1 EXHIBIT D STATEMENT OF COSTS AND FINANCING HOLT HYDROELECTRIC PROJECT FERC NO DRAFT LICENSE APPLICATION Alabama Power Company Birmingham, Alabama Prepared by: July 2012

2 EXHIBIT D STATEMENT OF COSTS AND FINANCING HOLT HYDROELECTRIC PROJECT FERC NO DRAFT LICENSE APPLICATION Alabama Power Company Birmingham, Alabama Prepared by: July 2012

3 EXHIBIT D STATEMENT OF COSTS AND FINANCING HOLT HYDROELECTRIC PROJECT FERC NO ALABAMA POWER COMPANY BIRMINGHAM, ALABAMA DRAFT LICENSE APPLICATION TABLE OF CONTENTS 1.0 ORIGINAL COST OF PROJECT AMOUNT PAYABLE IN EVENT OF PROJECT TAKEOVER FAIR VALUE, NET INVESTMENT, AND SEVERANCE DAMAGES FAIR VALUE NET INVESTMENT SEVERANCE DAMAGES ESTIMATED COST OF NEW DEVELOPMENT ESTIMATED AVERAGE ANNUAL COST OF THE PROJECT ESTIMATED ANNUAL VALUE OF THE PROJECT POWER SOURCES OF FINANCING AND ANNUAL REVENUES COST TO DEVELOP THE LICENSE APPLICATION VALUE OF PROJECT POWER CHANGES IN PROJECT GENERATION AND VALUE OF POWER DUE TO CHANGES IN PROJECT OPERATIONS ESTIMATED COST OF PROTECTION MITIGATION AND ENHANCMENT (PME) MEASURES...6 LIST OF TABLES TABLE D-1 PROJECT COSTS...2 TABLE D-2 SUMMARY OF ANNUAL BENEFITS AND COSTS...5 TABLE D-3 ESTIMATED COST OF PROTECTION MITIGATION AND ENHANCEMENT MEASURES...7 J:\535\016\Docs\Exhibits\Exhibit D docx - i -

4 EXHIBIT D STATEMENT OF COSTS AND FINANCING HOLT HYDROELECTRIC PROJECT FERC NO ALABAMA POWER COMPANY BIRMINGHAM, ALABAMA DRAFT LICENSE APPLICATION 1.0 ORIGINAL COST OF PROJECT This section is not applicable to the Holt Hydroelectric Project (Project) (FERC No. 2203) as Alabama Power Company (Alabama Power) is requesting a new license, not an initial license. Hereinafter in this exhibit, Project will apply to the Holt Hydroelectric Project. 2.0 AMOUNT PAYABLE IN EVENT OF PROJECT TAKEOVER FAIR VALUE, NET INVESTMENT, AND SEVERANCE DAMAGES To date, no agency or interested party has recommended a federal takeover of the Project pursuant to Section 14 of the Federal Power Act. If such a takeover were to occur, Alabama Power would have to be reimbursed for the net investment, not to exceed the fair value, of the property taken, plus severance damages (Section 14, Federal Power Act). 2.1 FAIR VALUE The fair value of this Project is dependent on prevailing power values and license conditions, both of which are currently subject to change. The best approximation of fair value would likely be the cost to construct and operate a comparable power generating facility. Because of the high capital costs involved with constructing new facilities and the increase in fuel costs (assuming a fossil fueled replacement), the fair value would be considerably higher than the net investment (see Section 2.2). If a takeover were to be proposed, Alabama Power would calculate fair value based on current conditions

5 2.2 NET INVESTMENT In 2015, the net investment for the Project is forecasted to be approximately $4,342,691. This amount includes the original costs, accumulated depreciation, capitalized capital work in progress, expenses prior to 2012, and net investment, according to the Commission s Uniform System of Accounts. Table D-1 provides the Project costs. TABLE D-1 PROJECT COSTS UNIFORM SYSTEM OF ACCOUNTS NO. TITLE ORIGINAL COST ($) ACCUMULATED DEPRECIATION ($) NET INVESTMENT ($) 302 Relicensing Cost 1,189, ,453 1,174, Land and Land Rights Structures & Improvements 3,951, ,937, , Reservoirs, Dams, and Waterways 3,408, ,408, Waterwheels, Turbines and 5,988, ,424, ,563, Generators 334 Accessory Electrical 1,040, , , Equipment 335 Misc. Power Plant Equipment 395, , , Roads, Railroads, and Bridges 337 ARO Structures & Improvements 353 Station Equipment 334, , , Totals $16,310,056 $11,967,365 $4,342,691 Note: These are values projected as of December 31,

6 2.3 SEVERANCE DAMAGES The Project provides power to the Alabama Power transmission and distribution system for ultimate consumption by Alabama Power s customers. Severance damages are determined either by the cost of replacing (retiring) equipment that is dependent for its usefulness upon the continuance of the License (Section 14, Federal Power Act), or the cost of obtaining an amount of power equivalent to that generated by the Project from the least expensive alternative source, plus the capital cost of constructing any facilities that would be needed to transmit the power to Alabama Power s customers, minus the cost savings that would be realized from not operating the Project. Again, these values would need to be calculated based on power values and license conditions at the time of project takeover. 3.0 ESTIMATED COST OF NEW DEVELOPMENT No new development has been proposed at the Project. The primary costs will be those costs associated with Alabama Power s proposed Protection, Mitigation, and Enhancement (PME) measures. PME costs related to Alabama Power s Proposal will increase operation and maintenance costs by approximately $18,600 annually. The annual increase in cost for capital and for operation and maintenance associated with Alabama Power s proposal for the Project is approximately $20, ESTIMATED AVERAGE ANNUAL COST OF THE PROJECT The estimated average cost of the Project before the proposed PME measures (No-Action alternative) will be approximately $2,729,141 per year, levelized on 2015 dollars, based on a 30- year period of analysis. This estimate includes annualized values for the cost of capital, taxes depreciation, and operation and maintenance expenses, as described in the following paragraph. The cost of capital is $382,165 with relicensing and $278, without relicensing. The cost of capital rate in percentage is 8.8%. In addition, the local tax rate for Tuscaloosa County is (tax amount $34,242.99) and the local tax rate for Tuscaloosa County for School District 1 is (tax amount $20,142.94). The total local taxes are $54, The federal - 3 -

