1 Interim Report on Operations at 31 March

2 ASTALDI Società per Azioni Head Office: Via Giulio Vincenzo Bona Rome (Italy) Registered with the Companies Register of Rome Tax code no.: R.E.A. no.: VAT no.: Share Capital: EUR 196,849, fully paid-in 2

3 SUMMARISED DATA Income Statement (Figures shown in EUR/000) % on total revenue (*) % on total revenue YOY change (%) % on total revenue Total revenue 651, % 632, % 3.0% 3,004, % EBITDA 85, % 90, % -5.9% 379, % EBIT 72, % 75, % -3.1% 316, % EBT 33, % 35, % -6.8% 129, % Net profit attributable to owners of the Parent 25, % 23, % 5.0% 72, % (*) Q figures referring to the jointly-controlled company Re.Consult Infrastrutture S.p.A., have been restated in compliance with IFRS 5 Non-Current Assets Held for Sale and Discontinued Operations. Statement of financial position (Figures shown in EUR/000) Total net non-current assets 1, ,007, ,939 Working capital 919, , ,258 Total provisions (22,351) (21,215) (25,852) Net invested capital 1,946,514 1,791,017 1,842,345 Total loans and borrowings / loan assets (*) (1,219,386) (1,092,532) (1,238,326) Equity attributable to owners of the Parent 721, , ,873 Total equity 727, , ,019 (*) Figure shown inclusive of treasury shares on hand equal to EUR 3.8 million in March 2017 and EUR 5.4 million in March 2016 and EUR 3.9 million in December INTRODUCTION Astaldi Group s Interim Report on Operations at 31 March 2017 has been drafted in accordance with the provisions set forth in Borsa Italiana (Italian Stock Exchange) Regulations for companies listed in the STAR segment (Article 2.2.3, subsection 3), which provides for the obligation of publication of the Interim Report on Operations within 45 days of the close of each quarter of the financial year. Borsa Italiana Notification no dated 21 April 2016 has also been taken into account herein. 3

4 The classification, entry recognition, measurement and cancellation criteria for asset and liability items and the procedures for revenue and cost recognition adopted herein are the same as those used for the Consolidated Financial Statements at 31 December 2016 which should be referred to for more information. Alternative performance indicators. The economic and financial performance of the Astaldi Group and its business segments are also assessed on the basis of some indicators not provided for in IFRSs, the specific components of which are listed below. EBITDA. This is calculated by subtracting production costs, personnel expenses and other operating costs from total revenue. It also contains the share of profit/losses of joint ventures and associates operating in the Group s core business segment. EBIT. This is calculated by excluding amortisation and depreciation, impairment losses and provisions and internal costs capitalised from EBITDA as calculated above. EBT. This is calculated as EBIT, excluding financial income and expense. Profit from continuing operations. This is calculated as EBT excluding taxation for the period. Debt/Equity Ratio. This is calculated as the ratio between the net financial position as numerator and equity as denominator, excluding treasury shares in portfolio. Net financial position. This is obtained by subtracting non-current loan assets and financial assets from concession activities, as well as specific items such as treasury shares from net financial debt, calculated as required under CONSOB Communication DEM/ dated 28 July 2006 that refers to European Securities and Markets Authority (ESMA, formerly CESR) Recommendation dated 10 February 2005 and provisions contained in CONSOB Communication dated 28 July Total financial debt. This is obtained by subtracting the total of non-current loan assets and financial assets from concession activities from net financial position (debt), calculated as required under CONSOB Communication DEM/ dated 28 July 2006 that refers to European Securities and Markets Authority (ESMA, formerly CESR) Recommendation dated 10 February 2005 and provisions contained in CONSOB Communication dated 28 July Net non-current assets. These are to be taken as the total of non-current assets; specifically, intangible assets, the Group s property, plant and equipment, equity investments as well as other non-current assets not included in those referred to above. Working capital. This is the result of the total of current loans and receivables and liabilities linked to the core business (trade receivables and payables, inventories, contract work in progress, tax assets, progress payments/billings from customers and other current assets). Net invested capital. This is the total of net non-current assets, working capital, provisions for risks and employee benefits. COMMENTS ON OPERATING PERFORMANCE Astaldi Group's commercial, economic and financial results in Q included the effects of the gradual repositioning of business activities in projects able to ensure more balanced diversification of business activities and with a more independent financial profile than in the past. The quarterly trends are in line with strategies contained in the plan and confirmed the trends already seen in the second half of last year. 4

5 The results of major commercial action taken over the last eighteen months have allowed for the gradual replacement of key projects (completed or being completed, for example, in Turkey and Russia) with equally important projects, but in countries with a more limited risk profile, which ensure a more marked ability to convert new orders into turnover. Operating revenue at 31 March 2017 increased by approximately 4% to EUR million (EUR million in Q1 2016). If we are to include other operating revenue, total revenue amounted to EUR million (+3%, compared to EUR million in March 2016). The quarter's margins reflected the change in the order backlog structure. At 31 March 2017, the EBITDA margin stood at 13.1%, with EBITDA totalling over EUR 85 million and the EBIT margin stood at 11.2%, for EBIT of EUR 72.7 million; in keeping with the trends set forth in the plan, the figures listed recorded margins that were the result of a mix of business activities whose risk profile is more in line with planned growth targets, even if the levels were lower than in the past. Net profit increased by 5% to over EUR 25 million (EUR 23.9 million at 31 March 2016), with a net margin of 3.9% (3.8% for Q1 2016). These results were achieved thanks to the attainment of key operating milestones such as completion of additional operational sections of the Gebze-Orhangazi-Izmir Motorway in Turkey (a useful condition, inter alia, for closure of a first partial operation period, with consequent collection of the relative guaranteed minimum revenue by the concession holder), or signing of the contract (with consequent start-up of works) for the I-405 Highway in California (USA). Total net financial debt amounted to EUR 1,216 million (EUR 1,088.7 million at 31 December 2016 and EUR 1,232.9 million at 31 March 2016). The quarterly figure basically reflects the seasonal nature of working capital which, thanks to policies ensuring strict control of contract financial flows implemented by management, showed much less marked use compared to similar periods of recent years. The increase in net financial debt during the first three months of 2017 totalled EUR 127 million, against an average increase of approximately EUR 230 million recorded in the first quarter of the last three years this was achieved even without the benefit of advances linked to the most recent acquisitions (Romania), scheduled for the coming months. The quarterly trend also included the collection of EUR 52 million (loan assets included) resulting from definition of asset transfer agreements in Chile, already disclosed in the Financial Statements at 31 December 2016 (Pacific Hydro Chacayes S.A., concession holder for Chacayes Hydroelectric Plant and 49% of the interest held in SCMS, concession holder for the West Metropolitan Hospital in Santiago). Taking into account the fact that some loan assets were already included among net financial debt, the overall financial effect of collection of this amount totalled EUR 16 million. The quarter's commercial results were in line with the strategies marked out and confirmed the progressive focus on areas with a lower risk profile, as already detailed above, as well as on contracts awarded in accordance with a logic based on a variety of technical and quality elements. The order backlog totalled EUR 19.2 billion, with construction accounting for 54% and concessions and related O&M activities for the remaining 46%. New orders and contractual increases totalling approximately EUR 1 billion were recorded (mainly EPC 1 contracts in Europe and North America), able to more than offset the decrease in the concessions backlog further to the aforementioned transfer of some assets in Chile. The figures shown do not include an additional EUR 8 million of options and contracts for which completion of the award/financing procedure is pending. If we are to include these, the total order backlog stands at more than EUR 27 billion. Note must also be taken of progressive performance of the asset disposal programme which, during the first quarter, saw definitive transfer of the aforementioned assets in Chile (at higher amounts than those entered in the balance sheet), as well as progress on financial closing of the M5 1 EPC = Engineering, Procurement, Construction. 5

6 transfer (further to agreements signed with Ferrovie dello Stato Italiane - Italy's National Railways company - in December 2016) and negotiations to transfer additional assets in Italy and Turkey. In this regard, it is important to note how in April in Turkey, the SPVs of two concession projects in progress in Turkey Third Bosphorus Bridge and Gebze-Orhangazi-Izmir Motorway collected the remainder of guaranteed minimum revenue forecast for the first period of operation. Collection of this sum completed the financial process of the two motorway concessions, making it possible to consider these two key projects as now being fully operational. INCOME STATEMENT AT 31 MARCH 2017 Main financial results (Figures shown in EUR/000) % on total revenue (*) % on total revenue YOY change (%) % on total revenue Total revenue 651, % 632, % 3.0% 3,004, % EBITDA 85, % 90, % -5.9% 379, % EBIT 72, % 75, % -3.1% 316, % EBT 33, % 35, % -6.8% 129, % Net profit attributable to owners of the Parent 25, % 23, % 5.0% 72, % (*) Q figures referring to the jointly-controlled company Re.Consult Infrastrutture S.p.A., have been restated in compliance with IFRS 5 Non-Current Assets Held for Sale and Discontinued Operations. Total revenue at 31 March 2017 increased by 3% to EUR million (EUR million in Q1 2016). Operating revenue accounted for 94% of this total, equal to EUR million (+3.8%, EUR million in March 2016), and ancillary revenue for the remaining 6%, equal to EUR 37.3 million (-8.8%, EUR 41 million in Q1 2016). Geographical diversification confirmed the major push to internationalise business activities. International activities generated over 80% of revenue, equal to EUR 493 million, (+2.1%, EUR 483 million in March 2016). As regard international activities, there was a drop in the volume generated in Europe (32% of operating activities), but there was a major contribution from America (43% of operating revenue) and an unvaried contribution from Africa (5% of operating revenue). Italy saw an 11% increase, recording a turnaround of the previous year s trend, and accounted for EUR 121 million (EUR 109 million in March 2016), thanks above all to the Transport Infrastructures segment. More specifically, the increase in production was supported by the intensification of activities in Canada (Muskrat Falls Hydroelectric Project further to signing of the agreement in November 2016), the start-up of new contracts in Chile (Chuquicamata Mine) and steady progress on projects underway in Turkey, Romania and Poland. This made it possible to offset the smaller contribution recorded in some areas including with regard to ancillary revenue due to completion of key projects such as the Third Bosphorus Bridge and Phase 1 of the Gebze-Orhangazi-Izmir Motorway in Turkey, the WHSD (Western High Speed Diameter) in St. Petersburg in Russia and Line 4 of Bucharest Underground in Romania. As regards North America (USA, California), works on 6

