SUFFOLK ESTUARY & COAST CONFERENCE

Size: px
Start display at page:

Download "SUFFOLK ESTUARY & COAST CONFERENCE"

Transcription

1 SUFFOLK ESTUARY & COAST CONFERENCE SATURDAY 14 JUNE 2008 BLYTH ESTUARY FLOOD RISK MANAGEMENT STRATEGIC PERSPECTIVE JEREMY SCHOFIELD STRATEGIC DIRECTOR SUFFOLK COASTAL DISTRICT COUNCIL

2

3 LIKELY FUTURE ESTUARY SHAPE

4 OPTIONS CONSIDERED FOR THE BLYTH 1. No active intervention 2. Do minimum 3. Hold the line throughout the Estuary 4. Hold the structures at the mouth, no active interventions elsewhere 5. Hold the line other than at Robinson s Marsh Embankment 6. Make the estuary shallower or narrower close to the Bailey bridge; hold the line elsewhere 7. As 6. but no active interventions at Tinker s Marsh 8. Hold the northern line of defence, no active intervention

5 EA CONCLUSION ON OPTIONS While the preferred technical and environmental option is hold the Northern line of defence with no active intervention elsewhere (Option 8) this does not satisfy the economic criteria for investment nor the priority score to attract funding In this situation a policy No Active Intervention (Option 1) is likely to be preferred policy for the Blyth Estuary A managed withdrawal of maintenance

6 ISSUES OF CONCERN TO THE BLYTH STRATEGY GROUP(1) Significant flaws in the economic appraisal Commissioned expert consultant to review Environmental appraisal does not demonstrate how AONB obligations have been met: to conserve and enhance the natural beauty of the AONB Gained support of AONB Partnership; discussions with Natural England Lack of clarity on replacement habitats for those lost Discussions with Natural England Consequences for the coastline not considered Working to link Shoreline Management Plan and Estuary Strategies

7 ISSUES OF CONCERN TO THE BLYTH STRATEGY GROUP (2) The affordability of a 100 year strategy is based on the current national funding of coast and flood defence Lobby the government Cost transfer to others e.g. for A12 and A1095, cash cost of 5m to Suffolk County Council Lobby the government Failure to link flood risk objectives to other policy objectives Integrated Coastal Zone Management initiative, to join up policies and programmes No allowance for the cumulative impact of subsequent estuary strategies on environmental, social and economic assets ICZM initiative No review process despite uncertainties about the underlying assumptions Lobby the government

8 ROYAL HASKONING REPORT SMP / BLYTH ESTUARY

9 Shoreline Management Plan Sub-Cell 3c SMP2 Process 1. Identify the issues 2. Set objectives associated with these issues 3. Decide on policies which will best deliver these objectives

10 Shoreline Management Plan Sub-Cell 3c Looking ahead over 100 years. Existing Issues Establishing a sustainable approach Time steps of: 100 years (2105) 50 years (2055) Developing a plan 20 years (2025)

11 SMP TIMETABLE - REVIEW Draft policy statements to key Stakeholder Forum September 2008 Draft SMP to be agreed end of November 2008 Public examination of draft SMP to commence January 2009 Finalise SMP in August 2009 Adoption of SMP Policies to follow

12 ISSUES RAISED WITH REGIONAL MINISTER There is more to coast and estuary management than flood risk management. There is more to funding coast and estuary management than the next 3 year national Flood and Coastal Defence budgets. There is more to appraising the benefits and costs of coast and estuary strategies than the current DEFRA guidance allows There is more knowledge to be gained about the scale of impacts of climate change on our coast in years to come caution is needed before irrevocably writing off economic, social and environmental assets

13 POLICY OBJECTIVES FOR COASTS AND ESTUARIES Flood and Coastal Erosion Risk Management Economic growth and sustainability Coastal Access and Recreation Sustainable Communities and Development Conservation of the AONB, biodiversity and other environmental assets Food and Farming Infrastructure Adapting to climate change Community Empowerment

14 POLICIES: OUR PROPOSAL AN INTEGRATED POLICY FRAMEWORK FOR COASTAL AREAS Build on the joining up of policies proposed in the Marine Bill DEFRA /CLG to incorporate the need for ICZM in policy and practice documents including PPSs, AONBs, SMPs, Flood and Coastal Erosion Risk strategies Carry through to delivery the Regional Coastal Initiatives findings Pilot the approach to managing the Suffolk Coast and Estuaries including joining the SMP and Estuary Strategies, and managing / conserving the AONB as a whole