7 tax rate is 3.42%, the state tax rate is 0.44%, and the total tax rate is 3.87%. Also, the average amount of depreciation is $174, 000 per year. Alabama Power uses Composite Straight-Line Rates which means that straight-line rates are established for similar assets. In addition, specific rates are established for each generating facility, including the Holt Project, taking into account the planned retirement date of the facility. With Alabama Power s proposal, total Project costs will be approximately $2,748,183 per year, levelized on 2015 dollars, based on a 30-year period of analysis. This estimate includes annualized values for the cost of capital, taxes, depreciation, and operation and maintenance expenses. The annual cost estimates associated with Alabama Power s proposal may not include all final costs. Should cost estimates change, Alabama Power will include final changes in the Final License Application. 5.0 ESTIMATED ANNUAL VALUE OF THE PROJECT POWER Alabama Power estimates total annual energy production of the Project under the No-Action alternative to be approximately 171,791 megawatt hours (MWh), while total annual energy production of the Project under Alabama Power s proposal will be approximately 171,791 MWh; Alabama Power s proposal will not affect energy production. Energy produced at the Project is sold at prevailing regulated rates as approved by the Alabama Public Service Commission. The estimated average annual Project cost under Alabama Power s proposal will be approximately $16.0 per MWh. Hydro projects typically complement gas-fueled generating units to serve the peak period customer loads served by Alabama Power. Were the Project not to be retained, additional generating capacity would be required to replace lost hydro capacity. Using typical capital cost for Alabama Power and projected gas, combined cycle capacity, and O&M cost as published by the Department of Energy s (DOE) Energy Information Administration (EIA), alternative capacity and energy equivalent to Project capacity and energy is expected to cost approximately $107 per MWh of average levelized annual cost over the same 30 year period of life expected for the Project. The EIA Annual Energy Outlook for 2012 accounts for recent market trends that - 4 -

8 exert downward pressure on natural gas prices, but the historical volatility in natural gas pricing is noteworthy and opportunity exists for upward price pressure over the additional life of the Project. Accordingly, the estimated annual value of the Project (defined as the difference between the cost to operate the Project and the cost to replace the generation associated with said Project (i.e., avoided cost) is approximately $91 per MWh ($107 per MWh minus $16 per MWh) or a total of $15.6 million per year over the 30 year period for Alabama Power s proposal. See Table D-2 for a summary of annual benefits and costs. TABLE D-2 SUMMARY OF ANNUAL BENEFITS AND COSTS NO ACTION ALABAMA ALTERNATIVE POWER S (BASELINE) PROPOSAL Annual Generation (MWh) 171, ,791 Average Annual Project Cost ($)* $ 2,729,141 $ 2,748,183 Average Annual Project Cost ($/MWh) Annual Replacement Cost ($) $ 18,303,449 $ 18,303,449 Annual Replacement Cost ($/MWh) $107 $107 Estimated Annual Project Value (Avoided Cost in $) Estimated Annual Project Value (Avoided Cost in $/MWh) *Costs levelized over 30 years in 2015 dollars $ 15,574,308 $ 15,555,266 $ 90.7 $ SOURCES OF FINANCING AND ANNUAL REVENUES Alabama Power obtains its annual revenues generally from the sale of electricity under retail rates established by the Alabama Public Service Commission and under wholesale rate contracts approved by the Federal Energy Regulatory Commission (FERC). Alabama Power has sufficient resources to finance the operational changes and PME measures in Alabama Power s proposal described in this application. If additional financing is necessary, - 5 -

9 Alabama Power will use its traditional sources of debt and equity financing. The interest rate for this financing is 8.8%. A more detailed description of Alabama Power s financial information is provided in its most recent FERC Form COST TO DEVELOP THE LICENSE APPLICATION Alabama Power developed its application to relicense the Project which will be filed no later than August 31, Alabama Power estimates that the Project relicensing process costs are approximately $1,189,909. The cost of the PME measures is presented in Section VALUE OF PROJECT POWER For Alabama Power, hydropower is sold under retail rates set by the Alabama Public Service Commission. 9.0 CHANGES IN PROJECT GENERATION AND VALUE OF POWER DUE TO CHANGES IN PROJECT OPERATIONS There are no anticipated license related changes in Project generation or operations that would lead to a change in value of power ESTIMATED COST OF PROTECTION MITIGATION AND ENHANCMENT (PME) MEASURES The estimated cost associated with the PME measures are provided in Table D-3. The costs were based on estimates made in 2012 dollars and escalated to the year in which they are expected to be spent

10 TABLE D-3 ESTIMATED COST OF PROTECTION MITIGATION AND ENHANCEMENT MEASURES PME MEASURE Continue Operating Project as occurs now with USACE operating restrictions Conduct water quality monitoring to comply with the requirements of the 401 Water Quality Certification Note: If ADEM requires profile data and monthly water chemistry for 5 months each year, we would add about $25,000 annually Map revision of existing Project Boundary- Exhibit G Continue light maintenance of the Overlook Park Maintenance of the transmission line CAPITAL SCHEDULED ($) 1 YEAR $1,400 (plus $1,400 annually for equipment) 2015 and annually TOTAL CAPITAL ($) (OVER 30 YEAR LICENSE) $43,400 $10,800 per year labor and travel ANNUAL YEARS O&M ($) 1 SPENT Annually $324,000 $400/month Annually $144,000 $2954 per year Every 5 Years TOTAL O&M ($) (OVER 30 YEAR LICENSE) Dangerous Tree $29,760 Side Trim $26,784 Mow $21,375 Herbicide $10,687 Total $88,606 1 Cost in 2015 dollars - 7 -

