Transit Asset Management (TAM) Final Rule - Small Systems Focus
|
|
- Eleanor Hoover
- 5 years ago
- Views:
Transcription
1 Transit Asset Management (TAM) Final Rule - Small Systems Focus John D. Giorgis The TAM webinar series is sponsored by the Federal Transit Administration, U.S. Department of Transportation
2 What is Transit Asset Management? Transit Asset Management (TAM) is a business model that uses the condition of assets to guide the optimal prioritization of funding at transit properties in order to keep our transit networks in a State of Good Repair (SGR). Transit Asset Management Background 4
3 2030 State of Good Repair Backlog (Billions in 2010 Dollars) Transit Asset Management: Background $200 $180 $160 Backlog in 2030 $8.2 billion gap $140 $120 $100 $80 Current Annual SGR Investment ($10.3 B) Current Backlog ($85.9 B) $60 $40 $20 Maintain Backlog ($12.7 B) Eliminate Backlog ($18.5 B) $0 $8 $10 $12 $14 $16 $18 $20 Annual Expenditures for Preservation (Billions in 2010 Dollars) Transit Asset Management Background 3
4 2030 State of Good Repair Backlog (Billions in 2010 Dollars) Transit Asset Management: Background $200 $180 $160 Backlog in 2030 $140 $120 $100 $80 $60 Current Annual SGR Investment ($10.3 B) Current Backlog ($85.9 B) $40 $20 $0 $8 $10 $12 $14 $16 $18 $20 Annual Expenditures for Preservation (Billions in 2010 Dollars) Transit Asset Management Background 4
5 2030 State of Good Repair Backlog (Billions in 2010 Dollars) Transit Asset Management: Background $200 $180 $160 Backlog in 2030 $140 $120 $100 $80 Current Annual SGR Investment ($10.3 B) Current Backlog ($85.9 B) $60 $40 Maintain Backlog ($12.7 B) $20 $0 $8 $10 $12 $14 $16 $18 $20 Annual Expenditures for Preservation (Billions in 2010 Dollars) Transit Asset Management Background 5
6 2030 State of Good Repair Backlog (Billions in 2010 Dollars) Transit Asset Management: Background $200 $180 $160 Backlog in 2030 $140 $120 $100 $80 Current Annual SGR Investment ($10.3 B) Current Backlog ($85.9 B) $60 $40 $20 Maintain Backlog ($12.7 B) Eliminate Backlog ($18.5 B) $0 $8 $10 $12 $14 $16 $18 $20 Annual Expenditures for Preservation (Billions in 2010 Dollars) Transit Asset Management Background 6
7 2030 State of Good Repair Backlog (Billions in 2010 Dollars) Transit Asset Management: Background $200 $180 $160 Backlog in 2030 $8.2 billion gap $140 $120 $100 $80 Current Annual SGR Investment ($10.3 B) Current Backlog ($85.9 B) $60 $40 $20 Maintain Backlog ($12.7 B) Eliminate Backlog ($18.5 B) $0 $8 $10 $12 $14 $16 $18 $20 Annual Expenditures for Preservation (Billions in 2010 Dollars) Transit Asset Management Background 7
8 Linking Proposed Regulations Public Transportation Agency Safety SMS Hazard Identification/Risk Assessment Establish Safety Targets Hazard, Control, and Monitoring Strategy Public Transportation Agency Safety Plan Transit Asset Management Asset Inventory/ Condition Assessment Establish SGR Targets Transit Asset Management Plan Prioritize Investments/ Program of Projects Program Formula Funds Submit Annual Report Transportation Planning MPO and State Performance Targets Integrate Performance- Based Plans Metropolitan and Statewide Long-Range Plans Adopt TIP/STIP Transit Asset Management Background 8 8
9 What Process Did We Take to Get Here? MAP-21 Passed (7/2012) Informal Outreach ( ) ANPRM Open for Comment (10/2013) NPRM Open for Comment (9/2015) FAST Act (12/2015) Final Rule Issued (7/26/16) Transit Asset Management Background 9
10 CFR Part 625 Transit Asset Management Final Rule A. General Provisions B. National Transit Asset Management System C. Transit Asset Management Plans D. Performance Management E. Recordkeeping and Reporting Requirements Transit Asset Management Final Rule 10
11 A. General Provisions Final Rule: General Provisions 11
12 TAM and State of Good Repair The purpose of the National TAM System is to keep our Nation s assets in a State of Good Repair (SGR) Consequences of not being in a SGR include: Safety risks Decreased system reliability Higher maintenance costs, and Lower system performance Final Rule: National Transit Asset Management System 12
13 A. General Provisions Δ Purpose To help achieve and maintain a state of good repair for the nation s public transportation systems Applicability All recipients or subrecipients of Federal financial assistance under 49 U.S.C. Chapter 53 that own, operate, or manage capital assets used in the provision of public transportation Definitions Final Rule: General Provisions 13
14 Definition of Public Transportation Δ Defined at 49 U.S.C regular, continuing shared-ride surface transportation services open to the general public or a segment of the general public defined by age, disability, or low income. Excludes 5310 alternatives to public transportation open only to clients of a specific program, service, or facility. Final Rule: General Provisions 14
15 B. National Transit Asset Management System Final Rule: National Transit Asset Management System 15
16 National Transit Asset Management System Define state of good repair Require TAM Plans for all recipients and subrecipients Establish SGR performance measures Report data to the NTD Receive Technical assistance from FTA Final Rule: National Transit Asset Management System 16
