Financial Plan Fifth Annual Update

Size: px
Start display at page:

Download "Financial Plan Fifth Annual Update"

Transcription

1 Financial Plan Fifth Annual September 2018 For State Fiscal Year Ending June 30, 2018 September 2018

2

3

4 INTRODUCTION TABLE OF CONTENTS 1. SUMMARY FINANCIAL PLAN OVERVIEW Annual s LOCATION OF JANE BYRNE INTERCHANGE PROJECT PROJECT HISTORY DESCRIPTION OF THE PROPOSED IMPROVEMENTS Major Components of Proposed Improvement PROJECT IMPLEMENTATION Project Contracts Contract Implementation PROJECT COSTS d Project Estimate Original Project Estimate Project Estimate s Evaluation and Summary of Construction s Evaluation and Summary of Engineering s Evaluation and Summary of ROW s Estimate Projections Inflation Assumptions PROJECT FINANCING AND REVENUES Illinois Department of Transportation Funding Sources Local Funding Sources Funding Commitments Cash Flow Analysis RISKS AND MITIGATION STRATEGIES Risks Identified and Encountered Probable Risks Moving Forward Unknown Factors Affecting s FINANCIAL PLAN UPDATES September 2018 i

5 LIST OF FIGURES Figure 1-1 Total Estimates by Annual Financial Plan Figure 3-1 Location Map Figure 3-2 Chicago Metropolitan Expressway System Figure 5-1 Preferred Alternative LIST OF TABLES Table 1-1 s by Major Project Element (Year of Expenditure s in $ Million)... 3 Table 1-2 Estimated Construction s... 4 Table 1-3 Contract Change Orders... 5 Table 1-4 Fiscal Year 2018 Letting s... 7 Table 1-5 Fiscal Year 2018 Construction s... 8 Table 1-6 Estimated Construction Engineering s... 9 Table 1-7 Construction Engineering Supplements Table 1-8 Fiscal Year 2018 Lettings Construction Engineering s Table 1-9 Fiscal Year 2018 Construction Engineering s Table 6-1 Contract Transition Summary Table 6-2 Contract Schedule Table 7-1 s by Major Project Element (Year of Expenditure (YOE) s in $ Million) Table 7-2 Project s Table 7-3 Contract Change Orders Table 7-4 Fiscal Year 2018 Letting s Table 7-5 Fiscal Year 2018 Construction s Table 7-6 Construction Engineering Supplements Table 7-7 Fiscal Year 2018 Lettings - Construction Engineering Adjustments Table 7-8 Fiscal Year 2018 Construction Engineering s Table 7-9 July Five-Year Construction Inflation Forecast (ODOT) Table 7-10 January Five-Year Construction Inflation Forecast (ODOT) Table 8-1 Advance Construction (AC) Authorization and Conversion (Millions of Dollars) Table 8-2 Cash Flow (Year of Expenditure in Millions of Dollars) Table 10-1 Financial Plan s Table 10-2 Expenditure Table (To be updated annually) APPENDIX Appendix A Detailed s by Contract September 2018 ii

6 1. SUMMARY This financial plan serves as the fifth Annual to the Jane Byrne Interchange Reconstruction project s Initial Financial Plan (IFP), which was approved on September 23, Contained in this document are expenditure and schedule data as of State Fiscal Year ending June 30, This document serves as an addendum to the IFP and summarizes the following key updates: Project Schedule Extends to a Fiscal Year 2023 Completion As construction work continues on the Jane Byrne Interchange Reconstruction, several construction delays have occurred on some of the twenty-two let projects. Within the last fiscal year and as more projects are let, overlapping work zones have caused delays and some of those delays have caused subsequent delays to both construction activities and schedule adjustments to future contracts. The resulting delays have revised the overall completion date from Fiscal Year 2022 into Fiscal Year Project Estimate Increases to $713.0 Million The total cost to complete the Jane Byrne Interchange project (including construction, right-of-way, utilities, and engineering) has increased from $535.5 million (IFP) to $713.0 million Financial Plan (FPU) The changes are summarized in Table 1-1. The cost data in this update provides an accounting of costs incurred to date and includes an estimate of future costs based on cost trends observed to date, engineers estimates, programmed costs and expected construction cost escalation factors. All of the cost increases denoted in this update have been accounted for in the State s Multi-Year Improvement Program (MYP). On the next page is a summary of the updates for Construction and Construction Engineering costs for Fiscal Year Construction s The Construction s for the project have been analyzed reflecting the following items: 1. Contract Change Orders this includes any increases from contracts currently in construction Letting s this includes the bid costs and any increases for contracts that were let during Fiscal Year Construction Contract s this includes any contracts which have updated costs during Fiscal Year 2018 due to design development or contract repackaging Table 1-2 is a summary showing the construction cost increases from each of the above items. A description and further breakdown of each line item is shown in Table 1-3 through Table 1-5. September

7 Table 1-1 s by Major Project Element (Year of Expenditure s in $ Million) Major Project Element IFP (YOE $) 2014 Annual (YOE $) 2015 Annual (YOE $) 2016 Annual (YOE $) 2017 Annual (YOE $) 2018 Annual (YOE $) 90% 10% 100% 90% 10% 100% 90% 10% 100% 90% 10% 100% 90% 10% 100% 90% 10% 100% Federal State State Federal State State Federal State State Federal State State Federal State State Federal State State Construction and Utilities $413.5 $46.0 $463.0 $51.4 $468.2 $52.0 $489.4 $54.3 $500.7 $55.6 $512.5 $57.0 ROW $ 0.5 $ 0.2 $ 0.2 $3.8 $4.5 $6.8 Preliminary Engineering Construction Engineering $25.7 $35.3 $35.3 $57.1 $59.6 $61.3 $49.8 $49.8 $51.8 $53.8 $61.0 $75.4 SUBTOTAL $413.5 $122.0 $463.0 $136.7 $468.2 $139.3 $489.4 $169.0 $500.7 $180.7 $512.5 $200.5 TOTAL $ $ $ $ $ $ September

8 Table 1-2 Estimated Construction s Construction s (Millions) 2017 Financial Plan Construction Estimate $ Contract Change Orders (See Table 1-3) $2.7 Fiscal Year 2018 Letting s (See Table 1-4) ($6.9) Fiscal Year 2018 Construction Contract s (See Table 1-5) $ Financial Plan Construction Estimate $569.5 Percentage Increase from 2017 Financial Plan 2.4% Contract Change Orders There were twenty-two contracts let prior to and during Fiscal Year 2018 that continued in Fiscal Year Some of these contracts had additions and deletions to their contracts over the past year. All of the individual contracts are listed in Table 1-3 and change orders, if any, are noted. With the addition of several contracts during this fiscal year, a net cost increase for ongoing contracts were realized from FPU Fiscal Year 2018 Letting s There are seven contracts that will be funded with Fiscal Year 2018 funds. Two of these contracts (Contract 60X99 and 62A75) were let in Fiscal Year 2017 but funded with Fiscal Year 2018 funds. Five contracts were let and will be funded with Fiscal Year 2018 funds. Table 1-4 depicts the cost changes as related to the Initial Financial Plan and FPU 2017 costs. Contracts 60X75, 60X76 and 62A74 were let in August 2017, Contract 62D78 was let in September 2017 and Contract 60X95 was let in November These contracts were awarded and funded with State Fiscal Year 2018 funding. The cost difference noted in Table 1-4 from the FPU 2017 reflects only the cost difference between the FPU 2017 cost and the letting cost. As these contracts continued construction through Fiscal Year 2018 they also had change orders during Fiscal Year 2018 that are reflected in Table 1-3. Letting costs during Fiscal Year 2018 totaled to a net decrease from the costs reported in the 2017 Financial Plan. Fiscal Year 2018 Construction s Table 1-5 depicts contract updates to future contracts that were made during Fiscal Year Three contracts will be let in Fiscal Year 2019 and final design plans and estimates were completed for these contracts and are reflected in Table 1-5 below. In addition, project scope from future year contracts have been shifted to the Fiscal Year 2019 contracts for constructability reasons and is reflected in the table below. A cost decrease in the future contracts (Contract 62A76, 62A78, and 60X96) is noted in Table 1-5 to reflect this shift of work (retaining walls, noise walls, and main drain) to Contract 60X79. In addition, the Advanced Noise Wall contract was deleted due to a noise wall being deleted and another noise wall being shifted to Contract 60X94. The cost revisions are noted in Table 1-5 below. The cost changes have been accounted for in the State s most recent State s Multi-Year Improvement Program (MYP). September

