Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17-

Size: px
Start display at page:

Download "Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17-"

Transcription

1 September 21, 2017 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. Bose, Secretary Re: Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17- Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") hereby tenders for filing and acceptance by the Federal Energy Regulatory Commission ("Commission" or FERC ) the tariff records listed in the attached Appendix A. The tariff records reflect the addition of a new non-conforming, negotiated rate transportation service agreement ( TSA ) to EPNG s FERC Gas Tariff, Third Revised Volume No. 1A ( Tariff ). The tariff records are proposed with an effective date of November 1, Reason for Filing In accordance with Section (b) of the Commission s regulations, EPNG is submitting TSA No. FT3HG000 with WPX Energy Marketing, LLC ( WPX ) for the Commission s review and acceptance as a non-conforming, negotiated rate TSA. 1 As described below, the TSA contains non-conforming provisions that are not included in EPNG s Rate Schedule FT-1 Form of Service Agreement ( Pro Forma ). Accordingly, EPNG is proposing to update its Tariff to reflect WPX s TSA. Description of Filing As part of contract negotiations, WPX and EPNG agreed to non-conforming provisions in TSA No. FT3HG000 2 that address the recovery of carbon tax and 1 2 EPNG notes that subsequent to the original execution of this TSA, but prior to its effective date, WPX and EPNG amended the TSA: (i) to extend the contract date, (ii) to delete a primary point of delivery and related footnote and pressure information displayed on Exhibit A, (iii) to add a contractual right of first refusal, and (iv) to allow electronic execution of the TSA. TSA No. FT3HG000 is a seven year term agreement that provides for a maximum quantity of 55,000 Dth per day of firm transportation capacity at a negotiated rate.

2 Federal Energy Regulatory Commission 2 September 21, 2017 greenhouse gas costs, the modification and construction of facilities, 3 creditworthiness and a future obligation to remove outdated non-conforming provisions from the TSA. As further described herein, EPNG requests that the Commission review and accept such non-conforming provisions. Recovery of Carbon Tax and Greenhouse Gas Costs Paragraph 6 includes a provision that addresses the possibility that the Commission may authorize EPNG to recover carbon tax and greenhouse gas emission costs ( Greenhouse Gas Costs ). Greenhouse Gas Costs include any carbon emissions tax or other greenhouse assessment imposed on EPNG including, but not limited to, any command or control costs, cap and trade costs, or any other greenhouse gas emissions-related costs arising from any statutory or regulatory framework. If FERC determines that such costs are recoverable only through EPNG s Commissionapproved recourse rates, then EPNG and WPX have agreed that the fixed negotiated reservation rate for service shall be increased by the amount of EPNG s maximum reservation rate under Rate Schedule FT-1 that is attributable to such Greenhouse Gas Costs. The Commission has previously accepted contract language proposing similar provisions. 4 Term of Agreement, Commitment to Good Faith Negotiations and Construction Language Paragraph 9 of the FT-1 Pro Forma provides a fill-in-the-blank provision for the term of the agreement. This provision allows for beginning and ending dates, construction requirements, extension rights, contractual right-of-first-refusal language as well as termination provisions. Paragraph 9 of WPX s TSA specifies that the term of the TSA will begin on the later of the in-service date of the Wink Compressor Modifications or November 1, 2017 and end on the later of November 30, 2024 or seven years from the In-Service Date of the Wink Compressor Modifications Such facilities will include the installation of minor Section 2.55(a) auxiliary facilities and plant yard piping modifications at an existing compressor station ( Wink Compressor Modifications ) that provide EPNG greater operational flexibility at the compressor station. EPNG will also construct a new receipt interconnect point, with associated metering facilities. The new meter station will be built pursuant to EPNG s blanket certificate authority. See El Paso Natural Gas Company L.L.C., unpublished letter orders dated May and July 28, 2016 in Docket No. RP , Colorado Interstate Gas Company, L.L.C. unpublished letter order in Docket No. RP dated March 19, 2015, and El Paso Natural Gas Company, L.L.C., unpublished letter order in Docket No. RP dated March 27, The in-service date is further defined in Paragraph 11 of the TSA. While the Pro Forma provides a fill-in-the-blank for Transportation Contract Demand and for specific time periods in this paragraph, EPNG and WPX have clarified that the in-service date shall mean the date (i) the Wink Compressor Modifications are ready for service and (ii) EPNG is authorized to place the Wink Compressor Modifications into service. While the addition of this provision provides further clarity as to the TSA s effective time period, it is not specifically included in the Pro Forma. As such, EPNG is providing the language to the Commission for review.

3 Federal Energy Regulatory Commission 3 September 21, 2017 Paragraph 9 contemplates that if for any reason FERC does not accept this TSA, then EPNG and WPX shall negotiate in good faith and enter into an amended TSA such that the amendment affects the original intent of the parties as closely as possible and facilitates approval of the amended agreement by the FERC. In such event, EPNG will seek approval of the amended TSA as soon as reasonably practicable. While EPNG s Pro Forma allows for a fill-in-the-blank for the term of the TSA and facility construction, it does not include language addressing further good faith negotiations if FERC fails to accept the TSA. Thus, EPNG is submitting this language for review. Paragraph 9 of the WPX TSA also includes a provision recognizing that EPNG must construct interconnect facilities in order to provide transportation service from the primary receipt point set forth in the TSA. EPNG will construct new receipt interconnect and meter station facilities in Loving County, TX ( WPX Interconnect ). The new metering facilities will be capable of accepting and measuring gas receipts of up to 95,000 Dth per day. Commencing on April 1, 2017, EPNG is obligated to provide WPX with bi-weekly reports on the status of the construction of facilities and projections of In- Service dates. Further, Paragraph 9 provides that EPNG s obligation to construct the WPX Interconnect and the Wink Compressor Modifications is subject to two conditions precedent. First, EPNG s obligation to construct the new WPX Interconnect and the Wink Compressor Modifications is subject to EPNG receiving all necessary approvals and authorizations from its senior management and/or from EPNG s Board of Directors and/or its appropriate parent company by November 25, Additionally, EPNG must receive all necessary regulatory approvals, permits, and other authorizations required for the construction and operation of the facilities, in a form and substance satisfactory to EPNG in its sole discretion. Pursuant to the terms of Paragraph 9, only EPNG has the right to waive such conditions precedent. If these conditions precedent are not fully satisfied, the EPNG may terminate the TSA. This language is not provided in EPNG s Pro Forma. Accordingly, EPNG is submitting the language for review. Creditworthiness EPNG and WPX have agreed to creditworthiness related provisions in Paragraph 14 of the TSA. Paragraph 14 provides that during the term of the TSA, WPX shall demonstrate and maintain satisfaction of creditworthiness in accordance with EPNG s Tariff. 7 If at any time during the term of the TSA WPX is unable to satisfy the Tariff s general creditworthiness provisions, WPX shall provide additional credit support. This additional support will be in the form of a letter of credit, a guaranty from a party that satisfies the creditworthiness standards, or such other form that is acceptable to EPNG in its sole discretion. Such credit support shall be at least equal to 18 months of anticipated charges ( Enhanced Credit Support ) for the first 2 years such capacity is 6 7 EPNG has already obtained such senior management approvals. See General Terms and Conditions, Section 4.16 in EPNG s Tariff.

4 Federal Energy Regulatory Commission 4 September 21, 2017 available under this TSA, and thereafter shall equal the amount of credit support authorized in the EPNG s Tariff for sales of existing capacity. The Enhanced Credit Support shall be provided to EPNG at least 90 days prior to the anticipated In-Service Date of the Wink Compressor Modifications. WPX shall not be required to maintain the Enhanced Credit Support for a period longer than 27 months. The specification of the creditworthiness requirement is necessary to provide EPNG greater financial security given that EPNG will be required to construct new pipeline and metering facilities in order to provide the requested service and provide WPX certainty. Although this language is non-conforming, EPNG believes this provision is an acceptable deviation and respectfully requests the Commission accept this non-conforming provision. 8 Elimination of Non-Conforming Provisions Paragraph 16 of the TSA provides that upon satisfaction of any condition to the TSA, or the completion of any action which causes a provision in this TSA to no longer be relevant, EPNG and WPX shall execute a replacement TSA. The replacement TSA will omit the outdated provisions but all other terms of the TSA shall remain unchanged. Since EPNG s Pro Forma does not include provide for such administrative updates, EPNG is submitting this language for review. EPNG believes this provision is an acceptable deviation from the Pro Forma and respectfully requests the Commission accept this non-conforming provision. Negotiated Rate Section 4.18 of the GT&C allows EPNG and a shipper to agree to a service rate that varies from the minimum-to-maximum range provided in the Tariff s Statement of Rates. Pursuant to that provision, EPNG and WPX have agreed to a negotiated fixed monthly reservation rate for TSA No. FT3HG000. Specifically, Exhibit B, Footnote 1a of the TSA contains a negotiated reservation rate of $3.65 per Dth per month that is not subject to the applicable maximum or minimum Rate Schedule FT-1 recourse reservation rate for the corresponding rate zone. The negotiated rate will allow EPNG to fully recover the costs of the lateral and meter station over the course of the TSA s term. EPNG requests that the Commission accept this negotiated rate. 8 The Commission has previously approved similar creditworthiness provisions. See El Paso Natural Gas Company, L.L.C., unpublished letter order in Docket No. RP dated March 27, 2013, Colorado Interstate Gas Company, L.L.C., unpublished letter order in Docket No. RP dated September 27, 2011; and El Paso Natural Gas Company, L.L.C, unpublished letter order in Docket No. RP dated December 20, 2013.