Final Application for New License for Major Water Power Project Existing Dam

Final Application for New License for Major Water Power Project Existing Dam Final Application for New License for Major Water Power Project Existing Dam Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project (FERC Project Number

More information

Exhibit D. Statement of Costs and Financing

Exhibit D. Statement of Costs and Financing Exhibit D Statement of Costs and Financing Exhibit D Statement of Costs and Financing D.1 Original Cost of the Project The Yadkin Project (Project) was originally licensed with an effective date of May

More information

Eugene Water & Electric Board Adopted Budget. December 5, 2017

Eugene Water & Electric Board Adopted Budget. December 5, 2017 Eugene Water & Electric Board 208 Adopted Budget December 5, 207 Eugene Water & Electric Board 500 East 4 th Avenue/Post Office Box 048 Eugene, Oregon 97440-248 54-685-7000 www.eweb.org Board of Commissioners

More information

Earnings Conference Call

Earnings Conference Call Exhibit 99.2 Earnings Conference Call Second Quarter 2015 Cautionary Statement Information Current as of July28, 2015 Except as expressly noted, the information in this presentation is current as of July28,

More information

South Carolina Public Service Authority. Public Service Authority Evaluation and Recommendation Committee

South Carolina Public Service Authority. Public Service Authority Evaluation and Recommendation Committee South Carolina Public Service Authority Presentation to: Public Service Authority Evaluation and Recommendation Committee September 5, 2018 Agenda Cost and Rate Development Santee Cooper Hydroelectric

More information

Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies. Robin Kliethermes Rachel Lewis

Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies. Robin Kliethermes Rachel Lewis Regulatory Authority Competences in Monitoring the Bookkeeping of the Regulated Companies Commissioner Steve Stoll Robin Kliethermes Rachel Lewis May 17, 2013 1 Overview of Regulatory Accounting Regulatory

More information

November 16, Ms. Donna Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901

November 16, Ms. Donna Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 Ms. Donna Mitchell, CPA Controller/Treasurer 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 Re: 2015 Electric Cost-of-Service and Rate Design Study Update Project Number 84122 Dear Ms.

More information

SOUTHERN COMPANY SYSTEM INTERCOMPANY INTERCHANGE CONTRACT ARTICLE I - RECITALS

SOUTHERN COMPANY SYSTEM INTERCOMPANY INTERCHANGE CONTRACT ARTICLE I - RECITALS Southern Company Services, Inc. Original Sheet No. 1 SOUTHERN COMPANY SYSTEM INTERCOMPANY INTERCHANGE CONTRACT ARTICLE I - RECITALS Section 1.1: This contract is made and entered into this 1 st day of

More information

PUD No. 1 of Pend Oreille County

PUD No. 1 of Pend Oreille County PUD No. 1 of Pend Oreille County Public Utility District #1 of Pend Oreille County Approved December 2, 2014 Public Utility District No. 1 of Pend Oreille County, Washington (the PUD, or the District)

More information

Rover Pipeline LLC. Explanatory Note

Rover Pipeline LLC. Explanatory Note Explanatory Note This contains the following 2 parts: (i) ( Rover ) derivation of its cost of service and recourse rates based on 3,250,000,000 Dt/Day of mainline capacity; and (ii) Rover s pro forma FERC

More information

GREEN ISLAND POWER AUTHORITY (A New York Public Benefit Corporation) FINANCIAL STATEMENTS and INDEPENDENT AUDITOR S REPORT. May 31, 2010 and 2009

GREEN ISLAND POWER AUTHORITY (A New York Public Benefit Corporation) FINANCIAL STATEMENTS and INDEPENDENT AUDITOR S REPORT. May 31, 2010 and 2009 (A New York Public Benefit Corporation) FINANCIAL STATEMENTS and INDEPENDENT AUDITOR S REPORT (A New York Public Benefit Corporation) FINANCIAL STATEMENTS and INDEPENDENT AUDITOR S REPORT C O N T E N T

More information

128 FERC 62,105 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Massachusetts Water Resources Authority Project No.

128 FERC 62,105 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Massachusetts Water Resources Authority Project No. 128 FERC 62,105 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Massachusetts Water Resources Authority Project No. 13400-000 Introduction ORDER GRANTING EXEMPTION FROM LICENSING (CONDUIT)

More information

2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy

2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy 2011 IRP Public Input Meeting October 5, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda Morning Session IRP Schedule Update Energy Gateway Transmission Construction Update and Evaluation

More information

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS Electric Utility Revenues, Revenue Requirements, Cost of Service, And Rates Draft Final Report (As Updated) February 2010 February 1, 2010 Kansas City Board

More information

An Economic Analysis of the Conowingo Hydroelectric Generating Stations

An Economic Analysis of the Conowingo Hydroelectric Generating Stations Executive Summary An Economic Analysis of the Conowingo Hydroelectric Generating Stations Prepared for: Water Power Law Group An analysis was conducted by Energy and Environmental Economics, Inc. (E3)

More information

Licensing of activities in energy sector of Latvia

Licensing of activities in energy sector of Latvia Licensing of activities in energy sector of Latvia Ainars Mengelsons Public Utilities Commission of Latvia Inogate Programme Riga, October 4, 2010 CONTENT Market overview Licences Main provisions of legal

More information

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Seventh Northwest Conservation and Electric Power Plan APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions...

