1 Regulation Director FERC Rates & Regulation March 16, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Bose: Pursuant to Section of the Federal Energy Regulatory Commission s ( Commission or FERC ) regulations under the Federal Power Act (18 C.F.R ), Southern California Edison Company ( SCE ) tenders for filing the amended Engineering, Design, Procurement and Construction Letter Agreement ( Amended Agreement ) between SCE and Rising Tree Wind Farm, LLC ( Rising Tree or Interconnection Customer ), Service Agreement No. 90, under SCE s Transmission Owner Tariff ( TO Tariff ). The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the Amended Agreement, in both clean and redline formats. Background On October 8, 2010, Horizon Wind Energy LLC ( Horizon Wind ) and SCE entered into an engineering, design and procurement letter agreement ( Letter Agreement ) for the Homestead Wind Farm Project, designated as Service Agreement No. 90 under SCE s TO Tariff. Pursuant to a FERC letter order issued December 2, 2010, the Letter Agreement was accepted for filing in Docket No. ER with an effective date of October 15, The Letter Agreement provides the terms and conditions for SCE to engineer, design, and procure material and equipment for the P.O. Box Walnut Grove Ave. Rosemead, CA 91770

2 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission Page 2 March 16, 2012 Participating TO s Interconnection Facilities and certain Network Upgrades identified in the Letter Agreement, and for Horizon Wind to pay for such work. 1 Horizon Wind subsequently changed its name to EDP Renewables North America LLC ( EDPR NA ). EDPR NA transferred ownership of the Homestead Wind Farm Project to its wholly-owned subsidiary, Rising Tree. Rising Tree subsequently changed the name of the project to the Rising Tree Wind Farm Project ( Project ). On August 3, 2011, Rising Tree provided written notification to SCE that the targeted In-Service Date of the Project was changed from September 15, 2012 to July 31, In order to stay on schedule to meet Rising Tree s targeted In-Service Date, the construction work on the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades needs to commence in March Rising Tree and SCE have agreed to amend the Letter Agreement in order for SCE to commence the necessary work beyond that already specified in such agreement. A copy of the letter memorializing the parties concurrence to amend the Letter Agreement is provided as Attachment A to this filing letter. Amended Agreement The Amended Agreement reflects: (a) the customer and project name changes, (b) an expansion of the scope of work to include construction, (c) increased charges and security postings to cover the expanded scope of work, and (d) a requirement for Rising Tree to provide proof of insurance. 1 All capitalized terms not otherwise defined herein shall have the meaning ascribed to such term in the California Independent System Operator Corporation Tariff.

3 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission Page 3 March 16, 2012 As a result of the expanded scope of work, Rising Tree will be required to pay an additional $4,581,000 under the Revised Agreement, for a total deposit of $9,381,000. Rising Tree is also required to increase the amount of security for the estimated tax liability from $1,015,000 to $2,352,000. Since Construction Activities will commence, Rising Tree is also required to provide Interconnection Financial Security for the third posting in the amount of $5,061,000 in accordance with the Generator Interconnection Procedures in the CAISO Tariff. Waiver SCE respectively requests, pursuant to Section (18 C.F.R ) of the Commission s regulations, waiver of the 60-day prior notice requirements specified in Section 35.3 (18 C.F.R. 35.3), and requests the Commission to accept the Amended Agreement for filing and assign an effective date of March 17, 2012, which is one day after the date of this filing. Such waiver would be consistent with the Commission s Order dated March 18, 2002 in Docket No. ER (98 FERC 61,304) wherein the Commission granted waiver of the 60-day prior notice requirement when a letter agreement, similar to the one in this instant filing, was filed within 30 days of the proposed effective date. Acceptance of the Amended Agreement would enable SCE to commence construction of the Participating TO s Interconnection Facilities and the Participating TO s Reliability Network Upgrades in order to meet Rising Tree s proposed In-Service Date. The granting of this waiver will not have any impact on SCE s other rate schedules. Other Filing Requirements No expenses or costs included in the rates tendered herein have been alleged or judged in any administrative or judicial proceeding to be illegal, duplicative, or unnecessary costs that are demonstrably the product of discriminatory employment practices.

4

5 FEDERAL ENERGY REGULATORY COMMISSION Mailing List NAME Public Utilities Commission Frank Lindh, General Counsel Harvey Y. Morris, General Counsel State of California Legal Division ADDRESS State Building 505 Van Ness Avenue San Francisco, California Rising Tree Wind Farm, LLC c/o EDP Renewables North America LLC Leslie Freiman, Regulatory Compliance Officer 808 Travis, Suite 700 Houston, TX 77002

6 ATTACHMENT A CONCURRENCE LETTER

7

8

9

10

11

12 Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 90 Title Page FERC FPA Electric Tariff ENGINEERING, DESIGN, PROCUREMENT AND CONSTRUCTION LETTER AGREEMENT BETWEEN RISING TREE WIND FARM LLC AND SOUTHERN CALIFORNIA EDISON COMPANY RISING TREE WIND FARM PROJECT Contract Effective Date: 10/15/2010 Tariff Record Proposed Effective Date: 3/17/ Version Number: TOT219 Option Code: A

13 Page 1 October 6, 2010 Mr. Andrew Young Executive Vice President, Western Region Rising Tree Wind Farm LLC 332 South Michigan Avenue, Suite 200 Chicago, IL Re: Engineering, Design, Procurement and Construction Letter Agreement for the Rising Tree Wind Farm Project Dear Mr. Young: EDP Renewables North America LLC ( EDPR NA ), formerly known as Horizon Wind Energy LLC, submitted an Interconnection Request to the California Independent System Operator Corporation ( CAISO ) proposing to construct a wind generation facility with a net output of 199 MW to be located in Mojave, California (the Homestead Wind Farm Project ); interconnect the Homestead Wind Farm Project to Southern California Edison Company s ( SCE ) new Windhub Substation via a customer-owned generation tie-line; and transmit Energy and/or Ancillary Services to the CAISO Controlled Grid. A Phase II Interconnection Study report containing the scope of work, estimated cost and estimated completion schedule for the Participating TO s Interconnection Facilities and Network Upgrades was completed for the Homestead Wind Farm Project, and tendered to EDPR NA by the CAISO on July 12, An addendum to the Phase II Interconnection Study report which includes additional scope, a revised estimated cost, and a revised construction schedule was tendered to EDPR NA by the CAISO on September 24, In the August 10, 2010 results meeting for the Phase II Interconnection Study, EDPR NA stated that it would permit, construct and own the single-mode fiber optic cable from the Homestead Wind Farm Project to SCE s Windhub 220 kv Substation. Such fiber optic cable would be a diverse telecomunnication path from the optical ground wire ( OPGW ) that EDPR NA would construct and own in its 220 kv transmission line from the Homestead Wind Farm Project to the Windhub 220 kv Substation. A second addendum to the Phase II Interconnection Study report which incorporates this scope change and additional scope changes at Windhub Substation to accommodate the Homestead Wind Farm Project and the associated cost estimate was tendered by the CAISO on February 23, On May 18, 2011, the CAISO provided notification to SCE that the ownership of the Homestead Wind Farm Project was changed by the Interconnection Customer to Rising Tree Wind Farm LLC ( Rising Tree ), a wholly-owned subsidiary of EDPR NA. On July 27, 2011, Rising Tree provided written notification to the CAISO that the project name was changed to the Rising Tree Wind Farm Project.

