1 Canada Infrastructure Bank November

2 CIB Mandate Invest $35B Attract private capital Into new infrastructure projects In the public interest Transfer significant usage or demand risk Provide advisory services including best practices, data, information and Inventory of Canadian Infrastructure Projects 2

3 We will invest >$5bn in each of the focus areas Green Infrastructure Public Transit Transport and Trade 3

4 Building Blocks Expanding on success of PPPs RISKS RETAINED Construction Risk Financing Equity Debt Equity Government Financing Government Financing Government Financing Government Financing Debt CIB Investment Government Financing Design Bid Build Design Build Design Build Finance Design Build Finance Operate & Maintain Usage & Revenue 4

5 CIB Investment Criteria Type of Project Transformative Public Interest Sustainable Bankability Reasonable Prospect of earning returns on Investment Go to Market Procurement Strategy Level Playing Field Competing Infrastructure 5

6 CIB Investment Criteria Structure CIB seeks To finance projects Private sector risk sharing - Construction - Usage and revenue, ramp-up - Capacity - Regulatory - Operational Private investment = a multiple of CIB s Strong alignment of all partners Level playing field 6 CIB does NOT Provide recurring funding Take all of the risk Crowd-out private investment with cheap capital Allow first money out for private investors Create unfair market advantage

7 CIB will fill in gaps to improve viability of Projects FLEXIBLE INSTRUMENTS Debt or equity Investment Senior/preferred or subordinated NO Grants FLEXIBLE RETURNS Investment: 0% to market pricing Pricing will depend on the requirements of the project Long term or short term FLEXIBLE TERMS Protect CIB investment, but allow developer to manage project effectively Alignment of interests between all parties 7

8 CIB Market Roles CIB actively works with the Public and Private Sector Public Sector Sponsors (Government Sponsors and Procurement Agencies) Co-investment of Development Costs Advisory & Structuring Bankability Assessment Private Sector Risk perspective Backstop Commitment Stapled Investment Products Standardized Investments for Scalability Go to market strategy Canada Infrastructure Bank Private Sector Sponsors (Proponents, Bidders and Debt& Equity Investors) Market Sounding Stapled Investment Products Treeing with Bidders Co-Investment & Syndication Sell Down Unsolicited Projects Market Development Ideas CIB Investment Requests 8

9 Market Engagement Unsolicited Proposals Backstop Commitment Standardized Investments for scalability Develop a credible process for all levels of governments Credentials based procurement Early projects Appropriate market testing Market discovery of the financing gap for CIB investment Competitive process Maximize risk transfer Convene private sector capital Limit CIB investment to required financing gap 9 Develop a credible process for all levels of government to work with Debt or equity programs Smaller investments Create scale to syndicate

10 We have had over 120 outreach meetings Project Discussions > 55 projects 50% unsolicited Actively Engaged 10 projects Closed 1 investment 10

11 Réseau Express Métropolitain (REM) $1,283,000,000 Interest Rate =1% escalating to 3% $2.9 billion of private capital is more than two times CIB s Core investment area for CIB Senior Secured Lender 15-Year Term Loan August 2018 Meets CIB s public interest and bankability criteria Five months to negotiate and finalize 11

12 Inventory of Canadian Infrastructure Projects Objectives Promote opportunities to domestic and international service and capital providers Foster collaboration, sharing of best practices and coordination of procurement Content provided by project proponents, managed by CIB Accessible to any user, free of charge Comprehensive list, not just projects meeting CIB criteria Projects in all stages of development Submission details to include project description, cost, stage, timing Expected launch by mid

13 We are building more infrastructure for Canadians and a larger addressable market More large scale transformative projects More government demand for private investments More equity and debt Sophisticated unsolicited proposal process More revenue, usage and operating risks and returns 13

14 1414

Global Infrastructure Facility: Update for G20--September 2014

Global Infrastructure Facility: Update for G20--September 2014 Global Infrastructure Facility: Update for G20--September 2014 1. Objectives and Operating Principles The Global Infrastructure Facility (GIF) is a global, open platform that will facilitate preparation

More information

Boosting Infrastructure Financing through Risk Mitigation Instruments

Boosting Infrastructure Financing through Risk Mitigation Instruments Boosting Infrastructure Financing through Risk Mitigation Instruments Financing Sources for Public-Private Partnerships Forum Kuala Lumpur, 25 November 2015 Dr Armand Hermawan CFO Indonesia Infrastructure

More information

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies GLOBAL INFRASTRUCTURE FACILITY A partnership platform for greater investment in the infrastructure of emerging markets and developing economies COLLABORATION FINANCE LEVERAGE IMPACT The Global Infrastructure

