The NEC 3 Engineering and Construction Contract

Size: px
Start display at page:

Download "The NEC 3 Engineering and Construction Contract"

Transcription

1 The NEC 3 Engineering and Construction Contract

2

3 The NEC 3 Engineering and Construction Contract A Commentary Second Edition Brian Eggleston CEng, FICE, FIStructE, FCIArb Blackwell Science

4 2006 Brian Eggleston Blackwell Science, a Blackwell Publishing company Blackwell Science Ltd, 9600 Garsington Road, Oxford OX4 2DQ, UK Tel: +44 (0) Blackwell Publishing Inc., 350 Main Street, Malden, MA , USA Tel: Blackwell Science Asia Pty Ltd, 550 Swanston Street, Carlton, Victoria 3053, Australia Tel: +61 (0) The right of the Author to be identified as the Author of this Work has been asserted in accordance with the Copyright, Designs and Patents Act All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher. First published 1996 by Blackwell Science as The New Engineering Contract: A Commentary Reissued in paperback 2000 Second retitled edition published 2006 by Blackwell Science ISBN-10: ISBN-13: Library of Congress Cataloging-in-Publication Data Eggleston, Brian, CEng. The NEC 3 engineering and construction contract : a commentary/brian Eggleston. 2nd ed. p. cm. Rev. ed. of: The new engineering contract Includes bibliographical references and index. ISBN-13: (hardback : alk. paper) ISBN-10: (hardback : alk. paper) 1. Engineering contracts Great Britain. I. Eggleston, Brian, CEng. New engineering contract. II. Title. KD1641.E dc A catalogue record for this title is available from the British Library Set in 10/12 pt Palatino by SNP Best-set Typesetter Ltd, Hong Kong Printed and bound in Great Britain by TJ International, Padstow The publisher s policy is to use permanent paper from mills that operate a sustainable forestry policy, and which has been manufactured from pulp processed using acid-free and elementary chlorine-free practices. Furthermore, the publisher ensures that the text paper and cover board used have met acceptable environmental accreditation standards. For further information on Blackwell Publishing, visit our website:

5 Contents Preface Author s note xi xiii 1 Introduction Development of NEC contracts Characteristics of NEC contracts Structure of the NEC 3 Engineering and Construction Contract Feedback from ECC Changes from ECC Points of interest in NEC Main options Introduction Contract strategy Option A priced contract with activity schedule Option B priced contract with bill of quantities Target contracts generally Options C and D target contracts Option E cost reimbursable contract Option F management contract Option W1 dispute resolution Option W2 dispute resolution 28 3 Secondary option clauses Introduction Option X1 price adjustment for inflation Option X2 changes in the law Option X3 multiple currencies Option X4 parent company guarantee Option X5 sectional completion Option X6 bonus for early completion Option X7 delay damages Option X12 partnering Option X13 performance bond Option X14 advanced payment to the contractor Option X15 limitation of contractor s liability for design Option X16 retention Option X17 low performance damages Option X18 limitation of liability 51

6 vi Contents 3.16 Option X20 key performance indicators Option Y(UK)2 Housing Grants, Construction and Regeneration Act Option Y(UK)3 Contracts (Rights of Third Parties) Act Option Z1 additional conditions 56 4 Contract documents Introduction Entire agreements Clause 12.4 of NEC Construction of contracts generally NEC 3 documentation Essential contract documents Identified and defined terms The contract date Works information Site information Contract data Schedules of cost components Ambiguities and inconsistencies in the contract documents Schedule of clauses referring to the works information 75 5 Key players Introduction Others Actions The employer Express obligations of the employer The project manager Express duties of the project manager The supervisor Express duties of the supervisor Communications The project manager and the supervisor General core clauses Introduction Actions Identified and defined terms Interpretation and the law Communications etc Instructions Adding to the working areas Early warning Ambiguities and inconsistencies 119

7 Contents vii 6.10 Illegal and impossible requirements Prevention Obligations and responsibilities of the contractor Introduction Design obligations, responsibilities and liabilities Providing the works The contractor s design Using the contractor s design Design of equipment People Working with the employer and others Subcontracting Other responsibilities Express obligations of the contractor Express prohibitions on the contractor Time (and related matters) Introduction Starting and completion Programmes Revision of programmes Shortened programmes Access to and use of the site Instructions to stop or not to start work Take-over Acceleration Testing and defects Introduction Definitions and certificates Tests and inspections Testing and inspection before delivery Searching and notifying defects Correcting defects Accepting defects Uncorrected defects Payments Introduction Assessing the amount due Payments Defined cost Payments main option A Payments main option B Payments main option C Payments main option D 207

8 viii Contents 10.9 Payments main option E Payments main option F NEC 3 compensation event schemes Introduction Changes in NEC 3 (from ECC 2) Outline of procedures Defining a compensation event Compensation events as exclusive remedies Fairness of the compensation event procedures Unusual features of the compensation event procedures Listed compensation events Introduction Omissions from the listed events Works information related events Employer s default events Employer s risk events Project manager/supervisor related events Physical conditions Adverse weather Prevention Measurement related events Secondary option clause events Notifying compensation events Introduction Notifications by the project manager Notifications by the contractor Project manager s response to notifications Last date for notification of compensation events Quotations for compensation events Introduction Instructions to submit quotations Instructions for alternative quotations Submission of quotations Status of the contractor s quotations Assessment of compensation events Introduction Changes from ECC General assessment rules Particular assessment rules The project manager s assessments Implementing compensation events Other financial remedies 281