14 Page 2 All capitalized terms used herein, and not otherwise defined, shall have the meaning ascribed to that term in the CAISO Tariff. Rising Tree and SCE are hereinafter sometimes referred to individually as Party and collectively as Parties. SCE and Rising Tree intend to execute a Large Generator Interconnection Agreement ( LGIA ) that would include the terms for SCE to engineer, design, construct, own, operate and maintain, and for Rising Tree to pay for, the Participating TO s Interconnection Facilities and its allocated share of the Participating TO s Reliability Network Upgrades. Rising Tree s targeted In-Service Date of the Rising Tree Wind Farm Project is July 31, In the interest of timely completion of the Participating TO s Interconnection Facilities and the Participating TO s Reliability Network Upgrades required to interconnect the Rising Tree Wind Farm Project, the Parties desire that SCE perform the engineering and design of, procurement of material and equipment for, and construction of such facilities as specified in Exhibit A hereto as soon as possible. The purpose of this letter agreement ("Agreement") is to agree upon an interim arrangement pursuant to which SCE will perform the engineering and design of, procurement of material and equipment for, and construction of the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades specified in Exhibit A hereto, as follows: 1. SCE will perform the engineering and design of, procurement of material and equipment for, and construction of the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades specified in Exhibit A hereto. 2. Rising Tree shall pay all of SCE s actual charges and expenses for the engineering and design of, procurement of material and equipment for, and construction of the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades. The charges and expenses incurred pursuant to this Agreement shall include, without limitation, SCE s costs of SCE employees and contractors including related overheads. Such charges and expenses are estimated to be $6,720,000 for the Participating TO s Interconnection Facilities and $2,661,000 for the Participating TO s Reliability Network Upgrades under the Agreement, as identified in Exhibit A hereto, for a total estimated amount of $9,381,000. SCE estimates the income tax liability associated with the Participating TO s Interconnection Facilities to be $2,352,000, as shown in Exhibit A. 3. Pursuant to Section of the Generator Interconnection Procedures, the third posting of the Interconnection Financial Security associated with the Participating TO s Interconnection Facilities and the Participating TO s Reliability Network Upgrades identified in the Phase II Interconnection Study for the Rising Tree Wind Farm Project, is due on or before the start of Construction Activities. The Construction Activities for the Rising Tree Wind Farm Project are expected to commence in March 2012 in order to accommodate the project s In-Service Date. The total amount of the third posting due to SCE for the Participating TO s Interconnection Facilities and the Participating TO s

15 Page 3 Reliability Network Upgrades under this Agreement is $5,061,000, as shown in Exhibit B hereto. 4. Rising Tree shall pay to SCE the deposits and provide the letters of credit or parent guarantees acceptable to SCE ( Security Instruments ) pursuant to the schedule listed in Exhibit B hereto to perform its obligations under the terms of this Agreement. SCE shall notify Rising Tree in writing within a reasonable time if SCE learns that charges and expenses are likely to exceed the total estimated amount of $9,381,000, which notification shall provide updated cost estimates in the format of Exhibit A. In such notification, SCE shall specify any additional deposit amount required to be paid by Rising Tree, and the amount by which the Security Instruments shall be increased, for SCE to continue work under the terms of this Agreement. Rising Tree shall pay such additional deposit amount and provide SCE the additional Security Instruments within thirty (30) calendar days of receipt of such notification. If Rising Tree does not pay any of the deposit amounts or provide the Security Instruments in the required amount by the due dates specified in this Agreement, SCE shall tender a cure notice to Rising Tree of such non-payment or failure to provide the Security Instruments and a final deadline for making such payment or providing such Security Instruments, which shall be fifteen (15) Business Days from the receipt of the notice. Subject to the foregoing sentence, if Rising Tree does not pay the amounts and provide the Security Instruments by the due dates specified in this Agreement, SCE may stop work and this Agreement shall terminate immediately upon written notice by SCE, subject to acceptance or approval by FERC. 5. SCE and Rising Tree are entering into this Agreement in order to expedite the engineering and design of, procurement of materials and equipment for, and construction of the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades. SCE shall use commercially reasonable efforts to complete the engineering and design of, procurement of materials and equipment for, and construction of the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades in accordance with Good Utility Practice by July 31, 2013, provided that Rising Tree does the following: (i) meets all of the due dates specified in this Agreement, and (ii) provides the project information requested in the monthly customer meetings for the Rising Tree Wind Farm Project by the dates required by SCE; however, SCE does not warrant that such work will be completed within such time. Rising Tree understands and acknowledges that such date is only an estimate and that various events could delay the actual completion of the engineering and design of, procurement of materials and equipment for, and construction of the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades. SCE shall not be liable for any cost or damage incurred by Rising Tree because of any delay in the work provided for in this Agreement. 6. SCE and Rising Tree intend to enter into an LGIA that will state the terms for payment of SCE's costs incurred for performing the work included in this Agreement. Such LGIA would supersede this Agreement upon its effective date. Rising Tree s deposits and the Security Instruments under the terms of this Agreement, including any additional deposits and increases to the Security Instruments pursuant to Section 4 of this Agreement, would

16 Page 4 be credited to the amount due under the terms of the LGIA. 7. Subject to Section 8 below, this Agreement shall terminate upon the earliest of the following to occur: (i) notice that this Agreement is not accepted for filing by FERC; (ii) the effective date of the LGIA, which supersedes this Agreement, as defined in that LGIA; (iii) written notice from Rising Tree to SCE at any time; or (iv) written notice by SCE and acceptance by FERC pursuant to Section 4 of this Agreement. Rising Tree shall have the right to terminate this Agreement by written notice at its sole discretion; in such event termination will become effective two (2) business days after receipt by SCE of the termination notice. 8. Rising Tree s obligations to pay charges and expenses incurred or irrevocably committed to be incurred pursuant to this Agreement as of the termination date of this Agreement will survive termination of this Agreement, except insofar as payment of such charges and expenses is provided for in an LGIA that is accepted for filing by the FERC and becomes effective. In the event of termination of this Agreement in the absence of such effective LGIA, SCE shall submit an invoice to Rising Tree of all such charges and expenses as soon as reasonably practicable but within twelve (12) months from the date of termination of this Agreement. Rising Tree shall have the same audit rights as would be afforded under Section 25 of the Standard Large Generator Interconnection Agreement. a. In the event that Rising Tree s deposits in accordance with Section 4 of this Agreement exceed the amount of SCE s charges and expenses incurred or irrevocably committed to be incurred pursuant to this Agreement, SCE shall return the excess amount to Rising Tree, without interest, within thirty (30) calendar days after the date of the invoice provided in accordance with this Section 8 hereof, without offset for any amount which may be in dispute. In the event of any such dispute, the parties shall promptly meet and attempt to resolve the dispute. In the event the parties determine that Rising Tree did not owe SCE the full amount paid, then SCE shall refund to Rising Tree, without interest, the amount overpaid by Rising Tree within thirty (30) calendar days of such determination. b. In the event that Rising Tree s deposits in accordance with Section 4 of this Agreement are less than the amount of SCE s charges and expenses incurred or irrevocably committed to be incurred pursuant to this Agreement, then Rising Tree shall pay the difference, without interest, as reflected in the invoice, within thirty (30) calendar days of receipt of the invoice provided in accordance with this Section 8 hereof, without offset for any amount which may be in dispute. In the event of any such dispute, the parties shall promptly meet and attempt to resolve the dispute. In the event the parties determine that Rising Tree did not owe SCE the full amount paid, then SCE shall refund to Rising Tree, without interest, the amount overpaid by Rising Tree within thirty (30) calendar days of such determination. c. If SCE has purchased any materials or equipment, or entered into any contracts for services, under this Agreement prior to termination, then upon termination SCE shall, to

