1 SECTION FIVE CHAPTER 7 Engineering Economics John M. Watts, Jr., and Robert E. Chapman Introduction Engineering economics is the application of economic techniques to the evaluation of design and engineering alternatives. 1 The role of engineering economics is to assess the appropriateness of a given project, estimate its value, and justify it from an engineering standpoint. This chapter discusses the time value of money and other cash-flow concepts, such as compound and continuous interest. It continues with economic practices and techniques used to evaluate and optimize decisions on selection of fire safety strategies. The final section expands on the principles of benefit-cost analysis. An in-depth treatment of the practices and techniques covered in this compilation is available in the ASTM compilation of standards on building economics. 2 The ASTM compilation also includes case illustrations showing how to apply the practices and techniques to investment decisions. A broader perspective on the application of engineering economics to fire protection engineering can be found in The Economics of Fire Protection by Ramachandran. 3 This work is intended as a textbook for fire protection engineers and includes material and references that expand on several other chapters of this section of the SFPE handbook. Cash-Flow Concepts Cash flow is the stream of monetary (dollar) values costs (inputs) and benefits (outputs) resulting from a project investment. Dr. John M. Watts, Jr., holds degrees in fire protection engineering, industrial engineering, and operations research. He is director of the Fire Safety Institute, a not-for-profit information, research, and educational corporation located in Middlebury, Vermont. Dr. Watts also serves as editor of NFPA s Fire Technology. Dr. Robert E. Chapman is an economist in the Office of Applied Economics, Building and Fire Research Laboratory, National Institute of Standards and Technology. Time Value of Money The following are reasons why $00 today is worth more than $00 one year from today: 1. Inflation 2. Risk 3. Cost of money Of these, the cost of money is the most predictable, and, hence, it is the essential component of economic analysis. Cost of money is represented by (1) money paid for the use of borrowed money, or (2) return on investment. Cost of money is determined by an interest rate. Time value of money is defined as the time-dependent value of money stemming both from changes in the purchasing power of money (inflation or deflation) and from the real earning potential of alternative investments over time. Cash-Flow Diagrams It is difficult to solve a problem if you cannot see it. The easiest way to approach problems in economic analysis is to draw a picture. The picture should show three things: 1. A time interval divided into an appropriate number of equal periods 2. All cash outflows (deposits, expenditures, etc.) in each period 3. All cash inflows (withdrawals, income, etc.) for each period Unless otherwise indicated, all such cash flows are considered to occur at the end of their respective periods. Figure is a cash-flow diagram showing an outflow or disbursement of $00 at the beginning of year 1 and an inflow or return of $00 at the end of year 5. Notation To simplify the subject of economic analysis, symbols are introduced to represent types of cash flows and 5 93

2 5 94 Fire Risk Analysis $00 F(2) C F(1) = F(1)(i) Interest is applied to the new sum: C (F)(1)(1 = i) C P(1 = i) 2 F(3) C F(2)(1 = i) C P(1 = i) 3 and by mathematical induction, $00 F(N) C P(1 = i) N Figure Cash-flow diagram. $0 at percent per year for 5 yr yields interest factors. The symbols used in this chapter conform to ANSI Z94; 4 however, not all practitioners follow this standard convention, and care must be taken to avoid confusion when reading the literature. The following symbols will be used here: P C Present sum of money ($) F C Future sum of money ($) N C Number of interest periods i C Interest rate per period (%) A complete list of the ANSI Z94 symbols is given in Appendix A to this chapter. Interest Calculations Interest is the money paid for the use of borrowed money or the return on invested capital. The economic cost of construction, installation, ownership, or operation can be estimated correctly only by including a factor for the economic cost of money. Simple interest: To illustrate the basic concepts of interest, an additional notation will be used: F(N) C Future sum of money after N periods Then, for simple interest, and F(1) C P = (P)(i) C P(1 = i) F(N) C P = (N)(P)(i) C P(1 = Ni) For example: $0 at percent per year for 5 yr yields F(5) C 0[1 = (5)(0.1)] C 0(1.5) C $150 However, interest is almost universally compounded to include interest on the interest. Compound interest F(1) C P = (P)(i) C P(1 = i) is the same as simple interest, F(5) C 0(1 = 0.1) 5 C 0(1.1) 5 C 0(1.651) C $ which is over 7 percent greater than with simple interest. In 1626 Willem Verhulst bought Manhattan Island from the Canarsie Indians for 60 florins ($24) worth of merchandise (a price of about 0.5 cents per hectare [0.2 cents per acre]). At an average interest rate of 6 percent, what is the present value (01) of the Canarsies $24? F C P(1 = i) N C $24(1 = 0.06) 375 C $7.4? Seventy-four billion dollars is a reasonable approximation of the present land value of the island of Manhattan. Interest Factors Interest factors are multiplicative numbers calculated from interest formulas for given interest rates and periods. They are used to convert cash flows occurring at different times to a common time. The functional formats used to represent these factors are taken from ANSI Z94, and they are summarized in Appendix B to this chapter. Compound Amount Factor In the formula for finding the future value of a sum of money with compound interest, the mathematical expression (1 = i) N is referred to as the compound amount factor, represented by the functional format (F/P, i, N). Thus, F C P(F/P, i, N) Interest tables: Values of the compound amount, present worth, and other factors that will be discussed shortly, are tabulated for a variety of interest rates and number of periods in most texts on engineering economy. Example tables are presented in Appendix C to this chapter. Although calculators and computers have greatly reduced the need for such tables, they are often still useful for interpolations.

3 Engineering Economics 5 95 Present Worth Present worth is the value found by discounting future cash flows to the present or base time. Discounting: The inverse of compounding is determining a present amount which will yield a specified future sum. This process is referred to as discounting. The equation for discounting is found readily by using the compounding equation to solve for P in terms of F: P C F(1 = i) >N What present sum will yield $00 in 5 yr at percent? P C 00(1.1) >5 C 00(0.692) C $6.92 This result means that $6.92 deposited today at percent compounded annually will yield $00 in 5 yr. Present worth factor: In the discounting equation, the expression (1 = i) >N is called the present worth factor and is represented by the symbol (P/F, i, N). Thus, for the present worth of a future sum at i percent interest for N periods, P C F(P/F, i, N) Note that the present worth factor is the reciprocal of the compound amount factor. Also note that (P/F, i, N) C 1 (F/P, i, N) What interest rate is required to triple $00 in years? therefore, From Appendix C, and By linear interpolation, Interest Periods P C F C (P/F, i, ) 3 (P/F, i, ) C 1 3 (P/F, %, ) C (P/F, 12%, ) C 0.32 i C 11.6% Normally, but not always, the interest period is taken as 1 yr. There may be subperiods of quarters, months, weeks, and so forth. Nominal versus effective interest: It is generally assumed that interest is compounded annually. However, interest may be compounded more frequently. When this occurs, there is a nominal interest or annual percentage rate and an effective interest, which is the figure used in calculations. For example, a savings bank may offer 5 percent interest compounded quarterly, which is not the same as 5 percent per year. A nominal rate of 5 percent compounded quarterly is the same as 1.25 percent every three months or an effective rate of 5.1 percent per year. If and r C Nominal interest rate, M C Number of subperiods per year then the effective interest rate is i C 1 = r M > 1 M Credit cards usually charge interest at a rate of 1.5 percent per month. This amount is a nominal rate of 18 percent. What is the effective rate? i C (1 = 0.015) 12 > 1 C > 1 C 19.56% Continuous interest: A special case of effective interest occurs when the number of periods per year is infinite. This represents a situation of continuous interest, also referred to as continuous compounding. Formulas for continuous interest can be derived by examining limits as M approaches infinity. Formulas for interest factors using continuous compounding are included in Appendix B. Continuous interest is compared to monthly interest in Table Compare the future amounts obtained under various compounding periods at a nominal interest rate of 12 percent for 5 yr, if P C $,000. (See Table ) Series Payments Life would be simpler if all financial transactions were in single lump-sum payments, now or at some time in the Table Continuous Interest (%) Effective Nominal % Monthly Continuous