More information

Best Practices for Navigating the Hydro Relicensing Process

Best Practices for Navigating the Hydro Relicensing Process Best Practices for Navigating the Hydro Relicensing Process A Guidebook for Hydro Owners and Investors Primary Contact: Jay Maher Market Leader FERC Licensing Jay.Maher@KleinschmidtGroup.com 207.416.1239

More information

RATES FOR EXPORT TRANSMISSION SERVICE

RATES FOR EXPORT TRANSMISSION SERVICE Page of RATES FOR EXPORT TRANSMISSION.0 INTRODUCTION The OEB has directed Hydro One Transmission to monitor and report to the Board, at the next rate case, on the functioning of the Export Transmission

More information

Fiscal Year Budget

Fiscal Year Budget Fiscal Year 2019 Budget Fiscal Year 2019 Project 3 Annual Budget Project 3 Fiscal Year 2019 Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Summary of Full Time Equivalent Table 2 5 Positions

More information

Schedule of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4

Schedule of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4 M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Simpson, Helgeson, Manning, Mital and Brown FROM: Sue Fahey, Chief Financial Officer; Susan Eicher, Accounting & Treasury Supervisor

More information

CENTRALLY HELD COSTS

CENTRALLY HELD COSTS Filed: 00-0- EB-00-000 Exhibit F Tab Schedule Page of 0 0 0 CENTRALLY HELD COSTS.0 PURPOSE This evidence presents OPG s centrally held costs. Centrally held costs primarily consist of: Certain pension

More information

Economic Benefit Analysis of the Navajo Generating Station to the Central Arizona Water Conservation District and Its Customers

Economic Benefit Analysis of the Navajo Generating Station to the Central Arizona Water Conservation District and Its Customers ENERGY VENTURES ANALYSIS JANUARY 2018 Economic Benefit Analysis of the Navajo Generating Station to the Central Arizona Water Conservation District and Its Customers January 2018 Prepared by: ENERGY VENTURES

More information

Introduction to Priest Rapids Project Power Sales Contracts

Introduction to Priest Rapids Project Power Sales Contracts Introduction to Priest Rapids Project Power Sales Contracts Background PRP was initially intended to be a Federal High Dam for Flood Control Pres. Eisenhower s Public/Private Partnership allowed non Fed

More information

MINNESOTA MUNICIPAL POWER AGENCY. Financial Statements. December 31, 2012 and 2011

MINNESOTA MUNICIPAL POWER AGENCY. Financial Statements. December 31, 2012 and 2011 Financial Statements (With Independent Auditors Report Thereon) Table of Contents Page Independent Auditors Report 1 Management s Discussion and Analysis 3 Statements of Net Position 9 Statements of Revenues,

More information

DATE: November 18, 2015 SUBJECT: 2016 Proposed Budgets, Revenue Requirements, and Prices OBJECTIVE: Approval of 2016 Budget and Price Proposals

DATE: November 18, 2015 SUBJECT: 2016 Proposed Budgets, Revenue Requirements, and Prices OBJECTIVE: Approval of 2016 Budget and Price Proposals M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: Commissioners Mital, Simpson, Helgeson, Manning and Brown Sue Fahey, Finance Manager; Harvey Hall, Deborah Hart and Edward Yan, Senior Financial

More information

Statement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4

Statement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4 M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: August 26, 2016 SUBJECT: OBJECTIVE: Commissioners Simpson, Helgeson, Manning, Mital and Brown Sue Fahey, CFO; Susan Eicher, Accounting

More information

Cautionary Statements and Factors That May Affect Future Results

Cautionary Statements and Factors That May Affect Future Results Cautionary Statements and Factors That May Affect Future Results Any statements made in this presentation about future operating results or other future events are forward looking statements under the

More information

EXHIBIT LIST. Administration. Summary of Board Directives and Undertakings from Previous Proceedings A 5 1 Corporate Organization Charts

EXHIBIT LIST. Administration. Summary of Board Directives and Undertakings from Previous Proceedings A 5 1 Corporate Organization Charts Page 1 of 9 1 EXHIBIT LIST A Administration A 1 1 Exhibit List A 2 1 Application A 2 1 1 Certification of Evidence A 3 1 Executive Summary A 4 1 Compliance with OEB Filing Requirements for Electricity

More information

Preliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO

Preliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO Preliminary 2019 Corporate Operating Plan Javier Fernandez Vice President & CFO Assumptions Alignment with Board Strategic Directives Revenue Adjustments No General rate increase No change in the fuel

More information

2003 Management s Discussion and Analysis

2003 Management s Discussion and Analysis OGE Energy Corp. 2003 Management s Discussion and Analysis Appendix A to the Proxy statement Management s Discussion and Analysis of Financial Condition and Results of Operations. Introduction OGE Energy

More information

Financial Analysis Shows Conowingo Revenues Insufficient to Fund Additional Sediment Mitigation

Financial Analysis Shows Conowingo Revenues Insufficient to Fund Additional Sediment Mitigation Exelon Generation Media Statement Information Contact: Deena O Brien, Exelon Regional Communications Manager, 610-765-5331 Financial Analysis Shows Conowingo Revenues Insufficient to Fund Additional Sediment

More information

Preliminary 2018 Corporate Operating Plan. Mr. L. Javier Fernandez, Vice President and Chief Financial Officer

Preliminary 2018 Corporate Operating Plan. Mr. L. Javier Fernandez, Vice President and Chief Financial Officer Preliminary Corporate Operating Plan Mr. L. Javier Fernandez, Vice President and Chief Financial Officer Assumptions Alignment with Board Strategic Directives Revenue Adjustments No General rate increase

