1 Northern Natural Gas Company P.O. Box 3330 Omaha, NE November 13, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Re: OEP/DPC/CB-1 Northern Natural Gas Company Docket No. CP (x)(3) Dear Ms. Bose: Northern Natural Gas Company (Northern) hereby submits for filing with the Federal Energy Regulatory Commission (FERC) under the above-referenced docket, its responses to the data request issued by FERC staff November 8, FERC s requests and Northern s responses are attached. Any questions regarding this filing should be directed to the undersigned at (402) Respectfully submitted, /signed/ Michael T. Loeffler Michael T. Loeffler Senior Director, Certificates and External Affairs cc: Parties of Record

2 Docket No. CP Northern Natural Gas Northern Lights 2019 Rochester Expansion 1. In Exhibit K, Northern Natural Gas Company estimates total capitalized Allowance for Funds Used During Construction (AFUDC) to be $5,777,973. Please provide the following in Microsoft Excel: (The worksheets and/or files should retain all notes and any formulas supporting the calculation.) i. The worksheet computations on a monthly basis to support the $5,777,973 of AFUDC. Separately identify the debt/equity components. RESPONSE: For the purpose of estimating, Northern calculates AFUDC as a percentage of the total project estimate based on historical comparable projects. The estimating engineer assigns an AFUDC percentage, typically between 2% and 5% of total project costs, depending on the estimated project duration and early financial commitments. The estimate does not break out debt and equity AFUDC amounts by month. See Exhibit 1 found on the first tab of the attached Excel file for details on how estimated AFUDC reported on Exhibit K was determined for the Northern Lights 2019 Expansion Project and the Rochester Project. When actual costs are incurred, Northern will calculate AFUDC based on actual costs paid. All accruals and retention charges as well as all other non-construction costs paid such as land and land rights that are charged to the project will be excluded from the AFUDC base. During construction, the AFUDC base will be equal to the sum of the prior month project to date payment s including AFUDC plus one half of the current month payments. See Exhibit 2 on the second tab of the attached Excel file for a demonstration of the calculation used to determine actual AFUDC charged to the Northern Lights Faribault Unit No. 3 compressor project through October 2018 based on the formula provided below. AFUDC base = Prior month project to date payments & AFUDC + ½ (current month payments) For the month assets are placed in service, the AFUDC base is the sum of one half of the prior month project to date payments including AFUDC plus one fourth of the current month payments. See the formula below. AFUDC base = ½ (prior month project to date payments + AFUDC) + ¼ (current month payments) Monthly AFUDC debt and equity accrual amounts are then determined based on the monthly rates derived using the methodology provided in the response to item (b) below, multiplied by the AFUDC base for the month.

3 Docket No. CP Northern Natural Gas Northern Lights 2019 Rochester Expansion RESPONSE: This same methodology of calculating monthly AFUDC will be applied to all components of the Northern Lights 2019 Expansion Project and the Rochester Project. ii. The computation and methodology to support the debt/equity cost rates used to derive the AFUDC rate. The worksheets and/or files should retain all notes and any formulas supporting the calculation. Actual monthly AFUDC rates are determined using the methodology shown on the attached AFUDC rate file. Northern does not have any short-term debt instruments; therefore, the proration calculation for short-term and long-term debt is not applicable. As shown on Exhibits 3 and 4, Northern first calculates its annual AFUDC rate for the current year based on its capital structure, as of December 31 of the prior year. Northern s capital structure is based on its total proprietary capital reported on page 112 of its FERC Form 2, line 15, and the sum of long-term debt also reported on page 112 on lines 17 and 20. Northern uses an equity rate of 12% for its AFUDC calculation, which is the imputed return on equity from Northern s consolidated rate case settlement (Docket Nos. RP and RP04-155), which was approved by the Commission. Northern s debt rate is its weighted average cost of debt per the calculations shown on Exhibits 3 and 4, which was 4.961% as of December 31, 2016 and Once Northern has determined its annual AFUDC rate it uses the formula below to determine its monthly AFUDC rate, compounded semi-annually. Monthly AFUDC Rate = [(1+annual AFUDC rate/2)^2^(1/12)]-1 In 2013, the FERC staff audited Northern s sister company Kern River Gas Transmission Company, to evaluate Kern River s compliance with the Commission s accounting and reporting requirements for calculating and accruing AFUDC. The final audit report filed in Docket No. FA contained no audit findings or recommendations. The Commission further explained the method used by Kern River to determine its AFUDC rate did not exceed the maximum rate permitted by the Commission nor did it compound more frequently than semi-annually. The same AFUDC methodology used by Kern River and audited by FERC staff is used by Northern to calculate and accrue its AFUDC as described above. In , the FERC staff audited Northern to determine compliance with the Commission s account and reporting requirements, which included AFUDC among other Accounting topics. Although the final audit report has not yet been issued, in an exit interview with FERC Staff there were no issues mentioned in regard to AFUDC calculations made by Northern during the audit period.