17 Page 5 the extent possible and with Rising Tree's authorization, cancel any pending orders of, or return, such materials or equipment, or cancel or terminate such contracts. In the event Rising Tree elects not to authorize cancellation of the materials or equipment, Rising Tree shall assume all remaining payment obligations with respect to such material and equipment, SCE shall deliver such material and equipment to Rising Tree as soon as practicable at Rising Tree s expense, and Rising Tree shall own all such materials or equipment. To the extent that Rising Tree has already paid SCE for any or all costs of such materials or equipment not taken by Rising Tree, SCE shall refund such amounts to Rising Tree, less any costs or penalties incurred by SCE to cancel pending orders, or return, of such materials and equipment. SCE may, at its option, retain any portion of such materials and equipment that Rising Tree chooses not to accept delivery of, in which case SCE shall be responsible for all costs associated with procuring such materials or equipment. SCE shall credit or refund to Rising Tree with the invoice specified in Section 8 herein any and all amounts paid by Rising Tree hereunder for such materials or equipment, and SCE shall own all such materials or equipment. d. In the event that Rising Tree and SCE enter into an LGIA subsequent to the termination of this Agreement, then any applicable work product generated by SCE and any associated payments made by Rising Tree pursuant to this Agreement not already credited or refunded on the invoice specified in Section 8 herein shall be reflected in the scope of, and the amount due under, such LGIA. 9. For the purposes of this Agreement, Force Majeure shall mean any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, any order, regulation or restriction imposed by governmental, military or lawfully established civilian authorities, or any other cause beyond a Party s control. A Force Majeure event does not include acts of negligence or intentional wrongdoing by the Party claiming Force Majeure. Economic hardship is not considered a Force Majeure event. 10. The Parties intend that all deposits and payments made by Rising Tree to SCE under this Agreement shall be non-taxable in accordance with the Internal Revenue Code and any applicable state income tax laws and shall not be taxable as contributions in aid of construction or otherwise under the Internal Revenue Code and any applicable state income tax laws. The Security Instrument associated with the estimated tax liability shall remain in place for ten (10) years unless superseded by another agreement or security instrument pursuant to Section of the Standard Large Generator Interconnection Agreement. SCE shall have the right to draw on the Security Instrument associated with the estimated tax liability if the Internal Revenue Service makes a final determination that activity taken pursuant to this Agreement is a federal income taxable event. SCE may draw on the Security Instrument in the actual amount of the tax liability. SCE shall also have the right to draw on the Security Instrument for any amounts due to SCE during the term of this Agreement pursuant to Section 8(b) in the event that Rising Tree s deposits are less than the amount of SCE s expenses incurred and (a) Rising Tree s dissolution or termination of existence; or (b) if any of the following actions or proceedings occur:

18 Page 6 Rising Tree s insolvency, becoming the subject of a petition in bankruptcy, either voluntary or involuntary, or in any other proceeding under federal bankruptcy laws; making an assignment for benefit of creditors, excluding any assignment for financing purposes; or being named in a suit for the appointment of a receiver. 11. No Party shall be considered to be in Default with respect to any obligation hereunder, other than the obligation to pay money when due, if prevented from fulfilling such obligation by Force Majeure. For the purposes of this Agreement, Default shall mean the failure of a breaching Party to cure its breach. A Party unable to fulfill any obligation hereunder (other than an obligation to pay money when due) by reason of Force Majeure shall give notice and the full particulars of such Force Majeure to the other Party in writing or by telephone as soon as reasonably possible after the occurrence of the cause relied upon. Telephone notices given pursuant to this Section shall be confirmed in writing as soon as reasonably possible and shall specifically state full particulars of the Force Majeure, the time and date when the Force Majeure occurred and when the Force Majeure is reasonably expected to cease. The Party affected shall exercise due diligence to remove such disability with reasonable dispatch, but shall not be required to accede or agree to any provision not satisfactory to it in order to settle and terminate a strike or other labor disturbance. 12. Each Party shall at all times indemnify, defend, and hold the other Party harmless from, any and all Losses arising out of or resulting from the other Party s action or inactions of its obligations under this Agreement on behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the indemnified Party. For the purposes of this Agreement, Losses shall mean any and all damages, losses, and claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third parties. 13. In no event shall any Party be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, including but not limited to loss of profit or revenue, loss of the use of equipment, cost of capital, cost of temporary equipment or services, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability; provided, however, that damages for which a Party may be liable to another Party under another agreement will not be considered to be special, indirect, incidental, or consequential damages hereunder. 14. Rising Tree shall, at its own expense, maintain in force throughout the period of this Agreement, and until released by SCE, the following minimum insurance coverages, with insurers rated no less than A- (with a minimum size rating of VII) by Bests Insurance Guide and Key Ratings and authorized to do business in the state where the Point of Interconnection is located: a. Employer's Liability and Workers' Compensation Insurance providing statutory benefits in accordance with the laws and regulations of the state in which the Point of

19 Page 7 Interconnection is located. b. Commercial General Liability Insurance including premises and operations, personal injury, broad form property damage, broad form blanket contractual liability coverage (including coverage for the contractual indemnification) products and completed operations coverage, coverage for explosion, collapse and underground hazards, independent contractors coverage, coverage for pollution to the extent normally available and punitive damages to the extent normally available and a cross liability endorsement, with minimum limits of one million dollars ($1,000,000) per occurrence/one million dollars ($1,000,000) aggregate combined single limit for personal injury, bodily injury, including death and property damage. c. Business Automobile Liability Insurance for coverage of owned and non-owned and hired vehicles, trailers or semi-trailers designed for travel on public roads, with a minimum, combined single limit of one million dollars ($1,000,000) per occurrence for bodily injury, including death, and property damage. d. Excess Public Liability Insurance over and above the Employer's Liability Commercial General Liability and Business Automobile Liability Insurance coverage, with a minimum combined single limit of twenty million dollars ($20,000,000) per occurrence/twenty million dollars ($20,000,000) aggregate. e. The Commercial General Liability Insurance, Business Automobile Insurance and Excess Public Liability Insurance policies shall name SCE, its parents, associated and affiliate companies and its directors, officers, agents, servants and employees ("Other Party Group") as additional insured. All policies shall contain provisions whereby the insurers waive all rights of subrogation in accordance with the provisions of this Agreement against the Other Party Group and provide thirty (30) calendar days advance written notice to the Other Party Group prior to anniversary date of cancellation or any material change in coverage or condition. f. The Commercial General Liability Insurance, Business Automobile Liability Insurance and Excess Public Liability Insurance policies shall contain provisions that specify that the policies are primary and shall apply to such extent without consideration for other policies separately carried and shall state that each insured is provided coverage as though a separate policy had been issued to each, except the insurer s liability shall not be increased beyond the amount for which the insurer would have been liable had only one insured been covered. Rising Tree shall be responsible for its deductibles or retentions. g. The Commercial General Liability Insurance, Business Automobile Liability Insurance and Excess Public Liability Insurance policies, if written on a Claims First Made Basis, shall be maintained in full force and effect for two (2) years after termination of this Agreement, which coverage may be in the form of tail coverage or extended reporting period coverage if agreed by the Parties. h. The requirements contained herein as to the types and limits of all insurance to be maintained by Rising Tree are not intended to and shall not in any manner, limit or qualify the liabilities and obligations assumed by the Rising Tree under this Agreement. i. By March 30, 2012, and as soon as practicable after the end of each fiscal year or at the

