CLASS A WATER AND/OR WASTEWATER UTILITIES FINANCIAL, RATE AND ENGINEERING MINIMUM FILING REQUIREMENTS VOLUME I FOR THE
|
|
- Ilene Paula Warren
- 5 years ago
- Views:
Transcription
1 CLASS A WATER AND/OR WASTEWATER UTILITIES 'i B FINANCIAL, RATE AND ENGINEERING MINIMUM FILING REQUIREMENTS OF L 1 L 1 I SANLANDO UTILITIES CORPORATION Exact Legal Name of Utility Docket No.: -WS VOLUME I FOR THE Test Year Ended: December 1,1 FPSC:- C OMHt S S i ON C L E 5
2 SCHEDULE E-I E - E- E E-5 E- E- E-8 E- E-IO E-I I E-I E-I E-I F-I F- F- F- F-5 F- F- F-8 F- F-IO A-I Interim A- Interim A- Interim B-I Interim 8- Interim 8- Interim 8- Interim C-I Interim C- Interim C-5 Interim D-I Interim D- Interim D- Interim E-I Interim E- Interim PAGE(S) I I8 1 I1 Ill CLASS A AND B WATER AND/OR SEWER UTILITIES FINANCIAL, RATE AND ENGINEERING MINIMUM FILING REQUIREMENTS INDEX RATE SCHEDULES DESCRIPTION OF SCHEDULE Rate Schedule Revenue Schedule at Present and Proposed Rates Customer Monthly Billing Schedule Miscellaneous Service Charges Miscellaneous Service Charge Revenue Public Fire Hydrants Schedule Private Fire Protection Schedule Contracts and Agreements Schedule Tax or Franchise Fee Schedule Service Availability Charges Schedule Guaranteed Revenues Received Schedule Class A Utility Cost of Service Study Projected Test Year Revenue Calculation Billing Analysis Schedule (contained in Volume ) ENGINEERING SCHEDULES Gallons of Water Pumped, Sold and Unaccounted For Gallons of Wastewater Treated Water Treatment Plant Data Wastewater Treatment Plant Data Used and Useful Calculations -Water Treatment Plant Used and Useful Calculations -Wastewater Treatment Plant Used and Useful Calculations -Water Distribution System and Wastewater Collection System Margin Reserve Calculations -Water and Wastewater Equivalent Residential Connections -Water Equivalent Residential Connections - Wastewater INTERIM RATE SCHEDULES Water Rate Base - Interim Sewer Rate Base -Interim Adjustments to Rate Base Schedule of Water Operating Statement - Interim Schedule of Sewer Operating Statement - Interim Adjustments to Operating Income Taxes Other Than Income Reconciliation of Total Income Tax Provision State and Federal Income Tax Calculation -Current Deferred Tax Expense - Interim Requested Cost of Capital Reconciliation of Capital Structure to Rate Base Short-Term Debt Rate Schedule -Present, and Interim Revenue Schedule at Present and Interim Rates
3 CLASS A AND B WATER AND/OR SEWER UTILITIES FINANCIAL, RATE AND ENGINEERING MINIMUM FILING REQUIREMENTS INDEX SCHEDULE PAGE@) DESCRIPTION OF SCHEDULE VOLUME I RATE BASE A-I A- A- A A-5 A- A- A-8 A- A-IO A-I1 A-1 A-I A-I A-I5 A-I A-I A8 A-I B-1 B B c-1 c- c- c c-5 C- C- c-8 c- c-1 D-I D - D- D D-5 D-8 D Schedule of Rate Base -Water - Final Schedule of Rate Base -Sewer Adjustments to Rate Base -Final Annual Plant Additions and Balances Water Plant in Service by Primary Account Sewer Plant in Service by Primary Account Summary of Non-Used & Useful Plant Annual Accumulated Depreciation Additions and Balances Water Accumulated Depreciation by Primary Account Sewer Accumulated Depreciation by Primary Account Annual ClAC Additions and Balances ClAC by Classification Annual Accumulated Amortization of ClAC Additions and Balances Accumulated Amortization of ClAC by Classification Schedule of AFUDC Rates Used Annual Advances for Construction Additions and Balances Calculation of Working Capital Allowance Comparative Balance Sheet -Assets Comparative Balance Sheet - Liabilities 8 Owners' Equity NET OPERATING INCOME Schedule of Water Operating Statement - Final Schedule of Sewer Operating Statement - Final Adjustments to Operating Income -Final Test Year Operating Revenues Operation and Maintenance Expenses by Month -Water Operation and Maintenance Expenses by Month -Sewer Comparative Operation and Maintenance Expenses -Water Comparative Operation and Maintenance Expenses - Sewer Schedule of Test Year Contractual Services Analysis of Rate Case Expense Analysis of Major Maintenance Projects -Water and Sewer Schedule of Allocated Expenses Depreciation Expense -Water Depreciation Expense -Sewer Schedule of Taxes Other than Income INCOME TAX Reconciliation of Total Income Tax Provision -Final State and Federal Income Tax Calculation -Current -Final Schedule of Interest in Tax Expense Calculation BooklTax Differences - Permanent Deferred Tax Expense - Final Accumulated Deferred Income Taxes - Final Investment Tax Credits Parent@) Debt Information Income Tax Returns Miscellaneous Tax Information COST OF CAPITAL Requested Cost of Capital -Final Reconciliation of Capital Structure to Requested Rate Base -Final Preferred Stock Outstanding Short-Term Debt Long-Term Debt Variable Rate Long-Term Debt Schedule of Customer Deposits
4 Schedule of Water Rate Base Docket No.: -WS Schedule Year Ended: 1/1/1 Interim [ ] Final [XI Historic [XI Projected [ 1 Schedule: A-1 Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide the calculation of average rate base for the test year, showing all adjustments. All non-used and useful items should be reported as Plant Held For Future Use. Line Average Amount Per A- Utility Adjusted Utility Supporting No. Description Books Adjustments Balance Schedule(s) 1 Utility Plant in Service s,,5 $ (,8,) (A) $,51,5 A-, A Utility Land & Land Rights Less: Non-Used & Useful Plant Construction Work in Progress Less: Accumulated Depreciation Less: ClAC Accumulated Amortization of ClAC Acquisition Adjustments Accum. Amort. of Acq. Adjustments Advances For Construction 18,51 1,1 (1,1,1) (,,8),8,18, (,5,55) (,,1) 8,,51 A-, A-5 A- A- A-, A- A-, A-1 A-, A-1 A-, A-1 1 Working Capital Allowance 5,8 (F) 5,8 A-, A- Total Rate Base $,8,8 $ (,) $,,51 1
5 Schedule of Wastewater Rate Base Docket No.: -WS Schedule Year Ended: 1/1/1 Interim [ ] Final [XI Historic [XI Projected [ ] Schedule: A- Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide the calculation of average rate base for the test year, showing all adjustments. All non-used and useful items should be reported as Plant Held For Future Use. (1) () () () (5) Average Amount A- Adjusted line Per Utility Utility Supporting No. Description Books Adjustments Balance Schedule(s) 1 Utility Plant in Service $ 5,5,5 $,1, (A) $,1,1 A-, A- 5 a Utility Land & Land Rights Less: Non-Used & Useful Plant Construction Work in Progress Less: Accumulated Depreciation Less: ClAC Accumulated Amortization of ClAC Acquisition Adjustments Accum. Amort. of Acq. Adjustments Advances For Construction Working Capital Allowance Total Rate Base,8 1 8, (8,) (1,8,58) (5,) (1,,1),5 io,,8 8, (A), A-, A- A- A- A-, A-1 A-, A-1 A-, A-1 A-, A-1 A-, A-
6 Schedule of Adjustments to Rate Base Docket No.: -WS Schedule Year Ended: 1/1/1 Interim [ 1 Final [XI Historic [XI Projected [I Schedule: A- Page 1 of Preparer: Kirsten Markwell Explanation: Provide a detailed description of all adjustments to rate base per books, with a total for each rate base line item. Line No. Description Water Wastewater so (A) Utility Plant in Service (1) Restate UPlS Per COA for 1/1/1 - //1 (booked 1) Organization.5.1 Franchises. Land & Land Rights Source of Supply. Land & Land Rights Water Treatment Land & Land Rights General Pit. Structures & improvements Water Treatment.5 / 5. Structures & improvements General Plt. Wells & Springs. Electric Pump Equip 55. Electric Pump Equip Water Treatment. Electric Pump Equip T & D. Water Treatment Equipment. Distribution Reservoirs &Standpipes 1. Transmission & Distribution Mains. Service Lines. Meters.5 1. Office Furniture & Equipment Tools, Shop & Garage Equipment.5 1. Laboratory Equipment.5 1. Communication Equipment.5 1. Miscellaneous Equipment 8.5 Water Plant Allocated 5.5 Land &Land Rights Reclaimed Water 5. Structures & Improvements - Pump Lift Station 5. Structures & improvements - Treatment & Disposal. Force Mains 1. Sewer Gravity Mains 1 Manholes. Services to Customers 1. Pumping Equipment 5. Reuse Transmission & Distribution 8. Treatment & Disposal Equip Wastewater Treatment () (1,) (,) (,) (,5) 1,1,5 (1,5,8),55, 8,8 (.) (8) (5,) (1,885) () () (,5) (,8),8 (,1),5, () (8.18) (188,1) (,5,1) (,5) (,1) 1, (1,) 5,1 188,1 (.81),5,1 (1,1), 1,51 (5,) (8,55) 8. Other Pit & Misc. Equipment (1) Total Restatement of UPlS $ (,) $ (8,) () Restate rate base allocations from W5C I Utilities inc..1 Franchises (1).5 f 5. Land &Land Rights Structures & Improvements,5,.5 1. Office Furniture & Equipment (18,18) (1,188).5 1. Tools, Shop & Garage Equipment,8, Communication Equipment, 1, Water Plant Allocated (1,18) Total restatement of allocations. $ (,) S 8,88 ()Adjust Common Plant Allocations between Systems Structures & Improvements (1,1) 1, Office Furniture & Equipment (8,18) 8, Transportation Equipment (,),.5 1. Tools, Shop & Garage Equipment (1,1) 1, Laboratory Equipment (.), Power Operated Equipment (8) Communication Equipment (,),.5 1. Miscellaneous Equipment 5.5 (5,5) Other Piant Allocated (,81).81 Total Common Plant Allocations between Systems S (1,,) S 1,, 1) 51 / 1 Adjust for Vehicle usage bv Sanlando s (1.8) S (81,8) Adjustments totest Year Utility Plant in Service $ (,8,) $ 1..58
