Board of Directors Meeting. December 7, 2017
|
|
- Augustus Greene
- 5 years ago
- Views:
Transcription
1 Board of Directors Meeting December 7, 2017
2 2018 Annual Budget December 7, 2017
3 Agenda Recap new sections in budget document Budget changes since October Financial impact Final results Highlights 2017 Budget to 2018 Budget
4 Collaboration Working together toward shared goals. Customer Information System Environmental Services Efficiency Works Demand Response Electric Vehicles Distributed Energy Distribution System Maintenance Renewable Supply Options SCADA Services Customized Resource Plan Engineering Services Zero Net Carbon Model Substation Security Community Relations & Communications Salary Survey Rates Framework NERC Compliance Headquarters Campus Project Disaster Recovery Fiber Optics Organized Energy Market Regional Water Exchange & Storage Joint Technical Advisory Committee Beyond traditional generation and transmission services. Other new sections: Strategic Initiatives Key Goals and Activities
5 Budget Changes Since October Operating Expenses $378K Contracted Services & Materials $333K Drain and clean the storm water holding basin to restore capacity. Replace four pulverizer/coal mill doors. Salaries $45K Opportunity arose to hire a high performing accounting intern in a new staff accountant position. Removed contracted services for hiring temporary assistance in the accounting department. Other minor adjustments were also made to salaries. Capital Additions $74K Cyber security controls project added. Partially offset by reduction to gas yard controls project and removal of skid steer replacement Annual Budget
6 Financial Impact $ in Thousands October Proposed Budget* O&M Net Increase Capital Increase Favorable (Unfavorable) Changes Final Budget Revenues Sales to Municipalities $ 197,016 $ - $ 197,016 Sales for Resale 23,476-23,476 Interest and Other Income 3,049-3,049 Total Revenues $ 223,541 $ - $ 223,541 Operating Expenses Purchased Power $ 34,525 $ - $ 34,525 Fuel 49,654 - $ 49,654 Production 44,861 $ (333) (333) $ 45,194 Transmission 17,199 - $ 17,199 Administrative and General 25,367 (45) (45) $ 25,412 Total Operating Expenses $ 171,606 $ (378) $ (378) $ 171,984 Debt Expenses $ 20,785 $ - $ 20,785 Capital Additions Production $ 42,066 $ (74) $ (74) $ 42,140 Transmission 3,274-3,274 General 15,300-15,300 Total Capital Additions $ 60,640 $ (74) $ (74) $ 60,714 Total Expenditures $ 253,031 $ (378) $ (74) $ (452) $ 253,483 Contingency Appropriation $ 23,000 $ 23,000 Total Expenditures and Contingency $ 276,031 $ (378) $ (74) $ (452) $ 276,483 Net Income $ 22,991 $ (378) $ (378) $ 22,613 *Small rounding adjustments were made to reconcile to final budget results Annual Budget
7 2018 Annual Budget Final 2018 Budget Results Budget Results ($ millions) 2018 Budget Total Revenues $ Total Expenditures $ Board Contingency $ 23.0 Strategic Financial Plan Indicators Target 2018 Minimums Budget Net Income ($ millions) $ 6.0 $ 22.6 Debt Service Coverage 1.50x 2.48x Debt to Capitalization Ratio < 50% 35% Unrestricted Days Cash on Hand Rate Increase 2%
8 Highlights 2017 Budget to 2018 Budget Ongoing operations & maintenance controlled Capital investments $28M w/o outage Debt financing $95M Rawhide outage $45.6M maintenance & capital Surplus sales $0.2M increase DSM expansion $2.2M increase $7.9M total 2018 Budget $276.5M 2% Tariff 1 rate increase $3.7M increase Positioned to meet Platte River s strategic direction Annual Budget
9 Questions
10 Board of Directors Meeting December 7, 2017
11 PLATTE RIVER POWER AUTHORITY NEW HEADQUARTERS CAMPUS Board of Directors Meeting 11 DECEMBER 7, 2017
12 AGENDA Headquarters Campus Project Activity Update Current Project Processes Cost Model Summary Site Development Renderings Next Steps 12
13 CURRENTPROJECT PROCESSES Completed Design Development pricing to confirm construction budget. Comprehensive design review discussions with Sr Leadership on direction is ongoing. Detailed site engineering in process. Headquarters building size, structure, systems, and finishes continue to be refined. Substation and Fleet Maintenance buildings scope, cost, and schedule being reviewed. Fort Collins development review schedule being drafted in conjunction with City staff. Platte River soft cost, FF&E, specialty equipment & systems budgets being validated. 13
14 COST MODEL SUMMARY 14
15 SITE DEVELOPMENT 15
16 RENDERINGS 16
17 RENDERINGS 17
18 RENDERINGS MAIN ENTRY 18
19 RENDERINGS MAIN ENTRY 19
20 RENDERINGS 20
21 RENDERINGS 21
22 COST REDUCTION STRATEGIES HQ: Electrical supply generator redundancy. HQ: Modify HVAC system. HQ: Simplify building exterior enclosure (skin). HQ: Simplify building structure (also changes interior aesthetics). HQ: Remove 2,100 square feet of discretionary circulation space. HQ: Remove 5,000 square feet of discretionary space (office/cubicle sizes, training room sizes/spaces, entry foyer, fitness area, etc.). HQ: Adjust interior finishes. HQ: Replace interior sliding glass doors and walls (mainly in conference rooms) with standard doors and side lights. Site development: Simplify and compact site design. Accomplished lower price. COST REDUCTIONS UP TO $5.5 MILLION 22
23 NEXT STEPS Dec. BOD Meeting Budget Approval Feb. BOD Meeting Construction Documents & Site Phasing March. BOD Meeting Site Mobilization 23
24 QUESTIONS? 24
25 Board of Directors Meeting December 7, 2017
26 Strategic Financial Plan Revisions December 7, 2017
27 Discussion Topics Strategic Financial Plan (SFP) background SFP revision purpose and proposals Next steps
28 SFP Background
29 Current Strategic Financial Plan Board adopted through separate resolution (4/2012) Included in the annual Strategic Plan Financial metric targets Cash flow, liquidity, leverage, earnings Targets established with the intent of maintaining a AA credit Reviewed with the Board annually during rates discussions Financial metrics are established and evaluated on an annual basis Multi-year performance is considered during the evaluation of rate action and decision making.