15 RESOURCES FOR COAST AND ESTUARY MANAGEMENT A NEED TO BROADEN THE RESOURCE BASE FOR COASTAL MANAGEMENT: Landowners Local communities Creation of new assets as part of change Funding/investment via the Planning system Co-ordinated use of public sector resources and assets EU and similar funding programmes

16 RESOURCES: OUR PROPOSAL Complement ICZM with integrated investment plans Provide policy choices to communities with associated differing resource requirements Facilitate landowners/stakeholders to manage coastal/estuary assets using their own resources Consider opportunities for private sector investment Periodic review of government funding the coast as a national asset Adaptation funding

17 APPRAISAL GUIDANCE FOR COASTS AND ESTUARIES Inadequate account is taken of: Economic impacts beyond the value of business assets lost Impact of loss of infrastructure beyond the immediate locality Community impacts e.g. reduction in quality of life and facilities Intangible costs e.g. loss of character of an area that determines its quality Cumulative impacts across a coastal zone e.g. on an AONB

18 APPRAISAL: OUR PROPOSAL DEFRA /EA review and revise the flood and coastal defence project appraisal guidance to reflect the full impacts on localities / the nation

19 100 YEARS HENCE! An asset once lost to erosion is lost permanently Today s predictions of sea level rise are different to yesterday s, and probably different to tomorrow s Incorrect process predictions will result in incorrect benefit and cost assessments Avoid precipitate decisions that we may regret

20 TIMING: OUR PROPOSAL Build in periodic and meaningful reviews of policy frameworks such as Flood and Coastal Erosion Risk Management Strategies to take account of increasing knowledge of change ( Incorporate in DEFRA policy / guidance)

21 Cumulative Impact for Flood Risk Areas Blyth Minsmere Alde-Ore Deben Orwell

22 WORKING WITH THE EA AND OTHERS LOCALLY Integrating local policy frameworks Linking proposals / consultations on SMP / Estuaries Options linked with resource implications Practical local solutions Locally generated resources Willingness to devise new solutions to climate change pressures

23

Adapting to coastal change in England: some practical experiences. Nick Hardiman, Senior Coastal Adviser Environment Agency Paris June 2015

Adapting to coastal change in England: some practical experiences. Nick Hardiman, Senior Coastal Adviser Environment Agency Paris June 2015 Adapting to coastal change in England: some practical experiences Nick Hardiman, Senior Coastal Adviser Environment Agency Paris June 2015 Outline Brief overview of coastal flood & erosion risk management

More information

Barry Island and Docks (2)

Barry Island and Docks (2) Barry Island and Docks (2) Draft Recommendations: Long Term Plan It has been assumed that the structures associated with Barry Docks will be maintained and upgraded in the long term, but this is subject

More information

COASTAL GROUPS IN ENGLAND THE ENVIRONMENT AGENCY STRATEGIC OVERVIEW OF SEA FLOODING AND COASTAL EROSION RISK MANAGEMENT MARCH 2008

COASTAL GROUPS IN ENGLAND THE ENVIRONMENT AGENCY STRATEGIC OVERVIEW OF SEA FLOODING AND COASTAL EROSION RISK MANAGEMENT MARCH 2008 COASTAL GROUPS IN ENGLAND - THE ENVIRONMENT AGENCY STRATEGIC OVERVIEW OF SEA FLOODING AND COASTAL EROSION RISK MANAGEMENT MARCH 2008 1 Contents 1.0 Introduction and Background 2.0 Coastal s - Terms of

More information

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004 ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE 12 January 2004 1.0 INTRODUCTION This is an update to the existing policy statement which was prepared by Arun District Council to provide

More information

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL Flood Risk Management We can only manage flood risk. It is not possible to prevent all flooding even if we had the money. There will

More information

Severn Estuary Shoreline Management Plan What does it mean for planning in the Forest of Dean?

Severn Estuary Shoreline Management Plan What does it mean for planning in the Forest of Dean? Severn Estuary Shoreline Management Plan What does it mean for planning in the Forest of Dean? Coastal planning The National Planning Policy Framework sets out the Government s planning policies for England.