More information

North Carolina Municipal Power Agency Financial Report

North Carolina Municipal Power Agency Financial Report North Carolina Municipal Power Agency 1 2017 Financial Report NORTH CAROLINA MUNICIPAL POWER AGENCY NUMBER 1 Annual Financial Report (With Report of Independent Auditor Thereon) December 31, 2017 and 2016

More information

Variable Operations and Maintenance (VOM) Costs Education

Variable Operations and Maintenance (VOM) Costs Education Variable Operations and Maintenance (VOM) Costs Education Thomas Hauske Senior Lead Engineer, Performance Compliance Market Implementation Committee July 25, 2017 Operating Agreement Schedule 2 Components

More information

Eugene Water & Electric Board. Annual Report for the year ended December 31, 2003

Eugene Water & Electric Board. Annual Report for the year ended December 31, 2003 Eugene Water & Electric Board Annual Report for the year ended December 31, 2003 Eugene Water & Electric Board December 31, 2003 Board of Commissioners 500 East Fourth Avenue Eugene, Oregon 97401 Mr. Patrick

More information

Portland General Electric

Portland General Electric Portland General Electric Earnings Conference Call Fourth Quarter and Full Year 2016 Cautionary Statement Information Current as of February 17, 2017 Except as expressly noted, the information in this

More information

UNIFORM SYSTEM OF ACCOUNTS ACCOUNT LISTING BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS

UNIFORM SYSTEM OF ACCOUNTS ACCOUNT LISTING BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS 1. UTILITY PLANT 101 Electric plant in service (Major only). 101.1 Property under capital leases. 102 Electric plant purchased or sold. 103 Experimental

More information

Rating Action: Moody's Affirms A3 Rating on American Municipal Power, Inc. Meldahl Hydroelectric Revenue Bonds; Outlook Stable

Rating Action: Moody's Affirms A3 Rating on American Municipal Power, Inc. Meldahl Hydroelectric Revenue Bonds; Outlook Stable Rating Action: Moody's Affirms A3 Rating on American Municipal Power, Inc. Meldahl Hydroelectric Revenue Bonds; Outlook Stable Global Credit Research - 05 Sep 2013 New Hydroelectric Facility Shows Construction

More information

Hydroelectric Licensing Workshop. January 13, 2015

Hydroelectric Licensing Workshop. January 13, 2015 Hydroelectric Licensing Workshop January 13, 2015 Introductions Mayor, City Council, and Utility Advisory Board River Falls Hydroelectric Project Federal Energy Regulatory Commission (FERC) Project Number

More information

Platte River Power Authority

Platte River Power Authority Independent Auditor s Report and Financial Statements Financial Statements Years Ended Contents Independent Auditor s Report...1 Management s Discussion and Analysis (Unaudited)...3 Financial Statements

More information

Hydroelectric Licensing Workshop. December 9, 2014

Hydroelectric Licensing Workshop. December 9, 2014 Hydroelectric Licensing Workshop December 9, 2014 River Falls Hydroelectric Project Junction Falls, Upper Hydro Concrete Gravity Dam 140 Long, 40 High Uncontrolled Overflow Spillway Generator rated at

More information

Transmission Program Impact on High Voltage TAC Estimating Model Version. Stakeholder Overview November 5, 2018

Transmission Program Impact on High Voltage TAC Estimating Model Version. Stakeholder Overview November 5, 2018 Transmission Program Impact on High Voltage TAC Estimating Model 2017-2018 Version Stakeholder Overview November 5, 2018 Background Forecasting tool developed for the 2012-2013 Transmission Plan in response

More information

AI.ASKA I O'VI~R l,"ijtiioritt LAKE ELVA HYDROELECTRIC PROJECT FEASIBILITY STUDY FINDINGS AND RECOMMENDATION Apri 1 30, 1981

AI.ASKA I O'VI~R l,ijtiioritt LAKE ELVA HYDROELECTRIC PROJECT FEASIBILITY STUDY FINDINGS AND RECOMMENDATION Apri 1 30, 1981 AI.ASKA I O'VI~R l,"ijtiioritt LAKE ELVA HYDROELECTRIC PROJECT FEASIBILITY STUDY FINDINGS AND RECOMMENDATION Apri 1 30, 1981 A preliminary assessment of the Lake Elva Hydroelectric Project was initially

More information

PPL Corporation 2 nd Quarter Earnings. July 31, 2014

PPL Corporation 2 nd Quarter Earnings. July 31, 2014 PPL Corporation 2 nd Quarter Earnings July 31, 2014 PPL Corporation 2014 Cautionary Statements and Factors That May Affect Future Results Any statements made in this presentation about future operating

More information

S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * *

S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * In the matter of the application of CONSUMERS ENERGY COMPANY ) and THE DETROIT EDISON COMPANY ) Case No. U- 0 Requesting

More information

Report of Independent Auditors and Financial Statements for. Imperial Irrigation District

Report of Independent Auditors and Financial Statements for. Imperial Irrigation District Report of Independent Auditors and Financial Statements for Imperial Irrigation District December 31, 2014 and 2013 CONTENTS REPORT OF INDEPENDENT AUDITORS 1 2 PAGE MANAGEMENT S DISCUSSION AND ANALYSIS

More information

1997 PACIFIC NORTHWEST COORDINATION AGREEMENT

1997 PACIFIC NORTHWEST COORDINATION AGREEMENT 1997 PACIFIC NORTHWEST COORDINATION AGREEMENT Agreement for Coordination of Operations among Power Systems of the Pacific Northwest June 18, 1997 Conformed Copy i Table of Contents Table of Contents i

More information

FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT AUDITORS EAST TEXAS ELECTRIC COOPERATIVE, INC. December 31, 2017 and 2016

FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT AUDITORS EAST TEXAS ELECTRIC COOPERATIVE, INC. December 31, 2017 and 2016 FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT AUDITORS EAST TEXAS ELECTRIC COOPERATIVE, INC. December 31, 2017 and 2016 C O N T E N T S Report of Independent Auditors...3 Financial Statements: Balance

More information

Goldman Sachs Power and Utility Conference

Goldman Sachs Power and Utility Conference Goldman Sachs Power and Utility Conference August 14, 2012 Name Title Company Name 1 Cautionary Statements and Factors That May Affect Future Results Any statements made in this presentation about future

More information

TVA BOARD MEETING AUGUST 22, 2013

TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING 2 CONSENT AGENDA Health Savings Account Contract Pharmacy Benefits Managers Contract Assistant Corporate Secretary Designations 3 CHAIRMAN S REPORT AUGUST

More information

Earnings Conference Call. Fourth Quarter and Full Year 2014

Earnings Conference Call. Fourth Quarter and Full Year 2014 Earnings Conference Call Fourth Quarter and Full Year 2014 Cautionary Statement Information Current as of February 13, 2015 Except as expressly noted, the information in this presentation is current as

More information

Rocky Mountain Power Exhibit RMP (JKL-5) Docket No Witness: Jeffrey K. Larsen BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (JKL-5) Docket No Witness: Jeffrey K. Larsen BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Exhibit RMP (JKL-5) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Jeffrey K. Larsen Proposed Schedule June 2017 Exhibit RMP (JKL-5)

More information

Volume 1. Summary Table of Contents. Discussion of Financial Forecasts... BC Hydro Deferral Accounts...

Volume 1. Summary Table of Contents. Discussion of Financial Forecasts... BC Hydro Deferral Accounts... Volume 1. Summary Table of Contents BC hydro CHAPTER 1. ApPLICATION OVERVIEW Introduction..... Context of Application........... Summary of Revenue Requirement... Overview of BC Hydro Organizational Structure...

More information

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS Filed: September, 00 EB-00-0 Schedule Page of PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS This set of exhibits describes the costs of the proposed facilities and the economics of

More information

Rationale The 'AA' rating on Chelan County Public Utility District No. 1 (Chelan), Wash.'s bonds reflects:

Rationale The 'AA' rating on Chelan County Public Utility District No. 1 (Chelan), Wash.'s bonds reflects: Publication date: 16-Jul-2002 Reprinted from RatingsDirect Chelan County Public Utility District No. 1, Washington; Utility, Retail Electric Analyst: Swami Venkataraman, San Francisco (1) 415-371-5071;

More information

Fiscal Year 2010 Packwood Annual Operating Budget

Fiscal Year 2010 Packwood Annual Operating Budget Fiscal Year 2010 Packwood Annual Operating Budget Table of Contents Table Page Summary 3 Key Assumptions/Qualifications 4 Summary of Operating and Capital Costs Table 1 5 Summary of Revenues Table 2 6

More information

CURRENT ASSETS: Cash and cash equivalents 281, ,246 Restricted cash 1,851 3,942. Other 15,551 17,556. Derivative instruments 18,400 23,164

CURRENT ASSETS: Cash and cash equivalents 281, ,246 Restricted cash 1,851 3,942. Other 15,551 17,556. Derivative instruments 18,400 23,164 Consolidated Balance Sheets (unaudited) (In Thousands) ASSETS June 30, June 30, 2018 2017 UTILITY PLANT: Electric plant $ 4,594,970 $ 4,484,180 Coal mine plant 326,988 338,265 Construction work in progress

More information

Rocky Mountain Power Exhibit RMP (GND-5) Docket No ER-15 Witness: Gregory N. Duvall BEFORE THE WYOMING PUBLIC SERVICE COMMISSION

Rocky Mountain Power Exhibit RMP (GND-5) Docket No ER-15 Witness: Gregory N. Duvall BEFORE THE WYOMING PUBLIC SERVICE COMMISSION Exhibit RMP (GND-5) BEFORE THE WYOMING PUBLIC SERVICE COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Gregory N. Duvall Proposed - March 2015 Exhibit RMP (GND-5) Page 1 of 10 Available

More information

Powering Beyond. Guggenheim investor meetings June 20 21, 2018

Powering Beyond. Guggenheim investor meetings June 20 21, 2018 Powering Beyond Guggenheim investor meetings June 20 21, 2018 Safe harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations of financial

More information

NEWS RELEASE. Government will complete Site C construction, will not burden taxpayers or BC Hydro customers with previous government s debt

NEWS RELEASE. Government will complete Site C construction, will not burden taxpayers or BC Hydro customers with previous government s debt For Immediate Release 2017PREM0135-002039 Dec. 11, 2017 NEWS RELEASE Government will complete Site C construction, will not burden taxpayers or BC Hydro customers with previous government s debt VICTORIA

More information

PJM Interconnection, L.L.C., Dkt. No. ER (Related to Docket Nos. ER , -1997, -2034)

PJM Interconnection, L.L.C., Dkt. No. ER (Related to Docket Nos. ER , -1997, -2034) American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com November 24, 2010 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room

More information

BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE OPERATING AND REVENUE FUNDS

BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE OPERATING AND REVENUE FUNDS Financial Statements and Supplementary Information BRADLEY LAKE PROJECT MANAGEMENT COMMITTEE Years ended June 30, 2017 and 2016 (With Independent Auditor s Report) Financial Statements and Supplementary

More information

BAML Investor Meetings February 28 and March 1, 2018

BAML Investor Meetings February 28 and March 1, 2018 Powering Beyond BAML Investor Meetings February 28 and March 1, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations

More information

Long Run Marginal Cost (LRMC)

Long Run Marginal Cost (LRMC) Long Run Marginal Cost (LRMC) Ryan Steele Power Supply Planning Specialist Agenda & Objectives Preliminary Discussion PART I Provide a historic overview of FBC s LRMC Highlights from BC Hydro s stated

More information

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1.

