1 21, rue d'artois, F Paris C2-102 Session 2004 CIGRÉ COMMON NORDIC BALANCE MANAGEMENT O.GJERDE* STATNETT (Norway) F.WIBROE ELTRA (Denmark) J-E. FISCHER ELKRAFT (Denmark) K.LINDSTRÖM FINGRID (Finland) T.GUDMUNDSSON LANDSVIRKJUN (Iceland) T. PINZÓN SVENSKA KRAFTNÄT (Sweden) Abstract The paper covers the Nordic real time balance management, in operation from September 2002, and shows the importance of a well-functioning market based balance management system. The development of the electricity markets in many countries shows that the need for an efficient regulating power market functioning under commercial conditions is underestimated. The same could be said about the significance of a well-functioning neutral balance settlement system. By the changes introduced in September 2002, the primary focus is now on frequency control. Area Control Error (ACE) is normally not used. Only in cases of major congestion between the countries, ACE is taken into account. To be able to do this, the transmission system operators in the countries have implemented a common regulating power market and developed a common information system. The general principles of the regulating power market, the principles for making bids, and the determination of regulating power prices and balance prices are explained. Key Words: Electricity market - Real time balance management - Secondary control - Settlement 1. INTRODUCTION The Nordic power system and electricity market have undergone a comprehensive process of restructuring in recent years. The liberalisation of the electricity markets in the Nordic countries started in the beginning of the 1990s. The common electricity market comprises the four countries Denmark, Finland, Norway and Sweden. Iceland is also taking part in the Nordic co-operation such as the Nordel organisation (the body for cooperation between the Nordic TSOs), but is not interconnected to the other countries. The peak load for the interconnected system is slightly less than MW, and the total consumption was 397 TWh in In all Nordic countries, an independent transmission system operator (TSO) solution was chosen. This means that the TSO both owns and operates the main national grid. The networks, as natural monopolies, are separated from competitive activities. All networks are opened up for third-party access, regardless of the connection point. This means free access on equal terms for everyone to transmit power through all Nordic transmission and distribution networks. All transmission charges between the countries are removed. *ole.gjerde@statnett.no

2 An important part of the development of the common Nordic electricity market is the development of the power exchange Nord Pool. Nord Pool is organised in two separate companies: - Nord Pool Spot for physical trading in spot market, Elspot (day-ahead), and adjustment market, Elbas (delivery day). - Long-term trading with financial instruments in the mother company of Nord Pool Group. 2. THE ELECTRICITY MARKET PRINCIPLES When developing the Nordic market, some fundamental requirements have been fulfilled in order to ensure a well-functioning electricity market: - All players must be treated equally and impartially and be allowed equal access to the grid. - Trade-stimulating tariffs and efficient management of transmission capacity are essential. - Operations must ensure instantaneous power balance and maintain satisfactory operational security. Figure 1 shows the Nordic market model where all players have the possibility of bilateral trade and also have access to a well-functioning power exchange. Physical trade on daily basis may be bilateral or done at the spot power exchange. PRODUCERS OTHER PLAYERS CONSUMERS BILATERAL ELECTRICITY TRADING PRODUCERS OTHER PLAYERS CONSUMERS One of the basic functions of the spot exchange is to establish a public price reference for other trading. Financial market ELSPOT ELECTRICITY EXCHANGE ELBAS Regulating power Balancing power 3 years - 56 hrs hrs 33-1 hrs In the hour After the hour of operation of Operation Figure 1 The Nordic electricity market principle After trade on the spot market has closed for the day, the players still have the possibility of adjusting their schedules either on the socalled adjustment market (Elbas) or even bilaterally very close to the operational hour. In the operational hour, the electricity balance is secured on the real time market (regulating power market) by the TSOs. Long-term risk management can be handled on the financial market or bilaterally. 3. TECHNICAL REQUIREMENTS ON SYSTEM OPERATION The Nordic electricity system has a long tradition for co-operation and co-ordination in operation and planning. The co-operation was earlier based on Nordel recommendations, and it is now based on a system operation agreement between the Nordic TSOs [1]. The TSOs shall jointly maintain a supply quality that is appropriate with respect to the joint system operation, e.g. frequency, time variation, system oscillations, etc. The criteria for operational reliability are based on the n-1 criterion. This implies that: - Single faults in a subsystem shall not result in serious operational disturbances in adjacent subsystems. - There shall be an adequate disturbance reserve and transmission capacity to enable the Nordic power system to cope with clear design contingencies. - The loss of a busbar in a subsystem must not lead to serious operational disturbances in other subsystems. 2

3 - Following a disturbance, the power system will be able to go into alert operation. The system shall return to normal operation within a period of 15 minutes. - Network protection requires a level of reliability in line with primary protection. - System protection schemes are accepted as part of the n-1 criterion, and are used to a variable degree in the various countries. - Temporarily lower reliability is more and more accepted regionally by each TSO under special operating conditions and when important lines are out for maintenance. The blackouts in the autumn of 2003 in USA/Canada, Sweden/Denmark and Italy may lead to a re-examination of this practice. Operations are based on a number of different reserves, such as: - Instantaneous operating reserve, which is split up into two parts: Frequency control reserve (activated 100% at 49.9 Hz) and instantaneous disturbance reserve (activated 50% in 5 sec. and 100% in 30 sec.). - Fast active operating reserve (activated in 15 minutes). - Slow active reserve (4-8 hours). - Reactive reserve. These reserves are of international standard. Due to the size of the system compared with for instance the UCTE, the instantaneous disturbance reserve has to be activated faster than in the UCTE system. The allowed frequency variation is normally between 49,9 and 50,1 Hz. For frequency control purposes at 50 Hz a power reserve of minimum 600 MW is required. It shall be utilised with a total primary response of MW/Hz. 4. BALANCE MANAGEMENT AND SECONDARY CONTROL PRACTICES IN THE NORDIC POWER SYSTEM BEFORE AND AFTER DEREGULATION Before the electricity market deregulation in the early 1990s liberal frequency control practices had been applied. It was accepted to allow a free power flow between the separate control areas (countries) within certain predetermined limits. Strict set-point control was not required except under certain stressed conditions. The deviations from predetermined power interchanges were settled after the fact, following certain rules. In practice, no Automatic Generation Control (AGC) was needed. The responsibility for generation scheduling and dispatch was decentralised to the power producers. The responsibility for primary frequency control was borne by the main producers in each country. After the deregulation in the mid 1990s, these same control practices are applied. Each TSO is responsible for the control of its subsystem (control area). In the first step after the deregulation, each TSO controlled its own subsystem by control actions based on an area control error (ACE limits), but under normal conditions no individual control actions are taken any longer to control the individual area. Control steps are taken to control the frequency for the whole Nordic power system. From September 2002, a common real time regulating power market has been developed to handle the secondary control. This means that secondary control steps for the whole Nordic synchronous power system are decided centrally by the Swedish or the Norwegian TSO, who bears the responsibility for keeping the frequency. This guarantees that all resources are utilised in the most optimal way. The only reason for exceptions from this rule is when main grid transmission bottlenecks occur. In such situations, the control actions may be taken in each subsystem. The decentralised generation dispatch is still applied, i.e. the producers are obliged to plan and dispatch their generation themselves. The TSO will only affect the generation when system security is stressed. The individual TSOs are responsible for the security within their respective transmission networks. They are therefore given the authority to intervene in various ways in the operation of the interconnected power companies within their own countries (control area). 3

