1 TUJUH BUKIT PROJECT INDONESIA HEAP LEACH OPERATION ON OXIDE RESOURCE DELIVERS ROBUST PRELIMINARY ECONOMIC ASSESSMENT RESULTS ANNUAL GOLD PRODUCTION - 143,000 OUNCES CASH COSTS - US$376 PER OUNCE (AFTER SILVER CREDITS) CAPITAL COSTS TO FIRST PRODUCTION - US$204 MILLION 20 April 2011: Intrepid Mines Limited (ASX,TSX: IAU) (the Company ) is pleased to announce the results of an independently prepared Preliminary Economic Assessment ( PEA ) for a potential heap leach, open pit gold mine on the oxide resource of the Tumpangpitu area of the Company s (80% interest) Tujuh Bukit Project in Indonesia. The PEA was prepared by Kappes Cassiday, of Reno, Nevada, based upon column leach and other metallurgical tests performed at their laboratory. The heap leach PEA is based on the Company's December 2010 resource estimate of the near surface oxide resource at Tujuh Bukit (see the Company s announcement of 14 December 2010) which is separate from the far larger, underlying porphyry resources - and produced a positive conceptual economic analysis for the project. Significantly, the PEA, based on conservative assumptions, demonstrated a life of project annual average production of 143,000 recovered ounces of gold for 9 years at a cash cost of US$376 per ounce, net of silver credits at US$16.50 per ounce. The project delivers a post-tax cumulative cashflow of US$445 million, an NPV (at a 10% discount rate) of US$180 million and an IRR of 31%, at a gold price of US$1,050 per ounce (Table 1). The production and financial numbers are reported on a project basis (Intrepid Mines Ltd holds an 80% economic interest in the project). The study also shows the deposit has considerable leverage to metal prices. At a gold price of US$1,450 per ounce and silver price of US$38 per ounce, post-tax cumulative cashflow increases to US$942 million (a NPV (10%) of US$446 million and an IRR of 54%) - Table 2. The project has further significant potential with respect to increased resource tonnages at heap leach cut off grades and increases to silver recovery with a dedicated grinding circuit for material grading plus 100g/t silver. The Company s board has approved immediate progress towards commencement of a pre-feasibility study, comprising in-fill drilling, metallurgical test work, engineering design and financing evaluation, with the forestry approval process to be conducted in parallel. Brad Gordon, the Company s Chief Executive Officer, stated: The Tujuh Bukit Oxide PEA demonstrates the viability of an extremely robust, low capital intensity and low operating cost stand-alone gold project. There is significant potential to improve the economics of this initial study through further project refinements as to production rate, the possibility of a small
2 grinding circuit and the conversion of waste to resources as in-fill drilling is completed. The merits of these options will be analysed during the pre-feasibility stage of the study process. I am pleased to announce that Intrepid is now proceeding to the oxide PFS stage. Table 1 Tujuh Bukit Oxide Gold Project - Heap Leach PEA Summary (100%) Life of Mine Production: Annual average gold production: Life of mine mining rate: Mining cost: G&A cost: Total operating cost: 57Mt at 0.86 g/t gold and 23 g/t silver. (based on unoptimised pit at US$1,050 per ounce gold and US$16.50 per ounce silver) 143,000 gold ounces per year 20,000 mill feed tonnes per day US$5.76 / processed tonne; (US$2.74 / tonne mined) US$0.80 per processed tonne US$10.82 per processed tonne; US$376 per ounce gold (after silver credits) Pre-production capital cost: US$204M (including working capital and pre-production mining) Company Tax: 25% Royalties: 3.75% on sale price Table 2 Base Case Gold Price Sensitivity Analysis (100%) (all values in constant 2011 US$) Gold / Silver Price (US$/oz) Post-tax cashflow - US$M (undiscounted) NPV (post-tax) (10%) (US$M) IRR % 1,050 / ,450 / Note: Numbers are for 100% of the project and are in real terms and post Indonesian Company tax rate of 25%. The resource estimate used in the PEA was prepared by independent consultants Hellman and Schofield. The resource block model was used in conjunction with Whittle 4D software to create an optimised pit shell as a guide for the working pit designs. A mining study including a
3 practical pit design was created by independent consultants Australian Mine Design And Development Pty Ltd, placing access ramps and catch berms into the slopes while keeping as close as possible to the same volume and waste to mill feed tonnes ratio as the Whittle shell. The Whittle shell used the abovementioned input criteria, as well as a wall slope assumption of 45 degrees. The life of mine design focused on maximising grade delivered to the heap in the early years, while minimising waste haulage profile. The PEA considered a conventional cyanide heap leach followed by Merrill Crowe precipitation and smelting to produce a goldsilver doré on site. Capital cost estimates to first production, as prepared by Kappes Cassiday, are: Direct Costs Mining $7M Processing & infrastructure Heap leach and solution ponds $32M Reclaim and stacking $25M Crushing $17M Other $29M Contingency $22M $125M Sub total direct costs $132M Indirect Costs Plant $4M Working capital $13M Owners costs $20M Initial fill $1M Sub total indirect costs $38M EPCM $16M VAT $17M Capital to first production $204M Total Phase 2 $9M Total $212M Note: Assumes contract mining The Company cautions that this PEA is preliminary in nature, and is based on technical and economic assumptions which will be evaluated in the Pre-feasibility Study. The PEA is based on the February 2011 oxide resource model, which is an inferred resource. The current basis of project information is not sufficient to convert the in-situ mineral resources to Mineral Reserves, and mineral resources that are not mineral reserves do not have demonstrated economic viability.