20 Page 8 renewal of the insurance policy and in any event within ninety (90) calendar days thereafter, Rising Tree shall provide certification of all insurance required in this Agreement, executed by each insurer or by an authorized representative of each insurer. j. Notwithstanding the foregoing, Rising Tree may self-insure to meet the minimum insurance requirements of Sections 14b through 14h to the extent it maintains a selfinsurance program; provided that, Rising Tree s senior unsecured debt or issuer rating is BBB-, or better, as rated by Standard & Poor s and that its self-insurance program meets the minimum insurance requirements of Sections 14b through 14h. For any period of time that Rising Tree s senior unsecured debt rating and issuer rating are both unrated by Standard & Poor s or are both rated at less than BBB- by Standard & Poor s, Rising Tree shall comply with the insurance requirements applicable to it under Sections 14b through 14i. In the event that Rising Tree is permitted to self-insure pursuant to this Section 14j, it shall notify SCE that it meets the requirements to self-insure and that its self-insurance program meets the minimum insurance requirements in a manner consistent with that specified in Section 14i. k. Rising Tree agrees to report to SCE in writing as soon as practical all accidents or occurrences resulting in injuries to any person, including death, and any property damage arising out of this Agreement. 15. This Agreement constitutes the complete and final expression of the agreement between the parties and is intended as a complete and exclusive statement of the terms of their agreement which supersedes all prior and contemporaneous offers, promises, representations, negotiations, discussions, communications, and other agreements which may have been made in connection with the subject matter of this Agreement. Nothing in this Agreement is intended or shall be deemed to require SCE or Rising Tree to enter into any other agreement, including without limitation, any interconnection agreement. 16. Any waiver at any time by either Party of its rights with respect to a default under this Agreement, or with respect to any other matter arising from this Agreement, shall not be deemed a waiver with respect to any subsequent default or other matter arising in connection therewith. Any delay, with the exception of the statutory period of limitation in assessing or enforcing any right, shall not be deemed a waiver of such right. 17. The covenants, obligations, and liabilities of the parties are intended to be several and not joint or collective, and nothing contained in this Agreement shall ever be construed to create an association, joint venture, trust or partnership, or to impose a trust or partnership covenant, obligation, or liability on or with regard to either Party. Each Party shall be individually responsible for its own covenants, obligations, and liabilities as provided in this Agreement. Neither Party shall be under the control of the other Party. Neither Party shall be the agent of or have a right or power to bind the other Party without such other Party s express written consent.

21 Page The Parties do not intend to create rights in, or to grant remedies to, any third party as a beneficiary either of this Agreement or of any duty, covenant, obligation, or undertaking established herein. 19. This Agreement shall be interpreted by and in accordance with the laws of the State of California, without regard to the principles of conflict of laws thereof, or the laws of the United States, as applicable, as if executed and to be performed wholly within the United States. 20. This Agreement shall be binding upon the Parties and their successors and assigns. Either Party may assign this Agreement subject to the conditions set forth in Article 19 of the Standard Large Generator Interconnection Agreement. 21. SCE will file this Agreement for acceptance by the FERC. Upon request by SCE, Rising Tree shall support acceptance of this Agreement as filed, including waiver of any necessary filing and notice requirements. Such support shall include a written statement of concurrence with such filing, if requested by SCE. 22. Ambiguities or uncertainties in the wording of this Agreement shall not be construed for or against any Party, but shall be construed in the manner that most accurately reflects the parties intent as of the date they executed this Agreement. 23. This Agreement shall become effective on the date the Agreement is fully executed by both Parties and the initial deposit and Security Instrument pursuant to Section 4 of this Agreement are received by SCE ("Effective Date"). If SCE does not receive the fully executed Agreement, initial deposit, and Security Instrument within thirty (30) calendar days of Rising Tree s receipt of this Agreement, then the offer reflected in this Agreement will expire and this Agreement will be of no effect.

22 Page This Agreement may be executed in one or more counterparts, each of which shall be deemed to be an original and all of which together shall be deemed to be one and the same instrument. SOUTHERN CALIFORNIA EDISON COMPANY By /s/david Mead David L. Mead Vice President Agreed to this_8th_ day of _October_, 2010 RISING TREE WIND FARM LLC (a wholly-owned subsidiary of EDP Renewables North America LLC, formerly Horizon Wind Energy LLC) By /s/ Andrew Young Name: Andrew Young Title: Executive Vice President, Western Region

23 Page 11 EXHIBIT A DESCRIPTION AND ESTIMATED COST SUMMARY ENGINEERING, DESIGN, PROCUREMENT AND CONSTRUCTION WORK Description of Work: The engineering, design, procurement and construction work to be performed under this Agreement are for the Participating TO s Interconnection Facilities and Participating TO s Reliability Network Upgrades necessary to accommodate the Rising Tree Wind Farm Project s desired In-Service Date. The scope described below is based on the second addendum to the Phase II Interconnection Study report; however, additional engineering for a different project is currently underway which will further refine the scope. Such scope refinement and corresponding cost estimates will be included in the forthcoming LGIA. I. Participating TO s Interconnection Facilities: a. Transmission: (1) Relocation of the existing 220 kv transmission line for the generation project referred to herein as Project Q95 from position 10 to position 3 at the Windhub 220 kv switchyard. Installation of one (1) 220 kv dead-end structure, two (2) spans of conductors and twelve (12) dead-end insulator / hardware assemblies between the last existing customer-owned structure located outside of and nearest to the Windhub Substation property line for Project Q95 and the substation deadend rack at the Windhub 220 kv switchyard. (2) Relocation of the existing 220 kv transmission line for the generation project referred to herein as Project Q96 from position 11 to position 4 at the Windhub 220 kv switchyard. Installation of one (1) 220 kv dead-end structure, two (2) spans of conductors and twelve (12) dead-end insulator / hardware assemblies between the last existing customer-owned structure located outside of and nearest to the Windhub Substation property line for Project Q96 and the substation deadend rack at the Windhub 220 kv switchyard. (3) Relocation of the Highwind 220 kv transmission line from position 12 to position 10 at the Windhub 220 kv switchyard. Installation of one (1) 220 kv dead-end structure and two spans of conductors. (4) Extension of the Rising Tree Wind Farm Windhub 220 kv transmission line from Rising Tree s last structure located outside of, and nearest to, the Windhub 220 kv Substation property line ( Last Structure ) to the position 11 substation dead-ead rack at the Windhub 220 kv switchyard using the existing two 220 kv transmission structures. Installation of three (3) spans of conductor on the vacant side of the such existing structures.