17 State of Good Repair The condition in which a capital asset is able to operate at a full level of performance. This means the asset: 1. Is able to perform its designed function, 2. Does not pose a known unacceptable safety risk, and 3. Its lifecycle investments have been met or recovered. Final Rule: National Transit Asset Management System 17
18 C. Transit Asset Management Plans Final Rule: Transit Asset Management Plans 18
19 Applicability Tier I or Tier II Δ Tier Operates Rail OR 101 vehicles across all fixed route modes OR 101 vehicles in one nonfixed route mode Tier Sub-recipient of 5311 Funds OR American Indian Tribe OR 100 vehicles across all fixed route modes OR 100 vehicles in one non-fixed route mode 19
20 Responsibility for TAM Plan Development Δ Each transit provider must designate an Accountable Executive Plan Coordination A Tier II provider may participate in a Group Plan or opt out and develop its own TAM Plan A Group Plan participant must collaborate with the sponsor in the development of the plan Eligible activity under 5337, 5307 & 5311 Final Rule: Transit Asset Management Plans 20
21 Group Plans Δ Group Plans compiled by a sponsor Generally the State DOT or Designated/Direct Recipient Small urban operators (5307 Recipients) are not required to be offered a group plan but CAN be based on mutual agreement between sponsor and operator. Tier II providers may participate in a single Group Plan or may choose to opt out and develop their own TAM Plans Final Rule: Transit Asset Management Plans 21
22 TAM Plan Elements 1. Inventory of Capital Assets 2. Condition Assessment 3. Decision Support Tools 4. Investment Prioritization 5. TAM and SGR Policy 6. Implementation Strategy 7. List of Key Annual Activities 8. Identification of Resources 9. Evaluation Plan All Providers (Tier I & II) Tier I only Final Rule: Transit Asset Management Plans 22
23 1. Inventory of Capital Assets Δ A listing of all capital assets: Owned by the transit provider Equipment: Non service vehicles & equipment > $50,000 Include third-party exclusive-use non-equipment Level of detail is same as in Capital Program of Projects May use existing inventories already collected E.g., existing rolling stock and equipment reports Include assets acquired without FTA funds Final Rule: Transit Asset Management Plans 23
24 2. Condition Assessment A rating of the inventoried assets E.g., age; good/fair/poor; percentage of residual life Ratings should be sufficiently detailed to monitor performance and plan capital investment Condition assessments may be collected at the individual or asset class level Condition assessments may include vulnerabilities to natural/climate hazards Condition assessments are only required for assets with direct capital responsibility Final Rule: Transit Asset Management Plans 24
25 3. Decision Support Tools List analytical process(es) used to make investment prioritization To estimate capital investment needs over time To assist in prioritization The tool does not have to be specialized software Final Rule: Transit Asset Management Plans 25
26 4. Investment Prioritization A ranked listing of proposed projects and programs ordered by year of planned implementation Prioritization locally determined based on policy and need Must adequately consider Identified unacceptable safety risks Accessibility requirements Fiscally constrained based on estimated funding levels Final Rule: Transit Asset Management Plans 30
27 TAM Plan Timeframes Plans would be updated in their entirety at least every 4 years Coincide with relevant (Statewide) Transportation Improvement Program Cover at least 4 years Should be amended during the horizon period when there is a significant change Initial TAM Plans completed no later than 2 years after effective date (October 2018) Final Rule: Transit Asset Management Plans 27
28 D. Performance Management Final Rule: Performance Management 28
29 Performance Measures Equipment Percentage of vehicles that have met or exceeded their Useful Life Benchmark (ULB) Rolling Stock Percentage of revenue vehicles within a particular asset class that have met or exceeded their ULB Infrastructure Percentage of track segments with performance restrictions by class Facilities Age Age Condition Performance Percentage of facilities with a condition rating below 3.0 on the FTA Transit Economic Requirements Model (TERM) scale (1=Poor to 5=Excellent) Final Rule: Performance Management 29
30 Targets for Performance Measures Set targets annually for each asset class Supported by data Most recent condition data Reasonable financial projections Targets for Group Plans apply to the group as a whole Reported annually to National Transit Database (NTD) Final Rule: Performance Management 30
31 Useful Life Benchmark (ULB) ULB Useful life for FTA grant programs Useful Life Benchmark is defined as the expected lifecycle of a capital asset for a particular Transit Provider s operating environment, or the acceptable period of use in service for a particular Transit Provider s operating environment. ULB takes into account a provider s unique operating environment (i.e. geography, service frequency, etc.) There are default ULB values, but agencies are welcome to develop their own Final Rule: Performance Management 31