4 Accordingly, there can be no certainty that the results estimated in this PEA will be realized. The PEA results are only intended as an initial, first-pass review of the potential project economics based on preliminary information. Forward-looking statements This announcement contains certain forward-looking statements, relating to, but not limited to Intrepid s expectations, intentions, plans and beliefs. Forward-looking information can often be identified by forward-looking words such as anticipate, believe, expect, goal, plan, intend, estimate, may and will or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future outcomes, or statements about future events or performance. Forward-looking information may include reserve and resource estimates, estimates of future production, unit costs, costs of capital projects, and timing of commencement of operations and is based on current expectations that involve a number of business risks and uncertainties. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from those expressed or implied. Shareholders and potential investors are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Intrepid undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law. Statements relating to gold resource estimates are expressions of judgment, based on knowledge and experience and may require revision based on actual production experience. Such estimates are necessarily imprecise and depend to some extent on statistical inferences and other assumptions, such as gold prices, cut-off grades and operating costs, which may prove to be inaccurate. Forestry Activities The Indonesian Forestry Law restricts non forestry activities within protected forests and prohibits mining using an open pit method in protected forest areas. The area of the Porphyry copper-gold resource estimate, and the Zone A, Zone B and Zone C oxide resource estimate areas fall within a protected forest area. Intrepid s Alliance partner, PT IMN, is working with relevant Indonesian authorities regarding a potential review of forest land status. There is no assurance that the forestry reclassification will take place in this instance. About Tujuh Bukit Intrepid s principal asset is known as Tujuh Bukit, a gold/silver and gold/copper project located in Indonesia on the island of Java, approximately 205 kilometres south east of Surabaya, capital of the province of East Java, and 60 kilometres south-west of Banyuwangi. The Tujuh Bukit Project area covers 11,621 hectares under two Izin Usaha Pertambangan ("IUP's"), the form of exploration/mining title introduced under the new Indonesian Mining Law, enacted in January The property contains a potentially large, high sulphidation epithermal gold-silver-copper system with areas of near surface oxidised gold-silver mineralisation and multiple copper-gold-molybdenum porphyries. Through a series of joint venture agreements, and having satisfied certain related expenditure commitments, Intrepid has acquired an 80% indirect economic interest in Tujuh Bukit. The IUPs are held by the Company s joint venture partner, an Indonesian company, PT Indo Multi Niaga ( PT IMN ) which has a 20% participation right in the project. Qualified Person The PEA was prepared by independent industry consultants, all qualified persons under National Instrument The qualified persons have reviewed and approved the content of this news release. The following consultants and qualified persons participated in the PEA: Kappes Cassiday and Associate, under the direction of Daniel Kappes, PEng. Mr Kappes is the President of KCA. He supervised and reviewed the heap leach pad and solution ponds design, process design and infrastructure requirements, capital and operating cost estimate, and financial analysis of this project. Daniel Kappes has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and an Independent Qualified Person as defined in the Canadian National Instrument (standards of Disclosure for Mineral Projects). Mr Kappes consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Australian Mine Design and Development Pty Ltd., under the direction of Peter Allen, MAusIMM. Mr. Allen is an open pit engineering and principal consultant at AMDAD Pty Ltd. He supervised and reviewed all the mining design aspects of this project. Peter Allen has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and an Independent Qualified Person as defined in the Canadian National Instrument (standards of Disclosure for Mineral Projects). Mr Allen consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. An NI compliant technical report will be filed on SEDAR within 45 days of the date of this press release.