30 What the Strategic Financial Plan is SFP Goals Long-term financial sustainability Manage financial risk SFP Priorities Support Mission, Vision, and Values Asset and Risk Management Rate requirements and practices Financial metrics Policy compliance Best practices Legal requirements Rate smoothing Cash flows, Liquidity, Leverage, Earnings
31 SFP Revision Purpose and Proposals
32 SFP Revision Purpose Ensure alignment with long-term organizational values and resource planning objectives Increase transparency Increase the emphasis placed on financial metrics ensuring the plan is measurable and verifiable Update metrics in consideration of rating agency guidelines Remove references to other Board approved policies Eliminates unnecessary dependencies among separate Board actions
33 Moody s Investors Service Source: Moody s Investors Service, Rating Methodology US Municipal Joint Action Agencies
34 PROPOSED UPDATE CURRENT SFP RESOLUTION Generate minimum 1.50 fixed obligation charge coverage ratio Generate minimum debt service coverage of 1.50 times Generate minimum net income equal to 3 percent of projected annual operating expenses Generate minimum net income of $6 million Target debt ratio less than 50 percent Target debt-to-capitalization less than 50 percent Target minimum 200 days of unrestricted cash-on-hand Target minimum 200 days of unrestricted cash-on-hand
35 = NNNNNN OOOOOOOOOOOOOOOOOO RRRRRRRRRRRRRRRR + IIIIIIIIIIIIIIII OOOOOOOOO IIIIIIIIIIII DDDDDDDD LLLLLLLL OOOOOOOOOOOOOOOOOOOOOO NNNNNN RRRRRRRRRRRRRR BBBBBBBB SSSSSSSSSSSSSS + DDDDDDDD LLLLLLLL OOOOOOOOOOOOOOOOOOOOOO Replaces 1.5x Debt Service Coverage (DSCR) target Measure of cash flow Fixed Obligation Charge Coverage Ratio (FOCCR) includes off balance sheet financings which more accurately represents cash flow requirements to meet debt obligations than DSCR FOCCR and target are consistent with rating agency guidelines Legal minimum 1.10 DSCR will be achieved by achieving FOCCR target
36 = TTTTTTTTTT OOOOOOOOOOOOOOOOOO RRRRRRRRRRRRRRRR TTTTTTTTTT OOOOOOOOOOOOOOOOOO EEEEEEEEEEEEEEEE + NNNNNN OOOOOOOOOOOOOOOOOO RRRRRRRRRRRRRRRR (EEEEEEEEEEEEEEEE) Replaces minimum net income of $6 million Measure of earnings Using a percent of operating expenses, instead of a fixed dollar target, allows for target to change over time with inflation and operational changes Three percent provides a longterm balance with leverage targets MILLIONS $8.0 $7.0 $6.0 $5.0 $4.0 $3.0 $2.0 $1.0 $- Net Income: SFP Targets Rating agencies do not provide specific guidelines for earnings Proposed SFP Current SFP
37 = LLLLLLLL TTTTTTTT DDDDDDDD, NNNNNN TTTTTTTTTT EEEEEEEEEEEEEEEE UUUUUUUUUUUUUU PPPPPPPPPP + NNNNNN WWWWWWWWWWWWWW CCCCCCCCCCCCCC Replaces Debt to Capitalization Ratio less than 50 percent Measure of leverage Debt ratio and target are consistent with rating agency guidelines
38 = CCCCCCC BBBBBBBB RRRRRRRRRRRRRRRR RRRRRRRRRRRRRRRR OOOOOOOOOOOOOOOOOO EEEEEEEEEEEEEEEE xx 365 DDDDDDDD Target remains unchanged Measure of liquidity 200 days unrestricted cash is consistent with rating agency guidelines Included in the days cash target is the rate stabilization fund
39 The Rate Stabilization Fund is included in the 200 days unrestricted cash on hand Rate Stabilization Fund Purpose Reduce or eliminate the rate impact due to an unforeseen event that affects Platte River s ability to meet the minimum legal DSCR requirement. Not to smooth the rate impacts of typical business operations Proposed removing $20 million target from the SFP Analysis and recommended funding outside the SFP Contributions approved through budget process Withdrawals communicated to the Board No business advantage to lowering fund balance and is view favorably by the rating agencies
40 SFP Revision Rate Impact SFP revisions applied to August 2017 rate projections $/MWh Compared to Current SFP minimum rate projections: Identical until % higher in % higher in /2017: Recommendation 2.0% ( ) 2.8% ( ) 8/2017: SFP Minimum Proposed SFP Minimum: Net Income 3% of Operating Expenses
41 Next Steps Present SFP proposed revisions December Board Meeting December and January Board feedback Request formal adoption of SFP through resolution February Board Meeting
42 Questions
43 Board of Directors Meeting December 7, 2017