4 5 96 Fire Risk Analysis Table Example of Continuous Interest N C 5 yr, r C 12% Compounding M i NM F/P F Annual Semi-annual Quarterly Monthly Weekly Daily Hourly Instantaneously ã ,800 ã a 17, , , , , , , , a F/P (instantaneous) C e Ni C e 5(0.12) C e 0.6. future. However, most situations involve a series of regular payments, for example, car loans and mortgages. Series compound amount factor: Given a series of regular payments, what will they be worth at some future time? Let A C the amount of a regular end-of-period payment Then, note that each payment, A, is compounded for a different period of time. The first payment will be compounded for N > 1 periods (yr): F C A(1 = i) N>1 and the second payment for N > 2 periods: F C A(1 = i) N>2 and so forth. Thus, the total future value is or F C A(1 = i) N>1 = A(1 = i) N>2 =ß=A(1 = i) = A F C A[(1 = i)n > 1] i The interest expression in this equation is known as the series compound amount factor, (F/A, i, N), thus F C A(F/A, i, N) Sinking fund factor: The process corresponding to the inverse of series compounding is referred to as a sinking fund; that is, what size regular series payments are necessary to acquire a given future amount? Solving the series compound amount equation for A, 4 8 i A C F [(1 = i) N > 1] Or, using the symbol (A/F, i, N) for the sinking fund factor A C F(A/F, i, N) Here, note that the sinking fund factor is the reciprocal of the series compound amount factor, that is, (A/F, i, N) C 1/(F/A, i, N). Capital recovery factor: It is also important to be able to relate regular periodic payments to their present worth; for example, what monthly installments will pay for a $,000 car in 3 yr at 15 percent? Substituting the compounding equation F C P(F/P, i, N) in the sinking fund equation, A C F(A/F, i, N), yields A C P(F/P, i, N)(A/F, i, N) And, substituting the corresponding interest factors gives A C P [i(1 = i)n ] [(1 = i) N > 1] In this equation, the interest expression is known as the capital recovery factor, since the equation defines a regular income necessary to recover a capital investment. The symbolic equation is A C P(A/P, i, N) Series present worth factor: As with the other factors, there is a corresponding inverse to the capital recovery factor. The series present worth factor is found by solving the capital recovery equation for P. P C A [(1 = i)n > 1] [i(1 = i) N ] or, symbolically P C A(P/A, i, N) Other Interest Calculation Concepts Additional concepts involved in interest calculations include continuous cash flow, capitalized costs, beginning of period payments, and gradients. Continuous cash flow: Perhaps the most useful function of continuous interest is its application to situations where the flow of money is of a continuous nature. Continuous cash flow is representative for 1. A series of regular payments for which the interval between payments is very short 2. A disbursement at some unknown time (which is then considered to be spread out over the economic period)

5 Engineering Economics 5 97 Factors for calculating present or future worth of a series of annual amounts, representing the total of a continuous cash flow throughout the year, may be derived by integrating corresponding continuous interest factors over the number of years the flow is maintained. Continuous cash flow is an appropriate way to handle economic evaluations of risk, for example, the present value of an annual expected loss. Formulas for interest factors representing continuous, uniform cash flows are included in Appendix B. Capitalized costs: Sometimes there are considerations, such as some public works projects, which are considered to last indefinitely and thereby provide perpetual service. For example, how much should a community be willing to invest in a reservoir which will reduce fire insurance costs by some annual amount, A? Taking the limit of the series present worth factor as the number of periods goes to infinity gives the reciprocal of the interest rate. Thus, capitalized costs are just the annual amount divided by the interest rate. When expressed as an amount required to produce a fixed yield in perpetuity, it is sometimes referred to as an annuity. Beginning-of-period payments: Most returns on investment (cash inflows) occur at the end of the period during which they accrued. For example, a bank computes and pays interest at the end of the interest period. Accordingly, interest tables, such as those in Appendix C, are computed for end-of-year payments. For example, the values of the capital recovery factor (A/P, i, N) assume that the regular payments, A, occur at the end of each period. On the other hand, most disbursements (cash outflows) occur at the beginning of the period (e.g., insurance premiums). When dealing with beginning-of-period payments, it is necessary to make adjustments. One method of adjustment for beginning-of-period payments is to calculate a separate set of factors. Another way is to logically interpret the effect of beginning-of-period payments for a particular problem, for example, treating the first payment as a present value. The important thing is to recognize that such variations can affect economic analysis. Fire protection engineering economic analysis is primarily concerned with cost-reduction decisions, finding the least expensive way to fulfill certain requirements, or minimizing the sum of expected fire losses plus investment in fire protection. There are four common methods of comparing alternative investments: (1) present worth, (2) annual cost, (3) rate of return, and (4) benefit-cost analysis. Each of these is dependent on a selected interest rate or discount rate to adjust cash flows at different points in time. Discount Rate The term discount rate is often used for the interest rate when comparing alternative projects or strategies. Selection of discount rate: If costs and benefits accrue equally over the life of a project or strategy, the selection of discount rate will have little impact on the estimated benefit-cost ratios. However, most benefits and costs occur at different times over the project life cycle. Thus, costs of constructing a fire-resistive building will be incurred early in contrast to benefits, which will accrue over the life of the building. The discount rate then has a significant impact on measures such as benefit-cost ratios, since the higher the discount rate, the lower the present value of future benefits. In view of the uncertainty concerning appropriate discount rate, analysts frequently use a range of discount rates. This procedure indicates the sensitivity of the analysis to variations in the discount rate. In some instances, project rankings based on present values may be affected by the discount rate as shown in Figure Project A is preferred to project B for discount rates below 15 percent, while the converse is true for discount rates greater than 15 percent. In this instance, the decision to adopt project A in preference to project B will reflect the belief that the appropriate discount rate is less than or equal to 15 percent. Gradients: It occasionally becomes necessary to treat the case of a cash flow which regularly increases or decreases at each period. Such patterned changes in cash flow are called gradients. They may be a constant amount (linear or arithmetic progression), or they may be a constant percentage (exponential or geometric progression). Various equations for dealing with gradient series may be found in Appendix B. Net present value B A Comparison of Alternatives Most decisions are based on economic criteria. Investments are unattractive, unless it seems likely they will be recovered with interest. Economic decisions can be divided into two classes: 1. Income-expansion that is, the objective of capitalism 2. Cost-reduction the basis of profitability Discount rate (%) Figure Impact of discount rate on project selection.

6 5 98 Fire Risk Analysis A comparison of benefits and costs may also be used to determine the payback period for a particular project or strategy. However, it is important to discount future costs or benefits in such analyses. For example, an analysis of the Beverly Hills Supper Club fire compared annual savings from a reduction in insurance premiums to the costs of sprinkler installation. Annual savings were estimated at $11,000, while costs of sprinkler installation ranged from $42,000 to $68,000. It was concluded that the installation would have been paid back in four to seven years (depending on the cost of the sprinklers). However, this analysis did not discount future benefits, so that $11,000 received at the end of four years was deemed equivalent to $11,000 received in the first year. Once future benefits are discounted, the payback period ranges from five to eleven years with a discount rate of percent. Inflation and the discount rate: Provision for inflation may be made in two ways: (1) estimate all future costs and benefits in constant prices, and use a discount rate which represents the opportunity cost of capital in the absence of inflation; or (2) estimate all future benefits and costs in current or inflated prices, and use a discount rate which includes an allowance for inflation. The discount rate in the first instance may be considered the real discount rate, while the discount rate in the second instance is the nominal discount rate. The use of current or inflated prices with the real discount rate, or constant prices with the nominal discount rate, will result in serious distortions in economic analysis. Present Worth In a present worth comparison of alternatives, the costs associated with each alternative investment are all converted to a present sum of money, and the least of these values represents the best alternative. Annual costs, future payments, and gradients must be brought to the present. Converting all cash flows to present worth is often referred to as discounting. Two alternate plans are available for increasing the capacity of existing water transmission lines between an unlimited source and a reservoir. The unlimited source is at a higher elevation than the reservoir. Plan A calls for the construction of a parallel pipeline and for flow by gravity. Plan B specifies construction of a booster pumping station. Estimated cost data for the two plans are as follows: Plan A Pipeline Plan B Pumping Station Construction cost $1,000,000 $0,000 Life 40 years 40 years (structure) years (equipment) Cost of replacing equipment at the end of yr 0 $75,000 Operating costs $00/yr $50,000/yr If money is worth 12 percent, which plan is more economical? (Assume annual compounding, zero salvage value, and all other costs equal for both plans.) Present worth (Plan A) C P = A(P/A, 12%, 40) C $1,000,000 = $00( ) C $1,008,244 Present worth (Plan B) C P = A(P/A, 12%, 40) = F(P/F, 12%, ) C $0,000 = $50,000( ) = $75,000(0.367) C $619,964 Thus, plan B is the least-cost alternative. A significant limitation of present worth analysis is that it cannot be used to compare alternatives with unequal economic lives. That is, a ten-year plan and a twenty-year plan should not be compared by discounting their costs to a present worth. A better method of comparison is annual cost. Annual Cost To compare alternatives by annual cost, all cash flows are changed to a series of uniform payments. Current expenditures, future costs or receipts, and gradients must be converted to annual costs. If a lump-sum cash flow occurs at some time other than the beginning or end of the economic life, it must be converted in a two-step process: first moving it to the present and then spreading it uniformly over the life of the project. Alternatives with unequal economic lives may be compared by assuming replacement in kind at the end of the shorter life, thus maintaining the same level of uniform payment. Insurance System Cost Premium Life Partial system $ 8000 $00 15 yr Full system $15,000 $250 yr Compare the value of a partial or full sprinkler system purchased at percent interest. Annual cost (partial system) C A = P(A/P, %, 15) C $00 = $8000( ) C $51.75 Annual cost (full system) C A = P(A/P, %, ) C $250 = $15,000( ) C $11.90 The full system is slightly more economically desirable. When costs are this comparable, it is especially important to consider other relevant decision criteria, for example, uninsured losses. Rate of Return Rate of return is, by definition, the interest rate at which the present worth of the net cash flow is zero. Computationally, this method is the most complex method of comparison. If more than one interest factor is involved,