24 Page 12 b. Substations - Windhub 220 kv Substation: (1) Termination of the Rising Tree Wind Farm Windhub 220 kv transmission line at position 11, and installation of the following facilities at position 11: A. One (1) G.E. L90 line current differential relay. B. One (1) SEL 311 L line current differential relay. (2) Installation of the following facilities for the relocation of Project Q95 from position 10 to position 3: A. One (1) 65-foot high by 50-foot wide dead-end structure. B. Three (3) MFD coupling capacitor voltage transformers with steel pedestal support structures. C. Three (3) 60-foot line tie-downs with 2B-1590 kcmil ACSR conductors. D. One (1) G.E. L90 line current differential relay. E. One (1) SEL 311L line current differential relay. (3) Installation of the following facilities for the relocation of Project Q96 from position 10 to position 4: A. One (1) 65-foot high by 50-foot wide dead-end structure. B. Three (3) MFD coupling capacitor voltage transformers with steel pedestal support structures. C. Three (3) 60-foot line tie-downs with 2B-1590 kcmil ACSR conductors. D. One (1) G.E. L90 line current differential relay. E. One (1) SEL 311L line current differential relay. c. Telecommunications: (1) Installation of fiber optic cable to extend the OPGW from the Last Structure into the communication room at the Windhub 220 kv Substation. (2) Installation of fiber optic cable to extend the diverse telecommunication path from the Last Structure into the communication room at the Windhub 220 kv Substation. (3) Installation of the telecommunication lightwave terminal equipment at the Rising Tree Wind Farm Project and the Windhub 220 kv Substation to support the remote terminal unit ( RTU ), SCADA and line protection relays for the Rising Tree Wind Farm Windhub 220 kv transmission line, and the special protection system ( SPS ). d. Transmission Project Licensing and Environmental Health and Safety: Performance of all required environmental activities for the installation of SCE s portion of the Rising Tree Wind Farm -Windhub 220 kv transmission line and

25 Page 13 telecommunication routes. e. Metering: Installation of revenue meters required to meter the retail load at the Rising Tree Wind Farm Project. f. Power System Control: Installation of one (1) RTU at the Rising Tree Wind Farm Project to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Rising Tree Wind Farm Project and the plant auxiliary load, and transmit the information to SCE s Grid Control Center. II. Participating TO s ReliabilityNetwork Upgrades: a. Windhub Substation - Relocation Work: (1) For the relocation of the Project Q95 transmission line from position 10 to position 3, installation of the following equipment at position 3: A. Two (2) 3000 A, 63 ka circuit breakers. B. Four (4) 3000 A, 80 ka horizontal-mounted group-operated disconnect switches. C. One (1) grounding switch attachment (for line grounding). D. Eighteen (18) bus supports with associated steel pedestals. E. Update Windhub RTU with new protection relay points. (2) For the relocation of the Project Q96 transmission line from position 11 to position 4, installation of the following equipment at position 4: A. Two (2) 3000 A, 63 ka circuit breakers. B. Four (4) 3000 A, 80 ka horizontal-mounted group-operated disconnect switches. C. One (1) grounding switch attachment (for line grounding). D. Eighteen (18) bus supports with associated steel pedestals. E. Update Windhub RTU with new protection relay points. b. Windhub AA Bank N-1 SPS: Install SPS to trip the Rising Tree Wind Farm Project and other Windhub-area generation for AA bank N-1 conditions. Such facilities consist of the following: (1) Four (4) G.E. N-60 relays for bank monitoring. (2) Two (2) RTUs.

26 Page 14 Estimated Cost Summary: Cost of Participating TO s Interconnection Facilities Cost of Participating TO s Reliability Network Upgrades - Estimated Tax Liability* Element Participating TO s Interconnection Facilities Transmission $3,155,000 - $1,104,250 Substations $1,894,000 - $662,900 Telecommunications $1,201,000 - $420,350 Transmission Project Licensing $16,000 - $5,600 Environmental Health & Safety $361,000 - $126,350 Metering $27,000 - $9,450 Power System Control $66,000 - $23,100 Subtotal $6,720,000 - $2,352,000 Participating TO s Reliability Network Upgrades Windhub Substation Relocation Work - $2,453,000** - Windhub AA Bank N-1 SPS - $208,000** - Subtotal - $2,661,000 - Total $6,720,000 $2,661,000 $2,352,000 * The estimated tax liability is based on a tax rate of 35%. ** The estimated amounts represent Rising Tree s allocated cost responsibility of the Participating TO s Reliability Network Upgrades pursuant to the Phase II Interconnection Study results for the Rising Tree Wind Farm Project.

27 Page 15 Payment Period Cost for the Participating TO s Interconnection Facilities EXHIBIT B DEPOSIT AND SECURITY INSTRUMENT SCHEDULE Cost for the Participating TO s Reliability Network Upgrades Total Deposit Amount Security Amount for Estimated Tax Liability Security Balance Due for Third Posting Due Date 1 $580,000 $380,000 $960,000 $1,025,000* - Payment received 10/15/ , ,000 1,440, Payment Received 1/11/ , ,000 1,440, Payment received 4/4/ , , , Payment received 7/1/ ,000 82, ,000 1,327,000 $5,061,000** 3/15/ , , , /1/ ,000, ,000 1,115, /1/ ,006, ,000 1,244, /1/ , , , /1/ , , , /1/2013 Total $6,720,000 $2,661,000 $9,381,000 $2,352,000 $5,061,000 * The Interconnection Customer provided security for the estimated tax liability in the amount of $1,025,000, which is $10,000 more than what was required. Payment Period 5 for the estimated tax liability security is therefore reduced by such $10,000 amount from $1,337,000 to $1,327,000. ** $5,061,000 is the sum of security amounts owed for the Participating TO s Interconnection Facilities and the Participating TO s Reliability Network Upgrades identified in this Agreement minus the payments already received by SCE for such facilities and upgrades under the Agreement as follows: - Participating TO s Interconnection Facilities security owed = $6,720,000 $2,610,000 = $4,110,000 - Participating TO s Reliability Network Upgrades security owed = $2,661,000 - $1,710,000 = $951,000 The second posting received by the Participating TO for the Rising Tree Wind Farm Project would need to be adjusted or replaced such that the security amount totals $5,061,000 for the third posting under this Agreement. The $5,061,000 posting excludes the security for the Vincent 500 kv circuit breakers to be collected under the Generator Interconnection Procedures.