4 An important task for the TSO is to offer the market players an impartial balancing service and balance settlement. The objective is to perform a control action where it is most effective. When power is traded either via the exchange or bilaterally sooner or later the situation will arise whereby the agreed delivery is deviating from the physical one. Imbalances between agreed and physical deliveries are handled by the TSO in a way that is impartial for all parties. 5. THE FUNCTIONS IN THE COMMON NORDIC BALANCE MANAGEMENT (REGULATING POWER MARKET) Figure 2 shows how the roles of the electricity market are distributed. The electricity exchange organises and operates marketplaces for physical and financial trade as described in chapter two. The TSOs bear the overall responsibility for operational reliability of the power system. This includes among other tasks: security, ancillary services, operating the regulating power market and balance settlement. Electricity exchange Organising and operation Financial market Elspot Elbas Bids to Elspot and Elbas markets Transmission capacity Spot trade System operator (TSO) Operations security Ancillary services Real time regulating power market Balance settlement Both market players and the TSOs contribute to maintaining the balance of the power system. The players are bound by the agreements they have entered into, and they have an economical incentive to balance their schedules through bilateral trade and trading at the electricity exchange. Producers Distributors Grid operators Traders Brokers Large end users Market actors Order up and down regulation Generation schedules Bids to real time regulating power market Figure 2 Roles of the different market participants The players submit their schedules to the TSOs one day ahead. The possible errors in their forecasts will cause imbalances, which can cause them economic losses. Therefore, the players have possibilities of adjusting the schedules, in some cases, up until and during the hour of operation. In the planning phase, the market players bear the responsibility for planning themselves into balance. Following the planning phase, the TSOs take control of the power balance during the operational hour. After the operational phase, the balance responsible players will be settled for the imbalances that have occurred. 5.1 Balance Responsible Players Each party operating in the electricity market is responsible for continuously maintaining the balance between its production and consumption. In order to help the market parties in taking care of their balance responsibility, so-called balance responsible players have been introduced. According to agreement such a balance responsible player may bear the balance responsibility for several market players. The TSO makes an agreement with these balance responsible players to deliver their unplanned energy supplies for each operational hour. A balance responsible player has a right to use balance power delivered from the TSO for his imbalances. 5.2 The Real time Regulating Power Market A player who has available regulating capacity can offer it to the TSOs regulating power market. The regulating power market is based on bids on upward or downward regulation from the players (see figure 3, step 1). These bids can be steps to either increase or decrease power generation or consumption. The bids are entered into a common price list (step 2) in the common Nordic Operational Information System (NOIS). According to mutual agreement, the TSOs in Sweden and Norway activate these bids when frequency deviations occur (step 3). The final commands to the resource owners go from the national TSO (step 4). 4

5 Bids on upward and downward regulation Step 1 National TSOs handles Step 2 Common Nordic Operational Information system (NOIS) Merit order list list of of bids 50 Hz Market players owning regulating resources Consumption Generation Norwegian and Swedish TSOs maintains the frequency Step 3 Activate the bids Activate the bids National TSO submit Step 4 Order upward or downward regulation Figure 3 The real time control steps In situations of bottlenecks in the transmission system, necessary steps to avoid the bottleneck are first taken. Subsequently, the frequency is corrected, if necessary. In many cases, the steps to alleviate bottlenecks will clear out the frequency deviations. The total number of active regulation steps today for frequency control in the common system is much lower than in the earlier balance management in each country. 5.3 The Pricing Mechanism Figure 4 shows how the bids are handled and how the pricing is performed. For purposes of compensating the balance responsible players, the upward and downward regulation prices in the regulating power market have to be defined. The highest price of the regulation step, which is called to regulate upwards during the hour in question, becomes the upward regulation price. The lowest price of the regulation step, which is called to regulate downwards during the hour in question, becomes the downward regulation price. The energy produced or saved on the basis of these regulation steps is defined as regulating power. Price Price Highest up regulation price = Sales price for balancing power Downward regulation Upward regulation Spot price = base price - MWh + MWh Lowest down regulation price = Purchase price for balancing power Regulating power Figure 4 The pricing mechanisms Balancing power 5