5 Federal Energy Regulatory Commission 5 September 21, 2017 Tariff Provisions EPNG is submitting the following tariff records pursuant to Section (b) (2016) and Subpart C of the Commission's regulations. Part VII, Sections through are updated to display the WPX nonconforming, negotiated rate agreement described above. Procedural Matters Inasmuch as this filing is fully described herein, the statement of the nature, the reasons and the basis for the instant tariff filing required by Section 154.7(a)(6) (2016) of the Commission's regulations is omitted. In accordance with the applicable provisions of Part 154 of the Commission's regulations, EPNG is submitting an etariff XML filing package, which includes the following: a) a transmittal letter; b) Appendix A, a list of the proposed tariff records; c) Appendix B, a marked version of the non-conforming, negotiated rate TSA reflecting changes from the Pro Forma; d) Appendix C, a copy of the executed agreement; and e) clean and marked versions of each tariff record in PDF format. EPNG respectfully requests the Commission accept the tendered tariff records for filing and permit them to become effective on November 1, 2017 coincident with the effective date of the TSA. With respect to any tariff provisions the Commission allows to go into effect without change, EPNG hereby moves to place the tendered tariff provisions into effect at the end of the suspension period. Additionally, pursuant to 18 C.F.R (a)(7) (2016) of the Commission's regulations, EPNG respectfully requests that the Commission grant all waivers necessary to effectuate this filing. to: Correspondence and communications concerning this filing should be directed Mr. Francisco Tarin Mr. Mark A. Minich Director, Regulatory Assistant General Counsel El Paso Natural Gas Company, L.L.C. El Paso Natural Gas Company, L.L.C. Post Office Box 1087 Post Office Box 1087 Colorado Springs, CO Colorado Springs, CO Telephone: (719) Telephone: (719) Facsimile: (719) Facsimile: (719) EPNGRegulatoryAffairs@kindermorgan.com Mark_Minich@kindermorgan.com

6 Federal Energy Regulatory Commission 6 September 21, 2017 These persons have been designated for service in accordance with Rule 203 of the Commission's Rules of Practice and Procedure. The undersigned hereby certifies that he has read this filing and knows (i) the contents of such filing and the attachments; (ii) that the contents as stated in the filing and in the attachments are true to the best of his knowledge and belief; and (iii) that he possesses full power and authority to sign this filing. Respectfully submitted, EL PASO NATURAL GAS COMPANY, L.L.C. By /s/ Francisco Tarin Director Regulatory Enclosures

7 Certificate of Service I hereby certify that I have this day caused a copy of the foregoing document to be served upon all shippers on EPNG s pipeline system and interested state regulatory commissions, in accordance with the requirements of Sections and of the Commission's Rules of Practice and Procedures. Dated at Colorado Springs, Colorado as of this 21 st day of September /s/ Francisco Tarin Post Office Box 1087 Colorado Springs, CO (719)

8 EL PASO NATURAL GAS COMPANY, L.L.C. Non-Conforming, Negotiated Rate Agreement Filing Appendix A Third Revised Volume No. 1A Part VII: Non-Conforming Agreements Section WPX Energy Marketing, LLC # FT3HG000 Version Section WPX Energy Marketing, LLC #FT3HG000 Exh A Version Section WPX Energy Marketing, LLC #FT3HG000 Exh B Version 0.0.0

9 Appendix B

10 Agreement No. FT3HG000 Firm Transportation Service Agreement Rate Schedule FT-1 between El Paso Natural Gas Company, L.L.C. and WPX Energy Marketing, LLC Dated: November 1, 2017

11 Agreement No. FT3HG000 Transportation Service Agreement Rate Schedule FT-1 Dated: November 1, 2017 The Parties identified below, in consideration of their mutual promises, agree as follows: 1. Transporter: EL PASO NATURAL GAS COMPANY, L.L.C. 2. Shipper: WPX ENERGY MARKETING, LLC 3. Applicable Tariff: Transporter's FERC Gas Tariff Third Revised Volume No. 1A, as the same may be amended or superseded from time to time ("Tariff"). Capitalized terms used in this Agreement and not defined elsewhere have the meanings given to them in the Tariff. 4. Incorporation by Reference: This Agreement in all respects shall be subject to the provisions of Rate Schedule FT-1 and to the applicable provisions of the General Terms and Conditions of the Tariff as filed with, and made effective by, the FERC as same may change from time to time. 5. Transportation service at and between primary receipt points and primary delivery points shall utilize a Flow Path and shall be transported on a firm basis in accordance with the Tariff. Receipt Points, Delivery Points and Flow Paths: Shipper agrees to tender gas for transportation service and Transporter agrees to accept receipt quantities at the primary receipt points identified in Exhibit A. Transporter agrees to provide transportation service and deliver gas to Shipper (or for Shipper's account) at the primary delivery points identified in Exhibit A. Receipts and deliveries of gas for transportation service shall be accommodated by the Flow Path(s) identified on Exhibit A. Minimum and maximum delivery pressures, as applicable, are listed on Exhibit A. 6. Rates and Surcharges: As set forth in Exhibit B, Shipper shall pay the applicable maximum tariff rate unless otherwise provided. Transporter and Shipper may mutually agree to a discounted rate pursuant to the rate provisions of Rate Schedule FT-1 and Section 4.17 of the General Terms and Conditions. Recovery for Carbon Tax and Greenhouse Gas Costs: Shipper shall pay Transporter for any FERC-approved costs incurred by Transporter in connection with any greenhouse gas emissions tax or charges imposed on Transporter including, but not limited to, any command and control costs, cap and trade costs, or any other greenhouse gas emissions-related costs arising from any statutory or regulatory framework whatsoever ( Greenhouse Gas Costs ). If FERC authorizes the recovery of Greenhouse Gas Costs only through Transporter s reservation rates, then Shipper will agree to modify its negotiated fixed monthly Reservation Rate under this Agreement by the amount of Transporter s maximum reservation rate under Rate Schedule FT-1 that is attributable to such costs. 7. Exhibits A and B attached to this Agreement, are hereby incorporated by reference as part of this Agreement. 8. Negotiated Rate Agreement: Yes X No 9. Term of Agreement: Beginning: The later of November 1, 2017 or the In-Service Date of the Wink Compressor Modifications Ending: The later of November 30, 2024 or seven (7) years from the In-Service Date of the Wink Compressor Modifications 1

12 Agreement No. FT3HG000 If the FERC for any reason does not accept this Agreement for filing, then Transporter and Shipper shall negotiate in good faith and enter into an amended Firm Transportation Service Agreement so as to (i) effect the original intent of the parties as closely as possible in order that the transaction contemplated herein is consummated as originally contemplated to the fullest extent possible and (ii) facilitate approval of the amended agreement by the FERC. In such event, Transporter shall seek FERC approval of the amended Firm Transportation Service Agreement as soon as reasonably practicable. A contractual right of first refusal shall apply to this Agreement, pursuant to Section 4.14 of the General Terms and Conditions. Construction of Facilities: In order to provide transportation service for Shipper under this Agreement, the Parties recognize that Transporter must construct additional facilities that will include certain piping modifications at the Wink compressor station, which will be hereinafter referred to as the ( Wink Compressor Modifications ). Transporter shall also construct a new interconnect facility on Transporter s Line No at or near milepost 976 in Loving County, Texas, and associated metering facilities capable of accepting and measuring gas receipts of up to 95,000 Dth/day, such interconnect facilities will be hereinafter referred to as the ( WPX Interconnect ). Shipper shall enter into, or cause an affiliate to enter into, a mutually agreeable Interconnect Agreement with Transporter for the WPX Interconnect. Commencing April 1, 2017, Transporter shall provide Shipper bi-weekly reports on the status of the construction of the facilities described above and projections of the in-service dates. Transporter s obligation to construct the WPX Interconnect and the Wink Compressor Modifications and to provide firm transportation service is expressly made subject to the following two (2) conditions precedent, and only Transporter shall have the right to waive such conditions precedent: (a) Receipt of all necessary approvals and authorizations for the construction of the Wink Compressor Modifications and the WPX Interconnect from the senior management of Transporter and/or from the Board of Directors of Transporter and/or its appropriate parent company by November 25, 2016; and (b) The receipt by Transporter of all necessary regulatory approvals, permits, and other authorizations required for the construction and operation of the WPX Interconnect and the Wink Compressor Modifications in a form and substance satisfactory to Transporter in its sole discretion. If the immediately preceding conditions precedent are not fully satisfied then Transporter may terminate this Agreement. 10. Effect on Prior Agreement(s): When this Agreement becomes effective, it shall amend and restate the following agreement(s) between the Parties: Agreement No. FT3HG000 originally dated November 1,