44 Wind Purchase Update December 7, 2017
45 Platte River Wind RFP Timeline Issued RFP for wind proposals Board Executive Session Sent out initial draft PPA to preferred developer(s) Completed congestion analysis & developed transmission approval timeline Inform Board of preferred option Negotiate Final PPA Execute final PPA(s) 6/6/17 10/26/17 11/15/17 12/1/17 12/7/17 12/20/17 1/15/18
46 Preferred Proposal Roundhouse Renewable Energy (Enyo) Roundhouse Located on Duck Creek Ranch in southern Wyoming / northern Colorado Purchase 150 MW from about Dec 1, 2020 through May 31, 2042 No third party transmission service or congestion risk Requires miles of transmission line construction to the Rawhide Substation Review transmission easement options Slightly lower price available if we extend transmission line into Wyoming and construct all turbines in Wyoming
47 Enyo Wind Project
48 Preferred Proposal Roundhouse Renewable Energy (Enyo) Roundhouse Located on Duck Creek Ranch in southern Wyoming / northern Colorado Annual output 600,000 MWh per year Annual capacity factor 45.7% Platte River will serve 48% of member load with carbon free resources in 2021, compared to 30% carbon free today
49 Key Terms of PPA Development Milestones April 2018 July 2019 July 2019 January 2020 June 2020 Enyo will provide communication plan for permitting transmission project Enyo will execute necessary easements and leases Enyo will execute generator interconnection agreement Enyo will obtain all permits to construct and operate wind turbines and transmission line Issue a full notice to construct the project
50 Key Terms of PPA (cont d) Platte River will have the option to purchase the transmission line after 5 years Platte River will have the right to curtail wind output Platte River will have the Right of First Offer to purchase the wind project if Enyo decides to sell Enyo will not have the right to deliver additional output into the Rawhide Substation without Platte River s approval
51 Risk Management With new wind resources, Platte River will be more active in managing additional volumes, requiring additional risk management: RTO should accommodate more market sales Use bilateral markets to manage excess wind, sometimes at prices lower than market Pursue monthly or even yearly long-term sales agreement(s) to effectively reduce Platte River s Craig or Rawhide minimum output levels Exercise wind curtailments economically Increase operational flexibility
52 Project Risks Higher wind penetration in the region may result in even lower market prices Must sell surplus wind energy in the market when Craig and Rawhide are at minimum output Greater load following of wind resources could increase Operational and Maintenance costs at Rawhide and Craig New transmission line to Rawhide could result in third party use of excess Platte River transmission system capacity Developer fails to timely secure necessary approvals to proceed with the project
53 Financial Impact: 150 MW Wind PPA Millions Net Savings (Costs): RTO vs Non-RTO $14 $12 $10 $8 $6 $4 $2 $- $(2) $(4) RTO, Base Market Projections RTO, Low Market Projections Non-RTO, Low Market Projections Projected long-term financial benefit from increased sale, reduced operating expenses Financial benefit greater in an RTO (avoided integration costs) Projected Rate Savings *2021: (0.9%) to 1.7% 2025: 0.5% to 3.7% 2030: 2.4% to 5.1% *2021 reflective of current market. Actual savings dependent on market
54 Financial Impact: 225 MW Wind PPA Millions Net Savings (Costs): RTO vs Non-RTO $20 $15 $10 $5 $- $(5) $(10) RTO, Base Market Projections RTO, Low Market Projections Non-RTO, Low Market Projections Projected long-term financial benefit from increased sale, reduced operating expenses Financial benefit greater in an RTO (avoided integration costs) Projected Rate Savings *2021: (3.6%) to 1.9% 2025: (1.6%) to 4.9% 2030: 1.2% to 6.9% *2021 reflective of current market. Actual savings dependent on market
55 Recommendations Proceed to finalize negotiations with Roundhouse Renewable Energy LLC ( Enyo ) and execute PPA for 150 MW of nameplate wind consistent with terms defined herein An additional 75 MW of wind, for a total of 225 MW, is still being evaluated to assist our members in meeting their customer s energy goals