9 Table 1-3 Contract Change Orders Contract State Fiscal Year Let IFP Construction Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) 60X27 Halsted/Harrison St Water Main Materials 2014 $ $1.2 $1.2 $1.2 $1.2 $1.2 $0.0 0% 60W26 Harrison St. Bridge (WB) and Halsted St. Bridge 2014 $ $42.6 $44.6 $46.5 $43.9 $46.8 $2.9 7% 60W29 Peoria St. Bridge 2014 $10.9 $23.6 $26.2 $26.9 $26.7 $26.7 $0.0 0% 60W71 Harrison St. (East) 2014 $6.3 $10.8 $10.9 $11.3 $10.5 $10.5 $0.0 0% 60W28 Flyover North to West I $ $55.8 $56.4 $57.7 $58.8 $55.9 -$2.9-5% 60W49 Congress/Jane Byrne Interchange Surveillance 2014 Post DA 3 $0.7 $0.8 $0.8 $0.8 $0.8 $0.0 0% 60X37 Tree Planting (#1) 2014 Post DA 3 $0.2 $0.2 $0.2 $0.2 $0.2 $0.0 0% 60X61 I-290 WB Auxiliary Lane 2015 $ $20.5 $20.5 $35.5 $36.2 $35.1 -$1.1-3% 60W30 Taylor Street Bridge 2015 $13.4 $17.7 $18.1 $18.4 $17.8 $17.6 -$0.2-1% 60X62 Peoria Street Aesthetics 2015 Post DA 3 $1.4 $1.4 $1.4 $1.4 $1.2 -$0.2-4% 60Y66 Tree Planting (#2) 2015 Post DA 3 $0.2 $0.2 $0.2 $0.2 $0.2 $0.0 0% 60Y67 Tree Planting (#3) 2016 Post DA 3 $0.2 $0.2 $0.3 $0.3 $0.3 $0.0 0% 62B76 Ramp NE 2017 $ $0.0 $0.0 $9.6 $8.1 6 $8.1 $0.0 0% 60X77 I-290 WB Mainline 2017 $ $14.0 $11.5 $9.8 $ $10.5 $0.5 5% 60X78 I-290 WB Bridges 2017 $ $28.7 $25.5 $22.7 $ $23.4 $0.6 3% 60X99 Van Buren Street Bridge 2017 $ $21.2 $21.2 $21.2 $21.2 $21.6 $0.4 2% 62A75 Jackson Boulevard Utility 2017 $ $4.7 $4.7 $4.7 $2.7 $2.7 $0.0 0% Relocation 60X75 I-290 EB Bridge over I-90/ $ $23.3 $23.3 $22.3 $21.6 $22.1 $0.5 2% 60X76 I-290 EB Mainline 2018 $ $22.2 $22.2 $22.2 $30.5 $30.7 $0.2 1% 62A74 Water Main Relocation/Rehabilitation and Retaining Wall near IUC 2018 $ $15.7 $15.7 $15.7 $19.4 $21.2 $1.8 9% 62D78 I-290 Storm Sewer 2018 $ $0.0 $0.0 $0.0 $4.1 $ $ % 60X95 Monroe Street over I-90/ $ $15.2 $15.2 $15.2 $19.7 $ $ % September % Change from 2017

10 Total $319.9 $320.0 $343.8 $358.1 $354.7 $ % 1. Halsted/Harrison Street Water Main Materials and Harrison Street (WB) and Halsted Street Bridge were combined in the Initial Financial Plan. 2. I-290 WB Auxiliary Lane IFP includes the entire Ramp NW Flyover project. The project was broken into the Flyover North to West I-290 Project and I-290 WB Auxiliary Lane Pavement project as part of the FPU The project was broken further to the I-290 WB Storm Sewer project as part of the FPU Items were added after Design Approval (DA) and therefore no associated costs were included in the Initial Financial Plan. 4. Ramp NE and Ramp EN were part of the IFP costs for System Ramps and were broken into separate contracts as part of the FPU 2014.The project was further split into a Ramp NE contract and a Ramp EN contract as part of the FPU I-290 IFP included both I-290 WB Mainline and Bridges in addition to I-290 EB Mainline and Bridges. The project was broken into 4 contracts as part of the Financial Plan A fifth project, Congress Viaduct Bridge Painting was broken out as part of the Financial Plan Van Buren Street Bridge, Jackson Boulevard Utility Relocation, Water Main Relocation/Rehabilitation and Retaining Wall near UIC, and Monroe Street over I-90/94 were broken out from the IFP of the I-90/94, Various Bridges. 7. Difference reflects 2018 change order costs post letting only. See Table 1-4 for cost differences due to letting costs. shown in the 2018 column are the most recent costs and reflect both bid costs and change order costs incurred during Fiscal Year September

11 Contract State Fiscal Year Let IFP Construction Table 1-4 Fiscal Year 2018 Letting s d Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) % Change from X99 Van Buren Street Bridge $ $21.2 $21.2 $21.2 $21.2 $21.6 $0.0 0% 62A75 Jackson Boulevard Utility Relocation $ $4.7 $4.7 $4.7 $2.7 $2.7 $0.0 0% 60X75 I-290 EB Bridge over I- 90/ $ $23.3 $23.3 $23.3 $21.7 $ $ % 60X76 I-290 EB Mainline 2018 $ $22.2 $22.2 $22.2 $30.5 $ $ % 62A74 Water Main Relocation /Rehabilitation and Retaining Wall near UIC 2018 $ $15.7 $15.7 $15.7 $19.4 $ $ % 62D78 I-290 WB Storm Sewer 2018 $ $0.0 $0.0 $0.0 $4.1 $ $ % 60X95 Monroe Street Bridge over I-90/ $ $15.2 $15.2 $15.2 $19.7 $15.5 4,6 -$4.6 4,6-23% Peoria Street Siphon 62C Post DA Lining 5 $0.0 $0.0 $0.8 $0.8 $ $ % Total $68.6 $75.1 $68.0 $119.3 $ $6.9-6% 1. I-290 IFP included both I-290 WB Mainline and Bridges in addition to I-290 EB Mainline and Bridges. The project was broken into 4 contracts as part of the Financial Plan A fifth project, Congress Viaduct Bridge Painting, was broken out as part of the Financial Plan Van Buren Street Bridge, Jackson Boulevard Utility Relocation, Water Main Relocation/Rehabilitation and Retaining Wall near UIC and Monroe Street over I-90/94 were broken out from the IFP of the I-90/94, Various Bridges. 3. I-290 WB Auxiliary Lane IFP includes the entire Ramp NW Flyover project. The project was broken into the Flyover North to West I-290 Project and I-290 WB Auxiliary Lane Pavement project as part of the FPU The project was broken further to the I-290 WB Storm Sewer project as part of the FPU difference reflects difference between 2018 and letting costs only. See Table 1-3 for cost difference due to change orders during Fiscal Year s shown in the 2018 column are the most recent costs and reflect both the bid costs and change order costs incurred during Fiscal Year Items were added after Design Approval (DA) and therefore no associated costs were included in the Initial Financial Plan. 6. During Fiscal Year 2018 Contract 62C92 (Peoria Street Siphon Lining) work was added to Contract 60X95 (Monroe Street Bridge over I-90/94) and Contract 62C92 was deleted entirely. 7. Van Buren Street Bridge and Jackson Boulevard Utility Relocation were let in June 2017, but were awarded and funded in State Fiscal Year September

12 Table 1-5 Fiscal Year 2018 Construction s Contract State Fiscal Year Let IFP Construction Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) % Change from X79 Ramp EN 2019 $ $25.0 $25.0 $21.7 $21.7 $ $ % 60X93 Interchange Ramp Completions 2019 $45.0 $55.0 $60.6 $60.6 $60.6 $79.6 $ % 62A76 Northbound I-90/ $ $37.3 $37.3 $37.3 $37.3 $ $ % 60X96 Advanced Noise Walls 2020 $ $0.6 $0.6 $0.6 $0.6 $ $ % 62A78 Jackson Boulevard over I- 90/ $ $14.0 $14.0 $14.0 $14.0 $ $ % 60X94 Adams Street over I-90/ $ $14.8 $14.8 $14.8 $14.8 $ $ % Total $146.7 $152.4 $149.1 $149.1 $166.4 $ % 1. Ramp NE and Ramp EN were part of the IFP costs for System Ramps and were broken into separate contracts as part of the FPU 2014.The project was further split into a Ramp NE contract and a Ramp EN contract as part of the FPU Northbound I-90/94, Jackson Boulevard over I-90/94, Advanced Noise Walls and Adams Street over I-90/94 were included in the I-90/94, Various Bridges Contract in the IFP. The projects were broken out as part of the FPU During Fiscal Year 2018 a portion of the Contract 60X96 work was deleted from the overall scope and a portion of work was moved to the Adams Street over I-90/94 (Contract 60X94). The Advanced Noise Wall contract will no longer exist after FPU Project scope including Retaining Walls 22A, 22B, and Main Drain work was shifted from Northbound I-90/94 (Contract 62A76) to Ramp EN (Contract 60X79). Project scope including Retaining Wall 23 was shifted from Jackson Boulevard over I-90/94 (Contact 62A78) to Ramp EN (Contract 60X79). September