13 Agreement No. FT3HG Transportation Contract Demand ("TCD"): TCD (Dth/d) Time Period 55,000 See 9 Subject to this Paragraph 11, In-Service Date shall mean the date (i) the Wink Compressor Modifications are completed and ready for service, and (ii) Transporter is authorized to place the Wink Compressor Modifications into service. 12. Notices, Statements, and Bills: To Shipper: WPX Energy Marketing, LLC 3500 One Williams Center, Suite 3400 Tulsa, OK Attn: Contract Management Fax: (539) To Transporter: See Points of Contact in the Tariff. 13. Changes in Rates and Terms: Transporter shall have the right to propose to the FERC changes in its rates and terms of service, and this Agreement shall be deemed to include any changes which are made effective pursuant to FERC Order or regulation or provisions of law, without prejudice to Shipper's right to protest the same. 14. Creditworthiness: Shipper shall demonstrate, and maintain throughout the term of this Agreement, satisfaction of creditworthiness requirements of the GT&C of Transporter s Tariff. In the event Shipper is unable to satisfy the general creditworthiness provisions set forth in Transporter s Tariff, Shipper shall provide additional credit support (in the form of a Letter of Credit, a guaranty from a party that satisfies the creditworthiness standards, or such other form that is acceptable to Transporter in its sole discretion). Such credit support shall be at least equal to 18 months of anticipated charges (the Enhanced Credit Support ) for the first 2 years such capacity is available under this Agreement, and thereafter shall equal the amount of credit support authorized in the Transporter s Tariff for sales of existing capacity. The Enhanced Credit Support shall be provided to Transporter at least 90 days prior to the anticipated In-Service Date of the Wink Compressor Modifications. Shipper shall not be required to maintain the Enhanced Credit Support for a period longer than 27 month 15. Governing Law: Transporter and Shipper expressly agree that the laws of the State of Colorado shall govern the validity, construction, interpretation and effect of this Agreement and of the applicable Tariff provisions. This Agreement is subject to all applicable rules, regulations, or orders issued by any court or regulatory agency with proper jurisdiction. (Agreements executed prior to January 1, 2006 will be subject to the governing law provisions stated in such Agreements.) 16. Elimination of Non-Conforming Provisions: Upon the satisfaction of any condition to this Agreement, or the completion of any action which causes provisions of this Agreement to be no longer relevant, Transporter and Shipper shall execute a replacement Agreement with each of such conditions and/or provisions omitted, but with all other terms of this Agreement unchanged. Transporter and Shipper will exercise reasonable efforts to minimize the number of replacement Agreements 3

14 Agreement No. FT3HG000 IN WITNESS HEREOF, the Parties have caused this Agreement to be electronically executed, by their duly authorized officers, the Day and Year first set forth herein. WPX ENERGY MARKETING, LLC EL PASO NATURAL GAS COMPANY, L.L.C. By Name By Will W. Brown Vice President-Business Development Title Date Date 4

15 Effective Dates: See 9 EXHIBIT A To The Transportation Service Agreement Between El Paso Natural Gas Company, L.L.C. (Transporter) and WPX Energy Marketing, LLC (Shipper) Dated: November 1, 2017 Agreement No. FT3HG000 Maximum Quantity - D-Code (Dth/d) 1/ Primary Receipt Point(s) / Location(s) (Scheduling Code(s)) IRAMSEYS prior to the inservice date of the new WPX Interconnect (anticipated to be November 1, 2017). The new WPX Interconnect would be the primary receipt point thereafter. Receipt Loc Code(s) / Primary Delivery Point(s) / Location(s) (Scheduling Code(s)) Delivery Loc Code(s) Flow Path January February March April May June July August September October November December TBD ILONEWA VA 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 Delivery Pressure (p.s.i.g.) Not less than 2/ Delivery Pressure (p.s.i.g.) Not greater than 2/ TRANSPORTATION CONTRACT DEMAND 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 Shipper's Transportation Contract Demand: See Paragraph 11 1/ The sum of the Maximum Quantities identified above is equal to Shipper's Transportation Contract Demand for that Month. 2/ Unless otherwise specified on this Exhibit A, the pressure(s) for the point(s) listed above shall be the pressure existing from time to time at the metering facility; provided, however, El Paso reserves the right to deliver quantities at pressures up to the MAOP of that facility.

16 EXHIBIT B To The Transportation Service Agreement Between El Paso Natural Gas Company, L.L.C. (Transporter) and WPX Energy Marketing, LLC (Shipper) Dated: November 1, 2017 Agreement No. FT3HG000 Primary Receipt Point(s) As listed in Exhibit A Primary Delivery Point(s) Effective Dates Reservation Rate 1/ Usage Rate 1/ Fuel 2/ Surcharges 3/ As listed in Exhibit A See See 9 (1a) Primary and Alternate Receipt Point(s) / Location(s) (Scheduling Code(s)) Receipt Loc Code(s) Primary and Alternate Delivery Point(s) / Location(s) (Scheduling Code(s)) Delivery Loc Code(s) Effective Dates Reservation Rate 1/ Usage Rate 1/ Fuel 2/ Surcharges 3/ IRAMSEYS WPX Interconnect TBD IMOBILWA IWESTARW IOASISWA ILONEWA IVALEROW WAHATRAN DPECSTRL See 9 (1a) 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter's maximum rates for service under Rate Schedule FT-1; as such rates may be changed from time to time. 1a - As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s): $ per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter's Tariff.

17 EXHIBIT B To The Transportation Service Agreement Between El Paso Natural Gas Company, L.L.C. (Transporter) and WPX Energy Marketing, LLC (Shipper) Dated: November 1, 2017 Agreement No. FT3HG000 2/ Fuel and L&U shall be as stated on Transporter's Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: All applicable surcharges, unless otherwise specified, shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time, unless otherwise agreed to by the Parties.

18 Appendix C

19

20

21

22

23

24

25

26 CLEAN TARIFF SECTIONS

27 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG000 Firm Transportation Service Agreement Rate Schedule FT-1 between El Paso Natural Gas Company, L.L.C. and WPX Energy Marketing, LLC Dated: November 1, 2017 Issued on: September 21, 2017 Effective on: November 1, 2017

28 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Transportation Service Agreement Rate Schedule FT-1 Dated: November 1, 2017 Agreement No. FT3HG000 The Parties identified below, in consideration of their mutual promises, agree as follows: 1. Transporter: EL PASO NATURAL GAS COMPANY, L.L.C. 2. Shipper: WPX ENERGY MARKETING, LLC 3. Applicable Tariff: Transporter's FERC Gas Tariff Third Revised Volume No. 1A, as the same may be amended or superseded from time to time ("Tariff"). Capitalized terms used in this Agreement and not defined elsewhere have the meanings given to them in the Tariff. 4. Incorporation by Reference: This Agreement in all respects shall be subject to the provisions of Rate Schedule FT-1 and to the applicable provisions of the General Terms and Conditions of the Tariff as filed with, and made effective by, the FERC as same may change from time to time. 5. Transportation service at and between primary receipt points and primary delivery points shall utilize a Flow Path and shall be transported on a firm basis in accordance with the Tariff. Receipt Points, Delivery Points and Flow Paths: Shipper agrees to tender gas for transportation service and Transporter agrees to accept receipt quantities at the primary receipt points identified in Exhibit A. Transporter agrees to provide transportation service and deliver gas to Shipper (or for Shipper's account) at the primary delivery points identified in Exhibit A. Receipts and deliveries of gas for transportation service shall be accommodated by the Flow Path(s) identified on Exhibit A. Minimum and maximum delivery pressures, as applicable, are listed on Exhibit A. 6. Rates and Surcharges: As set forth in Exhibit B, Shipper shall pay the applicable maximum tariff rate unless otherwise provided. Transporter and Shipper may mutually agree to a discounted rate pursuant to the rate provisions of Rate Schedule FT-1 and Section 4.17 of the General Terms and Conditions. Recovery for Carbon Tax and Greenhouse Gas Costs: Shipper shall pay Transporter for any FERC-approved costs incurred by Transporter in connection with any greenhouse gas emissions tax or charges imposed on Transporter including, but not limited to, any command and control costs, cap and trade costs, or any other greenhouse gas emissions-related costs arising from any statutory or regulatory framework whatsoever ( Greenhouse Gas Costs ). If FERC authorizes the recovery of Greenhouse Gas Costs only through Transporter s reservation rates, then Shipper will agree to modify its negotiated fixed monthly Reservation Rate under this Agreement by the amount of Transporter s maximum reservation rate under Rate Schedule FT-1 that is attributable to such costs. Issued on: September 21, 2017 Effective on: November 1, 2017