28 Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 90 Title Page FERC FPA Electric Tariff Formatted: Font: Times New Roman, 12 pt Formatted: Font: Arial Formatted: Header, Border: Bottom: (No border) Formatted: Font: Times New Roman Formatted: Title,t Formatted: Indent: Left: 0.5", First line: 0.5" ENGINEERING, DESIGN AND, PROCUREMENT AND CONSTRUCTION LETTER AGREEMENT BETWEEN HORIZONRISING TREE WIND ENERGYFARM LLC AND SOUTHERN CALIFORNIA EDISON COMPANY HOMESTEADRISING TREE WIND FARM PROJECT

29 Contract Effective Date: 10/15/2010 Tariff Record Proposed Effective Date: 10/15/20103/17/ Version Number: TOT219 Option Code: A Formatted: Tab stops: 3", Centered + 6", Right + Not at 4.69" "

30 Page 1 October 6, 2010 Mr. Andrew Young Chief Development Officer HorizonExecutive Vice President, Western Region Rising Tree Wind EnergyFarm LLC 332 South Michigan Avenue, Suite 200 Chicago, IL Re: Engineering, Design and, Procurement and Construction Letter Agreement for the HomesteadRising Tree Wind Farm Project Dear Mr. Young: Horizon Wind Energy LLC ( Horizon ) proposesedp Renewables North America LLC ( EDPR NA ), formerly known as Horizon Wind Energy LLC, submitted an Interconnection Request to the California Independent System Operator Corporation ( CAISO ) proposing to construct a wind generation facility with a net output of 199 MW to be located in Mojave, California (the Homestead Wind Farm Project ); interconnect the Homestead Wind Farm Project to Southern California Edison Company s ( SCE ) new Windhub Substation via a customer-owned generation tie-line; and transmit Energy and/or Ancillary Services to the California Independent System Operator ( CAISO ) Controlled Grid. Formatted: Left, Widow/Orphan control All capitalized terms used herein, and not otherwise defined, shall have the meaning ascribed to that term in the CAISO Tariff. Horizon and SCE are hereinafter sometimes referred to individually as Party and collectively as Parties. A Phase II Interconnection Study report containing the scope of work, estimated cost and estimated completion schedule for the Participating TO s Interconnection Facilities and Network Upgrades was completed for the Homestead Wind Farm Project, and tendered to HorizonEDPR NA by the CAISO on July 12, An addendum to the Phase II Interconnection Study report which includes additional scope, a revised estimated cost, and a revised construction schedule was tendered to HorizonEDPR NA by the CAISO on September 24, As requested by Horizon inin the August 10, 2010 results meeting for the Phase II Interconnection Study, Horizon has elected toedpr NA stated that it would permit, construct and own the single-mode fiber optic cable from the Homestead Wind Farm Project to SCE s Windhub 220 kv Substation. Such fiber optic cable willwould be a diverse telecomunnication path from the optical ground wire ( OPGW ) that Horizon willedpr NA would construct and own in its 220 kv transmission line from the Homestead Wind Farm Project to the Windhub 220 kv Substation ( Homestead Windhub 220 kv Line ).. A second addendum to the Phase II Interconnection Study report which incorporates this scope change and additional scope changes

31 Page 2 at Windhub Substation to accommodate the Homestead Wind Farm Project and the associated cost estimate was tendered by the CAISO on February 23, SCE and HorizonOn May 18, 2011, the CAISO provided notification to SCE that the ownership of the Homestead Wind Farm Project was changed by the Interconnection Customer to Rising Tree Wind Farm LLC ( Rising Tree ), a wholly-owned subsidiary of EDPR NA. On July 27, 2011, Rising Tree provided written notification to the CAISO that the project name was changed to the Rising Tree Wind Farm Project. All capitalized terms used herein, and not otherwise defined, shall have the meaning ascribed to that term in the CAISO Tariff. Rising Tree and SCE are hereinafter sometimes referred to individually as Party and collectively as Parties. SCE and Rising Tree intend to execute a Large Generator Interconnection Agreement ( LGIA ) that would include the terms for SCE to engineer, design, construct, own, operate and maintain, and for HorizonRising Tree to pay for, the Participating TO s Interconnection Facilities and its allocated share of the Participating TO s Reliability Network Upgrades. Horizon s Rising Tree s targeted in-service datein-service Date of the HomesteadRising Tree Wind Farm Project is September 15, 2012July 31, In the interest of timely completion of the Participating TO s Interconnection Facilities and the Participating TO s Reliability Network Upgrades required solely to interconnect the HomesteadRising Tree Wind Farm Project ( Plan of Service Network Upgrades ),, the Parties desire that SCE perform the engineering and design of, and procurement of material and equipment for, and construction of such facilities as specified in Exhibit A hereto as soon as possible. The purpose of this letter agreement ("Agreement") is to agree upon an interim arrangement pursuant to which SCE will perform the engineering and design of, and procurement of material and equipment for, and construction of the Participating TO s Interconnection Facilities and Plan of ServiceParticipating TO s Reliability Network Upgrades specified in Exhibit A hereto, as follows: 1. SCE will perform the engineering and design of, and procurement of material and equipment for, and construction of the Participating TO s Interconnection Facilities and Plan of ServiceParticipating TO s Reliability Network Upgrades as specified in Exhibit A hereto. 2. HorizonRising Tree shall pay all of SCE s actual charges and expenses for the engineering and design of, and procurement of material and equipment for, and construction of the Participating TO s Interconnection Facilities and Plan of ServiceParticipating TO s Reliability Network Upgrades. The charges and expenses incurred pursuant to this Agreement shall include, without limitation, SCE s costs of SCE employees and contractors including related overheads. Such charges and expenses are estimated to be $4,8006,720,000 for the Participating TO s Interconnection Facilities and $2,661,000 for the Participating TO s Reliability Network Upgrades under the Agreement, as identified in Exhibit A hereto., for a total estimated amount of $9,381,000.

Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 101 FERC FPA Electric Tariff ENGINEERING, DESIGN AND PROCUREMENT LETTER AGREEMENT BETWEEN

More information

Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 92 FERC FPA Electric Tariff ENGINEERING, DESIGN AND PROCUREMENT LETTER AGREEMENT BETWEEN

More information

September 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

September 8, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Karen Koyano Principal Manager FERC Rates & Compliance September 8, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose:

More information

June 21, The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the Letter Agreement.

June 21, The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the Letter Agreement. Karen Koyano Principal Manager FERC Rates & Compliance June 21, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant

More information

Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 93 FERC FPA Electric Tariff ENGINEERING, DESIGN AND PROCUREMENT LETTER AGREEMENT BETWEEN

More information

February 25, The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the LGIA.

February 25, The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the LGIA. Regulation James A. Cuillier Director FERC Rates & Regulation February 25, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms.

More information

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT THIS STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT ( Agreement ) is made and entered

More information

Solar Generator Interconnection Agreement

Solar Generator Interconnection Agreement Solar Generator Interconnection Agreement THIS AGREEMENT is made and entered into as of the last date of signature provided below, by and between Fort Collins Utilities ( FCU ) and ( Generator ), an electric

More information

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT APPENDIX A (insert date) MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT This Interconnection Agreement ( Agreement ) is

More information

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature APPLICATION FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION WITH THE UTILITY SYSTEM Return Completed Application to: Fannin County Electric Coop, INC. Attention: Colton Whisenhunt

More information

Regulation Director FERC Rates & Regulation. January 27, 2012

Regulation Director FERC Rates & Regulation. January 27, 2012 Regulation Director FERC Rates & Regulation January 27, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to

More information

Town of Highlands Board Approved as of May 17, 2012

Town of Highlands Board Approved as of May 17, 2012 TOWN OF HIGHLANDS INTERCONNECTION AGREEMENT FOR SMALL PHOTOVOLTAIC GENERATION FACILITY OF 10 kw OR LESS This PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR SMALL GENERATION 10 kw or less (the Agreement ),