6 The successful bidders are paid for the regulating power based on the highest (upward regulation) or lowest price (downward regulation) during the operational hour. This means that the successful bidders get the same or a better price than they have asked for when bidding. For upward regulation, the TSO will pay the bidder for the used power, and for downward regulation the bidder will pay the TSO for the saved power. If no transmission bottlenecks occur, the regulating power price will be optimal and the same in all countries. In constrained transmission situations, the price differs from one subsystem to the other. The cost of the regulations is used as a basis for pricing the imbalances, which is calculated in the settlement phase (described below). The settlement and pricing procedure for balancing power within each country is still different. 5.4 Self-regulation during the Operational Hour Traditionally in the Nordic countries, the major power generating companies used to control their balance individually during the operational hour. The development of the electricity market has shown that there are many disadvantages of this self-regulation. Individual control steps can disturb the total system balance and available regulating capacity can be withheld from the market. This would cause larger deviations in energy flow from one country to another compared to planned energy exchange. It can also be much more expensive for the individual market player. As a result, the individual national balances are no longer regulated during the operational hour. In some cases, the rules are such that self-regulation is not feasible at all. 5.5 Balance Settlement The purpose of the balance settlement is to settle the electricity deliveries between all parties in the electricity market. The balance settlement is based on metered hourly delivered energies where available, and based on so-called load profiles for customers without hourly metering. In the balance settlement, the total balancing power between the TSO and the balance responsible players is calculated. The TSOs perform two kinds of balance settlement: one between the countries and one inside each country. The imbalances which occur during the operational hour are handled as purchase or sales of balancing power. The balance settlement between two countries is done in two steps. In the first step, the pre-agreed electricity deliveries are summarised to determine the planned net exchange. In the second step, the metered hourly energy exchange on all interconnections is collected and summarised to determine the real exchange. Imbalance energy is the difference between planned net exchange and metered exchange. The imbalance energy is settled financially on the basis of the price of regulating power for the hour. It means that the costs of regulating actions, based on executed regulations, are distributed between the TSOs. In situations of transmission constraints, regulating power prices differ from each other and the mean value between each country is calculated. The balance settlement inside the country is also done in two steps. In the first step, the production and consumption in the regional and distribution networks are computed. In the second step, the settlement is done between the TSO and the balance responsible players by computing the imbalance energy as the difference between the scheduled and the actual supply and demand. A balance responsible player who has less metered consumption than metered production is compensated for his imbalance energy. A balance responsible player who has more metered consumption than metered production is invoiced for his imbalance energy. 6

7 6. EXPERIENCES As mentioned in this report there is a need to set up a framework of rules and organise the different functions in the electricity market in such a way that the functionality and the confidentiality in the market will be guaranteed. The TSOs bear the main responsibility for fulfilling this requirement. To measure the outcome of the balance management in an electricity system, both the quality and the cost have to be considered. The most relevant quality parameter to use in evaluating the balance management is the system frequency. The Nordel Operations Committee is following the quality of frequency as the number of minutes the frequency is exceeding the limits of normal value (high or low). Statistics are available from the early 1990s, showing a slowly increasing trend. These deviations are more evident in summer time at lower load periods with less generation connected to the power system. Another observation is that the deviations seem to occur around the change of the hour. Some remarkable change in the frequency variations occurred from 1996 until now. At the same time, the electricity market was extended gradually from Norway to all Nordic countries. As such, these variations in frequency are not seen as critical, because the quality of the frequency is still far below the limits of concern, but the trend gives some reasons for concern for the TSOs. The trading of electric energy on the electricity market is based on hourly periods, specifically trading on the spot market, which has continuously increased. Because of this, the producers tend to keep the generation on a permanent level through most of the hour. They then tend to change the generation near the change of hour causing large gradients. As a natural consequence, the quality of frequency will decrease causing the system operators to take stronger control steps. Bad synchronisation of all control steps is contributing to larger imbalances. Finally, we have to conclude that the market players do not always follow their plans accurately. Too early or too late regulation steps cause imbalances. A key challenge is to develop the real time procedures and the real time market. A challenge is also to encourage the power producers and consumers to participate in the real time market. The implementation of a fully integrated real time market takes time for developing both technical systems (information systems, metering) as well as human abilities to act in a proper way. A joint approach to developing real time markets will give substantial benefits for participants. One of the key issues in developing the functions is how the regulating resources in the neighbouring countries can be utilised, and how the markets are developing in these countries. The energy metering needs to be developed towards hourly registering meters. Hourly registered energy meter values do not necessarily need to be collected every hour. A test period regarding improved frequency quality has been performed in the Nordic system in the autumn of This showed that it is possible to break the trend of decreasing frequency quality. By better planning of control actions, increased focus on the frequency control process and an increased number of control steps, it has been possible to reduce the number of minutes the frequency is exceeding the limits of normal value. Some solutions to improve the frequency quality on a more permanent basis are underway: - To improve the methods and details of generation scheduling by better considering the variations in the consumption of the individual market players. 7

8 - Generation schedules based on 15-minute periods instead of one hour are considered. This more detailed planning might give the TSOs some more possibilities to impact on the control steps especially regarding hydro generation. - The more accurate generation scheduling does not as such improve the balance in the system, but it will improve the possibilities for the TSOs of planning their own actions. - More attention will be paid to the producers following their generation schedules. From this might follow that the schedules might include timing of control steps. - Procedures to monitor how the players follow their plans are developed and more stable generation might be required. - Increasing the primary response requirements in the system decreases the need for manual activities, but it would at the same time occupy some more capacity, causing less capacity for energy trading in the electricity market. The model for common use of regulating resources, which was introduced in Nordel in September 2002, is an essential step on the road to harmonising the conditions for the players on the Nordic electricity market. The model has had the following outcome: - Efficient balance control. - Lower number of control actions in opposite direction in the different control areas. - Lower total control cost for the TSOs. - Improved operational reliability due to simplified routines and improved overview in the TSO control centres. - Equalisation of the regulating power price in the Nordic countries. - Increased interest in placing bids on the regulating power market. - Harmonisation of balance settlement between the countries. - In practice, the TSOs work as one company in this respect. The principles for balancing developed on the Nordic electricity market are well in line with the strategic goals inside the common European market. According to the latest EU strategy report on the development of the internal electricity market in Europe, balance management is handled differently from one European country to the other. Improvement is foreseen. The report furthermore points at a common regulating power market as an efficient tool to prevent abuse of market power. 7. REFERENCES [1] Nordel System Operation Agreement, Nordel home page, May [2] F. Wibroe, J.-E. Fischer Pedersen, K. Lindström, T. Gudmundsson, O. Gjerde, T. Pinzon. Common Balance Management in the Nordic Countries, Nordel Annual report 2002, Feature article, pp , Jun. 2003, Nordel home page, June [3] W.R. Kearsley, C. Norlander, N. Lindén, O. Gjerde, G. Nilsen. Information Exchange in a Liberalised International Market for Electricity [Report SC 39, Cigré Session, Paris 1998] [4] Nordel homepage: 8

The Nordic Market Model 10 Years of Experience

The Nordic Market Model 10 Years of Experience The Nordic Market Model 10 Years of Experience 7 th International Workshop on Electric Power Control Centers Ortisei, Italy May 25-28, 2003 Presentation by Ole Gjerde Senior Adviser, Statnett SF 1 Contents