4

5

May 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 May 22, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426

More information

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 September 6, 2016 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C April 29, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com web

More information

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main June 5, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy

More information

Sierrita is hereby submitting its responses to the April 3, 2018 OEMR Data Request questions.

Sierrita is hereby submitting its responses to the April 3, 2018 OEMR Data Request questions. April 10, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Attention: Re: Ms. Kimberly D. Bose, Secretary Office of Energy Market Regulation Letter Order Pursuant to

More information

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C August 1, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher

More information

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019)

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C April 29, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Director, Rates & Tariffs tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com

More information

Statement of the Nature, Reasons, and Basis for the Filing

Statement of the Nature, Reasons, and Basis for the Filing May 1, 2008 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Operational Purchases and Sales Report Docket No. RP08- Dear Ms. Bose: ("ANR"),

More information

October 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

October 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 5400 Westheimer Court Houston, TX 77056-5310 Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 713.627.5400 main October 5, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

March 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C March 28, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher

More information

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C April 29, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Director, Rates & Tariffs tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com

More information

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C March 25, 2010 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Gas Transmission Northwest Corporation 717 Texas Street, Suite 2400 Houston,

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main August 1, 2017 Ms. Kimberly D. Bose, Secretary Federal

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate Annual

More information

Operational Purchases and Sales Report, Wyoming Interstate Company, L.L.C.; Docket No. RP18-

Operational Purchases and Sales Report, Wyoming Interstate Company, L.L.C.; Docket No. RP18- September 27, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly Bose, Secretary Re: Operational Purchases and Sales Report, Wyoming Interstate

More information

boardman (1 Richard A. Heinemann August 27, 2015

boardman (1 Richard A. Heinemann August 27, 2015 boardman & ci a r k up L A W F I R M Richard A. Heinemann, Attorney 1 SOUTH PINCKNEY STREET, STE. 410, P.O. BOX 927, MADISON, WI 53701-0927 Telephone 608-283-1706 Facsimile 608-283-1709 rheinemann@boardmanclark.com

More information

Mailing Address: P.O. Box 1642 Houston, Texas September 1, 2011

Mailing Address: P.O. Box 1642 Houston, Texas September 1, 2011 Big Sandy Pipeline, LLC 5400 Westheimer Court Houston, TX 77056-5310 Mailing Address: P.O. Box 1642 Houston, Texas 77251-1642 713.627.5400 main September 1, 2011 Ms. Kimberly D. Bose, Secretary Federal

More information

September 30, Part Version Title V LNG Rates

September 30, Part Version Title V LNG Rates Columbia Pipeline Group 5151 San Felipe, Ste 2400, Houston, Texas, USA 77056 Tel: 713.386.3776 slinder@cpg.com Sorana Linder Director, Regulated Services September 30, 2016 Ms. Kimberly D. Bose Federal

More information

Mailing Address: P.O. Box 1642 Houston, TX

Mailing Address: P.O. Box 1642 Houston, TX 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 August 20, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

January 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. January 3, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Columbia Gas Transmission, LLC 700 Louisiana Street, Suite 700 Houston,

More information

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. ANDREW W. TUNNELL t: (205) 226-3439 f: (205) 488-5858 e: atunnell@balch.com BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

GridLiance West Transco LLC Docket No. ES Amendment to Application Under Section 204 of the Federal Power Act

GridLiance West Transco LLC Docket No. ES Amendment to Application Under Section 204 of the Federal Power Act January 12, 2017 VIA ELECTRONIC FILING Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: GridLiance West Transco LLC Docket No. ES17-9-000 Amendment

More information

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. December 6, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, TX 77002-2700 John A. Roscher

More information

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 5, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Tuscarora Gas Transmission Company 700 Louisiana Street, Suite 700 Houston, TX

More information

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company The Dayton Power and Light Company 1065 Woodman Drive, Dayton Ohio 45458 May 8, 2018 Via etariff Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

July 15, 2015 VIA ELECTRONIC FILING

July 15, 2015 VIA ELECTRONIC FILING July 15, 2015 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket No.