9 Contents ix 16 Title Introduction Employer s title to equipment, plant and materials Marking equipment, plant and materials Removing equipment Objects and materials within the site Risks and insurances Introduction Employer s risks Contractor s risks Repairs Indemnity Insurance cover Insurance policies Contractor s failure to insure Insurance by the employer Termination Introduction Summary of NEC 3 termination provisions Termination for any reason Termination under section Reasons for termination Procedures on termination Amounts due on termination Dispute resolution Introduction Developments in dispute resolution Meaning of dispute Adjudication under Option W Adjudication under Option W Review by the tribunal The Adjudicator s Contract NEC 3 Engineering and Construction Subcontract Introduction Core clauses general Core clauses the subcontractor s main responsibilities Core clauses time Core clauses testing and defects Core clauses payment Core clauses compensation events Core clauses title Core clauses risks and insurance 343

10 x Contents Core clauses termination Dispute resolution NEC 3 family of contracts The contracts NEC 3 Short Contract and Short Subcontract NEC 3 Term Service Contract NEC 3 Framework Contract NEC 3 Professional Services Contract NEC 3 Adjudicator s Contract Concluding comment 354 Table of cases 355 Table of clause references 359

11 Preface In the preface to my 1996 book on the second edition of the New Engineering Contract (ECC 2) I questioned whether it was necessary to scrutinise the detail of the contract when faith in its principles might be more important to users than the detail of its provisions. However, I went on to suggest that if the contract succeeded and gained widespread use then commercial pressures would prevail and the contract would need to be robust enough to withstand detailed analysis and criticism. It was soon evident that ECC 2 was becoming a popular contract of choice for civil engineering works and for building works and its usage remains on an upward curve. It has certainly succeeded. But it was also soon evident that there were problems with the contract, particularly with its compensation event procedures. The need for a third edition was obvious and urgent. NEC 3 took a few years longer than expected to produce. Perhaps this reflected the difficulties of amending clauses written in a unique style with minimalistic drafting. Perhaps remaining true to the original concepts of the contract inhibited change. When NEC 3 did eventually emerge in 2005 it was not the comprehensive revision which might have been expected. Some useful changes to compensation event procedures had been made, a few gaps had been plugged here and there, and a few new clauses added. At first sight it seemed that not much had changed. But getting into the detail revealed a different picture. There has been significant change probably far more than the draftsmen intended and not all of it for the better. My endeavour in writing this book has been to try to explain in ordinary language what the clauses of NEC 3 say and what I think they mean. Not everyone will share my views but if they do no more than provide food for thought I hope they will make some contribution to the use and development of the contract. Brian Eggleston May 2006

12

13 Author s note Phraseology The New Engineering Contract is a family of contract documents and the proper use of the acronym NEC is as a prefix rather than as the name of any single contract. This book is principally a commentary on the third edition of the NEC Engineering and Construction Contract the main contract in the family. For convenience that contract is referred to throughout this book simply as NEC 3. Its predecessor is referred to as ECC 2. Capitals NEC 3 relies heavily on defined terms which have capital initials and identified terms which are in italics. However, for reasons of style which I hope make for easier reading, capitals and italics have been used sparingly in this book, and therefore both defined terms and identified terms appear usually in ordinary case. Text of NEC 3 Very little of the text of NEC 3 is quoted in this book. I have assumed that readers will have to hand a copy of NEC 3 and the other forms in the family as appropriate. Commentary on the text is against the June 2005 publication of NEC 3. Content of book I have endeavoured to cover in this book all the clauses of NEC 3 and all the changes from ECC 2. I have retained the general layout and some of the content of my book on ECC 2 whilst extending commentary on compensation events from one to five chapters. Table of clause numbers The published version of the NEC 3 contract contains a comprehensive index of subjects referenced to clause numbers. In this book a full table of clause

14 xiv Author s note numbers with descriptions is referenced to chapter sections. The table is set out on pages Readers of this book who wish to have the benefit of a subject index will find it a straightforward matter to move from the subjects in the NEC 3 contract to the chapter sections in this book.

The ICE Conditions of Contract: Seventh Edition. Brian Eggleston CEng, FICE, FIStructE, FCIArb. bblackwell. Science

The ICE Conditions of Contract: Seventh Edition. Brian Eggleston CEng, FICE, FIStructE, FCIArb. bblackwell. Science The ICE Conditions of Contract: Seventh Edition Brian Eggleston CEng, FICE, FIStructE, FCIArb bblackwell Science # Brian Eggleston, 1993, 2001 Blackwell Science Ltd Editorial Offices: Osney Mead, Oxford

More information

Whole Life Appraisal for Construction

Whole Life Appraisal for Construction Whole Life Appraisal for Construction Roger Flanagan Carol Jewell with George Norman Blackwell Science ß 2005 by Blackwell Publishing Ltd Editorial offices: Blackwell Science Ltd, 9600 Garsington Road,

More information

ENGINEERING AND CONSTRUCTION CONTRACT

ENGINEERING AND CONSTRUCTION CONTRACT THE NEC 3RD EDITION ENGINEERING AND CONSTRUCTION CONTRACT INTRODUCTION AND CRITICAL APPRAISAL For the HKIS March 23 rd 2010 Ian Heaphy Agenda Engineering and Construction Contract 3rd Edition: Aim of Presentation

More information

Peter Kerrigan CONTRACTING ON NEC 3 ENGINEERING CONSTRUCTION CONTRACT OPTION A - AN INTRODUCTION.