More information

Report on Proposed principles for Common Balance Management

Report on Proposed principles for Common Balance Management Report on Proposed principles for Common Balance Management 2007-11-16 1 Contents 1. INTRODUCTION AND BACKGROUND...3 2. COMMON COST ALLOCATION...3 3. FEE STRUCTURE... 4 4. NEW MODEL FOR ENCOMPASSING TWO

More information

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS Ancillary services to be delivered in Denmark. Tender conditions 1/49 Energinet.dk Tonne Kjærsvej 65 DK-7000 Fredericia +45 70 10 22 44 info@energinet.dk VAT no. 28 98 06 71 Date: 30. august 2017 Author:

More information

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller Wholesale market models and the role of exchanges and traders Prepared by Anders Plejdrup Houmøller www. erranet.org Agenda The trading system. The spot market. Transparency. Surveillance of the market.

More information

How to avoid market manipulation lessons learnt in Norway. 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE

How to avoid market manipulation lessons learnt in Norway. 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE How to avoid market manipulation lessons learnt in Norway 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE Overview Nord Pool Spot History and organisation The role of the power

More information

20 years operation of the Nordic electricity market

20 years operation of the Nordic electricity market ENERGY 20 years operation of the Nordic electricity market ADB Regional Energy Trade Workshop September 8-9, 2014 Manila Dr. Per Christer Lund 1 SAFER, SMARTER, GREENER Electricity market world wide 2

More information

PRICING ASPECTS OF FORWARD LOCATIONAL PRICE DIFFERENTIAL PRODUCTS

PRICING ASPECTS OF FORWARD LOCATIONAL PRICE DIFFERENTIAL PRODUCTS PRICING ASPECTS OF FORWARD LOCATIONAL PRICE DIFFERENTIAL PRODUCTS Tarjei Kristiansen Norwegian University of Science and Technology and Norsk Hydro ASA Oslo, Norway Tarjei.Kristiansen@elkraft.ntnu.no Abstract

More information

Report on regulation and the electricity market. Norway

Report on regulation and the electricity market. Norway Report on regulation and the electricity market Norway Norwegian Water Resources and Energy Directorate (NVE) 30 th of June 2008 1 1 Foreword The Norwegian electricity market was formally opened up for

More information

Information about Nordic Imbalance Settlement to prospective Settlement Banks. 30 November 2016

Information about Nordic Imbalance Settlement to prospective Settlement Banks. 30 November 2016 Information about Nordic Imbalance Settlement to prospective Settlement Banks 30 November 2016 Purpose of this package Introduce the new Nordic Imbalance Settlement operation Present the banking services

More information

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2) Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2) of the Commission Regulation (EU) 2017/1485 of 2 August

More information

Available online at ScienceDirect. Energy Procedia 58 (2014 ) Renewable Energy Research Conference, RERC 2014

Available online at  ScienceDirect. Energy Procedia 58 (2014 ) Renewable Energy Research Conference, RERC 2014 Available online at www.sciencedirect.com ScienceDirect Energy Procedia 58 (2014 ) 58 64 Renewable Energy Research Conference, RERC 2014 An econometric analysis of the regulation power market at the Nordic

More information

Baltic Harmonised Imbalance Settlement Model Document

Baltic Harmonised Imbalance Settlement Model Document Baltic Harmonised Imbalance Settlement Model Document Elering AS July 12, 2017 AS Augstsprieguma tīkls Litgrid AB 1. Update on the Baltic harmonised imbalance settlement model... 3 2. Description of Baltic

More information

Congestion Management Guidelines. Compliance report

Congestion Management Guidelines. Compliance report Congestion Management Guidelines Compliance report Report 8/2007 Congestion Management Guidelines Compliance report Report 8/2007 NordREG c/o Danish Energy Regulatory Authority Nyropsgade 30 DK- 1780

More information

BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION

BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION BASREC WS, St. Petersburg, February 28 th, 2014 NORD POOL SPOT LEADING THE POWER MARKETS INTEGRATION North Western Europe (NWE) FINLAND North Western Europe (NWE) NORWAY SWEDEN ESTONIA LATVIA RUSSIA DENMARK

More information

NordREG Activities 2008

NordREG Activities 2008 NordREG Activities 2008 NordREG Activities 2008 NordREG c/o Norwegian Water Resources and Energy Directorate P.O. Box 5091, Majorstua N-0301 Oslo Norway Telephone: +47 22 95 95 95 Telefax: +47 22 95 90

More information

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority. 1 (6) Request for amendment on Nordic TSOs proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission Regulation (EU) 2015/1222 Between

More information

Work Programme Nordic Energy Regulators (NordREG)

Work Programme Nordic Energy Regulators (NordREG) Work Programme 2009 Nordic Energy Regulators (NordREG) Work Programme 2009 Nordic Energy Regulators (NordREG) Nordic Energy Regulators 2009 Report 1/2009 NordREG c/o Norwegian Water Resources and Energy

More information

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT DK1-DE Countertrade models Collected Impact Assessment 1/46 FINAL REPORT DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT Date: 1. 29th november of November 2017 2017 Author: Contents 1. Executive summary...

More information

ELECTRICITY BALANCING IN EUROPE

ELECTRICITY BALANCING IN EUROPE EUROPEAN ELECTRICITY BALANCING GUIDELINE NOVEMBER 2018 AN OVERVIEW OF THE EUROPEAN BALANCING MARKET AND ELECTRICITY BALANCING GUIDELINE European Network of Transmission System Operators for Electricity

More information

Work Programme 2007 Report 1/2007

Work Programme 2007 Report 1/2007 Work Programme 2007 Report 1/2007 WORK PROGRAMME 2007 NORDIC ENERGY REGULATORS (NordREG) Nordic Energy Regulators 2007 Report 1/2007 NordREG c/o The Energy Markets Inspectorate P.O. Box 310 SE- 631 04

More information

FREQUENCY SUPPORT MARKETS WITH WIND POWER PARTICIPATION

FREQUENCY SUPPORT MARKETS WITH WIND POWER PARTICIPATION 0 Frequency Support Markets with Wind Power Integration s FREQUENCY SUPPORT MARKETS WITH WIND POWER PARTICIPATION Master thesis, UPC Barcelona Mentors: Dr. José Luis Domínguez-García, IREC Ivanova, A.