More information

An Early Assessment of the Proposed Canadian Infrastructure Bank

An Early Assessment of the Proposed Canadian Infrastructure Bank Aon Risk Solutions Construction Services Group Aon Infrastructure Solutions An Early Assessment of the Proposed Canadian Infrastructure Bank March 2017 Risk. Reinsurance. Human Resources. To attract and

More information

Recent experience of establishing a PPP framework to mitigate fiscal risks in Bangladesh

Recent experience of establishing a PPP framework to mitigate fiscal risks in Bangladesh (Strengthened Fiscal Management in Asia) Recent experience of establishing a PPP framework to mitigate fiscal risks in Bangladesh 4 June 2018 Mita Conference Hall, Tokyo PPP Authority Prime Minister s

More information

Green Bond Workshop. Monitoring, Reporting and Market Aspects. Amal-Lee Amin

Green Bond Workshop. Monitoring, Reporting and Market Aspects. Amal-Lee Amin Green Bond Workshop Monitoring, Reporting and Market Aspects Amal-Lee Amin Inter-American Development Bank Climate Change and Sustainable Development Sector Climate Change Division INTERNATIONAL CONTEXT

More information

Draft PPP Policy Outline

Draft PPP Policy Outline Note 7 May 2012 Draft PPP Policy Outline This note is the seventh in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership (PPP) programs.

More information

FROM BILLIONS TO TRILLIONS:

FROM BILLIONS TO TRILLIONS: 98023 FROM BILLIONS TO TRILLIONS: MDB Contributions to Financing for Development In 2015, the international community is due to agree on a new set of comprehensive and universal sustainable development

More information

City Policy & Procedure

City Policy & Procedure City Policy & Procedure Subject: PUBLIC-PRIVATE PARTNERSHIP (P3) POLICY Policy Number: #1011 Effective: September 3rd, 2014 Purpose: The City of Brandon Public-Private Partnership (P3) Policy intends to

More information

Financing Mining Infrastructure in Northern Australia a NAIF Perspective. 1 November 2017

Financing Mining Infrastructure in Northern Australia a NAIF Perspective. 1 November 2017 Financing Mining Infrastructure in Northern Australia a NAIF Perspective 1 November 2017 NAIF a brief history The facility will address gaps in the infrastructure finance market for northern Australia

More information

Public Private Partnerships (PPP)- The Financial Perspective October 2014

Public Private Partnerships (PPP)- The Financial Perspective October 2014 Public Private Partnerships (PPP)- The Financial Perspective October 2014 The Logo is a trademark of Canadian Imperial Bank of Commerce, used by FirstCaribbean International Bank under license Table of

More information

SADC PPP Network PPPs in SADC

SADC PPP Network PPPs in SADC SADC PPP Network PPPs in SADC Kogan Pillay Head: SADC PPP Network CEO Forum December 6 th, 2013 SADC DFRC, Botswana What is the SADC PPP Network» Created by the Ministers of Finance and Infrastructure

More information

Strategic Priority: Industrialize Africa

Strategic Priority: Industrialize Africa Strategic Priority: Industrialize Africa Strategy Overview The strategy is meant to be delivered through strategic partnerships with key players in the area The strategy is the output of a Tripartite Agreement

More information

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office Financing Sustainable Infrastructure In Asia Fei Yu Deputy Representative Asian Development Bank North American Representative Office Agenda The Asia Scene The sustainable infrastructure gap The current

More information

Canada. 1. Noteworthy practices for project preparation. Case Study

Canada. 1. Noteworthy practices for project preparation. Case Study Case Study Canada 1. Noteworthy practices for project preparation EXISTING ENABLING ENVIRONMENT Decentralised planning process with strong collaboration between provincial levels and the national government

More information

Public-Private Partnerships (P3)

Public-Private Partnerships (P3) Public-Private Partnerships () Agenda What is a? How are s structured? De-mystified 1 Defined UK, Canada, USA A Public-Private Partnership (PPP) is a contractual agreement between a public agency (federal,

More information

The extension of the duration of the European Fund for Strategic Investment (EFSI 2.0)

The extension of the duration of the European Fund for Strategic Investment (EFSI 2.0) The extension of the duration of the European Fund for Strategic Investment (EFSI 2.0) European Economic and Social Committee Public Hearing Matthieu Bertrand EFSI Senior Mandate Manager, EIB, Directions

More information

Forum 4 Business Growth. Northern Australia Infrastructure Facility. Ms Carol Bellettini, Chief of Staff September 2017

Forum 4 Business Growth. Northern Australia Infrastructure Facility. Ms Carol Bellettini, Chief of Staff September 2017 Forum 4 Business Growth Northern Australia Infrastructure Facility Ms Carol Bellettini, Chief of Staff September 2017 Northern Australia a key contributor and well placed UNTAPPED POTENTIAL 11.7% of GDP