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1. The following questions pertain to the spreadsheet file 07-2015---Attachment_O- 2014_SPS_Transmission_Formula_Rate_True-Up_rv1 : GSEC 1-1. Refer to SPS s 2014 FERC Form 1 page 207, line 48 Account 350

More information

EUGENE WATER & ELECTRIC BOARD INDEPENDENT AUDITOR S REPORTS AND FINANCIAL STATEMENTS DECEMBER 31, 2006 AND 2005

EUGENE WATER & ELECTRIC BOARD INDEPENDENT AUDITOR S REPORTS AND FINANCIAL STATEMENTS DECEMBER 31, 2006 AND 2005 INDEPENDENT AUDITOR S REPORTS AND FINANCIAL STATEMENTS DECEMBER 31, 2006 AND 2005 CONTENTS BOARD OF COMMISSIONERS AND OFFICERS 1 PAGE INDEPENDENT AUDITOR S REPORT 2 MANAGEMENT S DISCUSSION AND ANALYSIS

More information

Fresno, California FINANCIAL STATEMENTS. For the Year Ended June 30, 2017

Fresno, California FINANCIAL STATEMENTS. For the Year Ended June 30, 2017 FINANCIAL STATEMENTS For the Year Ended TABLE OF CONTENTS Page Independent Auditor s Report... 1 Management s Discussion and Analysis... 3 Basic Financial Statements: Government-Wide Financial Statements:

More information

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008 BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008 Attached is management s discussion and analysis of Brookfield Renewable Power Inc. (formerly Brookfield Power Inc. and

More information

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1. Updated: 0-0-0 EB-0-0 Exhibit G Schedule Page of RATE DESIGN.0 INTRODUCTION The purpose of this evidence is to present the proposed rates designed to collect the revenue requirement as determined by the

More information

OPINION on position limits on Swiss Power Base contracts. I. Introduction and legal basis

OPINION on position limits on Swiss Power Base contracts. I. Introduction and legal basis Date: 24 September 2018 ESMA70-155-2938 OPINION on position limits on Swiss Power Base contracts I. Introduction and legal basis 1. On 20 October 2017, the European Securities and Markets Authority ( ESMA

More information

Errata to SCE-36: Testimony of Southern California Edison Company Responding to Certain Issues Identified in July 1, 2013 ALJ Ruling

Errata to SCE-36: Testimony of Southern California Edison Company Responding to Certain Issues Identified in July 1, 2013 ALJ Ruling Investigation No.: 1-10-01 Exhibit No.: SCE- Witnesses: Doug Bauder Rick Fisher (U 8-E) Errata to SCE-6: Testimony of Southern California Edison Company Responding to Certain Issues Identified in July

More information

MEMORANDUM. July 29, Power Committee. Massoud Jourabchi. SUBJECT: Financial Assumptions for the Seventh Power Plan

MEMORANDUM. July 29, Power Committee. Massoud Jourabchi. SUBJECT: Financial Assumptions for the Seventh Power Plan Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington July 29,

More information

Leading provider of comprehensive energy services

Leading provider of comprehensive energy services Leading provider of comprehensive energy services Suzanne Thoma, CEO Beat Grossenbacher, CFO Overview Financials FY 2013 and Outlook Strategy Summary page 2 Continued challenging business environment Neighbouring

More information

Powering Beyond. Wells Fargo Equity Investor Meetings April 6, 2018

Powering Beyond. Wells Fargo Equity Investor Meetings April 6, 2018 Powering Beyond Wells Fargo Equity Investor Meetings April 6, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations

More information

ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE

ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE 2015 Our Vision: We Power Life Our Mission: We exist to operate a world-class energy business that creates sustainable value for our four stakeholders owners,

More information

Costs Reimbursable by the IESO under the Real-Time Generation Cost Guarantee ( RT-GCG ) Program

Costs Reimbursable by the IESO under the Real-Time Generation Cost Guarantee ( RT-GCG ) Program Interpretation Bulletins are produced by the IESO to give notice to market participants of clarifications regarding the interpretation, application or implementation of a market rule. Terms and acronyms

More information

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL APPENDIX B: PORTFOLIO OPTIMIZATION MODEL PUBLIC UTILITY DISTRICT #1 OF SNOHOMISH COUNTY Prepared by Generation, Power, Rates, and Transmission Management Division Snohomish County PUD DRAFT 2017 Integrated

More information

Brookfield Renewable Energy Partners (BEP)

Brookfield Renewable Energy Partners (BEP) Brookfield Renewable Energy Partners (BEP) June 2015 Brookfield Renewable A Leader in Renewable Power Generation CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS 2 This presentation contains forward-looking

More information

PPL Corporation 3 rd Quarter Earnings. November 4, 2014

PPL Corporation 3 rd Quarter Earnings. November 4, 2014 PPL Corporation 3 rd Quarter Earnings November 4, 2014 PPL Corporation 2014 Cautionary Statements and Factors That May Affect Future Results Any statements made in this presentation about future operating

More information

Georgian National Electricity Regulatory Commission

Georgian National Electricity Regulatory Commission Georgian National Electricity Regulatory Commission Resolution # 3 1 July, 1998 Tbilisi On Approval of the Electricity Tariff Methodology, Setting Rules and Procedures. On the recent stage of the reform

More information

March 30, I.R.B.