More information

October 11, Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C

October 11, Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C October 11, 2018 Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C. 20426 Re: Docket No. RP19- Filing in Compliance with Order No. 849 Form 501-G

More information

March 19, MidAmerican Central California Transco, LLC Docket No. ER

March 19, MidAmerican Central California Transco, LLC Docket No. ER 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax Douglas W. Smith (202) 298-1902 dws@vnf.com March 19, 2019 Via e-filing Kimberly D. Bose Secretary

More information

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 December 6, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 700 Louisiana Street, Suite 700 Houston, TX 77002-2700 John A. Roscher Director,

More information

March 25, 2016 VIA ELECTRONIC FILING

March 25, 2016 VIA ELECTRONIC FILING James P. Johnson Assistant General Counsel 414 Nicollet Mall, 5 th Floor Minneapolis, Minnesota 55401 Phone: 612-215-4592 Fax: 612-215-4544 James.P.Johnson@xcelenergy.com VIA ELECTRONIC FILING Honorable

More information

In addition to this transmittal letter and associated records for the etariff database, this filing includes:

In addition to this transmittal letter and associated records for the etariff database, this filing includes: 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax SUBMITTED VIA E-TARIFF FILING January 4, 2017 Kimberly D. Bose Secretary Federal Energy Regulatory

More information

March 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

March 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 31, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 ANR Pipeline Company 700 Louisiana Street, Suite 700 Houston, TX 77002-2700

More information

December 6, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

December 6, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. December 6, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: FERC Form No. 501-G; ; Docket No. RP19- Commissioners:

More information

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting

Potomac Electric Power Company ( Pepco ), Docket No. ER Informational Filing of 2017 Formula Rate Annual Update; Notice of Annual Meeting Amy L. Blauman Assistant General Counsel Edison Place 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 12, 2017 Ms. Kimberly

More information

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER Hesser G. McBride, Jr. Associate General Regulatory Counsel Law Department 80 Park Plaza, T5G, Newark, NJ 07102-4194 tel: 973.430.5333 fax: 973.430.5983 email: Hesser.McBride@pseg.com June 13, 2016 VIA

More information

MidAmerican Energy Holdings Company, Docket No. HC FERC-61

MidAmerican Energy Holdings Company, Docket No. HC FERC-61 OBSESSIVELY, RELENTLESSLY AT YOUR SERVICE TM P.O. Box 657 Des Moines, Iowa 50306-0657 (515) 242-4099 Telephone (515) 281-2460 Fax E-mail: pjleighton@midamerican.com PAUL J. LEIGHTON Vice President, Assistant

More information

Office Fax pepco.com

Office Fax pepco.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 pepco.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D. Bose

More information

Office Fax delmarva.com

Office Fax delmarva.com Amy L. Blauman Assistant General Counsel EP1132 701 Ninth Street NW Washington, DC 20068-0001 Office 202.872.2122 Fax 202.331.6767 delmarva.com alblauman@pepcoholdings.com May 16, 2016 Ms. Kimberly D.

More information

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2 Karen Koyano Principle Manager FERC Rates and Compliance Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to Section 205 of the Federal Power Act and

More information

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER Gary A. Morgans 202 429 6234 gmorgans@steptoe.com 1330 Connecticut Avenue, NW Washington, DC 20036-1795 202 429 3000 main www.steptoe.com The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

Negotiated Rate Agreements Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Negotiated Rate Agreements Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP19- November 29, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Negotiated Rate Agreements Filing; El

More information

RE: Revision to Southern California Edison Company s Formula Transmission Rate Annual Update in Docket No. ER (Amended TO8)

RE: Revision to Southern California Edison Company s Formula Transmission Rate Annual Update in Docket No. ER (Amended TO8) Regulation James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Revision to Southern California Edison Company s Formula Transmission

More information

Mailing Address: P.O. Box 1642 Houston, TX

Mailing Address: P.O. Box 1642 Houston, TX 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 November 20, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

American Electric Power Service Corporation Docket No. ER10- -

American Electric Power Service Corporation Docket No. ER10- - American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com May 3, 2010 Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E.