More information

Now, therefore, in consideration of and subject to the mutual covenants contained herein, the Parties agree as follows:

Now, therefore, in consideration of and subject to the mutual covenants contained herein, the Parties agree as follows: Interconnection Agreement for Small Generator Facility Tier 1, Tier 2, Tier 3 or Tier 4 Interconnection (Small Generator Facilities with Electric Nameplate Capacities or 10 MW or smaller) Form 8 This Interconnection

More information

BC Hydro Open Access Transmission Tariff Effective: 09 December 2010 OATT Attachment M-1 Appendix 5 Page 1

BC Hydro Open Access Transmission Tariff Effective: 09 December 2010 OATT Attachment M-1 Appendix 5 Page 1 APPENDIX 5 to SGIP BC Hydro OATT Attachment M-1 Appendix 5 Page 1 Standard Generator Interconnection Agreement (SGIA) Project Name Table of Contents BC Hydro OATT Attachment M-1 Appendix 5 Page 2 Article

More information

December 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

December 22, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 James A. Cuillier Director FERC Rates & Regulation December 22, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: FERC Docket No.

More information

LARGE GENERATOR INTERCONNECTION AGREEMENT (LGIA) AMONG [INTERCONNECTION CUSTOMER] AND [PARTICIPATING TO] AND

LARGE GENERATOR INTERCONNECTION AGREEMENT (LGIA) AMONG [INTERCONNECTION CUSTOMER] AND [PARTICIPATING TO] AND (LGIA) AMONG [INTERCONNECTION CUSTOMER] AND [PARTICIPATING TO] AND CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION PROJECT: Project Name (Q#) TABLE OF CONTENTS LARGE GENERATOR INTERCONNECTION AGREEMENT...

More information

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission This STANDARD INTERCONNECTION AGREEMENT, (the Agreement ), is entered into this day of, 20 by and between, hereinafter called Customer

More information

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20, by Egyptian Electric Cooperative Association,

More information

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Regulation James A. Cuillier Director FERC Rates & Regulation January 31, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms.

More information

February 29, Southwest Power Pool, Inc., Docket No. ER16- Submission of Meter Agent Services Agreement

February 29, Southwest Power Pool, Inc., Docket No. ER16- Submission of Meter Agent Services Agreement February 29, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 RE: Southwest Power Pool, Inc., Docket No. ER16- Submission of Meter

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff CAISO TARIFF APPENDIX CC

California Independent System Operator Corporation Fifth Replacement Electronic Tariff CAISO TARIFF APPENDIX CC CAISO TARIFF APPENDIX CC Large Generator Interconnection Agreement for Interconnection Requests in a Queue Cluster Window that are tendered a Large Generator Interconnection Agreement on or after July

More information

August 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

August 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Regulation Karen Koyano Principal Manager FERC Rates & Compliance August 25, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms.

More information

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland;

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland; MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW FOR MARYLAND STATE AND LOCAL GOVERNMENT ENTITIES This Agreement

More information

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION AVAILABILITY This rate schedule is applicable to Customers with facilities consisting of one or more on-site generating units operating in parallel with the Company s system (Distributed Generation) as

More information

December 10, Southwest Power Pool, Inc., Docket No. ER15- Submission of Meter Agent Services Agreement

December 10, Southwest Power Pool, Inc., Docket No. ER15- Submission of Meter Agent Services Agreement The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 December 10, 2014 RE: Southwest Power Pool, Inc., Docket No. ER15- Submission of Meter

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59898-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57292-E Sheet 1 GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59895-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57290-E GENERATING FACILITY INTERCONNECTION AGREEMENT (Non-Exporting)

More information

ATTACHMENT AM METER AGENT SERVICES AGREEMENT FOR SPP MARKET BETWEEN CITY OF INDEPENDENCE, MISSOURI (MARKET PARTICIPANT) AND

ATTACHMENT AM METER AGENT SERVICES AGREEMENT FOR SPP MARKET BETWEEN CITY OF INDEPENDENCE, MISSOURI (MARKET PARTICIPANT) AND ATTACHMENT AM METER AGENT SERVICES AGREEMENT FOR SPP MARKET BETWEEN CITY OF INDEPENDENCE, MISSOURI (MARKET PARTICIPANT) AND WESTAR ENERGY, INC. (METER AGENT) OCTOBER 1, 2009 This Agreement made and entered

More information

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20, by Kosciusko Rural Electric Membership Corporation,

More information

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW This Agreement is made and entered into this day of, by

More information

INTERCONNECTION AND OPERATING AGREEMENT

INTERCONNECTION AND OPERATING AGREEMENT INTERCONNECTION AND OPERATING AGREEMENT This Interconnection and Operating Agreement ( Agreement ) for the facility located at, in the City of, Michigan, is entered into this day of, 200 by and between

More information

STANDARD AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES WITH A CAPACITY LESS THAN OR EQUAL TO 10 MW

STANDARD AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES WITH A CAPACITY LESS THAN OR EQUAL TO 10 MW STANDARD AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES WITH A CAPACITY LESS THAN OR EQUAL TO 10 MW This Agreement is made and entered into this day of, by and between, a organized

More information

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3 5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF GREATER THAN 150 kw BETWEEN CONSUMERS ENERGY COMPANY AND (PROJECT DEVELOPER NAME) GENERATOR

More information

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND This Standard Generation Interconnection Agreement ( Interconnection Agreement ), dated, for purposes of identification only, is

More information

Title Page Southern California Edison Company Tariff Title: Transmission Owners Tariff Tariff Record Title: First Revised Service Agreement No. 39 FER

Title Page Southern California Edison Company Tariff Title: Transmission Owners Tariff Tariff Record Title: First Revised Service Agreement No. 39 FER Title Page Southern California Edison Company Tariff Title: Transmission Owners Tariff Tariff Record Title: First Revised Service Agreement No. 39 FERC FPA Electric Tariff INTERCONNECTION FACILITIES AGREEMENT

More information

Project J290. AMENDED AND RESTATED FACILITIES CONSTRUCTION AGREEMENT by and among. Border Winds Energy, LLC, Otter Tail Power Company.

Project J290. AMENDED AND RESTATED FACILITIES CONSTRUCTION AGREEMENT by and among. Border Winds Energy, LLC, Otter Tail Power Company. SA 2678 BORDER WINDS-OTTER TAIL POWER FCA EFFECTIVE 07/19/2014 SUBSTITUTE ORIGINAL SERVICE AGREEMENT NO. 2678 PUBLIC VERSION Project J290 AMENDED AND RESTATED FACILITIES CONSTRUCTION AGREEMENT by and among

More information

SAMPLE FORMS - CONTRACTS Compression Services Agreement (Form 8100) (See Attached Form)

SAMPLE FORMS - CONTRACTS Compression Services Agreement (Form 8100) (See Attached Form) SOUTHERN CALIFORNIA GAS COMPANY Revised CAL. P.U.C. SHEET NO. 51176-G LOS ANGELES, CALIFORNIA CANCELING Original CAL. P.U.C. SHEET NO. 49858-G SAMPLE FORMS - CONTRACTS Compression Services Agreement (Form