More information

Contents Amendment Record

Contents Amendment Record Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Approved by 1 1 0 1 Draft for CSG review Consultation Draft 30 April 2010 30 July 2010 M Phillips

More information

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F Lincolnshire Flood Risk and Drainage Management Partnership Framework Lincolnshire Joint Flood Risk and Drainage Management Strategy Draft v.6.0 Consultation Draft 23 rd May 2012 Annexes A-F Joint Lincolnshire

More information

Porthcawl to Sker Point (7)

Porthcawl to Sker Point (7) Porthcawl to Sker Point (7) Draft Recommendations: Long Term Plan The long term plan for the developed frontage of Porthcawl (which extends between the northern boundary of Merthyr-mawr Warren and the

More information

Severn Estuary Flood Risk Management Strategy. Report on 2013 Consultation

Severn Estuary Flood Risk Management Strategy. Report on 2013 Consultation Severn Estuary Flood Risk Management Strategy Report on 2013 Consultation 1 Contents 1 Introduction 2 General Comments 3 Key Themes for remaining concerns 4 1. Future maintenance, management and funding

More information

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED We are the Environment Agency. We protect and improve the environment and make

More information

November 2016 Revision

November 2016 Revision APPENDIX C - SAFETY AND ENVIRONMENTAL ISSUES LICENSING AND OPERATORSHIP LICENSING AND OPERATORSHIP The Offshore Petroleum Licensing (Offshore Safety Directive) Regulations 2015 (the OSD Licensing Regulations)

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions The West of Wales Shoreline Management Plan (SMP) provides a high level strategy for managing flood and erosion risk for the coastline and is a non statutory policy document

More information

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba Creetown (Potentially Vulnerable Area 14/17) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment Moneypool Burn Summary of flooding impacts 90 residential properties

More information

COMMON QUESTIONS & ANSWERS CONNECTICUT RESERVE NOMINATION PUBLIC MEETING

COMMON QUESTIONS & ANSWERS CONNECTICUT RESERVE NOMINATION PUBLIC MEETING QUESTION: What is the National Estuarine Research Reserve System? ANSWER: The National Estuarine Research Reserve System (https://coast.noaa.gov/nerrs/) is a network of protected areas representative of

More information

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made Development and Flood Risk - the Environment Agency s approach to PPS25 Steve Cook Flood Risk Policy Advisor Stephen.cook@environment-agency.gov.uk Our role in PPS25 h Providing advice and information

More information

National Infrastructure Assessment Technical Annex. Technical annex: Flood modelling

National Infrastructure Assessment Technical Annex. Technical annex: Flood modelling Technical annex: Flood modelling July 2018 1 This annex provides supplementary detail on modelling of flood management for the National Infrastructure Assessment. Assessing cost and benefits of different

More information

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Flood Risk Management Planning in Scotland: Arrangements for February 2012 Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable

More information

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management River Lugg Internal Drainage Board Policy Statement on Flood Protection and Water Level Management 1 INTRODUCTION Purpose 1.1 This policy statement has been prepared by the River Lugg Internal Drainage

More information

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee Flood Risk Management Strategy Solway Local Plan District Section 1: Flood Risk Management in Scotland 1.1 What is a Flood Risk Management Strategy?... 1 1.2 How to read this Strategy... 1 1.3 Managing

More information

THE CONSERVATION (NATURAL HABITATS, ETC) AMENDMENT (SCOTLAND) REGULATIONS CONSULTATION

THE CONSERVATION (NATURAL HABITATS, ETC) AMENDMENT (SCOTLAND) REGULATIONS CONSULTATION Allan Scott Scottish Executive Environment & Rural Affairs Department Nature Conservation Strategy & Protected Areas Team Landscapes & Habitats Division G-H 93 Victoria Quay Edinburgh EH6 6QQ 28 July 2006

More information

THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY

THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY THAMES-COROMANDEL DISTRICT COUNCIL COASTAL HAZARDS POLICY 1. OBJECTIVES a) To sustainably manage the effects of coastal hazards on the District s coastal foreshore land by ensuring risk to life and property

More information

Local Government Group. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management.

Local Government Group. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management A Living Document February 2011 Preliminary Framework for Local Flood Risk Management Strategy Page 1 Table

More information

A guide to how we fund and deliver Flood Risk Management Schemes

A guide to how we fund and deliver Flood Risk Management Schemes A guide to how we fund and deliver Flood Risk Management s We are currently in the appraisal stages of many projects investigating whether schemes to manage flood risk can be provided throughout Cumbria.