7 Engineering Economics 5 99 the solution is by trial and error. Microcomputer programs are most useful with this method. The calculated interest rate may be compared to a discount rate identified as the minimum attractive rate of return or to the interest rate yielded by alternatives. Rate-of-return analysis is useful when the selection of a number of projects is to be undertaken within a fixed or limited capital budget. An industrial fire fighting truck costs $0,000. Savings in insurance premiums and uninsured losses from the acquisition and operation of this equipment is estimated at $60,000/yr. Salvage value of the apparatus after 5 yr is expected to be $,000. A full-time driver during operating hours will accrue an added cost of $,000/yr. What would the rate of return be on this 40% present worth C P = F(P/F, 40%, 5) = A(P/A, 40%, 5) C >$0,000 = $,000( ) = ($60,000 >,000)(2.0352) C 50% present worth C P = F(P/F, 50%, 5) = A(P/A, 50%, 5) C >$0,000 = $,000( ) = ($60,000 > $,000)(1.7366) C>$, By linear interpolation, the rate of return is 43 percent. Benefit-Cost Analysis Benefit-cost analysis, also referred to as cost-benefit analysis, is a method of comparison in which the consequences of an investment are evaluated in monetary terms and divided into the separate categories of benefits and costs. The amounts are then converted to annual equivalents or present worths for comparison. The important steps of a benefit-cost analysis are 1. Identification of relevant benefits and costs 2. Measurement of these benefits and costs 3. Selection of best alternative 4. Treatment of uncertainty Identification of Relevant Benefits and Costs The identification of benefits and costs depends on the particular project under consideration. Thus, in the case of fire prevention or control activities, the benefits are based on fire losses prior to such activities. Fire losses may be classified as direct or indirect. Direct economic losses are property and contents losses. Indirect losses include such things as the costs of injuries and deaths, costs incurred by business or industry due to business interruption, losses to the community from interruption of services, loss of payroll or taxes, loss of market share, and loss of reputation. The direct costs of fire protection activities include the costs of constructing fire-resistive buildings, installation costs of fire protection systems, and the costs of operating fire departments. Indirect costs are more difficult to measure. They include items such as the constraints on choice due to fire protection requirements by state and local agencies. A major factor in the identification of relevant benefits and costs pertains to the decision unit involved. Thus, if the decision maker is a property owner, the relevant benefits from fire protection are likely to be the reduction in fire insurance premiums and fire damage or business interruption losses not covered by insurance. In the case of a municipality, relevant benefits are the protection of members of the community, avoidance of tax and payroll losses, and costs associated with assisting fire victims. Potential benefits, in these instances, are considerably greater than those faced by a property owner. However, the community may ignore some external effects of fire incidents. For example, the 1954 automobile transmission plant fire in Livonia, Michigan, affected the automobile industry in Detroit and various automobile dealers throughout the United States. However, there was little incentive for the community to consider such potential losses in their evaluation of fire strategies, since they would pertain to persons outside the community. It might be concluded, therefore, that the more comprehensive the decision unit, the more likely the inclusion of all relevant costs and benefits, in particular, social costs and benefits. Measurement of Benefits and Costs Direct losses are measured or estimated statistically or by a priori judgment. Actuarial fire-loss data collected nationally or for a particular industry may be used, providing it is adequately specific and the collection mechanism is reliable. More often, an experienced judgment of potential losses is made, sometimes referred to as the maximum probable loss (MPL). Indirect losses, if considered, are much more difficult to appraise. A percentage or multiple of direct losses is sometimes used. However, when indirect loss is an important decision parameter, a great deal of research into monetary evaluation may be necessary. Procedures for valuing a human life and other indirect losses are discussed in Ramachandran. 3 In the measurement of benefits, it is appropriate to adjust for utility or disutility which may be associated with a fire loss. Costs may be divided into two major categories: (1) costs of private fire protection services, and (2) costs of public fire protection services. In either case, cost estimates will reflect the opportunity cost of providing the service. For example, the cost of building a fire-resistive structure is the production foregone due to the diversion of labor and resources to make such a structure. Similarly, the cost of a fire department is the loss of other community services which might have been provided with the resources allocated to the fire department. Selection of Best Alternative There are two considerations in determining benefitcost criteria. The first pertains to project acceptability, while the second pertains to project selection. Project acceptability may be based on benefit-cost difference or benefit-cost ratio. Benefit-cost ratio is a measure

8 5 0 Fire Risk Analysis of project worth in which the monetary equivalent benefits are divided by the monetary equivalent costs. The first criterion requires that the value of benefits less costs be greater than zero, while the second criterion requires that the benefit-cost ratio be greater than one. The issue is more complicated in the case of project selection, since several alternatives are involved. It is no longer a question of determining the acceptability of a single project, but rather selecting from among alternative projects. Consideration should be given to changes in costs and benefits as various strategies are considered. Project selection decisions are illustrated in Figure The degree of fire protection is given on the horizontal axis, while the marginal costs and benefits associated with various levels of fire safety are given on the vertical axis. As the diagram indicates, marginal costs are low initially and then increase. Less information is available concerning the marginal benefit curve, and it may, in fact, be horizontal. The economically optimum level of fire protection is given by the intersection of the marginal cost and marginal benefit curves. Beyond this point, benefits from increasing fire protection are exceeded by the costs of providing the additional safety. A numerical example is given in Table There are five possible strategies or programs possible. The first strategy, A, represents the initial situation, while the remaining four strategies represent various fire loss reduction activities, each with various costs. Strategies are arranged in ascending order of costs. Fire losses under each of the five strategies are given in the second row, while the sum of fire losses and fire reduction costs for each strategy is given in the third row. The sum of fire losses and fire reduction costs of each strategy is equivalent to the life-cycle cost of that strategy. Life-cycle cost analysis is an alternative to benefit-cost analysis when the outcomes of the investment decision are cost savings rather than benefits per se. Additional information on life-cycle cost analysis is found in Fuller and Petersen. 5 Marginal costs Table Category Fire reduction costs Fire losses Sum of fire reduction costs and fire losses Marginal benefits Marginal costs Marginal benefits minus marginal costs Marginal benefit-cost ratio Use of Benefit-Cost Analyses in Strategy Selection A Data in the first two rows may then be used to determine the marginal costs or marginal benefits from the replacement of one strategy by another. Thus, strategy B has a fire loss of $70 compared to $0 for strategy A, so the marginal benefit is $30. Similarly, the marginal benefit from strategy C is the reduction in fire losses from B to C or $. The associated marginal cost of strategy C is $15. Declining marginal benefits and rising marginal costs result in the selection of strategy C as the optimum strategy. At this point, the difference between marginal benefits and marginal costs is still positive. Marginal benefit-cost ratios are given in the last row. It is worth noting that, while the highest marginal benefitcost ratio is reached at activity level B (as is the highest marginal benefit-cost difference), project C is still optimum, since it yields an additional net benefit of $5. This finding is reinforced by examining changes in the sum of fire losses and fire reduction costs (i.e., life-cycle costs). Total cost plus loss first declines, reaching a minimum at point C, and then increases. This pattern is not surprising, since as long as marginal benefits exceed marginal costs, total losses should decrease. Thus, the two criteria equating marginal costs and benefits, and minimizing the sum of fire losses and fire reduction costs yield identical outcomes. B Strategy C D E $ Marginal benefits Treatment of Uncertainty A final issue concerns the treatment of uncertainty. One method for explicitly introducing risk considerations is to treat benefits and costs as random variables which may be described by probability distributions. For example, an estimate of fire losses might consider the following events: no fire, minor fire, intermediate fire, and major fire. Each event has a probability of occurrence and an associated damage loss. The total expected loss (EL) is given by 0 0% Degree of fire safety Figure Project selection. EL C }3 ic0 where p 0 C probability of no fire p 1 C probability of a minor fire p i D i