13 Engineering s Preliminary and construction engineering costs have been evaluated for the project. Preliminary engineering costs have increased $1.7 M in Fiscal Year The preliminary engineering costs have increased to reflect the programmed costs as the contracts have been repackaged from the original 9 contracts to the current 33 contracts and as the design effort has progressed. These costs also reflect the cost changes from the estimated preliminary engineering contract costs to the actual preliminary engineering contract costs. The increase in preliminary engineering costs has been accounted for in the State s most recent MYP. Construction engineering costs have increased $14.4 M in Fiscal Year Table 1-6 is a summary showing the construction engineering cost increases from each of the below items. The construction engineering costs have been prorated by individual contracts from the bundled construction engineering contracts of the Department. As construction continues on the project, construction durations have been being extended causing the construction engineering costs to increase proportionally. Within the last fiscal year, as over 10 contracts are ongoing at the same time, contract overlap has caused further construction delays and increased construction and construction engineering costs. The complexity of this project has resulted in an increase in the construction engineering efforts to monitor the contracts. As the construction contracts are established, construction engineering contract packages are finalized and better estimated costs for the construction engineering packages are established. The future estimated construction engineering costs have been updated to reflect the anticipated increased efforts. The increases in construction engineering costs have been accounted for in the State s most recent MYP. A description and further breakdown of each line item is shown in Table 1-7 through Table 1-9. The construction engineering cost breakdowns below address the following items: 1. Construction Engineering Supplements this includes any additions or deletions to the contracts for construction engineering for construction contracts let prior to Fiscal Year Fiscal Year 2018 Lettings - Construction Engineering Adjustments this includes the actual awarded costs for construction engineering for projects let during Fiscal Year Fiscal Year 2018 Construction Engineering s this includes any contracts which have updated costs during Fiscal Year 2018 due to design development or contract repackaging. Table 1-6 Estimated Construction Engineering s Construction Engineering s (Millions) 2017 Financial Plan Construction Engineering Estimate $61.0 Construction Engineering Supplements (See Table 1-7) $0.0 Fiscal Year 2018 Lettings - Construction Engineering s (See Table 1-8) $6.1 Fiscal Year 2018 Construction Engineering s (See Table 1-9) $ Financial Plan Construction Engineering Estimate $75.4 Percentage increase from 2017 Financial Plan 24% Construction Engineering Supplements There have been several supplements approved for the construction engineering contracts that were let prior to Fiscal Year 2018 and the changes are summarized in Table 1-7. Some of the construction engineering supplements have resulted from the delays to the initial construction contracts completion dates. September

14 Contract State Fiscal Year Let Table 1-7 Construction Engineering Supplements IFP Construction Engineering Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) 60X27 Halsted/Harrison St Water Main Materials 2014 $0.0 1 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 0% 60W26 Harrison St. Bridge (WB) and Halsted St. Bridge 2014 $3.8 1 $2.7 $3.4 $4.0 $3.9 $4.0 $0.1 0% 60W29 Peoria St. Bridge 2014 $1.2 $2.1 $2.2 $2.3 $2.3 $2.3 $0.0 0% 60W71 Harrison St. (East) 2014 $0.7 $0.7 $0.9 $1.0 $1.0 $1.0 $0.0 0% 60W28 Flyover North to West I $5.2 2 $8.0 $8.2 $8.2 $8.2 $8.2 $0.0 0% 60W49 Congress/Jane Byrne Interchange Surveillance 2014 Post DA 3 $0.08 $0.08 $0.08 $0.08 $0.08 $0.0 0% 60X37 Tree Planting (#1) 2014 Post DA 3 $0.02 $0.02 $0.02 $0.02 $0.02 $0.0 0% 60X61 I-290 WB Auxiliary Lane 2015 $5.2 2 $2.1 $2.5 $2.5 $3.4 $3.2 -$0.2-6% 60W30 Taylor Street Bridge 2015 $1.5 $1.7 $2.1 $2.1 $3.0 $2.8 -$0.2-7% 60X62 Peoria Street Aesthetics 2015 Post DA 3 $0.1 $0.1 $0.1 $0.1 $0.1 $0.0 0% 60Y66 Tree Planting (#2) 2015 Post DA 3 $0.02 $0.02 $0.02 $0.02 $0.02 $0.0 0% 60Y67 Tree Planting (#3) 2016 Post DA 3 $0.02 $0.02 $0.02 $0.02 $0.02 $0.0 0% 62B76 Ramp NE 2017 $6.7 4 $2.3 $2.3 $1.3 $1.4 6 $1.4 $0.0 0% 60X77 I-290 WB Mainline 2017 $ $1.3 $1.3 $1.3 $1.7 6 $1.7 $0.0 0% 60X78 I-290 WB Bridges 2017 $ $2.7 $2.7 $2.7 $3.8 6 $3.8 $0.0 0% 60X99 Van Buren Street Bridge 2017 $ $2.0 $2.0 $2.0 $3.4 $3.7 $0.3 9% 60X75 I-290 EB Bridges 2018 $2.2 5 $2.2 $2.1 $2.1 $2.1 $4.6 7 $ % 60X76 I-290 EB Mainline 2018 $2.1 5 $2.1 $2.1 $2.1 $3.1 $5.1 7 $ % 62A74 Water Main Relocation/Rehabilitatio n and Retaining Wall 2018 $ $1.5 $1.5 $1.5 $1.9 $2.8 7 $ % near UIC 62D78 I-290 Storm Sewer 2018 Post DA 3 $0.0 $0.0 $0 $0.4 $0.4 7 $ % September % Change from 2017

15 Contract State Fiscal Year Let IFP Construction Engineering Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) % Change from 2017 Monroe Street over I- 60X $ /94 6 $1.4 $1.4 $1.4 $2.0 $2.7 7 $ % Total $33.0 $33.9 $34.7 $41.8 $47.9 $0.0 0% 1. Halsted/Harrison Street Water Main Materials and Harrison Street (WB) and Halsted Street Bridge were combined in the Initial Financial Plan. 2. I-290 WB Auxiliary Lane IFP includes the entire Ramp NW Flyover project. The project was broken into the Flyover North to West I-290 Project and I-290 WB Auxiliary Lane Pavement project as part of the FPU The project was broken further to the I-290 WB Storm Sewer project as part of the FPU Items were added after Design Approval (DA) and therefore no associated costs were included in the Initial Financial Plan. 4. Ramp NE and Ramp EN were part of the IFP costs for System Ramps and were broken into separate contracts as part of the FPU 2014.The project was further split into a Ramp NE contract and a Ramp EN contract as part of the FPU I-290 IFP included both I-290 WB Mainline and Bridges in addition to I-290 EB Mainline and Bridges. The project was broken into 4 contracts as part of the Financial Plan A fifth project was broken out as part of the Financial Plan Van Buren Street Bridge, Jackson Boulevard Utility Relocation, Water Main Relocation/Rehabilitation and Retaining Wall near UIC, and Monroe Street over I-90/94 were broken out from the IFP of the I-90/94, Various Bridges. 7. Difference reflects 2018 supplement cost post contract award only. See Table 1-8 for cost differences due to contract award costs. show in the 2018 column are the most recent costs and reflect both awarded costs and supplemental costs incurred during Fiscal Year September