More information

Strategy Appraisal Report

Strategy Appraisal Report Strategy Appraisal Report Authority Scheme Reference IMSO000556 Defra / WAG LDW Number Promoting Authority Strategy Name Environment Agency Southern Region Portchester Castle to Emsworth Coastal Flood

More information

120 of 124 PLAN MELBOURNE REFRESH DISCUSSION PAPER

120 of 124 PLAN MELBOURNE REFRESH DISCUSSION PAPER 120 of 124 PLAN MELBOURNE REFRESH DISCUSSION PAPER VICTORIAN POLICY AND STRATEGY REVIEWS UNDERWAY THAT RELATES TO PLAN MELBOURNE BAPPENDIX PLAN MELBOURNE REFRESH DISCUSSION PAPER 121 of 124 APPENDIX B

More information

Strategic Environmental Assessment

Strategic Environmental Assessment Strategic Environmental Assessment Cambridgeshire Local Strategy for Flood Risk Management 2012-2015 Non-Technical Summary - Hyder Consulting (UK) Limited 2212959 Manning House 22 Carlisle Place London

More information

Consider the risks to your own business as well as to your operations

Consider the risks to your own business as well as to your operations Hayley Bowman Flood and Coastal Risk Management Mapping, Modelling and Data 07919 544 551 Hayley.bowman@environment-agency.gov.uk DataInfo@environment-agency.gov.uk EA covers England only. Wales covered

More information

Department for Environment Food and Rural Affairs Supplementary Estimate 2011/12 Select Committee Memorandum

Department for Environment Food and Rural Affairs Supplementary Estimate 2011/12 Select Committee Memorandum Table of Contents Department for Environment Food and Rural Affairs Supplementary Select Committee Memorandum Section Section Header Page 1 Executive Summary 2 2 The main activities and priorities for

More information

HRPP 313. Developing a performance - based management system for flood and coastal defence assets

HRPP 313. Developing a performance - based management system for flood and coastal defence assets HRPP 313 Developing a performance - based management system for flood and coastal defence assets Paul Sayers, Jonathan Simm, Michael Wallis, Foekje Buijs, Jaap Flikweert & Ben Hamer Reproduced from a paper

More information

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD Policy Statement on Water Level and Flood Risk Management 1. Introduction Purpose 1.1. This policy statement has been prepared by the River Stour (Kent) Internal

More information

Coastal Advisory. Group (NDAS( NDASCAG CAG) Shoreline Management Plan Review (SMP2( SMP2) Hartland Point to Anchor Head

Coastal Advisory. Group (NDAS( NDASCAG CAG) Shoreline Management Plan Review (SMP2( SMP2) Hartland Point to Anchor Head North Devon and Somerset Coastal Advisory Group (NDAS( NDASCAG CAG) Shoreline Management Plan Review (SMP2( SMP2) Hartland Point to Anchor Head Hartland Point to Anchor Head SMP2 June 2010 Page deliberately

More information

LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for Lincolnshire MARK WELSH & DAVID HICKMAN THE LEGISLATION:

LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for Lincolnshire MARK WELSH & DAVID HICKMAN THE LEGISLATION: LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for MARK WELSH & DAVID HICKMAN ADA Local Authority Seminar Thursday 17 March 2010 Great Northern Hotel, Peterborough THE LEGISLATION:

More information

Adapting to. and Flooding. Report on a 2014 Survey of Waterford Residents. George Perkins Marsh Institute/Clark University and The Nature Conservancy

Adapting to. and Flooding. Report on a 2014 Survey of Waterford Residents. George Perkins Marsh Institute/Clark University and The Nature Conservancy Adapting to Coastal Storms and Flooding Report on a 2014 Survey of Waterford Residents George Perkins Marsh Institute/Clark University and The Nature Conservancy Town of Waterford Adapting to Coastal Storms

More information

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name:

RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name: RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name: Manatee County 1. MULTIYEAR PLAN VERSION (INITIAL OR AMENDMENT NUMBER): Initial

More information

Department for Environment Food and Rural Affairs. Select Committee Memorandum

Department for Environment Food and Rural Affairs. Select Committee Memorandum Department for Environment Food and Rural Affairs 2018-19 Select Committee Memorandum Table of Contents Section Section Header Page 1 Executive Summary 2 2 The strategic objectives for the Department 3

More information

Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England

Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England 14669 NFS Cor Slip / Sig: 1 / Plate A Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England Session: 2010-2012

More information

Work Package 2: Socio- Economic Evaluation ComCoast

Work Package 2: Socio- Economic Evaluation ComCoast Work Package 2: Socio- Economic Evaluation ComCoast The Roach and Crouch Flood Management Strategy: A Case Study for the Economic Assessment and Valuation of Multifunctional Flood Management Projects Insert

More information

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201-

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201- Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text Flood Risk Management in Ireland The National CFRAM Programme & overview of the Capital Works Programme Click to add text Dr. John Martin Office of Public Works Engineers Ireland's Local Government Seminar