7 construction of Highway I-405 commenced, with the new focus of the Group s commercial strategy in the USA starting to produce its first effects on the income statement. In Italy, specifically progress went ahead on works related to the Marche-Umbria Quadrilatero Road Network, Line 4 of the Milan Underground, Naples-Afragola HS Station and the Brenner Base Tunnel. Important working milestones were also achieved such as opening to the public of San Giovanni museum station on Line C of the Rome Underground (March) and final inspection of the new hospital in Naples ( Ospedale del Mare ) (February). Segment diversification confirmed a suitable distribution of activities. Construction (99.5% of operating revenue) generated EUR 611 million, showing a 4.1% increase compared to March 2016, mainly due to the contribution of Energy Production Plants (for the progress of works for the Muskrat Falls Hydroelectric Plant, in Canada) and Plant Engineering (for works performed by the investee NBI). Concessions (including related O&M activities) generated 0.5% of operating revenue, which amounted to EUR 3 million (EUR 5 million in Q1 2016): the figure listed basically includes the results of operation of the four new hospitals in Tuscany, (referring to O&M activities performed through the investee GE.SAT). Breakdown of operating revenue according to segment and geographical area (Figures shown in millions of Euro) (EUR/millions) % % YOY change (%) ITALY % % 11.0% INTERNATIONAL % % 2.1% Rest of Europe % % -24.9% America % % 52.3% Asia (Middle East) 0 0.0% 6 1.0% % Africa (Algeria) % % -23.7% TOTAL OPERATING REVENUE % % 3.7% (EUR/millions) % % YOY change (%) CONSTRUCTION % % 4.1% Transport Infrastructures % % -21.6% Railways and undergrounds % % -10.3% Roads and motorways % % -28.9% Ports and airports % % 41.7% Hydraulic and Energy Production Plants % % 94.1% Civil and Industrial Construction % % 15.8% Plant Engineering % % 89.1% CONCESSIONS 3 0.5% 5 0.8% -40.0% TOTAL OPERATING REVENUE % % 3.7% The cost structure reflects the production trend and the mix of activities which, when compared to the past, show a greater incidence of specialist services which the Group prefers to 7

8 provide with its own specialised personnel (and not through subcontracts). An example of this is the personnel dedicated to tunnel excavation, which is the reason why Astaldi is currently using a total of 8 TBMs at its sites worldwide. Production costs at 31 March 2017 dropped to EUR million (EUR million in March 2016), with a dip in the incidence on total revenue, passing from 69.6% to 64.4%. Personnel expenses increased to EUR million (EUR million in Q1 2016), with an increase in incidence on revenue from 18.3% to 24.3%. Other operating costs totalled EUR 15.5 million (EUR 5.8 million in Q1 2016), with an increase in incidence from approximately 1% to 2.4%. The quarterly trend is to be attributed to lower production costs resulting from the completion of key projects performed using subcontractors (e.g. Third Bosphorus Bridge in Turkey), together with an increase in personnel expenses and other operating costs caused by the intensification and/or start-up of projects featuring direct production (e.g. the Muskrat Falls Project in Canada and new contracts for the Chuquicamata Mine in Chile). The share of profits from joint ventures and associates totalled EUR 27 million (+37.2%, EUR 19.7 million in Q1 2016). The quarterly figure recorded the pro quota results of investees (which benefitted inter alia from the operation of motorway contracts in Turkey). They also included the effects related to the investee Pacific Hydro Chacayes SA., following its definitive transfer in March The quarter's margins reflected the change in the order backlog structure and stood at similar levels to those recorded at the end of The EBITDA margin at 31 March 2017 equalled 13.1%, with EBITDA of over EUR 85 million (respectively, 14.3% and EUR 90.4 million in Q1 2016). As already mentioned, the quarterly figure shows the progressive alignment with Plan targets which, when fully implemented, provide for margins in line with a mix of business activities boasting an improved risk profile compared to the past. The order backlog s new focus will also result in benefits as regards financial activities thanks to a project trend that is more in line with planned growth. The EBIT margin totalled 11.2% for EBIT of EUR 72.7 million (respectively, 11.9% and EUR 75 million in Q1 2016). These figures were the result of a lower incidence of amortisation, depreciation and impairment, mainly due to project phases which provide for fewer contributions in terms of amortisation and depreciation. Net financial expense totalled EUR 39.5 million, hence in keeping with the figure at 31 March 2016 (EUR 39.4 million) and with a 6.1% incidence on revenue (6.2% for Q1 2016). The quarter benefitted from a lower level of debt exposure compared to the same period of the previous year which offset the renewed backlog s higher charges for guarantees and sureties. The positive effects of this in terms of production will start to be seen as from the second half of this year EBT totalled EUR 33.2 million, (EUR 35.6 million at 31 March 2016) as a result of the aforementioned trends. This resulted in a 5% increase in net profit to over EUR 25 million (EUR 23.9 million at 31 March 2016), with a net margin of 3.9% (3.8% in Q1 2016), against an estimated tax rate of 24.8%. 8

9 STATEMENT OF FINANCIAL POSITION AT 31 MARCH 2017 Main financial position results (Figures shown in EUR/000) Total net non current assets 1,049,805 1,007, ,939 Working capital 919, , ,258 Total provisions (22,351) (21,215) (25,852) Net invested capital 1,946,514 1,791,017 1,842,345 Total loans and borrowings/loan assets (*) (1,219,386) (1,092,532) (1,238,326) Equity attributable to owners of the Parent 721, , ,873 Total equity 727, , ,019 (*) Figure shown inclusive of treasury shares on hand equal to EUR 3.8 million in March 2017 and EUR 5.4 million in March 2016 and EUR 3.9 million in December Net fixed assets totalled EUR 1,049.8 million (EUR 1,007.4 million in December 2016) and basically included an increase due to equity accounting of motorway concessions in Turkey as well as conversion of capital (equity) of sums previously paid, as subordinated loan, into the Gebze- Orhangazi-Izmir Motorway concession project. Tangible fixed assets totalled EUR 202 million (EUR 208 million in December 2016), showing a slight drop during the quarter mainly due to progressive depreciation and investments made (the latter amounting to approximately EUR 3 million). The quarter's fixed assets also included EUR 48 million referring to reclassification of values regarding non-current assets held for sale, as provided for in reference accounting standards and already announced in the financial statements for the year ending 31 December Indeed the figure refers to the carrying amounts of investments in the concession holders for Line 5 of the Milan Underground and the four new hospitals in Tuscany (Italy), the transfer of which is forecast within the next 12 months. Working capital totalled approximately EUR 919 million (EUR 805 million in December 2016). The quarterly figure showed a 14% increase (against an approximately 3% increase in revenue) but it is important to note that, traditionally, working capital increases during the first three months of the year, but in a much more marked manner said increase has been equal to 35% on average over the last four years. The much smaller increase compared to the past is to be attributed to the Group's specific focus on the payment and collection cycle and actions of the dedicated task force set up during the last year. The ratio between working capital and revenue stood at 30%, compared to 34% in March Net invested capital totalled EUR 1,946.5 million (EUR 1,791 million in December 2016), as a result of the aforementioned trends. Equity attributable to owners of the Parent totalled EUR million (EUR million in December 2016), basically further to the quarter's result. With the contribution of EUR 6 million of equity attributable to non-controlling interests (EUR 6.1 million in December 2016), total equity amounted to EUR million (EUR million in December 2016). 9

10 Net Financial Debt Total net financial debt at 31 March 2017 amounted to EUR 1,215.6 million (EUR 1,088.7 million at 31 December 2016 and EUR 1,232.9 million at 31 March 2016). The quarterly figure basically reflects the trends seen as regards working capital, mentioned previously, and investments made. The quarterly trend also included the collection of EUR 52 million (including loan assets) resulting from definition of transfer agreements for some assets in Chile, already disclosed in the Financial Statements at 31 December 2016 (Pacific Hydro Chacayes S.A., concession holder for the Chacayes Hydroelectric Plant and 49% of the interest held in SCMS, concession holder for the West Metropolitan Hospital in Santiago). The overall financial effect of this collection amounted to EUR 16 million, taking into account the fact that some loan assets were already included among net financial debt. The Debt/Equity ratio stood at 1.67x, against a Corporate Debt/Equity ratio of 1.04x (insofar as calculated by excluding the share of debt related to concessions, which is self-liquidating). Breakdown of Net Financial Debt (Figures shown in EUR/000) 31/03/ /12/ /09/ /06/ /03/2016 A Cash 417, , , , ,813 B Securities held for trading ,126 1,189 1,096 C Cash and cash equivalents 417, , , , ,909 - Current loan assets 34,477 25,227 16,965 25,262 18,903 D Current loan assets 34,477 25,227 16,965 25,262 18,903 E Current portion of bank loans and borrowings (449,905) (336,408) (471,276) (513,799) (526,681) F Current portion of bonds (15,980) (4,294) (16,142) (4,252) (16,534) G Current portion of non-current debt (173,675) (154,801) (201,004) (150,516) (94,224) H Other current loans and borrowings (8,150) (8,304) (8,235) (6,767) (7,598) I Current financial debt (647,710) (503,808) (696,657) (675,333) (645,037) J Net current financial debt (195,345) 28,737 (289,571) (321,871) (162,225) K Non-current portion of bank loans and borrowings (446,871) (580,203) (441,339) (528,680) (528,662) L Bonds (874,883) (874,333) (873,799) (873,256) (872,734) M Other non-current financial liabilities (23,556) (24,722) (24,801) (15,070) (14,826) N Non-current financial debt (1,345,310) (1,479,258) (1,339,940) (1,417,006) (1,416,221) O P Q Gross financial debt from continuing operations Net financial debt from continuing operations Net financial debt - disposal groups (1,993,020) (1,983,065) (2,036,597) (2,092,339) (2,061,258) (1,540,655) (1,450,521) (1,629,510) (1,738,877) (1,578,446) 41,271 76, R Net financial debt (1,499,384) (1,373,778) (1,629,510) (1,738,877) (1,578,446) - Non-current loan assets 45,299 36,440 33,295 35,731 35,391 - Subordinated loans 227, , , , ,739 - Non-current portion of financial assets from concession activities 6,757 4, ,011 81,442 55,989 S Non-current loan assets 279, , , , ,120 10