7 Schedule of Adjustments to Rate Base Docket No.: WS Schedule Year Ended: 1/1/1 Interim [ 1 Final [XI Historic [XI Projected [ 1 Schedule: A- Page of Preparer: Kirsten Markwell Explanation: Provide a detailed description of all adjustments to rate base per books, with a total for each rate base line item. Line No. Description Water Wastewater 1 1Al.. Utilitv. Plant in Service contd. (5) Pro Forma Plant Additions 1. SR FDOT Widening T & D Mains s 1.1.5R FDOT Widening Force Main, 5. Des Pinar Force Main Replacement 1, 8. WWTP Filter Replacement,5 5. Eng-Wekiva-Apopka Reuse Main, 8 5. Wekiva-Apopka Reuse Main,, Total Pro Forma Piant Additions s 1,1 $,1, 1 () Retirements related to Pro Forma Additions 1.5R FDOT Widening T & D Mains (5,) 1. SR FDOT Widening Force Main (,) 1. Des Pinar Force Main Replacement (,) 1 8. WWTP Filter Replacement (,5) Total Retirements s (5,) s (,58) 1 Total Adjustments to Utility Plant in Service $ (,,85) $,1,8 (8) Construction Work in Progress 18 To remove from rate base average construction work in progress $ (1.1) $ (8,) 1 Total Construction Work in Progress $ (1. 5 (8,) (C) Accumulated Depreciation 1 (1) Restate Accum Depreciation Per COA for 1/1/1 - //1 (booked 1) Organization 1 ().5.1 Franchises 1,5,1. Structures & Improvements Source of Supply 1,1 5. Structures & Improvements WaterTreatment (,1).515. Office Structures & Improvements,,8,8. Wells & Springs (8) 8 8. Infiltration Gallery 1,. Supply Mains 1 1. Power Generation Equipment () 1. Electric Pump Equip 55 (). Electric Pump Equip Water Treatment (.). Electric Pump Equip T&D (1). Water Treatment Equipment (1) 5. Distribution Reservoirs & Standpipes, 1. Transmission & Distribution Mains 5,. Service Lines (81) 8. Meter Instailations (18). Meters (1.) 5. Hydrants () 1. Backflow Prevention Devices (). Other Miscellaneous Equipment Water Treatment (8). Other Miscellaneous Equipment Transmission & Distribution (5).51. Office Furniture & Equipment 8,5, TOOIS, Shop & Garage Equipment,,1.51. Laboratory Equipment (,) (.5) Power Operated Equipment (5) (5) Communication Equipment 1.,8.51. Miscellaneous Equipment Other Piant (5) Structures & Improvements -Collection () 5 5. Structures & Improvements - Pump Lift Station (5,8) 5 5. Structures & Improvements Wastewater Treatment (,8,) Power Generation Equipment Collection Power Generation Equipment Treatment & Disposal () 5. Force Mains (8) 5 1. Sewer Gravity Mains (,5) 58. Services to Customers,85 5. Flow Measuring Devices (). Reuse Services (5) 1. Reuse Meters & Installations () 1. Pumping Equipment () 1.5 Pumping Equipment Reclaimed Water Treatment (). Reuse Distribution Reservoirs 5 5. Reuse Transmission & Distribution Treatment & Disposal Equip Wastewater Treatment (,8) 8. Outfall Lines () 8 8. Other Plant Collection (8) 8. Other Piant Pump (1.) 8. Other Plant Wastewater Treatment (1.8) Other Piant Reclaimed Water Treatment (18) Total Adjustment to Accum Depreciation per COA S, S (1,8)
8 Schedule of Adjustments to Rate Base Schedule: A- Docket No.: -WS Page of Schedule Year Ended: 1/1/1 Preparer: Kirsten Markwell Interim [ ] Final [XI Historic [XI Projected I Explanation: Provide a detailed description of all adjustments to rate base per books, with a total for each rate base line item. Line No. Description Water Wastewater 1 (C) Accumulated Depreciation contd () Restate rate base allocations from WSCI Utilities, Inc..1 Franchises Structures & Improvements (1,) (,).5 1. Office Furniture & Equipment 8.8 8, Tools, Shop &Garage Equipment (.5) (.).5 1. Communication Equipment,, 8.5 Other Tangible Plt Water 1,1 Total Rate Base Allocation Adjustment from Utilities, Inc. s 5,51 f 5,5 () Adjust Common Plant Allocations between Systems based on Structures & Improvements,1 (,1).5 1. Office Furniture &Equipment 8, (8,) Transportation Equipment,1 (,1).5 1. Tools, Shop & Garage Equipment,5 (,5).5 1. Laboratoly Equipment, (,) Power Operated Equipment ().5 1. Communication Equipment (,1), Miscellaneous Equipment (,181),181 Total Common Plant Allocations between Systems s 51,1 $ (51,1) (5) Adiust accumulated depreciations for vehicle usaae by Saniando s 1,55 $ 8,8 Adjustments to Test Year Utility Accumulated Depreciation $ 1,,1 S (,5) () Pro Forma Plant Additions 1. SR FDOT Widening T & D Mains. SR FDOT Widening Force Main (,8) (1,). Des Pinar Force Main Replacement (.5) 8. WWTP Filter Replacement (,1) 5. Eng-Wekiva-Apopka Reuse Main (,1) 5. Wekiva-Apopka Reuse Main (,) Total Pro Forma Plant Additions s (,8) S (1,58) () Retirements related to Pro Forma Additions 1. SR FDOT Widening T & D Mains 5,. SR FDOT Widening Force Main. Des Pinar Force Main Replacement,, 8. WWTP Filter Replacement 1,5 Total Adjustments Accum Depr - Retirements s 5, S 18. Pro Forma Adjustments to Accumulated Depreciation $,55 $.18 (D) Contributions in Aid of Construction (1) Restate ClAC Per COAfor 1/1/1 - //1 (booked 1) Transmission &Distribution Mains Service Lines Force Mains Gravity Mains 1 Manholes Outfall Lines Adjustments ClAC -Lines Meters Meter Installations Hydrants Adjustments ClAC - Meters & Meter Installations Structures & Improvements Source of Supply Structures & Improvements Water Treatment Wells & Springs Electric Pump Equipment Water Treatment Water Treatment Equipment Distribution Reservoirs & Standpipes Other Tangible Structures & Improvements Pump Lift Station Structures & Improvements Wastewater Treatment Structures & improvements General Plant Plant Mod Fee Treatment & Disposal Treatment Equipment Adjustments ClAC - Property Total Adjustments to Accumulated Depreciation $ 1,5,5 $ (5,) 1,1 18,1 (1.88), 1,5,8 s 15,88 $,8 18,8,5 s,1 $ 85,185 1, 1,1 5,,5 5,5 5,8 (,,5),5,18 (1,1), s 1,5 S 5, Total Adjustments to ClAC per COA $ 58, S,5 5
9 Schedule of Adjustments to Rate Base Docket No.: -WS Schedule Year Ended: /1/ Interim [ ] Final [XI Historic [XI Projected [ 1 Schedule: A- Page of Preparer: Kirsten Markwell Explanation: Provide a detailed description of all adjustments to rate base per books, with a total for each rate base line item. Line No. Description Water Wastewater ' ID).. Contributions in Aid of Construction contd. () Reclass ClAC from Miscellaneous Revenues: ClAC Suspense Connection Meter Fee Adjustments ClAC Amortization - Property Total Adjustments to reclass ClAC $ (1,) (5,8) (.8) 5 Total Adjustments ClAC $ 5,1 $,5 (E) Accumulated Amortization Contributions In Aid of Construction (1) Restate Accum Amort ClAC Per COAfor 1/1/1 - //1 (booked 1/1) Transmission & Distribution Mains (,) Service Lines 5,55 Reuse Services force Mains Gravity Mains/ Manholes Outfaii Lines Adjustments CiAC Amortization - Lines Meters Meter Installations Hydrants Adjustments ClAC Amortization - Meters & Meter Installations Organization Structures & Improvements Source of Supply Structures & Improvements Water Treatment Wells & Springs Electric Pump Equipment Water Treatment Electric Pump Equipment SRC Electric Pump Equipment Trans & Dist Water Treatment Equipment Distribution Reservoirs & Standpipes Other Tangible Structures & Improvements Pump Lift Station Structures & Improvements Wastewater Treatment Structures & improvements General Plant Plant Mod Fee Treatment & Disposal Treatment Equipment Reserve Capacity Fee Plant Mtr Fee (F) Working Capital per Schedule A- (G) Restate Deferred Asset allocations from W5C / Utilities Inc. Deferred Rate Case Expense Rate Case Accumulated Amortization Deferred Maintenance 51 Deferred Maintenance Accumulated Amortization,5,5 (,8) (1.) 8.58 $ (1,8) $ (,) ,1 $, $ 8,O 5 18,8 (,) 8,5 (,) (,) (5) (5,8) (,5) (,5) (5,8),1,8 (,58,5) (5) (,5) 1 () 1 $ 1,8 $ 1,1 s (5,8) s Total Adjustments to ClAC Amortization per COA $ (1.8) $ 8,
10 Schedule of Water and Wastewater Plant in Service Annual Balances Subsequent to Last Established Rate Base Docket No.: -WS Test Year Ended: 1/1/1 Schedule: A- Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide the annual balance of the original cost of plant in service, for water and sewer separately, for all years since either rate base was last established by this Commission, or the date of inception of utility service if rate base has not been established previously by this Commission; and yearly additions, retirements, and adjustments by dollar amount up to the end of the test year. Provide an additional page if necessary. If a projected test year is used, include the projected annual additions and/or retirements specifically identifying those amounts. Line Year-End Balance No. Description Water Wastewater 1 Balance 1/1/8 $,, $,18, Additions Retirements 5, 51,85 Adjustment - Rounding 5 Balance 1/1/ ' $,, $,8, 8 1 Adjustments per Docket -WS Adjustment Annual Report balance Additions Retirements Adjustments (,),8 (5,) (1,5) (,8) 1,, (,5) (1,) 1 Adjustment - Rounding Balance 1/1/1 ',1,,,8 'Balance per Annual Report ' Balance per 1 Annual Report