29 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG Exhibits A and B attached to this Agreement, are hereby incorporated by reference as part of this Agreement. 8. Negotiated Rate Agreement: Yes X No 9. Term of Agreement: Beginning: The later of November 1, 2017 or the In-Service Date of the Wink Compressor Modifications Ending: The later of November 30, 2024 or seven (7) years from the In-Service Date of the Wink Compressor Modifications If the FERC for any reason does not accept this Agreement for filing, then Transporter and Shipper shall negotiate in good faith and enter into an amended Firm Transportation Service Agreement so as to (i) effect the original intent of the parties as closely as possible in order that the transaction contemplated herein is consummated as originally contemplated to the fullest extent possible and (ii) facilitate approval of the amended agreement by the FERC. In such event, Transporter shall seek FERC approval of the amended Firm Transportation Service Agreement as soon as reasonably practicable. A contractual right of first refusal shall apply to this Agreement, pursuant to Section 4.14 of the General Terms and Conditions. Construction of Facilities: In order to provide transportation service for Shipper under this Agreement, the Parties recognize that Transporter must construct additional facilities that will include certain piping modifications at the Wink compressor station, which will be hereinafter referred to as the ( Wink Compressor Modifications ). Transporter shall also construct a new interconnect facility on Transporter s Line No at or near milepost 976 in Loving County, Texas, and associated metering facilities capable of accepting and measuring gas receipts of up to 95,000 Dth/day, such interconnect facilities will be hereinafter referred to as the ( WPX Interconnect ). Shipper shall enter into, or cause an affiliate to enter into, a mutually agreeable Interconnect Agreement with Transporter for the WPX Interconnect. Commencing April 1, 2017, Transporter shall provide Shipper bi-weekly reports on the status of the construction of the facilities described above and projections of the in-service dates. Transporter s obligation to construct the WPX Interconnect and the Wink Compressor Modifications and to provide firm transportation service is expressly made subject to the following two (2) conditions precedent, and only Transporter shall have the right to waive such conditions precedent: Issued on: September 21, 2017 Effective on: November 1, 2017

30 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG000 (a) Receipt of all necessary approvals and authorizations for the construction of the Wink Compressor Modifications and the WPX Interconnect from the senior management of Transporter and/or from the Board of Directors of Transporter and/or its appropriate parent company by November 25, 2016; and (b) The receipt by Transporter of all necessary regulatory approvals, permits, and other authorizations required for the construction and operation of the WPX Interconnect and the Wink Compressor Modifications in a form and substance satisfactory to Transporter in its sole discretion. If the immediately preceding conditions precedent are not fully satisfied then Transporter may terminate this Agreement. 10. Effect on Prior Agreement(s): When this Agreement becomes effective, it shall amend and restate the following agreement(s) between the Parties: Agreement No. FT3HG000 originally dated November 1, Transportation Contract Demand ("TCD"): TCD (Dth/d) Time Period 55,000 See 9 Subject to this Paragraph 11, In-Service Date shall mean the date (i) the Wink Compressor Modifications are completed and ready for service, and (ii) Transporter is authorized to place the Wink Compressor Modifications into service. 12. Notices, Statements, and Bills: To Shipper: WPX Energy Marketing, LLC 3500 One Williams Center, Suite 3400 Tulsa, OK Attn: Contract Management Fax: (539) To Transporter: See Points of Contact in the Tariff. 13. Changes in Rates and Terms: Transporter shall have the right to propose to the FERC changes in its rates and terms of service, and this Agreement shall be deemed to include any changes which are made effective pursuant to FERC Order or regulation or provisions of law, without prejudice to Shipper's right to protest the same. Issued on: September 21, 2017 Effective on: November 1, 2017

31 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG Creditworthiness: Shipper shall demonstrate, and maintain throughout the term of this Agreement, satisfaction of creditworthiness requirements of the GT&C of Transporter s Tariff. In the event Shipper is unable to satisfy the general creditworthiness provisions set forth in Transporter s Tariff, Shipper shall provide additional credit support (in the form of a Letter of Credit, a guaranty from a party that satisfies the creditworthiness standards, or such other form that is acceptable to Transporter in its sole discretion). Such credit support shall be at least equal to 18 months of anticipated charges (the Enhanced Credit Support ) for the first 2 years such capacity is available under this Agreement, and thereafter shall equal the amount of credit support authorized in the Transporter s Tariff for sales of existing capacity. The Enhanced Credit Support shall be provided to Transporter at least 90 days prior to the anticipated In- Service Date of the Wink Compressor Modifications. Shipper shall not be required to maintain the Enhanced Credit Support for a period longer than 27 months. 15. Governing Law: Transporter and Shipper expressly agree that the laws of the State of Colorado shall govern the validity, construction, interpretation and effect of this Agreement and of the applicable Tariff provisions. This Agreement is subject to all applicable rules, regulations, or orders issued by any court or regulatory agency with proper jurisdiction. (Agreements executed prior to January 1, 2006 will be subject to the governing law provisions stated in such Agreements.) 16. Elimination of Non-Conforming Provisions: Upon the satisfaction of any condition to this Agreement, or the completion of any action which causes provisions of this Agreement to be no longer relevant, Transporter and Shipper shall execute a replacement Agreement with each of such conditions and/or provisions omitted, but with all other terms of this Agreement unchanged. Transporter and Shipper will exercise reasonable efforts to minimize the number of replacement Agreements. IN WITNESS HEREOF, the Parties have caused this Agreement to be electronically executed, by their duly authorized officers, the Day and Year first set forth herein. WPX ENERGY MARKETING, LLC EL PASO NATURAL GAS COMPANY, L.L.C. By Name By Will W. Brown Vice President-Business Development Title Date Date Issued on: September 21, 2017 Effective on: November 1, 2017

32 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Exh A Third Revised Volume No. 1A Version Effective Dates: See 9 EXHIBIT A To The Transportation Service Agreement Between El Paso Natural Gas Company, L.L.C. (Transporter) and WPX Energy Marketing, LLC (Shipper) Dated: November 1, 2017 Agreement No. FT3HG000 Maximum Quantity - D-Code (Dth/d) 1/ Primary Receipt Point(s) / Location(s) (Scheduling Code(s)) IRAMSEYS prior to the inservice date of the new WPX Interconnect (anticipated to be November 1, 2017). The new WPX Interconnect would be the primary receipt point thereafter. Receipt Loc Code(s) / Primary Delivery Point(s) / Location(s) (Scheduling Code(s)) Delivery Loc Code(s) Flow Path January February March April May June July August September October November December TBD ILONEWA VA 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 Delivery Pressure (p.s.i.g.) Not less than 2/ Delivery Pressure (p.s.i.g.) Not greater than 2/ TRANSPORTATION CONTRACT DEMAND 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 Shipper's Transportation Contract Demand: See Paragraph 11 1/ The sum of the Maximum Quantities identified above is equal to Shipper's Transportation Contract Demand for that Month. 2/ Unless otherwise specified on this Exhibit A, the pressure(s) for the point(s) listed above shall be the pressure existing from time to time at the metering facility; provided, however, El Paso reserves the right to deliver quantities at pressures up to the MAOP of that facility. Issued on: September 21, 2017 Effective on: November 1, 2017