More information

Current State of Intraday Markets in Europe May 2007

Current State of Intraday Markets in Europe May 2007 Current State of Intraday Markets in Europe May 2007 ETSO Report: Current State of Intraday Markets in Europe Page 1 of 18 Contents 1. Introduction... 3 1.1 Objective and scope of this report... 3 2. Intraday

More information

Regional Spot Markets and Inter-Regional Market Coupling

Regional Spot Markets and Inter-Regional Market Coupling APEx conference in Boston 11-13 October 2009 Session 1 part 2: European Market Situations Regional Spot Markets and Inter-Regional Market Coupling 1. Intro to Nord Pool Spot and the Nordic PX & Market

More information

The current ETSO ITC Model and possible development

The current ETSO ITC Model and possible development The current ETSO ITC Model and possible development 1. Summary The present model for inter-tso compensation for transit (ITC) was introduced in 2002 and has been modified step-by-step from year to year.

More information

Application instruction for the maintenance of frequency controlled reserves

Application instruction for the maintenance of frequency controlled reserves Appendix 2 to the Yearly Agreement and Hourly Market Agreement for Frequency Controlled Normal Operation Reserve and Frequency Controlled Disturbance Reserve Valid as of 1 January 2017 Unofficial translation

More information

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers.

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers. Public ISBN-number: 978-82-93150-43-5 Nordic bidding zones Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers October 2013 Thema Report 2013-27

More information

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules Original Sheet No. 637 ISO TARIFF APPENDIX L Rate Schedules Original Sheet No. 638 Schedule 1 Grid Management Charge The Grid Management Charge (ISO Tariff Section 8.0) is a formula rate designed to recover

More information

Appendix 1 HANDBOOK CONCERNING BALANCE RESPONSIBILITY AND IMBALANCE SETTLEMENT

Appendix 1 HANDBOOK CONCERNING BALANCE RESPONSIBILITY AND IMBALANCE SETTLEMENT Appendix 1 HANDBOOK CONCERNING BALANCE RESPONSIBILITY AND IMBALANCE SETTLEMENT PART 2: FINGRID OYJ S GENERAL TERMS AND CONDITIONS CONCERNING IMBALANCE SETTLEMENT 1 Introduction... 3 2 National imbalance

More information

Nordic Imbalance Settlement Handbook. Instructions and Rules for Market Participants. 2 nd of December 2016

Nordic Imbalance Settlement Handbook. Instructions and Rules for Market Participants. 2 nd of December 2016 Nordic Imbalance Settlement Handbook Instructions and Rules for Market Participants 2 nd of December 2016 Business process: Nordic Imbalance Settlement Version: 2.2 Status: For contractual basis Date:

More information

Report on regulation and the electricity market. Norway

Report on regulation and the electricity market. Norway Report on regulation and the electricity market Norway Norwegian Water Resources and Energy Directorate (NVE) 30 th of June 2009 1 Table of contents 1 Foreword 3 2 Main developments in the electricity

More information

Table of Contents List of Figures...3 List of Tables...3 Definitions and Abbreviations...4 Introduction...7

Table of Contents List of Figures...3 List of Tables...3 Definitions and Abbreviations...4 Introduction...7 Explanatory document to all TSOs proposal for a methodology for the TSO-TSO settlement rules for the intended exchange of energy in accordance with Article 50(1) of Commission Regulation (EU) 2017/2195

More information

South East Europe Electricity Market options paper

South East Europe Electricity Market options paper EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE C - Conventional Energies Electricity & Gas Brussels, 5 December 2005 DG TREN/C2/MS South East Europe Electricity Market options

More information

Baltic Harmonised Imbalance Settlement Model Document

Baltic Harmonised Imbalance Settlement Model Document Baltic Harmonised Imbalance Settlement Model Document Elering AS February 17 th, 2017 AS Augstsprieguma tīkls Litgrid AB 1. Introduction... 3 2. Building Blocks... 3 2.1. Single Portfolio Model... 4 2.2.

More information

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling Michael Schaefer Project Manager, Amprion System Operation Diploma in Information Science & Advanced Postgraduate

More information

AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO /2018

AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO /2018 AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO. 2128 /2018 PARTIES This agreement (the Agreement ) has been concluded by and between: 1) Fingrid

More information

Deregulation of electricity markets The Norwegian experience By Torstein Bye and Einar Hope 1

Deregulation of electricity markets The Norwegian experience By Torstein Bye and Einar Hope 1 1 Deregulation of electricity markets The Norwegian experience By Torstein Bye and Einar Hope 1 Abstract In this paper, we describe the approach to, and experience of, the deregulation and liberalisation

More information

The market setup in the Baltics explanation with examples

The market setup in the Baltics explanation with examples The market setup in the Baltics explanation with examples Table of Contents The market setup in the Nordic-... 3 Baltic exchange area... 3 Daily routines at Nord Pool... 4 Price calculation principles...

More information

15 MINUTES IMBALANCE SETTLEMENT PERIOD MARKET IMPACTS OF LATE IMPLEMENTATION Final report. June 15, 2018

15 MINUTES IMBALANCE SETTLEMENT PERIOD MARKET IMPACTS OF LATE IMPLEMENTATION Final report. June 15, 2018 15 MINUTES IMBALANCE SETTLEMENT PERIOD MARKET IMPACTS OF LATE IMPLEMENTATION Final report June 15, 2018 DISCLAIMER AND RIGHTS This report has been prepared by Pöyry Management Consulting Oy ( Pöyry ) for

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT

Nord Pool the Nordic power exchange GROUP MARKET REPORT Nord Pool the Nordic power exchange GROUP MARKET REPORT Highlights physical markets : POWER: Nord Pool Spot market share of Nordic consumption was 74.3 per cent in. Volumes traded were 18.5 TWh in compared

More information

SPP Reserve Sharing Group Operating Process

SPP Reserve Sharing Group Operating Process SPP Reserve Sharing Group Operating Process Effective: 1/1/2018 1.1 Reserve Sharing Group Purpose In the continuous operation of the electric power network, Operating Capacity is required to meet forecasted