More information

FROM BILLIONS TO TRILLIONS: TRANSFORMING DEVELOPMENT FINANCE POST-2015 FINANCING FOR DEVELOPMENT: MULTILATERAL DEVELOPMENT FINANCE

FROM BILLIONS TO TRILLIONS: TRANSFORMING DEVELOPMENT FINANCE POST-2015 FINANCING FOR DEVELOPMENT: MULTILATERAL DEVELOPMENT FINANCE DEVELOPMENT COMMITTEE (Joint Ministerial Committee of the Boards of Governors of the Bank and the Fund on the Transfer of Real Resources to Developing Countries) DC2015-0002 April 2, 2015 FROM BILLIONS

More information

PROCUREMENT DEPARTMENT FISCAL YEAR 2019 BUDGET TESTIMONY APRIL 16, 2018

PROCUREMENT DEPARTMENT FISCAL YEAR 2019 BUDGET TESTIMONY APRIL 16, 2018 INTRODUCTION PROCUREMENT DEPARTMENT FISCAL YEAR 209 BUDGET TESTIMONY APRIL 6, 208 Good morning, President Clarke and Members of City Council. I am Trevor Day, Procurement Commissioner. Joining me today

More information

DEPARTMENT OF CANADIAN HERITAGE FINAL REPORT AUDIT OF THE CANADIAN HERITAGE INFORMATION NETWORK (CHIN)

DEPARTMENT OF CANADIAN HERITAGE FINAL REPORT AUDIT OF THE CANADIAN HERITAGE INFORMATION NETWORK (CHIN) DEPARTMENT OF CANADIAN HERITAGE FINAL REPORT AUDIT OF THE CANADIAN HERITAGE INFORMATION NETWORK (CHIN) October 19, 2005 TABLE OF CONTENTS Executive Summary 1.0 Background 2.0 Audit Objectives and Scope

More information

CREDIT BIDDING. A Presentation to the Insolvency Institute of Canada September 22, 2012

CREDIT BIDDING. A Presentation to the Insolvency Institute of Canada September 22, 2012 CREDIT BIDDING A Presentation to the Insolvency Institute of Canada September 22, 2012 Credit Bidding: Allows a secured creditor to bid the face value of the secured debt as currency in a sale of the collateral

More information

AIIB S ROLE IN FINANCING ASIA S INFRASTRUCTURE GAP OPPORTUNITIES FOR EUROPEAN CONTRACTORS

AIIB S ROLE IN FINANCING ASIA S INFRASTRUCTURE GAP OPPORTUNITIES FOR EUROPEAN CONTRACTORS AIIB S ROLE IN FINANCING ASIA S INFRASTRUCTURE GAP OPPORTUNITIES FOR EUROPEAN CONTRACTORS Ian Nightingale - AIIB Procurement Advisor WHAT IS THE ASIAN INFRASTRUCTURE INVESTMENT BANK? A new multilateral

More information

Housing Operations. Housing Division Re-Organization. Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps

Housing Operations. Housing Division Re-Organization. Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps Housing Operations Housing Operations Housing Division Re-Organization Robert Lee s retirement Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps Housing Division Re-Org Principles

More information

Investment Plan for Europe

Investment Plan for Europe Investment Plan for Europe Giorgio Chiarion Casoni Head of Unit Financing of climate change, infrastructure policies and Euratom European Commission DG Economic and Financial Affairs Luxembourg, 5 March

More information

PPP PUBLIC PRIVATE PARTNERSHIP

PPP PUBLIC PRIVATE PARTNERSHIP PPP PUBLIC PRIVATE PARTNERSHIP Definition by MOF 1. An arrangement between Government and Private party 2. To provide public assets and/or related services for public benefit 3. Private party makes investments

More information

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships Budapest, Hungary March 7 8, 2007 The views expressed in this paper are those of the

More information

Reserve Bank of Fiji

Reserve Bank of Fiji Outline of Presentation A. The Reserve Bank s Vision B. Fiji s Financial System C. Regulator for Capital Markets D. Reserve Bank Approval E. Assessment Criteria F. Capital Raising - Key Requirements G.

More information

Infrastructure Impact and Challenges P3s in the Water/Wastewater Sector. Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON

Infrastructure Impact and Challenges P3s in the Water/Wastewater Sector. Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON Infrastructure Impact and Challenges P3s in the Water/Wastewater Sector Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON Introduction PPP Canada Leading the Government s P3 Agenda Acts as a Source of Expertise

More information

1 ST ISTANBUL PPP SUMMIT, 2015

1 ST ISTANBUL PPP SUMMIT, 2015 1 ST ISTANBUL PPP SUMMIT, 2015 OVERVIEW OF THE PPP FRAMEWORK IN KENYA MS. HADIJA R. DIBA PPP UNIT, NATIONAL TREASURY - KENYA TUESDAY, 3 RD NOVEMBER 2015 BOĞAZİÇİ UNIVERSITY CAMPUS, ISTANBUL - TURKEY OUTLINE