16 Fiscal Year 2018 Lettings Construction Engineering s Table 1-8 depicts the Construction Engineering cost changes for contracts funded with Fiscal Year 2018 funds as related to the Initial Financial Plan and FPU 2017 costs. The 2018 cost column reflects the total construction engineering cost for these contracts. The cost difference from the FPU 2017 reflects only those costs associated with the awarded construction engineering contracts. The increases in these costs have been accounted for in the State s most recent MYP. Contract State Fiscal Year Let Table 1-8 Fiscal Year 2018 Lettings Construction Engineering s IFP Construction Engineering Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) 60X99 Van Buren Street Bridge $ $2.0 $2.0 $2.0 $3.4 $3.7 $0.0 0% 62A75 Jackson Boulevard Utility Relocation 60X75 I-290 EB Bridge over I- 90/94 % Change from $ $0.4 $0.4 $0.4 $0.4 $0.4 $0.0 0% 2018 $ $2.2 $2.2 $2.1 $2.2 $4.7 $ % 60X76 I-290 EB Mainline 2018 $ $2.1 $2.1 $2.1 $3.1 $5.2 $ % 62A74 Water Main Relocation /Rehabilitation and Retaining Wall near UIC 2018 $ $1.5 $1.5 $1.5 $1.9 $2.8 $ % 62D78 I-290 WB Storm Sewer 2018 $5.2 3 $0.0 $0.0 $0.0 $0.4 $0.4 $0.0 0% 60X95 Monroe Street Bridge over I-90/ $ $1.4 $1.4 $1.4 $2.0 $2.7 6 $ % 62C92 Peoria Street Siphon Lining 2018 Post DA 5 $0.0 $0.0 $0.1 $0.1 $ $ % Total $9.6 $9.6 $9.6 $13.5 $23.6 $6.1 45% 1. I-290 IFP included both I-290 WB Mainline and Bridges in addition to I-290 EB Mainline and Bridges. The project was broken into 4 contracts as part of the Financial Plan A fifth project, Congress Viaduct Bridge Painting, was broken out as part of the Financial Plan Van Buren Street Bridge, Jackson Boulevard Utility Relocation and Water Main Relocation/Rehabilitation and Retaining Wall near UIC and Monroe Street over I-90/94 were broken out from the IFP of the I-90/94, Various Bridges. 3. I-290 WB Auxiliary Lane IFP includes the entire Ramp NW Flyover project. The project was broken into the Flyover North to West I-290 Project and I-290 WB Auxiliary Lane Pavement project as part of the FPU The project was broken further to the I-290 WB Storm Sewer project as part of the FPU difference reflects difference between 2018 and letting costs only. See Table 1-7 for cost difference due to change orders during Fiscal Year s shown in the 2018 column are the most recent costs and reflect both the bid costs and change order costs incurred during Fiscal Year September

17 5. Items were added after Design Approval (DA) and therefore no associated costs were included in the Initial Financial Plan. 6. During Fiscal Year 2018 Contract 62C92 (Peoria Street Siphon Lining) work was added to Contract 60X95 (Monroe Street Bridge over I-90/94) and Contract 62C92 was deleted entirely. 7. Van Buren Street Bridge and Jackson Boulevard Utility Relocation were let in June 2017, but were awarded and funded in State Fiscal Year September

18 Fiscal Year 2018 Lettings Construction Engineering s Table 1-9 depicts construction engineering cost updates during Fiscal Year 2018 to future contracts. Construction engineering for the contracts below will be awarded in State Fiscal Year 2018 and the table reflects the construction engineering cost based on the current construction cost estimate for each project. In some instances, contract work has been shifted from future contracts to the current contracts for constructability reasons. A cost decrease in the future construction engineering (Contract 62A76, 62A78, and 60X96) is noted to reflect this shift of work. The cost increases have been accounted for in the State s most recent State s Multi-Year Improvement Program (MYP). Contract State Fiscal Year Let Table 1-9 Fiscal Year 2018 Construction Engineering s IFP Construction Engineering Difference from 2017 Number Name (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) (Millions) 60X79 Ramp EN 2019 $6.7 1 $2.4 $2.4 $2.1 $2.1 $5.2 4 $ % 60X93 62A76 60X96 62A78 60X94 Interchange Ramp Completions Northbound I-90/94 Advanced Noise Walls Jackson Boulevard over I-90/94 Adams Street over I-90/94 % Change from $5.0 $5.4 $5.4 $5.4 $5.4 $12.0 $ % 2020 $ $3.5 $3.5 $3.5 $3.5 $ $ % 2020 $ $0.05 $0.05 $0.05 $0.05 $ $ % 2021 $ $1.3 $1.3 $1.3 $1.3 $0.9 4 $ % 2021 $ $1.4 $1.4 $1.4 $1.4 $1.4 3 $ % Total $14.1 $14.1 $13.7 $13.7 $22.0 $8.3 61% 1. Ramp NE and Ramp EN were part of the IFP costs for System Ramps and were broken into separate contracts as part of the FPU 2014.The project was further split into a Ramp NE contract and a Ramp EN contract as part of the FPU Northbound I-90/94, Jackson Boulevard over I-90/94, and Adams Street over I-90/94 were included in the I-90/94, Various Bridges Contract in the IFP. The projects were broken out as part of the FPU During Fiscal Year 2018 a portion work of Contract 60X96 was deleted from the overall scope and a portion of work was moved to the Adams Street over I-90/94 (Contract 60X94). 4. Project scope including Retaining Walls 22A, 22B, and Main Drain work was shifted from the Northbound I-90/94 (Contract 62A76) to Ramp EN (Contract 60X79). Project scope including Retaining Wall 23 was shifted from the Jackson Boulevard over I-90/94 (Contact 62A78) to Ramp EN (Contract 60X79). September

19 Right-of-Way s During Fiscal Year 2018, right-of-way (ROW) costs were updated as the design progressed towards future year contracts. The ROW process has moved towards acquisition for future year contracts and property appraisals have resulted in higher costs than initially estimated based on higher property appraisals. Overall, the ROW cost has increased by $2.3 million from the This change been accounted for in the State s most recent MYP. Project Expenditures to Through the State Fiscal Year 2018, ending June 30, 2018, the project expended $330.7 million since the inception of the project, or 46.4% of the current project estimate. Of this total, $48.8 million is for Preliminary Engineering ($11.1 million Phase 1; $37.7 million Phase 2) and $281.9 is for Construction ($249.6 for Construction; $30.8 million Construction Engineering; $1.5 million ROW). This was the fifth year of construction expenditure since the IFP. Figure 1-1 Total Estimates by Annual Financial Plan $800 $700 Amount Above Original Estimate Millions of dollars $600 $500 $400 $300 $200 $100 $- Initial Financial Plan 1st 2nd (September (June 2015) 2014) 3rd (June 2016) 4th (June 2017) 5th (June 2018) Work Uncompleted Work Completed To Preliminary Engineering Completed To Project Funding Levels to be d As a result of the increase in the project cost estimate, funding levels in the State s Proposed Fiscal Year Multi-Year Improvement Program were increased accordingly. Project Name On August 29, 2014, then Illinois Governor Pat Quinn renamed the Circle Interchange the Jane Byrne Interchange. Any references in the Initial Financial Plan, its updates, or other project documents which refer to the Circle Interchange can now be assumed to refer to the Jane Byrne Interchange. September

20 2. FINANCIAL PLAN OVERVIEW The Jane Byrne Interchange Project Financial Plan is a comprehensive document that reflects the project scope, schedule, estimate of cost, revenue funding plan, and risk/mitigation strategies for the proposed improvement of the Jane Byrne Interchange Project. The project study area is along Interstate 90/94 (I-90/94) from south of Roosevelt (on the south) to north of Lake Street (on the north), along Interstate 290 (I-290) from Loomis Street (on the west) to the Jane Byrne Interchange; and along the Congress Parkway from the Jane Byrne Interchange to Canal Street/Old Post Office (on the east). The purpose of the Financial Plan and the Annual s is to help decision-makers track the progress of the Jane Byrne Interchange Project over time. This update includes information about expenditures to date and adjustments to the anticipated revenue streams Annual s The Financial Plan is effective for the entire construction life of the project and approximately one year after construction completion. As stated in the Initial Financial Plan, the plan is to be updated on a yearly basis as of June 30 th (end of the State s Fiscal Year) and due within 90 days (approximately September 30 th ). In 2014, direction was received from FHWA to update the plan as of September 30 th (end of the Federal Fiscal Year) and due within 90 days (approximately December 31 st ). The Financial Plan for 2014 was prepared as of September 30, Direction received in 2015 from FHWA noted that future updates should be prepared according to the original Financial Plan on an annual basis as of June 30 th. The 2018 Financial Plan is based on data as of June 30, The initial approved Financial Plan will be the basis for all future updates. The Financial Plan and future updates will be submitted to IDOT District 1 for review. The scope of the annual update shall be sufficient to identify and resolve any cost and/or funding changes (including cash flow) that have occurred since the previous submission. This will include any changes in project scope that impact the cost estimate and/or schedule of the project. In the instance of major cost or funding changes, the update may need to refine the cost and funding for future years in addition to those for the current year. The updates will reflect changes in total and remaining project cost and/or available funding. The timing of the annual updates shall also be denoted with an identifier noting the as of date of the update. This will be the date that the financial information is extracted from the accounting system, i.e. expenditures to date. September