More information

Making The Most Of The North West s Coast. The North West Coastal Forum Delivery Plan

Making The Most Of The North West s Coast. The North West Coastal Forum Delivery Plan Making The Most Of The North West s Coast The North West Coastal Forum Delivery Plan 2016 2018 Contents Page Introduction to the North West Coastal Forum 3 A Vision for the North West Coast 4 Delivering

More information

2018 Long Term Plan Financial forecasting assumptions

2018 Long Term Plan Financial forecasting assumptions 2018 Long Term Plan Financial forecasting assumptions Forecasting assumption Risk Likelihood of occurrence Projected price change factors Forecast financial information That actual price changes vary Medium

More information

Flood Risk Management Strategy. Shetland

Flood Risk Management Strategy. Shetland Flood Risk Management Strategy Shetland Publication date: 14 December 2015 Terms and conditions Ownership: All intellectual property rights for Flood Risk Management Strategies are owned by SEPA or its

More information

Habitat Banking the in the EU: Demand, Supply and Design Elements

Habitat Banking the in the EU: Demand, Supply and Design Elements Habitat Banking the in the EU: Demand, and Elements A report prepared for the European Commission : Exploring potential Demand for and of Habitat Banking in the EU and appropriate design for a Habitat

More information

Community Incentives for Nature-Based Flood Solutions

Community Incentives for Nature-Based Flood Solutions Community Incentives for Nature-Based Flood Solutions A GUIDE TO FEMA S COMMUNITY RATING SYSTEM FOR CONSERVATION PRACTITIONERS The Federal Emergency Management Agency (FEMA) uses a Community Rating System

More information

Climate Change: Recent Developments in Adaptation Policy and Law

Climate Change: Recent Developments in Adaptation Policy and Law Climate Change: Recent Developments in Adaptation Policy and Law Dr. Konstantinos Katsibardis Coordinator, Climate Change Policy & Law Unit, EKEPEK, Panteion Un. of Athens Introductory remarks The UNDP

More information

1 member of the public was present : Alison Doggett

1 member of the public was present : Alison Doggett MINUTES OF THE MEETING OF THE CHILTERNS CONSERVATION BOARD HELD ON WEDNESDAY 27 TH MARCH 2013 AT RESTORE HOPE DAIRY, LATIMER HP5 1TU AT 10.00AM AND CONCLUDING AT 12.50 PM. PRESENT: Member Appointed by

More information

FLOOD RISK MANAGEMENT IN IRELAND

FLOOD RISK MANAGEMENT IN IRELAND National Flood Management Conference 2018 FLOOD RISK MANAGEMENT IN IRELAND Mark Adamson Office of Public Works 15 th March, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 Flooding: Joint

More information

National Assessment of Defence Needs and Costs for flood and coastal erosion management (NADNAC) Summary Report

National Assessment of Defence Needs and Costs for flood and coastal erosion management (NADNAC) Summary Report National Assessment of Defence Needs and Costs for flood and coastal erosion management (NADNAC) Summary Report Flood Management Division June 2004 Contents Contents, Abbreviations and Glossary...1 1 Introduction...2

More information

eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy

eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy 2013 2016 Foreword I am sure that you will agree that flooding has been at the forefront of all our minds over the past year. The country

More information

in the EU A new EU legal context on the assessment and management of flood water.europa.eu Maria Brättemark, WFD Team, DG ENV.D.1, European Commission

in the EU A new EU legal context on the assessment and management of flood water.europa.eu Maria Brättemark, WFD Team, DG ENV.D.1, European Commission Setting the scene : Flood Risk Management in the EU A new EU legal context on the assessment and management of flood risks Maria Brättemark, WFD Team, DG ENV.D.1, European Commission water.europa.eu This

More information

Managing flood risk on the Severn Estuary Gloucestershire. January 2011

Managing flood risk on the Severn Estuary Gloucestershire. January 2011 Managing flood risk on the Severn Estuary Gloucestershire January 2011 We are the Environment Agency. It s our job to look after your environment and make it a better place _ for you, and for future generations.