More information

STATEMENT OF NATURE, REASONS AND BASIS

STATEMENT OF NATURE, REASONS AND BASIS October 1, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Texas Eastern Transmission, LP, Docket No. RP13- -000 Dear Ms. Bose: Pursuant

More information

March 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17-

March 15, Informational Filing UNS Electric, Inc., Formula Transmission Service Rates Docket No. ER17- 88 E. Broadway Boulevard, Tucson, Arizona 85701 P.O. Box 711, Tucson, Arizona 85702 Amy Welander, Assistant General Counsel Telephone: 520-884-3655 Legal Department, HQE910 Fax: 520-884-3601 awelander@tep.com

More information

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C McGuireWoods LLP 2001 K Street N.W. Suite 400 Washington, DC 20006-1040 Phone: 202.857.1700 Fax: 202.857.1737 www.mcguirewoods.com Julia Dryden English Direct: 202.857.1706 jenglish@mcguirewoods.com Fax:

More information

March 7, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

March 7, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 7, 2012 Re: California Independent

More information

Rover Pipeline LLC Docket No. RP Compliance with Order on Compliance Filing

Rover Pipeline LLC Docket No. RP Compliance with Order on Compliance Filing December 8, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Rover Pipeline LLC Docket No. RP17-772- Compliance with Order on

More information

Berkshire Hathaway Energy Company, Docket No. HC FERC-61, Narrative Description of the Service Company Functions

Berkshire Hathaway Energy Company, Docket No. HC FERC-61, Narrative Description of the Service Company Functions Berkshire Hathaway Energy Company 666 Grand Avenue, Suite 500 Des Moines, Iowa 50309-2580 (515) 242-4099 Telephone (515) 281-2460 Fax E-mail: pjleighton@midamerican.com PAUL J. LEIGHTON Vice President,

More information

Non-Conforming Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Non-Conforming Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19- February 28, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Non-Conforming Negotiated Rate Agreement Update; El Paso

More information

Entergy Services, Inc., Docket No. ER Informational Filing of Annual Transmission Formula Rate Update

Entergy Services, Inc., Docket No. ER Informational Filing of Annual Transmission Formula Rate Update Entergy Services, Inc. 101 Constitution Ave., N.W. Suite 200 East Washington, DC 20001 Tel: 202 530 7323 Fax: 202 530 7350 E-mail: mgriffe@entergy.com Michael C. Griffen Assistant General Counsel Federal

More information

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols

May 18, Black Hills Power, Inc. Docket Nos. ER and EL Compliance Filing Revising Attachment H Formula Rate Protocols Texas New York Washington, DC Connecticut Seattle Dubai London Blake R. Urban Attorney 202.828.5868 Office 800.404.3970 Fax Blake.Urban@bgllp.com Bracewell & Giuliani LLP 2000 K Street NW Suite 500 Washington,

More information

December 19, Cal. Indep. Sys. Operator Corp., 165 FERC 61,140 (2018) (November 19 Order).

December 19, Cal. Indep. Sys. Operator Corp., 165 FERC 61,140 (2018) (November 19 Order). California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 December 19, 2018 Re: California

More information

BILLING CODE P DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. [Docket Nos. RM and RM ]

BILLING CODE P DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. [Docket Nos. RM and RM ] This document is scheduled to be published in the Federal Register on 05/01/2013 and available online at http://federalregister.gov/a/2013-10258, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF ENERGY

More information

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C May 8, 2017 Great Lakes Gas Transmission Company 700 Louisiana Street Houston, TX 77002-2700 John A. Roscher Director, Rates & Regulatory Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

STATEMENT OF NATURE, REASONS AND BASIS

STATEMENT OF NATURE, REASONS AND BASIS Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main March 29, 2018 Ms. Kimberly D. Bose, Secretary Federal

More information

December 17, 2013 VIA ELECTRONIC FILING

December 17, 2013 VIA ELECTRONIC FILING December 17, 2013 VIA ELECTRONIC FILING Ellen Desmond Director of Legal Affairs & Administration New Brunswick Energy and Utilities Board P.O. Box 5001 15 Market Square, Suite 1400 Saint John, NB E2L 4Y9

More information

Docket No. ER July 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity

Docket No. ER July 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity California Independent System Operator Corporation September 14, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Steckman Ridge, LP, Docket No. RP

Steckman Ridge, LP, Docket No. RP December 9, 2009 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Steckman Ridge, LP, Docket No. RP10- -000 Dear Ms. Bose: Steckman

More information

October 4, 2013 VIA ELECTRONIC FILING

October 4, 2013 VIA ELECTRONIC FILING VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: New York Independent System Operator, Inc. s, Report

More information

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION Sidley Austin LLP 701 Fifth Avenue, Suite 4200 Seattle, WA 98104 Baltimore Gas and Electric Company Suite 1301,

