1 CASH FLOW ANALYSIS HANDOUTS 1

2 2

3 RateOfCompoundingAnalysis.hava FV1 r m T FV PV1 r m T PV INF INF INF INF INF INF INF INF INF INF INF INF FV2 r m T FV PV2 r m T PV 3

4 INF INF INF INF INF INF INF INF INF INF INF INF

5 AnnuityCashFlowAnalysis.hava r 0.09 A 6000 g 0.12 T 10 Yearly r SA1 Date CF FV PV SA2 Date CF FV PV Monthly r SA3 Date CF FV PV SA4 Date CF FV PV

6 6

7 Fixed-Rate Mortgages 1 Mortgage Basics We adopt the following continuous-time notation: LB(t) = the outstanding loan balance at time t. IP (t) = the interest payment on the loan made at time t. P P (t) = the principal payment on the loan made at time t. i = the annual loan interest rate. T = the (remaining) life of the loan. All continuous-time formulas have discrete-time counterparts, which we include as we go. Let c(t) denote the rate of cash flow paid to the mortgage holder (i.e. the bank). With an outstanding loan balance of LB(t) at time t, in the next t units of time the bank increases the loan balance by ilb(t) t, the interest it expects the mortgagee to pay, but will subtract the payment c(t) t it receives. Therefore, the change in loan balance from t to t + t is which, as t 0, implies that LB(t + t) LB(t) = ilb(t) t c(t) t, (1) d LB(t) = ilb(t) c(t). (2) dt The solution to the differential equation (2) may be readily verified as 1 Note that we can invert (3) to reveal that LB(t) = e it{ t } LB(0) e is c(s)ds. (3) 0 t LB(0) = e it LB(t) + e is c(s)ds, (4) 0 which merely states that present value of all cash the bank receives up to time t including repayment of the outstanding loan balance at time t (which pays off the loan) must equal the original loan balance, i.e., the bank is indifferent to these two cash flow streams. 1 Use the product rule of differentiation and the Fundamental Theorem of Calculus. 7

8 We now proceed to calculate the principal and interest payments at time t. The total payment M = IP (t) + P P (t) (5) is the sum of the principal and interest payments, and since IP (t) = ilb(t), P P (t) = M ilb(t). (6) Since we now know how to compute M and LB(t) we can compute P P (t), too. However, we can do better. Since ilb(t) = IP (t) and c(t) = IP (t) + P P (t), it follows immediately from (2) that d LB(t) = P P (t). (7) dt Now take the time derivative of both sides of (6) and use the identity (7) to obtain that or that d P P (t) = ip P (t), (8) dt P P (t) = P P (0)e it. (9) We conclude that the principal payments increase exponentially. Perhaps this is not too surprising: we know the loan balance decreases exponentially, and this is solely due to the principal payments. In discrete-time, the period n principal payment is given by P P (n) = P P (1)(1 + i/12) n 1. 2 Conventional Fixed-Rate Mortgage 2.1 Fixed-rate payment A conventional fixed-rate mortgage requires the mortgagee to pay a fixed amount M per month for a duration of T years. In continuous-time, the fixed rate is Y = 12M per year. Setting c(s) = Y and LB(T ) = 0 into (4), we have that or that LB(0) = T 0 e is Y ds = Y i ( 1 e it ) (10) Y = ilb(0). (11) 1 e it The corresponding estimate of the monthly payment is then M = Y/12. Example 1. Consider a 30-year, fixed-rate mortgage for 125,000 at 6.75%. In continuous-time, the yearly payment is (125, 000) Y = 1 e (30) = (12) 8

9 and the monthly payment is estimated as The actual monthly payment is computed as M = 2.2 Remaining loan balance M = Y/12 = (13) (0.0675/12)(125, 000) = (14) 1 ( /12) 360 After replacing c(s) = Y in (3) with its solution (11), and performing a little algebra, we have that { } 1 e i(t t) LB(t) = LB(0) 1 e it. (15) The expression in braces equals the proportion LB(t)/LB(0) of the original loan balance remaining, and T t represents the time (or number of periods) remaining on the loan. To obtain the corresponding discrete-time formula, one simply replace e ix with (1 + i/12) 12x : { } 1 (1 + i/12) 12(T t) LB(t) = LB(0) 1 (1 + i/12) 12T. (16) This is a very useful fact to remember. Remark 1. Suppose it is time t and we wish to take out a loan in the amount of LB(t) for a period of T t at the same rate of interest i. What would be the new (monthly) mortgage payment M t T? Intuition suggests the process is regenerative, namely, the process starts over and this claim is easily verified. From (11) and (15), M t T = 1 12 Y t T = 1 12 ilb(t) 1 e i(t t) = 1 12 ilb(0) 1 e it = 1 12 Y 0 T = M. (17) Example 2. For the loan of Example 1, what is the loan balance after 10 years and 8 months? In continuous-time, the value for t = with T t = Therefore, LB(10. 6) LB(0) = , which implies that the loan balance is 104, In discrete-time, the value of t = 128 with T t = 232 payment periods remaining. Keep in mind you have to convert to monthly periods! Therefore, LB(128) LB(0) = 1 ( /12) 232 = , 1 ( /12) 360 which implies the loan balance is 104,

10 2.3 Prepayment options We now address two practical questions often asked by a mortgagee. In what follows, we let M denote the current monthly payment computed as in Example 1. (1) If I want to pay off my loan in S years, then how much more do I have to pay per month? To answer this question, use (11); that is, M + A = 1 12 from which one may solve for A. In discrete-time, M + A = 1 12 ilb(0), (18) 1 e is ilb(0) 1 (1 + i/12) 12S (19) (2) If I pay an additional A dollars per month, then how many years S will it take to pay off my loan? To answer this question, use (10); that is, 12(M + A) LB(0) = (1 e is ), (20) i from which one may solve for S. In discrete-time, LB(0) = 12(M + A) (1 (1 + i/12) 12S ). (21) i Example 3. Consider once again the loan of Example 1, and suppose the remaining duration of the loan is 19 years and 4 months. Recall that M = in continuous-time and M = in discrete-time. If we add 100 to our payment each month, then how quickly will the loan be paid off? Let S denote the remaining life of the loan. In continuous-time, we have 104, = (910.05)(12) (1 e S ), which gives S = years. In discrete-time, we have 104, = /12 [1 ( /12) S ], which gives S = months or years. How much do we have to add to our monthly payment to pay off the loan in 10 years (or 120 payments periods)? Let A denote the additional amount. In continuous-time, we have (M + A) = , (0.0675) 1 e (10) = , which means that A = In discrete-time, we have (M + A) = 1 12 which means that A = , (0.0675) = , 1 ( /12)

11 3 Homework Problems Consider a 15-year fixed-rate mortgage for 200,000 at 6.25%. In what follows, the first solution is the discrete-time answer while the solution in brackets is the continuous-time answer. 1. What is the monthly payment? M = [M = ] 2. What is the loan balance after 4 years, 3 months? LB(51) = 160, [LB(4.25) = 160, ] 3. Suppose the remaining duration of the loan is 10 years and 9 months. If we pay 2000 each month how quickly will the loan be paid off? Let S denote the remaining life of the loan. S = months or 8.70 years [S = 8.68 years] 4. Suppose the remaining duration of the loan is 10 years, 9 months. How much do we have to add to our monthly payment to pay off the loan in 5 years? Let A denote the additional amount. A = [A = ] Load files MA Hmk hava, MA Hmk.03.hava and MA Hmk.04.hava to see more complete solutions to these homework problems. 11

12 12

13 MA.01.hava T 5 LB r 0.1 n 1 taxrate 0.4 FixedRateLCF i IP PP netap TP taxshield cashflow LB netlb FixedRatePV FixedPrincipalLCF i IP PP netap TP taxshield cashflow LB netlb FixedPrincipalPV E-12 13

14 MA.02.hava T 5 LB r 0.1 n 1 taxrate 0.4 FixedRateLCF i IP PP netap TP taxshield cashflow LB netlb FixedRatePV FixedPrincipalLCF i IP PP netap TP taxshield cashflow LB netlb FixedPrincipalPV E-13 14

15 MA.03.hava T 5 LB r 0.1 n 1 taxrate 0.4 FixedRateLCF i IP PP netap TP taxshield cashflow LB netlb FixedRatePV FixedPrincipalLCF i IP PP netap TP taxshield cashflow LB netlb FixedPrincipalPV E-13 15

16 MA_Refi.01.hava T 5 LB r 0.1 n 1 taxrate 0.4 new_r 0.08 LCF_FixedRate i IP PP netap TP taxshield cashflow LB netlb LCF_newFixedRate i IP PP netap TP taxshield cashflow LB netlb currentloan_pv currentloan_newpv newloan_pv refibenefit i value