Peter Kerrigan CONTRACTING ON NEC 3 ENGINEERING CONSTRUCTION CONTRACT OPTION A - AN INTRODUCTION. CONTRACTING ON NEC 3 ENGINEERING CONSTRUCTION CONTRACT OPTION A - AN INTRODUCTION Peter Kerrigan LL.B (HONS), FRICS, FCIARB, BARRISTER www.kerrigans.net 1 Course Content Introduction and overview of ECC

More information

Australian Standard. Subcontract conditions for design and construct. AS (Incorporating Amendment No. 1) AS

Australian Standard. Subcontract conditions for design and construct. AS (Incorporating Amendment No. 1) AS AS 4903 2000 (Incorporating Amendment No. 1) AS 4903 2000 Australian Standard Subcontract conditions for design and construct This Australian Standard was prepared by Committee OB-003, General Conditions

More information

Professional Services Contract

Professional Services Contract Professional Services Contract Revising the programme 32 32.1 The Consultant shows on each revised programme. the actual progress achieved on each operation and its effect upon the timing of the reing

More information

Subcontract conditions

Subcontract conditions AS 2545 1993 (Incorporating Amendment No. 1) Australian Standard Subcontract conditions This Australian Standard was prepared by Committee OB/3, General Conditions of Contract. It was approved on behalf

More information

Project Finance in Construction

Project Finance in Construction Project Finance in Construction A Structured Guide to Assessment Anthony Merna Oriel Group Practice Manchester, UK Yang Chu Postdoctoral Research Associate Manchester Business School The University of

More information

Course agenda. Course agenda. NEC3: Introduction to the Engineering and Construction Contract (ECC)

Course agenda. Course agenda. NEC3: Introduction to the Engineering and Construction Contract (ECC) NEC3: Introduction to the Engineering and Construction Contract (ECC) Course agenda Welcome and Introductions Session 1 elearning review Session 2 the ECC system and contract strategy the Options Session

More information

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT CONTRACT ADMINISTRATOR SCHEDULES EDITION

CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT CONTRACT ADMINISTRATOR SCHEDULES EDITION CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 09 CONTRACT ADMINISTRATOR SCHEDULES 8 + 9 2015 EDITION CIOB TIME AND COST MANAGEMENT CONTRACT CONSULTANCY APPOINTMENT 09 CONTRACT ADMINISTRATOR

More information

The Contractor s NEC3 ECC Handbook

The Contractor s NEC3 ECC Handbook The Contractor s NEC3 ECC Handbook The Contractor s NEC3 ECC Handbook Steven C. Evans This edition first published 2017 2017 John Wiley & Sons Ltd All rights reserved. No part of this publication may

More information

CONTRACT DATA. Part one Data provided by the Employer CONTRACT DATA PART 1

CONTRACT DATA. Part one Data provided by the Employer CONTRACT DATA PART 1 CONTRACT DATA Part one Data provided by the Employer Statements given in all contracts Completion of the data in full, according to the Options chosen, is essential to create a complete contract. 1 General

More information

Sub-contracting under the JCT 2005 Forms

Sub-contracting under the JCT 2005 Forms Sub-contracting under the JCT 2005 Forms Sub-Contracting under the JCT 2005 Forms Peter Barnes and Matthew Davies 2008 Blackwell Publishing Ltd. ISBN: 978-1-405-17788-7 To our wives, Carol and Karen, and

More information

2 nd Edition September 2005 (Second Edition of CIDB document 1020)

2 nd Edition September 2005 (Second Edition of CIDB document 1020) Supply of Goods (Short Contract) 2 nd Edition September 2005 (Second Edition of CIDB document 1020) CIDB Supply of Goods (Short Contract) September 2005, Second Edition of CIDB document 1020 SUPPLY OF

More information

A Foreign Exchange Primer

A Foreign Exchange Primer A Foreign Exchange Primer For other titles in the Wiley Trading series please see www.wiley.com/finance A FOREIGN EXCHANGE PRIMER Second Edition Shani Shamah A John Wiley and Sons, Ltd., Publication Copyright

More information

NEC3 ECC Introductory Training

NEC3 ECC Introductory Training NEC3 ECC Introductory Training John Rayner House Keeping and Safety Fire Alarm Toilets Mobile phones Please remember to switch all mobile phones to silent 1 Introductions John Rayner Name: NEC3 Knowledge:

More information

NEC4 Engineering and Construction Contract review of changes from NEC3

NEC4 Engineering and Construction Contract review of changes from NEC3 Here is a review from GMH Planning Ltd of the significant changes within the NEC4 ECC contract compared to that of the NEC3 version. We have not identified every single change, but picked out the main

More information

Experience Sharing in the use of the NEC3 Contracts Working with Employer under NEC3 Contract Arrangement

Experience Sharing in the use of the NEC3 Contracts Working with Employer under NEC3 Contract Arrangement Experience Sharing in the use of the NEC3 Contracts Working with Employer under NEC3 Contract Arrangement Technical Forum on NEC3 Collaborative Contracts 7 March 2012 Ir Ken W. N. Ko 1 Agenda Subletting

More information

CHARTERED INSTITUTE OF ARBITRATORS NEC compensation events A process for all eventualities? April 21 st 2016

CHARTERED INSTITUTE OF ARBITRATORS NEC compensation events A process for all eventualities? April 21 st 2016 CHARTERED INSTITUTE OF ARBITRATORS NEC compensation events A process for all eventualities? April 21 st 2016 SARAH KELLERMAN PARTNER m +44 (0) 7810 850 387 e sarah.kellerman@arcadis.com Arcadis Arcadis,

More information

Off-Site Manufacturing

Off-Site Manufacturing Off-Site Manufacturing The Legal Implications YORhub Conference 15 th November 2018 Dr Julie Morrissy A word of warning MODERNISE OR DIE 1 Modernise or die 2016 - The Farmer Review of the UK Construction

More information

Hedge Fund. Course STUART A. MCCRARY. John Wiley & Sons, Inc.