9 Engineering Economics 5 1 p 2 C probability of an intermediate fire p 3 C probability of a major fire D n C associated damage loss, n C 0,1,2,3 Expected losses may be computed for different fire protection strategies. Thus, a fire protection strategy that costs C 3 and reduces damage losses of a major fire from D 3 to D 3 will result in an expected loss EL C p 0 D 0 = p 1 D 1 = p 2 D 2 = p 3 D 3 = C3 Similarly, a fire control strategy that costs C 2 and reduces the probability of an intermediate fire from p 2 to p 2 has an expected loss EL C p 0 D 0 = p 1 D 1 = p 2 D 2 = p 3 D 3 = C 2 A comparison of expected losses from alternative strategies may then be used to determine the optimal strategy. Use of expected value has a limitation in that only the average value of the probability distribution is considered. Discussion of other procedures for evaluating uncertain outcomes is given by Anderson and Settle. 6 References Cited 1. ASTM E833, Definitions of Terms Relating to Building Economics, American Society for Testing and Materials, West Conshohocken, PA (1999). 2. ASTM Standards on Building Economics, 4th ed., American Society for Testing and Materials, West Conshohocken, PA (1999). 3. G. Ramachandran, The Economics of Fire Protection, E & FN Spon, London (1998). 4. American National Standards Institute Standard Z , Industrial Engineering Terminology, Chapter 5, Engineering Economy, Industrial Engineering and Management Press, Atlanta, GA (1983). 5. S.K. Fuller and S.R. Petersen, Life-Cycle Costing Manual for the Federal Energy Management Program, NIST Handbook 135, National Institute of Standards and Technology, Gaithersburg, MD (1996). 6. L.G. Anderson and R.E. Settle, Benefit-Cost Analysis: A Practical Guide, Lexington Books, Lexington, MA (1977). Additional Readings R.E. Chapman, A Cost-Conscious Guide to Fire Safety in Health Care Facilities, NBSIR , National Bureau of Standards, Washington, DC (1982). R.E. Chapman and W.G. Hall, Code Compliance at Lower Costs: A Mathematical Programming Approach, Fire Technology, 18, 1, pp (1982). L.P. Clark, A Life-Cycle Cost Analysis Methodology for Fire Protection Systems in New Health Care Facilities, NBSIR , National Bureau of Standards, Washington, DC (1982). W.J. Fabrycky, G.J. Thuesen, and D. Verma, Economic Decision Analysis, 3rd ed., Prentice Hall International, London (1998). E.L. Grant, W.G. Ireson, and R.S. Leavenworth, Principles of Engineering Economy, 8th ed., John Wiley and Sons, New York (1990). J.S. McConnaughey, An Economic Analysis of Building Code Impacts: A Suggested Approach, NBSIR , National Bureau of Standards, Washington, DC (1978). D.G. Newnan and J.P. Lavelle, Engineering Economic Analysis, 7th ed., Engineering Press, Austin, TX (1998). C.S. Park, Contemporary Engineering Economics, 2nd ed., Addison- Wesley, Menlo Park, CA (1997). J.L. Riggs, D.D. Bedworth, and S.U. Randhawa, Engineering Economics, 4th ed., McGraw-Hill, New York (1996). R.T. Ruegg and H.E. Marshall, Building Economics: Theory and Practice, Van Nostrand Reinhold, New York (1990). R.T. Ruegg and S.K. Fuller, A Benefit-Cost Model of Residential Fire Sprinkler Systems, NBS Technical Note 13, National Bureau of Standards, Washington, DC (1984). W.G. Sullivan, J.A. Bontadelli, and E.M. Wicks, Engineering Economy, 11th ed., Prentice Hall, Upper Saddle River, NJ (00). Appendix A: Symbols and Definitions of Economic Parameters Symbol A j A A F G M N P S f g i r Definition of Parameter Cash flow at end of period j End-of-period cash flows (or equivalent end-of-period values) in a uniform series continuing for a specified number of periods Amount of money (or equivalent value) flowing continuously and uniformly during each period, continuing for a specified number of periods Future sum of money the letter F implies future (or equivalent future value) Uniform period-by-period increase or decrease in cash flows (or equivalent values); the arithmetic gradient Number of compounding periods per interest period a Number of compounding periods Present sum of money the letter P implies present (or equivalent present value). Sometimes used to indicate initial capital investment. Salvage (residual) value of capital investment Rate of price level increase or decrease per period; an inflation of escalation rate Uniform rate of cash flow increase or decrease from period to period; the geometric gradient Effective interest rate per interest period a (discount rate), expressed as a percent or decimal fraction Nominal interest rate per interest period, a expressed as a percent or decimal fraction a Normally, but not always, the interest period is taken as 1 yr. Subperiods, then, would be quarters, months, weeks, and so forth.

10 5 2 Fire Risk Analysis Appendix B: Functional Forms of Compound Interest Factors a Name of Factor Algebraic Formulation Functional Format Group A. All cash flows discrete: end-of-period compounding Compound amount (single payment) Present worth (single payment) Sinking fund Capital recovery Compound amount (uniform series) Present worth (uniform series) Arithmetic gradient to uniform series Arithmetic gradient to present worth Group B. All cash flows discrete: continuous compounding at nominal rate r per period Continuous compounding compound amount (single payment) Continuous compounding present worth (single payment) Continuous compounding present worth (single payment) Continuous compounding sinking fund Continuous compounding capital recovery Continuous compounding compound amount (uniform series) Group C. Continuous, uniform cash flows: continuous compounding Continuous compounding sinking fund (continuous, uniform payments) Continuous compounding capital recovery (continuous, uniform payments) Continuous compounding compound amount (continuous, uniform payments) Continuous compounding present worth (continuous, uniform payments) a See Appendix A for definitions of symbols used in this table. (1 = i) N (1 = i) N i (1 = i) N 1 i(1 = i) N (1 = i) N 1 (1 = i) N 1 i (1 = i) N 1 i(1 = i) N (1 = i) N in 1 i(1 = i) N i (1 = i) N in 1 i 2 (1 = i) N e rn e rn e rn (e r 1) e r 1 e rn (e r 1) e r 1 r re rn r re rn (F/P, i, N) (P/F, i, N) (A/F, i, N) (A/P, i, N) (F/A, i, N) (P/A, i, N) (A/G, i, N) (P/G, i, N) (F/P, r, N) (P/F, r, N) (P/A, r, N) (A/F, r, N) (A/P, r, N) (F/A, r, N) A /F, r, N A /P, r,n F/A, r, N) P/A, r, N)

11 Appendix C Interest Tables Engineering Economics 5 3 Yr % % % % % % % % % % % % Table C-7.1 Present Worth Factor (Changes F to P) 1 (1 = i) y

12 5 4 Fire Risk Analysis Yr % % % % % % % % % % % % Table C-7.2 Capital Recovery Factor (Changes P to A) i(1 = i) y (1 = i) y 1

FE Review Economics and Cash Flow

FE Review Economics and Cash Flow 4/4/16 Compound Interest Variables FE Review Economics and Cash Flow Andrew Pederson P = present single sum of money (single cash flow). F = future single sum of money (single cash flow). A = uniform series