More information

EIB Financing for Transport Sector. The development of financial instruments

EIB Financing for Transport Sector. The development of financial instruments EIB Financing for Transport Sector The development of financial instruments Hydrogen Fuel Cell Joint Undertaking Brussels, November 19th, 2015 18/06/2015 European Investment Bank Group 1 1. EIB Lending

More information

Special Report Benchmark for Investing in African Infrastructure Project Development ( I4PD Benchmark )

Special Report Benchmark for Investing in African Infrastructure Project Development ( I4PD Benchmark ) OCTOBER 2018 Special Report 2018 Benchmark for Investing in African Infrastructure Project Development ( I4PD Benchmark ) INSTITUTIONAL INVESTMENT AND COMMERCIAL PROJECT DEVELOPMENT IN AFRICA CO-AUTHORS

More information

PPP - ADB's role in structuring, financing and procurement. Asean Connectivity Forum 8 November, 2016

PPP - ADB's role in structuring, financing and procurement. Asean Connectivity Forum 8 November, 2016 PPP - ADB's role in structuring, financing and procurement Asean Connectivity Forum 8 November, 2016 Contents I. Asian Development Bank products & procurement II. III. Challenges to PPP in Asia and the

More information

NO: R027 COUNCIL DATE: FEBRUARY 24, FROM: Acting General Manager, Engineering FILE: (Garbage & Recycling)

NO: R027 COUNCIL DATE: FEBRUARY 24, FROM: Acting General Manager, Engineering FILE: (Garbage & Recycling) CORPORATE REPORT NO: R027 COUNCIL DATE: FEBRUARY 24, 2014 REGULAR COUNCIL TO: Mayor & Council DATE: February 19, 2014 FROM: Acting General Manager, Engineering FILE: 2320-20 (Garbage & Recycling) SUBJECT:

More information

Public Private Partnerships. Alberta Infrastructure Guidance Document

Public Private Partnerships. Alberta Infrastructure Guidance Document P3 Public Private Partnerships Alberta Infrastructure Guidance Document P3 Public Private Partnerships Alberta Infrastructure Guidance Document Excerpt from the February 18, 2003 Speech from the Throne

More information

Blending EU grants with PPPs in the next MFF. CSI-Europe towards Financial Instruments for Cities 30 th January 2014, EIB

Blending EU grants with PPPs in the next MFF. CSI-Europe towards Financial Instruments for Cities 30 th January 2014, EIB Blending EU grants with PPPs in the next MFF CSI-Europe towards 2014-2020 Financial Instruments for Cities 30 th January 2014, EIB Agenda The principles of blending PPP with EU Funds Why blending EU Funds

More information

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited Headline Verdana Bold Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited About us Kenneth Legesi Infrastructure and Capital Projects / PPP Advisory Deloitte

More information

COMPACT MONITORING REPORT TO G20 FINANCE MINISTERS AND CENTRAL BANK GOVERNORS APRIL

COMPACT MONITORING REPORT TO G20 FINANCE MINISTERS AND CENTRAL BANK GOVERNORS APRIL COMPACT MONITORING REPORT TO G20 FINANCE MINISTERS AND CENTRAL BANK GOVERNORS APRIL 2018 1 CONTENTS Overall Assessment of Progress by the World Bank Group... 3 Joint Report of the International Organizations...

More information

Bringing Lethbridge Home Community Leader s Council

Bringing Lethbridge Home Community Leader s Council Bringing Lethbridge Home Community Leader s Council 1.0 Name and Type of Committee Community Leader s Council, Bringing Lethbridge Home Community Advisory Board 2.0 General Purpose The Leader s Council,

More information

Budget 2016 Summary. Budget 2016 will implement a plan to invest more than $120 billion in infrastructure over 10 years, including:

Budget 2016 Summary. Budget 2016 will implement a plan to invest more than $120 billion in infrastructure over 10 years, including: Budget 2016 Summary Infrastructure Budget 2016 will implement a plan to invest more than $120 billion in infrastructure over 10 years, including: - $3.4 billion over three years to upgrade and improve

More information

The Kuala Lumpur Statement on Financing Sources for Public-Private Partnerships in South-East Asia

The Kuala Lumpur Statement on Financing Sources for Public-Private Partnerships in South-East Asia Sub-Regional Expert Group Meeting (EGM) for South-East Asian Countries Financing Sources for Public-Private Partnerships (PPPs) The Kuala Lumpur Statement on Financing Sources for Public-Private Partnerships