5 The information in this announcement that relates to mineral resources is based on information compiled by or under the supervision of Dr. Phillip Hellman, who is an independent consultant to Intrepid Mines Limited, a Director of Hellman and Schofield Pty Ltd and a Fellow of The Australian Institute of Geoscientists. Dr Hellman has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and an Independent Qualified Person as defined in the Canadian National Instrument (standards of Disclosure for Mineral Projects). Dr Hellman consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Dr Hellman has undertaken independent verification sampling and assaying of drill core with a close agreement of results with those previously reported. A 40 x 40 x 6 metre block model was used for the quoted estimates. If smaller selective mining units are considered it is estimated that an approximate 10 to 20% lift in grade may result. In future, increasing the drilling density in areas of higher gold grades is anticipated to achieve a higher grade outcome. Sample Analysis Intrepid exercises a strict chain of sample custody in its drilling program at Tujuh Bukit. Joint Venture personnel remove core from the drill rig and deliver it to a project geologist who logs the core and marks the core into two metre sample intervals. Intrepid and Joint Venture personnel supervise the immediate splitting, sawing and bagging of samples, and packaging of groups of samples for dispatch to the laboratory. The remainder of the split core remains on site. Samples are securely packaged, batched, and then transported under supervision to Intertek s laboratory facility in Jakarta. At the laboratory, the samples are prepared by crushing and pulverizing and a 30 gram charge is assayed for gold by conventional fire assay and/or atomic absorption methods. Multi-element ICP analysis is carried out using a multi-acid digestion process. All samples that contain silver and/or copper, lead, and zinc values that exceed the upper detection limits for ICP are re-analysed by conventional atomic absorption methods to determine the absolute values of these metals. For further information please contact: Brad Gordon, Chief Executive Officer, Brisbane, Australia : : bgordon@intrepidmines.com Greg Taylor, Toronto, Canada : : gtaylor@intrepidmines.com
Orezone Announces Positive Preliminary Economic Assessment
Orezone Announces Positive Preliminary Economic Assessment January 22, 2014 - Orezone Gold Corporation (ORE:TSX) is pleased to announce the results of an independent Preliminary Economic Assessment (the
More informationSpanish Mountain Gold Announces Results of New PEA for the First Zone
1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain
More informationALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)
FOR IMMEDIATE RELEASE ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) 368-9932 or 1 (866) 788-8801 (All amounts are expressed in United States dollars, unless
More informationArgonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery
Argonaut Gold Announces Updates on the Magino and San Agustin Projects Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery The San Agustin Preliminary Economic Assessment Results
More informationSHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS
FOR IMMEDIATE RELEASE December 8th, 2009 TSX: SUE SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS Toronto, Ontario, Canada, December 8 th, 2009 Sulliden Gold Corporation ( Sulliden or the Company )
More informationNews Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia
News Release B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia Vancouver, March 12, 2014 B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX:
More informationPRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo
PRESS RELEASE Banro Files NI 43-101 Technical Report on Namoya Project, Democratic Republic of the Congo Toronto, Canada May 13, 2014 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX
More informationNEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742
NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Probe Metals Increases Resource to 682,400 ounces Indicated at 2.35 g/t gold and 722,100 ounces Inferred at 2.41 g/t gold at the Val-d