17 CFA.01.hava revyr rev_growth 0 costyr cost_growth 0 investment loanamount 0 loaninterestrate 0.1 loantype FIXED_PRINCIPAL propertylife 5 taxrate 0.4 projecthorizon 4 salvagevalue costofcapital 0.15 loanlcf i IP PP netap TP taxshield cashflow LB netlb AfterTaxCF Date Rev Cost EBITDA Int Depr EBT Taxes NetInc LPCF Depr Inv FCF PV NPV NPV

18 CFA.02.hava revyr rev_growth 0 costyr cost_growth 0 investment loanamount loaninterestrate 0.1 loantype FIXED_PRINCIPAL propertylife 5 taxrate 0.4 projecthorizon 4 salvagevalue costofcapital 0.15 loanlcf i IP PP netap TP taxshield cashflow LB netlb AfterTaxCF Date Rev Cost EBITDA Int Depr EBT Taxes NetInc LPCF Depr Inv FCF PV NPV NPV

19 CFA.03.hava revyr rev_growth 0 costyr cost_growth 0 investment loanamount loaninterestrate 0.1 loantype FIXED_RATE propertylife 5 taxrate 0.4 projecthorizon 4 salvagevalue costofcapital 0.15 loanlcf i IP PP netap TP taxshield cashflow LB netlb AfterTaxCF Date Rev Cost EBITDA Int Depr EBT Taxes NetInc LPCF Depr Inv FCF PV NPV NPV

20 AfterTaxCF Date Rev Cost EBITDA Int Depr EBT Taxes NetInc LPCF Depr Inv FCF PV NPV AfterTaxCF Date Rev Cost EBITDA Int Depr EBT Taxes NetInc LPCF Depr Inv FCF PV NPV AfterTaxCF Date Rev Cost EBITDA Int Depr EBT Taxes NetInc LPCF Depr Inv FCF PV NPV 20

21 Depreciation A. Tax Effect of Depreciation 1. For the current year a company has income of R and cost of C for a net income before tax of R-C for the year. The company s marginal tax rate is τ. The company s after-tax cash flow for the year is therefore (1- τ)[r C]. Example 1. Say R = 3,000 and C = 1,000 with τ = 40%. Then the company s after-tax cash flow for the year is (1 0.40)[3,000 1,000] = 1,200. Note that this may be equivalently expressed as (0.60)[3,000] (0.60)[1,000] = 1, = 1,200. That is, the company receives a net of 60 cents for each dollar of revenue it takes in but it only costs the company 60 cents for dollar of expense. On the expense side note that -(1- τ)[c] = -C + τc = (0.40)(1000), and so the net effect of being able to deduct expenses it that the company receives a tax benefit of τc = 400, i.e., it wrote a check for 1,000 during the year and receives back 400 due to the expense write-off. 2. Let s assume the revenue R is sufficiently high to offset the expenses. In what follows we shall ignore the after-tax cash flow due to revenue, since it is a constant as far as the analysis of the after-tax cash flow due to cost. Now let s suppose for the current year a company spends I = 1000 on capital investment for equipment. The equipment is classified as 5-year property and straight-line depreciation is used. If the company were able to write-off this capital investment as an expense, then the after-tax cash flow would be 600, exactly as in Example 1. However, the government s perspective on this is that the equipment is being used over a 5- year period and provides economic value over its entire book life of 5 years. (The company may choose to use this equipment for more than 5 years.) Consequently, the government will only allow the company to expense each year an appropriate amount for the wear and tear or depreciation of the equipment. Since straight-line depreciation is being used, the depreciation expense each year is 1000/5 = 200. There is NO out-of-pocket depreciation expense each year. That is, the 1000 is spent now; the 200 is computed only for tax purposes. As explained in #1 above, from the after-tax cash flow perspective, this 200 depreciation allowance yields a tax benefit of 0.40(200) = 80 each year for the next 5 years. That is, the after-tax cash flow due to the capital investment for the next 5 years (ignoring the salvage value due to possible sale of equipment) is: , Note how the undiscounted sum of the depreciation allowances over the 5-year horizon adds up to 400, the total tax benefit. Again, the total tax benefit of 400 would be added to the 1,000 if this were an ordinary expense (for materials, labor, etc.). 21

22 Suppose the company were to use a 6% cost of capital for purposes of determining the Net Present Value of this cash flow stream, then the NPV = -1,000 + {[1 (1.06) -5 ]/(0.06)} 80 = -1, (80) = , which translates to a net cost of 66.3% per dollar spent on this capital equipment. Note that if this equipment had been expensed, then the net cost would be 60% per dollar spent. The loss of 6.3% is due to the DELAY of receiving the benefit of 80 per year for 5 years, as above, as opposed to receiving the total of 400 right NOW. Which cash flow would a company prefer? For the purpose of after-tax cash flow, the company would prefer to be able to write-off as much depreciation as quickly as it can. That is, it would prefer accelerated depreciation. For the purpose of reporting profits, however, the company would prefer to delay the expense! The IRS allows a company to keep two sets of books, one for tax purposes and the other for reporting to shareholders. B. Accounting for Depreciation in the Income Statement Example 2. Suppose our company has a net operating income (R C) for the year of 3,000 and a depreciation expense of 1,000. According to what we have learned above, the taxes owed to the government this year would be 0.40(3,000 1,000) = 800. The Flow In is therefore 3,000 and the Flow Out is 800 for a net of 2,200. Here is the income statement approach to this calculation: Income Statement Approach Flow In Flow Out Approach Net Revenue 3,000 Net Revenue 3,000 Expenses Total 1,000 Taxes -800 Income tax 800 Net Income after tax 1,200 Adjustments Depreciation 1,000 After tax cash flow 2,200 After tax cash flow 2,200 In general notation, the two approaches to after tax cash flow are, respectively: Income Statement Approach: Flow In Flow Out Approach: = (1 - τ)[r C Dep] + Dep = (1- τ)[r C] + τ Dep, = [R C] - τ[r C Dep] = (1- τ)[r C] + τ Dep, which produce the same result, as it should. Note that if the depreciation adjustment below the line (i.e. below the Net Income after tax) is NOT made, then the income statement approach would incorrectly report an after tax cash flow of 1,200. The discrepancy would arise because the depreciation allowance is NOT an out of pocket expense. 22

23 SIMPLE EQUIPMENT SELECTION ANALYSIS I. A company must acquire a piece of equipment. It is considering the following two options: a. Initial cost = 1,000. Annual cost = 300. Salvage value = year lifetime. b. Initial cost = 1,300. Annual cost = 270. Salvage value = year lifetime. Discount rate = 12%. Ignore taxes. ANALYSIS: I. COMPUTE PRESENT VALUE: The present value cost of option (a) is: { [ 1 (1.12) -10 ] 0.12} - 100(1.12) -10 = The present value cost of option (b) is: { [ 1 (1.12) -15 ] 0.12} - 200(1.12) -15 = COMPUTE ANNUAL EQUIVALENT: The Annual Equivalent (or Worth) of option (a) is: { 0.12 [ 1 (1.12) -10 ] } = , and its lifetime cost is: = The Annual Equivalent (or Worth) of option (b) is: { 0.12 [ 1 (1.12) -15 ] } = , and its lifetime cost is: =

24 II. A manufacturer requires a chemical finishing process for a product produced under contract for 4 years. Three options are available. Initial cost of process device A = 100,000. It has an annual cost = 60,000 and a salvage value = 10,000 after 4 years. Initial cost of process device B = 150,000. It has an annual cost = 50,000 and a salvage value = 30,000 after 6 years. It is also possible to subcontract at 100,000 per year. Appropriate cost of capital is 10%. Marginal tax rate = 40%. ANALYSIS: We shall assume process devices are classified as 5-year property with SL depreciation. For purposes of estimating salvage value we shall assume that the market value of both process devices depreciates in a straight line to its terminal projected market (salvage) values. Thus, the salvage value for process device A is 10,000, and for process device B it is 70,000. Finally, we assume there are other profitable ongoing operations sufficient to cover any losses on sale of equipment. Process Device A Operations cost 60,000 60,000 60,000 60,000 Depreciation 20,000 20,000 20,000 20,000 Total cost 80,000 80,000 80,000 80,000 Tax benefit 32,000 32,000 32,000 32,000 After-tax cost 48,000 48,000 48,000 48,000 Depreciation 20,000 20,000 20,000 20,000 Investment -100, *14,000 After-tax cash flow -100,000-28,000-28,000-28,000-14,000 Process Device B Operations cost 50,000 50,000 50,000 50,000 Depreciation 30,000 30,000 30,000 30,000 Total cost 80,000 80,000 80,000 80,000 Tax benefit 32,000 32,000 32,000 32,000 After-tax cost 48,000 48,000 48,000 48,000 Depreciation 30,000 30,000 30,000 30,000 Investment -150, **54,000 After-tax cash flow -150,000-18,000-18,000-18,000 36,000 * 14,000 = 10, (10,000 20,000) ** 54,000 = 70, (70,000 30,000). 10% of after-tax cash flow for A = -179,194. Annual Equivalent (AE) for 4 years = -56, % of after-tax cash flow for B = -170,175. AE for 4 years = -53, % of after-tax cash flow for subcontracting = -190,192. AE for 4 years = -60,000. Process device B is the best option. SENSITIVITY ANALYSIS: What is the salvage value of B after 4 years that would cause the manufacturer to be indifferent in choosing between it and A? Let δ SV denote the change in salvage value of B for which we would be indifferent between it and A. The new salvage value = 70 + δ SV. The change to after-tax cash flows for B will simply be (1-τ)δ SV = 0.60δ SV. The present value of this 10% = 0.60δ SV (1.1) -4. This must equal (-179,194) - (-170,175) = -9,019. Thus, δ SV = -22,008 so that the break-even salvage value = 47,