11 T Total financial debt (1,219,386) (1,092,532) (1,231,132) (1,378,430) (1,238,326) Treasury shares in portfolio 3,801 3,864 4,192 4,336 5,439 Total net financial debt (1,215,585) (1,088,667) (1,226,940) (1,374,094) (1,232,887) Investments Net technical investments in Q totalled approximately EUR 3 million, to be attributed to projects in progress in Canada (Muskrat Falls), Russia (M-11 Moscow-St. Petersburg Motorway) and Poland. Approximately EUR 7 million was paid during the quarter in the form of semi-equity, in line with commitments undertaken in particular for some concessions in Chile (Arturo Merino Benítez International Airport in Santiago) and Turkey (Etlik Integrated Health Campus in Ankara). The quarter also saw the aforementioned conversion to capital (equity) of sums previously paid as subordinated loan for the Gebze-Orhangazi-Izmir Motorway concession in Turkey. Therefore, concession investments (in other words Astaldi s shares of equity and semi-equity paid into SPVs related to the individual projects in progress in the segment, as well as relative working capital) amounted progressively to EUR 708 million. The figure includes EUR 7 million of financial assets arising from concession activities referred to projects in Chile (La Punilla Hydroelectric Project); it must be recalled that said assets refer to shares of investments covered by guaranteed cash flows, as required in IFRIC-12. At the reporting date, approximately 12% of EUR 708 million invested in concessions is classified among assets held for sale, thanks to progressive performance of the asset disposal programme provided for in the Strategic Plan. Statement of Cash Flows (Figures shown in EUR/000) Q Q A) Cash flow used in operating activities (122,243) (263,914) B) Cash flow generated (used) by investing activities 30,094 (11,229) C) Cash flow from financing activities (4,258) 126,693 NET DECREASE OF CASH AND CASH EQUIVALENTS (A+B+C) (96,407) (148,450) OPENING CASH AND CASH EQUIVALENTS* 513, ,263 CLOSING CASH AND CASH EQUIVALENTS 417, ,813 * These figures include cash and cash equivalents referring to assets available for disposal, equal to EUR 7.1 million. Cash flow from operating activities Cash flow used by operating activities in Q totalled EUR million (EUR million in Q1 2016). This use, typical of the first quarter of each year, is to be attributed mainly to development of major international contracts and payment trend involving public counterparts that are usually concentrated in the second half of each year. The quarterly figure is positive on the whole when compared with the traditional trend of flows in Q1. Specifically, the efficient working capital 11

12 management policy is taking shape, also thanks to the good result achieved by the dedicated task force. Cash flow from investing activities Financial flow generated by investment activities recorded a positive value of EUR 30 million, to be linked as follows: - Approximately EUR 41 million as sums collected for sale of the concession holder Pacific Hydro Chacayes; - Approximately EUR 10 million as collection of the first instalment of sums provided for sale of the concession holder SCMS; - Approximately EUR (7) million for payments of equity and semi-equity (capital and subordinated loans) for some concession projects (mainly Etlik Integrated Health Campus in Ankara and Arturo Merino Benítez International Airport in Santiago de Chile); - Approximately EUR (4) million for sums paid for payment of the amount agreed in relation to purchase of the Quadrilatero industrial complex; - Approximately EUR (3) million for capital invested in technical resources and equipment for construction contracts; - Approximately EUR (3) million for capital invested in the La Punilla Hydroelectric Project concession in Chile. Cash flow from financing activities Financing activities used financial resources totalling EUR 4.2 million during the quarter. This change, even if not especially significant in absolute terms, reflects the action taken by the management to limit financial debt and maintain a suitable level of liquidity, in a context where special support is lent to developing operating activities. ORDER BACKLOG The order backlog totalled EUR 19.2 billion, 54% of which generated by Construction and the remaining 46% by Concessions and related O&M activities (Operation and Maintenance), with Italy accounting for 31% and international projects for the remaining 69% (mainly Europe and America). The quarterly figure included approximately EUR 1 billion of new orders and contractual increases (mainly EPC 2 contracts in Europe and North America) that are able to more than offset the decrease in the concession backlog following transfer of the Chilean assets detailed above. The figures shown do not take into account options and contracts for which completion of the award/financing procedure is still pending. If we are to include these, the total order backlog amounts to over EUR 27 billion. The backlog structure shows an increase in contracts awarded in accordance with a logic of variety of technical and quality elements and progressive focus on areas with a lower risk profile, in keeping with the Group s forecasts and strategies. 2 EPC = Engineering, Procurement, Construction. 12

13 Main new orders during the quarter FRONTIERĂ-CURTICI-SIMERIA RAILWAY LINE (Lots 2A and 2B) Romania (construction) A total of EUR 776 million (Astaldi has a 42% interest) for upgrading of 80 kilometres of the Frontieră- Curtici-Simeria Railway Line forming part of the Pan-European Corridor 4. The construction of 11 stations, 30 bridges and a tunnel is also planned along with a signalling and ERTMS telecommunications system. The duration of works is 36 months, with start-up by June The works have been commissioned by CFR SA, the Romanian National Railway Company. 75% of works are financed by European funding (as part of the POIM Programme to upgrade the Curtici- Brasov-Constanta Railway Corridor 4) and the remaining 25% by state funding. FRONTIERĂ-CURTICI-SIMERIA RAILWAY LINE (Lot 3) Romania (construction) EUR 600 million, Astaldi has a 49.5% interest, for upgrading of approximately 40 kilometres of the Frontieră Curtici Simeria Railway Line related to the stretch between Gurasada and Simeria of the 614 km- Radna-Simeria section. The construction of 17 bridges, electrification, signalling and ERTMS telecommunication system is also planned along with renovation of 8 railway stations and minor works. The duration of work is 3 years, with start-up by June The works have been commissioned by CFR SA, the Romanian National Railway Company. 75% of works are financed by EU funding (as part of the POIM Programme to upgrade the Curtici-Brasov-Constanta Railway Corridor 4) and the remaining 25% by state funding. ISTANBUL UNDERGROUND (Kirazli-Halkalı section) Turkey (construction) EUR 627 million, Astaldi Group has a 15% interest, for performance of civil works and electro-mechanical systems of the new section of the Istanbul Underground. The project involves the construction of 10 kilometres of two-tube tunnel, 7 km of which dug using TBMs, as well as the construction of 9 stations and related works. Works commenced in April with a planned duration of 34 months. The project has been commissioned by the Municipality of Istanbul. MENEMEN-ALIAĞA-ÇANDARLI MOTORWAY Turkey (construction and operation contract) Total investment of EUR 392 million, EUR 333 million of which for construction activities (Astaldi has a 33% interest). The BOT contract involves construction and operation of 80 kilometres of new motorway sections in İzmir province (including 14 junctions, 3 service areas, 7 motorway tollgates, 10 viaducts and 11 bridges), and the performance of all O&M activities. The concession duration is approximately 10 years with 36 months for construction and the rest for operation. The project has been commissioned by KGM (Turkish Ministry of Transport, Motorways General Directorate), operating in the capacity of Granting Authority. The financial structure of the transaction provides for contribution of equity amounting to 20% of the total investment, which means a contribution of EUR 26 million for Astaldi to be paid within the construction period. The ROI is based on a forecast minimum turnover guaranteed by the Granting Authority totalling EUR 45 million/year. Works commenced in April following signature of the concession contract. «PIEMONTE-SAVOIA» ITALY-FRANCE HVDC INTERCONNECTION PROJECT (Lower Section and Upper Section) Italy (construction): EUR 54 million for performance of civil works for the Italian section of the HVDC (High Voltage Direct Current) interconnection project in progress involving Italy and France. As regards the Italian section, the cable system route will run from Piossasco substation to the Fréjus Tunnel, mainly along the A-32 Turin-Bardonecchia motorway, starting from Avigliana East junction. Astaldi will perform the lots known as Lower Section (26 kilometres) and Upper Section (19 kilometres of horizontal development). Works involve the construction of cuttings with installation of HDPE pipes and underground excavation using microtunnelling technology, for subsequent systems installation, as well as all related works. The project will be performed without any interruption of vehicle traffic. The duration of works is 2 years, with start-up by Q The project has been commissioned by Terna Rete Italia S.p.A., the operator of the Italian distribution network which will fund the works. 13

14 BIG BULLFROG CREEK ROAD PROJECT USA, Florida (construction): more than EUR 43 million for the performance of works to widen more than 6 kilometres of the SR-43 (US-301) from 2 to 6 lanes, for the section between the SR-674 and the CR-672 (Balm Road). The duration of works is just over 2 years. The project has been commissioned by FDOT (Florida Department of Transportation). The works will be performed by Astaldi Construction Corporation, the Astaldi Group company dedicated to developing the American market. Main options and contracts to be formalised/financed to date NAPLES-BARI HS/HC RAILWAY LINE (Naples-Cancello section) Italy (construction) EUR 397 million, Astaldi has a 40% interest, for the design and construction of a preliminary section of the Naples-Bari high-speed, high-capacity railway line and connection to the Naples railway junction at the new Naples-Afragola HS Station (built by Astaldi and currently being completed). Completion of the award procedure is pending for this project. LA PUNILLA HYDROELECTRIC PROJECT Chile (construction and operation contract) Financial closing is pending for this project which involves the design, construction and operation of a multi-purpose hydroelectric plant, with a storage capacity of 625 million m 3 and installed power of 94 MW. The plant will be used to improve storage capacity of water for irrigation and to improve the electricity generation capacity of the BíoBío region and of the SIC (Sistema Interconectado Central) which powers Santiago de Chile. VERONA-PADUA HS/HC RAILWAY LINE (Vicenza-Padua) Italy (construction) The project refers to the second phase of the contract for design and construction of the Verona-Padua highspeed, high-capacity railway line which Astaldi holds a 37.49% interest in through Consorzio IRICAV DUE, the General Contractor awarded the works. 14