March 30, I.R.B. Section 141. Private Activity Bond; Qualified Bond 26 CFR 1.141 7 T: Special rules for output facilities (temporary). T.D. 8757 DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 Obligations

More information

FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT AUDITORS EAST TEXAS ELECTRIC COOPERATIVE, INC. December 31, 2013 and 2012

FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT AUDITORS EAST TEXAS ELECTRIC COOPERATIVE, INC. December 31, 2013 and 2012 FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT AUDITORS EAST TEXAS ELECTRIC COOPERATIVE, INC. December 31, 2013 and 2012 C O N T E N T S Report of Independent Auditors... 3 Financial Statements: Balance

More information

Financial Report - Year Ending December 31, 2000 Public Utility District No. 1 of Douglas County, Washington

Financial Report - Year Ending December 31, 2000 Public Utility District No. 1 of Douglas County, Washington Financial Report - Year Ending December 31, 2000 Public Utility District No. 1 of Douglas County, Washington Board of C ommissioners L ynn M. Heminger Michael Doneen T. James Davis William C. Dobbins Chief

More information

RR1 - Page 181 of 518

RR1 - Page 181 of 518 DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of JENNIFER S. PYTLIK on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

Strategic Planning. Steve Wright, General Manager Feb. 7, 2019

Strategic Planning. Steve Wright, General Manager Feb. 7, 2019 Strategic Planning Steve Wright, General Manager Feb. 7, 2019 Starting Strategic Planning Review where we have been since 2015 when the plan was adopted Review our key metrics Describe key strategic questions

More information

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001 Pacific Gas and Electric Company Statement of Estimated Cash Flows April 20, 2001 This document provides the latest forecast of cash flows for Pacific Gas and Electric Company (the Company ). The purpose

More information

4.1 Daily & Hourly Bid Components

4.1 Daily & Hourly Bid Components 4.1 Daily & Hourly Bid Components This section is based on CAISO Tariff Section 30.4 Election for Start-Up and Minimum Load Costs and Section 39.6.1.6. (Start-Up and Minimum Load Costs are not applicable

More information

Exhibit Table 1: PG&E Corporation Business Priorities

Exhibit Table 1: PG&E Corporation Business Priorities Exhibit 99.2 Table 1: PG&E Corporation Business Priorities 2006-2010 1. Advance business transformation 2. Provide attractive shareholder returns 3. Increase investment in utility infrastructure 4. Implement

More information

Powering Beyond. UBS investor meeting August 24, 2018

Powering Beyond. UBS investor meeting August 24, 2018 Powering Beyond UBS investor meeting August 24, 2018 Safe harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations of financial

More information

Merger Plus. Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005

Merger Plus. Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005 Merger Plus Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005 Safe Harbor Language This presentation includes forward-looking

More information

Available To owners of Qualifying Facilities ( QF ) making sales of electricity to the Company in the State of Oregon.

Available To owners of Qualifying Facilities ( QF ) making sales of electricity to the Company in the State of Oregon. FACILITIES OF GREATER THAN 10,000 KW Page 1 Available To owners of Qualifying Facilities ( QF ) making sales of electricity to the Company in the State of Oregon. Applicable For power purchased from Qualifying

More information

Rocky Mountain Power Exhibit RMP (BNW-7) Docket No Witness: Bruce N. Williams BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (BNW-7) Docket No Witness: Bruce N. Williams BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Exhibit RMP (BNW-7) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Bruce N. Williams May 8, 2013 Moody s Investors Service January

More information

MANAGEMENT S DISCUSSION AND ANALYSIS December 31, 2011 and 2010

MANAGEMENT S DISCUSSION AND ANALYSIS December 31, 2011 and 2010 Public Utility District No. 1 of Pend Oreille County, Washington MANAGEMENT S DISCUSSION AND ANALYSIS December 31, 2011 and 2010 The financial management of the Public Utility District No. 1 of Pend Oreille

More information

COMPONENTS OF REVENUE REQUIREMENT

COMPONENTS OF REVENUE REQUIREMENT COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)

More information

BOARD MEETING. Knoxville, Tennessee. August 21, 2014

BOARD MEETING. Knoxville, Tennessee. August 21, 2014 BOARD MEETING Knoxville, Tennessee August 21, 2014 CHAIRMAN S REPORT BOARD MEETING Knoxville, Tennessee August 21, 2014 PRESIDENT S REPORT Bill Johnson President & CEO President s Report 4 Mission of Service

More information

VILLA SOL. Community Development District. Annual Operating and Debt Service Budget. Fiscal Year Version 2 - Approved Tentative Budget

VILLA SOL. Community Development District. Annual Operating and Debt Service Budget. Fiscal Year Version 2 - Approved Tentative Budget VILLA SOL Annual Operating and Debt Service Budget Version 2 - Approved Tentative Budget (Approved at 6/04/2018 meeting) Prepared by: VILLASOL Table of Contents Page # OPERATING BUDGET Summary of Revenues,

More information

DEPRECIATION AND AMORTIZATION

DEPRECIATION AND AMORTIZATION Filed: 0-0- EB-0-0 Exhibit F Page of 0 0 0 0 DEPRECIATION AND AMORTIZATION.0 PURPOSE This evidence highlights aspects of OPG s depreciation and amortization policy, provides OPG s actions in response to

More information

Rate Formula Template (A) (B) (C) (D) (E) (F)

Rate Formula Template (A) (B) (C) (D) (E) (F) Page 1 of 4 Rate Formula Template (A) (B) (C) (D) (E) (F) Line Allocated No. Reference Worksheet/Note Amount A. NETWORK SERVICE 1 GROSS REVENUE REQUIREMENT Page 2, line 26, col. (F) $ 116,851,990 REVENUE

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UE 171 ) ) ) ORDER ) )

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UE 171 ) ) ) ORDER ) ) ENTERED 06/06/05 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UE 171 In the Matter of PACIFIC POWER & LIGHT Klamath Basin Irrigator Rates. DISPOSITION: ORDER MOTION FOR SUMMARY JUDGMENT DISMISSED; MATTER

More information