More information

Department of Humanities. Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus

Department of Humanities. Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus Department of Humanities Sub: Engineering Economics and Costing (BHU1302) (4-0-0) Syllabus Module I (10 Hours) Time value of money : Simple and compound interest, Time value equivalence, Compound interest

More information

Engineering Economy Chapter 4 More Interest Formulas

Engineering Economy Chapter 4 More Interest Formulas Engineering Economy Chapter 4 More Interest Formulas 1. Uniform Series Factors Used to Move Money Find F, Given A (i.e., F/A) Find A, Given F (i.e., A/F) Find P, Given A (i.e., P/A) Find A, Given P (i.e.,

More information

2/22/2017. Engineering Economics Knowledge. Engineering Economics FE REVIEW COURSE SPRING /22/2017

2/22/2017. Engineering Economics Knowledge. Engineering Economics FE REVIEW COURSE SPRING /22/2017 FE REVIEW COURSE SPRING 2017 Engineering Economics Paige Harris 2/22/2017 Engineering Economics Knowledge 4 6 problems Discounted cash flow Equivalence, PW, equivalent annual worth, FW, rate of return

More information

LESSON 2 INTEREST FORMULAS AND THEIR APPLICATIONS. Overview of Interest Formulas and Their Applications. Symbols Used in Engineering Economy

LESSON 2 INTEREST FORMULAS AND THEIR APPLICATIONS. Overview of Interest Formulas and Their Applications. Symbols Used in Engineering Economy Lesson Two: Interest Formulas and Their Applications from Understanding Engineering Economy: A Practical Approach LESSON 2 INTEREST FORMULAS AND THEIR APPLICATIONS Overview of Interest Formulas and Their

More information

Time Value of Money and Economic Equivalence

Time Value of Money and Economic Equivalence Time Value of Money and Economic Equivalence Lecture No.4 Chapter 3 Third Canadian Edition Copyright 2012 Chapter Opening Story Take a Lump Sum or Annual Installments q q q Millionaire Life is a lottery

More information

TIME VALUE OF MONEY. Lecture Notes Week 4. Dr Wan Ahmad Wan Omar

TIME VALUE OF MONEY. Lecture Notes Week 4. Dr Wan Ahmad Wan Omar TIME VALUE OF MONEY Lecture Notes Week 4 Dr Wan Ahmad Wan Omar Lecture Notes Week 4 4. The Time Value of Money The notion on time value of money is based on the idea that money available at the present

More information

Cha h pt p er 2 Fac a t c o t rs r : s : H o H w w T i T me e a n a d I nte t r e e r s e t s A f f e f c e t c t M oney

Cha h pt p er 2 Fac a t c o t rs r : s : H o H w w T i T me e a n a d I nte t r e e r s e t s A f f e f c e t c t M oney Chapter 2 Factors: How Time and Interest Affect Money 2-1 LEARNING OBJECTIVES 1. F/P and P/F factors 2. P/A and A/P factors 3. Interpolate for factor values 4. P/G and A/G factors 5. Geometric gradient

More information

Introduction to Engineering Economic Analysis DR. AHMED ELYAMANY

Introduction to Engineering Economic Analysis DR. AHMED ELYAMANY Introduction to Engineering Economic Analysis DR. AHMED ELYAMANY Topics ointroduction to engineering economic analysis otime value of money othe principle of interest, osimple interest rates ocompounding

More information

IE463 Chapter 2. Objective. Time Value of Money (Money- Time Relationships)

IE463 Chapter 2. Objective. Time Value of Money (Money- Time Relationships) IE463 Chapter 2 Time Value of Money (Money- Time Relationships) Objective Given a cash flow (or series of cash flows) occurring at some point in time, the objective is to find its equivalent value at another

More information

CE 231 ENGINEERING ECONOMY PROBLEM SET 1

CE 231 ENGINEERING ECONOMY PROBLEM SET 1 CE 231 ENGINEERING ECONOMY PROBLEM SET 1 PROBLEM 1 The following two cash-flow operations are said to be present equivalent at 10 % interest rate compounded annually. Find X that satisfies the equivalence.

More information

3: Balance Equations

3: Balance Equations 3.1 Balance Equations Accounts with Constant Interest Rates 15 3: Balance Equations Investments typically consist of giving up something today in the hope of greater benefits in the future, resulting in

More information

22.812J Nuclear Energy Economics and Policy Analysis S 04. Classnote: The Time Value of Money

22.812J Nuclear Energy Economics and Policy Analysis S 04. Classnote: The Time Value of Money 22.812J uclear Energy Economics and Policy Analysis S 04 Classnote: The Time Value of Money 1. Motivating Example To motivate the discussion, we consider a homeowner faced with a decision whether to install

More information

CHAPTER 2. Financial Mathematics

CHAPTER 2. Financial Mathematics CHAPTER 2 Financial Mathematics LEARNING OBJECTIVES By the end of this chapter, you should be able to explain the concept of simple interest; use the simple interest formula to calculate interest, interest

More information

PLANT DESIGN AND ECONOMICS

PLANT DESIGN AND ECONOMICS (7) PLANT DESIGN AND ECONOMICS Zahra Maghsoud ٢ INTEREST AND INVESTMENT COSTS (Ch. 7 Peters and Timmerhaus ) Engineers define interest as the compensation paid for the use of borrowed capital. This definition

More information

Many decisions in operations management involve large

Many decisions in operations management involve large SUPPLEMENT Financial Analysis J LEARNING GOALS After reading this supplement, you should be able to: 1. Explain the time value of money concept. 2. Demonstrate the use of the net present value, internal

More information

Nominal and Effective Interest Rates

Nominal and Effective Interest Rates Nominal and Effective Interest Rates 4.1 Introduction In all engineering economy relations developed thus far, the interest rate has been a constant, annual value. For a substantial percentage of the projects

More information

My Notes CONNECT TO HISTORY

My Notes CONNECT TO HISTORY SUGGESTED LEARNING STRATEGIES: Shared Reading, Summarize/Paraphrase/Retell, Create Representations, Look for a Pattern, Quickwrite, Note Taking Suppose your neighbor, Margaret Anderson, has just won the

More information

The Time Value. The importance of money flows from it being a link between the present and the future. John Maynard Keynes

The Time Value. The importance of money flows from it being a link between the present and the future. John Maynard Keynes The Time Value of Money The importance of money flows from it being a link between the present and the future. John Maynard Keynes Get a Free $,000 Bond with Every Car Bought This Week! There is a car

More information

CHAPTER 7: ENGINEERING ECONOMICS

CHAPTER 7: ENGINEERING ECONOMICS CHAPTER 7: ENGINEERING ECONOMICS The aim is to think about and understand the power of money on decision making BREAKEVEN ANALYSIS Breakeven point method deals with the effect of alternative rates of operation

More information

Definition 2. When interest gains in direct proportion to the time in years of the investment

Definition 2. When interest gains in direct proportion to the time in years of the investment Ryan Thompson Texas A&M University Math 482 Instructor: Dr. David Larson May 8, 2013 Final Paper: An Introduction to Interest Theory I. Introduction At some point in your life, you will most likely be

More information

4: Single Cash Flows and Equivalence

4: Single Cash Flows and Equivalence 4.1 Single Cash Flows and Equivalence Basic Concepts 28 4: Single Cash Flows and Equivalence This chapter explains basic concepts of project economics by examining single cash flows. This means that each

More information

Principles of Energy Conversion Part 4. Introduction to Energy Economics

Principles of Energy Conversion Part 4. Introduction to Energy Economics Principles of Energy Conversion Part 4. Introduction to Energy Economics January 23, 2018 7 Energy Economics 3 7.1 Energy Costs...................................... 3 7.2 Time Value of Money.................................