56 Questions?
57 Board of Directors Meeting December 7, 2017
58 October Operational Results Category October Variance YTD Variance Municipal Demand (2.0%) (0.9%) Municipal Energy (1.6%) (1.5%) Baseload Generation (10.7%) (2.8%) Wind Generation 13.1% (3.2%) Solar Generation (4.3%) (8.6%) Surplus Sales Volume (3.7%) 9.5% Surplus Sales Price (11.0%) (4.9%) Dispatch Cost 1.9% (0.9%) Variance Key: Favorable: >2% Near budget: +/- 2% Unfavorable: <-2%
59 Board of Directors Meeting December 7, 2017
60 Financial Summary Category October Variance from Budget ($ in millions) Year to Date Variance from Budget ($ in millions) Net Income ($0.1) $5.3 Debt Coverage (.03x).23x Revenues ($0.1) ($1.3) Operating Expenses $ - $6.0 Capital Additions ($0.5) $15.8 > 2% Favorable 2% to -2% At or Near Budget < -2% Unfavorable
61 Board of Directors Meeting December 7, 2017
Board of Directors Meeting. September 27, 2018
Board of Directors Meeting September 27, 2018 2019 proposed budget work session September 27, 2018 Agenda Budget Schedule Trends Process Budget document 2019 overview Capital 5-year forecast Budget schedule
More informationBoard of Directors Meeting. August 31, 2017
Board of Directors Meeting August 31, 2017 Wholesale Rate Projections August 31, 2017 Discussion Topics Strategic Financial Plan 2018 Tariff 1 Rate Recommendation Tariff 1 Long-Term Projections 2018 Tariff
More informationBoard of Directors Meeting. February 23, 2017
Board of Directors Meeting February 23, 2017 Video Board of Directors Meeting February 23, 2017 2016 Operations Review Board of Directors February 23, 2017 Year-End Operational Results Category YTD Variance
More informationBoard of Directors Regular Meeting 2000 E. Horsetooth Rd, Fort Collins, CO Thursday, September 27, 2018, 9:00 a.m.
Call to Order Board of Directors Regular Meeting 2000 E. Horsetooth Rd, Fort Collins, CO 80525 Thursday, September 27, 2018, 9:00 a.m. 1) Consent Agenda Motion to Approve Minutes of the Regular Meeting
More informationThe budget has been updated to reflect the most current information for revenues and expenditures as listed below.
Memorandum Date: October 18, 2017 To: From: Subject: Board of Directors Jason Frisbie, General Manager/CEO Dave Smalley, Deputy General Manager and Chief Financial Officer Shelley Nywall, Controller 2018
More informationBoard of Directors Meeting. August 25, 2016
Board of Directors Meeting August 25, 2016 July 2016 Operating Report August 25, 2016 July Operational Results Category July Variance 2016 Variance Municipal Demand (MW) 1.1% (2.3%) Municipal Energy (MWh)
More informationPlatte River Power Authority
Independent Auditor s Report and Financial Statements Financial Statements Years Ended Contents Independent Auditor s Report...1 Management s Discussion and Analysis (Unaudited)...3 Financial Statements
More informationNovember 2016 Operating Report
216 Operating Report EXECUTIVE SUMMARY Municipal demand came in just above budget with energy coming in slightly below budget. Rawhide Unit 1 ran extremely well all month. Craig Unit 1 experienced three
More informationRegular Meeting Minutes of the Board of Directors 2000 East Horsetooth Road, Fort Collins, Colorado Thursday, August 28, 2014
Regular Meeting Minutes of the Board of Directors 2000 East Horsetooth Road, Fort Collins, Colorado Thursday, August 28, 2014 ATTENDANCE Board Members Representing Estes Park: Mayor Bill Pinkham and Reuben
More informationPortland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance
February 16, 2018 Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance Full-year 2017 financial results on target excluding the effects of the Tax Cuts and Jobs
More informationBoard of Directors Annual Meeting. February 25, 2016
Board of Directors Annual Meeting February 25, 2016 2015 Operations and Financial Year In Review Board of Directors Meeting February 25, 2016 2015 Lost Time Accidents 2015 Goal 0 2015 Actual 1 5 Five-Year
More informationBoard of Directors Meeting. April 28, 2016
Board of Directors Meeting April 28, 2016 March Operational Results Category March Variance 2016 Variance Municipal Demand (MW) (5.0%) (5.1%) Municipal Energy (MWh) 0.8% (0.3%) Baseload Generation (MWh)
More informationFinancial Policy Review: Debt Service Coverage and Capital Financing Policies
Services of the San Francisco Public Utilities Commission Financial Policy Review: Debt Service Coverage and Capital Financing Policies 2018 Water and Sewer Rates Study Citizens Advisory Committee February
More informationEarnings Conference Call
Exhibit 99.2 Earnings Conference Call Second Quarter 2015 Cautionary Statement Information Current as of July28, 2015 Except as expressly noted, the information in this presentation is current as of July28,
More informationPacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012
PacifiCorp Utah All Source Request for Proposal 2016 Resource Issued January 6, 2012 Responses May 9, 2012 TABLE OF CONTENTS Page SECTION 1. INTRODUCTION... 7 SECTION 2. RESOURCE ALTERNATIVES AND PROPOSAL
More informationSchedule of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Simpson, Helgeson, Manning, Mital and Brown FROM: Sue Fahey, Chief Financial Officer; Susan Eicher, Accounting & Treasury Supervisor
More informationLong-Term Reliability Assessment
Long-Term Reliability Assessment Key Findings and Long-Term Issues John Moura, Director of Reliability Assessment Topics Covered Today Background on NERC s Long-Term Reliability Assessment Emerging and
More information2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy
2011 IRP Public Input Meeting October 5, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda Morning Session IRP Schedule Update Energy Gateway Transmission Construction Update and Evaluation
More informationEugene Water & Electric Board Adopted Budget. December 5, 2017
Eugene Water & Electric Board 208 Adopted Budget December 5, 207 Eugene Water & Electric Board 500 East 4 th Avenue/Post Office Box 048 Eugene, Oregon 97440-248 54-685-7000 www.eweb.org Board of Commissioners
More informationBoard of Directors Regular Meeting 2000 E. Horsetooth Rd, Fort Collins, CO Thursday, April 26, 2018, 9:00 a.m.