33 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Exh B Third Revised Volume No. 1A Version EXHIBIT B To The Transportation Service Agreement Between El Paso Natural Gas Company, L.L.C. (Transporter) and WPX Energy Marketing, LLC (Shipper) Dated: November 1, 2017 Agreement No. FT3HG000 Primary Receipt Point(s) As listed in Exhibit A Primary Delivery Point(s) Effective Dates Reservation Rate 1/ Usage Rate 1/ Fuel 2/ Surcharges 3/ As listed in Exhibit A See See 9 (1a) Primary and Alternate Receipt Point(s) / Location(s) (Scheduling Code(s)) Receipt Loc Code(s) Primary and Alternate Delivery Point(s) / Location(s) (Scheduling Code(s)) Delivery Loc Code(s) Effective Dates Reservation Rate 1/ Usage Rate 1/ Fuel 2/ Surcharges 3/ IRAMSEYS WPX Interconnect TBD IMOBILWA IWESTARW IOASISWA ILONEWA IVALEROW WAHATRAN DPECSTRL See 9 (1a) 1/ Unless otherwise agreed by the Parties in writing, the rates for service shall be Transporter's maximum rates for service under Rate Schedule FT-1; as such rates may be changed from time to time. 1a - As provided in Section 4.18 of the GT&C of Transporter s Tariff, the parties agree to the following negotiated rate(s): $ per Dekatherm per month which shall not be subject to the applicable maximum or minimum Rate Schedule FT-1 reservation rate for the corresponding rate zone as set forth in Transporter's Tariff. Issued on: September 21, 2017 Effective on: November 1, 2017

34 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Exh B Third Revised Volume No. 1A Version EXHIBIT B To The Transportation Service Agreement Between El Paso Natural Gas Company, L.L.C. (Transporter) and WPX Energy Marketing, LLC (Shipper) Dated: November 1, 2017 Agreement No. FT3HG000 2/ Fuel and L&U shall be as stated on Transporter's Statement of Rates in the Tariff, as they may be changed from time to time, unless otherwise agreed between the Parties. 3/ Surcharges, if applicable: All applicable surcharges, unless otherwise specified, shall be the maximum surcharge rate as stated on the Statement of Rates, as they may be changed from time to time, unless otherwise agreed to by the Parties. Issued on: September 21, 2017 Effective on: November 1, 2017

35 MARKED TARIFF SECTIONS

36 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG000 Firm Transportation Service Agreement Rate Schedule FT-1 between El Paso Natural Gas Company, L.L.C. and WPX Energy Marketing, LLC Dated: November 1, 2017 Issued on: September 21, 2017 Effective on: November 1, 2017

37 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Transportation Service Agreement Rate Schedule FT-1 Dated: November 1, 2017 Agreement No. FT3HG000 The Parties identified below, in consideration of their mutual promises, agree as follows: 1. Transporter: EL PASO NATURAL GAS COMPANY, L.L.C. 2. Shipper: WPX ENERGY MARKETING, LLC 3. Applicable Tariff: Transporter's FERC Gas Tariff Third Revised Volume No. 1A, as the same may be amended or superseded from time to time ("Tariff"). Capitalized terms used in this Agreement and not defined elsewhere have the meanings given to them in the Tariff. 4. Incorporation by Reference: This Agreement in all respects shall be subject to the provisions of Rate Schedule FT-1 and to the applicable provisions of the General Terms and Conditions of the Tariff as filed with, and made effective by, the FERC as same may change from time to time. 5. Transportation service at and between primary receipt points and primary delivery points shall utilize a Flow Path and shall be transported on a firm basis in accordance with the Tariff. Receipt Points, Delivery Points and Flow Paths: Shipper agrees to tender gas for transportation service and Transporter agrees to accept receipt quantities at the primary receipt points identified in Exhibit A. Transporter agrees to provide transportation service and deliver gas to Shipper (or for Shipper's account) at the primary delivery points identified in Exhibit A. Receipts and deliveries of gas for transportation service shall be accommodated by the Flow Path(s) identified on Exhibit A. Minimum and maximum delivery pressures, as applicable, are listed on Exhibit A. 6. Rates and Surcharges: As set forth in Exhibit B, Shipper shall pay the applicable maximum tariff rate unless otherwise provided. Transporter and Shipper may mutually agree to a discounted rate pursuant to the rate provisions of Rate Schedule FT-1 and Section 4.17 of the General Terms and Conditions. Recovery for Carbon Tax and Greenhouse Gas Costs: Shipper shall pay Transporter for any FERC-approved costs incurred by Transporter in connection with any greenhouse gas emissions tax or charges imposed on Transporter including, but not limited to, any command and control costs, cap and trade costs, or any other greenhouse gas emissions-related costs arising from any statutory or regulatory framework whatsoever ( Greenhouse Gas Costs ). If FERC authorizes the recovery of Greenhouse Gas Costs only through Transporter s reservation rates, then Shipper will agree to modify its negotiated fixed monthly Reservation Rate under this Agreement by the amount of Transporter s maximum reservation rate under Rate Schedule FT-1 that is attributable to such costs. Issued on: September 21, 2017 Effective on: November 1, 2017

38 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG Exhibits A and B attached to this Agreement, are hereby incorporated by reference as part of this Agreement. 8. Negotiated Rate Agreement: Yes X No 9. Term of Agreement: Beginning: The later of November 1, 2017 or the In-Service Date of the Wink Compressor Modifications Ending: The later of November 30, 2024 or seven (7) years from the In-Service Date of the Wink Compressor Modifications If the FERC for any reason does not accept this Agreement for filing, then Transporter and Shipper shall negotiate in good faith and enter into an amended Firm Transportation Service Agreement so as to (i) effect the original intent of the parties as closely as possible in order that the transaction contemplated herein is consummated as originally contemplated to the fullest extent possible and (ii) facilitate approval of the amended agreement by the FERC. In such event, Transporter shall seek FERC approval of the amended Firm Transportation Service Agreement as soon as reasonably practicable. A contractual right of first refusal shall apply to this Agreement, pursuant to Section 4.14 of the General Terms and Conditions. Construction of Facilities: In order to provide transportation service for Shipper under this Agreement, the Parties recognize that Transporter must construct additional facilities that will include certain piping modifications at the Wink compressor station, which will be hereinafter referred to as the ( Wink Compressor Modifications ). Transporter shall also construct a new interconnect facility on Transporter s Line No at or near milepost 976 in Loving County, Texas, and associated metering facilities capable of accepting and measuring gas receipts of up to 95,000 Dth/day, such interconnect facilities will be hereinafter referred to as the ( WPX Interconnect ). Shipper shall enter into, or cause an affiliate to enter into, a mutually agreeable Interconnect Agreement with Transporter for the WPX Interconnect. Commencing April 1, 2017, Transporter shall provide Shipper bi-weekly reports on the status of the construction of the facilities described above and projections of the in-service dates. Transporter s obligation to construct the WPX Interconnect and the Wink Compressor Modifications and to provide firm transportation service is expressly made subject to the following two (2) conditions precedent, and only Transporter shall have the right to waive such conditions precedent: Issued on: September 21, 2017 Effective on: November 1, 2017

39 El Paso Natural Gas Company, L.L.C. Part VII: Non-Conforming FERC Gas Tariff Section WPX Energy Marketing, LLC #FT3HG000 Third Revised Volume No. 1A Version Agreement No. FT3HG000 (a) Receipt of all necessary approvals and authorizations for the construction of the Wink Compressor Modifications and the WPX Interconnect from the senior management of Transporter and/or from the Board of Directors of Transporter and/or its appropriate parent company by November 25, 2016; and (b) The receipt by Transporter of all necessary regulatory approvals, permits, and other authorizations required for the construction and operation of the WPX Interconnect and the Wink Compressor Modifications in a form and substance satisfactory to Transporter in its sole discretion. If the immediately preceding conditions precedent are not fully satisfied then Transporter may terminate this Agreement. 10. Effect on Prior Agreement(s): When this Agreement becomes effective, it shall amend and restate the following agreement(s) between the Parties: Agreement No. FT3HG000 originally dated November 1, Transportation Contract Demand ("TCD"): TCD (Dth/d) Time Period 55,000 See 9 Subject to this Paragraph 11, In-Service Date shall mean the date (i) the Wink Compressor Modifications are completed and ready for service, and (ii) Transporter is authorized to place the Wink Compressor Modifications into service. 12. Notices, Statements, and Bills: To Shipper: WPX Energy Marketing, LLC 3500 One Williams Center, Suite 3400 Tulsa, OK Attn: Contract Management Fax: (539) To Transporter: See Points of Contact in the Tariff. 13. Changes in Rates and Terms: Transporter shall have the right to propose to the FERC changes in its rates and terms of service, and this Agreement shall be deemed to include any changes which are made effective pursuant to FERC Order or regulation or provisions of law, without prejudice to Shipper's right to protest the same. Issued on: September 21, 2017 Effective on: November 1, 2017

Non-Conforming Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Non-Conforming Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19- February 28, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Non-Conforming Negotiated Rate Agreement Update; El Paso

More information

Negotiated Rate Agreements Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Negotiated Rate Agreements Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP19- November 29, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Negotiated Rate Agreements Filing; El

More information

March 26, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

March 26, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. March 26, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Negotiated Rate Agreements Filing; ; Docket No. RP19- Commissioners:

More information

Re: Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19-

Re: Negotiated Rate Agreement Update; El Paso Natural Gas Company, L.L.C.; Docket No. RP19- December 31, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Negotiated Rate Agreement Update; El Paso

More information

Negotiated Rate Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP18-

Negotiated Rate Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP18- February 28, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Negotiated Rate Agreement Filing; El Paso

More information

April 10, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

April 10, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. April 10, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20046 Attention: Ms. Kimberly D. Bose, Secretary Re: Non-Conforming Transportation Service Agreements; ; Docket

More information

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main June 5, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy

More information

October 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

October 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 5400 Westheimer Court Houston, TX 77056-5310 Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 713.627.5400 main October 5, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

March 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C March 28, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher

More information

Mailing Address: P.O. Box 1642 Houston, TX

Mailing Address: P.O. Box 1642 Houston, TX 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 August 20, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

Mailing Address: P.O. Box 1642 Houston, Texas September 1, 2011

Mailing Address: P.O. Box 1642 Houston, Texas September 1, 2011 Big Sandy Pipeline, LLC 5400 Westheimer Court Houston, TX 77056-5310 Mailing Address: P.O. Box 1642 Houston, Texas 77251-1642 713.627.5400 main September 1, 2011 Ms. Kimberly D. Bose, Secretary Federal

More information

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main August 1, 2017 Ms. Kimberly D. Bose, Secretary Federal

More information

STATEMENT OF NATURE, REASONS AND BASIS

STATEMENT OF NATURE, REASONS AND BASIS Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main March 29, 2018 Ms. Kimberly D. Bose, Secretary Federal

More information

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 5, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 5, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Tuscarora Gas Transmission Company 700 Louisiana Street, Suite 700 Houston, TX

More information

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C August 1, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher

More information

STATEMENT OF NATURE, REASONS AND BASIS

STATEMENT OF NATURE, REASONS AND BASIS October 1, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Texas Eastern Transmission, LP, Docket No. RP13- -000 Dear Ms. Bose: Pursuant

More information

January 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. January 3, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Columbia Gas Transmission, LLC 700 Louisiana Street, Suite 700 Houston,

More information

June 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 1, 2010 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 North Baja Pipeline, LLC 717 Texas Street, Suite 2400 Houston, TX 77002-2761

More information

Operational Purchases and Sales Report, Wyoming Interstate Company, L.L.C.; Docket No. RP18-

Operational Purchases and Sales Report, Wyoming Interstate Company, L.L.C.; Docket No. RP18- September 27, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly Bose, Secretary Re: Operational Purchases and Sales Report, Wyoming Interstate

More information

Rover Pipeline LLC Docket No. RP Compliance with Order on Compliance Filing

Rover Pipeline LLC Docket No. RP Compliance with Order on Compliance Filing December 8, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Rover Pipeline LLC Docket No. RP17-772- Compliance with Order on

More information

Sierrita is hereby submitting its responses to the April 3, 2018 OEMR Data Request questions.

Sierrita is hereby submitting its responses to the April 3, 2018 OEMR Data Request questions. April 10, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Attention: Re: Ms. Kimberly D. Bose, Secretary Office of Energy Market Regulation Letter Order Pursuant to

More information

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C March 25, 2010 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Gas Transmission Northwest Corporation 717 Texas Street, Suite 2400 Houston,

More information

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. January 31, 2014 Great Lakes Gas Transmission Company 717 Texas Street, Suite 2400 Houston, TX 77002-2761 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Woodbridge Delivery Lateral Project Service Agreement Containing Negotiated Rates And Non-Conforming Provisions Docket No. RP15

Woodbridge Delivery Lateral Project Service Agreement Containing Negotiated Rates And Non-Conforming Provisions Docket No. RP15 Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 March 27, 2015 Federal Energy Regulatory Commission 888 First Street,

More information

March 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

March 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 31, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 ANR Pipeline Company 700 Louisiana Street, Suite 700 Houston, TX 77002-2700

More information

REVISED OPEN SEASON NOTICE (PREVIOUS NOTICE 16834) Arizona Gas Storage Project

REVISED OPEN SEASON NOTICE (PREVIOUS NOTICE 16834) Arizona Gas Storage Project REVISED OPEN SEASON NOTICE 16846 (PREVIOUS NOTICE 16834) Arizona Gas Storage Project On Tuesday, January 31, 2017, El Paso Natural Gas Company, L.L.C., posted an open season (Notice ID: 16834) which contained

More information

Mailing Address: P.O. Box 1642 Houston, TX

Mailing Address: P.O. Box 1642 Houston, TX 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 November 20, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

Steckman Ridge, LP, Docket No. RP

Steckman Ridge, LP, Docket No. RP December 9, 2009 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Steckman Ridge, LP, Docket No. RP10- -000 Dear Ms. Bose: Steckman

More information

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C April 29, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Director, Rates & Tariffs tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com

More information

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C April 29, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Director, Rates & Tariffs tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com

More information

FERC GAS TARIFF ORIGINAL VOLUME NO. 1 RUBY PIPELINE, L.L.C.

FERC GAS TARIFF ORIGINAL VOLUME NO. 1 RUBY PIPELINE, L.L.C. FERC GAS TARIFF ORIGINAL VOLUME NO. 1 of RUBY PIPELINE, L.L.C. Communications regarding this Tariff should be addressed to: William D. Wible, Vice President Ruby Pipeline, L.L.C. P. O. Box 1087 Colorado

More information

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C April 29, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com web

More information

Table of Contents. Viking Gas Transmission Company Volume No. 1 Tariff. Tariff - Volume No. 1. Part Table of Contents

Table of Contents. Viking Gas Transmission Company Volume No. 1 Tariff. Tariff - Volume No. 1. Part Table of Contents Viking Gas Transmission Company Volume No. 1 Tariff Table of Contents Tariff - Volume No. 1 Part 2.0 - Table of Contents Part 3.0 - Preliminary Statement Part 4.0 - System Map Part 5.0 - Statement of Rates

More information

Rover Pipeline LLC. Explanatory Note

Rover Pipeline LLC. Explanatory Note Explanatory Note This contains the following 2 parts: (i) ( Rover ) derivation of its cost of service and recourse rates based on 3,250,000,000 Dt/Day of mainline capacity; and (ii) Rover s pro forma FERC

More information

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 December 6, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 700 Louisiana Street, Suite 700 Houston, TX 77002-2700 John A. Roscher Director,

More information

Natural Gas Pipeline Company of America LLC Part 6. Eighth Revised Volume No. 1 Version GENERAL TERMS AND CONDITIONS

Natural Gas Pipeline Company of America LLC Part 6. Eighth Revised Volume No. 1 Version GENERAL TERMS AND CONDITIONS Natural Gas Pipeline Company of America LLC Part 6 FERC Gas Tariff General Terms and Conditions Eighth Revised Volume No. 1 Version 0.0.0 GENERAL TERMS AND CONDITIONS Issued On: September 30, 2010 Effective

More information

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

December 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. December 6, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, TX 77002-2700 John A. Roscher

More information

September 30, Part Version Title V LNG Rates

September 30, Part Version Title V LNG Rates Columbia Pipeline Group 5151 San Felipe, Ste 2400, Houston, Texas, USA 77056 Tel: 713.386.3776 slinder@cpg.com Sorana Linder Director, Regulated Services September 30, 2016 Ms. Kimberly D. Bose Federal

More information

October 11, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

October 11, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. October 11, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: FERC Form No. 501-G; ; Docket No. RP19- Commissioners:

More information

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. El Paso Natural Gas Company, L.L.C. ) Docket No.

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. El Paso Natural Gas Company, L.L.C. ) Docket No. THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION El Paso Natural Gas Company, L.L.C. ) Docket No. CP18-332-000 ANSWER OF EL PASO NATURAL GAS COMPANY, L.L.C. TO THE MOTIONS TO

More information

December 6, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

December 6, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. December 6, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: FERC Form No. 501-G; ; Docket No. RP19- Commissioners:

More information

November 29, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

November 29, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. November 29, 2016 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Annual Recomputation of Fuel and Lost

More information

March 7, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

March 7, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 7, 2012 Re: California Independent

More information

144 FERC 61,159 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C August 28, 2013

144 FERC 61,159 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C August 28, 2013 144 FERC 61,159 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 August 28, 2013 In Reply Refer To: Kinetica Energy Express, LLC Docket No. RP13-1116-000 Crowell & Morning Attention: Jenifer

More information

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company

May 8, Response to Show Cause Order, Filing of Revised Tariff Sheet And Request for Any Necessary Waivers. The Dayton Power and Light Company The Dayton Power and Light Company 1065 Woodman Drive, Dayton Ohio 45458 May 8, 2018 Via etariff Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

CURRENTLY EFFECTIVE RATE SCHEDULES AND STATEMENT OF OPERATING CONDITIONS OF ONEOK GAS TRANSPORTATION, L.L.C. SUBJECT TO THE JURISDICTION OF

CURRENTLY EFFECTIVE RATE SCHEDULES AND STATEMENT OF OPERATING CONDITIONS OF ONEOK GAS TRANSPORTATION, L.L.C. SUBJECT TO THE JURISDICTION OF CURRENTLY EFFECTIVE RATE SCHEDULES AND STATEMENT OF OPERATING CONDITIONS OF ONEOK GAS TRANSPORTATION, L.L.C. SUBJECT TO THE JURISDICTION OF THE FEDERAL ENERGY REGULATORY COMMISSION Effective October 1,

More information

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %.