More information

Jan- Sept/13. Sept/12. - % of turnover % Research and development expenses

Jan- Sept/13. Sept/12. - % of turnover % Research and development expenses Stock exchange release 1 (13) January September 2013: Improved result for the review period The Group s turnover between January and September was 388 million ( 368 million). The Group's operating profit

More information

Comments on CEPA s draft conclusions in relation to European transmission tariffs

Comments on CEPA s draft conclusions in relation to European transmission tariffs July 2015 Frontier Economics 1 ACER commissioned CEPA to review harmonisation of transmission tariffs in Europe, and specifically to: assess whether increased harmonisation of electricity transmission

More information

Definitions. Trading Appendix 1. Nord Pool AS. Obsolete

Definitions. Trading Appendix 1. Nord Pool AS. Obsolete Definitions Trading Appendix 1 Nord Pool AS DEFINITIONS This document sets out the definitions of capitalized terms in the Trading Rules and the Clearing Rules (as defined below): Acceptance Ratio Account

More information

ENTSO-E Network Code on Electricity Balancing

ENTSO-E Network Code on Electricity Balancing Annex II to Recommendation of the Agency for the Cooperation of Energy Regulators No 03/2015 of 20 July 2015 on the Network Code on Electricity Balancing Proposed amendments to the Network Code ENTSO-E

More information

Contents Introduction Chapter 1 - Security Policy... 6

Contents Introduction Chapter 1 - Security Policy... 6 Policy statement Contents Introduction... 5 PURPOSE... 5 SYSTEM OPERATOR POLICIES TO ACHIEVE THE PPOS and dispatch objective... 5 Avoid Cascade Failure... 5 Frequency... 6 Other Standards... 6 Restoration...

More information

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: 1 July (5)

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: 1 July (5) Trading Appendix 3 Product Specifications Physical Markets Issued by Nord Pool Spot AS Effective from: 1 July 2014 1(5) PRODUCT SPECIFICATIONS - PHYSICAL MARKET 1 INTRODUCTION 1.1 General The following

More information

Stochastic Optimal Regulation Service Strategy for a Wind Farm Participating in the Electricity Market Zhang, Baohua; Hu, Weihao; Chen, Zhe

Stochastic Optimal Regulation Service Strategy for a Wind Farm Participating in the Electricity Market Zhang, Baohua; Hu, Weihao; Chen, Zhe Aalborg Universitet Stochastic Optimal Regulation Service Strategy for a Wind Farm Participating in the Electricity Market Zhang, Baohua; Hu, Weihao; Chen, Zhe Published in: Proceedings of IEEE PES Innovative

More information

Grid Investments from a Nordic Perspective

Grid Investments from a Nordic Perspective Grid Investments from a Nordic Perspective NordREG recommendations 1 Background and task As one of the challenges for the further development of the Nordic electricity market has in the last few years

More information

The Concept of Baltic CoBA

The Concept of Baltic CoBA The Concept of Baltic CoBA Explanatory document Supporting public consultation material 27 th June, 2016 Elering, Augstsprieguma tīkls, LITGRID 1 1. Introduction According to draft guideline on Electricity

More information

NPCC Regional Reliability Reference Directory # 5 Reserve

NPCC Regional Reliability Reference Directory # 5 Reserve NPCC Regional Reliability Reference Directory # 5 Task Force on Coordination of Operations Revision Review Record: December 2 nd, 2010 October 11 th, 2012 Adopted by the Members of the Northeast Power

More information

Finer time resolution in Nordic power markets: A Cost Benefit Analysis

Finer time resolution in Nordic power markets: A Cost Benefit Analysis Finer time resolution in Nordic power markets: A Cost Benefit Analysis Energinet, Fingrid, Statnett and Svenska kraftnät 30 October 2017 0 0 A Cost Benefit Analysis Preface This cost-benefit analysis is

More information

HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations

HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations Friday July 20th ΟΤΕAcademy, Athens HEnEx s Spot Markets Trading Rulebook: Intra-Day Market Operations Dr. Nikolaos P. Ziogos Introduction CACM XBID Participation in ID Market LIDAs GRIDAs XBID Results

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT

Nord Pool the Nordic power exchange GROUP MARKET REPORT April 28 Nord Pool the Nordic power exchange GROUP MARKET REPORT Highlights physical markets: POWER: Volume Elspot 25 TWh in April and 11.5 TWh YTD. Volume Elbas 96.5 GWh in April and YTD 442.2 GWh. The

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT

Nord Pool the Nordic power exchange GROUP MARKET REPORT Nord Pool the Nordic power exchange GROUP MARKET REPORT Highlights physical markets: POWER: Volume Elbas 114.5 GWh in and YTD 345.7 GWh Volume Elspot 28.3 TWh in and 85.5 TWh YTD The exchange's market

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT

Nord Pool the Nordic power exchange GROUP MARKET REPORT May 28 Nord Pool the Nordic power exchange GROUP MARKET REPORT Highlights physical markets: POWER: Volume Elspot 23.4 TWh in May and 133.9 TWh YTD. Volume Elbas 161.4 GWh in May and YTD 63.6 GWh. The exchange's

More information

Order Minute Settlements

Order Minute Settlements Order 825 5 Minute Settlements Ray Fernandez Manager, Market Settlements Development Market Implementation Committee December 14, 2016 PJM Open Access Transmission Tariff 2 Tariff Changes PJM conducting

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT

Nord Pool the Nordic power exchange GROUP MARKET REPORT August 28 Nord Pool the Nordic power exchange GROUP MARKET REPORT Highlights physical markets: POWER: Volume Elspot 2.7 TWh in August and 196.2 TWh YTD Volume Elbas 15.3 GWh in August and YTD 1 69.6 GWh

More information

Economic Dispatch. Quantitative Energy Economics. Anthony Papavasiliou 1 / 21

Economic Dispatch. Quantitative Energy Economics. Anthony Papavasiliou 1 / 21 1 / 21 Economic Dispatch Quantitative Energy Economics Anthony Papavasiliou Economic Dispatch 2 / 21 1 Optimization Model of Economic Dispatch 2 Equilibrium Model of Economic Dispatch Outline 3 / 21 1

More information

Does Inadvertent Interchange Relate to Reliability?