Page 1 Call to Order Board of Directors Regular Meeting 2000 E. Horsetooth Rd, Fort Collins, CO 80525 Thursday, April 26, 2018, 9:00 a.m. 1) Consent Agenda Motion to Approve a. Minutes of the Regular Meeting
More informationTennessee Valley Authority Strategic Plan. Fiscal Years
Tennessee Valley Authority Strategic Plan Fiscal Years 2014-2018 Submitted to Office of Management and Budget March 2014 Table of Contents 1. TVA s Mission Energy Environment Economic Development 2. Overview
More informationSPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017
1 SPP New Member Communication and Integration Process Mountain West Transmission Group Background Information October 2017 Contents Introduction... 2 1. Westside Tariff Design... 2 2. Operational Provisions...
More informationPortland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION
Portland General Electric Company Sheet No. 201-1 PURPOSE SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION To provide information about Standard Avoided Costs and
More informationDevelopment of the Renewable Dispatchable Generation Model. Overview of SEPA & ScottMadden Engagement
Development of the Renewable Dispatchable Generation Model Overview of SEPA & ScottMadden Engagement Speakers John Sterling Senior Director, Advisory Services Smart Electric Power Alliance John Pang Partner
More information2011 Budget Initial Stakeholder Call
2011 Budget Initial Stakeholder Call Michael Epstein Director of Financial Planning June 23, 2010 Agenda TOPIC PRESENTER Introduction Steve Berberich Budget principles & strategic initiatives Steve Berberich
More informationENTERGY STATISTICAL REPORT AND INVESTOR GUIDE
ENTERGY STATISTICAL REPORT AND INVESTOR GUIDE 2015 Our Vision: We Power Life Our Mission: We exist to operate a world-class energy business that creates sustainable value for our four stakeholders owners,
More informationResource Allocation, Management, and Planning Steering Committee #7
Resource Allocation, Management, and Planning Steering #7 August 28, 2018 1 Agenda Huron is pleased to partner with WKU on this resource allocation, management, and planning ( RAMP ) initiative. Our goals
More informationPositioned for Growth. Business Review & Outlook
Positioned for Growth Business Review & Outlook 1 Forward Looking Statements This presentation may contain forward looking statements, including statements regarding the business and anticipated financial
More informationMountain West Transmission Group (MWTG) Introduction and Process
Mountain West Transmission Group (MWTG) Introduction and Process October 13 Denver, CO October 16 Little Rock, AR 2 Agenda Overview of SPP Overview of the MWTG Members SPP Process New Member Integration
More informationStrategic Plan Progress Update
2015-2019 Strategic Plan Progress Update Strategic Goals 2017 Highlights 2018 Initiatives 2 Key Issues Known Unknowns Summary Strategic Goals Reinvest in value-creating core assets and people Reduce debt
More information2019 Integrated Resource Plan (IRP) Public Input Meeting January 24, 2019
1 2019 Integrated Resource Plan (IRP) Public Input Meeting January 24, 2019 Agenda January 24 9:00am-9:30am pacific Capacity-Contribution Values for Energy-Limited Resources 9:30am-11:30am pacific Coal
More informationDecember 9, City of Farmington Integrated Resource Planning (IRP)
December 9, 2016 City of Farmington Integrated Resource Planning (IRP) Restricted Siemens AG 2013 All rights reserved. Answers for infrastructure and cities. Pace Global Disclaimer This Report was produced
More informationDEUTSCHE 2017 CLEAN TECH, UTILITIES & POWER CONFERENCE
DEUTSCHE 2017 CLEAN TECH, UTILITIES & POWER CONFERENCE New York May 16, 2017 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking
More informationStatement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: August 26, 2016 SUBJECT: OBJECTIVE: Commissioners Simpson, Helgeson, Manning, Mital and Brown Sue Fahey, CFO; Susan Eicher, Accounting
More informationRegular Meeting Minutes of the Board of Directors 2000 E. Horsetooth Road, Fort Collins, CO Thursday, September 28, 2017
Regular Meeting Minutes of the Board of Directors 2000 E. Horsetooth Road, Fort Collins, CO 80525 Thursday, September 28, 2017 ATTENDANCE Board Members Representing Estes Park: Mayor Todd Jirsa and Reuben
More information2012 Budget and Grid Management Charge Rates
2012 Budget and Grid Management Charge Rates December 7, 2011 FINAL Prepared by Department of Financial Planning California Independent System Operator Corporation 2012 Budget and GMC Rates Table of Contents
More informationBoard Finance & Budget Planning Workshop. April 16, 2012
Board Finance & Budget Planning Workshop 1 Agenda Management Introduction Financial Highlights Administration Highlights Energy Resource Planning Highlights Engineering & Operations Highlights Customer
More informationENMAX Corporation 2017 Q2 INTERIM REPORT CAUTION TO READER
ENMAX Corporation 2017 Q2 INTERIM REPORT ENMAX Corporation CAUTION TO READER This document contains statements about future events and financial and operating results of ENMAX Corporation and its subsidiaries
More informationInvestor Meeting December 6, 2017 CMS MODEL: CONSISTENT PAST WITH A SUSTAINABLE FUTURE
Investor Meeting December 6, 2017 CMS MODEL: CONSISTENT PAST WITH A SUSTAINABLE FUTURE This presentation is made as of the date hereof and contains forward-looking statements as defined in Rule 3b-6 of