More information

Executive Director Regulatory fax

Executive Director Regulatory fax 80 South Jefferson Road Whippany, NJ 07981 Richard A. Askoff raskoff@neca.org Executive Director Regulatory 973 884-8350 fax 973 884-8008 February 26, 2018 Marlene H. Dortch Secretary Federal Communications

More information

SCHIFF HARDIN LLP A Limited Liability Partnership

SCHIFF HARDIN LLP A Limited Liability Partnership SCHIFF HARDIN LLP A Limited Liability Partnership Owen E. MacBride (312) 258-5680 Email: omacbride@schiffhardin.com 233 SOUTH WACKER DRIVE SUITE 6600 CHICAGO, ILLINOIS 60606 Tel.: 312.258.5500 Fax: 312.258.5700

More information

SOUTHERN CALIFORNIA EDISON COMPANY

SOUTHERN CALIFORNIA EDISON COMPANY UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER17- -000 SOUTHERN CALIFORNIA EDISON COMPANY ANNUAL UPDATE FILING OF THE TRANSMISSION

More information

January 25, By Electronic Filing

January 25, By Electronic Filing Gary J. Newell P 202.370.0137 F 202.370.0143 gnewell@jsslaw.com Jennings, Strouss & Salmon, P.L.C. 1350 I Street, NW Suite 810 Washington, D.C. 200053305 jsslaw.com January 25, 2019 By Electronic Filing

More information

SOUTHERN CALIFORNIA EDISON COMPANY

SOUTHERN CALIFORNIA EDISON COMPANY UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER18- -000 SOUTHERN CALIFORNIA EDISON COMPANY ANNUAL UPDATE FILING OF THE TRANSMISSION

More information

September 1, Southern California Edison Company/ Docket No. ER

September 1, Southern California Edison Company/ Docket No. ER Anna J. Valdberg Senior Attorney anna.valdberg@sce.com September 1, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Southern California

More information

May 30, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

May 30, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: NERC Full Notice of Penalty regarding, FERC Docket No. NP12-_-000 Dear Ms. Bose: The

More information

October 8, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

October 8, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. October 8, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Duke Energy Carolinas, LLC; Carolina Power & Light Company;

More information

January 22, Compliance Filing of Virginia Electric and Power Company Docket No. EL

January 22, Compliance Filing of Virginia Electric and Power Company Docket No. EL Troutman Sanders LLP 401 9th Street, N. W., Suite 1000 Washington, D.C. 200042134 troutman.com Anne K. Dailey anne.dailey@troutman.com January 22, 2019 The Honorable Kimberly D. Bose, Secretary Federal

More information

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 December 23, 2014 By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Nevada Power Company and Sierra Pacific Power Company,

More information

SCHIFF HARDIN LLP A Limited Liability Partnership

SCHIFF HARDIN LLP A Limited Liability Partnership SCHIFF HARDIN LLP A Limited Liability Partnership Owen E. MacBride (312) 258-5680 Email: omacbride@schiffhardin.com 233 SOUTH WACKER DRIVE SUITE 6600 CHICAGO, ILLINOIS 60606 Tel.: 312.258.5500 Fax: 312.258.5700

More information

December 18, Filing in Compliance with November 26, 2018 Order Docket No. ER

December 18, Filing in Compliance with November 26, 2018 Order Docket No. ER California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 December 18, 2018 Re: California

More information

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %.

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %. May 25, 2017 Transmittal Letter No. 34 Kim Christiansen, Executive Director Kansas Corporation Commission 1500 S.W. Arrowhead Road Topeka, KS 66604-4027 Dear Ms. Christiansen, Magellan Pipeline Company,

More information

June 29, 2016 VIA OVERNIGHT MAIL

June 29, 2016 VIA OVERNIGHT MAIL !! June 29, 2016 VIA OVERNIGHT MAIL Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3 rd Floor 1601 Lower Water Street P.O. Box 1692, Unit M Halifax, Nova Scotia B3J

More information

January 31, Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

January 31, Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 January 31, 2011 Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: NERC Abbreviated Notice of Penalty regarding Sharyland Utilities, LP, as

More information

Transmission Access Charge Informational Filing

Transmission Access Charge Informational Filing California Independent System Operator September 27, 213 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 2426 Re: California Independent

More information

Re: Rockland Electric Company, Docket No. EL18-111

Re: Rockland Electric Company, Docket No. EL18-111 Margaret Comes Associate Counsel Rockland Electric Company 4 Irving Place, Room 1815-S, New York, NY 10003 Tel.: 212-460-3013 Email: comesm@coned.com May 14, 2018 Hon. Kimberly D. Bose Secretary Federal