21 3. LOCATION OF JANE BYRNE INTERCHANGE PROJECT The Jane Byrne Interchange Project is located within the City of Chicago, Cook County, Illinois. The project study area is along Interstate 90/94 (I-90/94) from south of Roosevelt Road (on the south) to north of Lake Street (on the north), along Interstate 290 (I-290) from Loomis Street (on the west) to the Jane Byrne Interchange; and along Congress Parkway from the Jane Byrne Interchange to Canal Street/Old Post Office (on the east). See Figure 3-1. The routes typically have three lanes of traffic in each direction with mostly one lane ramps at the interchanges. In a simplistic sense, the Jane Byrne Interchange connects I-90/94 with I-290/Congress Parkway. But in a broader view, the Jane Byrne Interchange is the nexus of the Chicagoland expressway system. See Figure 3-2. It directly connects three expressways and a major arterial: Kennedy Expressway (I-90/94 north of the interchange), Dan Ryan Expressway (I-90/94 south of the interchange) Eisenhower Expressway (I-290 west of the interchange) Congress Parkway (east of the interchange) Congress Parkway provides a direct link into the Chicago Loop. Other nearby expressways feed towards the Jane Byrne Interchange, as follows: Edens Expressway (I-94, eight miles north of the Jane Byrne Interchange) Stevenson Expressway (I-55, one mile south) Chicago Skyway (I-90, seven miles south) Bishop Ford Freeway (I-94, 11 miles south) I-57 (11 miles south) Reagan Memorial Tollway (I-88, merges with I-290 approximately 13 miles west) The Jane Byrne Interchange is situated among diverse land uses. The four quadrants around the interchange include Greektown/West Loop to the northwest, the University of Illinois at Chicago (UIC) and the Illinois Medical District to the southwest, an industrial setting to the southeast and a mix of residential, retail and office spaces adjacent to the Loop (central business district) to the northeast. September

22 Figure 3-1 Location Map Lake St Project Area Loomis St Old Post Office Roosevelt Rd September

23 Figure 3-2 Chicago Metropolitan Expressway System EDENS EXPY KENNEDY EXPY JANE BYRNE INTERCHANGE EISENHOWER EXPY CONGRESS PKWY REAGAN TOLLWAY STEVENSON EXPY DAN RYAN EXPY CHICAGO SKYWAY BISHOP FORD FWY September

24 4. PROJECT HISTORY The Jane Byrne Interchange was built in the late 1950s and early 1960s as part of the Interstate Highway System. It is under the jurisdiction of the Illinois Department of Transportation (IDOT). The Jane Byrne Interchange has outlived its design life according to several performance indicators on safety, infrastructure condition and congestion. It is one of the worst bottlenecks in the country for traffic congestion. Operations of the interchange are impacted by geometrics, significant traffic, and facility condition. Multiple geometric elements are deficient at certain locations within the Jane Byrne Interchange. These include steep grades, sharp curves, narrow lane and shoulder widths, substandard bridge clearances, entrance and exit ramp tapers, and triple convergences and divergences. There had been no major improvements made to the Jane Byrne Interchange since its construction in the 1950s. Based on engineering concerns over safety, infrastructure condition and congestion, Governor Pat Quinn in April 2012 directed IDOT to begin planning work for this project. The planning work began in spring 2012 proceeded on an accelerated schedule. On March 14, 2013, Governor Quinn directed IDOT to accelerate the project that will reconstruct Chicago's Jane Byrne Interchange, improving traffic flow in the most congested interchange in the nation. Extensive stakeholder outreach was a focal point of a comprehensive planning and process. The Environmental Assessment (EA) was approved and released for public review on June 11, A Finding of No Significant Impact (FONSI) was determined on September 17, There have been no changes to the environmental status or legal challenges to the project in the year covered by this Annual. Originally, the Jane Byrne Interchange project was divided into 9 contracts, but has since been subdivided into 33 contracts. As of June 30, 2018, twenty-two contracts have been let, awarded and are under construction. September

25 5. DESCRIPTION OF THE PROPOSED IMPROVEMENTS 5.1. Major Components of Proposed Improvement The following are major attributes of the overall proposed improvement: An increase from three to four through lanes on I-90/94 under the Jane Byrne Interchange to correct a lane balance issue. A NW flyover ramp for the north-to-west movement (northbound Dan Ryan Expressway to westbound Eisenhower/ I-290) consisting of two lanes with an outside landing on I-290. Two flyover ramps above Harrison Street (Ramp NW and Ramp WS). One flyover ramp above Halsted Street (Ramp NW). A northbound collector-distributor road for northbound Dan Ryan Expressway traffic exiting to the local streets to eliminate the current weaving section. A southbound collector-distributor road for southbound Kennedy Expressway traffic exiting at Adams Street, Jackson Boulevard, and Taylor Street. Enhancements to pedestrian and bicycle accessibility on local roads within the project limits; improvements will be made to sidewalk widths and bicycle accommodations in several locations. A pedestrian signal, crosswalk, and decorative canopy over Halsted Street in front of the CTA Halsted Station. Access to Morgan Street will be changed from existing conditions and be via Ramp NW only Installation of landscaping within the Jane Byrne Interchange. Aesthetic treatments to retaining walls, piers, flyovers, and bridges. Potential installation of noise walls at five locations. Reconfiguration of Chicago Transit Authority (CTA) Peoria Street Station. Creating a pedestrian corridor connecting the Peoria Street Station to the UIC campus including a seating wall, an electronic way finding sign, and various aesthetic and landscaping treatments. As part of the Preferred Alternative, small amounts of right-of-way are needed at various locations along the west side of I-90/94. The Preferred Alternative is shown in Figure 5-1. September

26 Figure 5-1 Preferred Alternative September

27 6. PROJECT IMPLEMENTATION 6.1. Project Contracts Contract # (IFP) The implementation of the Jane Byrne Interchange is a complex affair, due to the restricted surroundings and the need to maintain traffic during construction. In the IFP, it was assumed that the Jane Byrne Interchange project would be divided into nine contracts. Continuing development of the contract packaging and scheduling further divided the project into thirty-one contracts as was noted in the FPU These contracts can generally be seen as parts of the original nine contracts, allowing comparisons between the planned and current estimates and schedules. With the FPU 2016, one additional contract was added and two contracts were broken out from existing contracts. With the FPU 2017, one additional contract was broken out from existing contracts to bring the total to thirty-five total contracts. With FPU 2018, two contracts have been shifted to existing contracts and completely removed to bring the total to thirty-three total contracts. The two contracts that were shifted to existing contracts are: Contract 60X96 Advanced Noise Walls A portion of the noise wall scope was removed from overall contract and a portion was moved to Contract 60X94. Contract 62C92 Peoria Street Siphon Lining This contract was incorporated within Contract 60X95 for scheduling purposes. The comparison of contracts from the IFP is shown in Table 6-1: Table 6-1 Contract Transition Summary Contract Contract Name (IFP) Contract Name (FPU) # (FPU) 1 Harrison St (West) & Halsted 60X27 Halsted/Harrison St Water Main Materials St 60W26 Harrison (West) and Halsted Bridge 2 Peoria Street Bridge 60W29 Peoria St. Bridge 3 Harrison Street (East) Bridge 60W71 Harrison Bridge (East) 60W28 Flyover North to West I Ramp NW Flyover 60X61 I-290 Westbound Auxiliary Lane Pavement 62D78 I-290 WB Storm Sewer 5 Taylor Street Bridge 60W30 Taylor St. Bridge over I-90/94 60X75 Congress Parkway Bridge Eastbound & I-290 Eastbound Bridge over I-90/94 60X76 I-290 EB Mainline 6 I X77 I-290 WB Mainline 60X78 Congress Parkway Bridge Westbound & I-290 Westbound Bridge over I-90/94 62B87 Congress Viaduct Bridge Painting 7 System Ramps 60X79 Ramp EN -Partial 62B76 Ramp NE 60Y00 Interchange High Mast Lighting and ITS 8 I-90/94, Various Bridges 60X94 Adams Street over I-90/94 60X95 Monroe Street Bridge over I-90/94 60X99 Van Buren Street Bridge September

28 Contract Contract Contract Name (IFP) # (IFP) # (FPU) Contract Name (FPU) 62A78 Jackson Boulevard over I-90/94 62A75 Jackson Boulevard Utility Relocation 62A77 Southbound I-90/94 from Roosevelt Rd to Lake St/Madison St 62A76 Northbound I-90/94 from Roosevelt Rd to Lake St/Madison St 62A74 Water Main Relocation/Rehabilitation and Retaining Wall near UIC 9 System Ramps 60X93 Interchange Ramp Completions 60W49 Congress/Jane Byrne Interchange Surveillance 60X62 Peoria Street Aesthetics 60X98 Green Space Contract Post N/A 60X37 Tree Planting (#1) Design 60Y66 Approval Tree Planting (#2) 60Y67 Tree Planting (#3) 60Y68 Tree Planting (#4) 60Y69 Tree Planting (#5) Note: Contract packaging is subject to change based on contract breakouts, funding availability, right of way, and traffic control coordination Contract Implementation The general order of implementation for the Jane Byrne Interchange project remains the same as reported in the FPU Some of the initial construction contracts of Halsted Street, Harrison Street, Peoria Street, NW Flyover, Taylor Street, and the I-290 Westbound Auxiliary lanes have wrapped up during the past fiscal year. Some of the initial projects experienced some construction delays which affected future construction schedules, which were revised to accommodate the delay in lettings. The schedule revisions were also due to the advancement of construction of other projects on IDOT s system in need of immediate repair including the nearby interchange of Interstate 55 at Lake Shore Drive which was experiencing deteriorating conditions. As construction work continues on the Jane Byrne Interchange Reconstruction, several construction delays have occurred on some of the twenty-two let projects. Within the last fiscal year as the five projects let in 2018 were ongoing as the seventeen previous projects were wrapping up and still ongoing, overlapping work zones continue to cause delays in the construction work. Some of those delays have caused subsequent delays to both construction activities and schedule adjustments to future contracts. The resulting delays have revised the overall completion date from Fiscal Year 2022 into Fiscal Year Table 6-2 Contract Schedule lists the original letting and completion dates of each contract and the current letting and completion dates. s that haven t changed since the previous update have been noted with NC. September