More information2019 Budget and Grid Management Charge Initial Stakeholder Meeting
2019 Budget and Grid Management Charge Initial Stakeholder Meeting July 24, 2018 Agenda Topic: Welcome and Introductions Presenter: Kristina Osborne 2019 Budget Process & GMC Rate Outlook April Gordon
More information2019 Corporate Operating Plan
2019 Corporate Operating Plan 2019 CORPORATE OPERATING PLAN 1 2 2019 CORPORATE OPERATING PLAN TABLE OF CONTENTS Page Management Letter... 5 Corporate Strategic Planning... 9 Assumptions... 15 2019 Corporate
More informationFiscal Year Budget
Fiscal Year 2019 Budget Fiscal Year 2019 Project 3 Annual Budget Project 3 Fiscal Year 2019 Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Summary of Full Time Equivalent Table 2 5 Positions
More informationReport of Independent Auditors
Report of Independent Auditors To the Board of Commissioners Public Utility District No. 1 of Clark County Vancouver, Washington Report on the Financial Statements We have audited the accompanying individual
More information2018 Corporate Operating Plan
2018 Corporate Operating Plan 2018 CORPORATE OPERATING PLAN TABLE OF CONTENTS Page Management Letter... 1 Corporate Strategic Planning... 2 Executive Summary... 7 Assumptions... 9 2018 Corporate Operating
More information2 nd Quarter 2017 Earnings Release Presentation. July 27, 2017
2 nd Quarter 2017 Earnings Release Presentation July 27, 2017 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within
More informationAppendix B-2. Term Sheet for Tolling Agreements. for For
Appendix B-2 Term Sheet for Tolling Agreements for For 2015 Request For Proposals For Long-Term Developmental Combined-Cycle Gas Turbineand Existing Capacity and Energy Resources in WOTAB DRAFT Entergy
More informationAppendix C-2 DRAFT. Entergy Services, Inc. May 6July 13, 2016
Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy New Orleans, Inc. DRAFT Entergy Services, Inc. May
More informationPublic Service Enterprise Group
Public Service Enterprise Group PSEG Earnings Conference Call 1 st Quarter 2018 April 30, 2018 Forward-Looking Statements Certain of the matters discussed in this presentation about our and our subsidiaries
More informationDebt Investor Meetings November 2013
A final base shelf prospectus containing important information relating to the securities described in this document has been filed with the securities regulatory authorities in each of the provinces of
More information83C Questions and Answers
83C Questions and Answers (1) Section 1.10 Could the Evaluation Team elaborate on what types of changes constitute a new project, including listing additional examples? For example, we have assumed that
More informationPortland General Electric
Portland General Electric Earnings Conference Call First Quarter 2018 Cautionary Statement Information Current as of April 27, 2018 Except as expressly noted, the information in this presentation is current
More informationBusiness Overview. Jim Scilacci Senior VP and CFO, Edison Mission Group. Lehman Brothers High Yield Bond and Syndicated Loan Conference
Business Overview Jim Scilacci Senior VP and CFO, Edison Mission Group Lehman Brothers High Yield Bond and Syndicated Loan Conference March 15, 2006 Forward-Looking Statement This presentation contains
More information2015 Budget and Grid Management Charge Rates
2015 Budget and Grid Management Charge Rates September 18, 2014 PRELIMINARY Prepared by Department of Financial Planning California Independent System Operator Corporation 2015 Budget and GMC Rates Table
More informationNovember 6, Financial Update 3 rd Quarter 1
November 6, 2014 Financial Update 3 rd Quarter 1 Disclaimer All statements in this presentation other than historical facts are forward-looking statements that involve risks and uncertainties which are
More informationREDACTED Rocky Mountain Power Docket No Witness: Chad A. Teply BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH
REDACTED Rocky Mountain Power Docket No. 17-035-40 Witness: Chad A. Teply BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER REDACTED Surrebuttal Testimony of Chad A. Teply
More informationSafe Harbor Statement under the Private Securities Litigation Reform Act of 1995
2016 Power & Gas Leaders Conference Bank of America Merrill Lynch Boston, MA September 15, 2016 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains
More informationAgenda - Renewable Energy Advisory Council Wednesday, May 9, 2018: 9:30 a.m. 11:45 a.m. Special joint RAC/CAC lunch meeting to follow at noon - 1:30pm
Agenda - Renewable Energy Advisory Council Wednesday, May 9, 2018: 9:30 a.m. 11:45 a.m. Special joint RAC/CAC lunch meeting to follow at noon - 1:30pm Energy Trust conference room Kilowatt 421 SW Oak St.,
More informationNYISO 2018 BUDGET OVERVIEW
NYISO 2018 BUDGET OVERVIEW Alan Ackerman Customized Energy Solutions Chair, Budget & Priorities Working Group Management Committee October 25, 2017 Rensselaer, NY This presentation is unchanged from the
More informationEarnings Conference Call. Fourth Quarter and Full Year 2014
Earnings Conference Call Fourth Quarter and Full Year 2014 Cautionary Statement Information Current as of February 13, 2015 Except as expressly noted, the information in this presentation is current as
More informationBusiness Overview and Strategy. Handout. March, 2005
Business Overview and Strategy Handout March, 2005 Forward-Looking Statements This presentation contains forward-looking information. The words expect, forecast, potential, projected, anticipated, predict,