11 Schedule of Water Plant in Service By Primary Account Test Year Average Balance Docket No.: -WS Schedule Year Ended: 1/1/1 Historic [XI Projected [ 1 Schedule: A-5 Page 1 of Preparer: Kirsten Markwell Recap Schedules: A-1, A- (1) () () () (5) () () (8) Line Prior Year Test Year 1 Month Adjusted Non-Used & Non-Used & No. Account No. and Name 1/1/ 1/1/1 Average Balance Adjustments' Average Useful % Amount INTANGIBLE PLANT 1.1 Organization.1 Franchises.1 Other Plant & Misc. Equipment SOURCE OF SUPPLY AND PUMPING PLANT. Land & Land Rights. Structures & Improvements 5. Collect. & Impound. Reservoirs. Lake, River & Other Intakes. Wells &Springs 8. Infiltration Galleries &Tunnels. Supply Mains 1. Power Generation Equipment. Pumping Equipment. Other Piant & Misc. Equipment WATER TREATMENT PLANT. Land & Land Rights. Structures & Improvements. Pumping Equipment. Water Treatment Equipment. Other Plant & Mix. Equipment TRANSMISSION & DISTRIBUTION PLANT. Land & Land Rights. Structures & Improvements. Pumping Equipment. Distr. Reservoirs &Standpipes 1. Transm. & Distribution Mains. Services. Meters & Meter Installations 5. Hydrants. Backflow Prevention Devices. Other Plant & Misc. Equipment GENERAL PLANT.5 Land & Land Rights.5 Structures & Improvements.5 Office Furniture & Equipment 1.5 Transportation Equipment.5 Stores Equipment.5 Tools, Shop &Garage Equipment.5 Laboratory Equipment 5.5 Power Operated Equipment.5 Communication Equipment.5 Miscellaneous Equipment 8.5 Other Plant - Allocations Total,, 1,8 88, 18, 1,1, 1,8 5, 81,1,1,5 8,8,5 5, 1,, 8,, 1,5, 1,51,, 55,85 1,5,58,,, 88,,1 1,1 1, 8,5 5,5, 1,,5 88, 18, 1,1, 1,8,,, ,5,5 15, 1,5,,88,5 1,51,55 1,518,8,55 5.,5 58,1,18,1,1 5,,85 1, 8,1,5 Reconciliation to Annual ReDort Annual Allocations between Systems:.5 Structures & Improvements.5 Office Furniture & Equipment 1.5 Transportation Equipment.5 Tools, Shop & Garage Equipment.5 Laboratory Equipment 5.5 Power Operated Equipment.5 Communication Equipment.5 Miscellaneous Equipment 8.5 Other Plant -Allocations (88,) (5,) (8,) (1.8) (,5) () 1, (,) (.5) (,) (1.5 1.) (,) (1,15) (,1) 1,18, (1,) Total Per Annual Report,,,1,,,, 88, 18, 1,1, 1,8, 55,,, 8,5,5 8, 1,, 8,, 1,8,5 1,58,18 5, 5.58,,8,581,,5,,1, 1, 1,,1 (1,1) (,),55, (,) 1,1,5 8,8 (81 (,1 (5,) (1,) (1 (1 (,1) (,,) (1,1,88) (5,55) (,) (.81 (81 (5,),1 1, 1,, 8,8 18, 1,1.,,8,,,,5 8,1,5,8 1,1,,, 1,8, 1,58,51 5, 5,58,88,5 1,1,1,518, 1, 5,5 8.81,85, 1, (58,8) 1,8 $,,1 $,85,555 S.5. $ (,,85) f,8, ' Including Allocations between Systems. a
12 I I I I I I I 1 I I I I Scheduk of Water Plant in Service By Primary Account Florida Public Sewice Commission Test Year Average Balance Srheduk: A Company: Sanlando Utilifies Corp. Docket No.: -WS Page of Preparer: Kirsten Mahell Schedukvear Ended: 1/llzOlO Historic [XI Projected 1 I Recap Schedules: A-1, A line ( () () I 1) () () () 11 (1) 1) (1) (1) ) () U- Month NO. Account NO. and Name Der Jan-1 Feb-1 Mar.lO Apr-1 May-lO Jun-lU JuClO Aug-1 Sep-1 Oct-1 Now-1 Dec-1 Average 1 INTANGIBLE PLANT 5 8,, 1,8,. 1,8,,.8,,,s,8,,8,8,.8.,,8.,,8.,,8,,,8,,,5,,,5, 1,,5,,, 1.1 Organization.1 Franchises.1 Other Plant E Mac. Equipment SOURCE OF SUPPLY AND PUMPING PUNT. Land & Land Rights. Structures E lmprovementr 5. Collect. E Impound. Rerervoirr. Lake, River & Other intaker. Wells & Springs 8. lnhltration Galleries E Tunnels. Supply Mains 1. Power Generation Equipment. Pumping Equipment. Other Piant & Mix. Equipment WATER TREATMENT PLANT. Land E Land Rights. Structures E Improvements. Pumping Equipment. Water Treatment Equipment. Other Plant & MIIC. Equipment TRANSMISSION E DISTRIBUTION PLANT. Land E Land Rights. Structures & Improvements. Pumping Equipment. Dirtr. Rerervoirr E Standpipes 1. Tranrm. E Distribution Mains. Services. Meters E Meter Installations 5 Hydrants. Sackflow Prevention Devices. Other Plant & Mtrc. Equipment GENERAL PLANT.5 Land & Land Rights.5 Structures & Improvements.5 Office Furniture E Equipment 1.5 Transportation Equipment.5 Stores Equipment.5 Took, Shop E Garage Equipment.5 Laboratow Equipment 5.5 Power Operated Equipment.5 Communication Equipment.5 Miscehneous Equipment 8.5 Other Plant - Aliocatianr Total ReCOnCiliation to Annual Re~ort Annual AII~~ations beween Syrtcmr:.5 Structures & Improvements.5 Office FumitUre & Equipment 1.5 Transportation Equipment.5 Tds, Shop & Garage Equipment.5 Laboratow Equipment 5.5 Power operated Equipment.5 Communication Equtpment.5 M~s~ellane~us Equipment 8.5 Other Plant- Aliocatms 88, 18, 1.1, 1,8 5, 81,1,1,5 8,8,5 5. 1,, 8,, 1,5, 1,51,, 55,85 1,5,58,,, 88, 88, 18, 1.1, 1,8 5, 81,1,1,8 8,8,5 1,5 1,, 8,,8 1,, 1,518,1, 55,85 1, ,, , 18, 1.1, ,1,1,5 8,8,5,1 1,, 8,,85 1,. 1,5,1.5 55,85 1,,5,1,,8 88,558 88, 18, 1,1, ,5,,1 8,8.5,1 1,, 8,, ,55.5,5 55, ,.5 88, , 1,1, 1,8 5, 81,5,1,1 8, ,, 8,, 1,5,1 1.5.,5 55,85 1,,58,8,8,8 8, 88, 18. 1,1, 1,8 5, 81,5,1,1 8, ,, 8,5, 1, ,55.8,5 55,85 1,1,588,8,, 8,1 88, 18, 1,1, 1, ,1,1 8,8,5,1 1,1, 8,5. 1,, ,588,1,,5 81,8 88, 18, 1,1, 1,8 5, 81,5,1.5 8,8,5,1 1,1, 8,1,5 1,,55 1,585,, 55,85 1.1,588,8,1, 81, 88, 18, 1,1, 1, ,5,8, 8, 8,5,1 1,1, 8,8, 1,8, 1,8,585, ,58,1,1,81 81,81 88, 18, 1,1, 1,8 5, 81,8,8,88 8,8,5,1 1,1, 8,,1 1,8, 1,,58, ,58,,1,5 8, 88, 18, 1,1, ,1,8,15 8,8.5,1 1,5,5 8,,88 1,8, ,85,55,,,1, 1,5, 88, 18, 1.1, 1,8 5, 8,1,8,5 8.1,5,1 1,, 8,1,55 1,5, 1,5,,8 5,85.55,,,18.5,11 88, 18, 1.1, 1,8.,,1,1,8 8,5,5 15, 1,5.,88,5 1,51,55 1,518,8,55 5,.5 58,1,18.1,1 88, 18. 1,1, 1,8, 55,,, 8,5.5 8, 1,, 8,, 1,8,5 1,58, ,58,1 1,1 1,, 1,1 1., 1,1 1,.1, 1,,5, 1,,1, 1,,5, 1,.51, 1,,. 1,,, 1,,5, 1,,, 1, 5,,85 1,,1, 1. 8, ,51 5.5, 5.5, , 5.5 1, , , ,5 5.5,5 5,5 8,1,5 1,,1,85,85,85 (1,) (1,) (1.) (1,) (1,) (1,) (1,) (1,) (1,), 1, $,,1 $,5,5 $,8, $,8, $,5, $,55,15 $,,5 $,, $,8,1 $,,8 $ 5,5, $ 5,1, $,85,555 $.5. (88.) (5,51 (8.) (1,8) (.5) 1 1, 1.1 (,1 (1.51.) (,1 (1,15l (.1) (,5) I1.l Total Per Annual Report 1,,,1.,,8,581,,5,
13 Schedule of Wastewater Plant In Service By Primary Account Test Year Average Balance Docket No.: -WS Schedule Year Ended: 1/1/1 Historic [XI Projected I I Florida Public Service Commlssic Schedule: A- Page 1 of Preparer: Kirsten Markwell Recap Schedules: A-, A-.. Prior Year Test Year 1 Month Line No. Account No. and Name 1/1/ 1/1/1 Average Balance Adjustments' Average Useful % Amount 1 INTANGIBLE PLANT 51.1 Organization S () S Franchises 8.1 Other Plant & Misc. Equipment COLLECTION PLANT 5. Land &Land Rights 5. Structures & Improvements 55. Power Gen Equipment. Collection Sewers - Force 1. Collection Sewers -Gravity. Special Collecting Structures. Services to Customers. Flow Measuring Devices 5. Flow Measuring Installations 8. Other Plant & Misc. Equipment SYSTEM PUMPING PLANT 5. Land &Land Rights 5. Structures & Improvements. Receiving Wells 1. Pumping Equipment 8. Other Plant & Misc. Equipment TREATMENT AND DISPOSAL PLANT 5. Land & Land Rights 5. Structures & Improvements 55. Power t en Equip 8. Treatment & Disposal Equipment 81. Plant Sewers 8. Outfall Sewer Lines 8. Other Plant & Misc. Equipment RECLAIMED WATER DISTRIBUTION PLANT 5.5 Land &Land Rights 1.5 Pumping Equipment.5 Reuse Distribution Reservoirs 5. ReuseTransmission & Distribution 8.5 Other Plant & Misc Equipment. Reuse Services. Reuse Mtr Installations GENERAL PLANT 5. Land &Land Rights 5. Structures & Improvements. Office Furniture & Equipment 1. Transportation Equipment. Tools, Shop & Garage Equipment. Laboratory Equipment 5. Power Operated Equipment. Communication Equipment. Miscelianeous Equipment 8. Other Plant - Allocations Total Reconciliation to Annual Report 1. Collection Sewers - Gravity Annual Allocations between Systems:.5 Structures & Improvements.5 Office Furniture & Equipment 1.5 Transportation Equipment.5 Tools, Shop & Garage Equipment s $ - s 8,1 1,5 1,58,5,8.5 Laboratory Equipment 5.5 Power Operated Equipment.5 Communication Equipment.5 Miscellaneous Equipment 8.5 Other Plant -Allocations,5 (1,1,,5,1 (1 (1,18) (,) 1, Total Per Annual Report,8,..8 1,,,5 5,8,8 1,5 1,5,,5,58 1,8,55,5,, 5,,,8,1, 5,8 8,58 8, 8,,18 5 1,5 1,85,8,8,,,,,18,8,8,,1 1,5 1,,,5 1,1,8,5,55,5,8, 5. 1, () 1, 5, 8, , , 1,5 1,1,558,1,558,,,18, 8,1,8 1, 1,5 1,,8,5,1,8,,55,,, 5,,88 188,1,5,1 5,18 8,5 8, 8, (8,18) (,8), 1,51 (,81),5,1 85, (1) 188,1,8,1 (188,) (,1,1 ) 81, 1,855 1,8, 8 1,58 (,) Adjusted Non-Used.Si Non-Used &,18 1,5 18,,8, 1,,,,1,,8,8,1, 1,5 1,5,881,5,58,s,,55,5,, 5,,88 1,1 1,,5 1,855,585, 8,1 5, $ 5,1, S 5,58, $ 5,,5 S,1,8 S,,51 (1.) Erroneously omitted from Annual Report 88,, 5, 1,51, 8,, 1,8 1,15 * Including Allocations between Systems. 1