More information

ME 353 ENGINEERING ECONOMICS Sample Second Midterm Exam

ME 353 ENGINEERING ECONOMICS Sample Second Midterm Exam ME 353 ENGINEERING ECONOMICS Sample Second Midterm Exam Scoring gives priority to the correct formulation. Numerical answers without the correct formulas for justification receive no credit. Decisions

More information

Time value of money-concepts and Calculations Prof. Bikash Mohanty Department of Chemical Engineering Indian Institute of Technology, Roorkee

Time value of money-concepts and Calculations Prof. Bikash Mohanty Department of Chemical Engineering Indian Institute of Technology, Roorkee Time value of money-concepts and Calculations Prof. Bikash Mohanty Department of Chemical Engineering Indian Institute of Technology, Roorkee Lecture - 13 Multiple Cash Flow-1 and 2 Welcome to the lecture

More information

School of Engineering University of Guelph. ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008

School of Engineering University of Guelph. ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008 School of Engineering University of Guelph ENGG*3240 Engineering Economics Course Description & Outline - Fall 2008 CALENDAR DESCRIPTION Principle of project evaluation, analysis of capital and operating

More information

A Brief Guide to Engineering Management Financial Calculations in ENGM 401 Section B1 Winter 2009

A Brief Guide to Engineering Management Financial Calculations in ENGM 401 Section B1 Winter 2009 A Brief Guide to Engineering Management Financial Calculations in ENGM 401 Section B1 Winter 2009 MG Lipsett 2008 last updated December 8, 2008 Introduction This document provides concise explanations

More information

Chapter 21: Savings Models Lesson Plan

Chapter 21: Savings Models Lesson Plan Lesson Plan For All Practical Purposes Arithmetic Growth and Simple Interest Geometric Growth and Compound Interest Mathematical Literacy in Today s World, 8th ed. A Limit to Compounding A Model for Saving

More information

Cash Flow and the Time Value of Money

Cash Flow and the Time Value of Money Harvard Business School 9-177-012 Rev. October 1, 1976 Cash Flow and the Time Value of Money A promising new product is nationally introduced based on its future sales and subsequent profits. A piece of

More information

CE 561 Lecture Notes. Engineering Economic Analysis. Set 2. Time value of money. Cash Flow Diagram. Interest. Inflation Opportunity cost

CE 561 Lecture Notes. Engineering Economic Analysis. Set 2. Time value of money. Cash Flow Diagram. Interest. Inflation Opportunity cost CE 56 Lecture otes Set 2 Engineering Economic Analysis Time value of money Inflation Opportunity cost Cash Flow Diagram P A A PInvestment AYearly Return 0 o. of Years Interest Profit Motive MARR Public

More information

THREE. Interest Rate and Economic Equivalence CHAPTER

THREE. Interest Rate and Economic Equivalence CHAPTER CHAPTER THREE Interest Rate and Economic Equivalence No Lump Sum for Lottery-Winner Grandma, 94 1 A judge denied a 94-year-old woman s attempt to force the Massachusetts Lottery Commission to pay her entire

More information

Introduction to the Hewlett-Packard (HP) 10B Calculator and Review of Mortgage Finance Calculations

Introduction to the Hewlett-Packard (HP) 10B Calculator and Review of Mortgage Finance Calculations Introduction to the Hewlett-Packard (HP) 0B Calculator and Review of Mortgage Finance Calculations Real Estate Division Faculty of Commerce and Business Administration University of British Columbia Introduction

More information

IE 343 Midterm Exam 1

IE 343 Midterm Exam 1 IE 343 Midterm Exam 1 Feb 17, 2012 Version A Closed book, closed notes. Write your printed name in the spaces provided above on every page. Show all of your work in the spaces provided. Interest rate tables

More information

CAPITAL BUDGETING AND THE INVESTMENT DECISION

CAPITAL BUDGETING AND THE INVESTMENT DECISION C H A P T E R 1 2 CAPITAL BUDGETING AND THE INVESTMENT DECISION I N T R O D U C T I O N This chapter begins by discussing some of the problems associated with capital asset decisions, such as the long

More information

Survey of Math: Chapter 21: Consumer Finance Savings (Lecture 1) Page 1

Survey of Math: Chapter 21: Consumer Finance Savings (Lecture 1) Page 1 Survey of Math: Chapter 21: Consumer Finance Savings (Lecture 1) Page 1 The mathematical concepts we use to describe finance are also used to describe how populations of organisms vary over time, how disease

More information

The Theory of Interest

The Theory of Interest Chapter 1 The Theory of Interest One of the first types of investments that people learn about is some variation on the savings account. In exchange for the temporary use of an investor's money, a bank

More information

CHAPTER 4 SIMPLE AND COMPOUND INTEREST INCLUDING ANNUITY APPLICATIONS. Copyright -The Institute of Chartered Accountants of India

CHAPTER 4 SIMPLE AND COMPOUND INTEREST INCLUDING ANNUITY APPLICATIONS. Copyright -The Institute of Chartered Accountants of India CHAPTER 4 SIMPLE AND COMPOUND INTEREST INCLUDING ANNUITY APPLICATIONS SIMPLE AND COMPOUND INTEREST INCLUDING ANNUITY- APPLICATIONS LEARNING OBJECTIVES After studying this chapter students will be able

More information

Chapter 2. Time Value of Money (TVOM) Principles of Engineering Economic Analysis, 5th edition

Chapter 2. Time Value of Money (TVOM) Principles of Engineering Economic Analysis, 5th edition Chapter 2 Time Value of Money (TVOM) Cash Flow Diagrams $5,000 $5,000 $5,000 ( + ) 0 1 2 3 4 5 ( - ) Time $2,000 $3,000 $4,000 Example 2.1: Cash Flow Profiles for Two Investment Alternatives (EOY) CF(A)

More information

SIMULATION CHAPTER 15. Basic Concepts

SIMULATION CHAPTER 15. Basic Concepts CHAPTER 15 SIMULATION Basic Concepts Monte Carlo Simulation The Monte Carlo method employs random numbers and is used to solve problems that depend upon probability, where physical experimentation is impracticable

More information

Chapter 7 Rate of Return Analysis

Chapter 7 Rate of Return Analysis Chapter 7 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion Incremental Analysis Mutually Exclusive Alternatives Why ROR measure is so popular? This

More information

Global Financial Management

Global Financial Management Global Financial Management Valuation of Cash Flows Investment Decisions and Capital Budgeting Copyright 2004. All Worldwide Rights Reserved. See Credits for permissions. Latest Revision: August 23, 2004

More information

Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates

Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates Eighth Edition ENGINEERING ECONOMY Leland Blank, P. E. Texas A & M University American University of Sharjah, United Arab Emirates Anthony Tarquin, P. E. University of Texas at El Paso Mc Graw Hill Education

More information

ENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36. Introduction

ENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36. Introduction ENGM 310 Engineering Economy Lecture Notes (MJ Zuo) Page 1 of 36 Introduction 1. Syllabus distributed: Dates of assignments, mid-terms, and final exams specified. (a) Let me know in writing about possible

More information

Survey of Math Chapter 21: Savings Models Handout Page 1

Survey of Math Chapter 21: Savings Models Handout Page 1 Chapter 21: Savings Models Handout Page 1 Growth of Savings: Simple Interest Simple interest pays interest only on the principal, not on any interest which has accumulated. Simple interest is rarely used

More information

Chapter 9, Mathematics of Finance from Applied Finite Mathematics by Rupinder Sekhon was developed by OpenStax College, licensed by Rice University,

Chapter 9, Mathematics of Finance from Applied Finite Mathematics by Rupinder Sekhon was developed by OpenStax College, licensed by Rice University, Chapter 9, Mathematics of Finance from Applied Finite Mathematics by Rupinder Sekhon was developed by OpenStax College, licensed by Rice University, and is available on the Connexions website. It is used

More information

Chapter One. Definition and Basic terms and terminology of engineering economy

Chapter One. Definition and Basic terms and terminology of engineering economy Chapter One Definition and Basic terms and terminology of engineering economy 1. Introduction: The need for engineering economy is primarily motivated by the work that engineers do in performing analysis,

More information

Financial Management Masters of Business Administration Study Notes & Tutorial Questions Chapter 3: Investment Decisions

Financial Management Masters of Business Administration Study Notes & Tutorial Questions Chapter 3: Investment Decisions Financial Management Masters of Business Administration Study Notes & Tutorial Questions Chapter 3: Investment Decisions 1 INTRODUCTION The word Capital refers to be the total investment of a company of

More information

Year 10 General Maths Unit 2

Year 10 General Maths Unit 2 Year 10 General Mathematics Unit 2 - Financial Arithmetic II Topic 2 Linear Growth and Decay In this area of study students cover mental, by- hand and technology assisted computation with rational numbers,

More information

A Brief Guide to Engineering Management Financial Calculations in ENGM 401 & ENGM 620 Section X1 Fall 2010

A Brief Guide to Engineering Management Financial Calculations in ENGM 401 & ENGM 620 Section X1 Fall 2010 A Brief Guide to Engineering Management Financial Calculations in ENGM 401 & ENGM 620 Section X1 Fall 2010 MG Lipsett last updated October 21, 2010 Introduction This document provides concise explanations