25 Selecting a Bid Price A municipality needs to dispose of 1 million tons of refuse each year for the next 5 years. It is requesting bids from firms for the business. A bid of R means that the firm contractually agrees to receive $R/ton each year for the next 5 years from the municipality in exchange for disposing of the refuse. A new firm is planning to bid for the business, and has asked you to recommend a bid price. The firm will have to acquire a new fleet of trucks to pick up the refuse. The cost of the trucks to handle the proposed volume is $6 million. The projected market value of the trucks is $2 million at the end of 5 years. The trucks are classified as 5-year property and straight-line depreciation is used. A landfill is also required for disposal. The municipality s sole landfill owner is currently charging $5/ton each year. Fuel and labor are projected at $1/ton per year. There is an administrative cost of $0.5 million each year to set up contracts, acquire capital goods, plan operations, etc. To be qualified for a bid a firm must finance at least 50% of the initial investment with equity. The loan interest rate offered by the local bank is 10% compounded annually with principal repaid in five equal annual installments. The marginal tax rate of the company is 40%. The after-tax cost of equity capital is 20%. What bid price do you recommend? SAMPLE WORKSHEET: Revenues Cost Landfill cost Labor/fuel cost Administrative cost EBITDA Interest expense Depreciation EBT Taxes Net Income Adjustments Loan principal cash flow Depreciation Investment Free cash flow

26 26

27 PBA.01.hava cashflows ((0, -175), (1, 110), (2, 121)) marr 0.1 numcompoundperiods 1 ProjectBalances_marr t cashflow projectbalance PresentValueAnalysis_marr date flow rpv irr ProjectBalances_irr t cashflow projectbalance PresentValueAnalysis_irr date flow rpv

28 PBA.02.hava cashflows ((0, ), (1, 33600), (2, 33600), (3, 33600), (4, 73200)) marr 0.15 numcompoundperiods 1 ProjectBalances_marr t cashflow projectbalance PVA_marr date flow rpv irr ProjectBalances_irr t cashflow projectbalance PVA_irr date flow rpv PBA.03.hava cashflows ((0, ), (1, 8800), (2, 10000), (3, 11200), (4, 52000)) marr 0.15 numcompoundperiods 1 ProjectBalances_marr t cashflow projectbalance PVA_marr date flow rpv irr ProjectBalances_irr t cashflow projectbalance PVA_irr date flow rpv

29 IRA.01.hava numcompoundperiods 1 SpotRates date rate ForwardRates date1 date2 rate Discounts date1 date2 discountfactor IRA.02.hava numcompoundperiods 2 SpotRates date rate ForwardRates date1 date2 rate Discounts date1 date2 discountfactor

30 IRA.03.hava numcompoundperiods 1 SpotRates date rate ForwardRates date1 date2 rate Discounts date1 date2 discountfactor

31 PVA.01.hava cashflows ((1, 1100), (2, 1210), (3, 1331)) spotrates ((1, 0.1), (2, 0.1), (3, 0.1)) numcompoundperiods 1 cashflowvalue PV_Analysis date flow npv Discounts date1 date2 discountfactor ForwardRates date1 date2 rate ytm PVA.02.hava cashflows ((1, 1100), (2, 1210), (3, 1331)) spotrates ((1, 0.1), (2, 0.09), (3, 0.08)) numcompoundperiods 1 cashflowvalue PV_Analysis date flow npv Discounts date1 date2 discountfactor ForwardRates date1 date2 rate ytm

32 32

33 BA.01.hava coupon 0.06 issemiannual false maturity 4 facevalue 1000 numcompoundperiods 1 spotrates cashflows bondprice presentvalueanalysis date flow rpv ytm BA.02.hava coupon 0.06 issemiannual false maturity 4 facevalue 1000 numcompoundperiods 1 spotrates cashflows bondprice presentvalueanalysis date flow rpv ytm

34 BA.03.hava coupon 0.06 issemiannual false maturity 4 facevalue 1000 numcompoundperiods 1 spotrates cashflows bondprice presentvalueanalysis date flow rpv ytm

35 BA.04.hava coupon 0.06 issemiannual false maturity 4 facevalue 1000 numcompoundperiods 1 spotrates cashflows bondprice presentvalueanalysis date flow rpv ForwardRates date1 date2 rate Discounts date1 date2 discountfactor ytm

36 BA.05.hava coupon 0.06 issemiannual true maturity 4 facevalue 1000 numcompoundperiods 2 spotrates cashflows bondprice presentvalueanalysis date flow rpv

37 ForwardRates date1 date2 rate

38 Discounts date1 date2 discountfactor ytm Sensitivity Analysis delta newspotrates newbondprice presentvalueanalysis2 date flow rpv durationestimate

39 DSRA.01.hava numbonds 4 couponrates (0, 0.035, 0.04, 0.045) maturities (1, 2, 3, 4) facevalues (1000, 1000, 1000, 1000) issemiannual false prices ( , , , ) bonddata coupon issemiannual maturity facevalue 0 false false false false bondcashflowmatrix deriveddiscountfactors derivedspotrates NB: Supplied spot rate curve to derive bond price data above spotrates discountfactors derivedprices

40 DSRA.02.hava numbonds 4 couponrates (0.06, 0.07, 0, 0.09) maturities (0.5, 1.5, 1.5, 2) facevalues (1000, 1000, 1000, 1000) issemiannual true prices ( , , , ) bonddata coupon issemiannual maturity facevalue 0.06 true true true true bondcashflowmatrix deriveddiscountfactors derivedspotrates NB: Supplied spot rate curve to derive bond price data above spotrates discountfactors derivedprices

41 CASH FLOW ANALYSIS SAMPLE PROBLEMS 1. You invest $1000 today in a bank. Stated annual interest is 4%. How much money will you have (to the nearest penny) if this investment is a. compounded annually for 4 years? b. compounded semi-annually for 4 years? c. compounded continuously for 4 years? 2. You invest $1000 today in a bank. Stated annual interest is 8%. How much money will you have (to the nearest penny) if this investment is a. compounded annually at 8% for 4 years? b. compounded semi-annually for 4 years? c. compounded quarterly for 7.5 years? d. compounded continuously for 4 years? 3. Consider the cash flow stream (C 0, C 1, C 2, C 3, C 4, C 5, C 6, C 7, C 8,, C 40, C 41 ) = (100, 110, 100, 110, 100, 110,, 100, 110). (The pattern (100, 110) repeats itself.) The appropriate per-period rate of interest is 10%. Determine the present value of this cash flow stream. 4. Ms. Jones financed her home purchase with a fixed-rate 20-yr mortgage at 6%. The original loan balance was 400, With her monthly mortgage just paid her current loan balance is 301, a. What is Jones s monthly payment to the bank? b. How many months remain until the loan is paid off? c. Jones would like to pay off her loan sooner. She has decided that she would like to pay off her loan in 10 years, and is willing to add $A per month to her payment. What is the value for A? 5. Jones financed his home purchase with a conventional fixed-rate 30-yr mortgage at 9%. The original loan balance was 200, With his monthly mortgage just paid his current loan balance is 173, a. What is Jones s monthly payment to the bank? b. How many months remain until the loan is paid off? c. Jones would like to pay off his loan sooner. He has decided that he can afford an extra 50 per month. How many months will it take to pay off his loan? 6. A company has two options for a machine it must purchase. The manufacturer s discount rate is 10%. Ignore taxes and depreciation. Type I: Initial cost = 250,000. Annual cost = 40, yr lifetime. Salvage value = 80,000. Type II: Initial cost = 400,000. Annual cost = 20, yr lifetime. Salvage value = 50,000. Use the annual equivalent method to determine which machine to purchase. 7. A company must purchase a piece of equipment. Two types are being considered: TYPE A: initial cost = 1000, annual cost = 400, salvage value = 300, 5-yr lifetime. TYPE B: initial cost = 2000, annual cost = 200, salvage value = 800, 8-yr lifetime. Discount rate is 10%. Use the annual equivalent method to recommend which equipment type to purchase. Ignore taxes and use annual compounding. 41