More information

INNOVATIVE SOLUTIONS TO CLIMATE FINANCE: BLENDED FINANCE FOR PRIVATE SECTOR PROJECTS

INNOVATIVE SOLUTIONS TO CLIMATE FINANCE: BLENDED FINANCE FOR PRIVATE SECTOR PROJECTS INNOVATIVE SOLUTIONS TO CLIMATE FINANCE: BLENDED FINANCE FOR PRIVATE SECTOR PROJECTS Blended Climate Finance IFC Climate Business October 15, 2015 For further information: Ricardo Gonzalez rgonzalez4@ifc.org

More information

1 July Guideline for Municipal Competency Levels: Chief Financial Officers

1 July Guideline for Municipal Competency Levels: Chief Financial Officers 1 July 2007 Guideline for Municipal Competency Levels: Chief Financial Officers issued in terms of the Local Government: Municipal Finance Management Act, 2003 Introduction This guideline is one of a series

More information

INDEX annual management plan, terminology in credit agreement

INDEX annual management plan, terminology in credit agreement INDEX Aboriginal rights Aboriginal title, establishment of, 316 claims, suggested clauses, 321-323 consultation, process for, 318-321 duty to consult and accommodate, 317-318 generally, 313-315 risk assessment,

More information

TERMS OF REFERENCE FOR THE BOARD OF DIRECTORS

TERMS OF REFERENCE FOR THE BOARD OF DIRECTORS TERMS OF REFERENCE FOR THE BOARD OF DIRECTORS I. INTRODUCTION The primary responsibility of the (the Board ) is to maximize returns to shareholders of (the Corporation ) and to foster the long-term success

More information

The European Fund for Strategic Investments (EFSI)

The European Fund for Strategic Investments (EFSI) Issue 11/ 2016 6 April The European Fund for Strategic Investments (EFSI) Maximising its Potential Guiding principle of EFSI is to stimulate private, market-based investments, not to replace them In this

More information

Europe 2020 Project Bond Initiative. ÖPP Forum NRW

Europe 2020 Project Bond Initiative. ÖPP Forum NRW Europe 2020 Project Bond Initiative Innovations in Financing European Infrastructure ÖPP Forum NRW 1 EU 2020 Project Bond Initiative «Project Bonds» were proposed by EU President J.M. Barroso in his «State

More information

June 2018 GREEN BOND PROGRAM. Province of Québec

June 2018 GREEN BOND PROGRAM. Province of Québec June 2018 GREEN BOND PROGRAM Province of Québec ECONOMIC OUTLOOK The Québec economy is going full throttle. Growth in real gross domestic product (GDP) accelerated from 1.4% in 2016 to 3.0% in 2017, one

More information

Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance. Ana Carvajal

Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance. Ana Carvajal Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance Ana Carvajal Istanbul, November 2015 The Context: Gaps in long term finance Infrastructure Financing gap estimated

More information

OPERATIONS MANUAL BANK POLICIES AND PROCEDURES NONSOVEREIGN OPERATIONS

OPERATIONS MANUAL BANK POLICIES AND PROCEDURES NONSOVEREIGN OPERATIONS Page 1 of 7 These policies and procedures were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. This Operations Manual is issued by the Strategy and Policy Department

More information

Bridging the Digital Divide: through access to finance

Bridging the Digital Divide: through access to finance Bridging the Digital Divide: through access to finance Chijioke Egejuru, Investment Officer, TMT Africa Contents 1. What we do 2. A Case for TMT Investments 3. Key Focus Sectors 4. Targeted Funding for

More information

Overview. FINTRAC at a glance

Overview. FINTRAC at a glance FINTRAC at a glance Overview Shedding light on money laundering and terrorist activity financing Our role in the fight against ML and TF Join the fight! FINTRAC at a glance Canada s Financial Intelligence

More information

Business Plan. BC Oil and Gas Research and Innovation Society. April 1, 2017 to March 31, 2020 Version Harbour Road Victoria, BC V9A 0B7

Business Plan. BC Oil and Gas Research and Innovation Society. April 1, 2017 to March 31, 2020 Version Harbour Road Victoria, BC V9A 0B7 Business Plan April 1, 2017 to March 31, 2020 Version 1 300-398 Harbour Road Victoria, BC V9A 0B7 Tel: 220-1418 info@bcogris.ca BC OGRIS Business Plan (2017/20) Table of Contents Executive Summary...

More information

The Benefits of P3s. Why do P3s work?