All rates in Item 200 have been increased by the F.E.R.C. Annual Index of %. May 25, 2017 Transmittal Letter No. 34 Kim Christiansen, Executive Director Kansas Corporation Commission 1500 S.W. Arrowhead Road Topeka, KS 66604-4027 Dear Ms. Christiansen, Magellan Pipeline Company,

More information

October 31, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary. Docket No.

October 31, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary. Docket No. 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-3380 October 31, 2005 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Re: Magalie

More information

Statement of the Nature, Reasons, and Basis for the Filing

Statement of the Nature, Reasons, and Basis for the Filing May 1, 2008 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Operational Purchases and Sales Report Docket No. RP08- Dear Ms. Bose: ("ANR"),

More information

December 18, Columbia Gas Transmission, LLC, Docket No. RP Offer of Settlement and Petition for Approval of Settlement

December 18, Columbia Gas Transmission, LLC, Docket No. RP Offer of Settlement and Petition for Approval of Settlement 5151 San Felipe, Suite 2400 Houston, Texas 77056 Phone: 713-386-3757 Fax: 713-386-3755 gcarter@cpg.com Georgia Carter Senior Vice President and Deputy General Counsel Ms. Kimberly D. Bose, Secretary 888

More information

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Texas Eastern Transmission, LP Mailing Address: 5400 Westheimer Court P.O. Box 1642 Houston, Texas 77056 Houston, TX 77251-1642 713.627.5400 main September 29, 2017 Ms. Kimberly D. Bose, Secretary Federal

More information

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501 1 st Revised Sheet No. 50 Canceling Original Sheet No. 50 Page 1 of 8 Availability: This service is applicable for transportation of natural gas to customer's premise (metered at a single delivery point)

More information

June 29, Currently Effective Rates ITS and AOR /1/2018 Change. Currently Effective Rates PALS

June 29, Currently Effective Rates ITS and AOR /1/2018 Change. Currently Effective Rates PALS 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 www.vnf.com June 29, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington,

More information

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C May 8, 2017 Great Lakes Gas Transmission Company 700 Louisiana Street Houston, TX 77002-2700 John A. Roscher Director, Rates & Regulatory Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

ALON USA ENERGY, INC. (Exact Name of Registrant as Specified in Charter)

ALON USA ENERGY, INC. (Exact Name of Registrant as Specified in Charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(d) of the Securities Exchange Act of 1934 Date of report (Date of earliest event

More information

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 September 6, 2016 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. ANDREW W. TUNNELL t: (205) 226-3439 f: (205) 488-5858 e: atunnell@balch.com BY ELECTRONIC FILING Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Re: Rockland Electric Company, Docket No. EL18-111

Re: Rockland Electric Company, Docket No. EL18-111 Margaret Comes Associate Counsel Rockland Electric Company 4 Irving Place, Room 1815-S, New York, NY 10003 Tel.: 212-460-3013 Email: comesm@coned.com May 14, 2018 Hon. Kimberly D. Bose Secretary Federal

More information

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 4, 2012 Service Agreement Number Northeast

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 4, 2012 Service Agreement Number Northeast Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 4, 2012 Service Agreement Number 131579 Northeast Natural Energy, LLC Option Code A REDLINE

More information

DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. Combined Notice Of Filings

DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. Combined Notice Of Filings This document is scheduled to be published in the Federal Register on 12/07/2015 and available online at http://federalregister.gov/a/2015-30747, and on FDsys.gov DEPARTMENT OF ENERGY Federal Energy Regulatory

More information

American Electric Power

American Electric Power American Electric Power 801 Pennsylvania Ave. NW, Suite 320 Washington, DC 20004-2615 AEP.com September 12, 2016 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E.,

More information

FIRM GAS STORAGE CONTRACT EFFECTIVE DATE: Moss Bluff Hub, LLC Attn: Vice President, Marketing Attn: 5400 Westheimer Court Address: Houston, TX 77056

FIRM GAS STORAGE CONTRACT EFFECTIVE DATE: Moss Bluff Hub, LLC Attn: Vice President, Marketing Attn: 5400 Westheimer Court Address: Houston, TX 77056 FIRM GAS STORAGE CONTRACT EFFECTIVE DATE: MOSS BLUFF: CUSTOMER: Moss Bluff Hub, LLC Attn: Vice President, Marketing Attn: 5400 Westheimer Court Address: Houston, TX 77056 This Firm Gas Storage Contract

More information

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501 1 st Revised Sheet No. 24 Canceling Original Sheet No. 24 Page 1 of 8 Availability: This service is applicable for transportation of natural gas to customer s premise (metered at a single delivery point)

More information

Notice Text. Non-Binding Open Season Notice Kinder Morgan Powder River Lateral NGL Pipeline Project June 23, 2014

Notice Text. Non-Binding Open Season Notice Kinder Morgan Powder River Lateral NGL Pipeline Project June 23, 2014 TSP Name: Colorado Interstate Gas Company, L.L.C. TSP: 00-691-4865 Notice ID: 9081 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Prior Notice: Notice Eff Date: 06/23/2014 Notice Eff Time:

More information

September 21, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

September 21, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 DANIEL L. LARCAMP 202.274.2841 telephone 202.654.5616 facsimile daniel.larcamp@troutmansanders.com TROUTMAN SANDERS LLP Attorneys at Law 401 9th Street, N. W., Suite 1000 Washington, D.C. 20004-2134 202.274.2950

More information

FERC GAS TARIFF VOLUME NO. 1 RAGER MOUNTAIN STORAGE COMPANY LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION

FERC GAS TARIFF VOLUME NO. 1 RAGER MOUNTAIN STORAGE COMPANY LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION FERC GAS TARIFF VOLUME NO. 1 Of RAGER MOUNTAIN STORAGE COMPANY LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Any communications regarding this Tariff should be addressed to: Sarah A. Shaffer,

More information

UNIFIED GROCERS, INC.

UNIFIED GROCERS, INC. UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of the earliest

More information

NOTICE OF REQUEST FOR PROPOSALS (RFP) NATURAL GAS CAPACITY, LIQUIFIED NATURAL GAS (LNG), AND NATURAL GAS STORAGE PROCUREMENT

NOTICE OF REQUEST FOR PROPOSALS (RFP) NATURAL GAS CAPACITY, LIQUIFIED NATURAL GAS (LNG), AND NATURAL GAS STORAGE PROCUREMENT NOTICE OF REQUEST FOR PROPOSALS (RFP) NATURAL GAS CAPACITY, LIQUIFIED NATURAL GAS (LNG), AND NATURAL GAS STORAGE PROCUREMENT INTRODUCTION On October 2, 2015, The Massachusetts Department of Public Utilities

More information

October 11, Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C

October 11, Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C October 11, 2018 Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C. 20426 Re: Docket No. RP19- Filing in Compliance with Order No. 849 Form 501-G

More information

Unit Corporation (Exact name of registrant as specified in its charter)

Unit Corporation (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of The Securities Exchange Act of 1934 Date of Report (Date of earliest event

More information

Cheyenne Plains Gas Pipeline Company, LLC Fifth Report of Service Interruption and/or Damage to Facilities Pursuant to Section 260.