42 8. A manufacturer must acquire equipment to produce a product for a customer for a period of exactly two years. Relevant data are: Revenues are projected to be 600,000 in the first year and 800,000 in the second year. The manufacturer s discount rate is 15% and its marginal tax rate is 30%. For tax purposes straight-line depreciation is used. The equipment s market value depreciates at a rate of 30% per year, i.e., its value at the end of the year is 70% of the value at the beginning of the year. The equipment will be classified as 7-year property. The equipment initially costs 350,000, of which 150,000 will be financed by a 2-year loan at 12% interest, with principal repaid in two equal annual installments. First year annual operating costs will be 250,000. Each successive year these costs rise by 10%. Use annual compounding. Obtain the after-tax cash flows by filling out the following table. Revenues Expenses EBITDA Interest Depreciation EBT Taxes Net Income Adjustments Loan principal cash flow Depreciation Investment Free cash flow Net present value Project cash flow analysis A manufacturer must acquire equipment to produce a product for a customer for a period of exactly two years. Relevant data are: Revenues are projected to be 500,000 in the first year and 700,000 in the second year. The manufacturer s discount rate is 12% and its marginal tax rate is 30%. For tax purposes straight-line depreciation is used. The equipment s market value depreciates at a rate of 40% per year, i.e., its value at the end of the year is 60% of the value at the beginning of the year. The equipment will be classified as 5-year property. The equipment initially costs 250,000, of which 100,000 will be financed by a 2-year loan at 10% interest, with principal repaid in two equal annual installments. First year annual operating costs will be 400,000. Each successive year these costs rise by 25%. Use annual compounding. Obtain the after-tax cash flows by filling out the following table. Revenues Expenses EBITDA Project cash flow analysis

43 Interest Depreciation EBT Taxes Net Income Adjustments Loan principal cash flow Depreciation Investment Free cash flow Net present value 10. Company X is considering investing in one of two mutually exclusive projects, A and B. The Company s cost of capital is 12% (annual compounding). The after tax cash flows for projects A and B are as follows: Project A -18,000 5,650 16,600 B -6,000 4,600 2,645 The IRR for project A is 13% and the IRR for project B is 15%. Which project (if any) do you recommend for investment? 11. At time 0 the cash flows associated with a financial instrument are as shown in the table. Time Cash flow How would the market describe this type of financial instrument? 12. The price of a 6% coupon bond with semi-annual payments and a face value of 100 is Is its YTM higher or lower than 6%? Explain. 13. The current annual spot rate curve s = (s 1, s 2, s 3, s 4, s 5 ) = (5.00, 5.25, 5.50, 5.00, 4.75). Determine the forward rate f The current annual short rate curve r = (r 0, r 1, r 2 ) = (4.4, 4.8, 5.5). Determine the current annual spot rate curve s = (s 1, s 2, s 3 ). 15. In this problem all bonds have face values of 100 and all coupon payments are annual. Bond A is a 2-year, zero coupon bond. Its price is Bond B is a 3-year, 6% coupon bond. Its price is Bond C is a 2-year, 8% coupon bond. Its price is Determine the annual spot rate curve s = (s 1, s 2, s 3 ). 16. In this problem all bonds have face values of 1000 and all coupon payments are annual. Bond A is a 1-year, zero coupon bond. Its price is Bond B is a 2-year, 6% coupon bond. Its price is Bond C is a 4-year, 9% coupon bond. Its price is Bond D is a 4-year, 8% coupon bond. Its price is Consider a liability stream (L 1, L 2, L 3, L 4 ) for the next 4 years. Precisely explain how it is possible to use the 4 bonds above to obtain an immunization that will exhibit absolutely no interest risk over the next 4 years. (Do not solve.) 43

44 CASH FLOW ANALYSIS SAMPLE PROBLEM SOLUTIONS 1. a. (1000)(1.04) 4 = b. 1000(1.02) 8 = c. 1000e 0.16 = a. 1000(1.08) 4 = b. 1000(1.04) 8 = c. 1000(1.02) 30 = d. 1000e.32 = The PV with r = 10% of (C 0, C 1 ) = (100, 110) at time 0 is, of course, 200. The cash flow stream is therefore equivalent to (200, 0, 200, 0, 200,, 200, 0), where the last 200 occurs at time 40. This cash flow stream is equivalent to 200 at each time t = 0, 1, 2,..., 20, where the period length is 2 years. Since (1.1) 2 1 = 0.21, the PV equals 200[1 + (1 (1.21) -20 )/0.21] = a. M = (0.005)(400,000)/[1 (1.005) -240 ] = b. The ratio LB(t)/LB(0) = 301,903.48/400,000. We know that LB(t)/LB(0) = [1 (1.005) (240-t) ]/[1 (1.005) -240 ]. Thus, the number of months remaining is (240-t) = 150. Alternatively, 301, = [ /0.005][1 (1.005) n ], which gives n = 150. c. We seek the value of A such that [( A)/0.005][1 (1.005) -120 ] = 301, a. M = 200,000(0.09/12)/[1 ( /12) -360 ] = b. 173,719.16/200,000 = [1 (1.0075) -n ]/[1 (1.0075) -360 ] and so n = 222. c. Seek n such that 173, = ( /0.0075) [1 (1.0075) -n ] and so n = PV I = 250, ,000[1 (1.1) -4 ]/(0.1) 80,000/(1.1) 4 = 322,154. AE I = [0.1PV I ]/[1 (1.1) -4 ] = 101,630. PV II = 400, ,000[1 (1.1) -7 ]/(0.1) 50,000/(1.1) 7 = 471,710. AE II = [0.1PV II ]/[1 (1.1) -7 ] = 96,892. Recommend Type II machine. 7. PV A = (400/0.1)[1 (1.1) -5 ] - 300(1.1) -5 = AE A = 0.1( )/[1 (1.1) -5 ] = PV B = (200/0.1)[1 (1.1) -8 ] - 800(1.1) -8 = AE B = 0.1( )/[1 (1.1) -8 ] = Recommend equipment type B. 44

45 8. Project cash flow analysis Revenues 600, ,000 Expenses 250, ,000 EBITDA 350, ,000 Interest 18,000 9,000 Depreciation 50,000 50,000 EBT 282, ,000 Taxes 84, ,800 Net Income 197, ,200 Adjustments Loan principal cash flow 150,000-75,000-75,000 Depreciation 50,000 50,000 Investment -350, ,050 Free cash flow -200, , ,250 Net present value 325, , ,250 SV = (0.7) 2 (350,000) = 171,500. BV = 250,000. Taxes = 0.3(171, ,000) = -23,550. SV taxes = 171,500 (-23,550) = 195, Project cash flow analysis Revenues 500, ,000 Expenses 400, ,000 EBITDA 100, ,000 Interest 10,000 5,000 Depreciation 50,000 50,000 EBT 40, ,000 Taxes 12,000 43,500 Net Income 28, ,500 Adjustments Loan principal cash flow 100,000-50,000-50,000 Depreciation 50,000 50,000 Investment -250, ,000 Free cash flow -150,000 28, ,500 Net present value 42, , ,500 SV = (0.6) 2 (250,000) = 90,000. BV = 150,000. Taxes = 0.3(90, ,000) = -18,000. SV taxes = 90,000 (-18,000) = 108, NPV A = -18, ,560/ ,600/(1.12) 2 = NPV B = -6, ,600/ ,645/(1.12) 2 = Since NPV A > NPV B > 0, project A is recommended. (The IRR s are irrelevant.) % level coupon bond, face value of 100, 3 yr maturity. 45

46 12. Bond sells at a premium, which implies its YTM must be less than 6%. 13. (1 + f 24 ) 2 = (1.05) 4 / ) 2. Thus, f 24 = 4.75%. {Note that [4(5) 2(5.25)]/2 = 4.75.} 14. s 1 = 4.4. (1.044)(1.048) = (1 + s 2 ) 2 and so s 2 = 4.6. (1 + s 2 ) 2 (1.055) = (1 + s 3 ) 3 and so s 3 = = 100/(1 + s 2 ) 2 and so s 2 = = 8/(1 + s 1 ) + 108/(1.07) 2 and so s 1 = Finally, = 6/(1.065) + 6/(1.07) /(1 + s 3 ) 3 and so s 3 = The cash flows associated with these 4 bonds are: Bond A B C D One can achieve an exact cash match by selecting the number of bonds of each type so that the following 4 equalities hold: 1000n A + 60n B + 90n C + 80n D = L n B + 90n C + 80n D = L 2. 90n C + 80n D = L n C n D = L 4. This linear system is easily solvable. The cost of the portfolio, which also equals the present value of the liabilities, is n A n B n C n D. 46

MFE8812 Bond Portfolio Management

MFE8812 Bond Portfolio Management MFE8812 Bond Portfolio Management William C. H. Leon Nanyang Business School January 16, 2018 1 / 63 William C. H. Leon MFE8812 Bond Portfolio Management 1 Overview Value of Cash Flows Value of a Bond

More information

MULTIPLE-CHOICE QUESTIONS Circle the correct answer on this test paper and record it on the computer answer sheet.