More information4 th Quarter 2017 Earnings Release Presentation
4 th Quarter 2017 Earnings Release Presentation January 25, 2018 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements
More informationPortland General Electric
Portland General Electric Earnings Conference Call Fourth Quarter and Full-Year 2017 Cautionary Statement Information Current as of February 16, 2018 Except as expressly noted, the information in this
More informationTransAlta Corporation. Investor Presentation April 2017
TransAlta Corporation Investor Presentation April 2017 1 Forward Looking Statements This presentation may include forward-looking statements or information (collectively referred to herein as forward-looking
More informationAppendix C-2. Entergy Arkansas, Inc. May 26, 2016
Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc. Entergy Arkansas, Inc. May 26, 2016
More informationEVERCORE ISI UTILITY CEO RETREAT. January 12 & 13, 2017
EVERCORE ISI UTILITY CEO RETREAT January 12 & 13, 2017 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the
More informationCIBC 2014 Institutional Investor Conference Dawn Farrell Chief Executive Officer
CIBC 2014 Institutional Investor Conference Dawn Farrell Chief Executive Officer 1 Forward Looking Statements This presentation may contain forward-looking statements pertaining to the following: the timing
More informationPowering Beyond. Wells Fargo Fixed Income Investor Meetings April 5, 2018
Powering Beyond Wells Fargo Fixed Income Investor Meetings April 5, 2018 Safe Harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations
More informationEIPC GAS-ELECTRIC SYSTEM INTERFACE STUDY
EIPC GAS-ELECTRIC SYSTEM INTERFACE STUDY Status Update Mark Babula Principal Engineer System Planning ISO New England Inc. NPCC Governmental/Regulatory Affairs Advisory Group December 3, 2013 Table of
More informationResults Presentation /1Q2018. Avangrid, utility of the future
Results Presentation /1Q2018 Legal Notice FORWARD LOOKING STATEMENTS Certain statements in this presentation may relate to our future business and financial performance and future events or developments
More informationManagement Discussion and Analysis of Financial and Operational Performance for the year ended 30 June 2015
Management Discussion and Analysis of Financial and Operational Performance for the year ended 30 June 2015 31 August 2015 All figures in this report relate to businesses of the Infigen Energy Group (
More informationEconomic Benefit Analysis of the Navajo Generating Station to the Central Arizona Water Conservation District and Its Customers
ENERGY VENTURES ANALYSIS JANUARY 2018 Economic Benefit Analysis of the Navajo Generating Station to the Central Arizona Water Conservation District and Its Customers January 2018 Prepared by: ENERGY VENTURES
More informationTVA BOARD MEETING AUGUST 22, 2013
TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING 2 CONSENT AGENDA Health Savings Account Contract Pharmacy Benefits Managers Contract Assistant Corporate Secretary Designations 3 CHAIRMAN S REPORT AUGUST
More informationDepartment of Water and Power City of Los Angeles. City of Los Angeles 4th Regional Investors Conference March 19, 2018
Department of Water and Power City of Los Angeles City of Los Angeles 4th Regional Investors Conference March 19, 2018 LADWP Overview Largest municipal utility in the US 1.5 million power customers; 680,000
More informationBoston & New York Investor Meetings October 5 & 6, 2015
Boston & New York Investor Meetings October 5 & 6, 2015 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the
More information2018 Budget and Grid Management Charge Rates December 14, 2017 FINAL
2018 Budget and Grid Management Charge Rates December 14, 2017 FINAL Prepared by the Financial Planning and Procurement Department California Independent System Operator Corporation Table of Contents I.
More informationPublic Service Enterprise Group
Public Service Enterprise Group PSEG Earnings Conference Call 2 nd Quarter 2018 August 1, 2018 Forward-Looking Statements Certain of the matters discussed in this report about our and our subsidiaries
More informationIllinois Power Agency Act and Related Legislation
Craig D. Nelson Vice President Regulatory Affairs & Financial Services November 1, 2007 Topics Implications of Illinois Power Agency Act and related changes to Public Utility Act Expected influence on
More informationRMR and CPM Enhancements Stakeholder Conference Call December 20, 2018
RMR and CPM Enhancements Stakeholder Conference Call December 20, 2018 Keith Johnson Infrastructure & Regulatory Policy Manager Agenda Time Item Presenter 10:00-10:15 1. Stakeholder process and general
More information48 th Annual EEI Financial Conference November Brett Gellner, Chief Financial Officer
48 th Annual EEI Financial Conference November 2013 Brett Gellner, Chief Financial Officer 1 Forward Looking Statements This presentation may contain forward-looking statements pertaining to the following:
More informationFIRST SOLAR Q4 17 EARNINGS CALL
FIRST SOLAR Q4 17 EARNINGS CALL IMPORTANT INFORMATION Cautionary Note Regarding Forward Looking Statements This presentation contains forward-looking statements which are made pursuant to safe harbor provisions
More informationPortland General Electric