More information

Interest Compounded Annually. Table 3.27 Interest Computed Annually

Interest Compounded Annually. Table 3.27 Interest Computed Annually 33 CHAPTER 3 Exponential, Logistic, and Logarithmic Functions 3.6 Mathematics of Finance What you ll learn about Interest Compounded Annually Interest Compounded k Times per Year Interest Compounded Continuously

More information

Multiple Compounding Periods in a Year. Principles of Engineering Economic Analysis, 5th edition

Multiple Compounding Periods in a Year. Principles of Engineering Economic Analysis, 5th edition Multiple Compounding Periods in a Year Example 2.36 Rebecca Carlson purchased a car for $25,000 by borrowing the money at 8% per year compounded monthly. She paid off the loan with 60 equal monthly payments,

More information

Capital Budgeting Decisions

Capital Budgeting Decisions Capital Budgeting Decisions Chapter 13 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright 2012

More information

Chapter 6 Capital Budgeting

Chapter 6 Capital Budgeting Chapter 6 Capital Budgeting The objectives of this chapter are to enable you to: Understand different methods for analyzing budgeting of corporate cash flows Determine relevant cash flows for a project

More information

ENGINEERING ECONOMIC. Bhesh R Kanel, Coordinator. College of Biomedical engineering And Applied sciences June, 2015

ENGINEERING ECONOMIC. Bhesh R Kanel, Coordinator. College of Biomedical engineering And Applied sciences June, 2015 ENGINEERING ECONOMIC Bhesh R Kanel, Coordinator College of Biomedical engineering And Applied sciences June, 2015 COURSE CONTENT 1. Introduction: (3 hours) 1. Essential business and accounting terminology.

More information

COPYRIGHTED MATERIAL. Time Value of Money Toolbox CHAPTER 1 INTRODUCTION CASH FLOWS

COPYRIGHTED MATERIAL. Time Value of Money Toolbox CHAPTER 1 INTRODUCTION CASH FLOWS E1C01 12/08/2009 Page 1 CHAPTER 1 Time Value of Money Toolbox INTRODUCTION One of the most important tools used in corporate finance is present value mathematics. These techniques are used to evaluate

More information

Mathematics of Finance

Mathematics of Finance CHAPTER 55 Mathematics of Finance PAMELA P. DRAKE, PhD, CFA J. Gray Ferguson Professor of Finance and Department Head of Finance and Business Law, James Madison University FRANK J. FABOZZI, PhD, CFA, CPA

More information

Copyright 2015 by the UBC Real Estate Division

Copyright 2015 by the UBC Real Estate Division DISCLAIMER: This publication is intended for EDUCATIONAL purposes only. The information contained herein is subject to change with no notice, and while a great deal of care has been taken to provide accurate

More information

The Theory of Interest

The Theory of Interest Chapter 1 The Theory of Interest One of the first types of investments that people learn about is some variation on the savings account. In exchange for the temporary use of an investor s money, a bank

More information

Mathematics for Economists

Mathematics for Economists Department of Economics Mathematics for Economists Chapter 4 Mathematics of Finance Econ 506 Dr. Mohammad Zainal 4 Mathematics of Finance Compound Interest Annuities Amortization and Sinking Funds Arithmetic

More information

Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar

Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar Professor of International Finance Capital Budgeting Agenda Define the capital budgeting process, explain the administrative

More information

Financial Management Bachelors of Business Administration Study Notes & Tutorial Questions Chapter 1: Investment & Project Appraisal

Financial Management Bachelors of Business Administration Study Notes & Tutorial Questions Chapter 1: Investment & Project Appraisal Financial Management Bachelors of Business Administration Study Notes & Tutorial Questions Chapter 1: Investment & Project Appraisal Ibrahim Sameer AVID College Page 1 INTRODUCTION Capital budgeting is

More information

Chapter 6: Supply and Demand with Income in the Form of Endowments

Chapter 6: Supply and Demand with Income in the Form of Endowments Chapter 6: Supply and Demand with Income in the Form of Endowments 6.1: Introduction This chapter and the next contain almost identical analyses concerning the supply and demand implied by different kinds

More information

Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS 10-1 a. Capital budgeting is the whole process of analyzing projects and deciding whether

More information

The three formulas we use most commonly involving compounding interest n times a year are

The three formulas we use most commonly involving compounding interest n times a year are Section 6.6 and 6.7 with finance review questions are included in this document for your convenience for studying for quizzes and exams for Finance Calculations for Math 11. Section 6.6 focuses on identifying

More information

Economic Perspectives on the Advance Market Commitment for Pneumococcal Vaccines

Economic Perspectives on the Advance Market Commitment for Pneumococcal Vaccines Web Appendix to Accompany Economic Perspectives on the Advance Market Commitment for Pneumococcal Vaccines Health Affairs, August 2011. Christopher M. Snyder Dartmouth College Department of Economics and

More information

IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES

IE463 Chapter 4. Objective: COMPARING INVESTMENT AND COST ALTERNATIVES IE463 Chapter 4 COMPARING INVESTMENT AND COST ALTERNATIVES Objective: To learn how to properly apply the profitability measures described in Chapter 3 to select the best alternative out of a set of mutually

More information

The application of linear programming to management accounting

The application of linear programming to management accounting The application of linear programming to management accounting After studying this chapter, you should be able to: formulate the linear programming model and calculate marginal rates of substitution and

More information

(Refer Slide Time: 00:55)

(Refer Slide Time: 00:55) Engineering Economic Analysis Professor Dr. Pradeep K Jha Department of Mechanical and Industrial Engineering Indian Institute of Technology Roorkee Lecture 11 Economic Equivalence: Meaning and Principles

More information

3.1 Simple Interest. Definition: I = Prt I = interest earned P = principal ( amount invested) r = interest rate (as a decimal) t = time

3.1 Simple Interest. Definition: I = Prt I = interest earned P = principal ( amount invested) r = interest rate (as a decimal) t = time 3.1 Simple Interest Definition: I = Prt I = interest earned P = principal ( amount invested) r = interest rate (as a decimal) t = time An example: Find the interest on a boat loan of $5,000 at 16% for

More information

A COMPARISON BETWEEN AE AND NPV IN THE REPLACEMENT PROBLEM

A COMPARISON BETWEEN AE AND NPV IN THE REPLACEMENT PROBLEM A COMPARISON BETWEEN AE AND NPV IN THE REPLACEMENT PROBLEM Igor Gimenes Cesca (IBMEC-SP, IEE/USP) igcesca@gmail.com Abstract: When maintenance cost rise and market value of physical assets decreases, it

More information

Chapter 7 Rate of Return Analysis

Chapter 7 Rate of Return Analysis Chapter 7 Rate of Return Analysis 1 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At the end of 5 years, the principal and interest payments

More information

You will also see that the same calculations can enable you to calculate mortgage payments.

You will also see that the same calculations can enable you to calculate mortgage payments. Financial maths 31 Financial maths 1. Introduction 1.1. Chapter overview What would you rather have, 1 today or 1 next week? Intuitively the answer is 1 today. Even without knowing it you are applying

More information

Global Financial Management

Global Financial Management Global Financial Management Bond Valuation Copyright 24. All Worldwide Rights Reserved. See Credits for permissions. Latest Revision: August 23, 24. Bonds Bonds are securities that establish a creditor

More information

ENGINEERING ECONOMY. William G. Sullivan. Fourteenth Edition. Prentice Hall. Virginia Polytechnic institute and State University

ENGINEERING ECONOMY. William G. Sullivan. Fourteenth Edition. Prentice Hall. Virginia Polytechnic institute and State University ENGINEERING ECONOMY Fourteenth Edition William G. Sullivan Virginia Polytechnic Institute and State University, Emeritus Elin M. Wicks Wicks and Associates C. Patrick Koelling Virginia Polytechnic institute

More information

8: Economic Criteria

8: Economic Criteria 8.1 Economic Criteria Capital Budgeting 1 8: Economic Criteria The preceding chapters show how to discount and compound a variety of different types of cash flows. This chapter explains the use of those

More information

UNIT 16 BREAK EVEN ANALYSIS

UNIT 16 BREAK EVEN ANALYSIS UNIT 16 BREAK EVEN ANALYSIS Structure 16.0 Objectives 16.1 Introduction 16.2 Break Even Analysis 16.3 Break Even Point 16.4 Impact of Changes in Sales Price, Volume, Variable Costs and on Profits 16.5

More information

Chapter 4. Determination of Income and Employment 4.1 AGGREGATE DEMAND AND ITS COMPONENTS

Chapter 4. Determination of Income and Employment 4.1 AGGREGATE DEMAND AND ITS COMPONENTS Determination of Income and Employment Chapter 4 We have so far talked about the national income, price level, rate of interest etc. in an ad hoc manner without investigating the forces that govern their

More information

A probability distribution shows the possible outcomes of an experiment and the probability of each of these outcomes.