Hedge Fund. Course STUART A. MCCRARY. John Wiley & Sons, Inc. Hedge Fund Course STUART A. MCCRARY John Wiley & Sons, Inc. Hedge Fund Course Founded in 1807, John Wiley & Sons is the oldest independent publishing company in the United States. With offices in North

More information

2 The Contractor s main responsibilities

2 The Contractor s main responsibilities Core Clauses 2 The Contractor s responsibilities Providing the Service 20 20.1 The Contractor Provides the Service in accordance with the Service Information. 20.2 In Providing the Service, the Contractor

More information

Business Ratios and Formulas

Business Ratios and Formulas Business Ratios and Formulas A COMPREHENSIVE GUIDE SECOND EDITION Steven M. Bragg John Wiley & Sons, Inc. Business Ratios and Formulas SECOND EDITION Business Ratios and Formulas A COMPREHENSIVE GUIDE

More information

Contract Administration and Procurement in the Singapore Construction Industry Downloaded from

Contract Administration and Procurement in the Singapore Construction Industry Downloaded from This page intentionally left blank Published by World Scientific Publishing Co. Pte. Ltd. 5 Toh Tuck Link, Singapore 596224 USA office: 27 Warren Street, Suite 401-402, Hackensack, NJ 07601 UK office:

More information

The New NZS 3910:2013

The New NZS 3910:2013 The New NZS 3910:2013 Introduction On the 1 st of October 2013, NZS 3910:2013 Conditions of Contract for Building and Civil Engineering Construction was released by New Zealand Standards. This is the first

More information

Handbook of Asset and Liability Management

Handbook of Asset and Liability Management Handbook of Asset and Liability Management From models to optimal return strategies Alexandre Adam Handbook of Asset and Liability Management For other titles in the Wiley Finance series please see www.wiley.com/finance

More information

Using a Dispute Avoidance Board for contracts covered by the Housing Grants, Construction and Regeneration Act 1996

Using a Dispute Avoidance Board for contracts covered by the Housing Grants, Construction and Regeneration Act 1996 NEC4 ECC 5 Using a Dispute Avoidance Board for contracts covered by the Housing Grants, Construction and Regeneration Act 1996 This practice note has been prepared due to feedback from UK based users who

More information

Governmental Accounting Standards Board of the Financial Accounting Foundation

Governmental Accounting Standards Board of the Financial Accounting Foundation IMPLEMENTATION GUIDE Guide to Implementation of GASB Statement 10 on Accounting and Financial Reporting for Risk Financing and Related Insurance Issues Questions and Answers Governmental Accounting Standards

More information

Standard forms of partnering contracts The ultimate contractual commitment? Part 4

Standard forms of partnering contracts The ultimate contractual commitment? Part 4 Standard forms of partnering contracts The ultimate contractual commitment? Part 4 This is the fourth in a series of articles being published in CES comparing the terms of some of the different standard

More information

Discounted Cash Flow. A Theory of the Valuation of Firms. Lutz Kruschwitz and Andreas Löffler

Discounted Cash Flow. A Theory of the Valuation of Firms. Lutz Kruschwitz and Andreas Löffler Discounted Cash Flow A Theory of the Valuation of Firms Lutz Kruschwitz and Andreas Löffler Discounted Cash Flow For other titles in the Wiley Finance Series please see www.wiley.com/finance Discounted

More information

Fundamentals of Actuarial Mathematics

Fundamentals of Actuarial Mathematics Fundamentals of Actuarial Mathematics Third Edition S. David Promislow Fundamentals of Actuarial Mathematics Fundamentals of Actuarial Mathematics Third Edition S. David Promislow York University, Toronto,

More information

The following amendments have been made to the June 2005 edition deleted: and of notified early warning matters

The following amendments have been made to the June 2005 edition deleted: and of notified early warning matters AMENDMENTS JUNE 2006 The following amendments have been made to the June 2005 edition. Page Clause Line 10 32.1 4 deleted: and of notified early warning matters 17 70.4 2 otherwise inserted after stated

More information

Fiscal Sustainability and Competitiveness in Europe and Asia

Fiscal Sustainability and Competitiveness in Europe and Asia Fiscal Sustainability and Competitiveness in Europe and Asia This page Intentionally left blank Fiscal Sustainability and Competitiveness in Europe and Asia Ramkishen S. Rajan Adjunct Senior Research Fellow,

More information

[Based on or amended from] Australian Standard. Subcontract conditions for design and construct (QLD) Design and Construction of: PROJECT

[Based on or amended from] Australian Standard. Subcontract conditions for design and construct (QLD) Design and Construction of: PROJECT AS 4903 2000 [Based on or amended from] 4903 2000 (Incorporating Amendment No. 1) Design and Construction of: PROJECT At: Main Contractor: Subcontractor: ADDRESS EVANS BUILT PTY LTD SUBCONTRACTOR Australian

More information

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date NZS 3915:2005 COMMITTEE REPRESENTATION This Standard was prepared by Technical Committee P 3915 for the Standards Council established under the Standards Act 1988. Peter Fehl New Zealand Contractors Federation

More information

Global Property Investment

Global Property Investment Global Property Investment To our wives and children The book s companion website at www.wiley.com/go/baumglobalpropertyinvestment offers freely downloadable material for practitioners, lecturers and students,

More information

The Option Trader Handbook

The Option Trader Handbook The Option Trader Handbook Strategies and Trade Adjustments GEORGE M. JABBOUR, PhD PHILIP H. BUDWICK, MsF John Wiley & Sons, Inc. The Option Trader Handbook Founded in 1807, John Wiley & Sons is the oldest

More information

Construction Law Update The NEC4 suite of contracts are here!