Cheyenne Plains Gas Pipeline Company, LLC Fifth Report of Service Interruption and/or Damage to Facilities Pursuant to Section 260. October 10, 2007 Mr. Berne Mosley Director, Division of Pipeline Certificates Federal Energy Regulatory Commission Facsimile number: (202) 208-2853 E-mail: pipelineoutage@ferc.gov RE: Cheyenne Plains Gas

More information

MOOG INC. (Exact name of registrant as specified in its charter)

MOOG INC. (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 OR 15(d) of The Securities Exchange Act of 1934 Date of Report (Date of earliest event

More information

SECURITIES AND EXCHANGE COMMISSION. Washington, D.C FORM 8-K CURRENT REPORT

SECURITIES AND EXCHANGE COMMISSION. Washington, D.C FORM 8-K CURRENT REPORT SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report: June 19, 2003 Exact Name of Registrant

More information

Live Ventures Incorporated (Exact name of registrant as specified in its charter)

Live Ventures Incorporated (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date of Report (Date of earliest event

More information

UGI PENN NATURAL GAS, INC. AGGREGATION AGREEMENT FOR RATE SCHEDULES RT and NT. This Aggregation Agreement for Rate Schedules RT and NT

UGI PENN NATURAL GAS, INC. AGGREGATION AGREEMENT FOR RATE SCHEDULES RT and NT. This Aggregation Agreement for Rate Schedules RT and NT UGI PENN NATURAL GAS, INC. AGGREGATION AGREEMENT FOR RATE SCHEDULES RT and NT This Aggregation Agreement for Rate Schedules RT and NT ("Aggregation Agreement") is made and entered into this day of, 20,

More information

December 19, Cal. Indep. Sys. Operator Corp., 165 FERC 61,140 (2018) (November 19 Order).

December 19, Cal. Indep. Sys. Operator Corp., 165 FERC 61,140 (2018) (November 19 Order). California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 December 19, 2018 Re: California

More information

RAILROAD COMMISSION OF TEXAS GAS SERVICES DIVISION ) ) ) )

RAILROAD COMMISSION OF TEXAS GAS SERVICES DIVISION ) ) ) ) RAILROAD COMMISSION OF TEXAS GAS SERVICES DIVISION STATEMENT OF INTENT OF WEST TEXAS GAS, INC. TO INCREASE GAS DISTRIBUTION RATES IN THE UNINCORPORATED AREAS OF TEXAS GUD NO. STATEMENT OF INTENT OF WEST

More information

May 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 May 22, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426

More information

Pursuant to section 205 of the Federal Power Act ( FPA ), 1 and part 35 of the regulations

Pursuant to section 205 of the Federal Power Act ( FPA ), 1 and part 35 of the regulations PJM Interconnection, L.L.C. 2750 Monroe Blvd Audubon, PA 19403-2497 Jeanine S. Watson Senior Counsel T: (610) 666-4438 ǀ F: (610) 666-8211 jeanine.watson@pjm.com February 7, 2017 The Honorable Kimberly

More information

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax: August 6, 2008

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax: August 6, 2008 ALSTON&BIRD LLP The Atlantic Building 95 F Street, NW Washington, DC 24-144 22-756-33 Fax: 22-756-3333 August 6, 28 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First

More information

STURM, RUGER & COMPANY, INC. (Exact Name of Registrant as Specified in its Charter)

STURM, RUGER & COMPANY, INC. (Exact Name of Registrant as Specified in its Charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of earliest event

More information

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019)

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: February 19, 2015 Service Agreement No.

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: February 19, 2015 Service Agreement No. Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective : February 19, 2015 Service Agreement No. 162164 Exelon Generation Company, LLC Option Code A Service Agreement No.

More information

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax:

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax: ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-756-3300 Fax: 202-756-3333 Bradley R. Miliauskas Direct Dial: 202-756-3405 Email: bradley.miliauskas@alston.com December

More information

GridLiance West Transco LLC Docket No. ES Amendment to Application Under Section 204 of the Federal Power Act

GridLiance West Transco LLC Docket No. ES Amendment to Application Under Section 204 of the Federal Power Act January 12, 2017 VIA ELECTRONIC FILING Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: GridLiance West Transco LLC Docket No. ES17-9-000 Amendment

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-756-3300 Fax: 202-756-3333 March 2, 2011 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

LOSS PORTFOLIO TRANSFER AGREEMENT. by and between. The Florida Department of Financial Services, as Receiver of [Company in Receivership] and

LOSS PORTFOLIO TRANSFER AGREEMENT. by and between. The Florida Department of Financial Services, as Receiver of [Company in Receivership] and LOSS PORTFOLIO TRANSFER AGREEMENT by and between The Florida Department of Financial Services, as Receiver of [Company in Receivership] and Purchaser [Name of Purchasing Company] TABLE OF CONTENTS Article

More information

PANHANDLE OIL AND GAS INC.

PANHANDLE OIL AND GAS INC. UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934. Date of Report: (Date of Earliest

More information

Case LSS Doc Filed 04/29/16 Page 1 of 7. Exhibit A. First Amendment to DIP Credit Agreement

Case LSS Doc Filed 04/29/16 Page 1 of 7. Exhibit A. First Amendment to DIP Credit Agreement Case 16-10882-LSS Doc 242-1 Filed 04/29/16 Page 1 of 7 Exhibit A First Amendment to DIP Credit Agreement 01:18631850.2 Case 16-10882-LSS Doc 242-1 Filed 04/29/16 Page 2 of 7 FIRST AMENDMENT TO DEBTOR-IN-POSSESSION

More information

BIDDING PROCEDURES ANY PARTY INTERESTED IN BIDDING ON THE ASSETS SHOULD CONTACT:

BIDDING PROCEDURES ANY PARTY INTERESTED IN BIDDING ON THE ASSETS SHOULD CONTACT: BIDDING PROCEDURES On September 11, 2017, Vitamin World, Inc. and certain of its affiliates, as debtors and debtors in possession (collectively, the Debtors ), filed voluntary petitions for relief under

More information

Transportation of Customer-Secured Natural Gas (T-1)

Transportation of Customer-Secured Natural Gas (T-1) Original Sheet No.: 802 Transportation of Customer-Secured Natural Gas (T-1) AVAILABILITY This tariff is available to any qualifying Customer for transportation of natural gas by the Company from existing

More information

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 December 23, 2014 By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Nevada Power Company and Sierra Pacific Power Company,

More information

OASIS PIPELINE, LP FERC NGPA GAS TARIFF STATEMENT OF OPERATING CONDITIONS VERSION EFFECTIVE AUGUST 1, 2014 OPTION CODE A

OASIS PIPELINE, LP FERC NGPA GAS TARIFF STATEMENT OF OPERATING CONDITIONS VERSION EFFECTIVE AUGUST 1, 2014 OPTION CODE A OASIS PIPELINE, LP FERC NGPA GAS TARIFF STATEMENT OF OPERATING CONDITIONS VERSION 1.0.0 EFFECTIVE AUGUST 1, 2014 OPTION CODE A OASIS PIPE LINE COMPANY TEXAS L.P. And OASIS PIPELINE, LP STATEMENT OF OPERATING

More information

Standard Credit Package Attn: Brenda Koch Ph.:

Standard Credit Package Attn: Brenda Koch Ph.: Standard Credit Package Attn: Brenda Koch Ph.: 281.597.5479 In order to expedite your request, please include the following: 1. A completed and signed credit application. If you have your credit information

More information

Dakota Midstream, LLC

Dakota Midstream, LLC Dakota Midstream, LLC DAKOTA MIDSTREAM PIPELINE PROJECT MCKENZIE COUNTY, N.D. I. OPEN SEASON A. INTRODUCTION OPEN SEASON NOTICE January 2, 2015 On January 2, 2015, Dakota Midstream, LLC ( Dakota Midstream

More information

RATE SCHEDULE 3A LARGE COMMERCIAL FIRM SERVICE (LCS-1) APPENDIX. LARGE VOLUME COMMERCIAL CUSTOMER AGREEMENT (System Supply Option)

RATE SCHEDULE 3A LARGE COMMERCIAL FIRM SERVICE (LCS-1) APPENDIX. LARGE VOLUME COMMERCIAL CUSTOMER AGREEMENT (System Supply Option) (866) 275-5265 toll-free Original Sheet No. 2-3A.1/21 RATE SCHEDULE 3A LARGE COMMERCIAL FIRM SERVICE (LCS-1) APPENDIX LARGE VOLUME COMMERCIAL CUSTOMER AGREEMENT (System Supply Option) THIS AGREEMENT (the

More information

June 9, Filing of CAISO Rate Schedule No. 92 Powerex EIM Implementation Agreement Docket No. ER

June 9, Filing of CAISO Rate Schedule No. 92 Powerex EIM Implementation Agreement Docket No. ER California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 9, 2017 Re: California Independent

More information

American Electric Power Service Corporation Docket No. ER10- -

American Electric Power Service Corporation Docket No. ER10- - American Electric Power 801 Pennsylvania Avenue N.W. Suite 320 Washington, DC 20004 AEP.com May 3, 2010 Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E.

More information

RESTRICTED STOCK PURCHASE AGREEMENT

RESTRICTED STOCK PURCHASE AGREEMENT RESTRICTED STOCK PURCHASE AGREEMENT THIS RESTRICTED STOCK PURCHASE AGREEMENT (the Agreement ) is made as of by and between STARTUP INC., a Delaware corporation (the Company ) and ( Purchaser ). Certain

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate Annual

More information