14 I I I I 1 I I I I 1 I I I I I Schedule of WaRewater Plant in Service By Primaly Account Florida Public Sewice Commission Test Year Avenge Balance Schedule: Ad Page of Docket NO.: -WS Preparer: Kirsten Markwell Schedule Year Ended 1/llZOlO Historic [XI Projected ( ) Recap Schedules: A-, A- (1) () 1) (1 (5) 1) () (8) 11 ( () (1) (1) ) 1) 1- Month line No. Account No. and Name Dec Jan-1 Feb-1 Mar-1 Apr-1 May1 Juc-1 JuClO Aug-1 SeplO OR-1 Nov-1 Dec-1 Average 1 INTANGIBLE PLANT Organization 5.1 Franchises 8.1 Other Plant & Mirc. Equipment COLLECTION PLANT 5. Land & Land Rights 5 Structures & improvements 55. Power Gen Equipment. Collection Sewers. Force 1 Collection Sewers. Gravrty. Special Collecting Structures. Services to Customers. Flow Measuring Devices 5 Flow Measuring Installations 8. Other Plant & Mix Equipment SYSTEM PUMPING PLANT 5 Land & Land Rights 5. Structures & Improvements. Receiving Wells 1 Pumping Equipment 8. Other Plant & Mix. Equipment TREATMENT AND DISPOSAL PLANT 5. Land & Land Rights 5 Structures & Improvements 55. PowerGen Equip 8. Treatment & Disposal Equipment 81 Plant Sewerr 8. Outfall Sewer Liner 8. Other Plant & Mw. Equipment RECLAIMED WATER DISTRIBUTION PLAN1 5 5 Land & Land Rights 1.5 Pumping Equipment. Reuse Distribution Reservoirs 5 ReuseTransmission & Distribution 8.5 Other Plant & Misc Equipment. Reuse Services. Reuse Mtr Installations GENERAL PLANT 5. Land & Land Rights 5 Structures & Improvements Office Furnture & Equipment 1. Transportation Equipment. Tools, Shop & Garage Equipment. Laboratory Equipment 5. Power Operated Equipment. Communication Equipment. Miscellaneous Equipment 8. Other Plant - Allocations Total Reconciliation to Annual Rep& 1 Collection Sewers. Gramfy Annual AII~cationi between Systems:.5 Structures & Improvements.5 Office Furnotwe & Equipment 1.5 Transportation Equipment.5 Tools, Shop &Garage Equipment.5 Labantory Equipment 5.5 Paweroperated Equipment.5 Communication Equipment.5 Mlrcellaaneour Equipment 8.5 Other Piant- Allocationr $ $ $ $ $ ' $ $ $ $ $ 8,1 8,1 8,1 8,1 8,1 8,1 8,1 8,1 8,1 8,1 8,1 8,1 1,5 1,58,5,8,,5 1,5,,5, 1,5,,5, 1,5, ,5,,5, 1...,,.%..%, 5,8,8 1,5 1,5,,5,58 1,8,55,5,, 5,,,8,1, 5,8 8,58,,85,5,8 1,5 1,5,5,5,58 1,8,55,5,, 5,,,8,1, 5,8,,85 8,1,8 1,5 1,,8,5,58 1,8,55,5,, 5,,,8,1. 5,8,, 85.5,8 1,5 1.%,8,5,58 1,8,55,5,, 5,,,8,1, 5,8,,, 85,8,8 1,5 1,,,5,58,5,55,5,, 5,,,8,1, 5,8 1,5,,5,.,, 8,88,8 1,5 1,,1,5,58,5,55,5,, 5,,,8,1, 5, , ,58 5 1,5,,5,8, 5 1,5 5,5,5,5, 5 1,5,,5,, ,55, ,5 5,88,55,55 5 1,5 5,555,58, 1,,,.,,.%,,,,5 1,,8 1,5 1,,,5,58,5,55,55,1, 5,,,8,1, 5,8 8, , 8.,18,,,8 1,5 1,,181,5,58,5,55,55,, 5,,,8,1, 5,8 8, , 8,,1,,,8 1,5 1,,.5,58,5,55,55,55, 5,,,8,1, 5,8.. 8, , 8,,1,8,,8 1,5 1,,,5,58,5.55,55,55, 5, 1.,,1,,88, ,5,,5 1,1,5,55,55,5, 5, 1.,1,8 1,,8 1,5 1,51,1,5 1,1,5,55,55,, 5, 1, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8. OW OW O W OW $ 5,1, $ 5,,1 $ 5,5, $ 5,, S 5,8,8 S 5,5,8 S 5,,85 $ 5,,585 $ 5,1,8 $ 5,,8 S 5,8,8 $ 5,8, $ 5,58, $ 5,,5 (1.) Enoneourhl ommed tom Annual Report ,5 (1.),.5 Total Per Annual Report.8.,8,1, 5,8 8, ,,8,1, 5,8 8, , 8,,8,1, 5,8 8, , 8,,18 5 1,5 1,85,8,8,,,,18,8,8,,1 1,5 1,,,5 1,1,8,5,55,5,8, 5, 1, (1 1, 5, 8, ,18 8,, 1.S ,1 (1,18) 1.) 1.W,,8 81, 1,5 1,1,558,1.558,,.18. 8,1,8 1, 1,5 1,,8,5,1,8,,55,,, 5,,88 188,1,5,1 5,18 8,5 8, 8,
15 Non-Used and Useful Piant - Summary. Final Docket No.: -WS Schedule Year Ended: 1/1/1 Schedule: A- Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide a summary of the items included in non-used and useful plant for the test year. Provide additional support schedules, if necessary. (1) (1 1) () Line Average Amount Utility Balance No. Description Per Books Adjustments Per Utility 1. WATER Plant in Service 5 Land Accumulated Depreciation 8 Other (Explain) Total WASTEWATER 1 Piant in Service 1 Land 18 1 Accumulated Depreciation 1 Other (Explain) Total Supporting Schedules: A-5, A-, A-. A-1 Recap Schedules: A-1, A- 1
16 Schedule of Water and Wastewater Accumulated Depreciation Annual Balances Subsequent to Last Established Rate Base Docket No.: -WS Test Year Ended: 1/1/1 Schedule: A-8 Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide the annual balance of accumulated depreciation, for water and sewer separately, for all years since either rate base was last established by this Commission, or the date of inception of utility service if rate base has not been established previously by this Commission; and yearly additions, retirements, and adjustments by dollar amount up to the end of the test year. Provide an additional page If necessary. If a projected test year is used, include the projected annual additions and/or retirements specifically identifying those amounts. Line Year-End Balance No. Description Water Wastewater 1 Balance 1/1/8 $ 1,1,5 $ 1,, Additions,5,8 Retirements Adjustment - Rounding 5 Balance 1/1/ Adjustments Annual report balance Adjustments per Docket -WS 8 Additions Retirements 1 Adjustment - Rounding Balance 1/1/1 $,1,5 $ 1,,1 1,5, (5,), 85,5 (,5) () $ 1,,581 $ 1,,1 'Balance per Annual Report Balance per 1 Annual Report 1
17 Allocations Schedule of Water Accumulated Depreciation By Primarq Account Test Year Average Balance Docket No.: -WS Explanation: Provide month ending balances for Preparer: Klrsten Markwell Schedule Year Ended: 1/1/1 each month of the test year and the ending balance Schedule: A- Page 1 of Historic [XI Projected [ I for the prior year. Recap Schedules: A-1, A-8 (1) () 1) () (5) () ) (8) Line Prior Year Test Year 1 Month Adjusted Non-Used & Non-Used & No. Account No. and Name 1/1/ 1/1/1 Average Balance Adjustments' Average Useful % Amount 1 INTANGIBLE PLANT 1.1 Organization Franchises.1 Other Plant & Mix. Equipment SOURCE OF SUPPLY AND PUMPING PLANT. Land & Land Rights. Structures & lmprovements 5. Collect. & Impound. Reservoirs. Lake, River & Other Intakes. Wells & Springs 8. Infiltration Galleries &Tunnels. Supply Mains 1. Power Generation Equipment. Pumping Equipment. Other Plant & Misc. Equipment WATER TREATMENT PLANT. Land & Land Rights. Structures & Improvements. Pumping Equipment. Water Treatment Equipment. Other Plant & Misc. Equipment TRANSMl55lON & DISTRIBUTION PLANT. Land &Land Rights. Structures & Improvements. Pumping Equipment. Distr. Reservoirs & Standpipes 1. Transm. & Distribution Mains. Services. Meters & Meter Installations 5. Hydrants. Backflow Prevention Devices. Other Plant & Mix. Equipment GENERAL PLANT.5 Land & Land Rights.5 Structures & Improvements.5 Office Furniture & Equipment 1.5 Transportation Equipment.5 Stores Equipment.5 Tools, Shop &Garage Equipment.5 Laboratory Equipment 5.5 Power Operated Equipment.5 Communication Equipment.5 Miscellaneous Equipment 8.5 Other Plant ~ (8,1) (18,) (8,) (1,,5) (8,) (1) (.1) (1,1) (,81,8) (,51) (1,,) (,5) (1) () (8,5) (1,58) (51,1) (,) (.1) (5,) () 18.1 (,) (15,85) (55,8) (1,) () () (1,) (,5) (1,58,) (55,) () (5,) (,) (,,58) (,) (1,,8) (,581) () (5) (,5) (1,,8) (88,55) (,) (1,1) (8) (5,) (1.8) (,) (,) (55,8) (8.) () () (1.11) (,) (1,58,1) (,) (1) (,8) (,58) (,,55) (1,1) (1,,8) (,5) () (88) (88,) (1,5,5) (,) (1,5) (.) (1) (,8) (1,1),1 1,5 1,1 (,1) (,) (1) (8), , 1,5 (.) (8) 1,18 (8,) 1,55 (,) (1,8) (55,) (.5) () (8) (1.) (8,85) (1,51,85) (,1) () (,) (1,85) (,,5) (,) (1,,8) (,18) () () (,) (5,1) (,) (,81) (,) () (1,8) (,1) I1 5 Total Reconciliation to Annual ReDort. Other Plant & Misc. Equipment 8 Common Plant Allocations:.5 Structures & Improvements 5.5 Office Furniture & Equipment Transportation Equipment 5.5 Tools, Shop & Garage Equipment 5.5 Laboratory Equipment Power Operated Equipment 55.5 Communication Equipment 5.5 Miscellaneous Equipment Other Plant -Allocations 58 Total Per Annual Report * Including Allocations between Systems S (,,8) S (1,,) S (1,1,1) S l.5.55) 1 Erroneously omitted from Annual Report. 1,5 8.,58, ,8 (1,1) 1, 1,8,5 () (,) (,5) (.8) 8, (,1,5) S (1,,581) 1
18 ~ I I I 1 I I 1 1 I 1 I i I I I Schedule of Water Accumulated Depreciation By Primry Account TcnYearAverage Bllince Florida Public Service Commirrion Schedule: A Company: Sanhndo Utilities Corp. Pale of Docket No.: -WS Prcparer: Kirrten Mattwell Schedule Year Ended 1/1/1 Historic 1x1 Projected [ 1 Explanation: Provide month ending balancer for each month of the ten year and the ending blanre for the prior year. Reop Scheduler: A-1. A I (1) () (1 1) (51 (1 (1 (8) (1 ( (1 (1 (1) 1 () tine NO. Account No and Name oecm Ian-1 Fet-1 Mar-1 Apr-1 May-lo Ju-1 Jut-1 Aly-1 Sep-1 Oct-1 Now1 Oec-1 1- Month Awwe 1 INTANGIBLE PLANT Organization 1 Franchiser 1 Other Plant & Mirc Equipment SOURCE OF SUPPLV AND PUMPING PLANT Land & Land Rights. Structures & lmprwementr 5. Collect & Impound Reiewoin Lake, River & Other Intakes Wellr &Springs 8 Infiltration Galleries & Tunnels. supply M ~I~S 1. Power Generation Equipment. Pumping Equipment. Other Plant & Mix. Equipment WATER TREATMENT PLANT. Land & Land Rights. Structures & lmprovementr. Pumping Equipment. Water Treatment Equipment. Other Plant & MISC. Equipment TRANSMISSION & DISTRIBUTION PLANT Land & Land Rights. Structures & lmprovementr. Pumping Equipment Dirtr. Rerervoirr & Standpiper 1. Tranrm. & Oirtribution Mains. 5ervIcer Meters & Meter lnrtallationr 5 Hydrants. Backflow Prevention Devices. Othet Plant & Misc. Equipment GENERAL PmNT 5 Land & Land Rights 5 Structures & Improvements.5 Ofice Furniture & Equipment Transportation Equipment.5 Stores Equipment.5 Tools, Shop &Garage Equipment.5 Laboratory Equipment 5.5 Power Operated Equipment.5 Communication Equipment 5 Mircellaneour Equipment 8 5 Other Plant - Allocations Total Remmilnfmn to Annual Reoar@ (81 11 (1) (1 ( 1 1 (1 ( (1 (181 (11 1 (8,11 (8,5) (.18) (,) (.) (,) (1.51) (.5) (,8) (.1 (,881 (. (.1 (,) (18,) (1,1) (1,1) (,) (,8) (1,1) (1.8) (.) (,) (,1 (,1 (.5) (15.85) (.1 1,81 (5,1) (5.) (58,) (51,5) (5,) (55,) (5,1) (55.) (55,5) (55,8) 5,1 (55.8) 5.81 (,1.1 (,81) (8,) (8,5) (8,5) (8,) (,1) (.51 (,) (1.85) (1,1 (1.1 (8,) 11 (1 11 (1 (1 (1 11 (1 (51 (51 1 () (1 (11 (1 (181 (181 (1 ( (1 (1 (1 (81 11 (z1 (81 (51 (51 (51 (1.1) (1.8) (1.11) (1.) (1.) (1.) (1,1) (1,58) (1,1 (1.1 (8,) (.18) (1,1) (,8) (1,) (1,1) (1,1) (.18) (1,181 (,181) (18,18).81 (,51 (Jl,,51,51,) (1,,1 (1,,) (1.8.) (1,,5) (1,5,) (1,5,85) (1,5,) (1,5,1) (1.555.) (1,5,1) (1,58,1 (1,58,1) (8,1 (,) (1,5) (,) (,) (,8) (,) (8.1) (,5) (51.).5) (5.1 (55.1 (.1 1 ( (5) (1 (181 (11 (51 81 ( (1 (51 (1 () (1) (.1l (1,1) (,81,8) (,51) (1,,) (,5) ( (1 (.81 (.1) (.) (,5) (1,,) (,) (1 11 (.1 (,8) (,,) (.5) (1,5,8) (5,1) () 151. Qfhcr Plant&Miw Equipment 1 ~noneov.iyom,n~dfrom~nnull I V L P ~ R Annual Allocations between Syrtcmr 5 SLrYctYrel &Impmvernenu 1,5 5 Office Furniture & Equipment,58 TrmrparIation Equipment Tools. Shop & Garage Equipment (1.1) 5 Laboratory Equipment S Power Operated Equipment 5 Cammunicafion Equipment (.).5 Mi~ullaneous Equipment 8 5 Other Plant - Allootimr 8, Total Per Annual Report (,1.51 (,1 (,) (,18,1 (,5) (1,,5) (,) (1 1 (.1 (,) (.1.1) (,) (1,8,88) (8.) (81 (1 (.1 (5.) (,.5) (8,1) (1..) (,) (1 (51 (.81 (,) (,,) (,5) (1..81 (.1) (1 1 (. (.8) (,18,) (1,) (1..l (,) (1 51 (.1 (,58) (,5.1) (.8) ( (.8) (1 (5 (.851 (5.5) (,1,) (.1 (1,,8) (1,58) (1 (551 (.81 (.8) (,,1) (1,1 (1,,1) (1,) (1 (581 (5.1) (,) (,5,5) (1,5) (1,5,) (,11) (1 ( (5,1 (,) (,.58) (.1 (1,,8) (.581) 5) (.81 (,58) (,,55l (1.1) (1,,81 (.5) (1 ( ) (5,) (1,) (,5) (,) (.55) (85,) (,) (,5) (5,) (5,1 (1.) (.5) (88) (1.581 (,5 (8,18) (,8) (1,5) (1,8,) (1,,5) (1,5,) (1,5,5) (1,5,51 (1,1,51) (1,1,88) (1,.81 (1,5, (5.1) (,) (,8) (8,8) (88,1 (,5) (8,) (.) (1,55) (85.51) (81,18) (88.55) (.) 