Does Inadvertent Interchange Relate to Reliability? [Capitalized words will have the same meaning as listed in the NERC Glossary of Terms and Rules of Procedures unless defined otherwise within this document.] INADVERTENT INTERCHANGE Relationship to Reliability,

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT. TWh

Nord Pool the Nordic power exchange GROUP MARKET REPORT. TWh November Nord Pool the Nordic power exchange GROUP MARKET REPORT Physical market Nord Pool Spot AS Turnover in the physical market in November was 26.7 (1 TWh = 1 billion KWh). This was an increase of

More information

CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES

CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES A POSITION PAPER BY THE ENTSO-E ANCILLARY SERVICES WORKING GROUP JANUARY 2012 Purpose & objectives of the paper This paper further

More information

Wholesale power market challenges:

Wholesale power market challenges: EU Electricity Market Reform Seminar Dublin 13 March 2013 Wholesale power market challenges: from simplicity and efficiency to complexity and regulation Peter Styles European Federation of Energy Traders

More information

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received ERGEG Public Consultation on Guidelines on Transmission Tarification 1 - Evaluation of the Comments Received - 18-07-2005 INTRODUCTION This document contains the evaluation by ERGEG of the comments received

More information

POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING

POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING Regional Electricity Trading Conference Tbilisi, Georgia, 19-20/Nov/2012 Plamen Popov, Statkraft 1 AGENDA 1 2 3 Market elements Standardization issue

More information

Fortum in Russia. Tapio Kuula. Senior Vice President Fortum Corporation. Capital Markets Day

Fortum in Russia. Tapio Kuula. Senior Vice President Fortum Corporation. Capital Markets Day Fortum in Russia Tapio Kuula Senior Vice President Fortum Corporation Capital Markets Day Stockholm, 4 June 2007 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe

More information

NORD POOL ASA ANNUAL REPORT Norway Nord Pool ASA Vollsveien 19 P.O. Box 373 NO 1326 Lysaker Tel Fax

NORD POOL ASA ANNUAL REPORT Norway Nord Pool ASA Vollsveien 19 P.O. Box 373 NO 1326 Lysaker Tel Fax NORD POOL ASA ANNUAL REPORT 2003 NORD POOL ASA ANNUAL REPORT 2003 Norway Nord Pool ASA Vollsveien 19 P.O. Box 373 NO 1326 Lysaker Tel. +47 67 52 80 00 Fax +47 67 52 80 01 Sweden Nord Pool Sweden Barnhusgatan

More information

EURELECTRIC - CIS EPC Joint Report: Key differences in electricity trade market rules and obstacles to trade between the EU and Russia/Belarus

EURELECTRIC - CIS EPC Joint Report: Key differences in electricity trade market rules and obstacles to trade between the EU and Russia/Belarus EURELECTRIC - CIS EPC Joint Report: Key differences in electricity trade market rules and obstacles to trade between the EU and Russia/Belarus --------------------------------------------------------------------------------------------------

More information

FERC Order Minute Settlements Manual Revisions

FERC Order Minute Settlements Manual Revisions FERC Order 825 5 Minute Settlements Manual Revisions Ray Fernandez Manager, Market Settlements Development Market Settlements Subcommittee October 30, 2017 Impacted Settlement Manuals M-27 Open Access

More information

Agreement on Access to the Wholesale Market for Electrical Power in Norway

Agreement on Access to the Wholesale Market for Electrical Power in Norway Agreement on Access to the Wholesale Market for Electrical Power in Norway (The Balance Agreement) between Statnett SF (hereinafter called Statnett) and The Balance Responsible Market Player (hereinafter

More information

International Management Electricity Trading in Germany

International Management Electricity Trading in Germany SS 2012 International Management A presentation by André Weber (851056) André Weber SS 2012 Slide 2 TABLE OF CONTENTS 1. Framework Conditions 2. Wholesale 1. Over the Counter Market Futures Market Spot

More information

Nord Pool ASA Annual report 2005

Nord Pool ASA Annual report 2005 0011010111011101010 010011001000110101110111010100110001010011110101010111011110010101001100100011010 Nord Pool ASA Annual report 2005 B U I L D I N G A S E C U R E M A R K E T 0011010111011101010 010011001000110101110111010100110001010011110101010111011110010101001100100011010

More information

February 2008 TWh Spot turnover monthly EUR/MWh Average system price/month

February 2008 TWh Spot turnover monthly EUR/MWh Average system price/month February Nord Pool the Nordic power exchange GROUP MARKET REPORT Physical market Nord Pool Spot AS Turnover in the physical market in February was 27.6 TWh (1 TWh = 1 billion KWh). This was a decrease

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Last update: 04/12/2018 Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) started as a joint initiative by

More information

Nord Pool the Nordic power exchange GROUP MARKET REPORT. TWh

Nord Pool the Nordic power exchange GROUP MARKET REPORT. TWh Augus t 27 Nord Pool the Nordic power exchange GROUP MARKET REPORT Physical market Nord Pool Spot AS Turnover in the physical market in August was 21. TWh (1 TWh = 1 billion KWh). This was an increase

More information

METIS Technical Note T3. Market module configuration for study S12. Focus on day-ahead, intraday and balancing markets

METIS Technical Note T3. Market module configuration for study S12. Focus on day-ahead, intraday and balancing markets METIS Technical Note T3 Market module configuration for study S12 Focus on day-ahead, intraday and balancing markets METIS Technical Notes November 2016 Prepared by Christopher Andrey (Artelys) Maxime

More information

Electricity trading and risk management in liberalised market

Electricity trading and risk management in liberalised market www.pwc.com/jp Electricity trading and risk management in liberalised market PricewaterhouseCoopers Agenda Page 1 Current electricity trading in Japan 1 2 Evolution of trading in a deregulated market 5

More information

GROUP MARKET REPORT. CARBON: Volume EUAs and CERs 9.3 million tonnes in October and million tonnes YTD

GROUP MARKET REPORT. CARBON: Volume EUAs and CERs 9.3 million tonnes in October and million tonnes YTD October 28 GROUP MARKET REPORT Highlights physical markets: POWER: Volume Elspot 24.5 in October and 242.8 TWh YTD Volume Elbas 224.1 GWh in October and 1 44.7 GWh YTD The exchange's market share in October