The Benefits of P3s. Why do P3s work? The Benefits of P3s Why do P3s work? P3s are a long-term performance-based approach for procuring public infrastructure where the private sector assumes a major share of the responsibility in terms of

More information

CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY REPORT ON PLANS AND PRIORITIES

CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY REPORT ON PLANS AND PRIORITIES CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY 2010-2011 REPORT ON PLANS AND PRIORITIES The Honourable Jim Prentice Minister of the Environment and Minister responsible for the Canadian Environmental Assessment

More information

Re: Legislative Review of Export Development Canada

Re: Legislative Review of Export Development Canada EDC Review 2018 Team Leader, Review Team Diana Smallridge Stakeholder Liaison, Review Team Glen Hodgson consultations@edc2018.ca Dear Ms. Smallridge and Mr. Hodgson, Re: Legislative Review of Export Development

More information

René Saliba Chairman MDB Working Group. EIB CBM Conference 31 October 2017

René Saliba Chairman MDB Working Group. EIB CBM Conference 31 October 2017 René Saliba Chairman MDB Working Group EIB CBM Conference 31 October 2017 Objectives of Malta Development Bank Background to establishment of MDB Vision and purpose of MDB Strategic direction Governance

More information

Session: World Bank Government Bond Market Operations Speaker: Anderson Caputo Silva, The World Bank Group

Session: World Bank Government Bond Market Operations Speaker: Anderson Caputo Silva, The World Bank Group Session: World Bank Government Bond Market Operations Speaker: Anderson Caputo Silva, The World Bank Group Increasing Importance of LCBMs Objectives Finance development and growth Promote stability Foster

More information

Public Private Partnerships, The Rules Oranjestad February 18, Paul Swanenvleugel

Public Private Partnerships, The Rules Oranjestad February 18, Paul Swanenvleugel Public Private Partnerships, The Rules Oranjestad Paul Swanenvleugel Paul Swanenvleugel Director PricewaterhouseCoopers Advisory N.V. P.O.Box 9616 1006 GC Amsterdam The Netherlands Ph: +31 88 792 32 19

More information

COMPANION POLICY TO MULTILATERAL INSTRUMENT PROTECTION OF MINORITY SECURITY HOLDERS IN SPECIAL TRANSACTIONS

COMPANION POLICY TO MULTILATERAL INSTRUMENT PROTECTION OF MINORITY SECURITY HOLDERS IN SPECIAL TRANSACTIONS COMPANION POLICY 61-101 TO MULTILATERAL INSTRUMENT 61-101 PROTECTION OF MINORITY SECURITY HOLDERS IN SPECIAL TRANSACTIONS PART 1 GENERAL 1.1 General The Autorité des marchés financiers, the Ontario Securities

More information

Classroom and Class Lab Utilization

Classroom and Class Lab Utilization Classroom and Class Lab Utilization Tom Keaton Director, Finance and Resource Planning Texas Higher Education Coordination Board Space Performance Scoring (SPS) Current Guideline Classroom Use, 38 Hours

More information

What is the Cleantech Innovation Challenge? Web 2.0 Crowdsourcing Cleantech

What is the Cleantech Innovation Challenge? Web 2.0 Crowdsourcing Cleantech What is the Cleantech Innovation Challenge? Cleantech Innovation Challenge allows companies to solve the most challenging Cleantech tasks by tapping into the expertise of a global community of experts

More information

Blending ESIF grants and PPPs an EPEC perspective. Smart Procurement and Efficient PPPs Bled 28 November 2017

Blending ESIF grants and PPPs an EPEC perspective. Smart Procurement and Efficient PPPs Bled 28 November 2017 an EPEC perspective Smart Procurement and Efficient PPPs Bled 28 November 2017 Blending: what? Blending: A contribution from ESIF grants and PPP procurement involving private financing (debt/equity) Public-Private

More information

Mobilising private finance for infrastructure Myths and realities

Mobilising private finance for infrastructure Myths and realities Mobilising private finance for infrastructure Myths and realities Infrastructure is the backbone Fundamental Human Right Key Determinant of Domestic Investment Climate Private Capital Providers Commercial

More information

Catalyzing Green Finance

Catalyzing Green Finance Catalyzing Green Finance Blending & Leveraging Sovereign Finance For Financially & Environmentally Sustainable Infrastructure Projects October 2017 GFCF: A Knowledge Product GFCF: Pilot Project in PRC

More information

Branch Corporate Strategic Planning

Branch Corporate Strategic Planning Introduction Corporate Strategic Planning provides leadership and drives the integration and coordination of the City s strategic planning process with an emphasis on ensuring the achievement of Council

More information

Infrastructure - Changing procurement models

Infrastructure - Changing procurement models Infrastructure - Changing procurement models Angus Foley, Partner 4 September 2015 AUSTRALIA BELGIUM CHINA FRANCE GERMANY HONG KONG SAR INDONESIA (ASSOCIATED OFFICE) ITALY JAPAN PAPUA NEW GUINEA SAUDI

More information

PPP and the Consequences of the Financial Crisis

PPP and the Consequences of the Financial Crisis PPP and the Consequences of the Financial Crisis - Financing capacity - Future perspectives Nicholas Jennett European PPP Expertise Centre OECD Conference Centre Paris, 12-13 April 2010 1 Background Impact