15 Summary tables (Figures shown in millions of euro) Order backlog 01/01/2017 Acquisitions and contractual increases Decrease for production Order backlog 31/03/2017 Additional projects Total backlog Construction 9, ,326 2,766 13,092 Transport Infrastructures 7, ,291 1,692 9,983 Railways and undergrounds 3, ,328 1,384 5,712 Road and motorways 3, , ,831 Airports and port Hydraulic and energy production plants ,063 Civil Construction ,408 Plant Engineering and Management of Complex Systems Concessions 9, ,889 5,161 14,050 BACKLOG IN EXECUTION BY SEGMENT 19, ,215 7,927 27,142 Order backlog 01/01/2017 Acquisitions and contractual increases Decreases for production Order backlog 31/03/2017 Additional projects Total backlog Italy 5, ,926 1,842 7,768 International 13, ,289 6,085 19,374 BACKLOG IN EXECUTION BY GEOGRAPHICAL AREA Europe 8, (199) 9,433 1,446 10,879 America 4, (265) 3,694 4,639 8,333 Africa (29) Asia 68 0 (0) , ,215 7,927 27,142 Order backlog 01/01/2017 Acquisitions and contractual increases Decreases for production Order backlog 31/03/2017 ITALY - CONSTRUCTION 4, (118) 4,364 ITALY - CONCESSIONS 1,565 0 (3) 1,562 INTERNATIONAL - CONSTRUCTION 5, (493) 5,962 INTERNATIONAL - CONCESSIONS 7,987 (660) 0 7,327 ORDER BACKLOG IN EXECUTION 19, ,215 15

16 EVENTS AFTER THE REPORTING PERIOD In April 2017, the SPVs of two concession projects in Turkey Third Bosphorus Bridge and Gebze-Orhangazi-Izmir Motorway collected the remainder of guaranteed minimum revenue forecast for the first operating period, totalling 672 million Turkish Lire for the Third Bosphorus Bridge for September-December 2016; 844 million Turkish Lire for the Gebze-Orhangazi-Izmir Motorway (Phase 1 and Phase 2A) for July-December At an operating level, start-up of the last excavation front of «Lot Mules 2-3» of the Brenner Base Tunnel was achieved in April, a useful condition for the project to fully enter the operational phase. The new Trauma Center at Careggi Hospital in Florence was also opened. The works were performed through NBI (Astaldi Group) and have made it possible to double the healthcare facility s accommodation capacity. OUTLOOK In April 2017, the Company s Board of Directors approved the Strategic Plan. Therefore, over the coming months, the Group will work to achieve planned growth targets, in line with the plan s strategies. In the short term, the Group will work to achieve important operating milestones in Italy (opening to the public of Naples-Afragola HS Station in June) and in Chile (laying of the first stone of E-ELT in May), as well as for the start-up of recent acquisitions in Turkey (Menemen-Aliağa-Çandarli Motorway, Istanbul Underground). More generally speaking, the aim will be to ensure balanced geographical diversification of activities and a greater focus on projects with an independent financial profile. The acquisition of contracts assessed in accordance with a logic of variety of technical-quality elements will be favoured; contracts that are able to make best use of the Group s improved integrated supply capacity. From a geographical viewpoint, the aim will be to strengthen the Group s role in countries where traditionally present (especially Chile and the USA) and to consolidate new areas with a high development potential (North America and Europe). Buoyed by the success of the most recent projects (e.g. Third Bosphorus Bridge), additional commercial initiative will come from the consolidation of international partnerships, as has already been seen in Chile for the West Metropolitan Hospital and Arturo Merino Benítez International Airport in Santiago. Growth will receive an additional boost from the O&M segment which, together with the Group s existing operating capacity in the Plant Engineering segment via NBI, will definitively integrate the product range offered with regard to complex infrastructures. To this end, the asset disposal programme will tend to favour transfer agreements able to promote the O&M activities related to the transferred infrastructures remaining with the Group, as well as construction activities still in progress, as has already been seen in Chile (West Metropolitan Hospital in Santiago). Concessions will continue to represent a segment of growth, but with a different approach than in the past. The focus will be on promoting a project development model that sees Astaldi holding a smaller interest in the SPVs, and hence a smaller undertaking in terms of equity contribution, as has already been experimented in Chile (West Metropolitan Hospital and Arturo Merino Benítez International Airport in Santiago). 16

17 Therefore, the overall risk profile will be more balanced, projecting the Group in an increasingly consistent manner towards its planned growth. Curbing of levels and cost of debt will continue to be a strategic priority. Management choices will be adopted in accordance with a logic of strict discipline as regards working capital management. Targeted action to reduce working capital absorption will continue (for projects in progress), as well action to promote (in general) more efficient circulation of working capital components. At a commercial level, the acquisition of contracts with a more independent financial profile and forecast contractual advances will be encouraged. The asset disposal programme will also continue. Following the results achieved in relation to A4 Holding in Italy and SCMS and Pacific Hydro Chacayes in Chile, as well as agreements signed for M5 in Italy, the company will be focused over the coming months on concluding the additional transfers set forth in the Plan, also in light of the number of commercial options currently being examined. As regards the hospital sector in Italy, the medium-term goal is to streamline interests in projects in progress in order to accelerate the disposal process. Moreover, following collection of the guaranteed minimum revenue by concession holders of Turkish motorway assets (in April), all contractual premises have been satisfied and hence a process of assessing said assets with a view to their relative transfer will commence in the near future. 17

18 Statement by Manager in charge of financial reporting (pursuant to Article 154-bis, subsection 2, of Legislative Decree no. 58/1998) The undersigned, Paolo Citterio, Astaldi s General Manager Administration and Finance, in the capacity of Manager in charge of financial reporting, hereby declares, pursuant to subsection 2 of Article 154-bis of Legislative Decree no. 58/1998 (Consolidated Finance Act), that the accounting information contained herein tallies with accounting documents, ledgers and entries. Rome, 10 May 2017 Signed Paolo Citterio (Manager in charge of financial reporting) 18

19 Attachments Reclassified Income Statement (Figures shown in EUR/000) Revenue Other operating revenue Total revenue Production cost Added value Personnel expenses Other operating costs Share of profits of joint ventures and associates 31/03/ /03/2016 * 614, % 591, % 37, % 40, % 651, % 632, % (419,536) -64.4% (440,255) -69.6% 231, % 192, % (158,404) -24.3% (115,880) -18.3% (15,484) -2.4% (5,780) -0.9% 27, % 19, % EBITDA 85, % 90, % Amortisation and depreciation Provisions Impairment losses (11,838) -1.8% (14,945) -2.4% (427) -0.1% (380) -0.1% % (2) 0.0% EBIT 72, % 75, % Net financial expense Pre-tax profit Tax expense Profit from continuing operations Loss from discontinued operations Profit for the period (Profit) / loss attributable to non-controlling interests (39,526) -6.1% (39,394) -6.2% 33, % 35, % (8,260) -1.3% (9,573) -1.5% 24, % 26, % 0.0% (2,639) -0.4% 24, % 23, % % % Profit attributable to owners of the Parent 25, % 23, % * Q figures referring to the jointly-controlled company Re.Consult Infrastrutture S.p.A., have been restated in compliance with IFRS 5 Non-Current Assets Held for Sale and Discontinued Operations. 19

20 Reclassified Statement of Financial Position (Figures shown in EUR/000) 31/03/ /12/ /03/2016 Intangible assets 71,694 74,026 45,188 Property, plant and equipment and investment property 202, , ,476 Equity investments 573, , ,475 Other net non-current assets 154, , ,800 Non-current assets held for sale 48,224 69,973 Liabilities directly associable with non-current assets held for sale -- (17,888) -- Non-current assets (A) 1,049,805 1,007, ,939 Inventories 45,185 50,008 72,405 Contract work in progress 1,633,975 1,555,110 1,375,585 Trade receivables 51,950 57,327 44,378 Amounts due from customers 729, , ,292 Other assets 250, , ,545 Tax assets 93,904 94, ,497 Payments on account from customers (481,307) (492,856) (388,591) Subtotal 2,323,454 2,130,206 2,024,111 Trade payables (71,168) (61,352) (64,380) Payables to Suppliers (917,652) (934,748) (758,939) Other liabilities (415,576) (329,245) (235,534) Subtotal (1,404,395) (1,325,346) (1,058,853) Operating working capital ( B ) 919, , ,258 Employee benefits (8,712) (7,506) (9,242) Non-current portion of provisions for risks and charges (13,639) (13,709) (16,609) Total Provisions ( C ) (22,351) (21,215) (25,852) Net Invested Capital (D) = (A) + (B) + (C) 1,946,514 1,791,017 1,842,345 Cash and cash equivalents 417, , ,813 Current loan assets 34,477 25,227 18,903 Non-current loan assets 273, , ,131 Securities ,096 Current financial liabilities (647,710) (503,808) (645,037) Non-current financial liabilities (1,345,310) (1,479,258) (1,416,221) Net loans and borrowings (E) (1,267,415) (1,173,664) (1,294,315) Financial assets from concession activities 6,757 4,390 55,989 Net financial debt disposal groups 41,271 76,743 Total net loans and borrowings (F) (1,219,386) (1,092,532) (1,238,326) Equity attributable to owners of the Parent (721,149) (692,384) (598,873) Equity attributable to non-controlling interests (5,978) (6,101) (5,146) Equity (G) = (D) - (F) 727, , ,019 20

Interim Financial Report at 31 March 2014

Interim Financial Report at 31 March 2014 Interim Financial Report at 31 March 2014 Total revenues of EUR 551.6 million (+3.8%) EBITDA margin up to 13.3%, with EBITDA totalling EUR 73.4 million (+24.4%) EBIT margin of 10.5%, with EBIT totalling

More information

Interim Report on Operations at 30 September 2016

Interim Report on Operations at 30 September 2016 (Translation from Italian original which remains the definitive version Translation under review) Interim Report on Operations at 30 September 2016 Financial results at 30 September 2016, in line with

More information

FY 2015 Results Presentation Conference Call March

FY 2015 Results Presentation Conference Call March 3 rd Bridge on Bosphorus Turkey The largest suspended bridge at worldwide level FY 2015 Results Presentation Conference Call March 9 2016 1 Over the Last 10 Years Investments have supported a Consistent

More information

2015 Nine Months Results

2015 Nine Months Results 1. Update on Disposals 2. Update on Special Issues 3. New Orders & Backlog 4. 9M 2014 Results 5. Appendix 2015 Nine Months Results Rome - November 11, 2015 3 rd Bridge on Bosphorus, Turkey 2015 Nine Months

More information

H results 2 August 2017

H results 2 August 2017 H1 2017 results 2 August 2017 Delivering the Strategy Plan 2 Sustainable growth Operational discipline Financial strength Major operational milestones met on time Commercial growth continues Revenue geographic