More information

Docket No. ER April 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity

Docket No. ER April 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity California Independent System Operator Corporation June 13, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

NECA 2016 Further Modification of the Average Schedule Universal Service High Cost Loop Support Formula, WC Docket No

NECA 2016 Further Modification of the Average Schedule Universal Service High Cost Loop Support Formula, WC Docket No 80 South Jefferson Road Whippany, NJ 07981 Richard A. Askoff raskoff@neca.org Executive Director Regulatory 973 884-8350 fax 973 884-8008 May 13, 2016 Marlene H. Dortch Secretary Federal Communications

More information

September 30, 2016 VIA ELECTRONIC FILING

September 30, 2016 VIA ELECTRONIC FILING September 30, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket

More information

March 26, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

March 26, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. March 26, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Negotiated Rate Agreements Filing; ; Docket No. RP19- Commissioners:

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Accrual of Allowance for Funds Used ) Docket No. AD10-3-000 During Construction ) MOTION FOR LEAVE TO FILE COMMENTS OUT-OF-TIME

More information

Re: NERC Notice of Penalty regarding East Kentucky Power Cooperative, FERC Docket No. NP10-_-000

Re: NERC Notice of Penalty regarding East Kentucky Power Cooperative, FERC Docket No. NP10-_-000 November 13, 2009 Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: NERC Notice of Penalty regarding East Kentucky Power Cooperative, FERC

More information

October 11, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

October 11, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. October 11, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: FERC Form No. 501-G; ; Docket No. RP19- Commissioners:

More information

STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE THREE EMPIRE STATE PLAZA, ALBANY, NY

STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE THREE EMPIRE STATE PLAZA, ALBANY, NY STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE THREE EMPIRE STATE PLAZA, ALBANY, NY 12223-1350 www.dps.ny.gov PUBLIC SERVICE COMMISSION AUDREY ZIBELMAN Chair PATRICIA L. ACAMPORA GARRY A. BROWN GREGG C.

More information

NERC Abbreviated Notice of Penalty regarding Sierra Pacific Power Company, FERC Docket No. NP

NERC Abbreviated Notice of Penalty regarding Sierra Pacific Power Company, FERC Docket No. NP January 31, 2011 Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: NERC Abbreviated Notice of Penalty regarding Sierra Pacific Power Company,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability ) Corporation ) Docket No. FA11-21-000 COMPLIANCE FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

SIDLEY AUSTIN LLP 701 FIFTH AVENUE, SUITE 4200 SEATTLE, WA AMERICA ASIA PACIFIC EUROPE

SIDLEY AUSTIN LLP 701 FIFTH AVENUE, SUITE 4200 SEATTLE, WA AMERICA ASIA PACIFIC EUROPE SIDLEY AUSTIN LLP 701 FIFTH AVENUE, SUITE 4200 SEATTLE, WA 98104 AMERICA ASIA PACIFIC EUROPE SBERMAN@SIDLEY.COM +1 206 262 7681 October 1, 2018 Via etariff Filing Kimberly D. Bose Secretary Federal Energy

More information

December 31, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

December 31, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. December 31, 2012 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: NERC Spreadsheet Notice of Penalty FERC Docket No. NP13- -000 Dear

More information

If there are any questions concerning this filing, please contact the undersigned.

If there are any questions concerning this filing, please contact the undersigned. California Independent System Operator Corporation June 13, 2008 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: One Hundred

More information

August 24, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

August 24, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation August 24, 2007 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: One Hundred

More information

Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17-

Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17- September 21, 2017 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Non-Conforming, Negotiated Rate Transportation Service

More information

Exhibits 1a through 1e Average ROE for UI Distribution of 9.81% for the twelve months ended March 31, 2018.

Exhibits 1a through 1e Average ROE for UI Distribution of 9.81% for the twelve months ended March 31, 2018. May 4, 2018 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 76-03-07 Investigation to Consider Rate Adjustment

More information

January 25, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 25, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 25, 2008 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: One Hundred

More information

Re: NERC Notice of Penalty regarding Hopewell Cogeneration Limited Partnership, FERC Docket No. NP09-_-000

Re: NERC Notice of Penalty regarding Hopewell Cogeneration Limited Partnership, FERC Docket No. NP09-_-000 January 7, 2009 Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: NERC Notice of Penalty regarding, FERC Docket No. NP09-_-000 Dear Ms.

More information