Construction Law Update The NEC4 suite of contracts are here! Construction Law Update The NEC4 suite of contracts are here! Will Buckby and James Vernon 13 February 2018 Introductions Will Buckby, MCIHT Partner, Projects and Contracts Advisory +44 (0) 20 7469 0411

More information

MDB Harmonised Particular Conditions

MDB Harmonised Particular Conditions FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st

More information

superseries Working with Costs and Budgets FIFTH EDITION Published for the Institute of Leadership & Management Institute of Leadership & Management

superseries Working with Costs and Budgets FIFTH EDITION Published for the Institute of Leadership & Management Institute of Leadership & Management Prelims-I046430.qxd 4/21/07 6:25 PM Page i Institute of Leadership & Management superseries Working with Costs and Budgets FIFTH EDITION Published for the Institute of Leadership & Management AMSTERDAM

More information

NEC4 ENGINEERING & CONSTRUCTION CONTRACT

NEC4 ENGINEERING & CONSTRUCTION CONTRACT 1. Introduction 1.1 This paper provides an overview of the NEC Engineering & Construction Contract summarising the key features and structure of the NEC family of contracts. The NEC4 (4 th Edition) box

More information

The Enlargement of the European Union

The Enlargement of the European Union The Enlargement of the European Union A Guide for the Entrepreneur Ine Lejeune and Walter Van Denberghe PricewaterhouseCoopers The Enlargement of the European Union The Enlargement of the European Union

More information

HKIS Resolving Disputes between Contractors

HKIS Resolving Disputes between Contractors HKIS Resolving Disputes between Contractors 12 December 2012 (Wednesday) 7:00pm 7:45pm Gilbert Kwok FHKIS, FRICS Partner, Hong Kong and China Construction Group Clyde & Co For further information: gilbert.kwok@clydeco.com

More information

PLEASE READ THESE TERMS AND CONDITIONS OF USE CAREFULLY BEFORE USING. Welcome to our website. If you continue to browse and use this website you are

PLEASE READ THESE TERMS AND CONDITIONS OF USE CAREFULLY BEFORE USING. Welcome to our website. If you continue to browse and use this website you are PLEASE READ THESE TERMS AND CONDITIONS OF USE CAREFULLY BEFORE USING THIS WEBSITE. Welcome to our website. If you continue to browse and use this website you are agreeing to comply with and be bound by

More information

General Conditions of Sale of Schaeffler Australia Pty. Ltd.

General Conditions of Sale of Schaeffler Australia Pty. Ltd. These Trading Terms & Conditions ( Terms ) apply (unless otherwise previously agreed in writing) to the supply of Goods by the SA to a Customer from time to time. Any supply of Goods by the SA to the Customer

More information

Experience Sharing on NEC Implementation and its Effectiveness in Hong Kong

Experience Sharing on NEC Implementation and its Effectiveness in Hong Kong Experience Sharing on NEC Implementation and its Effectiveness in Hong Kong KH Fok NEC3 ECC Accredited Project Manager lobowfok@icloud.com Mobile: 9819 4463 17 January 2017 Note: This set of notes has

More information

Webinar - The Project Manager in the NEC4 ECC: What s new and different?

Webinar - The Project Manager in the NEC4 ECC: What s new and different? Webinar - The Project Manager in the NEC4 ECC: What s new and different? 17 th May 2017 Q&A session This document provides answers to the questions submitted during the webinar. The webinar can be viewed

More information

Paul Wilmott On Quantitative Finance

Paul Wilmott On Quantitative Finance Paul Wilmott On Quantitative Finance Paul Wilmott On Quantitative Finance Second Edition www.wilmott.com Copyright 2006 Paul Wilmott Published by John Wiley & Sons Ltd, The Atrium, Southern Gate, Chichester,

More information

Loose & Griffiths on Liquidators

Loose & Griffiths on Liquidators Loose & Griffiths on Liquidators The Role of a Liquidator in a Winding Up Eighth Edition Peter Loose MA, Solicitor Michael Griffiths LLM Published by Jordan Publishing Limited 21 St Thomas Street Bristol

More information

Structural Revolution in International Business Architecture

Structural Revolution in International Business Architecture Structural Revolution in International Business Architecture Structural Revolution in International Business Architecture Modelling and Analysis: Volume 1 Dipak Basu Nagasaki University, Japan Victoria

More information

The Liquidity Theory of Asset Prices. Gordon Pepper with Michael J. Oliver

The Liquidity Theory of Asset Prices. Gordon Pepper with Michael J. Oliver The Liquidity Theory of Asset Prices Gordon Pepper with Michael J. Oliver The following are quotes about the course The Monetary Theory of Asset Prices, Module 3, Practical History of Financial Markets,

More information

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard New Zealand Standard Conditions of contract for building and civil engineering construction Superseding (in part) NZS 3910:2003 NZS 3910:2013 COMMITTEE REPRESENTATION This Standard was prepared under the

More information

New Terminology. References to. The main theme of NEC4 is that it represents an evolution rather than a revolution in thinking

New Terminology. References to. The main theme of NEC4 is that it represents an evolution rather than a revolution in thinking New Terminology The main theme of NEC is that it represents an evolution rather than a revolution in thinking References to project participants as him and his actions are now stated in a neutral voice

More information

The Fundamentals of Hedge Fund Management

The Fundamentals of Hedge Fund Management The Fundamentals of Hedge Fund Management Founded in 1807, John Wiley & Sons is the oldest independent publishing company in the United States. With offices in North America, Europe, Australia and Asia,

More information

The following amendments have been made to the June 2005 edition deleted: and of notified early warning matters

The following amendments have been made to the June 2005 edition deleted: and of notified early warning matters AMENDMENTS JUNE 2006 The following amendments have been made to the June 2005 edition. Page Clause Line 10 32.1 4 deleted: and of notified early warning matters 59 Contract Data Part one, 1. 3 added, (with

More information

A GUIDE TO UNEMPLOYMENT REDUCTION MEASURES

A GUIDE TO UNEMPLOYMENT REDUCTION MEASURES A GUIDE TO UNEMPLOYMENT REDUCTION MEASURES Also by Edwin Whiting HOW TO GET YOUR EMPLOYMENT COSTS RIGHT A GUIDE TO BUSINESS PERFORMANCE MEASUREMENTS A Guide to Unemployment Reduction Measures Edwin Whiting