More information

Fitter for the Future Strategic Update

Fitter for the Future Strategic Update Fitter for the Future Strategic Update 2017-21 Chairman s remarks Global strategic overview Significant market opportunity Basarab Overpass in Bucharest, Romania Naples underground (Toledo Station), Italy

More information

1H 2015 Results A Durable Competitive Advantage

1H 2015 Results A Durable Competitive Advantage A Durable Competitive Advantage Rome August 3, 2015 Main Topics STRONG 1H 2015 RESULTS BENEFITING FROM A GOOD COMMERCIAL AND OPERATING PERFORMANCE Total Revenue +15.8%, at EUR 1.4 billion Operating revenue

More information

THE BOARD OF DIRECTORS HAS EXAMINED A CAPITAL AND FINANCIAL STREGTHENING PROGRAMME AND APPROVED THE INTERIM REPORT ON OPERATIONS AT 30 SEPTEMBER

THE BOARD OF DIRECTORS HAS EXAMINED A CAPITAL AND FINANCIAL STREGTHENING PROGRAMME AND APPROVED THE INTERIM REPORT ON OPERATIONS AT 30 SEPTEMBER PRESS RELEASE THE BOARD OF DIRECTORS HAS EXAMINED A CAPITAL AND FINANCIAL STREGTHENING PROGRAMME AND APPROVED THE INTERIM REPORT ON OPERATIONS AT 30 SEPTEMBER 2017 Equity and financial consolidation The

More information

RESULTS AT 30 SEPTEMBER 2016

RESULTS AT 30 SEPTEMBER 2016 Astaldi s Board of Directors approves Group s results at 30 September 2016 RESULTS AT 30 SEPTEMBER 2016 REVENUES FOR FIRST NINE MONTHS, UP BY 4.1% TO EUR 2.15 BILLION, NET PROFIT FROM CONTINUING OPERATIONS,

More information

FY16 Results Presentation

FY16 Results Presentation Muskrat Falls Hydro Plant, Canada FY16 Results Presentation March 14, 2017 Agenda Warsaw subway Line 2, Poland 2016 Highlights Q4 & FY16 results Appendix 2 Fit for the Future our Strategy Plan Sustainable

More information

Translation from the Italian original, that remains the definitive version. Interim Report on Operations at 30 September 2017

Translation from the Italian original, that remains the definitive version. Interim Report on Operations at 30 September 2017 Interim Report on Operations at 30 September 2017 ASTALDI Società per Azioni Head Office: Via Giulio Vincenzo Bona 65-00156 Rome (Italy) Registered with the Companies Register of Rome Tax code No.: 00398970582

More information

INTERIM REPORT ON OPERATIONS AT 31 MARCH Astaldi, consolidated net profit up by 14%

INTERIM REPORT ON OPERATIONS AT 31 MARCH Astaldi, consolidated net profit up by 14% INTERIM REPORT ON OPERATIONS AT 31 MARCH 2010 1 Astaldi, consolidated net profit up by 14% Total revenues up by 6.9% to EUR 460.7 million EBITDA: +10.5% to EUR 51.8 million, with the EBITDA margin up to

More information

Astaldi in 2010: Net profit of EUR 62.6 million, +12% Revenues of EUR 2 billion, +9.2% Reduction of debt to EUR 384 million, 8.8%

Astaldi in 2010: Net profit of EUR 62.6 million, +12% Revenues of EUR 2 billion, +9.2% Reduction of debt to EUR 384 million, 8.8% Astaldi s BoD has approved the consolidated results of Q4 2010 (unaudited) and examined the preliminary consolidated results of 2010 Astaldi in 2010: Net profit of EUR 62.6 million, +12% Revenues of EUR

More information

THE BOARD OF DIRECTORS OF ASTALDI APPROVES A SHARE CAPITAL INCREASE UP TO A MAXIMUM OF EUR 300 MILLION AND CALLS THE SHAREHOLDERS MEETING

THE BOARD OF DIRECTORS OF ASTALDI APPROVES A SHARE CAPITAL INCREASE UP TO A MAXIMUM OF EUR 300 MILLION AND CALLS THE SHAREHOLDERS MEETING THE BOARD OF DIRECTORS OF ASTALDI APPROVES A SHARE CAPITAL INCREASE UP TO A MAXIMUM OF EUR 300 MILLION AND CALLS THE SHAREHOLDERS MEETING 2018-2022 STRATEGIC PLAN AND CONSOLIDATED RESULTS OF Q1 2018 ALSO

More information

ASTALDI, REVENUES OF EUR 1.8 BILLION, +4.6% DURING THE FIRST NINE MONTHS OF THE YEAR and NET PROFIT OF EUR 60 MILLION, +14.5%

ASTALDI, REVENUES OF EUR 1.8 BILLION, +4.6% DURING THE FIRST NINE MONTHS OF THE YEAR and NET PROFIT OF EUR 60 MILLION, +14.5% The Board of Directors approves the consolidated results at 30 September 2012 ASTALDI, REVENUES OF EUR 1.8 BILLION, +4.6% DURING THE FIRST NINE MONTHS OF THE YEAR and NET PROFIT OF EUR 60 MILLION, +14.5%

More information

9M 2013 Results. November 11, 2013

9M 2013 Results. November 11, 2013 9M 2013 Results November 11, 2013 1 1 GOALS AND ACHIEVEMENTS FOR 2013 OUR GOALS OUR ACHIEVEMENTS Financial close and start-up of Turkish projects Financial support to domestic projects in order to deliver

More information

ASTALDI: AT 30 JUNE 2011, NET PROFIT +12.4% TO EUR 35 MILLION TOTAL REVENUES +14.3% TO OVER EUR 1.1 BILLION NEW ORDERS OF OVER EUR 1.

ASTALDI: AT 30 JUNE 2011, NET PROFIT +12.4% TO EUR 35 MILLION TOTAL REVENUES +14.3% TO OVER EUR 1.1 BILLION NEW ORDERS OF OVER EUR 1. The Board of Directors of Astaldi has approved the 2011 half-yearly results ASTALDI: AT 30 JUNE 2011, NET PROFIT +12.4% TO EUR 35 MILLION TOTAL REVENUES +14.3% TO OVER EUR 1.1 BILLION NEW ORDERS OF OVER

More information

Interim Report on Operations at 31 March 2012

Interim Report on Operations at 31 March 2012 Interim Report on Operations at 31 March 2012 Increase in profits and revenues despite effects of seasonal factors, already largely made up during the early part of Q2. Total revenues of EUR 522.3 million

More information

THE BOARD OF DIRECTORS APPROVES THE RESULTS AT 31 DECEMBER THE BoD EXAMINED THE PROPOSAL OF CAPITAL AND FINANCIAL STRENGTHENING PROGRAMME

THE BOARD OF DIRECTORS APPROVES THE RESULTS AT 31 DECEMBER THE BoD EXAMINED THE PROPOSAL OF CAPITAL AND FINANCIAL STRENGTHENING PROGRAMME THE BOARD OF DIRECTORS APPROVES THE RESULTS AT 31 DECEMBER 2017 THE BoD EXAMINED THE PROPOSAL OF CAPITAL AND FINANCIAL STRENGTHENING PROGRAMME Capital and financial strengthening programme The Company

More information

EBIT margin of 10%, with EBIT amounting to EUR 57.4 million (+9.4%) Net profit of EUR 21.2 million (+3.0%)

EBIT margin of 10%, with EBIT amounting to EUR 57.4 million (+9.4%) Net profit of EUR 21.2 million (+3.0%) FIRST NINE MONTHS FOR ASTALDI: NET PROFIT UP BY 1.6% TO EUR 61.4 MILLION NEW ORDERS TOTALLING EUR 4.2 BILLION ORDER BACKLOG UP BY 24.5% TO EUR 12.7 BILLION Consolidated results at 30 September 2013 Total

More information

ASTALDI: +14.8% INCREASE IN TOTAL REVENUES TO EUR 2.36 BILLION IN 2011 NET PROFIT OF EUR 71 MILLION, +12.9%

ASTALDI: +14.8% INCREASE IN TOTAL REVENUES TO EUR 2.36 BILLION IN 2011 NET PROFIT OF EUR 71 MILLION, +12.9% The BoD of Astaldi approves the consolidated results at 31 December 2011 ASTALDI: +14.8% INCREASE IN TOTAL REVENUES TO EUR 2.36 BILLION IN 2011 NET PROFIT OF EUR 71 MILLION, +12.9% PROPOSED DIVIDEND OF

More information

Milan STAR Conference - FY 2014 Results

Milan STAR Conference - FY 2014 Results 1. Update on Disposals 2. Update on Special Issues 3. New Orders & Backlog 4. 9M 2014 Results 5. Appendix Milan STAR Conference - FY 2014 Results Milan March 24 & 25, 2015 FY 2014 Results Main Items FY

More information

PRESS RELEASE S +7.5% TO

PRESS RELEASE S +7.5% TO PRESS RELEASE The Board of Directors of Astaldi approves the 2012 half-yearly results ASTALDI: AT 30 JUNE 2012, NET PROFIT +13.6% TO T EUR 39.8 MILLION TOTAL REVENUES S +7.5% TO EUR 1.2 BILLION NEW ORDERS

More information

FY 2012 Results. March 13 th, 2013

FY 2012 Results. March 13 th, 2013 FY 2012 Results March 13 th, 2013 ASTALDI GROUP FY 2012 RESULTS Conference Call, March 13 2013 1 1 2012 RESULTS OVERALL OUTLOOK Positive Group performance in a very difficult year both in the domestic

More information

Astaldi Group Annual Financial Report

Astaldi Group Annual Financial Report This translation from the Italian original is for reference purposes only. In the event of any discrepancy, the Italian original shall prevail. Astaldi Group Annual Financial Report 0 This translation

More information

PRESS RELEASE THE YEAR

PRESS RELEASE THE YEAR PRESS RELEASE The Board of Directors of Astaldi approves the 2013 half-yearly results ASTALDI: NET PROFIT OF OVER EURR 40 MILLION, +1% DURING D THE FIRST HALF OF THE YEAR NEW ORDERS OF EUR 2.4 BILLION

More information

Astaldi Group Annual Financial Report

Astaldi Group Annual Financial Report Note: This English translation is for reference purposes only. This English translation is under review. In the event of any discrepancy between the Italian original and this English translation, the Italian