More information

National Flood Risk Management Plan. CFRAM Programme

National Flood Risk Management Plan. CFRAM Programme National Flood Risk Management Plan AND THE CFRAM Programme Gerard O Connell, Engineer-in-Charge, Regional Projects & Flood Advisory Office Environmental SPC, 27 th June, 2018 HISTORIC & POLICY CONTEXT

More information

Comhairle Baile Cheanntair~ Nás na Ríogh

Comhairle Baile Cheanntair~ Nás na Ríogh Comhairle Baile Cheanntair~ Nás na Ríogh DRAFT STRATEGIC FLOOD RISK ASSESSMENT NAAS TOWN DEVELOPMENT PLAN 2011 ~ 2017 Kildare County Council Water Services Department Aras Chill Dara Devoy Park Naas County

More information

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014 Shropshire Local Flood Risk Management Strategy Summary for Consultation July 2014 SHROPSHIRE LOCAL FLOOD RISK MANAGEMENT STRATEGY 1 Introduction This Strategy is about managing flooding in Shropshire.

More information

Incorporating ecosystem services into flood risk management appraisal

Incorporating ecosystem services into flood risk management appraisal Incorporating ecosystem services into flood risk management appraisal With a focus on natural flood management Andrea Johnstonova, Helen Panter, Rebecca Badger, Jannette MacDonald & Roy Richardson 1 Content

More information

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment River Cree Summary of flooding impacts 210 residential properties

More information

FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013. Version

FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013. Version FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013 Regulation Common Provisions Regulation (CPR) Article 58 of CPR: Article Flat rate financing

More information

EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT

EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT COMPLAINT MECHANISM COMPLIANCE REVIEW MONITORING REPORT IV PARAVANI HPP PROJECT, REQUEST NUMBER: 2012/01 March 2016 Compliance Review Monitoring

More information

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management RIVER LUGG INTERNAL DRAINAGE BOARD Statement on Water Level and Flood Risk Management 1. Introduction Purpose 1.1. This policy statement has been prepared by the River Lugg Internal Drainage Board (the

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

THE EU FLOODS DIRECTIVE:

THE EU FLOODS DIRECTIVE: Sixth Bulgarian Austrian Seminar THE EU FLOODS DIRECTIVE: EUROPEAN PRACTICE AND RESEARCH IN FLOOD RISK MANAGEMENT Mark Adamson Co-Chair, Working Group F Office of Public Works, IE 7 th November, 2013 PRESENTATION

More information

15. Natural Hazards. Submission No. and Point / Submitter Name. Plan Provision Summary of Submission Decision Requested. General

15. Natural Hazards. Submission No. and Point / Submitter Name. Plan Provision Summary of Submission Decision Requested. General 15. Submission No. 2.4 Bluff Community Board 56.14 Jenny Campbell 64.33 Department of Conservation 116.3 Kylie Fowler 117.10 Southern District Health Board - tsunami There is a lack of information for

More information

Annual Report for the year ended

Annual Report for the year ended Internal Drainage Boards in England Annual Report for the year ended 31 March 2016 The Law the following annual report is provided in accordance with Paragraph 4 of Schedule 2 to the Land Drainage Act

More information

Executive Summary 1/3/2018

Executive Summary 1/3/2018 Executive Summary 1/3/2018 EXECUTIVE SUMMARY This comprehensive plan was prepared by the City of Langley in accordance with Section 36.70A.070 of the Growth Management Act (GMA). The plan guides future

More information

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( ) Office of Public Works DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) Determination of the need for strategic environmental

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 16.11.2017 C(2017) 7538 final COMMISSION DELEGATED REGULATION (EU) /... of 16.11.2017 on the increase of the percentage of the budgetary resources allocated to projects supported

More information

Maltese EU Presidency Meeting engo s. Agenda. 2. Environmental Priorities during January and June 2017 (and thereafter)

Maltese EU Presidency Meeting engo s. Agenda. 2. Environmental Priorities during January and June 2017 (and thereafter) Agenda 1. The Maltese EU Presidency: General overview 2. Environmental Priorities during January and June 2017 (and thereafter) 3. Discuss rough structure of the EU Presidency: meetings, upcoming decisions

More information

STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES

STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES HAKEEM JOHNSON CH2M, UK ASGHAR AKHONDI-ASL, IAIN ANDREWS Environment Agency, UK Flood & Coast 2017 Conference Outline of presentation

More information

THE EFFECTIVENESS OF FLOOD MANAGEMENT

THE EFFECTIVENESS OF FLOOD MANAGEMENT THE EFFECTIVENESS OF FLOOD MANAGEMENT A case study of England Prepared by Sayers and Partners Authors Paul Sayers CEng MICE For World Meteorological Organization Associated Programme on Flood Management