MULTIPLE-CHOICE QUESTIONS Circle the correct answer on this test paper and record it on the computer answer sheet. M I M E 3 1 0 E N G I N E E R I N G E C O N O M Y Class Test #2 Thursday, 23 March, 2006 90 minutes PRINT your family name / initial and record your student ID number in the spaces provided below. FAMILY

More information

DISCOUNTED CASH-FLOW ANALYSIS

DISCOUNTED CASH-FLOW ANALYSIS DISCOUNTED CASH-FLOW ANALYSIS Objectives: Study determinants of incremental cash flows Estimate incremental after-tax cash flows from accounting data and use them to estimate NPV Introduce salvage value

More information

Global Financial Management

Global Financial Management Global Financial Management Valuation of Cash Flows Investment Decisions and Capital Budgeting Copyright 2004. All Worldwide Rights Reserved. See Credits for permissions. Latest Revision: August 23, 2004

More information

Real Estate. Refinancing

Real Estate. Refinancing Introduction This Solutions Handbook has been designed to supplement the HP-12C Owner's Handbook by providing a variety of applications in the financial area. Programs and/or step-by-step keystroke procedures

More information

3 Leasing Decisions. The Institute of Chartered Accountants of India

3 Leasing Decisions. The Institute of Chartered Accountants of India 3 Leasing Decisions BASIC CONCEPTS AND FORMULAE 1. Introduction Lease can be defined as a right to use an equipment or capital goods on payment of periodical amount. Two principal parties to any lease

More information

Disclaimer: This resource package is for studying purposes only EDUCATION

Disclaimer: This resource package is for studying purposes only EDUCATION Disclaimer: This resource package is for studying purposes only EDUCATION Chapter 6: Valuing stocks Bond Cash Flows, Prices, and Yields - Maturity date: Final payment date - Term: Time remaining until

More information

Measuring Interest Rates

Measuring Interest Rates Measuring Interest Rates Economics 301: Money and Banking 1 1.1 Goals Goals and Learning Outcomes Goals: Learn to compute present values, rates of return, rates of return. Learning Outcomes: LO3: Predict

More information

I. Interest Rate Sensitivity

I. Interest Rate Sensitivity University of California, Merced ECO 163-Economics of Investments Chapter 11 Lecture otes I. Interest Rate Sensitivity Professor Jason Lee We saw in the previous chapter that there exists a negative relationship

More information

Cash Flow and the Time Value of Money

Cash Flow and the Time Value of Money Harvard Business School 9-177-012 Rev. October 1, 1976 Cash Flow and the Time Value of Money A promising new product is nationally introduced based on its future sales and subsequent profits. A piece of

More information

Global Financial Management

Global Financial Management Global Financial Management Bond Valuation Copyright 24. All Worldwide Rights Reserved. See Credits for permissions. Latest Revision: August 23, 24. Bonds Bonds are securities that establish a creditor

More information

Solutions to Problems

Solutions to Problems Solutions to Problems 1. The investor would earn income of $2.25 and a capital gain of $52.50 $45 =$7.50. The total gain is $9.75 or 21.7%. $8.25 on a stock that paid $3.75 in income and sold for $67.50.

More information

Section 5.1 Simple and Compound Interest

Section 5.1 Simple and Compound Interest Section 5.1 Simple and Compound Interest Question 1 What is simple interest? Question 2 What is compound interest? Question 3 - What is an effective interest rate? Question 4 - What is continuous compound

More information

Chapter. Bond Basics, I. Prices and Yields. Bond Basics, II. Straight Bond Prices and Yield to Maturity. The Bond Pricing Formula

Chapter. Bond Basics, I. Prices and Yields. Bond Basics, II. Straight Bond Prices and Yield to Maturity. The Bond Pricing Formula Chapter 10 Bond Prices and Yields Bond Basics, I. A Straight bond is an IOU that obligates the issuer of the bond to pay the holder of the bond: A fixed sum of money (called the principal, par value, or

More information

Equity Valuation APPENDIX 3A: Calculation of Realized Rate of Return on a Stock Investment.

Equity Valuation APPENDIX 3A: Calculation of Realized Rate of Return on a Stock Investment. sau4170x_app03.qxd 10/24/05 6:12 PM Page 1 Chapter 3 Interest Rates and Security Valuation 1 APPENDIX 3A: Equity Valuation The valuation process for an equity instrument (such as common stock or a share)

More information

Lecture 3. Chapter 4: Allocating Resources Over Time

Lecture 3. Chapter 4: Allocating Resources Over Time Lecture 3 Chapter 4: Allocating Resources Over Time 1 Introduction: Time Value of Money (TVM) $20 today is worth more than the expectation of $20 tomorrow because: a bank would pay interest on the $20

More information

Bond duration - Wikipedia, the free encyclopedia

Bond duration - Wikipedia, the free encyclopedia Page 1 of 7 Bond duration From Wikipedia, the free encyclopedia In finance, the duration of a financial asset, specifically a bond, is a measure of the sensitivity of the asset's price to interest rate

More information

REVIEW MATERIALS FOR REAL ESTATE FUNDAMENTALS

REVIEW MATERIALS FOR REAL ESTATE FUNDAMENTALS REVIEW MATERIALS FOR REAL ESTATE FUNDAMENTALS 1997, Roy T. Black J. Andrew Hansz, Ph.D., CFA REAE 3325, Fall 2005 University of Texas, Arlington Department of Finance and Real Estate CONTENTS ITEM ANNUAL

More information

Chapter 6 Capital Budgeting

Chapter 6 Capital Budgeting Chapter 6 Capital Budgeting The objectives of this chapter are to enable you to: Understand different methods for analyzing budgeting of corporate cash flows Determine relevant cash flows for a project

More information

Lecture 20: Bond Portfolio Management. I. Reading. A. BKM, Chapter 16, Sections 16.1 and 16.2.

Lecture 20: Bond Portfolio Management. I. Reading. A. BKM, Chapter 16, Sections 16.1 and 16.2. Lecture 20: Bond Portfolio Management. I. Reading. A. BKM, Chapter 16, Sections 16.1 and 16.2. II. Risks associated with Fixed Income Investments. A. Reinvestment Risk. 1. If an individual has a particular

More information

CHAPTER 4 DISCOUNTED CASH FLOW VALUATION

CHAPTER 4 DISCOUNTED CASH FLOW VALUATION CHAPTER 4 DISCOUNTED CASH FLOW VALUATION Answers to Concept Questions 1. Assuming positive cash flows and interest rates, the future value increases and the present value decreases. 2. Assuming positive

More information

AFM 271 Practice Problem Set #2 Spring 2005 Suggested Solutions

AFM 271 Practice Problem Set #2 Spring 2005 Suggested Solutions AFM 271 Practice Problem Set #2 Spring 2005 Suggested Solutions 1. Text Problems: 6.2 (a) Consider the following table: time cash flow cumulative cash flow 0 -$1,000,000 -$1,000,000 1 $150,000 -$850,000

More information

SECTION HANDOUT #1 : Review of Topics

SECTION HANDOUT #1 : Review of Topics SETION HANDOUT # : Review of Topics MBA 0 October, 008 This handout contains some of the topics we have covered so far. You are not required to read it, but you may find some parts of it helpful when you

More information

Finance 402: Problem Set 5 Solutions

Finance 402: Problem Set 5 Solutions Finance 402: Problem Set 5 Solutions Note: Where appropriate, the final answer for each problem is given in bold italics for those not interested in the discussion of the solution. 1. The first step is

More information

Introduction to Capital

Introduction to Capital Introduction to Capital What is Capital? Money invested in business to generate income The money, property, and other valuables which collectively represent the wealth of an individual or business The

More information

TVM Appendix: Using the TI-83/84

TVM Appendix: Using the TI-83/84 Time Value of Money Problems on a Texas Instruments TI-84 Before you start: To calculate problems on a TI-84, you have to go into the applications menu, the lavender APPS key on the calculator. Several