More information

1Q 2011 Results Conference call May 11, 2011

1Q 2011 Results Conference call May 11, 2011 1Q 2011 Results Conference call May 11, 2011 Growing steadily since 1920 1 1Q 2011 Results main items Total revenues up +10.1% to 511M, thanks to the positive trend of activities in Italy and abroad Net

More information

COMPANY PRESENTATION. FY 2017 Results. March 15, 2018

COMPANY PRESENTATION. FY 2017 Results. March 15, 2018 COMPANY PRESENTATION FY 2017 Results March 15, 2018 2 Agenda Capital and Financial Strengthening Program FY 2017 Results Appendix Capital and Financial Strengthening Program Key Features 3 300 M CAPITAL

More information

INTERIM REPORT ON OPERATIONS AT MARCH 31, 2008

INTERIM REPORT ON OPERATIONS AT MARCH 31, 2008 1 INTERIM REPORT ON OPERATIONS AT MARCH 31, 2008 CONTENTS Introduction Reclassified consolidated income statement Reclassified consolidated balance sheet and financial position Comments on the Group s

More information

Strategy Plan E Fit for the Future. May 2016

Strategy Plan E Fit for the Future. May 2016 Strategy Plan 2016-20E Fit for the Future May 2016 Agenda Chairman s remarks Strategy Plan 2016-2020 Q1 2016 Results Appendix 2 Chairman s remarks Transition to renewed BUSINESS MODEL addressing challenges

More information

2012 LONDON STAR Conference. London, 2 3 October 2012

2012 LONDON STAR Conference. London, 2 3 October 2012 2012 LONDON STAR Conference London, 2 3 October 2012 1 1 ASTALDI is the largest Contractor in Italy, operating only in large infrastructures at worldwide level Construction RoW 42% ( 4.2Bn) Construction

More information

Interim Report on Operations at 30 September 2015

Interim Report on Operations at 30 September 2015 Interim Report on Operations at 30 September 2015 Main consolidated results: - Total revenue up to EUR 2.1 billion (+11.6% compared to 30 September 2014) - EBITDA margin of 11.7%, with EBITDA of EUR 242.8

More information

2005 First Half Consolidated Results

2005 First Half Consolidated Results 2005 First Half Consolidated Results 1 Index 1H 2005 Results Transition to IFRS: main impacts Appendix 2 1H 2005 Main Highlights The following data and all comparisons with previous periods are based on

More information

9M 2017 results 14 November 2017

9M 2017 results 14 November 2017 9M 2017 results 14 November 2017 Agenda 2 Capital and financial strengthening Program Venezuela write-down 9M Results A comprehensive capital and financial strengthening program 3 A 400 million capital

More information

ASTALDI: NET PROFIT UP +20.1% AT 32 MILLION EUROS NET INDEBTEDNESS DOWN TO MILLION EUROS

ASTALDI: NET PROFIT UP +20.1% AT 32 MILLION EUROS NET INDEBTEDNESS DOWN TO MILLION EUROS The Board of Directors has approved the Intermediate Report at 30 September 2008 ASTALDI: NET PROFIT UP +20.1% AT 32 MILLION EUROS NET INDEBTEDNESS DOWN TO 467.7 MILLION EUROS Main consolidated data at

More information

ASTALDI, NET PROFIT INCREASED BY 16.7% TO EURO 10.2 MLN ORDER BACKLOG OUTREACHES EURO 8.5 BLN

ASTALDI, NET PROFIT INCREASED BY 16.7% TO EURO 10.2 MLN ORDER BACKLOG OUTREACHES EURO 8.5 BLN ASTALDI, NET PROFIT INCREASED BY 16.7% TO EURO 10.2 MLN ORDER BACKLOG OUTREACHES EURO 8.5 BLN Main consolidated data as at March 31, 2008 Total revenues scored Euro 334.1 million, +26.4% on an annual basis

More information

2010 Q1 RESULTS. Conference call - May 12, 2010

2010 Q1 RESULTS. Conference call - May 12, 2010 2010 Q1 RESULTS Conference call - May 12, 2010 Q1 2010 Results Overview The Group continues to perform well even in the midst of a negative scenario Total revenues: +6.9% at EUR 460.7mn EBITDA:+10.5% at

More information

Astaldi, the BoD approves the quarterly report at September 30, 2006

Astaldi, the BoD approves the quarterly report at September 30, 2006 Astaldi, the BoD approves the quarterly report at September 30, 2006 Total revenues of 766.6 million Group net profit for the first nine months of 2006 of 22.6 million Total orders backlog of over 8 billion

More information

2006 Second Quarter Results. August 1, 2006

2006 Second Quarter Results. August 1, 2006 2006 Second Quarter Results August 1, 2006 1 Foreign activities are a strategic asset that guarantees further business development 2006 Second Quarter Results Strong increase in order backlog (+28% yoy)

More information

Translation under review from the Italian original, that remains the definitive version. This report has been translated into the English language

Translation under review from the Italian original, that remains the definitive version. This report has been translated into the English language Annual Financial Report 2015 0 ASTALDI Società per Azioni Registered Office/Head Office: Via Giulio Vincenzo Bona 65-00156 Rome (Italy) Registered with the Companies Register of Rome Tax code no.: 00398970582

More information

- October, Pont Ventoux Hydroelectric (Venezuela) (Italy) (Italy) Hospital in Mestre. Milan Subway, Line 5. Rome Subway, Line C (Italy)

- October, Pont Ventoux Hydroelectric (Venezuela) (Italy) (Italy) Hospital in Mestre. Milan Subway, Line 5. Rome Subway, Line C (Italy) - October, 2009 - Rome Subway, Line C Caracas-Tuy Railway Hospital in Mestre Milan Subway, Line 5 Pont Ventoux Hydroelectric (Venezuela) Power Plant 2009-2013 Business Plan as of today 2009-20132013 Business

More information

(Translation from the Italian original which remains the definitive version)

(Translation from the Italian original which remains the definitive version) (Translation from the Italian original which remains the definitive version) Interim Financial Report at 30 June 2014 I ASTALDI Società per Azioni Registered Office/Head Office: Via Giulio Vincenzo Bona

More information

PRESS RELEASE INFORMATION REQUESTED BY CONSOB PURSUANT TO ART. 114 OF ITALIAN LEGISLATIVE DECREE NO. 58/1998 (CONSOLIDATED FINANCE ACT - TUF)

PRESS RELEASE INFORMATION REQUESTED BY CONSOB PURSUANT TO ART. 114 OF ITALIAN LEGISLATIVE DECREE NO. 58/1998 (CONSOLIDATED FINANCE ACT - TUF) PRESS RELEASE INFORMATION REQUESTED BY CONSOB PURSUANT TO ART. 114 OF ITALIAN LEGISLATIVE DECREE NO. 58/1998 (CONSOLIDATED FINANCE ACT - TUF) Rome, 16 November 2018 At CONSOB 1 s request further to art.

More information

Business Plan Business Plan

Business Plan Business Plan 1 : the scenario The takes account of changes in the domestic scenario, such as: Change in Italian Government and consequent redefinition of public expenditure priorities, causing a slowdown in construction

More information

Consolidated. Separate Financial Statements. thereto at 31 December of Astaldi S.p.A Shareholders Call 28. Corporate Bodies 30

Consolidated. Separate Financial Statements. thereto at 31 December of Astaldi S.p.A Shareholders Call 28. Corporate Bodies 30 annual report Separate Consolidated Financial annual Statements and report Notes thereto at 31 December 2013 Shareholders Call 28 Corporate Bodies 30 Management Report 32 Statement pursuant to Article

More information

PRESS RELEASE INFORMATION REQUESTED BY CONSOB PURSUANT TO ART. 114 OF ITALIAN LEGISLATIVE DECREE NO. 58/1998 (CONSOLIDATED FINANCE ACT TUF )

PRESS RELEASE INFORMATION REQUESTED BY CONSOB PURSUANT TO ART. 114 OF ITALIAN LEGISLATIVE DECREE NO. 58/1998 (CONSOLIDATED FINANCE ACT TUF ) PRESS RELEASE INFORMATION REQUESTED BY CONSOB PURSUANT TO ART. 114 OF ITALIAN LEGISLATIVE DECREE NO. 58/1998 (CONSOLIDATED FINANCE ACT TUF ) Rome, 28 September 2018 At CONSOB 1 s request further to Article

More information

ASTALDI: SUPPLEMENT OF INFORMATION ON RESULTS AT 31 MARCH 2018 PURSUANT TO ART. 114 OF LEGISLATIVE DECREE No. 58/1998 (CONSOLIDATED FINANCE ACT TUF)

ASTALDI: SUPPLEMENT OF INFORMATION ON RESULTS AT 31 MARCH 2018 PURSUANT TO ART. 114 OF LEGISLATIVE DECREE No. 58/1998 (CONSOLIDATED FINANCE ACT TUF) ASTALDI: SUPPLEMENT OF INFORMATION ON RESULTS AT 31 MARCH 2018 PURSUANT TO ART. 114 OF LEGISLATIVE DECREE No. 58/1998 (CONSOLIDATED FINANCE ACT TUF) Rome, 25 May 2018 As a supplement to what was announced

More information

2017. Future and concreteness.

2017. Future and concreteness. annual report 2017. Future and concreteness. Construction means imagination, design, giving shape to the future. OPENING LAYING OF THE FIRST STONE AWARD 11 October 2017 Opening of the Arts and Science

More information

Consolidated financial results 2014

Consolidated financial results 2014 PRESS RELEASE Consolidated financial results 2014 The Board of Directors has approved the Consolidated Financial Statement at December 31st, 2014. Consolidated income statement data: o Total revenues of

More information

Astaldi. Italian Investment Seminar April 27, 2005

Astaldi. Italian Investment Seminar April 27, 2005 Astaldi Italian Investment Seminar April 27, 2005 1 2004-2006 2006 Plan 2005-2009 2009 Plan >> The strong operating capacity of the Group, both in Italy and abroad, as proven by: The efficacy of 2004-2006

More information

CONSOLIDATED AND DRAFT FINANCIAL STATEMENTS 2017 APPROVED, DIVIDEND PROPOSED OF EUR 0.15 PER SHARE, 2018 GUIDANCE APPROVED

CONSOLIDATED AND DRAFT FINANCIAL STATEMENTS 2017 APPROVED, DIVIDEND PROPOSED OF EUR 0.15 PER SHARE, 2018 GUIDANCE APPROVED Genoa, March 14 th 2018 CONSOLIDATED AND DRAFT FINANCIAL STATEMENTS 2017 APPROVED, DIVIDEND PROPOSED OF EUR 0.15 PER SHARE, 2018 GUIDANCE APPROVED New orders of EUR 1,500.8 million (+1.7%) Order Backlog