1.1 (.8) (181,1 (18,5) (185,581 (18.1) (18,51) (11,1) (1,) (1.18) (,551 (,81) (,1 (1OS1 1, (,11) (.) (.) (,5) (,) (.1) (,) (,1) (,51 (,1 (.) (1,1) (.) 181 ( (5,1 (.) (,5) (,1) (8,8) (,1) (1.) (1,888) (,8) (1,) (18.851, (51) (5,1 (1.8) (.81 (1.1) () (181 (1 (1 11 (8.) (1 (8,) ) (8.81 (1 ( ( ( (11 I1 ( (1 (1 (1 (1 (1 (1,1 $ (,,81 S (1,,8) S (1,8,) 5 (1,,55) S (1,1,) S (1,,) $ (1,8,8) S (1,8,5) S (1.5.8) $ (1,5.) S (1,85,8l $ (1,8,) $ (1,,l $,1,1) ,8 1.,5 () (.5) (.81 (1..58
19 Schedule of Wastewater Accumulated Depreciation By Primaw Account Beginning and End of Year Average Docket No.: -WS Schedule Year Ended: 1/1/1 Historic [XI Projected I I Schedule: A Page 1 of Preparer: Kirsten Markwell Explanation: Provide month ending balances for each month of the test year and the ending balance for the prior year. Recap Schedules: A-, A-8 () () (5) () () (8) (1) () Adjusted Non-Used & Non-Used & Line Prior Year Test Year 1 Month No. Account No. and Name 1/1/ 1/1/1 Avg Balance Adjustments* Average Useful % Amount INTANGIBLE PLANT 51.1 Organization 5.1 Franchises 8.1 Other Plant & Misc. Equipment COLLECTION PLANT 5. Land Fi Land Rights 5. Structures & Improvements 55. Power Gen Equipment. Collection Sewers - Force 1. Collection Sewers - GraviW. Special Collecting Structures. Services to Customers. Flow Measuring Devices 5. Flow Measuring Installations 8. Other Plant & Misc. Equipment SYSTEM PUMPING PLANT 5. Land & Land Rights 5. Structures & Improvements. Receiving Wells 1. Pumping Equipment 8. Other Plant & Misc. Equipment TREATMENT AND DISPOSAL PLANT 5. Land &Land Rights 5. Structures & Improvements 55. Gen Equipment 8. Treatment & Disposal Equipment 81. Plant Sewers 8. Outfall Sewer Lines 8. Other Piant & Misc. Equipment RECLAIMED WATER DiSTRlBUTlON PLANT 1.5 Pumping Equipment.5 Reuse Distribution Reservoirs 5. Reuse Transmission & Dist 8.5 Other Plant & Misc Equipment. Reuse Services. Reuse Mtr Installations GENERAL PLANT 5. Land & Land Rights 5. Structures & improvements. Office Furniture & Equipment 1. Transportation Equipment. Tools, Shop & Garage Equipment. Laboratory Equipment 5. Power Operated Equipment. Communication Equipment. Miscellaneous Equipment 8. Other Piant -Allocations Total Reconciliation to Annual Report 1. Collection Sewers. Gravity 8. Other Plant & Misc. Equipment.5 Reuse Distribution Reservoirs Annual Allocations between Systems:.5 Structures &Improvements.5 Office Furniture & Equipment 1.5 Transportation Equipment 5 Tools. Shop &Garage Equipment.5 Laboratory Equipment 5.5 Power Operated Equipment.5 Communication Equipment.5 Miscellaneous Equipment 8.5 Other Plant -Allocations Total Per Annual Report * Including Aiiocations between Systems (,1) () (,) (,,) (8) (18) (1,81,) (,85) () (1) (,5) (,) (5) () (1.) (1,5,81) () (,) (1,8) (,5,58) (1,18) (15,8) (.) (1,) () () (5,1) (,1,5), (55) (5) (1,88,51) (8,) (.) (,,58) (1 (,5) (1,8) (.55) (1 (1,) (1,8,581) (855) (5,) (,1) (5,1) (,) (,) () () (,1) (,18) (,8) (1) (,) (,,) 1, (5) (1) (1,8,5) (5.8) (1,8) (,1) () (8,) (1,) (1,18) (1) (1,55) (1,1,) (55) (5.8) (1,8) (,8,) (18,8) (1,5) () () (1,) (,1) () 5,1 (), (,5),85 () (8) (5.8) () (1.) (,8,) () (,8) () (1.8) (), (18) (51 (),, (1,1) (,) () (5.) () 5,, (1,) () () (1,8) (,85,).5 (1) () (1,5,81) (5,) (.1 (,1,8) () (5,) (1,) (.8) () (1,5) (1,,85) (5) (5,5) (1,8) (8,18) (,588) (,) (15,81) (5.) () (1,8) (,51) S (1,5,5) 5 (1,1,1) S (1.8.58) S (5,) S (1,8,51) (1) 1, (,15) (8,8) (.551) (1,8) (,) (8,) (,1) (5,8) (1.) (.5),5,8 S,1, S (1..1) Erroneously omitted from Annual Report. Reverse Adjustment Erroneously omitted from Annual Report 1
20 I I 1 1 I I I I I I I i 1 i i I I Schedule of Wastewater Awmulated Depmia1ion.B~ Primary Account Beginning and End of VN~ Avenge Company: Sanhndo Utilkier C op Docket No.: -W5 Flonda Public Service Commirrian Schedule: A-1 Page of Prepamr: Kirrten Markwell Schedule Year Ended l/1/1 Historic [XI Proieded [ ) Explanation: Provide month ending balancesfor each month of thetest year and theending balance forthe prior year. RcupSrhedukr: A-, A-8 1 I1 ( ) ( Month I in. NO. Account No. and Name ON Jan-1 Feb-1 Msi.1 Apr-lo May-1 Jun-1 l"l-1 Aug-1 5ep-1 On-1 Nov-1 D=-lO AYCWe 1 INTANGIBLE PLANT Organization $ 85 $ 85 $ s 85 s s s 85 s 85 s () s 5.1 Franchiser 1. (,) (,8) (.8) (5,),1 (5.1 (5.581,8 (5,) (.181 (,1).51 (,8) 8.1 Other Plant & Mac. Equipment Reuse Mtr Inrtallationr 8 GENERAL PLANT 5. Land & Land Rights COLEITION PLANT 5. Land & Land Rights 5. Structures & Improvements 55. Powerten Equipment Collection Sewetr. Force 1. Collectl~n Sewers - Gravity Speoal Collecting Structures. S~NK~S to Customers Flow Mearuring Devices 5. Flow Measuring Inrtaliat~onr 8. Other Plant & MirC Equipment 5VSTEM PUMPING PUNT 5. Land & Land Rights 5 Structureel &Improvements. Receiving Wells 1. Pumping Equipment 8. Other Plant& Mi%. Equipment TREATMENT AND DISPOSAL PLANT 5. Land & Land Rights 5. Structures & Improvementi 55. Gen Equtpment 1. Pumping Equipment 8. Treatment & Disposal Equipment Plant sewers 8. Outfail Sewer Lmer 8. Other Plant & Msc. Equipment 1 REUAIMEO WATER DlSTRlBUTlON PUNT 1.5 Pumpcng Equipment. Reuse Otstributmn Reiewows 5. Reuse Transmission.$ Distribution 8.5 Other Plant & Mtrc Equipment Reuse S~NWS 5. Structures & Improvements omce Furniture.$ Equipment 1. Transportation Equipment Tools. Shop &Garage Equipment. Laboratory Equipment 5 5. Power Operated Equkpment. Communication Equipment Miscellaneous Equipment 8 8. Other Plant -Allocatianr Total 5 Reconclliatlon to Annual Relort 1 COlleCtlon Seven - GravW 8 Other Plant & Mirr Equipment.5 Reuse Diftnbution Rcrerroin Annual Alloutions between 5yrfcmr m.5 strurturer & ImprDvemenD 5 Office Furniture & Equipment 1.5 Transportation Egwmcnt.5 Toals,Shop&Gara(e Ewpment.5 Labontory Equlpmnf 5.5 Power Operated Equipment.5 Communiution Equipment.5 Mircellancoui EqYipmEnt 1 (,) (,,) (81 81 (1.81.) (1 ( 1.5) (.) 1 I1.1 (1,5, (1,81 (,5,58) (1.18) (15,8) (,) (1,) 8.5 Other Plant- Allocationr Tota PerAnnual Report (1..1) (81 (,) (,.) (1,8,) 1,11 (85) (.5) (,8) (,) (1 ( (1,81 ( (1.1 (,58,8) (1.1) (15.) (,1) (1,) 188) (.81) (,8,51) (151 (1, (.55) (1 (1.1) (,51 (,51 (58) (1 (1.1 (1,,85) 151 (.51 (L581 (,5,181 (1. (15.81 (,1 (1,5) 11 (8.1) (,1.55) 1) (18 (1,8, (1 (1.8) (8,) (5, (1,,) 151 (,1 It1 (,.51 (1.) (15,) (,5) (.) (1 1,) (,,88) (1 (1) (1,85, (1.51 ( (,58) (81 (11 (1.1 (1,8,88) 181 (,81.81 (.1.81) (1,1) (15,1) (.5) (,) (1) (.5) (,,1 (1,81,1) 1.81 (1.1) (.81 (5,81 (,) I1.1 (11 (1.8) ( (,1.1 (,.1) (1,) (15,1) (,1 (1.8) (11 (1,1 (,,5) (1,8, (5.1 (1.11 (1.) (.1 (1,1) (1.1) (1.51 (1,1,8) ) (5,1 (1.1 (,,1 (l.181) (15. (.81) (1,1 ( (.1 (,5,5) (1,88, (.) (,) (.581 (1,. 1 (5. (1.81 (,58,81 (1,18) (15,) () ( (.1 (,) ( (.85) (,1,1 (1.8L (1.) ( 81 (,) (,81 (1.1 (1.51 (1,,8) ( (5.1.1 (,1,) (1.18) (15.5) 181 (1 (,) 1.1 (1 (.1) (,85,1 (1,1,1 (.88) (1.81 (.) (5,5) (.1 (1,1 (181 (1.8) (1,5,5) 1 (5.8) (1.1 (,8,5) (1,1 (15.1 (11 (1 (,1) ( (,51 (,,) 81 (11 (5,1 1,81,1 1 ( (51 1 (5) ( (11,1l.18).51 (.) 18,) (8, (1.551 ( (1.1 (1,,851 ().51 (,1 (,5,) (1, (15,) 8) 1 (.1) (18,581 (1..1. (1,51 (8 ) (1,5) (.51, (1 181 (1,8,5) (1 (5,1 1,11 (,,1 (1.) 5.81 (1 1 (,1 (1.1 () (5.1) (,1,5), 551 (L88.51) (8.1 I.1 (,,581 (.) (.51 (1, (1 (1,1 (1,8,58 $ (1,5,5) S (1,,581 S (,,5) S (1,18,8) S (1,,51 5 (1,,1 S (1,.18) S (1,,5) S (1,51,) S (1, S (1,5,1 $ (B $ (1,1. $ (1,8,581 Ermneovrhlomiuedfrsm Annu~l Report (1) Adjustment not mduded in Annual report 1, Emoneourk omitted from Annual Report ( (5, ( (1 (, (.18) (8.1,1) 15,81 (1,) (.5),5.8 (1,, ( (.) 1,, (1,8,5).81 (1,81 (, 1) (8,1 (1,) (1.181 (1) IL551 (1,1,1 51 (5.81 (1.8WI (,8.1 (18.81,51 () (1 (1,1 1,
21 Schedule of Water and Wastewater Contributions in Aid of Construction Annual Balances Subsequent to Last Established Rate Base Docket No.: -WS Test Year Ended: 1/1/1 Schedule: A- Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide the annual balance of contributions in aid of construction, for water and sewer separately, for all years since either rate base was last established by this Commission, or the date of inception of utility service if rate base has not been established previously by this Commission; and yearly additions, retirements, and adjustments by dollar amount up to the end of the test year. Provide an additional page if necessary. If a projected test year is used, include the projected annual additions and/or retirements specifically identifying those amounts. Line Year-End Balance No. Description Water Wastewater 1 Balance 1/1/8 $,,1 $ 1,5,8 1,1 8 1 $,5,5 $ 1,, (58,8) (,) 58,8 5, Additions Adjustment - Rounding Balance 1/1/ ' Adjustments per Docket -WS Additions Retirements Adjustment - Rounding Balance 1/1/1 ' (1) $,5,8 $ 1,58,85 'Balance per Annual Report 'Balance per 1 Annual Report 18