More information

TRANSNET NATIONAL PORTS AUTHORITY RFP NUMBER TNPA 541 DESCRIPTION OF THE WORKS: PORT OF RICHARDS BAY - CONSTRUCTION OF PORT ENTRANCES AND ACCESS ROADS

TRANSNET NATIONAL PORTS AUTHORITY RFP NUMBER TNPA 541 DESCRIPTION OF THE WORKS: PORT OF RICHARDS BAY - CONSTRUCTION OF PORT ENTRANCES AND ACCESS ROADS C1.2 Contract Data Part one - Data provided by the Employer Clause Statement Data 1 General The conditions of contract are the core clauses and the clauses for main Option B: Priced Contract with Bill

More information

MacRoberts. A law firm as individual as you.

MacRoberts. A law firm as individual as you. MacRoberts. A law firm as individual as you. The New NEC4: Exploring the Key Changes Mike Barlow, Partner MacRoberts LLP www.macroberts.com Glasgow Edinburgh Dundee 1 THE NEC4 ENGINEERING AND CONSTRUCTION

More information

Australian/New Zealand Standard

Australian/New Zealand Standard Water Corporation July 2012 Version AS/NZS 4911:2003 (Incorporating Amendment No. 1) AS/NZS 4911:2003 Australian/New Zealand Standard Water Corporation General conditions of contract amended from Australian

More information

The NEC Contract Key Concepts and the Proper Approach to Assessment. The proper basis of assessment of Compensation Events By Karen Gough, Barrister

The NEC Contract Key Concepts and the Proper Approach to Assessment. The proper basis of assessment of Compensation Events By Karen Gough, Barrister The NEC Contract Key Concepts and the Proper Approach to Assessment The proper basis of assessment of Compensation Events By Karen Gough, Barrister 1 Overriding principles in NEC3: ECC Flexibility Usable

More information

Conditions of Contract for PLANT and Design-Build

Conditions of Contract for PLANT and Design-Build Conditions of Contract for PLANT and Design-Build FOR ELECTRICAL AND MECHANICAL WORKS AND FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE CONTRACTOR General Conditions 1st Edition 1999 FEDERATION INTERNATIONALE

More information

Section 7. General Conditions of Contract for the Procurement of Works

Section 7. General Conditions of Contract for the Procurement of Works Section 7. General Conditions of Contract for the Procurement of Works Table of Clauses A. General...3 1. Definitions...3 2. Interpretation...5 3. Language and Law...5 4. Project Manager s Decisions...5

More information

Page 1 CONTRACT DATA. used in conjunction with the. JBCC Minor Works Agreement. Edition published March 2014

Page 1 CONTRACT DATA. used in conjunction with the. JBCC Minor Works Agreement. Edition published March 2014 Page 1 Preface JBCC Constituents Association of South African Quantity Surveyors South African Black Technical and Allied Careers Organisation Application of JBCC Contract Documents Warning CONTRACT DATA

More information

Co p y r i g h t e d Ma t e r i a l

Co p y r i g h t e d Ma t e r i a l i JWBK850-fm JWBK850-Hilpisch October 13, 2016 14:56 Printer Name: Trim: 244mm 170mm Listed Volatility and Variance Derivatives ii JWBK850-fm JWBK850-Hilpisch October 13, 2016 14:56 Printer Name: Trim:

More information

Byte Paradigm General Conditions ( Design version)

Byte Paradigm General Conditions ( Design version) Byte Paradigm General Conditions ( Design version) Article I General 1. When these General Conditions for Delivery are part of tenders and agreements concerning the performance of deliveries and/or services

More information

(PROGRAM NAME) SYNTHESIS STUDY SUBAWARD INFORMATION

(PROGRAM NAME) SYNTHESIS STUDY SUBAWARD INFORMATION (PROGRAM NAME) SYNTHESIS STUDY SUBAWARD INFORMATION SUBAWARD NO: UNIT NUMBER: 913 PURCHASE ODER No.: SUBAWARDEE NAME: DUNS NUMBER: ADDRESS: PRINCIPAL INVESTIGATOR: ( ) PROJECT ADMINISTRATOR: ( ) AWARD

More information

Understanding the Mathematics of Personal Finance An Introduction to Financial Literacy Lawrence N. Dworsky A John Wiley & Sons, Inc., Publication Understanding the Mathematics of Personal Finance Understanding

More information

reads: ICEBERG AHEAD! (DEFINED COST UNDER THE NEC3 ENGINEERING AND CONSTRUCTION CONTRACT)

reads: ICEBERG AHEAD! (DEFINED COST UNDER THE NEC3 ENGINEERING AND CONSTRUCTION CONTRACT) Tenth Edition - October 2013 NEC: DEFINED COST UNDER THE NEC3 ENGINEERING AND CONSTRUCTION CONTRACT reads: The Fee is the sum of the amounts calculated by applying the subcontracted fee percentage to the

More information

Issued by the Association FME-CWM, P.O. Box 190, 2700 AD ZOETERMEER

Issued by the Association FME-CWM, P.O. Box 190, 2700 AD ZOETERMEER TRANSLATION of the "Algemene verkoop- en leveringsvoorwaarden voor de technologische industrie". Only the Dutch text of these conditions is authentic. In case of ambiguities or doubts as to the meaning

More information

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE

More information

Leveraged Exchange-Traded Funds

Leveraged Exchange-Traded Funds Leveraged Exchange-Traded Funds Leveraged Exchange- Traded Funds A Comprehensive Guide to Structure, Pricing, and Performance Narat Charupat and Peter Miu LEVERAGED EXCHANGE-TRADED FUNDS Copyright Narat