More informationFilo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019
Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019 Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained
More informationARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014
ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company or Argonaut
More informationAntioquia Gold Announces Preliminary Economic Assessment and Mineral Resource Update for Cisneros Gold Project
Antioquia Gold Announces Preliminary Economic Assessment and Mineral Resource Update for Cisneros Gold Project CALGARY, Alberta, Feb. 20, 2018 -- Antioquia Gold Inc. ("Antioquia Gold" or the "Company")
More informationEldorado Gold Reports Results of Technical Studies
NEWS RELEASE TSX: ELD NYSE: EGO March 21, 2018 Eldorado Gold Reports Results of Technical Studies VANCOUVER, BC Eldorado Gold Corporation, ( Eldorado or the Company ) today announces the release of three
More informationAsia s newest major gold producer Tujuh Bukit Oxide Gold Silver Heap Leach
Asia s newest major gold producer Tujuh Bukit Oxide Gold Silver Heap Leach Mines and Money Asia Company Spotlight Presentation Paul Muddy Willis April 2017 1 Disclaimer PT Merdeka Copper Gold Tbk ( PT
More informationKişladağ Update March 2018
Kişladağ Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or
More informationVelocity Files NI Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria
NR-18-10 April 5, 2018 Velocity Files NI 43-101 Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria Inferred Resource at 0.5g/t gold cut-off
More informationNEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE
May 31, 2018 For Immediate Release NEWS RELEASE TSX: GPR NYSE AMERICAN: GPL GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE Potential for Average Annual Production
More informationARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2014
ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2014 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold Inc. (the Company
More informationARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010
ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold
More informationTUNKILLIA GOLD PROJECT
TUNKILLIA GOLD PROJECT Positive Scoping Study establishes that Mungana (ASX: MUX) can become costcompetitive gold producer in South Australia Highlights Technical and economic assessment provides confidence
More informationWest African Resources awards underground mining contract for M1 South to Byrnecut
Press Release 28 th November 2018 West African Resources awards underground mining contract for M1 South to Byrnecut Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to announce
More informationCoeur Provides Updated Palmarejo Mine Plan
NEWS RELEASE Coeur Provides Updated Palmarejo Mine Plan Chicago, Illinois - July 20, 2014 - Coeur Mining, Inc. ( Coeur or the Company ) (NYSE: CDE) announced an updated and re-scoped mine plan and preliminary
More informationSECOND QUARTER 2018 RESULTS. August 10, 2018
SECOND QUARTER 2018 RESULTS August 10, 2018 FORWARD LOOKING STATEMENTS Certain statements and information contained in this presentation constitute forward-looking statements within the meaning of applicable
More informationAVINO SILVER & GOLD MINES LTD.
AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com April 11, 2017 NYSE - MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES
More informationJinshan Gold Mines Inc. April 24, 2006
Jinshan Gold Mines Inc. April 24, 2006 FINAL FEASIBILITY STUDY EXTENDS MINE LIFE AND DEMONSTRATES ROBUST ECONOMICS FOR JINSHAN S CSH (217) GOLD PROJECT, CHINA INFILL DRILLING INCREASES MEASURED AND INDICATED
More informationRoyal Gold Announces Preliminary Economic Assessment for the Peak Gold Project
Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project DENVER, COLORADO. SEPTEMBER 24, 2018: ROYAL GOLD, INC. (NASDAQ:RGLD) (together with its subsidiaries, Royal Gold or the Company
More informationNEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project
NEWS RELEASE Centerra Gold Announces Positive Feasibility Study on the Öksüt Project All figures are in United States dollars. This news release contains forward-looking information that is subject to
More informationDalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland
2012 No. 12 TSX: DNA Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland TORONTO, ONTARIO - (Marketwire - July 25, 2012) - Dalradian
More informationTurquoise Hill files 2016 Oyu Tolgoi Technical Report
October 21, 2016 Press release Turquoise Hill files 2016 Oyu Tolgoi Technical Report VANCOUVER, CANADA Turquoise Hill Resources today filed an updated compliant independently-prepared technical report
More informationCOPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES
COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES $2.2 Billion After-Tax NPV@8 and IRR of 20. 3.6 Year Payback at $3.00/lb. Copper and 36 Year Mine Life 45 Million lbs. Average
More informationMarigold Life of Mine Plan
Marigold Life of Mine Plan October 7, 2014 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking statements within the meaning
More informationErdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project
Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project Halifax, Nova Scotia December 18, 2018 - Erdene Resource Development Corp. (TSX:ERD; MSE:ERDN) ("Erdene" or "Company"),
More informationTrevali Provides Murray Brook Project Update
Trevali Mining Corporation 1400 1199 West Hastings Street Vancouver, British Columbia, CANADA V6E 3T5 Telephone: (604) 488-1661 www.trevali.com NEWS RELEASE Trevali Provides Murray Brook Project Update
More informationMarlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update
250 1199 WEST HASTINGS ST. VANCOUVER, B.C. V6E 3T5 CANADA T. 604 646 1580 F. 604 642 2411 WWW.MARLINGOLD.COM TSX.V: MLN Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate
More informationFor personal use only
ASX ANNOUNCEMENT 28th November 2012 MATILDA MINE DEMONSTRATES ROBUST ECONOMICS Matilda open pit design confirms o 2.45Mt milled tonnes @ 2.11 g/t au head grade o 150,000oz gold production over four years
More information(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,
All figures in U.S. Dollars TAHOE RESOURCE ES ANNOUNCES UPDATED NI 43-101 RESOURCE 50% Growth in Indicated Resource Fuels PEA for Expansion VANCOUVER, B.C. (May 7, 2012) Tahoe Resourcess Inc. (TSX: THO)
More informationLEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD
News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation
More informationAllied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns
Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 89521 USA NEWS RELEASE Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns October
More informationPRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016
CZN-TSX CZICF-OTCQB PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016 CANADIAN ZINC FILES TECHNICAL REPORT ON 2016 PREFEASIBILITY STUDY UPDATE FOR THE PRAIRIE CREEK MINE Vancouver, British Columbia, May
More informationGlencore Finances Matrix into Copper Production Summary
19 October 2006 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 Dear Sir, ANNOUNCEMENT ABN 42 082 593 235 Electronic
More informationMCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)
MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars) TORONTO, ONTARIO - (September 23, 2013) - McEwen Mining Inc. (NYSE:
More informationWetar Copper Project Expansion Update - Commencement
For ASX Market Release: 7th January 2015 Wetar Copper Project Expansion Update - Commencement HIGHLIGHTS Daewoo funds of USD45M received Contract negotiations on major contracts well advanced Orders placed
More informationTSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS
Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intercepts Broad Mineralization, Including 162m at 2.01 g/t Au
More informationPRODUCING AND EXPLORING Q WEBCAST
PRODUCING AND EXPLORING Q3 2012 WEBCAST 1 CAUTIONARY STATEMENT This presentation contains forward looking information, within the meaning of applicable Canadian securities legislation, and forward looking
More informationAbraPlata Files Diablillos Silver-Gold Project PEA Report IRR of 30.2% and After-Tax NPV 7.5% of US$212 Million
Equivalent Sliver Production (M oz) AbraPlata Files Diablillos Silver-Gold Project PEA Report IRR of 30.2% and After-Tax NPV 7.5% of US$212 Million BUENOS AIRES April 23, 2018, - AbraPlata Resource Corp.