22 I 1 I I I I i i i i i i i I I I I Schedule of Contributions in Aid of Construction By Classification Test Year Average Balance Docket No.: -WS Schedule Year Ended: 1/1/1 Historic [XI Projected [ ] Schedule: A-1 Page 1 of Preparer: Kinten Markwell Explanation: Provide the average ClAC balance by account. If a projected year is employed, provide breakdown for average and projected test year. ( () () () (5) () () 1 WATER Plant Capacity Fees 5 LineIMain Extension Fees Meters & Meter Installation Fees 8 Contributed Property 1 Other -Tap Fees 1 1 Total 1 1 WASTEWATER 18 Plant Capacity Fees 1 LineJMain Extension Fees 1 Contributed Property Other - Tap Fees 5 Total $ - $ - $ $ (,,8) (,,) (,,85) 15,88 (,,5) (1,51,1) (1,8,) (1,5,) 1,1 (1,,) (,1,) (,,5) (,,) 1,5 (,,5) (,) (58,8) (1,8) (,) (55,) $ (,5,5) $ (,5,8) $ (,,8) $ 5, $ (..1) $ - $ $ (,,5) (,5,1) (,,8),8 (,5,) (,,8) (5,5,) (,8,5) 5, (5,51,8) (8,55) (1,5) (1,) (,1) (1,5) $ (1,,) $ (1,58,85) $ (1,,1) $,5 $ (1,558,1) Recap Schedules: A-1,A-,A- 1
23 N
24 Schedule of Water and Wastewater Accumulated Amortization of CIAC Annual Balances Subsequent to Last Established Rate Base Docket No.: -WS Test Year Ended: 1/1/1 Schedule: A-1 Page 1 of 1 Preparer: Kirsten Markwell Explanation: Provide the annual balance of accumulated amortization of CIAC, for water and sewer separately, for all years since either rate base was last established by this Commission, or the date of inception of utility service if rate base has not been established previously by this Commission; and yearly additions and adjustments by dollar amount up to the end of the test year. Provide an additional page if necessary. If a projected test year is used, include the projected additions and/or retirements specifically identifying those amounts. ~~ Line No. Description Water Wastewater 1 Balance 1/1/8 $ 8,,5 $,,81 Additions Adjustment - Rounding Balance 1/1/ 5 Adjustments per Docket -WS Additions Adjustment - Rounding 8 Balance 1/1/1, 5, $ 8,8, $,8, (1,5) 5, 1,8 51,8 (),5,1 1,5, 'Balance per Annual Report Balance per 1 Annual Report 1
CLASS "C" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT. Exact Legal Name of Respondent
CLASS "C" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT OF Exact Legal Name of Respondent Certificate Number(s) Submitted To The Charlotte County Budget Office
More informationPublic Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants
LITTLE GASPARILLA WATER UTILITY INC. Located in Charlotte County, Florida STAFF ASSISTED RATE STUDY For the Test Year Ending December 31, 2010 April 9, 2012 Public Resources Management Group, Inc. Utility,
More informationCLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT. Exact Legal Name of Respondent
CLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT OF Exact Legal Name of Respondent Certificate Number(s) Submitted To The CHARLOTTE COUNTY GOVERNMENT
More informationCLASS "C" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT
CLASS "C" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT OF WS918-14-AR Terie Hall TBBT Utility LLC 1512 El Dorado Parkway West Cape Coral Fl 33914 Certificate
More informationWATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT WS AR
WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than $2, Each) ANNUAL REPORT WS964-14-AR Conslidated Services of Hendry & Collier, LLC C/ Mitch Hutchcraft 362 Colonial Court Fort Myers, FL 33913
More informationCLASS "C" WATER and/or WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT. WU AR NHC Utilities, Inc.
CLASS "C" oh=rcial co~ r Public Service Con;rr;ission Do Not Remove From This C':fflce WATER and/or WASTEWATER UTILITIES (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT WU96315AR NHC Utilities,
More informationRE: Phone: (304) Fax: (304) Charleston, West Virginia May 17,2018. Electronic Service Only
Charleston, West Virginia 25323 Phone: (304) 340-0300 Fax: (304) 340-0325 May 17,2018 Electronic Service Only Robert R. Rodecker, Esq. Counsel, The Newell Company Kay Casto & Chaney PLLC PO Box 203 1 Charleston,
More informationXML Publisher Balance Sheet Vision Operations (USA) Feb-02
Page:1 Apr-01 May-01 Jun-01 Jul-01 ASSETS Current Assets Cash and Short Term Investments 15,862,304 51,998,607 9,198,226 Accounts Receivable - Net of Allowance 2,560,786
More informationCLASS "A" OR "B" ANNUAL REPORTk' :~,)t \(..
CLASS "A" OR "B" WATER and/or WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ~'., ' ANNUAL REPORTk' :~,)t \(.. OF WS57017 AR ROYAL UTILITY COMPANY Exact Legal Name of Respondent 259W /199S
More informationGENERAL DEFINITIONS CLASS"C" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT SU AR
GENERAL DEFINITIONS CLASS"C" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than 200,000 Each) ANNUAL REPORT OF SU94216AR TKCB, INC.....,..., Exact Legal Name of Respondent 562S Certificate Number(s)
More informationUNS Electric, Inc. Rates for Transmission Service For June 1, 2016 Through May 31, 2017 Data For Period Ending December 31, 2015
UNS Electric, Inc. Rates for Transmission Service For June 1, 2016 Through May 31, 2017 Data For Period Ending December 31, 2015 Mohave Total Line Division Division Company 1 2016 Revenue Requirements
More informationCLASS "C" WATER AND/OR WASTEWATER UTILITIES ANNUAL REPORT
CLASS "C" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than 200,000 Each),:,,'' LCIAl COPY Pubhc s~::nicf" Camrr Do Not Remove From Thh,... ~ ANNUAL REPORT wu ;'79-tt.- --,:fi?_ ~,) Li.. D!J
More informationPublic Ser,;ice Commission CLASS "A" OR ~Bi;~'"' From This Office. WATER and/or WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each)
OFFICIAL COPY Public Ser,;ice Commission CLASS "A" OR ~Bi;~'"' From This Office WATER and/or WASTEWATER UTILITIES (Gross Revenue of More Than 200,000 Each) ANNUAL REPORT OF WU38515'1AR Windstream Utilities
More informationCLASS "C" WATER and/or WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT WS AR. Sun River Utilities Inc.
CLASS "C" WATER and/or WASTEWATER UTILITIES (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT WS92213AR Sun River Utilities Inc. EXACT LEGAL NAME OF RESPONDENT 611W, 527S Certificate Number(s) Submitted
More informationANNUAL RESULTS OF OPERATIONS REPORT
Class A Water Utility (Annual Gross Revenue of 1,000,000 or more) Class B Water Utility (Annual Gross Revenue between 200,000 and 999,999) Class C Water Utility (Annual Gross Revenue less than 199,999)
More informationCLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT WS AR LAKE PLACID UTILITIES, INC
CLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT OF WS709-15-AR LAKE PLACID UTILITIES, INC Exact Legal N arne of Respondent 414W 347S Certificate
More informationCLASS "A" OR ANNUAL REPORT
CLASS "A" OR WATER and/or WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT OF WU38513AR Windstream Utilities Company Exact Legal Name of Respondent 427W Certificate Numbers
More informationANNUAL RESULTS OF OPERATIONS REPORT
Class A Water U lity(annual Gross Revenue of 1,000,000 or more) Class B Water U lity(annual Gross Revenue between 200,000 and 999,999) Class C Water U lity(annual Gross Revenue less than 199,999) ANNUAL
More informationJune 29, Annua! Depreciation Report for The York Water Company
^Gannett Fleming ^ S Your Trusted Advisor Since 1915 GANNETT FLEMING, INC. P.O. Box 671 Harrisburg, PA 1716-71 Location: 27 Senate Avenue Camp Hill, PA 1711 Office: (717)763-7211 Fax: (717)763-459 vvww.gannettfleming.com
More informationANNUAL RESULTS OF OPERATIONS REPORT
Class A Water Utility(Annual Gross Revenue of 1,000,000 or more) Class B Water Utility(Annual Gross Revenue between 200,000 and 999,999) Class C Water Utility(Annual Gross Revenue less than 199,999) ANNUAL
More informationCLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue ofmore Than $200,000 Each) ANNUAL REPORT. Certificate Number(s) Submitted To The
~~~4 CLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue ofmore Than 2, Each) ANNUAL REPORT Pc c. OF WS63817 AR William J. Deas Southlake Utilities, Inc. 2215 River Blvd. Jacksonville, FL
More informationUNS Electric, Inc. Rates for Transmission Service For June 1, 2017 Through May 31, 2018 For Period Ending December 31, 2016
UNS Electric, Inc. Rates for Transmission Service For June 1, 2017 Through May 31, 2018 For Period Ending December 31, 2016 Mohave Total Line Division Division Company 1 2017 Revenue Requirements $5,525,195
More informationMarch 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17-
88 E. Broadway Boulevard, Tucson, Arizona 85701 P.O. Box 711, Tucson, Arizona 85702 Amy Welander, Assistant General Counsel Telephone: 520-884-3655 Legal Department, HQE910 Fax: 520-884-3601 awelander@tep.com
More informationSUEZ WATER RHODE ISLAND, INC.