32 Sample Default ULBs Revenue Vehicle Type Default Useful Life Benchmark Useful Life in Grant Programs Automated Guideway Vehicle (AG) Bus (BU) Cutaway Bus (CU) Ferryboat (FB) 42 8 Heavy Rail Passenger Car (HR) Light Rail Vehicle (LR) Commuter Rail Locomotive (RL) Trolleybus (TB) Van (VN) 8 7 Final Rule: Performance Management 32
33 E. Recordkeeping and Reporting Requirements Including the role of the National Transit Database Final Rule: Recordkeeping and Reporting Requirements 33
34 Annual Reporting Requirements Submit to NTD 1. Data Reports Projected performance targets for next fiscal year System Condition and Performance Reports 2. Narrative Report Change in condition Progress toward targets Group Plan Sponsors submit consolidated reports on behalf of their participants A TAM-NTD Crosswalk can be found on the TAM website Final Rule: Recordkeeping and Reporting Requirements 34
35 National Transit Database Webpage Δ Asset Module Reporting Template Final Rule: Recordkeeping and Reporting Requirements 35
36 Recordkeeping Requirements Maintain records supporting TAM Plan Share with State and metropolitan planning organization (MPO) planning agencies TAM Plan Performance targets Investment strategies Annual condition assessments Final Rule: Recordkeeping and Reporting Requirements 36
37 Certification TAM Plans are Self-Certified by the Accountable Executive FTA will update Certifications and Assurances to reflect TAM Plan requirements FTA will review Plans and Progress during Triennial and State Management Reviews, as well as during MPO Certification Reviews Final Rule: Recordkeeping and Reporting Requirements 37
38 Implementation Implementation 38
39 Where do we go from here? Final Rule Published (7/26/2016) Final Rule Effective (10/1/2016) Initial Target Submittal Due Date (1/2017) Initial TAM Plan Completion Date (10/2018) TAM Reports Due Date (Annually with NTD report ) Implementation 39
40 TAM Timelines Items in blue Submitted to NTD Activity Initial Due Date Ongoing Submittal Frequency Final Rule Effective Date October 1, 2016 n/a SGR Targets Set by 1/1/17 Annually within 4 months of end of provider s FY as part of NTD Report TAM Plan October 1, 2018 Every 4 years Asset Inventory and Condition Reporting* Narrative Report Within 4 months of end of provider s FY 2018 Within 4 months of end of provider s FY 2019 As part of NTD Report Annually, concurrent with NTD Report * Only 1/3 of facilities condition assessments are due in NTD report year 2018 Implementation 40
41 Report Annually to NTD (group plan sponsor): Data Report Condition information Performance targets for next FY Narrative report Describing changes Sponsors submit consolidated report for the group 41
42 Technical Assistance from FTA TERM-Lite Transit Asset Management Guide TCRP Products TAM News & Noteworthy Practices Small Provider Guide and Template Asset Inventory Development & Integration Guide Training & Webinars Facility Condition & Rail Guideway Guidebooks Technical Assistance 42
43 Asset Management Guide for Small Providers Explains/provides: Who, What, & Why TAM TAM plan requirements for small providers Other TAM plan considerations (e.g., reporting, monitoring) TAM plan template 43
44 TAM Template for Small Providers 44
45 Getting Started Optional and flexible use by State DOT or Small Provider Template questions organized by Compliant vs. Comprehensive Section by section instructions and questions Ability to add, edit, tailor questions Tips found in blue text boxes List of relevant documents
46 Introduction Establishes the context of the TAM Plan with references to the authorizing documents (including legislation and policies). The Introduction also includes performance targets and may include asset management vision, goals, and objectives.
47 Asset Portfolio Asset Portfolio may include any of the following: Characteristics (manufacturer, quantity, age, etc.); Status Within the Asset Hierarchy; GPS Location; Condition (excellent, poor, etc.); Historical Data; Valuation (replacement cost, DRC, annual depreciation); and, the Information Systems that support asset data location and organization
48 Asset Condition
49 Management Approach Identifies any decision support tools and investment prioritization facilitate whole life management of the asset, including strategies that may address: -risk -asset handover/transition -maintenance -design/procurement -rehabilitation/overhaul -disposal
50 Work Plans and Schedules The TAM Plan forecasts the set of work plans and expected operational and capital expenditures.
51 Next Steps Guides are open for comment If you have questions, where do you go? Website: Regional Staff Mshadoni Smith Next Steps 51
52 Thank you for your participation! Questions? Next Steps 52
CalACT Expo Transit Asset Management (TAM) Plan Workshop 49 CFR 625 April 24, 2017
CalACT Expo Transit Asset Management (TAM) Plan Workshop 49 CFR 625 April 24, 2017 Poll Question 2 Today s Presentation Transit Asset Management Context and Background Final Rule Provisions Reduced burden
More informationTransit Asset Management Plan
Transit Asset Management Plan FAMPO Technical Committee February 6, 2017 Tim Roseboom Northern Virginia Transit Planning Manager CFR Part 625 Transit Asset Management Final Rule A. General Provisions B.