More informationAllied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV
Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 89521 USA NEWS RELEASE Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV
More informationMinera Alamos Enters Option Agreement to Acquire Guadalupe de Los Reyes Advanced Stage Gold-Silver Project in Mexico from Vista Gold
Minera Alamos Inc. Minera Alamos Enters Option Agreement to Acquire Guadalupe de Los Reyes Advanced Stage Gold-Silver Project in Mexico from Vista Gold Minera Alamos Inc. (TSXV:MAI, OTCQB:VGMTF) (the "Company"
More informationFor personal use only
Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media
More informationCorvus Gold Announces Maiden Resource for Mother Lode Deposit, Nevada
Suite 1750, 700 West Pender St. Vancouver, British Columbia CANADA V6C 1G8 TSX: KOR OTCQX: CORVF Tel: (604) 638-3246 Toll Free: 1-844-638-3246 info@corvusgold.com www.corvusgold.com NR18-15 September 18,
More informationWEST AFRICAN SCOPING STUDY DELIVERS HIGH MARGIN, LOW CAPITAL COST STAGE 1 GOLD PROJECT
Press Release 29 th July 2014 WEST AFRICAN SCOPING STUDY DELIVERS HIGH MARGIN, LOW CAPITAL COST STAGE 1 GOLD PROJECT West African Resources Limited (ASX, TSXV: WAF) is pleased to announce the results of
More informationStock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)
Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO-EAGLE FILES NEW TECHNICAL REPORT ON GOLDEX
More informationNEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz
Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz
More informationAvnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project
Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project ST. PETER PORT, GUERNSEY, October 15, 2014 Avnel Gold Mining Limited ( Avnel Gold or the Company
More informationBellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia
Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia PEA Study Highlights La Mina as One of the Lowest Cost Gold Development
More informationMAG Silver Reports Juanicipio Updated PEA Study Prepared by AMC
#770 800 West Pender Street Vancouver, BC V6C 2V6 P: 604-630-1399 F: 604-681-0894 MAG Silver Corp. June 14, 2012 For Immediate Release NR#12-07 MAG Silver Reports Juanicipio Updated PEA Study Prepared
More informationQUARTERLY REPORT OCTOBER TO DECEMBER 2014
QUARTERLY REPORT OCTOBER TO DECEMBER 2014 Highlights Outlook for March Quarter 2015 TUNGSTEN & MOLYBDENUM Molyhil NT Revised feasibility study completed demonstrating robust economics Continue off-take
More informationMcEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO
McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO TORONTO, ONTARIO - (September 10, 2012) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce results of the
More informationQUARTERLY ACTIVITY STATEMENT
QUARTERLY ACTIVITY STATEMENT DECEMBER 2011 QUARTER HIGHLIGHTS Deflector Project Highlights: Deflector Deposit upgrade Significant upgrade in metallurgical test-work Deflector Drilling Program Recommencement
More informationMEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)
MEDIA RELEASE 26 June 2017 OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX: OGC) (the
More informationDuring the nine month period ended May 31, 2012, key events of the Company included:
Management s Discussion & Analysis For the Nine Month Period Ended May 31, 2012 The following Management s Discussion and Analysis ( MD&A ) of Barisan Gold Corporation (the Company or Barisan Gold ) should
More informationSeptember 2014 Quarterly Results
September 2014 Quarterly Results Sandeep Biswas Managing Director and Chief Executive Officer 21 October 2014 Disclaimer Forward Looking Statements These materials include forward looking statements. Often,
More informationMagino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce
NEWS RELEASE TSX.V PDG Magino Updated PEA: NPV of $939M, Projected Gold Production of 2.6M Ounces, Cash Costs $461(US)/Ounce Vancouver, British Columbia, December 22, 2011 Prodigy Gold Incorporated (PDG:
More informationNEWS RELEASE NR: October 11, 2017
NEWS RELEASE NR: 17-11 October 11, 2017 Eros Announces Results of Preliminary Economic Assessment for the Bell Mountain Gold Project Vancouver, BC (October 11, 2017) Eros Resources Corp. (TSX.V: ERC) (
More informationCANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604)
CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) 336-8612 Fax: (604) 718-2808 www.canamex.us NEWS RELEASE Canamex Resources Announces Positive Preliminary Economic
More informationAldridge Announces Results for Yenipazar Optimization Study
ALDRIDGE MINERALS INC. 10 King Street East, Suite 300 Toronto, Ontario Canada M5C 1C3 www.aldridgeminerals.ca Aldridge Announces Results for Yenipazar Optimization Study - Pre- Production Capital Costs
More informationNEWS RELEASE JANUARY 29, 2015
NEWS RELEASE 15-02 JANUARY 29, 2015 PILOT GOLD ANNOUNCES REVISED PRELIMINARY ECONOMIC ASSESSMENT FOR HALILAGA COPPER-GOLD PORPHYRY PROJECT Project Generates After-tax 43.1% IRR and US$474 Million NPV 7%
More informationSYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO
SYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO DISCLAIMER IMPORTANT NOTICES Nature of this document: The purpose of this presentation is to provide general information about Gold
More informationQ4 and Year End 2012 Conference Call. ArgonautGold.com
Q4 and Year End 2012 Conference Call Forward Looking Statement FORWARD LOOKING INFORMATION ALL MONETARY AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED This document contains certain forward-looking statements
More informationFor personal use only
` Dated: 14 April 2015 PHOENIX SUSPENDS SMALL MINING PROJECTS TO FOCUS ON NORTON JV AND HEAP LEACH ASX: PXG KEY POINTS Completion of mining at Kintore West in April 2015 Final milling campaign at Greenfields
More informationMarathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland
Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland TORONTO, ON October 30, 2018 - Marathon Gold Corporation
More informationNEWS RELEASE Orca Gold Intercepts 39m at 2.52 g/t Au in The Republic of The Sudan and 27.7 m at 1.74 g/t Au in Côte d Ivoire
Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intercepts 39m at 2.52 g/t Au in The Republic of The Sudan and
More informationFor further information: Investor Relations (416)
For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO EAGLE COMPLETES UPDATED NI 43-101 TECHNICAL REPORT ON THE MELIADINE GOLD
More informationNEWS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER
NEWS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE November 14, 2017 CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER Positive 2017 Feasibility Study shows increased production All season road environmental
More informationPress Release 31 January 2018
Press Release 31 January 2018 DECEMBER 2017 QUARTERLY REPORT (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso, West Africa, for the quarter ending
More informationFor personal use only
ASX Announcement 29 January 2014 Quarterly Activities Report December 2013 Project geologists inspecting new drill core from the Natougou Gold Project. Orbis Gold Limited ACN 120 212 017 ASX Code : OBS
More informationMEDIA RELEASE OCEANAGOLD UPDATES DIDIPIO NI TECHNICAL REPORT
MEDIA RELEASE 30 October 2014 OCEANAGOLD UPDATES DIDIPIO NI 43-101 TECHNICAL REPORT (All figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX/NZX: OGC) (the Company
More informationEmerging Producer in the. Murchison Goldfields
Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic
More informationPERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013
FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 AUSTRALIAN AND INDONESIA FOCUS PRODUCTION AND EXPLORATION ASSETS Bird s Head project Production and cash flow in
More informationFor Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING
For Immediate Release TSX:ORV Date: July 4, 2017 #07-2017 ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING TORONTO, ONTARIO, July 4, 2017 - Orvana Minerals Corp.
More informationExeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides
For Immediate Release: NR 17-01 Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides Vancouver, B.C., January 17, 2017: Exeter Resource Corporation (NYSE-MKT:XRA,
More informationDetour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates
March 6, 2015 NEWS RELEASE Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates Detour Gold Corporation (TSX: DGC) ( Detour Gold or the
More informationUPDATED MARIGOLD LIFE OF MINE PLAN CONFIRMS NEAR-TERM PRODUCTION GROWTH AND ROBUST ECONOMICS
News Release 18-09 June 18, 2018 UPDATED MARIGOLD LIFE OF MINE PLAN CONFIRMS NEAR-TERM PRODUCTION GROWTH AND ROBUST ECONOMICS VANCOUVER, B.C. SSR Mining Inc. (NASDAQ: SSRM) (TSX: SSRM) ( SSR Mining ) is
More informationSOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013
SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013 ASSETS, BOARD AND MANAGEMENT TEAM Production and cash flow in Australia Kanmantoo Copper Mine (100%
More informationNEWS RELEASE. Imperial Reports 2011 Third Quarter Financial Results
NEWS RELEASE Imperial Reports 2011 Third Quarter Financial Results Vancouver, BC November 14, 2011 Imperial Metals Corporation (TSX:III) reports comparative financial results for the three and nine months
More informationNEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan
Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block
More informationCapstone Mining 2017 Production Results and 2018 Operating and Capital Guidance
Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 10, 2018 Capstone Mining 2017 Production Results and 2018 Operating
More informationSANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE
PRESS RELEASE SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE Vancouver, British Columbia June 26, 2018 Sandstorm Gold Ltd. (dba Sandstorm Gold Royalties, Sandstorm or
More informationAllied Nevada Reports Second Quarter 2014 Financial Results
Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 89521 USA NEWS RELEASE Allied Nevada Reports Second Quarter 2014 Financial Results August 4, 2014 Reno, Nevada - Allied Nevada Gold Corp.