9- Page of 2 9-. Details of ADIT balances at December 3, 207. a) Identify the December 3, 207 recorded per-book balance of Accumulated Deferred Income Taxes (ADIT) in each account (account 90, 282, 283
More informationFLORIDA PUBLIC SERVICE COMMISSION SPECIAL COMMISSION CONFERENCE AGENDA NOTICE
FLORIDA PUBLIC SERVICE COMMISSION SPECIAL COMMISSION CONFERENCE AGENDA CONFERENCE DATE AND TIME: Thursday,, 9:30 a.m.* LOCATION: Betty Easley Conference Center, Joseph P. Cresse Hearing Room 148 DATE ISSUED:
More informationCity of Justin NOVEMBER
City of Justin MONTHLY FINANCIAL REPORT NOVEMBER - 2018 1 Revenues: Sales tax revenue is up 14.5% from this time prior year and November s sales tax collections increased 2.4% from November 2017. The City
More informationCLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT SU AR WU AR
CLASS "A" OR "B" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of More Than 2, Each) ANNUAL REPORT SU915-15-AR WU92-15-AR Exact Legal Name of Respondent 14S &388W Certificate Number(s) Submitted To
More informationRate Base (Schedule 3) $ 488,114. Rate of Return (Schedule 4) 6.74% 7.78% Operating Income Required $ 32,920
AWC Rosebrook Water Computation of Revenue Deficiency For the Test Year Ended September 30, 2017 Actual Proforma Rate Base (Schedule 3) $ 488,114 $ 625,578 Rate of Return (Schedule 4) 6.74% 7.78% Operating
More informationCLASS "A" OR "B" ANNUAL REPORT
CLASS "A" OR "B" WATER and/or WASTEWATER UTILITIES (Gross Revenue of More Than $200,000 Each) ANNUAL REPORT OF WS94915AR Aquarina Utilities, Inc. Exact Legal Name of Respondent 517W /450S Certificate Numbers
More informationSCHEDULE and 2019 Budget Assumptions
SCHEDULE 3.4 2018 and 2019 Budget Assumptions 1 2018-19 Budgets Assumptions 2 3 The following assumptions were used by EGNB in the development of its 2018 and 2019 Budgets: 4 5 Budget Item Assumption 6
More informationMonthly Financial Report
AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through February 2019 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report
More informationUTILITY RATE STUDY. Public Hearing
UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient
More informationGlacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers
Glacial Lakes Sanitary Sewer & Water District Utility Rate Study Shelly Eldridge Ehlers Jeanne Vogt - Ehlers 05/30/2017 1 Background What are Utility Funds Utility funds are used to pay for operations,
More informationMonthly Financial Report
AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through October 2017 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report
More informationI=PL. <?? (Jl --. { February 15, 2015
Florida Power & Light Company, 7 Universe Blvd, Juno Beach FL. 3348-42 I=PL February 15, 215 Mr. Bart Fletcher Public Utilities Supervisor Division of Accounting and Finance Florida Public Service Commission
More information/s/ John L. Carley Assistant General Counsel
John L. Carley Assistant General Counsel Law Department July 28, 2016 Christopher Psihoules, DAG Division of Law 124 Halsey Street, 5 th Floor P.O. Box 45029 Newark, NJ 07101 Christine M. Juarez, Esq.
More informationEntergy Services, Inc. Balance Sheet As of December 31, 2002 ( $ 000's )
Section I Statement AA Entergy Services, Inc. Balance Sheet As of December 31, 2002 ( $ 000's ) Ln Item Account Amount Assets and Other Debits 1 Utility Plant 101-106, 114 3,469,270 2 Construction Work
More informationCost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges
Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges UNC School of Government EFC 2017 Water & Wastewater Finance Workshop February 28 March 1, 2017 The William & Ida Friday
More informationCromwell Fire District Financial Statements March 31, 2019
Financial Statements March 31, 2019 Table of Contents Executive Overview 1-4 General Fund Budget Report - Summary Budget Report - Detail EMS Billing Report Projected Fund Balance Water Division Enterprise
More informationCHUGACH ELECTRIC ASSOCIATION 1 STATEMENT OF OPERATIONS. Allowance for Funds Used During Construction. Total Cost of Electric Service (MTD Actual)
FINANCIAL REPORT MARCH 2014 STATEMENT OF OPERATIONS CATEGORY 2014 MTD ACTUAL 2014 MTD BUDGET Operating Revenue and Patronage Capital Fuel and Purchased Power Expense Power Production Expense Transmission
More informationFiscal Year 2018 Project 1 Annual Budget
Fiscal Year 2018 Project 1 Annual Budget Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Treasury Related Expenses Table 2 5 Summary of Full Time Equivalent Table 3 6 Positions Cost-to-Cash
More informationCLASS "A" OR "B" WATER and/or WASTEWATER UTILITIES (Gross Revenue of MorE~ Than $200,000 Each) ANNUAL REPORT
orna.na.v Ptl'lc..._c... Net tt... omee CLASS "A" OR "B" WATER and/or WASTEWATER UTILITIES (Gross Revenue of MorE~ Than $200,000 Each) ANNUAL REPORT WU38512AR Windstream Utilities Company Exact Legal Name
More informationMemorandum. Background. November 2, 2018
Memorandum November 2, 2018 TO: THRU: FROM: SUBJ: Chris Cummings, Assistant Director, Economic Development Ed Tabor, Programs & Incentives Manager Shanna Bailey, Regional Project Manager Rich Rodriguez,
More informationSUMMARY EXPLANATION OF STATEMENTS AND SCHEDULES. The following summary explanations of Statements and Schedules are intended as a general guide.
Black Hills Power, Inc. South Dakota Revenue Requirement Model Description SUMMARY EXPLANATION OF STATEMENTS AND SCHEDULES The following summary explanations of Statements and Schedules are intended as
More informationBig Walnut Local School District
Big Walnut Local School District Monthly Financial Report for the month ended September 30, 2013 Prepared By: Felicia Drummey Treasurer BIG WALNUT LOCAL SCHOOL DISTRICT SUMMARY OF YEAR TO DATE FINANCIAL
More informationCalculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589
Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line No. Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR
More informationRe: Project No Pacific Northern Gas (N.E.) Ltd Revenue Requirements Application Update for Fort St. John/Dawson Creek Division
B-7 Craig P. Donohue Director, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5673 Tel: (604) 697-6210 Email: cdonohue@png.ca
More informationLarge Commercial Rate Simplification
Large Commercial Rate Simplification Presented to: Key Account Luncheon Red Lion Hotel Presented by: Mark Haddad Assistant Director/CFO October 19, 2017 Most Important Information First There is no rate
More informationCalculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618
Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618
More informationSpheria Australian Smaller Companies Fund
29-Jun-18 $ 2.7686 $ 2.7603 $ 2.7520 28-Jun-18 $ 2.7764 $ 2.7681 $ 2.7598 27-Jun-18 $ 2.7804 $ 2.7721 $ 2.7638 26-Jun-18 $ 2.7857 $ 2.7774 $ 2.7690 25-Jun-18 $ 2.7931 $ 2.7848 $ 2.7764 22-Jun-18 $ 2.7771
More informationWATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016
WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility
More informationCROMWELL FIRE DISTRICT MEETING OF THE BOARD OF COMMISSIONERS
CROMWELL FIRE DISTRICT MEETING OF THE BOARD OF COMMISSIONERS Tuesday, December 18, 2018, 7:00 PM Coles Road Firehouse, 105 Coles Road Cromwell, CT 06416 AGENDA I. Call to Order and Attendance - Pledge
More informationAccountant s Compilation Report
Tel: 817-738-2400 Fax: 817-738-1995 www.bdo.com 6050 Southwest Blvd, Suite 300 Fort Worth, TX 76109 Accountant s Compilation Report Joseph Portugal Town Administrator Town of Westover Hills, Texas Management
More informationWATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT
UTILITY NO. 5370 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF SHEBOYGAN WATER UTILITY 72 PARK AVE SHEBOYGAN, WI 53081-2958 For the Year Ended: DECEMBER 31, 2016 TO PUBLIC SERVICE COMMISSION
More informationMemorandum. May 12, 2017
Memorandum May 12, 2017 TO: Ed Tabor, Programs & Incentives Manager Robert Ault, Business & Community Development Division Manager FROM: Ami Keiffer, Regional Project Manager Rich Rodriguez, Finance Officer
More informationWATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT
UTILITY NO. 5370 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF SHEBOYGAN WATER UTILITY 72 PARK AVE SHEBOYGAN, WI 53081-2958 For the Year Ended: DECEMBER 31, 2017 TO PUBLIC SERVICE COMMISSION
More informationTHE YORK WATER COMPANY York, PA
Volume 9 Docket No. R-2012-2336379 Wastewater THE YORK WATER COMPANY York, PA INFORMATION SUBMITTED TO PENNSYLVANIA PUBLIC UTILITY COMMISSION PURSUANT TO: Title 52 Pennsylvania Code Exhibit No. HI-2W through
More informationMIAMI PARKING AUTHORITY
Revenue & Expenses Summary For the Five Months Ending February 28, 2019 Page 1 Adopted FY 2018 Actual Actual Actual Budget Actual Versus FY 2018 Versus 2019 Budget Year-To-Date $ $ $ $ % $ % Operating
More informationSELF-STORAGE FOR SALE
PURCHASE PRICE: $495,000 CAP RATE: 8.68% OCCUPANCY: 86.4% NOI: $42,973 LOT SIZE: 1.462ac (combined) BLDG CLASS: C OVERVIEW Multi-building storage facility in a rapidly growing area. The land offers over
More information11 May Report.xls Office of Budget & Fiscal Planning
Education and General Fund Actual Revenues and s by Month MTD YTD Change Revenue Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Per 14 Total over FY06 Enrollment Fees $ 8,211 $ 219 $ 41,952 ($ 818) $
More informationHOLLEY NAVARRE WATER SYSTEM INC BALANCE SHEET
BALANCE SHEET January 2018 CURRENT ASSETS Regions Operating Petty Cash Regions - Customer Water Deposits Regions - Customer Sewer Deposits Regions - Checking Regions - Investments Hancock Bank - HNWS14
More information1Q of FY ending December 31, (0.2) (1.9) 11.3 (0.2) (0.2) (0.2) (0.2) (1.2) (89.2) 0.1
August 6, ISEKI & CO., LTD. Supplementary Information to Consolidated Financial Results (April 1, June 30, ) I. Consolidated business results for the three months ended June 30, (Billions of yen, %) Year-on
More informationGROUNDWATER REDUCTION PLAN MONTHLY OPERATIONS REPORT MONTH REPORTED: DECEMBER, 2018
[Type here] GROUNDWATER REDUCTION PLAN MONTHLY OPERATIONS REPORT MONTH REPORTED: DECEMBER, 2018 FY 2019 - Operating Actual vs. Budgeted FYTD 2019 - Key Performance Indicators Actual Budgeted % Variance
More informationWATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT
UTILITY NO. 3140 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF LITTLE CHUTE MUNICIPAL WATER DEPT 108 W MAIN ST LITTLE CHUTE, WI 54140-1750 For the Year Ended: DECEMBER 31, 2016 TO PUBLIC
More informationHOLLEY NAVARRE WATER SYSTEM INC BALANCE SHEET
BALANCE SHEET February 2018 CURRENT ASSETS Regions Operating Petty Cash Regions - Customer Water Deposits Regions - Customer Sewer Deposits Regions - Checking Regions - Investments Hancock Bank - HNWS14
More informationMonthly Financial Report
SnapShot Citywide Revenues & Expenditures 2-3 Monthly Financial Report General Fund Revenues & Expenditures Capital Projects Tax Totals & Comparison Geo Codes & Sales Tax SIC Sales Tax Collections 4 5
More information(Internet version) Financial & Statistical Report November 2018
(Internet version) Financial & Statistical Report November 2018 12/17/2018 Statement of Operations For the Period Ended November 30, 2018 (in millions) Current Month Year-to-Date Operating Revenue $ 31.4
More informationPHOENIX ENERGY MARKETING CONSULTANTS INC. HISTORICAL NATURAL GAS & CRUDE OIL PRICES UPDATED TO July, 2018
Jan-01 $12.9112 $10.4754 $9.7870 $1.5032 $29.2595 $275.39 $43.78 $159.32 $25.33 Feb-01 $10.4670 $7.8378 $6.9397 $1.5218 $29.6447 $279.78 $44.48 $165.68 $26.34 Mar-01 $7.6303 $7.3271 $5.0903 $1.5585 $27.2714
More informationGENERAL FUND AT A GLANCE Category Budget YTD Actual % % Year Passed Resources 8.33% Uses 8.33% $0 $1,330,750
City of Edmond Monthly Financial Report FY 2008/2009 Through the Month Ended Unaudited - Intended for Management Purposes Only The following is a summary of the City's financial results for operating funds.