Portland General Electric Earnings Conference Call Fourth Quarter and Full Year 2016 Cautionary Statement Information Current as of February 17, 2017 Except as expressly noted, the information in this
More informationNew Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP
New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW
More information10-YEAR COSTS AND BENEFITS TO SPP MEMBERS OF INTEGRATING MOUNTAIN WEST TRANSMISSION GROUP Quantitative Analysis of Costs and Benefits
10-YEAR COSTS AND BENEFITS TO SPP MEMBERS OF INTEGRATING MOUNTAIN WEST TRANSMISSION GROUP Quantitative Analysis of Costs and Benefits Published on March 19, 2018 By SPP Staff REVISION HISTORY DATE OR VERSION
More informationNYISO 2019 BUDGET OVERVIEW
NYISO 2019 BUDGET OVERVIEW Alan Ackerman Customized Energy Solutions Chair, Budget & Priorities Working Group Management Committee October 31, 2018 Rensselaer, NY Except for items noted in RED, this presentation
More informationWALK-THROUGH THE LEGAL STRUCTURE OF PPA S عرض الهيكل القانوني التفاقيا شراء الطاق
WALK-THROUGH THE LEGAL STRUCTURE OF PPA S عرض الهيكل القانوني التفاقيا شراء الطاق Agenda What is a PPA? Timeline Bankability PPA Development of the Jordanian PPA PPA Main Components Purpose and Duration
More informationD Los Angeles ""VV Department of
D Los Angeles ""VV Department of... P.Water & Power RESOLUTION NO.-------- BOARDLETTERAPPROVAL Senior Assistant General Manager Power System MARCIE L. EDWARDS General Manager DATE: May 13, 2015 SUBJECT:
More informationNew York Investor Meetings
New York Investor Meetings May 10, 2016 Safe Harbor Except for the historical statements contained in this release, the matters discussed herein, are forwardlooking statements that are subject to certain
More informationWECC Process for Risk-Based Compliance Oversight Inherent Risk Assessment and Compliance Oversight Plan
WECC Process for Risk-Based Compliance Oversight Inherent Risk Assessment and Compliance Oversight Plan WECC Entity Oversight Effective Date: April 1, 2017 155 North 400 West, Suite 200 Salt Lake City,
More informationThe Australian national electricity market
The Australian national electricity market Are you managing your risks? AusIMM Technical presentation John Bartlett and Patrick Booth 26 April 2017 john.bartlett@energetics.com.au and patrick.booth@energetics.com.au
More information2017 Budget and Grid Management Charge Rates September 6, 2016 PRELIM-DRAFT
2017 Budget and Grid Management Charge Rates September 6, 2016 PRELIM-DRAFT Prepared by the Financial Planning and Procurement Department California Independent System Operator Corporation 2017 Budget
More informationSIX MONTHS ENDED MARCH
SIX MONTHS ENDED MARCH 2011 Orlando Utilities Commission Table of Contents Management s Discussion and Analysis 1 Statements of Revenues, Expenses and Changes in Net Assets based on Budget - Unaudited
More informationALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION
ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION November 30, 2016 www.poweradvisoryllc.com To: Power Advisory Clients and Colleagues From: Kris Aksomitis, Jason Chee-Aloy, Brenda Marshall,
More informationTennessee Valley Authority
Q4 Fiscal Year 2017 Conference Call CORPORATE PARTICIPANTS Tammy Wilson Vice President, Treasurer, and Chief Risk Officer Bill Johnson President and Chief Executive Officer John Thomas Chief Financial
More informationCorporate Renewable Energy Procurement
Corporate Renewable Energy Procurement Legal Considerations & Market Trends 8/17/2016 Presented by Ann A. Hawkins / Nike O. Opadiran / Ethan M. Schultz Beijing / Boston / Brussels / Chicago / Frankfurt
More informationPJM & MISO Assumptions and Criteria for Testing of New Resources
& Assumptions and Criteria for Testing of New Resources 1 Introduction These slides provide a description and comparison of the assumptions and criteria used by and during the study of customer proposed
More informationEntergy Reports Fourth Quarter and Full Year Financial Results; Initiates 2018 Earnings Guidance
Entergy 639 Loyola Avenue New Orleans, LA 70113 Date: Feb. 23, 2018 For Release: Immediately News Release Contact: Emily Parenteau (Media) (504) 576-4328 eparent@entergy.com David Borde (Investor Relations)
More informationPublic Service Enterprise Group. NYC Investor Meeting February 14, 2007
Public Service Enterprise Group NYC Investor Meeting February 14, 2007 Forward-Looking Statement The statements contained in this communication about our and our subsidiaries future performance, including,
More informationOREGON STANDARD AVOIDED COST RATES AVOIDED COST PURCHASES FROM ELIGIBLE QUALIFYING FACILITIES Page 1
S ELIGIBLE QUALIFYING FACILITIES Page 1 Available To owners of Qualifying Facilities making sales of electricity to the Company in the State of Oregon. Applicable For power purchased from Base Load and
More informationCURRENT ASSETS: Cash and cash equivalents 281, ,246 Restricted cash 1,851 3,942. Other 15,551 17,556. Derivative instruments 18,400 23,164
Consolidated Balance Sheets (unaudited) (In Thousands) ASSETS June 30, June 30, 2018 2017 UTILITY PLANT: Electric plant $ 4,594,970 $ 4,484,180 Coal mine plant 326,988 338,265 Construction work in progress
More informationSeptember Investor Meetings aep.com. 4th Quarter 2018 EARNINGS RELEASE PRESENTATION January 24, 2019
September Investor Meetings aep.com 4th Quarter 2018 EARNINGS RELEASE PRESENTATION January 24, 2019 1 Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995 This presentation
More information