More information

Climate Change and Coastal Defence

Climate Change and Coastal Defence Research Centre for Marine Sciences and Climate Change Climate Change and Coastal Defence Eur Ing Terry Hedges Department of Engineering University of Liverpool January 2008 Structure of Presentation Introduction

More information

Gallinas Watershed Program

Gallinas Watershed Program C O M M U N I T Y M E E T I N G April 5, 2016 Tonight s Agenda S C H E D U L E O F P R E S E N T A T I O N S Presentation: Gallinas Watershed Program Overview Questions and Answers Presentation: Upper

More information

Mapping flood risk its role in improving flood resilience in England

Mapping flood risk its role in improving flood resilience in England Mapping flood risk its role in improving flood resilience in England Catherine Wright Director of Digital and Skills Flood and Coastal Risk Management Environment Agency 6 October 2017 The Environment

More information

Strategic Flood Risk Assessment. SFRA Report

Strategic Flood Risk Assessment. SFRA Report Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.

More information

Coastal Vulnerability Assessment and Adaptation Plan CITY OF CLEARWATER

Coastal Vulnerability Assessment and Adaptation Plan CITY OF CLEARWATER Coastal Vulnerability Assessment and Adaptation Plan 1 Background Vulnerability Assessment Adaptation Plan Peril of Flood Grant 2 Background SEA LEVEL RISE ADAPTATION PROJECT This publication was funded

More information

The LIFE Programme

The LIFE Programme The LIFE Programme 2014-2020 General Introduction & Structure Funding Mechanisms Proposal Preparation & Support Paralimni Info Day, 30.6.2016 Marilena Papastavrou, CY LIFE NCP Cyclamen Project LIFE14 CAP/CY/000006

More information

Flood Risk Management in England

Flood Risk Management in England REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1521 SESSION 2010 2012 28 OCTOBER 2011 Department for Environment, Food and Rural Affairs and Environment Agency Flood Risk Management in England Flood

More information

ECONOMIC, SOCIAL AND ENVIRONMENTAL ASSESSMENT OF NEIGHBOURHOOD PLANS

ECONOMIC, SOCIAL AND ENVIRONMENTAL ASSESSMENT OF NEIGHBOURHOOD PLANS ECONOMIC, SOCIAL AND ENVIRONMENTAL ASSESSMENT OF NEIGHBOURHOOD PLANS 1. Introduction 1.1 The Localism Act 2011 requires neighbourhood plans to not breach, and be otherwise compatible with, EU and Human

More information

Managing flood risk on the Severn Estuary South Gloucestershire to Hinkley Point, Somerset. January 2011

Managing flood risk on the Severn Estuary South Gloucestershire to Hinkley Point, Somerset. January 2011 Managing flood risk on the Severn Estuary South Gloucestershire to Hinkley Point, Somerset January 2011 We are the Environment Agency. It s our job to look after your environment and make it a better place

More information

Hartlepool Borough Council

Hartlepool Borough Council Hartlepool Borough Council Strategic Flood Risk Assessment Level 1 Volume 1 - SFRA understanding the SFRA process May 2010 Tom Britcliffe Principal Planning Officer Department of Regeneration & Planning

More information

Taking Managed Realignment Forward as a Policy Option for Coastal Management in England and Wales

Taking Managed Realignment Forward as a Policy Option for Coastal Management in England and Wales Taking Managed Realignment Forward as a Policy Option for Coastal Management in England and Wales A CIWEM Briefing report October 2006 www.ciwem.org Taking Managed Realignment Forward as a Policy Option

More information

FORUM ON TAX ADMINISTRATION

FORUM ON TAX ADMINISTRATION FORUM ON TAX ADMINISTRATION Measures of Tax Compliance Outcomes - A Practical Guide Scoping document September 2013 FTA PROJECT: Measures of Tax Compliance Outcomes - A Practical Guide Background: current

More information

Freie und Hansestadt Hamburg Landesbetrieb Straßen, Brücken und Gewässer (LSBG) Sachsenfeld Hamburg

Freie und Hansestadt Hamburg Landesbetrieb Straßen, Brücken und Gewässer (LSBG) Sachsenfeld Hamburg Freie und Hansestadt Hamburg Landesbetrieb Straßen, Brücken und Gewässer (LSBG) Sachsenfeld 3 5 20097 Hamburg European Flood Risk Management Conference www.conference.sawa-project.eu Pre Announcement for

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 7C4

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 7C4 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 7C4 From: Date: Subject: Staff September 16, 2016 Council Meeting Local Government Comprehensive Plan Review