29 Table 6-2 Contract Schedule IFP Phase II Contract Number Location Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion 60X27 60W26 Halsted/Harrison St Water Main Materials Harrison (West) and Halsted Bridge Nov-13 Feb-14 Sep-13 Feb-14 NC NC NC NC NC NC NC NC Nov-13 Sep-14 Nov-13 Dec-15 NC NC NC Jul-16 NC NC NC NC 60W29 Peoria St. Bridge Jan-14 Sep-14 Feb-14 Nov-15 NC NC NC Jul-16 NC NC NC NC 60W71 Harrison Bridge (East) Mar-14 Sep-14 Apr-14 Sep-15 NC NC NC Jun-16 NC NC NC NC 60W28 Flyover North to West I-290 Jun-14 Sep-15 Jul-14 Jul-16 NC NC NC Mar-17 NC NC NC NC 60X61 I-290 Westbound Auxiliary Lane Jun-14 Sep-15 Mar-15 May-16 NC NC NC Dec-16 NC Dec-17 NC Jan -18 Pavement 62D78 I-290 Storm Sewer N/A N/A N/A N/A N/A N/A N/A N/A Sep-17 Sep-18 NC NC 60W30 Taylor St. Bridge over I-90/94 Aug-14 Mar-15 Mar-15 Oct-16 NC NC NC NC NC NC NC Aug X75 Congress Parkway Bridge Eastbound & I-290 Eastbound Bridge over I-90/94 Jun-15 Dec-16 Sep-16 Dec-17 NC NC Aug-17 Jun-19 NC NC NC Aug-19 60X76 I-290 EB Mainline (from Loomis St. to I- 90/94) Jun-15 Dec-16 Dec-16 Nov-17 NC NC Aug-17 Jun-19 NC Nov-19 NC NC September

30 IFP Phase II Contract Number Location Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion 60X77 I-290 WB Mainline (from I-90/94 to Racine Ave.) Jun-15 Dec-16 Nov-15 Nov-16 NC NC Jun-16 Aug-18 NC NC NC Sep-19 60X78 Congress Parkway Bridge Westbound & I-290 Westbound Jun-15 Dec-16 Jul-15 Oct-16 NC NC Jun-16 Aug-18 NC NC NC NC Bridge over I-90/94 62B87 Congress Parkway Bridge Painting N/A N/A N/A N/A N/A N/A Apr-19 May-20 NC NC Jun-19 Jul-20 60X79 Ramp EN Jun-15 Mar-17 Oct-16 Nov-17 NC NC Jun-18 Jun-20 NC NC Nov-18 May-21 62B76 Ramp NE N/A N/A N/A N/A N/A N/A Jul-16 Oct-18 NC NC NC NC 60Y00 Interchange High Mast Lighting and Jun-16 Mar-18 Jul-16 May-19 NC NC Jun-19 Dec-21 NC NC Apr-20 Nov-22 ITS 60X94 Adams Street over I- 90/94 Jun-16 Jun-17 Dec-16 Dec-17 NC NC Nov-18 May-20 NC NC Jun -20 Nov-22 60X95 Monroe Street over I-90/94 Jun-16 Dec-16 Nov-15 Dec-16 NC NC Jun-17 Oct-18 Sep-17 Jun-19 Nov-17 Aug-19 60X99 Van Buren Street over I-90/94 Jun-16 Dec-16 Nov-15 Dec-16 NC NC Mar-17 Oct-18 Jun-17 Jun-19 NC NC 62A78 Jackson Boulevard over I-90/94 Jun-16 Jun-17 Nov-17 May-19 NC NC Apr-20 Oct-21 NC NC Jun-20 Nov-22 62A75 Jackson Boulevard Utility Relocation N/A N/A Jan-16 Nov-16 NC NC Jun-17 Sep-18 NC NC NC NC September

31 IFP Phase II Contract Number Location Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion 62A77 Southbound I-90/94 from Roosevelt Rd to Lake St/Madison Jun-16 Mar-18 Jul-17 Dec-18 NC NC Jun-19 Nov-20 NC NC Apr-20 Nov-22 St 62A76 Northbound I-90/94 from Roosevelt Rd to Lake St/Madison Jun-16 Mar-18 Sep-17 May-19 NC NC Jun-19 Nov-20 NC NC Apr-20 Nov-22 St 62A74 Watermain Relocation/Rehabilit ation and Retaining N/A N/A Sep-15 Nov-16 NC NC Jun-17 Sep-18 Aug-17 NC NC Nov-18 Wall - UIC 60X93 Interchange Ramp Completions Jun-17 Jun-18 Dec-16 Aug-18 NC NC Jun-18 Oct-20 NC NC Nov-18 Dec-20 60W49 Congress/Jane Byrne Interchange N/A N/A Jan-14 Jul-14 NC NC NC NC NC NC NC NC Surveillance 60X62 Peoria Street Aesthetics N/A N/A Nov-14 Oct-17 NC NC NC NC NC NC NC NC 60X98 Green Space Contract (Greek Town & Other N/A N/A Nov-16 Oct-17 NC NC Sep-19 Oct-20 NC NC Sept-20 Nov-22 Locations) 60X37 Tree Planting (#1) N/A N/A Jan-14 Jul-14 NC NC NC NC NC NC NC NC 60Y66 Tree Planting (#2) N/A N/A Nov-14 May-16 NC NC NC NC NC NC NC NC 60Y67 Tree Planting (#3) N/A N/A Nov-15 Oct-16 NC NC Jan-16 May-17 NC NC NC NC 60Y68 Tree Planting (#4) N/A N/A Nov-16 Oct-17 NC NC Jun-18 Oct-19 NC NC Jan-19 NC September

32 IFP Phase II Contract Number Location Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion Letting Completion 60Y69 Tree Planting (#5) N/A N/A Nov-17 Oct-18 NC NC Jun-19 Aug-20 NC NC NC NC Contract lettings dates in bold refer to contracts already let. NC denotes that there is no change from the previous FPU. September

33 7. PROJECT COSTS This section summarizes the actual costs to date and estimation of future costs that have been conducted throughout the study process. The Initial Financial Plan (IFP) included a 2013 contingency-based cost estimate. The contingency-based cost estimate was then converted into a risk-based cost estimate through an FHWA cost estimate review (CER). The contingency-based estimate was then adjusted such that the Year-of-Expenditure (YOE) total matches the risk-based estimate from the CER. This includes cost modifications based on changes during construction of on-going projects, projects let during Fiscal Year 2018, and updated construction cost estimates d Project Estimate For the State Fiscal Year ending June 30, 2018, the Annual cost estimates have been refined to reflect the current anticipated costs for the project based on continuing project development. These are based on bid prices experienced for the initial twenty-two contract lettings, engineer s estimates, and consideration of schedule, market, and other influential factors. Inflation and YOE were also accounted for in the Original Project Estimate In the IFP, the total cost of the project in YOE dollars was estimated to be $535.5 million. Of that, $459.5 was estimated to be construction, change orders and utilities; $0.5 million for Right-of-Way (ROW) acquisition; and $75.5 million for Preliminary and Construction Engineering Project Estimate s As of June 30, 2018, twenty-two of the thirty-three contracts have been let and awarded. Initial contract bid total amounts were higher than originally estimated in the IFP. Recent bids have been lower than engineer s estimates. In addition, several of the construction contracts are underway and have incurred additional costs during construction due to change orders. Preliminary and construction engineering costs continue to be updated based on continuing project development. All of the cost increases denoted in this update have been accounted for in the State s Multi-Year Improvement Program (MYP). A summary of the IFP and Annual s 2014, 2015, 2016, 2017, and 2018 cost estimates are shown in Table 7-1. A comparison of overall cost estimates by contract are shown in Table 7-2. Total cost breakdowns by contract including construction and utilities, right-of-way and engineering are shown in Appendix A. In this Annual, the total cost of the project in YOE dollars is estimated to be $713.0 million, an increase of approximately 5% over the FPU 2017 estimate. Of that, $569.5 million is estimated for construction, change orders, and utilities; $6.8 million for ROW acquisition; and $136.8 million for Preliminary and Construction Engineering. September