More informationDetour Gold Updates Life of Mine Plan for Detour Lake
February 4, 2012 NEWS RELEASE Detour Gold Updates Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce an updated life of mine plan
More informationASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management
ASX ANNOUNCEMENT 31 October 2017 ASX Code: HOR Management Mr Michael Fotios Non-Executive Chairman Mr Neil Porter Non-Executive Director Mr Alan Still Non-Executive Director Issued Capital Shares: 194.6
More informationGROWTH THROUGH CASH FLOW. Q Results 3 August 2017
GROWTH THROUGH CASH FLOW 2017 Results 3 August 2017 2 DISCLOSURES Forward Looking Statements: There are risks associated with an investment in the shares of Centamin. Recipients of this presentation should
More informationTSX:AR CORPORATE PRESENTATION
TSX:AR CORPORATE PRESENTATION Second Quarter 2018 Conference Call August 10, 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information
More informationOTCQX:CROCF. February. completed % U 3 O 8 Cut Off Grade. contained. repetitions. significant the aim of. Gold retains
65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD ANNOUNCES INITIAL URANIUM RESOURCE ESTIMATE AT THUNDERBALL COMPLETED BY JV PARTNER THUNDELARRA February 8, 2011
More informationNOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA
13 July 2012 NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA This release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The
More informationAllied Nevada Reports Gold Equivalent Measured & Indicated Resources of 10.3 Million Ounces and Further Inferred Resources of 7.
Allied Nevada Gold Corp. 9790 Gateway Drive Suite 200 Reno, NV 85921 USA Allied Nevada Reports Gold Equivalent Measured & Indicated Resources of 10.3 Million Ounces and Further Inferred Resources of 7.7
More informationNEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase
Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Drills 123 m at 1.96 g/t Au and 12.0 m at 8.36 g/t Au and Proves
More informationNEWS VISTA GOLD CORP. ANNOUNCES MT. TODD GOLD PROJECT PRELIMINARY FEASIBILITY STUDY AND INCREASE IN RESERVES OF 44% TO 5.9 MILLION OUNCES OF GOLD
7961 Shaffer Parkway Suite 5 Littleton, CO 80127 Phone: 720-981-1185 Fax: 720-981-1186 Trading Symbol: VGZ Toronto and NYSE MKT Stock Exchanges NEWS VISTA GOLD CORP. ANNOUNCES MT. TODD GOLD PROJECT PRELIMINARY
More informationAlio Gold Reports Second Quarter 2018 Results
Alio Gold Reports Second Quarter 2018 Results VANCOUVER, British Columbia, g. 10, 2018 -- Alio Gold Inc. (TSX, NYSE AMERICAN: ALO) ( Alio Gold or the Company ) today reported its second quarter 2018 financial
More informationHBM. Creating Sustainable Value through High Quality Long Life Deposits
HBM Creating Sustainable Value through High Quality Long Life Deposits Q1 2012 Conference Call, May 10, 2012 Forward Looking Information This presentation contains contains forward-looking statements and
More informationMAG Silver Corp. August 14, 2013
#770 800 West Pender Street Vancouver, BC V6C 2B5 P: 604-630-1399 F: 604-681-0894 MAG Silver Corp. August 14, 2013 Juanicipio Property Assay Table (results provided by Fresnillo plc, as operator) and Review
More informationLiberty Gold Announces Positive Preliminary Economic Assessment for the Goldstrike Oxide Gold Deposit, Great Basin, USA
NEWS RELEASE 18-12 July 10, 2018 Liberty Gold Announces Positive Preliminary Economic Assessment for the Goldstrike Oxide Gold Deposit, Great Basin, USA Post-tax NPV5% of US$129.5 million, IRR of 29.4%,