More information

CHAPTER 4 DISCOUNTED CASH FLOW VALUATION

CHAPTER 4 DISCOUNTED CASH FLOW VALUATION CHAPTER 4 DISCOUNTED CASH FLOW VALUATION Answers to Concepts Review and Critical Thinking Questions 1. Assuming positive cash flows and interest rates, the future value increases and the present value

More information

Fin 5413: Chapter 06 - Mortgages: Additional Concepts, Analysis, and Applications Page 1

Fin 5413: Chapter 06 - Mortgages: Additional Concepts, Analysis, and Applications Page 1 Fin 5413: Chapter 06 - Mortgages: Additional Concepts, Analysis, and Applications Page 1 INTRODUCTION Solutions to Problems - Chapter 6 Mortgages: Additional Concepts, Analysis, and Applications The following

More information

CHAPTER 8. Valuing Bonds. Chapter Synopsis

CHAPTER 8. Valuing Bonds. Chapter Synopsis CHAPTER 8 Valuing Bonds Chapter Synopsis 8.1 Bond Cash Flows, Prices, and Yields A bond is a security sold at face value (FV), usually $1,000, to investors by governments and corporations. Bonds generally

More information

Copyright 2015 by the UBC Real Estate Division

Copyright 2015 by the UBC Real Estate Division DISCLAIMER: This publication is intended for EDUCATIONAL purposes only. The information contained herein is subject to change with no notice, and while a great deal of care has been taken to provide accurate

More information

Bond Analysis & Valuation Solutions

Bond Analysis & Valuation Solutions Bond Analysis & Valuation s Category of Problems 1. Bond Price...2 2. YTM Calculation 14 3. Duration & Convexity of Bond 30 4. Immunization 58 5. Forward Rates & Spot Rates Calculation... 66 6. Clean Price

More information

4. D Spread to treasuries. Spread to treasuries is a measure of a corporate bond s default risk.

4. D Spread to treasuries. Spread to treasuries is a measure of a corporate bond s default risk. www.liontutors.com FIN 301 Final Exam Practice Exam Solutions 1. C Fixed rate par value bond. A bond is sold at par when the coupon rate is equal to the market rate. 2. C As beta decreases, CAPM will decrease

More information

MS-E2114 Investment Science Lecture 3: Term structure of interest rates

MS-E2114 Investment Science Lecture 3: Term structure of interest rates MS-E2114 Investment Science Lecture 3: Term structure of interest rates A. Salo, T. Seeve Systems Analysis Laboratory Department of System Analysis and Mathematics Aalto University, School of Science Overview

More information

3: Balance Equations

3: Balance Equations 3.1 Balance Equations Accounts with Constant Interest Rates 15 3: Balance Equations Investments typically consist of giving up something today in the hope of greater benefits in the future, resulting in

More information

UNIVERSITY OF TORONTO Joseph L. Rotman School of Management SOLUTIONS. C (1 + r 2. 1 (1 + r. PV = C r. we have that C = PV r = $40,000(0.10) = $4,000.

UNIVERSITY OF TORONTO Joseph L. Rotman School of Management SOLUTIONS. C (1 + r 2. 1 (1 + r. PV = C r. we have that C = PV r = $40,000(0.10) = $4,000. UNIVERSITY OF TORONTO Joseph L. Rotman School of Management RSM332 PROBLEM SET #2 SOLUTIONS 1. (a) The present value of a single cash flow: PV = C (1 + r 2 $60,000 = = $25,474.86. )2T (1.055) 16 (b) The

More information

2. I =interest (in dollars and cents, accumulated over some period)

2. I =interest (in dollars and cents, accumulated over some period) A. Recap of the Variables 1. P = principal (as designated at some point in time) a. we shall use PV for present value. Your text and others use P for PV (We shall do it sometimes too!) 2. I =interest (in

More information

4: Single Cash Flows and Equivalence

4: Single Cash Flows and Equivalence 4.1 Single Cash Flows and Equivalence Basic Concepts 28 4: Single Cash Flows and Equivalence This chapter explains basic concepts of project economics by examining single cash flows. This means that each

More information

CHAPTER 4 DISCOUNTED CASH FLOW VALUATION

CHAPTER 4 DISCOUNTED CASH FLOW VALUATION CHAPTER 4 DISCOUNTED CASH FLOW VALUATION Answers to Concept Questions 1. Assuming positive cash flows and interest rates, the future value increases and the present value decreases. 2. Assuming positive

More information

Understanding Interest Rates

Understanding Interest Rates Money & Banking Notes Chapter 4 Understanding Interest Rates Measuring Interest Rates Present Value (PV): A dollar paid to you one year from now is less valuable than a dollar paid to you today. Why? -

More information

Bond Valuation. FINANCE 100 Corporate Finance

Bond Valuation. FINANCE 100 Corporate Finance Bond Valuation FINANCE 100 Corporate Finance Prof. Michael R. Roberts 1 Bond Valuation An Overview Introduction to bonds and bond markets» What are they? Some examples Zero coupon bonds» Valuation» Interest

More information

Bond Valuation. Capital Budgeting and Corporate Objectives

Bond Valuation. Capital Budgeting and Corporate Objectives Bond Valuation Capital Budgeting and Corporate Objectives Professor Ron Kaniel Simon School of Business University of Rochester 1 Bond Valuation An Overview Introduction to bonds and bond markets» What

More information

I. Warnings for annuities and

I. Warnings for annuities and Outline I. More on the use of the financial calculator and warnings II. Dealing with periods other than years III. Understanding interest rate quotes and conversions IV. Applications mortgages, etc. 0

More information

Chapter 4 Interest Rate Measurement and Behavior Chapter 5 The Risk and Term Structure of Interest Rates

Chapter 4 Interest Rate Measurement and Behavior Chapter 5 The Risk and Term Structure of Interest Rates Chapter 4 Interest Rate Measurement and Behavior Chapter 5 The Risk and Term Structure of Interest Rates Fisher Effect (risk-free rate) Interest rate has 2 components: (1) real rate (2) inflation premium

More information

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Learning Objectives LO1 How to compute the net present value and why it is the best decision criterion. LO2 The payback rule and some of its shortcomings.

More information

Chapter 15 Inflation

Chapter 15 Inflation Chapter 15 Inflation 15-1 The first sewage treatment plant for Athens, Georgia cost about $2 million in 1964. The utilized capacity of the plant was 5 million gallons/day (mgd). Using the commonly accepted

More information

Course FM/2 Practice Exam 2 Solutions

Course FM/2 Practice Exam 2 Solutions Course FM/ Practice Exam Solutions Solution 1 E Nominal discount rate The equation of value is: 410 45 (4) (4) d d 5,000 1 30,000 1 146,84.60 4 4 We let 0 (4) d x 1 4, and we can determine x using the

More information

Lesson Exponential Models & Logarithms

Lesson Exponential Models & Logarithms SACWAY STUDENT HANDOUT SACWAY BRAINSTORMING ALGEBRA & STATISTICS STUDENT NAME DATE INTRODUCTION Compound Interest When you invest money in a fixed- rate interest earning account, you receive interest at

More information

The Time Value. The importance of money flows from it being a link between the present and the future. John Maynard Keynes

The Time Value. The importance of money flows from it being a link between the present and the future. John Maynard Keynes The Time Value of Money The importance of money flows from it being a link between the present and the future. John Maynard Keynes Get a Free $,000 Bond with Every Car Bought This Week! There is a car

More information

Strategic Investment & Finance Solutions to Exercises

Strategic Investment & Finance Solutions to Exercises Strategic Investment & Finance Solutions to Exercises Exercise 1 Question a 40 30 30 20 20 0 1 2 3 4 5-100 With a discount rate equal to 10%: NPV 0 = 100 +40 1.1 1 +30 1.1 2 +30 1.1 3 +20 1.1 4 + 20 1.1

More information

Simple Interest. Simple Interest is the money earned (or owed) only on the borrowed. Balance that Interest is Calculated On

Simple Interest. Simple Interest is the money earned (or owed) only on the borrowed. Balance that Interest is Calculated On MCR3U Unit 8: Financial Applications Lesson 1 Date: Learning goal: I understand simple interest and can calculate any value in the simple interest formula. Simple Interest is the money earned (or owed)

More information

Our Own Problems and Solutions to Accompany Topic 11

Our Own Problems and Solutions to Accompany Topic 11 Our Own Problems and Solutions to Accompany Topic. A home buyer wants to borrow $240,000, and to repay the loan with monthly payments over 30 years. A. Compute the unchanging monthly payments for a standard