More information48962 Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Rules and Regulations
48962 Federal Register / Vol. 81, No. 143 / Tuesday, July 26, 2016 / Rules and Regulations asabaliauskas on DSK3SPTVN1PROD with RULES Executive Order 13175 (Tribal Consultation) FTA has analyzed this action
More informationFTA TRANSIT ASSET MANAGEMENT NPRM
FTA TRANSIT ASSET MANAGEMENT NPRM Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC November 2, 2015 Overview Transit Asset Management (TAM) A business model that uses the condition of assets
More informationCTAA Analysis of Transit Asset Management Proposed Rule
CTAA Analysis of Transit Asset Management Proposed Rule Issued: Sept. 30, 2015 Comments Due: Nov. 30, 2015 Summary: The Federal Transit Administration is proposing a new rule to establish a National Transit
More informationALDOT TRANSIT ASSET MANAGEMENT PLAN
ALDOT TRANSIT ASSET MANAGEMENT PLAN What is Transit Asset Management? Transit Asset Management (TAM) is a business model that uses the condition of assets to guide the optimal prioritization of funding
More informationMemphis Urban Area- Metropolitan Planning Organization Transportation Policy Board Meeting. August 23, 2018
Memphis Urban Area- Metropolitan Planning Organization Transportation Policy Board Meeting August 23, 2018. 1 Transit Asset Management (TAM) is a business model that prioritizes funding based on the condition
More informationRe: Transit Asset Management; National Transit Database; Proposed Rule (Docket Number FTA )
November 20, 2015 Honorable Therese McMillian Acting Administrator Federal Transit Administration United States Department of Transportation 1200 New Jersey Avenue SE Washington, DC 20590 Re: Transit Asset
More informationBOSTON REGION METROPOLITAN PLANNING ORGANIZATION
NMETROPOLITAN PLANNING ORGANIZATIO BOSTON REGION MPO BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,
More informationBOSTON REGION METROPOLITAN PLANNING ORGANIZATION
PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,
More informationPerformance-Based Planning APTA Sustainability and Multimodal Planning Workshop August 9, Mark Kane, Community Planner
Performance-Based Planning APTA Sustainability and Multimodal Planning Workshop August 9, 2017 Mark Kane, Community Planner MAP-21 Performance Management Framework To increase accountability and transparency
More informationTransit Asset Management Initial Performance Targets
Item #7 TPB Technical Committee January 6, 2017 Transit Asset Management Initial Performance Targets January 6, 2017 Background Federal TAM Law MAP-21 required that every transit operator receiving federal
More informationFTA Rural and Tribal NTD Overview and Updates. December 12, 2018
FTA Rural and Tribal NTD Overview and Updates December 12, 2018 Introductions Margaret (Maggie) Schilling Program Manager FTA National Transit Database Murtaza Naqvi Transportation Data Analyst, FTA Program
More informationDepartment of Transportation
Vol. 81 Tuesday, No. 143 July 26, 2016 Part II Department of Transportation Federal Transit Administration 49 CFR Parts 625 and 630 National Transit Database; Transit Asset Management; Final Rule; Notices;
More informationTransit Asset Management (TAM) Group TAM Plan for Tier II Subrecpients of 5311 Funds Nebraska Department of Transportation
Transit Asset Management (TAM) Group TAM Plan for Tier II Subrecpients of 5311 Funds Nebraska Department of Transportation Effective Date October 1, 2018 TABLE OF CONTENTS TAM Plan Objective... 1 Regulation
More informationProviders of Public Transportation Individual Targets
APPENDIX Providers of Public Transportation Individual Targets The following letters, presentation slides, and other data were provided by the individual reporting entities, and are posted on the MWCOG
More informationTECHNICAL ADVISORY COMMITTEE MEETING Monday, May 21, 2018 University Park, Suite N. IH 35, Austin, Texas :00 p.m.