More information

Implementing the Construction Supply Chain Payment Charter. January Guidance Note

Implementing the Construction Supply Chain Payment Charter. January Guidance Note Implementing the Construction Supply Chain Payment Charter January 2017 Guidance Note Contents Introduction 3 Implementing the Payment Charter 3 Commitments 3 1. We will make correct full payment as and

More information

MT WELD MINING PTY LTD ACN Purchase Order Terms and Conditions for the Supply Of Goods and/or Services

MT WELD MINING PTY LTD ACN Purchase Order Terms and Conditions for the Supply Of Goods and/or Services MT WELD MINING PTY LTD ACN 053 160 400 Purchase Order Terms and Conditions for the Supply Of Goods and/or Services 1. GENERAL 1.1 Subject to clause 1.3, these terms and conditions (Terms & Conditions)

More information

THE NEW WEALTH MANAGEMENT

THE NEW WEALTH MANAGEMENT THE NEW WEALTH MANAGEMENT CFA Institute is the premier association for investment professionals around the world, with over 101,000 members in 134 countries. Since 1963 the organization has developed and

More information

Margin Trading from A to Z

Margin Trading from A to Z Margin Trading from A to Z A Complete Guide to Borrowing, Investing, and Regulation MICHAEL T. CURLEY John Wiley & Sons, Inc. Margin Trading from A to Z Founded in 1807, John Wiley & Sons is the oldest

More information

HOUSING, ALTERATIONS AND SMALL BUILDINGS CONTRACT

HOUSING, ALTERATIONS AND SMALL BUILDINGS CONTRACT NEW ZEALAND STANDARD HOUSING, ALTERATIONS AND SMALL BUILDINGS CONTRACT ISBN 1-86975-015-2 NOTES CONTENTS PAGE Committee representation... IFC Copyright... IFC Referenced documents... 6 Latest revisions...

More information

Construction Law Update: Spotlight on the NEC3 Engineering and Construction Contract

Construction Law Update: Spotlight on the NEC3 Engineering and Construction Contract London Bristol Dublin Dubai Construction Law Update: Spotlight on the NEC3 Engineering and Construction Contract Tom Pemberton, Partner James Vernon, Associate 12 April 2016 Introductions Tom Pemberton

More information

Budgeting Basics and Beyond

Budgeting Basics and Beyond Budgeting Basics and Beyond Founded in 1807, John Wiley & Sons is the oldest independent publishing company in the United States. With offices in North America, Europe, Asia, and Australia, Wiley is globally

More information

AMENDMENTS APRIL 2013

AMENDMENTS APRIL 2013 AMENDMENTS APRIL 2013 The following amendments have been made to the December 2009 edition. Full details of all amendments are available on www.neccontract.com. Page Clause Line 11 40.1 1 replace: The

More information

CONSTRUCTION PLANT-HIRE ASSOCIATION STANDARD TERMS AND CONDITIONS FOR A CONTRACT FOR THE LIFTING AND MOVEMENT OF GOODS INVOLVING CRANE OPERATION

CONSTRUCTION PLANT-HIRE ASSOCIATION STANDARD TERMS AND CONDITIONS FOR A CONTRACT FOR THE LIFTING AND MOVEMENT OF GOODS INVOLVING CRANE OPERATION CONSTRUCTION PLANT-HIRE ASSOCIATION STANDARD TERMS AND CONDITIONS FOR A CONTRACT FOR THE LIFTING AND MOVEMENT OF GOODS INVOLVING CRANE OPERATION 1. Scope and Definitions 1.1. The terms and conditions set

More information

Green Taxation in Question

Green Taxation in Question Green Taxation in Question Also by Carsten Daugbjerg POLICY NETWORK UNDER PRESSURE: Pollution Control, Policy Reform and the Power of Farmers Also by Gert Tinggaard Svendsen PUBLIC CHOICE AND ENVIRONMENTAL

More information

Construction Law Update: NEC3 Engineering and Construction Contract Part 2 - Compensation events The role of the Project Manager

Construction Law Update: NEC3 Engineering and Construction Contract Part 2 - Compensation events The role of the Project Manager London Bristol Dublin Dubai Construction Law Update: NEC3 Engineering and Construction Contract Part 2 - Compensation events The role of the Project Manager Tom Pemberton, Partner James Vernon, Partner

More information

International Papers in Political Economy

International Papers in Political Economy International Papers in Political Economy International Papers in Political Economy Series Series Editors: Philip Arestis and Malcolm Sawyer Titles include: Philip Arestis and Malcolm Sawyer (editors)

More information

Mega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia

Mega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia Mega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia Megaprojects definition A project that costs more than US$1 billion and that attracts

More information

Financial Forecasting, Analysis, and Modelling

Financial Forecasting, Analysis, and Modelling Financial Forecasting, Analysis, and Modelling Financial Forecasting, Analysis, and Modelling A Framework for Long-Term Forecasting MICHAEL SAMONAS This edition first published 2015 2015 Michael Samonas

More information

Helpful instructions for webinar attendees

Helpful instructions for webinar attendees Helpful instructions for webinar attendees 1. Ensure you have clicked Yes to the Integrated Voice pop up when you entered. If No, then log out and join again. This will ensure you have sound. It will not

More information

(Program Name) SYNTHESIS STUDY UNIT NUMBER: 913 PURCHASE ORDER NO. : PRINCIPAL INVESTIGATOR: ( ) PROJECT ADMINISTRATOR: ( )