More information

UNDERSTANDING PARTICIPATING WHOLE LIFE INSURANCE

UNDERSTANDING PARTICIPATING WHOLE LIFE INSURANCE UNDERSTANDING PARTICIPATING WHOLE LIFE INSURANCE equimax CLIENT GUIDE ABOUT EQUITABLE LIFE OF CANADA Equitable Life is one of Canada s largest mutual life insurance companies. For generations we ve provided

More information

FRAMEWORK FOR RESOURCE MOBILIZATION

FRAMEWORK FOR RESOURCE MOBILIZATION FRAMEWORK FOR RESOURCE MOBILIZATION PMNCH Board Meeting Copenhagen May 19-20, 2016 Overview of the GFF The what of the GFF The how of the GFF The who of the GFF Smart RESULTS Scaled Sustainable 1. Investment

More information

UNDERSTANDING PARTICIPATING WHOLE LIFE INSURANCE

UNDERSTANDING PARTICIPATING WHOLE LIFE INSURANCE UNDERSTANDING PARTICIPATING WHOLE LIFE INSURANCE equimax CLIENT GUIDE ABOUT EQUITABLE LIFE OF CANADA Equitable Life is one of Canada s largest mutual life insurance companies. For generations we ve provided

More information

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS INDONESIA INFRASTRUCTURE GUARANTEE FUND (IIGF) FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS United Nations Economic And Social Commission For Asia And

More information

Enhancing Canada s International Tax Advantage Submission to the Advisory Panel on Canada s System of International Taxation

Enhancing Canada s International Tax Advantage Submission to the Advisory Panel on Canada s System of International Taxation THE CANADIAN CHAMBER OF COMMERCE LA CHAMBRE DE COMMERCE DU CANADA Enhancing Canada s International Tax Advantage Submission to the Advisory Panel on Canada s System of International Taxation July 2008

More information

Request for Proposal Kelowna Office Renovation. Request for Proposals (RFP)

Request for Proposal Kelowna Office Renovation. Request for Proposals (RFP) Request for Proposals (RFP) Scope of Service RFP # RFP issued by Kelowna Office Renovation 2018RFP-25 First Nations Health Authority (FNHA) Issue date October 20, 2017 Closing date/time FNHA Contact Information

More information

Horizon The EU Framework Programme for Luigi Scarpa de Masellis. Delegation of the EU to Canada. Research and Innovation

Horizon The EU Framework Programme for Luigi Scarpa de Masellis. Delegation of the EU to Canada. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Luigi Scarpa de Masellis Delegation of the EU to Canada 2014-2020 Research and The Multiannual Financial Framework 2014-2020: Commission s proposals

More information

POLICY STATEMENT TO REGULATION RESPECTING PROTECTION OF MINORITY SECURITY HOLDERS IN SPECIAL TRANSACTIONS

POLICY STATEMENT TO REGULATION RESPECTING PROTECTION OF MINORITY SECURITY HOLDERS IN SPECIAL TRANSACTIONS POLICY STATEMENT TO REGULATION 61-101 RESPECTING PROTECTION OF MINORITY SECURITY HOLDERS IN SPECIAL TRANSACTIONS PART 1 11 GENERAL General The Autorité des marchés financiers and the Ontario Securities

More information

Industrial Developer Loan Fund Request for Proposals

Industrial Developer Loan Fund Request for Proposals Industrial Developer Loan Fund Request for Proposals Question & Answer Information Session: Friday, May 4, 2018 RFP Submission Deadlines: June 29, 2018 September 28, 2018 December 28, 2018 March 29, 2019

More information

OPPORTUNITY PROFILE

OPPORTUNITY PROFILE www.apsc.ca OPPORTUNITY PROFILE Vice President, Pensions Services About Alberta Pensions Services Corporation Alberta Pensions Services Corporation (APS) is one of Canada s largest public sector pension

More information

ROADMAP TO INFRASTRUCTURE AS AN ASSET CLASS

ROADMAP TO INFRASTRUCTURE AS AN ASSET CLASS Infrastructure for Growth and Development Infrastructure is a key driver of economic growth and prosperity. The quality, access and affordability of infrastructure both physical and digital are determinants

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Authored and prepared by egx

Authored and prepared by egx Authored and prepared by egx Annotated Recognition Order egx Canada Inc. Section 24 of the Securities Act, RSBC 1996, c. 418 egx Canada Inc. (egx), a subsidiary of Global Financial Group Inc. (GFG), has

More information

Cornwall & Isles of Scilly Investment Fund

Cornwall & Isles of Scilly Investment Fund 1 Cornwall & Isles of Scilly Investment Fund Q&A Respondents are invited to direct questions in advance of submitting a response to sally-ann.rogerson@british-business-bank.co.uk. Questions (posted anonymously)

