today at Mumbai approved the Results for the quarter ended and nine
More information1 P a g e. Report By: Surbhi Bagaria Page 1
1 P a g e Report By: Surbhi Bagaria surbhi@dynamiclevels.com Page 1 Torrent Power- Building new destination of possibilities Torrent Power Ltd.. 3 Business Areas.....4 Industry Outlook......... 5 Overview
More informationSuzlon Energy Limited H1 FY November 2017
Suzlon Energy Limited H1 FY18 10 November 2017 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company ), have been
More informationReplies to objections raised by
O.P..8 & 9 of 2016 on PPA Between M/s Singareni Colliers Company Ltd(SCCL) & Telangana State DISCOMs for supply of power for a period of 25 years from Singareni Thermal Power Project Phase-I (2x600 MW)
More informationMYT PETITION FOR JUBILANT INFRASTRUCTURE LTD
BEFORE THE HON BLE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD Filing No. Case No.. /2012 IN THE MATTER OF Filing of Petition under section 62 of the Electricity Act, 2003 for Aggregate Revenue
More informationNTPC LIMITED RESEARCH
RESULTS REVIEW Share Data Market Cap Rs. 1,457.0 bn Price Rs. 176.70 BSE Sensex 9,201.85 Reuters NTPC.BO Bloomberg NATP IN Avg. Volume (52 Week) 2.06 mn 52-Week High/Low Rs. 227 / 113 Shares Outstanding
More informationPower Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012 (Regulation No. 1 of 2012).
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY/RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012
More informationCOAL DISTRIBUTION AND MARKETING
Chapter 7 COAL DISTRIBUTION AND MARKETING ANNUAL REPORT 2017-18 Ministry of Coal Coal Distribution and Marketing Coal Distribution and Marketing Allocation of coal to power, cement and steel plants. The
More informationJune 2, 2017 I Ratings
Rating Methodology for ratings of road projects based on Hybrid Annuity Model (HAM) June 2, 2017 I Ratings Introduction: The Government of India has approved the hybrid annuity model (HAM) to increase
More informationJSW Energy Limited Investor Presentation January 2017
JSW Energy Limited Investor Presentation January 2017 Agenda Overview Value Proposition Business Environment Appendix 2 JSW Group overview USD 11 billion group with presence across the core sectors JSW
More informationExperience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015
Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors
More informationPower Sector Reform India The Long Road Ahead
Power Sector Reform India The Long Road Ahead Rahul Tongia Department of Engineering & Public Policy/ School of Computer Science University February 19, 2003 2 Outline Overview of the Indian power sector
More informationNo. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION
No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred under Section 61(d),62(4), 86(1)(b) sub-section (1) of section 181
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK)
More information2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area
2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The
More informationMending Power Sector Finances PPP as the Way Forward. Energy Market Forum
Mending Power Sector Finances PPP as the Way Forward Energy Market Forum AF Mercados EMI 11 th February 2011 Structure of the Presentation Current Status of Power Sector Generation Transmission Distribution
More informationSector-Power BVPS P/BV
OFS BUY Note Market Data Current Market Price (INR) 152.00 52 Week High (INR) 187.65 52 Week Low (INR) 141.05 Market Capitalization (In INR Crs.) 125,330.99 NTPC BHEL Ltd Sector-Power NTPC Ltd, Maha Ratna
More informationSuzlon Energy Limited Q1 FY August 2018
Suzlon Energy Limited Q1 FY19 04 August 2018 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Suzlon Energy Limited (the Company ), have been prepared
More informationUttar Pradesh Electricity Regulatory Commission
Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86
More informationPOLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar
POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012 ( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification
More informationNo.CBA / 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER
No.CBA2-13011/ 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER Shastri Bhawan, New Delhi, Dated the 11` gi February, 2018,2 Subject: Methodology for Auction of Coal Mines/Blocks for sale
More informationFuel and Power Purchase Price Adjust Formula Regulations DRAFT
Fuel and Power Purchase Price Adjust Formula Regulations DRAFT 2011 No. F.25/TERC/09/ Dated, 30 th March 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred
More informationThe Role of Risk Allocation in Transaction Design: The Case of Power Distribution
The Role of Risk Allocation in Transaction Design: The Case of Power Distribution Allen Eisendrath & Fraser Morrison Deloitte Emerging Markets February 26, 2003 Agenda Investors View of Electricity Distribution
More informationSECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS
FY 2011 SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) FY 2011 India: World s 6 th largest
More informationJSW Energy Limited Investor Presentation August 2016
JSW Energy Limited Investor Presentation August 2016 Agenda Overview Value Proposition Business Environment Appendix 2 JSW Group overview USD 11 billion group with presence across the core sectors JSW
More informationPROJECT FINANCE GLOSSARY
API Gravity Availability Barrel Barrel of oil equivalent Barter Base load plant Berne Union Bid Bond BOT BPCD BTU Bullion Buyer Credit Capacity charge A measure of density of Crude Oil or other liquid
More informationFINANCIAL ANALYSIS: PROJECT 1
Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy
More informationFirst Quarter 2018 Ended June 30, 2017 Earnings Presentation
India s first private grid connected MW Solar plant India s first distributed rooftop solar project over one megawatt Pan India portfolio of solar assets in 18 States Issued India s First Solar Green Bond
More informationNovember 16, 2017 I Ratings. Peer to Peer (P2P) Lending in India: A positive disruption to traditional financing, albeit cautious approach required
Peer to Peer (P2P) Lending in India: A positive disruption to traditional financing, albeit cautious approach required Contact: Revati Kasture Senior Director revati.kasture@careratings.com 91-11- 6754
More informationGUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS
GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS (i) (ii) OF ALL SECTORS COSTING MORE THAN RS.100 CRORE AND LESS THAN RS.250 CRORE UNDER NHDP COSTING RS.250
More information