I-64 Capacity Improvements Segment III Initial Financial Plan

I-64 Capacity Improvements Segment III Initial Financial Plan I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/

More information

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017 Fiscal Year 2017 4 th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017 Footer Text Date Table of Contents Section Page Number Notes and Observations 3-4 Significant

More information

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018 Fiscal Year 2018 2 nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018 Footer Text Date Table of Contents Section Page Number Disclaimer 3 Notes and

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

Executive Summary. Prepared by: The Ohio Department of Transportation

Executive Summary. Prepared by: The Ohio Department of Transportation Executive Summary Prepared by: The Ohio Department of Transportation Table of Contents Executive Summary 1 Project History 1 Purpose and Need 1 Alternatives Analysis 1 Recommendations 3 Subdivision of

More information

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018 Fiscal Year 2018 4 th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018 Footer Text Date Table of Contents Section Page Number Disclaimer 3 Notes and

More information

2018 Budget Analysis. (Preliminary and Unaudited) Quarterly Financial Review

2018 Budget Analysis. (Preliminary and Unaudited) Quarterly Financial Review 2018 Budget Analysis (Preliminary and Unaudited) Quarterly Financial Review July 1 - September 30, 2018 Table of Contents Introduction... 3 Budget Summary... 4 Introduction... 4 Budgeted Revenue 2018...

More information

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

RMTA FY2016 Annual Traffic and Toll Revenue Report

RMTA FY2016 Annual Traffic and Toll Revenue Report RMTA Richmond Metropolitan Transportation Authority RMTA RMTA FY216 Annual Traffic and Report Richmond Metropolitan Transportation Authority August 216 Final Report RMTA FY216 Annual Traffic and Report

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT 10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT

More information

Unified Planning Work Program

Unified Planning Work Program Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

City of Portsmouth Portsmouth, New Hampshire Department of Public Works RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed

More information

Cancelled. Final Action

Cancelled. Final Action RESOLUTION NO. R2018-16 Baseline Budget and Schedule for the Lynnwood Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 05/10/2018 05/24/2018 Cancelled

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

Route Route Z Intersection Realignment

Route Route Z Intersection Realignment Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

APPENDIX E. Prepared for: Triborough Bridge and Tunnel Authority. Prepared by: Stantec Consulting Services, Inc.

APPENDIX E. Prepared for: Triborough Bridge and Tunnel Authority. Prepared by: Stantec Consulting Services, Inc. APPENDIX E Addendum: History and Projection of Traffic, Toll Revenues and Expenses and Review of Physical Conditions of the Facilities of Triborough Bridge and Tunnel Authority Prepared for: Triborough

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within

More information

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project SR 520 BRIDGE Investment Grade Traffic and Revenue Study Update SR 520 Bridge and the Eastside plus West Approach Bridge Project February 16, 2017 Photographs Courtesy of WSDOT Table of Contents Executive

More information

North Carolina Turnpike Authority Board of Directors Meeting

North Carolina Turnpike Authority Board of Directors Meeting North Carolina Turnpike Authority Board of Directors Meeting September 3, 2015 North Carolina Turnpike Authority Board of Directors Meeting September 3, 2015 - Presentation Agenda Triangle Expressway -

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2012/2013 1 2 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with

More information

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting May 30, 2014 Discussion Outline Finance Plan for the Metrorail Project Allocation of Estimated Capital Costs and TIFIA

More information

Wednesday, June 6, 2018

Wednesday, June 6, 2018 Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018

More information

Key IRS Interest Rates After PPA

Key IRS Interest Rates After PPA Key IRS Interest After PPA (updated upon release of figures in IRS Notice usually by the end of the first full business week of the month) Below are Tables I, II, and III showing official interest rates

More information

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement. Quarterly Report No. 4 (March 1 May 31, 2017)

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement. Quarterly Report No. 4 (March 1 May 31, 2017) SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 4 (March 1 May 31, 2017) Prepared by: Minnesota Department of Transportation 395

More information

SAN FRANCISCO PLANNING DEPARTMENT

SAN FRANCISCO PLANNING DEPARTMENT REMARKS Addendum #2 to Environmental Impact Report Addendum Date: June 11, 2015 Case No.: 2011.0558E Project Title: Transit Effectiveness Project, Modified TTRP.5 Moderate Alternative, McAllister Street

More information

2012 Budget Analysis. (Unaudited) Quarterly Financial Review

2012 Budget Analysis. (Unaudited) Quarterly Financial Review 2012 Budget Analysis (Unaudited) Quarterly Financial Review April 1 June 30, 2012 Table of Contents Introduction... 3 Budget Summary... 4 Introduction... 4 Budgeted Revenue 2012... 4 Allocation of Budgeted

More information

Key IRS Interest Rates After PPA

Key IRS Interest Rates After PPA Key IRS Rates - After PPA - thru 2011 Page 1 of 10 Key IRS Interest Rates After PPA (updated upon release of figures in IRS Notice usually by the end of the first full business week of the month) Below

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2018 : October 01 - December 31, 2017 Report prepared for the March 01, 2018 TA Board Meeting SAN MATEO COUNTY TRANSPORTATION AUTHORITY QUARTERLY

More information

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for:

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for: TYSONS CORNER Neighborhood Traffic Impact Study Traffic Analysis Report Task Order No. 07 077 03 Prepared by: Prepared for: December 2010 Tysons Corner Neighborhood Impact Study Page 2 TABLE OF CONTENTS

More information

2013 Budget Analysis. (Unaudited) Quarterly Financial Review

2013 Budget Analysis. (Unaudited) Quarterly Financial Review 2013 Budget Analysis (Unaudited) Quarterly Financial Review January 1 - March 31, 2013 Table of Contents Introduction... 3 Budget Summary... 4 Introduction... 4 Budgeted Revenue 2013... 4 First Quarter

More information

Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget. Suburban Suburban

Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget. Suburban Suburban v System Status Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget 6 4 2 0-2 -4-6 -8 Suburban Suburban Suburban ADA Suburban ADA ADA ADA Revenue Expenses Funding Required Net Funding

More information

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review Table of Contents Study Overview Corridor Needs Analysis Climbing Lanes Additional Lane I-25/I-80 Cost Estimate ITS Truck Parking Financial Strategies Legislative Review 02 Study Overview The overall goal

More information

Implementation Project Development and Review 255

Implementation Project Development and Review 255 Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT Project Type: GDOT District: Federal Route Number: State Route Number: P.I. Number: County: MPO ID Number: Project Description (provide

More information

Transportation Services

Transportation Services CAPITAL BUDGET NOTES 2027 CAPITAL BUDGET AND PLAN OVERVIEW maintains infrastructure comprised of 5,600 km of roads, 7,950 km of sidewalks, 900 bridges/culverts and 2,400 traffic control signals. The -

More information

State of New York Office of the State Comptroller Division of Management Audit

State of New York Office of the State Comptroller Division of Management Audit State of New York Office of the State Comptroller Division of Management Audit NEW YORK STATE THRUWAY AUTHORITY IMPLEMENTATION OF THE 1988 CAPITAL PLAN REPORT 95-S-109 H. Carl McCall Comptroller State

More information

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 9 (June 1, 2018 August 31, 2018) Prepared by: Minnesota Department of Transportation

More information

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates 2005-30 Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates The Federal Transportation bill, the Safe Accountable, Flexible, Efficient Transportation

More information

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks)

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks) ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study MONTHLY PROGRESS REPORT #19 Period Ending September 30, 2003 1. Work Accomplished This Period (4 Weeks) Strategic

More information

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning Land & Water Conservation Summit March 10, 2012 Statewide Planning Framework Department of Administration Statewide Planning Program State Planning

More information

I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018

I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018 I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018 UNSOLICITED PROPOSAL NDOT is actively addressing issues on I-80 Reno-Sparks Traffic Study (Completed Spring 2018) o Identified

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade

More information

Addendum to Environmental Impact Report

Addendum to Environmental Impact Report Lead Agency: Staff Contact: Addendum to Environmental Impact Report Addendum Date: Case No.: 2011.0558E Project Title:, EIR: 2011.0558E, certified March 27, 2014 Project Sponsor: Sean Kennedy, San Francisco

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

City of North Liberty FY 15 Budget Goal Setting. November 19, 2013 North Liberty City Council Chambers 6:30 P.M.