A probability distribution shows the possible outcomes of an experiment and the probability of each of these outcomes. Introduction In the previous chapter we discussed the basic concepts of probability and described how the rules of addition and multiplication were used to compute probabilities. In this chapter we expand

More information

Properties of IRR Equation with Regard to Ambiguity of Calculating of Rate of Return and a Maximum Number of Solutions

Properties of IRR Equation with Regard to Ambiguity of Calculating of Rate of Return and a Maximum Number of Solutions Properties of IRR Equation with Regard to Ambiguity of Calculating of Rate of Return and a Maximum Number of Solutions IRR equation is widely used in financial mathematics for different purposes, such

More information

Other Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period

Other Analysis Techniques. Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period Other Analysis Techniques Future Worth Analysis (FWA) Benefit-Cost Ratio Analysis (BCRA) Payback Period 1 Techniques for Cash Flow Analysis Present Worth Analysis Annual Cash Flow Analysis Rate of Return

More information

CHAPTER 2 How to Calculate Present Values

CHAPTER 2 How to Calculate Present Values CHAPTER How to Calculate Present Values Answers to Problem Sets. If the discount factor is.507, then.507 x. 6 = $. Est time: 0-05. DF x 39 = 5. Therefore, DF =5/39 =.899. Est time: 0-05 3. PV = 374/(.09)

More information

UNDERSTANDING RISK TOLERANCE CRITERIA. Paul Baybutt. Primatech Inc., Columbus, Ohio, USA.

UNDERSTANDING RISK TOLERANCE CRITERIA. Paul Baybutt. Primatech Inc., Columbus, Ohio, USA. UNDERSTANDING RISK TOLERANCE CRITERIA by Paul Baybutt Primatech Inc., Columbus, Ohio, USA www.primatech.com Introduction Various definitions of risk are used by risk analysts [1]. In process safety, risk

More information

Coming full circle. by ali zuashkiani and andrew k.s. jardine

Coming full circle. by ali zuashkiani and andrew k.s. jardine Coming full circle by ali zuashkiani and andrew k.s. jardine Life cycle costing is becoming more popular as many organizations understand its role in making long-term optimal decisions. Buying the cheapest

More information

2 BASIC FINANCIAL STATEMENTS

2 BASIC FINANCIAL STATEMENTS Chapter 02 Basic Financial Statements 2 BASIC FINANCIAL STATEMENTS Chapter Summary Financial statements are the primary means of communicating financial information to users. Chapter 2 covers the income

More information

Comparing Mutually Exclusive Alternatives

Comparing Mutually Exclusive Alternatives Comparing Mutually Exclusive Alternatives Comparing Mutually Exclusive Projects Mutually Exclusive Projects Alternative vs. Project Do-Nothing Alternative 2 Some Definitions Revenue Projects Projects whose

More information

Web Extension: The ARR Method, the EAA Approach, and the Marginal WACC

Web Extension: The ARR Method, the EAA Approach, and the Marginal WACC 19878_12W_p001-010.qxd 3/13/06 3:03 PM Page 1 C H A P T E R 12 Web Extension: The ARR Method, the EAA Approach, and the Marginal WACC This extension describes the accounting rate of return as a method

More information

A Different Approach of Tax Progressivity Measurement

A Different Approach of Tax Progressivity Measurement MPRA Munich Personal RePEc Archive A Different Approach of Tax Progressivity Measurement Florije Govori Faculty of Economics, University of Prizren, Shkronjat 1, 20000 Prizren, Republic of Kosova January

More information

A Refresher on Engineering Economics

A Refresher on Engineering Economics A Refresher on Engineering Economics International Society of Parametric Analysts (ISPA) and Society of Cost Estimating and Analysis 2009 Development and Training Workshop St. Louis Missouri Joe Hamaker,

More information

Investment Information and Criterions. Name of student: Admission: Course: Institution: Instructor: Date of Submission:

Investment Information and Criterions. Name of student: Admission: Course: Institution: Instructor: Date of Submission: Investment Information and Criterions Name of student: Admission: Course: Institution: Instructor: Date of Submission: 1 In certain instances, investors are faced with competing investment opportunities,

More information

INVESTMENT APPRAISAL TECHNIQUES FOR SMALL AND MEDIUM SCALE ENTERPRISES

INVESTMENT APPRAISAL TECHNIQUES FOR SMALL AND MEDIUM SCALE ENTERPRISES SAMUEL ADEGBOYEGA UNIVERSITY COLLEGE OF MANAGEMENT AND SOCIAL SCIENCES DEPARTMENT OF BUSINESS ADMINISTRATION COURSE CODE: BUS 413 COURSE TITLE: SMALL AND MEDIUM SCALE ENTERPRISE MANAGEMENT SESSION: 2017/2018,

More information

Appendix A Financial Calculations

Appendix A Financial Calculations Derivatives Demystified: A Step-by-Step Guide to Forwards, Futures, Swaps and Options, Second Edition By Andrew M. Chisholm 010 John Wiley & Sons, Ltd. Appendix A Financial Calculations TIME VALUE OF MONEY

More information

Term Par Swap Rate Term Par Swap Rate 2Y 2.70% 15Y 4.80% 5Y 3.60% 20Y 4.80% 10Y 4.60% 25Y 4.75%

Term Par Swap Rate Term Par Swap Rate 2Y 2.70% 15Y 4.80% 5Y 3.60% 20Y 4.80% 10Y 4.60% 25Y 4.75% Revisiting The Art and Science of Curve Building FINCAD has added curve building features (enhanced linear forward rates and quadratic forward rates) in Version 9 that further enable you to fine tune the

More information

Total revenue calculation in a two-team league with equal-proportion gate revenue sharing

Total revenue calculation in a two-team league with equal-proportion gate revenue sharing European Journal of Sport Studies Publish Ahead of Print DOI: 10.12863/ejssax3x1-2015x1 Section A doi: 10.12863/ejssax3x1-2015x1 Total revenue calculation in a two-team league with equal-proportion gate

More information

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project Evaluation and Analysis Project Financial Analysis Project Evaluation and Analysis The important aspects of project analysis are:

More information

BINARY LINEAR PROGRAMMING AND SIMULATION FOR CAPITAL BUDGEETING

BINARY LINEAR PROGRAMMING AND SIMULATION FOR CAPITAL BUDGEETING BINARY LINEAR PROGRAMMING AND SIMULATION FOR CAPITAL BUDGEETING Dennis Togo, Anderson School of Management, University of New Mexico, Albuquerque, NM 87131, 505-277-7106, togo@unm.edu ABSTRACT Binary linear

More information

3: Balance Equations 3.1 Accounts with Constant Interest Rates. Terms. Example. Simple Interest

3: Balance Equations 3.1 Accounts with Constant Interest Rates. Terms. Example. Simple Interest 3: Balance Equations 3.1 Accounts with Constant Interest Rates Example Two different accounts 1% per year: earn 1% each year on dollars at beginning of year 1% per month: earn 1% each month on dollars

More information

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Learning Objectives LO1 How to compute the net present value and why it is the best decision criterion. LO2 The payback rule and some of its shortcomings.

More information

University of Siegen

University of Siegen University of Siegen Faculty of Economic Disciplines, Department of economics Univ. Prof. Dr. Jan Franke-Viebach Seminar Risk and Finance Summer Semester 2008 Topic 4: Hedging with currency futures Name

More information

CHAPTER 4. The Time Value of Money. Chapter Synopsis

CHAPTER 4. The Time Value of Money. Chapter Synopsis CHAPTER 4 The Time Value of Money Chapter Synopsis Many financial problems require the valuation of cash flows occurring at different times. However, money received in the future is worth less than money

More information