(Program Name) SYNTHESIS STUDY UNIT NUMBER: 913 PURCHASE ORDER NO. : PRINCIPAL INVESTIGATOR: ( ) PROJECT ADMINISTRATOR: ( ) SYNTHESIS STUDY SUBAWARD NO. : UNIT NUMBER: 913 PURCHASE ORDER NO. : SUBAWARDEE NAME: Legal Name of State Agency DUNS NUMBER: ADDRESS: PRINCIPAL INVESTIGATOR: ( ) PROJECT ADMINISTRATOR: ( ) AWARD TYPE:

More information

MINISTRY OF FINANCE Procurement Policy Unit (Established under section 6 of the Public Procurement Act, 2015)

MINISTRY OF FINANCE Procurement Policy Unit (Established under section 6 of the Public Procurement Act, 2015) MINISTRY OF FINANCE Procurement Policy Unit (Established under section 6 of the Public Procurement Act, 2015) Ref: W/RFQ-GCC GENERAL CONDITIONS OF CONTRACT REQUEST FOR QUOTATION [Issued in terms of section

More information

GOODS & SERVICES TAX UPDATE 3

GOODS & SERVICES TAX UPDATE 3 GOODS & SERVICES TAX UPDATE 3 CENTRAL GOODS & SERVICES TAX (CGST) Some sections of CGST Act, 2017 to come into effect from 01.07.2017 Central Government vide Notification No. 09/2017-Central Tax, dt. 28-06-2017

More information

STRATEGIC LEVEL. SUBJECT P3 Risk Management CIMA OFFICIAL REVISION CARDS

STRATEGIC LEVEL. SUBJECT P3 Risk Management CIMA OFFICIAL REVISION CARDS STRATEGIC LEVEL SUBJECT P3 Risk Management CIMA OFFICIAL REVISION CARDS RISK MANAGEMENT Published by: Kaplan Publishing UK Unit 2 The Business Centre, Molly Millars Lane, Wokingham, Berkshire RG41 2QZ

More information

EnergyAustralia Market Retail Contract. Terms and Conditions

EnergyAustralia Market Retail Contract. Terms and Conditions EnergyAustralia Market Retail Contract Terms and Conditions Published February 2016 2 CONTENTS PART 1: Market Retail Contract Terms and Conditions 4 Preamble 4 1. The parties 4 2. Definitions and interpretation

More information

FEDERAL FLOWDOWN PROVISIONS FOR FEDERALLY FUNDED CONTRACTS

FEDERAL FLOWDOWN PROVISIONS FOR FEDERALLY FUNDED CONTRACTS FEDERAL FLOWDOWN PROVISIONS FOR FEDERALLY FUNDED CONTRACTS Applicable when solicitation or Purchase Order is in support of a Government Contract. General Provisions and Certifications for Government Contracts:

More information

Market Contract Terms

Market Contract Terms Market Contract Terms Electricity Market Retail Contract between Aurora Energy and you Aurora Energy Pty Ltd l ABN 85 082 464 622 21 Kirksway Place, Battery Point Tasmania 7004 Ph: 1300 132 003 Fax: (03)

More information

APPLICABLE COMMERCIAL PROVISIONS WHEN SOLICITATION OR PURCHASE ORDER IS IN SUPPORT OF A GOVERNMENT CONTRACT:

APPLICABLE COMMERCIAL PROVISIONS WHEN SOLICITATION OR PURCHASE ORDER IS IN SUPPORT OF A GOVERNMENT CONTRACT: APPLICABLE COMMERCIAL PROVISIONS WHEN SOLICITATION OR PURCHASE ORDER IS IN SUPPORT OF A GOVERNMENT CONTRACT: General Provisions and Certifications for Government Contracts: The following clauses are applicable

More information

Lonsec Direct Investment Services Terms and Conditions

Lonsec Direct Investment Services Terms and Conditions Lonsec Direct Investment Services ISSUE DATE: 30-04-2015 Terms of your agreement with Lonsec Limited (trading as Lonsec Stockbroking) when buying and selling Financial Products on the ASX market. Important

More information

HUMANITIX TICKET PURCHASING AGREEMENT

HUMANITIX TICKET PURCHASING AGREEMENT HUMANITIX TICKET PURCHASING AGREEMENT 1 Agreement 1.1 You should read these Terms and Conditions carefully. In these Terms and Conditions the words, Humanitix, Company, we, our and us refer to Humanitix

More information

Advanced and Basic Strategies on Stocks, ETFs, Indexes, and Stock Index Futures

Advanced and Basic Strategies on Stocks, ETFs, Indexes, and Stock Index Futures $95.00 USA / $105.00 CAN ( c o n t i n u e d f r o m f r o n t f l a p ) Three Appendices illustrate many of the strategies covered throughout this book and present them according to whether the strategies

More information

General Delivery and Payment Terms and Conditions of MARTOR KG, Heider Hof 60, Solingen, Germany As of: 01. April 2017

General Delivery and Payment Terms and Conditions of MARTOR KG, Heider Hof 60, Solingen, Germany As of: 01. April 2017 General Delivery and Payment Terms and Conditions of MARTOR KG, Heider Hof 60, 42653 Solingen, Germany I. Scope of Application 1. All deliveries and services (collectively: deliveries) by MARTOR KG (hereinafter

More information

Construction Management Approach based on FIDIC Conditions of Contract for Construction, st Edition. Dr. Munther M.

Construction Management Approach based on FIDIC Conditions of Contract for Construction, st Edition. Dr. Munther M. Construction Management Approach based on FIDIC Conditions of Contract for Construction, 1999 1st Edition Dr. Munther M. Saket March 2015 1 Traditional Construction Contracts Owner of a construction project

More information

The Budget-Building Book for Nonprofits

The Budget-Building Book for Nonprofits The Budget-Building Book for Nonprofits A Step-by-Step Guide for Managers and Boards Second Edition Murray Dropkin Jim Halpin Bill La Touche Praise for The Budget-Building Book for Nonprofits First Edition

More information