TECHNICAL ADVISORY COMMITTEE MEETING Monday, May 21, 2018 University Park, Suite 300 3300 N. IH 35, Austin, Texas 78705 2:00 p.m. AGENDA ACTION: 1. Certification of Quorum Quorum requirement is 13 members......chair
More informationCalifornia MAP-21 Transit Working Group: MAP-21 Questions for FTA
California MAP-21 Transit Working Group: MAP-21 Questions for FTA General Has FTA started developing rules for transit programs as identified in MAP 21? When will FTA offer stakeholders an opportunity
More informationReview of the Federal Transit Administration s Transit Economic Requirements Model. Contents
Review of the Federal Transit Administration s Transit Economic Requirements Model Contents Summary Introduction 1 TERM History: Legislative Requirement; Conditions and Performance Reports Committee Activities
More informationReport of Independent Accountants on Applying Agreed-Upon Procedures
KPMG LLP 2001 M Street, NW Washington, DC 20036 Report of Independent Accountants on Applying Agreed-Upon Procedures Board of Directors Washington Metropolitan Area Transit Authority: We have performed
More informationTransit Asset Management. Group Sponsored Plan Public Transportation Division. TxTx
Transit Asset Management Group Sponsored Plan Public Transportation Division TxTx Table of Contents Section 1 Executive Summary... i 1. Introduction... 1 TxDOT... 1 Division Goals and Objectives... 1 System
More informationTHE. ATLANTA REGION S Transit Programs Of Projects
THE ATLANTA REGION S Transit Programs Of Projects Table of Contents Introduction... 1 Transit Routes... 2 Fixing America s Surface Transportation Act (FAST Act)... 3 Transit Operators and Recipients of
More informationRail Modernization Study REPORT TO CONGRESS. April Prepared by: Federal Transit Administration
REPORT TO CONGRESS April 2009 Prepared by: Federal Transit Administration U.S. Department of Transportation Federal Transit Administration 1201 New Jersey Avenue S.E. Washington DC 20590 The Honorable
More informationTRANSIT ASSET MANAGEMENT PLAN
TRANSIT ASSET MANAGEMENT PLAN OCTOBER 2018 950 County Square Drive, Ventura, California 93003 805.642.1591 www.goventura.org Approval by Agency Accountable Executives Transit asset management plans are
More informationTHE. ATLANTA REGION S Transit Programs Of Projects
THE ATLANTA REGION S Transit Programs Of Projects Table of Contents Introduction... 1 Transit Routes... 2 Fixing America s Surface Transportation Act (FAST Act)... 3 Transit Operators and Recipients of
More informationQuarterly Meeting PTD Update October 26, 2016
NC Association of Rural Planning Organizations Quarterly Meeting PTD Update October 26, 2016 Debbie Collins North Carolina s Public Network 2 Public Ridership NC Public Transit Fastest Growing in Southeast
More informationMETROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS. Independent Accountants Report on Applying Agreed-Upon Procedures
METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS Independent Accountants Report on Applying Agreed-Upon Procedures Year ended September 30, 2017 KPMG LLP 811 Main Street Houston, TX 77002 Independent
More informationFinal Interim Policy Guidance Federal Transit Administration Capital Investment Grant Program
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL TRANSIT ADMINISTRATION Final Interim Policy Guidance Federal Transit Administration Capital Investment Grant Program August 2015 TABLE OF CONTENTS Introduction...
More informationBirmingham-Jefferson County Transit Authority P.O. Box Birmingham, AL Phone: (205) Fax: (205)
Birmingham-Jefferson County Transit Authority P.O. Box 10212 Birmingham, AL 35202-0212 Phone: (205) 521-0161 - Fax: (205) 521-0154 Program of Projects For Federal Fiscal Year 2018 (Utilizing FFY 2017 Apportionments)
More informationAnnual Listing of Federally Obligated Projects
Annual Listing of Federally Projects A summary of Federal transportation obligations in the Jonesboro Metropolitan Planning Area between October 1, 2012, and September 30, 2013 Jonesboro Metropolitan Planning
More informationCAPITAL PROGRAM COMMITTEE AGENDA
CALL TO ORDER 1. ROLL CALL CAPITAL PROGRAM COMMITTEE Thursday, June 28, 2018 12:00 PM VTA Conference Room B-106 3331 North First Street San Jose, CA AGENDA 2. Welcome remarks from the General Manager/CEO,
More informationNOTICE OF COMMISSION MEETING AND AGENDA DES MOINES AREA REGIONAL TRANSIT AUTHORITY DART MULTIMODAL ROOM, 620 CHERRY STREET OCTOBER 2, :00 PM
NOTICE OF COMMISSION MEETING AND AGENDA DES MOINES AREA REGIONAL TRANSIT AUTHORITY DART MULTIMODAL ROOM, 620 CHERRY STREET OCTOBER 2, 2018 12:00 PM Page # 1. CALL TO ORDER 2. ROLL CALL AND ESTABLISHMENT
More informationJULY 17, 2018 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT DECEMBER 2018)
NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS JULY 17,
More informationDRAFT. Relationship of Asset Condition Rating to Transit System Performance. Prepared for. Transportation Research Board
DRAFT Relationship of Asset Condition Rating to Transit System Performance Prepared for Transportation Research Board Committee for Review of the Federal Transit Administration s Transportation Economic
More informationMODULE 1: FUNDING TRANSIT IN TEXAS MODULE 1 1
MODULE 1: FUNDING TRANSIT IN TEXAS MODULE 1 1 LEARNING OBJECTIVES By the end of this module, you should be able to: Explain the categories of public transportation systems in Texas. Recall the state laws
More informationJACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS
JACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS Introduction 1 Five Year Planning Calendar 3 Budget Summary 4 Unified
More informationINVESTING STRATEGICALLY
11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program
More informationPublic Transportation Advisory Committee. Meeting Handouts January 24, 2019
Public Transportation Advisory Committee Meeting Handouts January 24, 2019 AGENDA ITEM 3 Approval of Minutes from September 2018 Meeting MINUTES FOR ADOPTION Public Transportation Advisory Committee Teleconference
More informationAppendix. G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY
Appendix G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Exhibit G-1 2014 RTP REVENUE FORECAST ASSUMPTIONS LOCAL REVENUES Measure K Sales Tax Renewal Program: Description:
More informationPRESENTATION TITLE TRANSLINK ASSET MANAGEMENT PROJECT. Title sub text if required. Vikki Kwan, TransLink
TRANSLINK ASSET MANAGEMENT PROJECT Vikki Kwan, TransLink vikki.kwan@translink.ca Chris Lombard, AECOM christiaan.lombard@aecom.com May 6 th, 2013 Agenda Introduction to TransLink Title Study sub text Background
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 TRANSIT Abilene DISTRICT November FY 2009 Quarterly Revisions 11-03-2009 FY 2010 TRANSIT PROJECT DESCRIPTIONS (2010 TxDOT Coordinated Call Projects)
More informationTo: Administration and Finance Committee Date: February 7, 2018
To: Administration and Finance Committee Date: February 7, 2018 From: Erick Cheung Reviewed By: Chief Finance Officer SUBJECT: Independent Accountant s report on National Transit Database report Form FFA-10
More informationWednesday, January 31, 2018, (February Meeting) 10:00 a.m. Spokane Transit Southside Conference Room AGENDA
Spokane Transit Authority 1230 West Boone Avenue Spokane, WA 99201-2686 (509) 325-6000 PLANNING & DEVELOPMENT COMMITTEE MEETING Wednesday,, (February Meeting) 10:00 a.m. Spokane Transit Southside Conference
More informationINVESTMENT STRATEGIES
3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This
More informationCHAPTER 9 FINANCIAL CONSIDERATIONS
CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit
More informationAnalysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates
Analysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates Dr. Allan M. Zarembski PE, FASME, Hon. Mbr. AREMA Research Professor and Director of the Railroad Engineering and Safety
More informationRIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century
RIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century Accent image here Rhode Island Bar Association Environmental and Energy Law Committee (EELC) February 16, 2018
More informationSTATE OF MINNESOTA Office of the State Auditor
STATE OF MINNESOTA Office of the State Auditor Rebecca Otto State Auditor METROPOLITAN COUNCIL METRO MOBILITY TWIN CITIES AREA, MINNESOTA AGREED-UPON PROCEDURES YEAR ENDED DECEMBER 31, 2016 Description
More informationPerformance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015
Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015 Transportation has two purposes & Mobility Access Quileute Reservation La Push,
More informationTony Mento, P.E. January 2017
Tony Mento, P.E. January 2017 Evolution of the Federal Program Manage ITS & Operations Manage Build preserve maintain Outcome Performance 2 National Highway Performance Program ($21.8B) Funds an enhanced
More informationREPORT OF INDEPENDENT AUDITORS AND SINGLE AUDIT REPORTS SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY
REPORT OF INDEPENDENT AUDITORS AND SINGLE AUDIT REPORTS SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY June 30, 2017 Table of Contents Report of Independent Auditors on the Financial Statements for the Year
More informationTo: Administration and Finance Committee Date: February 3, SUBJECT: Independent Auditor s Report on National Transit Database Report Form FFA-10
To: Administration and Finance Committee Date: February 3, 2016 From: Erick Cheung Reviewed By: Director of Finance SUBJECT: Independent Auditor s Report on National Transit Database Report Form FFA-10
More informationDepartment of Transportation
Department of Transportation Public Transporation Purpose: It is the mission of the Public Transportation Division, in partnership with other public and private entities, to support and promote the availability
More informationFY 2017 Rural Transportation Planning Work Program SCOPE OF WORK
FY 2017 Rural Transportation Planning Work Program SCOPE OF WORK for the Roanoke Valley-Alleghany Regional Commission (July 1, 2016 June 30, 2017) P.O. Box 2569, Roanoke, VA 24010 Ph: 540.343.4417 rvarc@rvarc.org
More informationMetropolitan Planning Organizations in North Carolina. Chris Lukasina NCAMPO
Metropolitan Planning Organizations in North Carolina Chris Lukasina NCAMPO February 1, 2016 Items to Discuss What is an MPO/RPO? Why were they established? How are they structured? What areas do they
More informationFEDERAL FISCAL YEARS TRANSPORTATION IMPROVEMENT PROGRAM. REVISION #12 Amendment 6/3/16 DRAFT. July 2016
FEDERAL FISCAL YEARS 215-218 TRANSPORTATION IMPROVEMENT PROGRAM REVISION #12 Amendment July 216 Oahu Metropolitan Planning Organization 77 Richards Street, Suite 2 Honolulu, Hawaii 96813-4623 (88) 587-215
More informationContents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205
Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.
More informationCapital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session
Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationMARYLAND DEPARTMENT OF TRANSPORTATION MARYLAND TRANSIT ADMINISTRATION
MARYLAND DEPARTMENT OF TRANSPORTATION MARYLAND TRANSIT ADMINISTRATION Report of Independent Public Accountants on Applying Agreed-Upon Procedures for Federal Funding Allocation Data (IAS-FFA) For the Year
More informationMETROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS. Independent Accountants Report on Applying Agreed-Upon Procedures
METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS Independent Accountants Report on Applying Agreed-Upon Procedures Year ended September 30, 2012 KPMG LLP 811 Main Street Houston, TX 77002 Independent
More informationBenefits of Long-Range Capital Planning
Benefits of Long-Range Capital Planning Presentation at the Transportation Research Board 9 th National Conference on Transportation Asset Management Stephen A. Berrang Director, Capital Program Management
More informationUNIFIED PLANNING WORK PROGRAM
B O N N E V I L L E M E T R O P O L I T A N P L A N N I N G O R G A N I Z A T I O N Bonneville Metropolitan B O N N E V I L L E M E T R O P O L I T A N P L A N N I N G O R G A N I Z A T I O N Planning
More informationMPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017
MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017 RECOMMENDED ACTION: Approve Candidate Projects for the ND FTA 5339 & 5310 Grant in the priority order given.
More informationBINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016
BINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016 The Binghamton Metropolitan Transportation Study Policy Committee is designated by the Governor of New York as the Metropolitan
More informationSEPTA s State of Good Repair Funding Crisis
SEPTA s State of Good Repair Funding Crisis Jeffrey D. Knueppel, PE Deputy General Manager Laura J. Zale Senior Asset Management Analyst State of Good Repair Summit. March 27, 2013 The Southeastern Pennsylvania
More informationMPO Policy Board Thursday, October 18, 2018 South Waco Community Center Large Conference Room, 2:00 p.m Speight Avenue, Waco, Texas
MPO Policy Board Thursday, October 18, 2018 South Waco Community Center Large Conference Room, 2:00 p.m. 2815 Speight Avenue, Waco, Texas Waco Metropolitan Planning Organization Summary Notes DRAFT Members
More information2040 Plan Update. Land Use Advisory Committee March 16, 2017
2040 Plan Update Land Use Advisory Committee March 16, 2017 What is the TPP? Long-range transportation plan for the Twin Cities region Part of the federal 3C planning process cooperative, continuous, comprehensive
More informationFY2016 True Up Overview
FY2016 True Up Overview Basis for Budgeting HRT s dependency on federal, state and local budgetary decisions guides revenue and. expenditure estimates. Both are based on the best available information
More informationFY Statewide Capital Investment Strategy... asset management, performance-based strategic direction
FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE
More informationOHIO STATEWIDE TRANSIT NEEDS STUDY
OHIO STATEWIDE TRANSIT NEEDS STUDY SUMMARY OF FINDINGS The Ohio Statewide Transit Needs Study was tasked with quantifying Ohio s transit needs, as well as recommending programmatic and policy initiatives
More informationTechnical Memorandum #1: Baseline Conditions. This section provides an overview of the main services operated and assets maintained by PRTC.
Technical Memorandum #1: Baseline Conditions INTRODUCTION This Baseline Conditions Technical Memorandum provides a summary of the key services provided by the Potomac and Rappahannock Transportation Commission
More informationFixed Guideway Transit Overview
Fixed Guideway Transit Overview March 13, 2017 House Ways and Means Committee Metropolitan Council Role in Transportation Planning 2 Serves as the region s federally required Metropolitan Planning Organization
More informationAPPENDIX A: 2018 Revisions Log
A: 2018 Revisions Log APPENDIX A: 2018 Revisions Log Florida Division of Emergency Management A: 2018 Revisions Log 2018 Maintenance Maintenance 2.1, 2.2 B 2.1, 2.2 B Risk Assessment 3.1, 3.3 Risk Assessment
More informationUrban Transit Funding Formula Study
Urban Transit Funding Formula Study FBRMPO TCC Meeting February 9, 2017 Presented by: Joel Eisenfeld KFH Group, Inc. Background Asheville UZA Includes Multiple Recipients of Section 5307 Funds Designated
More informationForecasting Asset Conditions with Decay Curves April 16, 2012 Keith Gates, PE Senior Analyst, Strategic Planning & Analysis
Forecasting Asset Conditions with Decay Curves April 16, 2012 Keith Gates, PE Senior Analyst, Strategic Planning & Analysis 9 th National Conference on Transportation Asset Management San Diego, California
More informationFederal Transit Administration s (FTA) Tribal Transit Program
Federal Transit Administration s (FTA) Tribal Transit Program Bill Ramos FTA Regional Tribal Liaison 18 th Annual Northwest Tribal Transportation Symposium Airway Heights, Washington April 2011 1 Federal
More informationValley Metro Fiscal Year 2014 Financial Results. Budget and Finance Subcommittee October 9, 2014
Valley Metro Fiscal Year 2014 Financial Results Budget and Finance Subcommittee October 9, 2014 Regional Fixed Route Bus Ridership 3-Year Comparison Regional Fixed Route Bus Average Daily Ridership Light
More informationHonolulu High-Capacity Transit Corridor Project Alternatives Analysis
Alternatives Analysis Financial Feasibility Report November 30, 2006 Prepared for: City and County of Honolulu Prepared by: PB Consult Inc. Under Subcontract to: Parsons Brinckerhoff Quade & Douglas, Inc.