More information

MATH/STAT 2600, Theory of Interest FALL 2014 Toby Kenney

MATH/STAT 2600, Theory of Interest FALL 2014 Toby Kenney MATH/STAT 2600, Theory of Interest FALL 2014 Toby Kenney In Class Examples () September 11, 2014 1 / 75 Compound Interest Question 1 (a) Calculate the accumulated value on maturity of $5,000 invested for

More information

Financial Management I

Financial Management I Financial Management I Workshop on Time Value of Money MBA 2016 2017 Slide 2 Finance & Valuation Capital Budgeting Decisions Long-term Investment decisions Investments in Net Working Capital Financing

More information

4. E , = + (0.08)(20, 000) 5. D. Course 2 Solutions 51 May a

4. E , = + (0.08)(20, 000) 5. D. Course 2 Solutions 51 May a . D According to the semi-strong version of the efficient market theory, prices accurately reflect all publicly available information about a security. Thus, by this theory, actively managed portfolios

More information

Chapter 21: Savings Models

Chapter 21: Savings Models October 14, 2013 This time Arithmetic Growth Simple Interest Geometric Growth Compound Interest A limit to Compounding Simple Interest Simple Interest Simple Interest is interest that is paid on the original

More information

FNCE 370v8: Assignment 3

FNCE 370v8: Assignment 3 FNCE 370v8: Assignment 3 Assignment 3 is worth 5% of your final mark. Complete and submit Assignment 3 after you complete Lesson 9. There are 12 questions in this assignment. The break-down of marks for

More information

THREE. Interest Rate and Economic Equivalence CHAPTER

THREE. Interest Rate and Economic Equivalence CHAPTER CHAPTER THREE Interest Rate and Economic Equivalence No Lump Sum for Lottery-Winner Grandma, 94 1 A judge denied a 94-year-old woman s attempt to force the Massachusetts Lottery Commission to pay her entire

More information

Debt. Last modified KW

Debt. Last modified KW Debt The debt markets are far more complicated and filled with jargon than the equity markets. Fixed coupon bonds, loans and bills will be our focus in this course. It's important to be aware of all of

More information

BOND VALUATION. YTM Of An n-year Zero-Coupon Bond

BOND VALUATION. YTM Of An n-year Zero-Coupon Bond BOND VALUATION BOND VALUATIONS BOND: A security sold by governments and corporations to raise money from investors today in exchange for promised future payments 1. ZERO COUPON BONDS ZERO COUPON BONDS:

More information

Sample Investment Device CD (Certificate of Deposit) Savings Account Bonds Loans for: Car House Start a business

Sample Investment Device CD (Certificate of Deposit) Savings Account Bonds Loans for: Car House Start a business Simple and Compound Interest (Young: 6.1) In this Lecture: 1. Financial Terminology 2. Simple Interest 3. Compound Interest 4. Important Formulas of Finance 5. From Simple to Compound Interest 6. Examples

More information

Interest Rate Forwards and Swaps

Interest Rate Forwards and Swaps Interest Rate Forwards and Swaps 1 Outline PART ONE Chapter 1: interest rate forward contracts and their pricing and mechanics 2 Outline PART TWO Chapter 2: basic and customized swaps and their pricing

More information

APPENDIX 3A: Duration and Immunization

APPENDIX 3A: Duration and Immunization Chapter 3 Interest Rates and Security Valuation APPENDIX 3A: Duration and Immunization In the body of the chapter, you learned how to calculate duration and came to understand that the duration measure

More information

1. Convert each of the following interest rates to the nominal or periodic interest rate requested.

1. Convert each of the following interest rates to the nominal or periodic interest rate requested. Review Problems 1. Convert each of the following interest rates to the nominal or periodic interest rate requested. (a j2 = 13% isa = (b j12 = 16% imo = (c j4 = 12.5% iq = (d j365 = 14% id = (e j52 = 6%

More information

Chapter 5. Interest Rates ( ) 6. % per month then you will have ( 1.005) = of 2 years, using our rule ( ) = 1.

Chapter 5. Interest Rates ( ) 6. % per month then you will have ( 1.005) = of 2 years, using our rule ( ) = 1. Chapter 5 Interest Rates 5-. 6 a. Since 6 months is 24 4 So the equivalent 6 month rate is 4.66% = of 2 years, using our rule ( ) 4 b. Since one year is half of 2 years ( ).2 2 =.0954 So the equivalent

More information

Tax Homework. A B C Installed cost $10,000 $15,000 $20,000 Net Uniform annual before 3,000 6,000 10,000

Tax Homework. A B C Installed cost $10,000 $15,000 $20,000 Net Uniform annual before 3,000 6,000 10,000 Tax Homework 1. A firm is considering three mutually exclusive alternatives as part of a production improvement program. Management requires that you must select one. The alternatives are: A B C Installed

More information

MGT201 Lecture No. 11

MGT201 Lecture No. 11 MGT201 Lecture No. 11 Learning Objectives: In this lecture, we will discuss some special areas of capital budgeting in which the calculation of NPV & IRR is a bit more difficult. These concepts will be

More information

Year 10 General Maths Unit 2

Year 10 General Maths Unit 2 Year 10 General Mathematics Unit 2 - Financial Arithmetic II Topic 2 Linear Growth and Decay In this area of study students cover mental, by- hand and technology assisted computation with rational numbers,

More information

Alan Brazil. Goldman, Sachs & Co.

Alan Brazil. Goldman, Sachs & Co. Alan Brazil Goldman, Sachs & Co. Assumptions: Coupon paid every 6 months, $100 of principal paid at maturity, government guaranteed 1 Debt is a claim on a fixed amount of cashflows in the future A mortgage

More information

Practice Test Questions. Exam FM: Financial Mathematics Society of Actuaries. Created By: Digital Actuarial Resources

Practice Test Questions. Exam FM: Financial Mathematics Society of Actuaries. Created By: Digital Actuarial Resources Practice Test Questions Exam FM: Financial Mathematics Society of Actuaries Created By: (Sample Only Purchase the Full Version) Introduction: This guide from (DAR) contains sample test problems for Exam

More information

Interest Rates & Bond Portfolio Management

Interest Rates & Bond Portfolio Management Interest Rates & Bond Portfolio Management I. Background & Motivation. A. Bond Portfolio managers are interest rate timers. 1. If you expect rates to decline, buy bonds. 2. If you expect rates to rise,

More information

MTH6154 Financial Mathematics I Interest Rates and Present Value Analysis

MTH6154 Financial Mathematics I Interest Rates and Present Value Analysis 16 MTH6154 Financial Mathematics I Interest Rates and Present Value Analysis Contents 2 Interest Rates 16 2.1 Definitions.................................... 16 2.1.1 Rate of Return..............................

More information

ECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I

ECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I ECONOMIC ANALYSIS AND LIFE CYCLE COSTING SECTION I ECONOMIC ANALYSIS AND LIFE CYCLE COSTING Engineering Economy and Economics 1. Several questions on basic economics. 2. Several problems on simple engineering

More information

Capital Budgeting Process and Techniques 93. Chapter 7: Capital Budgeting Process and Techniques

Capital Budgeting Process and Techniques 93. Chapter 7: Capital Budgeting Process and Techniques Capital Budgeting Process and Techniques 93 Answers to questions Chapter 7: Capital Budgeting Process and Techniques 7-. a. Type I error means rejecting a good project. Payback could lead to Type errors

More information

Engineering Economics Financial Decision Making for Engineers Canadian 6th Edition Fraser TEST BANK Full download at:

Engineering Economics Financial Decision Making for Engineers Canadian 6th Edition Fraser TEST BANK Full download at: Engineering Economics Financial Decision Making for Engineers Canadian 6th Edition Fraser TEST BANK Full download at: Engineering Economics Financial Decision Making for Engineers Canadian 6th Edition

More information

Interest Compounded Annually. Table 3.27 Interest Computed Annually

Interest Compounded Annually. Table 3.27 Interest Computed Annually 33 CHAPTER 3 Exponential, Logistic, and Logarithmic Functions 3.6 Mathematics of Finance What you ll learn about Interest Compounded Annually Interest Compounded k Times per Year Interest Compounded Continuously

More information

CFAspace. CFA Level I. Provided by APF. Academy of Professional Finance 专业金融学院 FIXED INCOME: Lecturer: Nan Chen

CFAspace. CFA Level I. Provided by APF. Academy of Professional Finance 专业金融学院 FIXED INCOME: Lecturer: Nan Chen CFAspace Provided by APF CFA Level I FIXED INCOME: Introduction to the Valuation of Debt Securities Lecturer: Nan Chen Framework Estimate CFs: Coupon and Principal 1. Steps in Bond Valuation Process Determine

More information

INTEREST RATE RISK. Luigi Vena 02/27/2017 Liuc Carlo Cattaneo

INTEREST RATE RISK. Luigi Vena 02/27/2017 Liuc Carlo Cattaneo INTEREST RATE RISK Luigi Vena 02/27/2017 Liuc Carlo Cattaneo TODAY S AGENDA Interest Rate Risk Managing Interest rate risk Duration Duration and Risk International Financial Markets 02/27/2017 Mishkin,

More information

JEM034 Corporate Finance Winter Semester 2017/2018

JEM034 Corporate Finance Winter Semester 2017/2018 JEM034 Corporate Finance Winter Semester 2017/2018 Lecture #1 Olga Bychkova Topics Covered Today Review of key finance concepts Present value (chapter 2 in BMA) Valuation of bonds (chapter 3 in BMA) Present

More information

BUSI 370 Business Finance

BUSI 370 Business Finance Review Session 2 February 7 th, 2016 Road Map 1. BONDS 2. COMMON SHARES 3. PREFERRED SHARES 4. TREASURY BILLS (T Bills) ANSWER KEY WITH COMMENTS 1. BONDS // Calculate the price of a ten-year annual pay

More information

It is a measure to compare bonds (among other things).