City of North Liberty FY 15 Budget Goal Setting. November 19, 2013 North Liberty City Council Chambers 6:30 P.M. City of North Liberty FY 15 Budget Goal Setting November 19, 2013 North Liberty City Council Chambers 6:30 P.M. Budget Timeline Sep 2 Sep 30 Department Heads create budgets Oct 1 Proposals submitted to

More information

Transportation Services

Transportation Services CAPITAL PROGRAM SUMMARY Transportation Services CONTENTS Overview 1. 1-Year Capital 6 2. Issues for Discussion 24 Appendices 1. 217 Performance 34 2. 218 Capital Budget 36 3. 218 Capital Budget; 219-227

More information

Performance Report October 2018

Performance Report October 2018 Structured Investments Indicative Report October 2018 This report illustrates the indicative performance of all Structured Investment Strategies from inception to 31 October 2018 Matured Investment Strategies

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASES 1 AND 2 AS OF NOVEMBER 30, 2014 JANUARY 2015 0 Phase 1 Cost Summary November Expenditures $ 1.6 Million Total Expenditures

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study

Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study Project Report FPN: 437289-1-22-01 Prepared for: FDOT District 7 February 2017 Table of Contents Executive Summary... E-1 E.1 Project Description...

More information

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE

More information

Executive Change Control Board. January 15, 2016

Executive Change Control Board. January 15, 2016 Executive Change Control Board January 15, 2016 1 Today s Topics Review In Kind Land Transfer (Action) Review Project Schedule Review Project Cost Estimate at 60% Design Review Project Scope (Action) Next

More information

IMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES

IMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES INTRODUCTION The Implementation Plan is intended to provide the City of Berkeley a framework to define the future steps for the West Berkeley Circulation Master Plan (WBCMP). Since the objective of the

More information

June 30, CUSIP Prefix 20786L

June 30, CUSIP Prefix 20786L CONNECTOR 2000 ASSOCIATION, INC. ANNUAL REPORT June 30, 2009 CUSIP Prefix 20786L Submitted in compliance with the provisions of the Continuing Disclosure Agreement dated February 11, 1998 (the Disclosure

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension RESOLUTION NO. R2015-04 Baseline and Schedule, and Approve Gates 5 and 6 for the East Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board 04/23/15 Final Action Ahmad Fazel, DECM Executive

More information

Target Formula Re-evaluation

Target Formula Re-evaluation Target Formula Re-evaluation Target Formula Background Target formula is used to distribute federal funding to the eight ATPs Current formula was developed in 1996 Reauthorization of federal transportation

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting December 15, 2014 Discussion Outline Finance Plan for the Metrorail Project Allocation of Estimated Capital Costs

More information

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):

More information

Allen Road Individual Environmental Assessment (EA)

Allen Road Individual Environmental Assessment (EA) STAFF REPORT ACTION REQUIRED PW14.8 Allen Road Individual Environmental Assessment (EA) Date: June 3, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager,

More information

HUD NSP-1 Reporting Apr 2010 Grantee Report - New Mexico State Program

HUD NSP-1 Reporting Apr 2010 Grantee Report - New Mexico State Program HUD NSP-1 Reporting Apr 2010 Grantee Report - State Program State Program NSP-1 Grant Amount is $19,600,000 $9,355,381 (47.7%) has been committed $4,010,874 (20.5%) has been expended Grant Number HUD Region

More information

DETROIT LAKES CITY COUNCIL SPECIAL MEETING AGENDA TUESDAY, June 19, 2018

DETROIT LAKES CITY COUNCIL SPECIAL MEETING AGENDA TUESDAY, June 19, 2018 DETROIT LAKES CITY COUNCIL SPECIAL MEETING AGENDA TUESDAY, June 19, 2018 The items on my desk as of Wednesday, June 13, 2018, to be presented for discussion and action at the Special Meeting of the City

More information

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement

SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 6 (September 1 November 30, 2017) Prepared by: Minnesota Department of Transportation

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting Meeting location: Pelican Conference Room 4974 ORL Tower Road Orlando, FL 32807

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB1A Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF EXTERNAL FINANCING,

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

Chapter 7. Future Network and Implementation

Chapter 7. Future Network and Implementation Chapter 7. Future Network and Implementation Background and Overall Approach The previous Range of Alternatives Chapter provides a summary of how the Universe of Projects list was developed, which encompasses

More information

TAX INCREMENT PROJECT PLAN

TAX INCREMENT PROJECT PLAN TAX INCREMENT PROJECT PLAN THE VILLAGE ON MONROE CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department May 2017 INTRODUCTION Tax Increment Financing is a

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

Oklahoma Turnpike Authority Report to Bondholders First Quarter Tim J. Gatz Executive Director. Prepared by the Controller Division

Oklahoma Turnpike Authority Report to Bondholders First Quarter Tim J. Gatz Executive Director. Prepared by the Controller Division Governor Mary Fallin, Member Ex-Officio Dana Weber, Chairwoman David A. Burrage Vice-Chairman G. Carl Gibson, Secretary & Treasurer Kenneth Adams, Member Guy Berry, Member Gene Love, Member Mike Patterson,

More information

Joint Appropriations Subcommittee on Transportation

Joint Appropriations Subcommittee on Transportation Joint Appropriations Subcommittee on Transportation Funding Overview February 21, 2013 H. Tasaico, PE 1 NCDOT Funding Overview - Agenda State Transportation Comparative Data Transportation Funding Sources

More information

Capital Improvement Program Update

Capital Improvement Program Update Finance & Administration Committee Information Item III-A May 12, 2011 Capital Improvement Program Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

METRO INVESTMENT REPORT ALL FUNDS

METRO INVESTMENT REPORT ALL FUNDS METRO INVESTMENT REPORT ALL FUNDS DECEMBER 2012 Metropolitan Transit Authority of Harris County Investment Report Portfolio Summary Management Report The following is a summary of METRO's Investment Portfolios:

More information

Fiscal Year 2018 Project 1 Annual Budget

Fiscal Year 2018 Project 1 Annual Budget Fiscal Year 2018 Project 1 Annual Budget Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Treasury Related Expenses Table 2 5 Summary of Full Time Equivalent Table 3 6 Positions Cost-to-Cash

More information

23 rd Avenue & Gateway Boulevard Interchange Project Review

23 rd Avenue & Gateway Boulevard Interchange Project Review 23 rd Avenue & Gateway Boulevard Interchange Project Review September 3, 2008 The Office of the City Auditor conducted this project in accordance with the International Standards for the Professional Practice

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer March 15, 2016

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer March 15, 2016 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer March 15, 2016 Northern Virginia District Construction Performance Bill Cuttler, P.E. District Construction Engineer

More information

STAFF REPORT. Highway 101 Milpas to Cabrillo/Hot Springs Project. MEETING DATE: January 15, 2009 AGENDA ITEM: 12

STAFF REPORT. Highway 101 Milpas to Cabrillo/Hot Springs Project. MEETING DATE: January 15, 2009 AGENDA ITEM: 12 STAFF REPORT SUBJECT: Highway 101 Milpas to Cabrillo/Hot Springs Project MEETING DATE: January 15, 2009 AGENDA ITEM: 12 STAFF CONTACT: Jim Kemp, Steve VanDenburgh RECOMMENDATION: Authorize the Executive

More information

Executive Change Control Board. August 3, 2016

Executive Change Control Board. August 3, 2016 Executive Change Control Board August 3, 2016 1 Today s Topics Approval of Meeting Minutes 90% Cost Estimate Project Schedule Project Scope and Budget Action Next Steps 2 90% Cost Estimate 3 Project Cost

More information

8.0% 7.0% 6.0% 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

8.0% 7.0% 6.0% 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec McKinney at a Glance A monthly report prepared by the McKinney Planning Department City of McKinney Planning Department 221 N. Tennessee St. McKinney, TX 7569 Phone: 972.547.7475 Fax: 972.547.264 Hours:

More information

Oklahoma Turnpike Authority Report to Bondholders Second Quarter Tim J. Gatz Executive Director. Prepared by the Controller Division

Oklahoma Turnpike Authority Report to Bondholders Second Quarter Tim J. Gatz Executive Director. Prepared by the Controller Division Governor Mary Fallin, Member Ex-Officio Dana Weber, Chairwoman David A. Burrage Vice-Chairman G. Carl Gibson, Secretary & Treasurer Kenneth Adams, Member Guy Berry, Member Gene Love, Member Mike Patterson,

More information

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2017

UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2017 UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2017 OVERVIEW Financial highlights of the fiscal year 2016-17 3 rd quarter financial report are summarized below: Cash (pages 2-3) The University

More information

Chapter 6 Transportation Improvements & Financial Plan

Chapter 6 Transportation Improvements & Financial Plan Chapter 6 Transportation Improvements & Financial Plan Introduction Up to this point, this plan has provided a regional profile (the population, employment, and commuting patterns) of the RTPO and MPO

More information