More information

February 10, Astaldi. 4Q 2004 and 2004 Preliminary Results

February 10, Astaldi. 4Q 2004 and 2004 Preliminary Results Astaldi 4Q 2004 and 2004 Preliminary Results February 10, 2005 1 Main Highlights (Million of euro) 2004 yoy 2006 CAGR 03-06 2004 RESULTS ABOVE 2004-2006 STRATEGIC PLAN TARGETS Order backlog 5,011 13.7%

More information

ASTALDI Società per Azioni. Registered Office: Via Giulio Vincenzo Bona 65, Rome. Share capital: 196,849, fully paid-in

ASTALDI Società per Azioni. Registered Office: Via Giulio Vincenzo Bona 65, Rome. Share capital: 196,849, fully paid-in ASTALDI Società per Azioni Registered Office: Via Giulio Vincenzo Bona 65, Rome Share capital: 196,849,800.00 fully paid-in Registered with the Companies Register of Rome under Tax Code Number: 00398970582

More information

ASTALDI S.P.A. A) COMPANY WHOSE FINANCIAL INSTRUMENTS ARE THE OBJECT OF THE SHAREHOLDERS AGREEMENTS

ASTALDI S.P.A. A) COMPANY WHOSE FINANCIAL INSTRUMENTS ARE THE OBJECT OF THE SHAREHOLDERS AGREEMENTS Essential information pursuant to article 122 of Legislative Decree no. 58 of 24 February 1998 (the Consolidated Finance Act TUF ) and art. 130 of the CONSOB regulation no. 11971/1999 ( Issuers Regulation

More information

Interim financial report at 30 June 2013

Interim financial report at 30 June 2013 (Translation from the Italian original which remains the definitive version) Interim financial report at 30 June 2013 Profit for the period of EUR 40.2 million (+1% YOY) Total revenue of EUR 1,160.8 million

More information

(Translation from the Italian original which remains the definitive version)

(Translation from the Italian original which remains the definitive version) 0 Astaldi Società per Azioni Registered Office/Head Office: Via Giulio Vincenzo Bona 65-00156 Rome (Italy) Registered with the Companies Register of Rome Tax Code: 00398970582 R.E.A. No. 152353 VAT No.:

More information

Building a stronger Astaldi

Building a stronger Astaldi Building a stronger Astaldi Investor presentation May 16, 2018 Disclaimer 1 THIS PRESENTATION IS NOT AN OFFER OR AN INVITATION TO BUY OR SELL SECURITIES. IMPORTANT: Please read the following before continuing.

More information

THE BOARD OF DIRECTORS APPROVES INTERIM CONSOLIDATED REPORT AT 31 MARCH 2017

THE BOARD OF DIRECTORS APPROVES INTERIM CONSOLIDATED REPORT AT 31 MARCH 2017 Milan, April 28 th 2017 THE BOARD OF DIRECTORS APPROVES INTERIM CONSOLIDATED REPORT AT 31 MARCH 2017 Order backlog at EUR 6,454.0 million (+0.6%); New Orders acquired in the period at EUR 266.1 million

More information

PRESS RELEASE. The Board of Directors approves the Consolidated Interim Financial Report for the first half of 2016.

PRESS RELEASE. The Board of Directors approves the Consolidated Interim Financial Report for the first half of 2016. PRESS RELEASE B&C Speakers S.p.A. The Board of Directors approves the Consolidated Interim Financial Report for the first half of 2016. Consolidated revenues of Euro 18.67 million (+0.9% compared with

More information

DIRECTORS APPROVES FIRST HALF 2012 FINANCIALS. REVENUES GROWING, SIGNIFICANT RECOVERY

DIRECTORS APPROVES FIRST HALF 2012 FINANCIALS. REVENUES GROWING, SIGNIFICANT RECOVERY BOARD OF DIRECTORS APPROVES FIRST HALF 2012 FINANCIALS. REVENUES GROWING, SIGNIFICANT RECOVERY IN PROFITABILITY IN SECOND QUARTER, IMPROVEMENT IN NET FINANCIAL POSITION. Total turnover of euro 66.3 million

More information

PRESS RELEASE. The Board of Directors approves the Consolidated Interim Financial Report for the first half of 2017.

PRESS RELEASE. The Board of Directors approves the Consolidated Interim Financial Report for the first half of 2017. PRESS RELEASE B&C Speakers S.p.A. The Board of Directors approves the Consolidated Interim Financial Report for the first half of 2017. Consolidated revenues of Euro 20.12 million (+7.7% compared with

More information

Astaldi Business Plan. Milan November 15 th, 2012

Astaldi Business Plan. Milan November 15 th, 2012 Astaldi 2012-2017 Business Plan Milan November 15 th, 2012 1 1 Executive summary 1 Concession: cash-in value to support the growth 2 2012-2017 Business Plan: targets and drivers 3 2012-2017 Business Plan:

More information

Centrale del Latte di Torino & C. S.p.A. Interim report at 31 March 2015

Centrale del Latte di Torino & C. S.p.A. Interim report at 31 March 2015 Interim report at 31 March 2015 Centrale del Latte di Torino & C. S.p.A. - Via Filadelfia 220 10137 Turin Share capital 20,600,000 fully paid up - Turin Chamber of Commerce no. 520409 Court of Turin no.

More information

Astaldi Società per Azioni Corporate and Head Offices: Via Giulio Vincenzo Bona 65, Rome (Italy) Registered with the Companies Register of Rome TIN:

Astaldi Società per Azioni Corporate and Head Offices: Via Giulio Vincenzo Bona 65, Rome (Italy) Registered with the Companies Register of Rome TIN: Half-Year Financial Report at 30 June 2009 Astaldi Società per Azioni Corporate and Head Offices: Via Giulio Vincenzo Bona 65, Rome (Italy) Registered with the Companies Register of Rome TIN: 00398970582

More information

TERNA: RESULTS AS OF JUNE 30, 2013 APPROVED

TERNA: RESULTS AS OF JUNE 30, 2013 APPROVED TERNA: RESULTS AS OF JUNE 30, 2013 APPROVED Revenues at 918.8 million euros (856.6 million euros in 1H 2012, +7.3%) EBITDA at 731.9 million euros (668.9 million euros in 1H 2012, +9.4%) EBITDA Margin of

More information

INTERIM FINANCIAL REPORT AS AT MARCH 31, 2018

INTERIM FINANCIAL REPORT AS AT MARCH 31, 2018 INTERIM FINANCIAL REPORT AS AT MARCH 31, 2018 (Translation into English of the original Italian version) JOINT-STOCK COMPANY - SHARE CAPITAL EURO 62,461,355.84 MANTOVA COMPANY REGISTER AND TAX CODE 00607460201

More information

Interpump Group approves 2011 first quarter results

Interpump Group approves 2011 first quarter results PRESS RELEASE Interpump Group approves 2011 first quarter results Net sales: 123.7 million ( 99.4 million in2010 first quarter): +24.4% EBITDA: 23.3 million (18.8% of sales): +42.8% EBIT: 18.9 million

More information

CONSOLIDATED AND DRAFT FINANCIAL

CONSOLIDATED AND DRAFT FINANCIAL A Genoa March 5 th, 2013 CONSOLIDATED AND DRAFT FINANCIAL STATEMENTS 2012 APPROVED, DIVIDEND PROPOSED, GUIDANCE 2013, THE CHAIRMAN RESIGNED FROM THE BOARD OF DIRECTORS Consolidated and draft financial

More information

BOARD APPROVES NINE-MONTH REPORT FOR 2012

BOARD APPROVES NINE-MONTH REPORT FOR 2012 Press release BOARD APPROVES NINE-MONTH REPORT FOR 2012 Consolidated revenue of 3,039m up 2.6% on 9M 2011. On like-for-like basis total revenue down 115.8m (3.9%) Motorway traffic on network operated under

More information

TERNA'S BOARD OF DIRECTORS: RESULTS AT 30 JUNE 2017 APPROVED

TERNA'S BOARD OF DIRECTORS: RESULTS AT 30 JUNE 2017 APPROVED TERNA'S BOARD OF DIRECTORS: RESULTS AT 30 JUNE 2017 APPROVED Revenues at 1,046.9 million ( 1,039.9 million in 1H16, +0.7%) EBITDA at 794.8 million ( 777 million in 1H16, +2.3%) EBIT at 534 million ( 509.8

More information

Interim Financial Report at 31 March 2017 of the Enav Group

Interim Financial Report at 31 March 2017 of the Enav Group Interim Financial Report at 31 March 2017 of the Enav Group Contents Main operating data 3 Introduction 4 Market and air traffic trends 5 Effects of seasonality 10 Alternative performance indicators 10

More information

Net Profit in the first semester of 2014 grew by 10.7% up to 395 Euro million

Net Profit in the first semester of 2014 grew by 10.7% up to 395 Euro million Net Profit in the first semester of 2014 grew by 10.7% up to 395 Euro million Sales stand at 18,759 Euro million, 83.8% of them from abroad. Net debt of the Group accounts for 5,812 Euro million, showing

More information

Press Release BOARD APPROVES NINE-MONTH REPORT FOR 2009

Press Release BOARD APPROVES NINE-MONTH REPORT FOR 2009 Press Release BOARD APPROVES NINE-MONTH REPORT FOR 2009 Signs of progressive recovery in traffic using Group s network as rate of decline eases to 0.7% in first nine months of year (1.9% after taking account

More information

RESULTS AT 31 MARCH 2018

RESULTS AT 31 MARCH 2018 RESULTS AT 31 MARCH 2018 Disclaimer This Interim Reporting at 31 March 2018 has been translated into English solely for the convenience of the international reader. In the event of conflict or inconsistency

More information

Interim Financial Report at March 31, 2018

Interim Financial Report at March 31, 2018 Interim Financial Report at March 31, 2018 Contents Our mission... 3 Foreword... 4 > Enel organizational model... 7 Summary of results... 8 Results by business area... 19 > Italy... 22 > Iberia... 27 >