More information

Acknowledgements. Legal Disclaimer. Copyright

Acknowledgements. Legal Disclaimer. Copyright SUMMARY REPORT 2018 Acknowledgements The Office of Public Works (OPW) gratefully acknowledges the assistance, input and provision of data by a large number of organisations towards the implementation

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:

More information

Earth is our Business

Earth is our Business Earth is our Business changing the rules of the game POLLY HIGGINS SHEPHEARD-WALWYN (PUBLISHERS) LTD 2012 Polly Higgins Some rights reserved. [license_3.0] This work is licensed under a Creative Commons

More information

September 8, RE: Application for Planned Unit Development and Special Exemption Permit by Bluff Point Holdings LLC

September 8, RE: Application for Planned Unit Development and Special Exemption Permit by Bluff Point Holdings LLC September 8, 2011 Northumberland County Board of Supervisors P.O. Box 129 Heathsville, VA 22473 RE: Application for Planned Unit Development and Special Exemption Permit by Bluff Point Holdings LLC Dear

More information

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page Mike Page Lowestoft FLOOD RISK MANAGEMENT Strategy Summary 2016 Introduction This Strategy Summary Document is a brief overview of the Strategy for managing the risk of flooding to Lowestoft from the sea,

More information

Heather Tallis TNC Stephen Polasky University of Minnesota

Heather Tallis TNC Stephen Polasky University of Minnesota Natural Capital Accounts: Aligning valuation methods for ecosystem goods, services and natural capital with accounting principles Heather Tallis TNC Stephen Polasky University of Minnesota Introduction

More information

Shannon Flood Risk State Agency Co-ordination Working Group - Open Days on Work Programme

Shannon Flood Risk State Agency Co-ordination Working Group - Open Days on Work Programme Shannon Flood Risk State Agency Co-ordination Working Group - Open Days on Work Programme Questions and Answers What is the purpose of the Shannon Flood Risk State Agency Co-ordination Working Group? The

More information

Adapting Maine s coastal communities to sea level rise and storm surge (2015 State of the Bay Presentation)

Adapting Maine s coastal communities to sea level rise and storm surge (2015 State of the Bay Presentation) University of Southern Maine USM Digital Commons Presentations Casco Bay Estuary Partnership (CBEP) 2015 Adapting Maine s coastal communities to sea level rise and storm surge (2015 State of the Bay Presentation)

More information

Engineers Ireland Annual Conference

Engineers Ireland Annual Conference Engineers Ireland Annual Conference MANAGING FLOOD RISK AND BUILDING SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 15 th May, 2015 FLOOD RISK IN IRELAND RECENT FLOODS November 2009: >1,600

More information

Committee of the Whole

Committee of the Whole Committee of the Whole Committee of the Whole to be held at City of Penticton, Council Chambers 171 Main Street, Penticton, B.C. Tuesday, June 19, 2018 Recessed from the Regular Council Meeting at 1:00

More information

MSP: An introduction

MSP: An introduction MSP: An introduction Kira Gee sustainable projects Presentation September 2007 / Split MSP: An introduction Points to consider: Why MSP? Benefits? Challenges Many users, growing pressure on the coast Many

More information

HAWICK FLOOD PROTECTION SCHEME. 21 December Report by Service Director Assets & Infrastructure SCOTTISH BORDERS COUNCIL

HAWICK FLOOD PROTECTION SCHEME. 21 December Report by Service Director Assets & Infrastructure SCOTTISH BORDERS COUNCIL HAWICK FLOOD PROTECTION SCHEME Report by Service Director Assets & Infrastructure SCOTTISH BORDERS COUNCIL 21 December 2017 1 PURPOSE AND SUMMARY 1.1 This report requests that the Council makes a Final

More information

DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT

DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) 2538_RP/003/C FRAM Section Office of Public Works 2538_RP/003/D CONTENTS 1.0

More information

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees

More information

Prioritising flood risk management interventions: how to make best use of limited funds

Prioritising flood risk management interventions: how to make best use of limited funds Prioritising flood risk management interventions: how to make best use of limited funds Ir J.J. Flikweert Royal Haskoning, Peterborough, United Kingdom Ir J.R. Moll Royal Haskoning, Nijmegen, The Netherlands

More information

Comptroller and Auditor General Special Report. Strategic Planning for Flood Risk Management

Comptroller and Auditor General Special Report. Strategic Planning for Flood Risk Management Comptroller and Auditor General Special Report Strategic Planning for Flood Risk Management Report number 92 December 2015 2 Strategic Planning for Flood Risk Management Report of the Comptroller and Auditor

More information