More information

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION Opinion on THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION IN JULY 2017 THE FEDERAL MINISTRY OF ECONOMIC AFFAIRS AND ENERGY OF THE FEDERAL REPUBLIC OF GERMANY AND

More information

Future Development Plan:

Future Development Plan: Standard BAL-007-1 Balance of Resources and Demand Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard

More information

Frequency Response Straw Proposal Stakeholder Meeting

Frequency Response Straw Proposal Stakeholder Meeting Frequency Response Straw Proposal Stakeholder Meeting October 19, 2015 October 19, 2015 stakeholder meeting agenda Time Topic Presenter 1:00-1:05 Introduction Kim Perez 1:05-1:10 Updated schedule Kim Perez

More information

The new electricity market arrangements in Ukraine

The new electricity market arrangements in Ukraine The new electricity market arrangements in Ukraine A report prepared by ECS Project Office April 2016 FINAL DRAFT Revisions Table Version Date Description FINAL DRAFT 1.0 November16, 2015 Internal Draft

More information

Integration of the Nordic Electricity Grids

Integration of the Nordic Electricity Grids LICENTIATE T H E S I S Integration of the Nordic Electricity Grids Incentives, Cost Sharing and Regional Perspective in Transmission Investments Hans Nylund Integration of the Nordic Electricity Grids

More information

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Submitted by Company Date Submitted Will Dong Paul Gribik (415) 973-9267 (415) 973-6274 PG&E December 5, 2013 Pacific

More information

The Model of Implicit Capacity Allocation in the Baltic States

The Model of Implicit Capacity Allocation in the Baltic States The Model of Implicit Capacity Allocation in the Baltic States This document describes a model of implicit allocation of gas transmission capacity in the Baltic States. Implicit capacity allocation is

More information

EFET reaction 25 April 2017

EFET reaction 25 April 2017 Energitilsynet consultation on the proposed decision of the Danish and Swedish NRAs on long- term hedging opportunities in Denmark and at its Northern borders n EFET reaction 25 April 2017 The European

More information

Cross-Border Intraday: Questions & Answers

Cross-Border Intraday: Questions & Answers Cross-Border Intraday: Questions & Answers 1. What is the Cross-Border Intraday initiative? The Cross-Border Intraday initiative (XBID Project) is a joint initiative by the Power Exchanges (PXs): APX/Belpex,

More information

Intraday Cross Border The Netherlands-Belgium

Intraday Cross Border The Netherlands-Belgium Intraday Cross Border The Netherlands-Belgium Content 1. Overall design 1. Process description 2. Capacity calculation 3. Elbas trading platform 4. Tradable products 5. Timeline & Nominations 2. Contractual

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 36. Congestion Revenue Rights... 3 36.1 Overview Of CRRs And Procurement Of CRRs... 3 36.2 Types Of CRR Instruments... 3 36.2.1 CRR Obligations... 3 36.2.2 CRR Options... 3 36.2.3 Point-To-Point

More information

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times Background information In December 2016, all TSOs submitted to all NRAs the all TSOs proposal for the

More information

Public consultation. 6 October 2015

Public consultation. 6 October 2015 Public consultation 6 October 2015 Public consultation by the French Energy Regulatory Commission of 6 October 2015 on the introduction of 30-minute power trading products in the organised market and at

More information

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: Launch of Elbas4 1(6)

Trading Appendix 3. Product Specifications. Obsolete. Physical Markets. Issued by Nord Pool Spot AS. Effective from: Launch of Elbas4 1(6) Trading Appendix 3 Product Specifications Physical Markets Issued by Nord Pool Spot AS Effective from: Launch of Elbas4 1(6) PRODUCT SPECIFICATIONS - PHYSICAL MARKET 1 INTRODUCTION 1.1 General The following

More information

The Way Forward Mikael Lilius President and CEO Capital Markets Day

The Way Forward Mikael Lilius President and CEO Capital Markets Day The Way Forward Mikael Lilius President and CEO Capital Markets Day June 17, 2004 Fortum's strategy Fortum focuses on the Nordic energy market as a platform for long-term profitable growth Create the leading

More information

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries Among: AS Augstsprieguma tīkls Elering AS LITGRID

More information

Why cross-border markets for frequency control are necessary

Why cross-border markets for frequency control are necessary Why cross-border markets for frequency control are necessary Workshop on Exchange of Balancing Services 28 October 2010 Yann Rebours EDF R&D yann.rebours@edf.fr Focus of this presentation Only frequency

More information

Stock exchange release 1 (18) FINGRID OYJ EET FINGRID GROUP S INTERIM REPORT 1 JANUARY - 30 SEPTEMBER 2016

Stock exchange release 1 (18) FINGRID OYJ EET FINGRID GROUP S INTERIM REPORT 1 JANUARY - 30 SEPTEMBER 2016 Stock exchange release 1 (18) FINGRID GROUP S INTERIM REPORT 1 JANUARY - 30 SEPTEMBER 2016 Fingrid s consolidated financial statements have been drawn up in accordance with the International Financial

More information

Measures to support the functioning of the Nordic financial electricity market

Measures to support the functioning of the Nordic financial electricity market Public ISBN nr. 978-82-93150-84-8 Measures to support the functioning of the Nordic financial electricity market Commissioned by NordREG November 2015 THEMA Report 2015-35 About the project About the report

More information

A common Nordic end-user market. Consequences of the EED

A common Nordic end-user market. Consequences of the EED A common Nordic end-user market Consequences of the EED A common Nordic end-user market Consequences of the EED Berit Tennbakk, Kristine Fiksen, Marius Holm Rennesund and Justin Wolst TemaNord 2014:551

More information

All CE TSOs proposal for additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2

All CE TSOs proposal for additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2 All CE TSOs proposal for additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission

More information

ELIA LFC Block Operational Agreement

ELIA LFC Block Operational Agreement ELIA LFC Block Operational Agreement Revision History V0.1 10.07.2018 ELIA s proposal for public consultation Disclaimer This document, provided by ELIA, is the draft for stakeholder consultation of the

More information

European transmission tariff structures Cambridge Economic Policy Associates

European transmission tariff structures Cambridge Economic Policy Associates European transmission tariff structures Cambridge Economic Policy Associates 24 March 2015 Cambridge Economic Policy Associates (CEPA) We are an economic and financial policy consulting business Our energy

More information