More information1 R E G I O N A L M O B I L I T Y P L A N
1 R E G I O N A L M O B I L I T Y P L A N 2 0 4 0 The Connections 2040 Regional Mobility Plan has been prepared to satisfy federal, state, and local needs. In order to demonstrate how the RMP addresses
More informationWASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER
WASATCH FRONT REGIONAL TRANSPORTATION PLAN 2007-2030 FINANCIAL PLAN Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER 2030 RTP Financial Plan WASATCH FRONT REGIONAL TRANSPORTATION PLAN
More informationApproved by the Roanoke Valley-Alleghany Regional Commission April 25, 2013
FY 2014 Rural Transportation Planning Assistance Program SCOPE OF WORK For the Roanoke Valley-Alleghany Regional Commission (July 1, 2013 June 30, 2014) Approved by the Roanoke Valley-Alleghany Regional
More informationMETROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS. Single Audit. September 30, (With Independent Auditors Reports Thereon)
Single Audit September 30, 2017 (With Independent Auditors Reports Thereon) Table of Contents Independent Auditors Report on Internal Control over Financial Reporting and on Compliance and Other Matters
More informationQUALITY TRANSPORTATION SUMMARY
QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...
More informationIndependent Accountant s Report Agreed-Upon Procedures Report on Federal Funding Allocation Data
Independent Accountant s Report Agreed-Upon Procedures Report on Federal Funding Allocation Data Board of Commissioners Kansas City Area Transportation Authority Kansas City, Missouri The Federal Transit
More informationReport by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:
More informationTable Of Contents Chapter 9: Vehicle, Facility and Other Equipment Inventory and Disposition
Table Of Contents Chapter 9: Vehicle, Facility and Other Equipment Inventory and Disposition 9-1 Equipment Definition 9-1 Inventory Control Requirements 9-1 Equipment Disposition 9-2 Bus and Rail Vehicles
More informationCOMPONENT 4. programming may differ from what is included in this chapter.
COMPONENT 4 PERFORMANCE- BASED PROGRAMMING This chapter provides assistance to transportation agencies with the Performance- Based Programming component of Transportation Performance Management (TPM).
More information49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see
TITLE 49 - TRANSPORTATION SUBTITLE III - GENERAL AND INTERMODAL PROGRAMS CHAPTER 53 - PUBLIC TRANSPORTATION 5302. Definitions (a) In General. Except as otherwise specifically provided, in this chapter,
More informationTRANSPORTATION IMPROVEMENT PROGRAM REVISION 19 F E D E R A L F I S C A L Y E A R S Expedited Administrative Modifications
TRANSPORTATION IMPROVEMENT PROGRAM F E D E R A L F I S C A L Y E A R S 2 0 1 5 2 0 1 8 REVISION 19 Expedited Administrative Modifications TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2015-2018
More informationRIDOA STATEWIDE PLANNING PROGRAM Transportation Planning
RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning Land & Water Conservation Summit March 10, 2012 Statewide Planning Framework Department of Administration Statewide Planning Program State Planning
More informationFTA SUBRECIPIENT MONITORING
FTA SUBRECIPIENT MONITORING JANUARY 2016 Contents Purpose... 3 Monitoring Process... 3 Elaboration of FTA Requirements and Subrecipient Guidelines... 8 Subrecipient Funding Agreement Execution... 9 Ongoing
More informationTribal Transportation Program Workshop. Transportation Planning
Tribal Transportation Program Workshop Transportation Planning Outline Planning LRTP TIP Why Plan? Provide direction To arrive at informed and thoughtful decisions. To have a product that is Efficient,
More informationTRANSPORTATION IMPROVEMENT PROGRAM WAUSAU METROPOLITAN PLANNING ORGANIZATION WAUSAU, WISCONSIN METROPOLITAN AREA
WAUSAU METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM WAUSAU, WISCONSIN METROPOLITAN AREA 2019-2022 MARATHON COUNTY METROPOLITAN PLANNING COMMISSION November 2018 WAUSAU METROPOLITAN
More informationMoDOT Title VI Workshop Introduction. Prepared by Philips & Associates, Inc., Program Consultants
MoDOT Title VI Workshop Introduction Prepared by Philips & Associates, Inc., Program Consultants November 20, 2013 Administration and Staff Lester Woods, Jr. Director MoDOT External Civil Rights Steve
More informationAPPENDIX B HIGH PRIORITY INVESTMENT PROGRAM (HPP) ( )
APPENDIX B HIGH PRIORITY INVESTMENT PROGRAM (HPP) (2017-2020) (replaces previous Transportation Improvement Program) ACCESS2040 APPENDIX B HIGH PRIORITY INVESTMENT PROGRAM The High Priority Investment
More information10 Financial Analysis
10 Financial Analysis This chapter summarizes the financial analysis for the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project. This chapter also describes
More informationTransportation Improvement Program
JOHRTS FY 2019-20 22 Transportation Improvement Program Effective from February 1, 2019 to September 30, 2022 South East Texas Regional Planning Commission-Metropolitan Planning Organization (SETRPC-MPO)
More informationHouse Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.
House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation
More informationRegional Transportation Plan 2040
South Jersey Transportation Planning Organization Regional Transportation Plan 2040 Technical Appendix #6: Financial Plan SJTPO July 2012 Version: July 16, 2012 The FHWA and FTA developed and issued the
More informationPENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE
November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning
More information