It is a measure to compare bonds (among other things). It is a measure to compare bonds (among other things). It provides an estimate of the volatility or the sensitivity of the market value of a bond to changes in interest rates. There are two very closely

More information

ATCF w/ Depreciation. Tax Savings Due to Depreciation. Timing of Expenses. PW of Tax Savings. Why Study Depreciation Methods?

ATCF w/ Depreciation. Tax Savings Due to Depreciation. Timing of Expenses. PW of Tax Savings. Why Study Depreciation Methods? 13: Depreciation and Basic Tax Considerations Taxes are a major component of any project's cash flows, particularly income tax Taxable income (TI) is the income on which taxes are paid Not reduced by initial

More information

B6302 Sample Placement Exam Academic Year

B6302 Sample Placement Exam Academic Year Revised June 011 B630 Sample Placement Exam Academic Year 011-01 Part 1: Multiple Choice Question 1 Consider the following information on three mutual funds (all information is in annualized units). Fund

More information

CHAPTER 2. Financial Mathematics

CHAPTER 2. Financial Mathematics CHAPTER 2 Financial Mathematics LEARNING OBJECTIVES By the end of this chapter, you should be able to explain the concept of simple interest; use the simple interest formula to calculate interest, interest

More information

Fin 5413: Chapter 04 - Fixed Interest Rate Mortgage Loans Page 1 Solutions to Problems - Chapter 4 Fixed Interest Rate Mortgage Loans

Fin 5413: Chapter 04 - Fixed Interest Rate Mortgage Loans Page 1 Solutions to Problems - Chapter 4 Fixed Interest Rate Mortgage Loans Fin 5413: Chapter 04 - Fixed Interest Rate Mortgage Loans Page 1 Solutions to Problems - Chapter 4 Fixed Interest Rate Mortgage Loans Problem 4-1 A borrower makes a fully amortizing CPM mortgage loan.

More information

Today, we will talk about. Profit Revisited. No! Profit is not zero. Depreciation and Taxes. Depreciation Calculations- Information Needed

Today, we will talk about. Profit Revisited. No! Profit is not zero. Depreciation and Taxes. Depreciation Calculations- Information Needed Today, we will talk about. Profit Revisited Basics of financial analysis Estimating revenues and expenses is crucial Time value of money concept The significance of present value comparisons Conversion

More information

Midterm 1 Practice Problems

Midterm 1 Practice Problems Midterm 1 Practice Problems 1. Calculate the present value of each cashflow using a discount rate of 7%. Which do you most prefer most? Show and explain all supporting calculations! Cashflow A: receive

More information

GOOD LUCK! 2. a b c d e 12. a b c d e. 3. a b c d e 13. a b c d e. 4. a b c d e 14. a b c d e. 5. a b c d e 15. a b c d e. 6. a b c d e 16.

GOOD LUCK! 2. a b c d e 12. a b c d e. 3. a b c d e 13. a b c d e. 4. a b c d e 14. a b c d e. 5. a b c d e 15. a b c d e. 6. a b c d e 16. MA109 College Algebra Spring 2017 Exam2 2017-03-08 Name: Sec.: Do not remove this answer page you will turn in the entire exam. You have two hours to do this exam. No books or notes may be used. You may

More information

CHAPTER 15 INVESTMENT, TIME, AND CAPITAL MARKETS

CHAPTER 15 INVESTMENT, TIME, AND CAPITAL MARKETS CHAPTER 15 INVESTMENT, TIME, AND CAPITAL MARKETS REVIEW QUESTIONS 1. A firm uses cloth and labor to produce shirts in a factory that it bought for $10 million. Which of its factor inputs are measured as

More information

MTH6154 Financial Mathematics I Interest Rates and Present Value Analysis

MTH6154 Financial Mathematics I Interest Rates and Present Value Analysis 16 MTH6154 Financial Mathematics I Interest Rates and Present Value Analysis Contents 2 Interest Rates and Present Value Analysis 16 2.1 Definitions.................................... 16 2.1.1 Rate of

More information

MS-E2114 Investment Science Exercise 4/2016, Solutions

MS-E2114 Investment Science Exercise 4/2016, Solutions Capital budgeting problems can be solved based on, for example, the benet-cost ratio (that is, present value of benets per present value of the costs) or the net present value (the present value of benets

More information

Chapter 6 Firms: Labor Demand, Investment Demand, and Aggregate Supply

Chapter 6 Firms: Labor Demand, Investment Demand, and Aggregate Supply Chapter 6 Firms: Labor Demand, Investment Demand, and Aggregate Supply We have studied in depth the consumers side of the macroeconomy. We now turn to a study of the firms side of the macroeconomy. Continuing

More information

CHAPTER 17: MORTGAGE BASICS (Ch.17, sects.17.1 & 17.2 only)

CHAPTER 17: MORTGAGE BASICS (Ch.17, sects.17.1 & 17.2 only) CHAPTER 17: MORTGAGE BASICS (Ch.17, sects.17.1 & 17.2 only) The Four Rules of Loan Payment & Balance Computation... Rule 1: The interest owed in each payment equals the applicable interest rate times the

More information

Bond Prices and Yields

Bond Prices and Yields Bond Characteristics 14-2 Bond Prices and Yields Bonds are debt. Issuers are borrowers and holders are creditors. The indenture is the contract between the issuer and the bondholder. The indenture gives

More information

ELEMENTS OF MATRIX MATHEMATICS

ELEMENTS OF MATRIX MATHEMATICS QRMC07 9/7/0 4:45 PM Page 5 CHAPTER SEVEN ELEMENTS OF MATRIX MATHEMATICS 7. AN INTRODUCTION TO MATRICES Investors frequently encounter situations involving numerous potential outcomes, many discrete periods

More information

The Theory of Interest

The Theory of Interest Chapter 1 The Theory of Interest One of the first types of investments that people learn about is some variation on the savings account. In exchange for the temporary use of an investor s money, a bank

More information

FIN 6160 Investment Theory. Lecture 9-11 Managing Bond Portfolios

FIN 6160 Investment Theory. Lecture 9-11 Managing Bond Portfolios FIN 6160 Investment Theory Lecture 9-11 Managing Bond Portfolios Bonds Characteristics Bonds represent long term debt securities that are issued by government agencies or corporations. The issuer of bond

More information

15.414: COURSE REVIEW. Main Ideas of the Course. Approach: Discounted Cashflows (i.e. PV, NPV): CF 1 CF 2 P V = (1 + r 1 ) (1 + r 2 ) 2

15.414: COURSE REVIEW. Main Ideas of the Course. Approach: Discounted Cashflows (i.e. PV, NPV): CF 1 CF 2 P V = (1 + r 1 ) (1 + r 2 ) 2 15.414: COURSE REVIEW JIRO E. KONDO Valuation: Main Ideas of the Course. Approach: Discounted Cashflows (i.e. PV, NPV): and CF 1 CF 2 P V = + +... (1 + r 1 ) (1 + r 2 ) 2 CF 1 CF 2 NP V = CF 0 + + +...

More information

Chapter 4. Discounted Cash Flow Valuation

Chapter 4. Discounted Cash Flow Valuation Chapter 4 Discounted Cash Flow Valuation Appreciate the significance of compound vs. simple interest Describe and compute the future value and/or present value of a single cash flow or series of cash flows

More information

The three formulas we use most commonly involving compounding interest n times a year are

The three formulas we use most commonly involving compounding interest n times a year are Section 6.6 and 6.7 with finance review questions are included in this document for your convenience for studying for quizzes and exams for Finance Calculations for Math 11. Section 6.6 focuses on identifying

More information