More information

BOARD APPROVES AUTOSTRADE PER L ITALIA GROUP S INTERIM REPORT FOR SIX MONTHS ENDED 30 JUNE 2017

BOARD APPROVES AUTOSTRADE PER L ITALIA GROUP S INTERIM REPORT FOR SIX MONTHS ENDED 30 JUNE 2017 Press Release BOARD APPROVES AUTOSTRADE PER L ITALIA GROUP S INTERIM REPORT FOR SIX MONTHS ENDED 30 JUNE 2017 Consolidated results (1) Motorway traffic on Group s Italian network up 2.9% in H1 2017 (up

More information

Astaldi Società per Azioni Registered Office and Head Office: Rome (Italy), Via Giulio Vincenzo Bona no. 65 Entered in the Rome Company Register TIN

Astaldi Società per Azioni Registered Office and Head Office: Rome (Italy), Via Giulio Vincenzo Bona no. 65 Entered in the Rome Company Register TIN Half Yearly Financial Report 30 June 2008 Astaldi Società per Azioni Registered Office and Head Office: Rome (Italy), Via Giulio Vincenzo Bona no. 65 Entered in the Rome Company Register TIN 00398970582

More information

2015. The architecture of a value-filled year.

2015. The architecture of a value-filled year. annual report 2015. The architecture of a value-filled year. 2015 was an important year, characterised by a clear increase in turnover and an increasingly marked international presence, with the acquisition

More information

TERNA'S BOARD OF DIRECTORS: RESULTS AS OF SEPTEMBER 30, 2013 APPROVED

TERNA'S BOARD OF DIRECTORS: RESULTS AS OF SEPTEMBER 30, 2013 APPROVED TERNA'S BOARD OF DIRECTORS: RESULTS AS OF SEPTEMBER 30, 2013 APPROVED Revenues at 1,401.2 million euros (1,298.7 million euros in 9M12, +7.9%) EBITDA at 1,132.7 million euros (1,029 million euros in 9M12,

More information

INTERIM REPORT FOR THE THREE MONTHS ENDED 31 MARCH 2018

INTERIM REPORT FOR THE THREE MONTHS ENDED 31 MARCH 2018 INTERIM REPORT FOR THE THREE MONTHS ENDED 31 MARCH 2018 Registered office in Via della Valle dei Fontanili 29/37 00168 Rome, Italy Share capital: 1,084,200.00 fully paid-in Rome Companies Register, Tax

More information

RESULTS ENDED 30 JUNE 2013

RESULTS ENDED 30 JUNE 2013 RESULTS ENDED 30 JUNE 2013 STRONG INCREASE IN TOTAL REVENUES AND MARGINS Consolidated key financial and economic data 1H13 Value of Production 678m Revenues 663m EBITDA 76m EBIT 43m Net Financial Position

More information

BOARD APPROVES NINE-MONTH REPORT FOR 2010 GROUP S INVESTMENTS UP 10%

BOARD APPROVES NINE-MONTH REPORT FOR 2010 GROUP S INVESTMENTS UP 10% Press Release BOARD APPROVES NINE-MONTH REPORT FOR 2010 GROUP S INVESTMENTS UP 10% Operating performance Consolidated revenue of 2,838m up 9.1% on 9M 2009, of which 5.0% due to the rise in the concession

More information

FIERA MILANO: THE BOARD OF DIRECTORS APPROVES THE 2017 RESULTS

FIERA MILANO: THE BOARD OF DIRECTORS APPROVES THE 2017 RESULTS FIERA MILANO: THE BOARD OF DIRECTORS APPROVES THE 2017 RESULTS Strong growth in all financial figures and a return to net profit Revenues of Euro 271.3 million, an increase of 23% compared to the figure

More information

5. The financial management in 2017

5. The financial management in 2017 5. The financial management in 2017 5.1. Consolidated FinanCial statements 5.2. Consolidated balance sheet of the acs Group 5.3. net Cash Flows of the acs Group 5.4. areas of activity evolution: ConstruCtion

More information

Ferrovial, S.A. and Subsidiaries. Consolidated Financial Statements Board of Directors 22 February 2011

Ferrovial, S.A. and Subsidiaries. Consolidated Financial Statements Board of Directors 22 February 2011 Consolidated Financial Statements 2010 Ferrovial, S.A. and Subsidiaries Board of Directors 22 February 2011 Free translation of the Consolidated Financial Statements for 2010 and 2009 and explanatory notes

More information

APPROVED THE CONSOLIDATED INTERIM FINANCIAL REPORT AT 30 SEPTEMBER 2018 GUIDANCE FOR THE 15 MONTHS PERIOD (JANUARY 2018 MARCH 2019) APPROVED

APPROVED THE CONSOLIDATED INTERIM FINANCIAL REPORT AT 30 SEPTEMBER 2018 GUIDANCE FOR THE 15 MONTHS PERIOD (JANUARY 2018 MARCH 2019) APPROVED Rome, October 30, 2018 APPROVED THE CONSOLIDATED INTERIM FINANCIAL REPORT AT 30 SEPTEMBER 2018 GUIDANCE FOR THE 15 MONTHS PERIOD (JANUARY 2018 MARCH 2019) APPROVED New orders at EUR 630.3 million (-31.1%)

More information

DIRECTORS REPORT PART I

DIRECTORS REPORT PART I DIRECTORS REPORT PART I Directors Report Financial highlights 24 ANNUAL REPORT 2017 The following tables show the Group s adjusted key financial indicators for 2017 compared to the previous year. Adjustments

More information

FY 2018 RESULTS ANNOUNCEMENT

FY 2018 RESULTS ANNOUNCEMENT Rome, February 5, 2019 FY 2018 RESULTS ANNOUNCEMENT Strong commercial performance with orders intake at EUR 1,889.1 million (+25.9%), leading to a backlog of EUR 6,883.4 million Revenue at EUR 1,437.1

More information

Interim Report on Operations at March 31, di 18

Interim Report on Operations at March 31, di 18 Interim Report on Operations at March 31, 2015 1 di 18 ENGINEERING INGEGNERIA INFORMATICA S.p.A. SEDE IN ROMA - VIA SAN MARTINO DELLA BATTAGLIA, 56 CAPITALE SOCIALE SOTTOSCRITTO E INTERAMENTE VERSATO EURO

More information

Interim report on operations as of March 31, di 19

Interim report on operations as of March 31, di 19 Interim report on operations as of March 31, 2016 1 di 19 ENGINEERING INGEGNERIA INFORMATICA S.p.A. HEADQUARTERS IN ROME, VIA SAN MARTINO DELLA BATTAGLIA, 56 UNDERSIGNED AND FULLY PAID UP SHARE CAPITAL

More information

STAR Conference

STAR Conference 1H 2014 Results Value Building Strategy Astaldi Today Outlook Appendix ASTALDI @ STAR Conference London - October 2&3, 2014 Agenda Value Building Strategy Astaldi Today Outlook Appendix Latest news & 1H

More information

ENEL GREEN POWER: BOARD OF DIRECTORS APPROVES RESULTS AT SEPTEMBER 30 TH, 2010

ENEL GREEN POWER: BOARD OF DIRECTORS APPROVES RESULTS AT SEPTEMBER 30 TH, 2010 ENEL GREEN POWER: BOARD OF DIRECTORS APPROVES RESULTS AT SEPTEMBER 30 TH, Revenues: 1,581 million euros (1,363 million at September 30 th,, +16.0%) EBITDA: 966 million euros (915 million at September 30

More information

* * * * * FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2017 GENERAL MEETING OF 18 APRIL 2018

* * * * * FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2017 GENERAL MEETING OF 18 APRIL 2018 NPL SECURITISATION EUROPE SPV S.r.l. single-member limited liability company Registered Office: Milan, Via A. Pestalozza, no. 12/14 Capital: Euro 10,000 fully paid up Milan Company Register Number 09686010969

More information

ACS gains 233 million euros, 6% more, in the first quarter of 2017

ACS gains 233 million euros, 6% more, in the first quarter of 2017 ACS gains 233 million euros, 6% more, in the first quarter of 2017 Sales increased by 11.2% up to 8,357 million euros Backlog increases by 15.0% up to 68,092 million euros in March 2017 Net debt decreases

More information

Interim condensed financial information in accordance with International Accounting Standard 34 for the period from 1 January to 30 September 2018

Interim condensed financial information in accordance with International Accounting Standard 34 for the period from 1 January to 30 September 2018 Interim condensed financial information in accordance with 25 ERMOU ST - 145 64 KIFISIA Tax Registration No: 094004914 ATHENS TAX OFFICE FOR SOCIÉTÉS ANONYMES Société Anonyme Registration No: 874/06/Β/86/16

More information

Financial RepoRt FoR the FiRSt HalF-YeaR of 2009

Financial RepoRt FoR the FiRSt HalF-YeaR of 2009 Financial Report FOR THE FIRST HALF-YEAR OF 2009 summary Management report for the first half-year of 2009 1 Condensed interim consolidated financial Statements at 30 June 2009 9 Financial statements 11

More information

PRESS RELEASE ACOTEL GROUP: interim report for three months ended 30 September 2014.

PRESS RELEASE ACOTEL GROUP: interim report for three months ended 30 September 2014. PRESS RELEASE ACOTEL GROUP: interim report for three months ended 30 September 2014. Consolidated results for 9M 2014: Revenue 52.4 million ( 79.1 million in 9M 2013) Negative EBITDA 6.9 million (negative

More information

EDISON CLOSES THE FIRST 9 MONTHS WITH REVENUES OF 6.5 BILLION EUROS, EBITDA AT 620 MILLION EUROS AND PROFIT OF 87 MILLION EUROS.

EDISON CLOSES THE FIRST 9 MONTHS WITH REVENUES OF 6.5 BILLION EUROS, EBITDA AT 620 MILLION EUROS AND PROFIT OF 87 MILLION EUROS. PRESS RELEASE EDISON CLOSES THE FIRST 9 MONTHS WITH REVENUES OF 6.5 BILLION EUROS, EBITDA AT 620 MILLION EUROS AND PROFIT OF 87 MILLION EUROS. Edison revised upwards its guidance for 2018 EBITDA which

More information

HALF-YEARLY FINANCIAL STATEMENTS Contents

HALF-YEARLY FINANCIAL STATEMENTS Contents HALF-YEARLY FINANCIAL STATEMENTS 2005 Contents Balance sheet Income statement Statement of changes in net borrowing Information on transition to IFRS CONSOLIDATED FINANCIAL STATEMENTS USING IFRS Balance

More information