More informationConcord ANNUAL REPORT SiGNED
STATE OF NEW HAMPSHIRE PUBLIC UTILITIES CO~ISSION Concord ANNUAL REPORT SiGNED ENTERED ~Ji41i~ ~ CF1ECKE 0 AU D~T ED SUMMARtZED CLOSED -~ Water Utilities Class C ANNUL REPORT OF )i ~C~L~\~\1 S1*r~f~~ ~c~fl~s
More informationCITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY
1 CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 12.20.2017 Overview 1. Sufficiency 2. Rate Classification 3. to Serve 4. Rate Structures 5. Customer Impacts 6. Affordability Program Foundation
More informationPPL Electric Utilities Corporation
Page 1 of 22 ATTACHMENT H8G PPL Electric Utilities Corporation Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction 2014 Data Shaded cells are input cells Allocators Wages & Salary Allocation
More information2016 DEPRECIATION STUDY
2016 DEPRECIATION STUDY CALCULATED ANNUAL DEPRECIATION ACCRUALS RELATED TO WATER PLANT AS OF DECEMBER 31, 2016 Prepared by: NEW JERSEY AMERICAN WATER COMPANY Voorhees, New Jersey 2016 DEPRECIATION STUDY
More informationQUESTION 2. QUESTION 3 Which one of the following is most indicative of a flexible short-term financial policy?
QUESTION 1 Compute the cash cycle based on the following information: Average Collection Period = 47 Accounts Payable Period = 40 Average Age of Inventory = 55 QUESTION 2 Jan 41,700 July 39,182 Feb 18,921
More informationHOLLEY NAVARRE WATER SYSTEM INC BALANCE SHEET
BALANCE SHEET November 2017 CURRENT ASSETS Regions Operating Petty Cash Regions - Customer Water Deposits Regions - Customer Sewer Deposits Regions - Checking Regions - Investments Hancock Bank - HNWS14
More informationENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M
ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M TABLE OF CONTENTS Schedule Schedule Name Page Sch 1 Summary
More information$180 $160 $140 $120 $100 $80 $60 $40 $20 $ Single Fam -New Apts -New
2012 REVENUE FORECAST Presented by Brian Henshaw September 26, 2011 1 Economic Conditions Housing starts Federal & State deficits Sovereign-debt crisis Bankruptcies Unemployment Stock Market volatility
More informationLOUISVILLE GAS AND ELECTRIC COMPANY Gas Rates 2018 Monthly Billing Adjustments
2018 Monthly Billing Adjustments GAS LINE TRACKER CHARGES GAS LINE TRACKER CHARGES DSM (2) PER MONTH PER METER PER MONTH PER CCF TAX CUTS AND JOBS ACT $ Per CCF Firm Trans. SURCREDIT ($ per ccf) (3) GAS
More information(Internet version) Financial & Statistical Report September 2017
(Internet version) Financial & Statistical Report September 2017 10/23/2017 Statement of Operations For the Period Ended September 30, 2017 (in millions) Current Month Year-to-Date Operating Revenue &
More information(Internet version) Financial & Statistical Report December 2017
(Internet version) Financial & Statistical Report December 2017 01/22/2018 Statement of Operations For the Period Ended December 31, 2017 (in millions) Current Month Year-to-Date Operating Revenue & Patronage
More information(Internet version) Financial & Statistical Report December 2016
(Internet version) Financial & Statistical Report December 2016 1/23/2017 Statement of Operations For the Period Ended December 31, 2016 (in millions) Current Month Year-to-Date Operating Revenue & Patronage
More informationUtilities - Water and Sewer Funds
Utilities - Water and Sewer Funds Summary of Expenditures by Fund: Water Funds: Actual Adopted Amended Adopted Amended Estimated Proposed Water Administration $ 158,511 $ 199,100 $ 199,100 $ 198,400 (0.4)
More informationORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Q3 Financial Report Page 1 of 20
ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Page 1 of 20 MEMORANDUM November 09, 2018 To: Board of Directors From: Foster Hildreth, General Manager Re: OPALCO 2018 Third Quarter Financial Report
More informationOrder No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018
THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES BEFORE: Irene A. Hamilton, Panel Chair Michael Watson, Member Room 400 330 Portage Avenue Winnipeg, MB R3C 0C4 www.pubmanitoba.ca
More informationFirm valuation (2) Class 7 Financial Management,
Firm valuation (2) Class 7 Financial Management, 15.414 Today Firm valuation x Free cashflows x Profitability, financial ratios, and terminal value Reading x Brealey and Myers, Chapter 12.4 12.6 x Wilson
More informationHOLLEY NAVARRE WATER SYSTEM INC BALANCE SHEET
BALANCE SHEET October 2018 CURRENT ASSETS Regions Operating Petty Cash Beach Bank - Operating Beach Bank - Water Deposits Beach Bank - Sewer Deposits Beach Bank - Impact Fees Hancock Bank - HNWS14 Bond
More informationSmallBizU WORKSHEET 1: REQUIRED START-UP FUNDS. Online elearning Classroom. Item Required Amount ($) Fixed Assets. 1 -Buildings $ 2 -Land $
WORKSHEET 1: REQUIRED START-UP FUNDS Item Required Amount () Fixed Assets 1 -Buildings 2 -Land 3 -Initial Inventory 4 -Equipment 5 -Furniture and Fixtures 6 -Vehicles 7 Total Fixed Assets Working Capital
More informationGeneral Manager s Report January 2018
General Manager s Report January 2018 Lyttonsville Crew Working on Water Main Break January 2018 Table of Contents Customer Service Call Center Operations Percent of Calls Answered... 1 Delinquent Accounts...
More informationCash & Liquidity The chart below highlights CTA s cash position at January 2018 compared to January 2017.
To: Chicago Transit Authority Board From: Jeremy Fine, Chief Financial Officer Re: Financial Results for January 2018 Date: March 14, 2018 I. Summary CTA s financial results are $1.7 million unfavorable
More informationJIu.blitc:$~ a:t~ug 24 AM II: 05 CAPITAL CIRCLE OFFICE CENTER SHUMARD OAK BOULEV~'1 ~'11 S S!0 N TALLAHASSEE, FLORIDA C L E R K
State of Florida JIu.blitc:$~ a:t~ug 24 AM II: 05 CAPITAL CIRCLE OFFICE CENTER. 2540 SHUMARD OAK BOULEV~'1 ~'11 S S!0 N TALLAHASSEE, FLORIDA 32399-0850 C L E R K -~-IC-~-()-It-j\-~-J)-lJ-~- DATE: August
More informationHOLLEY NAVARRE WATER SYSTEM INC BALANCE SHEET
BALANCE SHEET July 2018 CURRENT ASSETS Regions Operating Petty Cash Regions - Customer Water Deposits Regions - Customer Sewer Deposits Regions - Checking Regions - Investments Hancock Bank - HNWS14 Bond
More informationCITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010.
UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010 Overview The service area of the Utility District s Water System includes the entire City of Riviera Beach (approximately
More informationPETERS TOWNSHIP SANITARY AUTHORITY 2011 BUDGET WORKSHOP. November 30, 2010
PETERS TOWNSHIP SANITARY AUTHORITY 2011 BUDGET WORKSHOP November 30, 2010 Agenda A. 2010 Budget Performance Summary B. 2011 Budget Request C. 2011 Capital Plan D. Consulting Engineer s Annual Report Preliminary
More informationAnnual Reports. Water & Wastewater Reference Manual 1
Annual Reports Water & Wastewater Reference Manual 1 Annual Reports An Annual Report is a document that details the financial and operational data of the utility. Chapter 367.121, F.S., Powers of commission,
More informationStatement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: August 26, 2016 SUBJECT: OBJECTIVE: Commissioners Simpson, Helgeson, Manning, Mital and Brown Sue Fahey, CFO; Susan Eicher, Accounting
More informationCASCADE NATURAL GAS CORPORATION. Statement of Operations and Rate of Return. Twelve Months Ended. December 31, State of Oregon Operations
CASCADE NATURAL GAS CORPORATION Statement of Operations and Rate of Return Twelve Months Ended December 31, 2017 Operations CASCADE NATURAL GAS CORPORATION Twelve Months Ending December 31, 2017 Description
More information2016 Spring Conference And Training Seminar. Cash Planning and Forecasting
Cash Planning and Forecasting A different world! Cash forecasting starts with expectations about future flows Uses history to identify beginning balances.and to understand patterns of how things interact
More informationFinancial & Business Highlights For the Year Ended June 30, 2017
Financial & Business Highlights For the Year Ended June, 17 17 16 15 14 13 12 Profit and Loss Account Operating Revenue 858 590 648 415 172 174 Investment gains net 5 162 909 825 322 516 Other 262 146
More informationHearing on Temporary Rates. EXHIBIT A Page 1 of 48
Hearing on Temporary Rates October 25, 2011 EXHIBIT A Page 1 of 48 Page 2 of 48 EPE Overview Serving El Paso for over 110 years 1 of 3 publicly l traded d companies in El Paso Over 950 employees Significant
More informationFOURTH QUARTER AND FULL-YEAR 2016 RESULTS. February 24, 2017
FOURTH QUARTER AND FULL-YEAR 2016 RESULTS February 24, 2017 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations,
More information