More information

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS

More information

Green Bonds 101. Financing Solutions to Climate Change. Justine Leigh-Bell, Climate Bonds Initiative. 26 May 2016

Green Bonds 101. Financing Solutions to Climate Change. Justine Leigh-Bell, Climate Bonds Initiative. 26 May 2016 Green Bonds 101 Financing Solutions to Climate Change Justine Leigh-Bell, Climate Bonds Initiative 26 May 2016 Agenda 1. Introduction to the Climate Bonds Initiative 2. What is a bond? 3. Challenge + Opportunity:

More information

Report on Plans and Priorities

Report on Plans and Priorities Report on Plans and Priorities 2016 17 Her Majesty the Queen in Right of Canada, represented by the President of the Treasury Board, 2016 Catalogue No. BT1-23E-PDF ISSN: 2292-6402 This document is available

More information

VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT

VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT 1 2 3 4 Highway 407 East Phase 1 Project Artist s rendering Highlights of Highway 407 East Phase 1 Highway 407 East will help to relieve congestion

More information

Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013

Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013 Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013 Agenda What is a Public-Private Partnership? P3 Lessons Learned Locality Concerns Pop Quiz: Is this a P3 Project????

More information

Introduction to Alternative Procurement Delivery

Introduction to Alternative Procurement Delivery Introduction to Alternative Procurement Delivery for Florida Transportation Commission January 24, 2013 TABLE OF CONTENTS Alternative Project Delivery (APD) US Market Overview APD Funding and Financing

More information

PPP Finance and Legal Issues. Edward Farquharson 25 July 2006

PPP Finance and Legal Issues. Edward Farquharson 25 July 2006 PPP Finance and Legal Issues Edward Farquharson 25 July 2006 Modes of Finance Sovereign Finance Public Sector Full Recourse Private Sector Non Recourse Corporate Finance Project Finance Agenda Role of

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory

More information

Key lessons from South Africa s Renewable Energy IPP Programme

Key lessons from South Africa s Renewable Energy IPP Programme Key lessons from South Africa s Renewable Energy IPP Programme Management Program in Infrastructure Reform and Regulation University of Cape Town Competitive tenders for RE IPPs 2011 DoE issued RfP for

More information

People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing

People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing Consultant s Report Project Number: 49166-001 People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing Public Private Partnerships: Management

More information

Developing a PPP market: Getting the fundamentals right

Developing a PPP market: Getting the fundamentals right Developing a PPP market: Getting the fundamentals right Essentials for private sector participation 17 March 2016 Why does private sector care about PPP projects? PPP projects offers stable cash flows

More information

NPL Regulatory Developments EBA perspective

NPL Regulatory Developments EBA perspective NPL Regulatory Developments EBA perspective Oleg Shmeljov Senior Policy Expert, Department of Banking Markets, Innovations and Consumers 15-16 May 2018 World Bank FinSAC conference Outline 1. Background

More information

Submission to the House of Commons Standing Committee on Finance. Priorities for the 2015 Federal Budget

Submission to the House of Commons Standing Committee on Finance. Priorities for the 2015 Federal Budget Submission to the House of Commons Standing Committee on Finance The (CCCE) commends the government s commitment to sound management of public finances. With a small surplus expected in 2015-16, Budget

More information

RE: Employee Benefit Plan Renewals

RE: Employee Benefit Plan Renewals HALDIMAND COUNTY Report CS-HR-05-2014 of the General Manager of Corporate Services For Consideration By RE: Employee Benefit Plan Renewals OBJECTIVE: To approve Extended Health Care, Dental, Long Term

More information

CARE ADVISORY RESEARCH AND TRAINING LTD. Project Finance: Infrastructure and Manufacturing Sectors

CARE ADVISORY RESEARCH AND TRAINING LTD. Project Finance: Infrastructure and Manufacturing Sectors CARE ADVISORY RESEARCH AND TRAINING LTD Project Finance: Infrastructure and Manufacturing Secrs COURSE DESCRIPTION: Project finance involves limited or non-recourse of a new project in which risks must

More information

General management: update

General management: update PROGRAMME, BUDGET AND ADMINISTRATION EBPBAC16/2 COMMITTEE OF THE EXECUTIVE BOARD 3 May 2012 Sixteenth meeting Provisional agenda item 4.1 General management: update Report by the Secretariat 1. This document

More information

World Economic Forum Scaling-up Infrastructure Investments and Accelerating Infrastructure Development

World Economic Forum Scaling-up Infrastructure Investments and Accelerating Infrastructure Development World Economic Forum Scaling-up Infrastructure Investments and Accelerating Infrastructure Development Agenda 10:45 10:50 10:50 10:55 10:55 11:05 11:05 11:55 11:45 11:55 Session opening and welcome remarks

More information