More information

Residential Electricity Terms of Service

Residential Electricity Terms of Service Residential Electricity Terms of Service Commonwealth Edison ( Utility ) The following Residential Electricity Terms of Service ( TOS ) will apply to residential customers who choose Champion Energy (

More information

September 21, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

September 21, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 DANIEL L. LARCAMP 202.274.2841 telephone 202.654.5616 facsimile daniel.larcamp@troutmansanders.com TROUTMAN SANDERS LLP Attorneys at Law 401 9th Street, N. W., Suite 1000 Washington, D.C. 20004-2134 202.274.2950

More information

WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION

WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION This Connection Agreement ( Agreement ) is made and entered into this day of, 20, by Whitby Hydro ( the Distributor

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62200-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61862-E Sheet 1 TIME-OF-USE BASE INTERRUPTIBLE PROGRAM AGGREGATOR AGREEMENT

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator ) Docket No. ER14-2824-000 Corporation ) ) MOTION TO INTERVENE, LIMITED PROTEST AND COMMENTS

More information

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2 Karen Koyano Principle Manager FERC Rates and Compliance Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to Section 205 of the Federal Power Act and

More information

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION This Agreement, effective the day of, 20 by and between PUBLIC UTILITY DISTRICT NO. 1 OF Chelan COUNTY, WASHINGTON, herein referred to as

More information

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less SALEM CITY NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Salem City ( Salem

More information

CORE GAS AGGREGATION SERVICE AGREEMENT

CORE GAS AGGREGATION SERVICE AGREEMENT Distribution: PG&E Program Administrator (original) CTA PG&E Gas Contract Administrator PG&E Credit Manager For PG&E Use Only CTA Group No.: Billing Account No.: Date Received: Effective Service Date:

More information

RESIDENTIAL TERMS & CONDITIONS ( Agreement )

RESIDENTIAL TERMS & CONDITIONS ( Agreement ) RESIDENTIAL TERMS & CONDITIONS ( Agreement ) TERM GENERATION SERVICE CHARGES CANCELLATION FEE CONTRACT RENEWAL OTHER 12 N/A monthly billing cycles ("Term"). 5.10 cents per kwh for Generation Service. Price

More information

APPENDIX A. Name: Address:

APPENDIX A. Name:   Address: Adopted from Appendix A of the New York State Standardized Interconnection Requirements and Application Process for New Distributed Generators 2 MW or Less Connected in Parallel with Utility Distribution

More information

ABSTRACT Interconnection agreement for net energy billing DER systems or DER systems up to 100 kw that are compensated at avoided cost.

ABSTRACT Interconnection agreement for net energy billing DER systems or DER systems up to 100 kw that are compensated at avoided cost. ABSTRACT Interconnection agreement for net energy billing DER systems or DER systems up to 100 kw that are compensated at avoided cost. Roseau Electric Cooperative s 10 kw Demonstration Solar System Roseau,

More information

INTERCONNECTION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF CERTIFIED INVERTER-BASED EQUIPMENT 10 kw OR SMALLER

INTERCONNECTION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF CERTIFIED INVERTER-BASED EQUIPMENT 10 kw OR SMALLER INTERCONNECTION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF CERTIFIED INVERTER-BASED EQUIPMENT 10 kw OR SMALLER THIS INTERCONNECTION AGREEMENT ( Agreement ) is made and entered into this day

More information

CONTROL AREA SERVICES AND OPERATIONS TARIFF OTTER TAIL POWER COMPANY

CONTROL AREA SERVICES AND OPERATIONS TARIFF OTTER TAIL POWER COMPANY Otter Tail Power Company Original Sheet No. 1 CONTROL AREA SERVICES AND OPERATIONS TARIFF OTTER TAIL POWER COMPANY Otter Tail Power Company Substitute Original Sheet No. 2 Superseding Original Volume No.

More information

Name: Niagara Mohawk Power Corporation d/b/a National Grid. Address: 1125 Broadway Albany, NY Telephone: Telephone: (518)

Name: Niagara Mohawk Power Corporation d/b/a National Grid. Address: 1125 Broadway Albany, NY Telephone: Telephone: (518) FORM K APPENDIX A NIAGARA MOHAWK POWER CORPORATION d/b/a NATIONAL GRID NEW YORK STATE STANDARDIZED CONTRACT FOR INTERCONNECTION OF NEW DISTRIBUTED GENERATION UNITS WITH CAPACITY OF 2 MW OR LESS CONNECTED

More information

Southern Companies Attachment J (LGIP), Page 2 Standard Large Generator Interconnection Procedures (LGIP) (Applicable to Generating Facilities that ex

Southern Companies Attachment J (LGIP), Page 2 Standard Large Generator Interconnection Procedures (LGIP) (Applicable to Generating Facilities that ex Southern Companies Attachment J (LGIP), Page 1 ATTACHMENT J STANDARD LARGE GENERATOR INTERCONNECTION PROCEDURES (LGIP) including STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT (LGIA) Southern Companies

More information

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING ~A BARC ELECTRIC COOPERATIVE SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING A. APPLICABILITY This Schedule SGI is applicable to Interconnection Customers who own and operate, or

More information

The Cincinnati Gas & Electric Company Certified Supplier Service Agreement

The Cincinnati Gas & Electric Company Certified Supplier Service Agreement The Cincinnati Gas & Electric Company Certified Supplier Service Agreement This CERTIFIED SUPPLIER SERVICE AGREEMENT (Agreement) dated as of, 200 is between and among Cinergy Services, Inc. on behalf of

More information

SMALL RENEWABLE GENERATION INTERCONNECTION AGREEMENT BETWEEN

SMALL RENEWABLE GENERATION INTERCONNECTION AGREEMENT BETWEEN SAMPLE TEMPLATE December 3, 2014 SMALL RENEWABLE GENERATION INTERCONNECTION AGREEMENT BETWEEN PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY, WASHINGTON AND TABLE OF CONTENTS Article 1. Scope and Limitations

More information

NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. Distributed Generation Short Form Contract & DG Rider

NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. Distributed Generation Short Form Contract & DG Rider NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. Distributed Generation Short Form Contract & DG Rider November 1, 2015 Page 1 COOPERATIVE AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION SHORT FORM CONTRACT

More information

06/22/2017. acceptance by Provider. The terms of this Order also apply to any Corrective Action required by Company pursuant to Section 3 hereof.

06/22/2017. acceptance by Provider. The terms of this Order also apply to any Corrective Action required by Company pursuant to Section 3 hereof. 06/22/2017 1. Terms of Order This purchase order is an offer by the company identified on the face of this purchase order ("Company") for the procurement of the services specified (the "Services") from

More information

REP ENERGY, LLC MASSACHUSETTS OPERATIONS BUSINESS ELECTRICITY AUTHORIZATION

REP ENERGY, LLC MASSACHUSETTS OPERATIONS BUSINESS ELECTRICITY AUTHORIZATION REP ENERGY, LLC MASSACHUSETTS OPERATIONS BUSINESS ELECTRICITY AUTHORIZATION Version REP030415 Business Name Utility Account # Service Address Suite/ Unit # City State Zip Utility BILLING ADDRESS (if different

More information

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 20 kw

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 20 kw MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 20 kw This Maryland Standard Agreement For Interconnection Of Small Generator Facilities With

More information

APPENDIX B: Compression Services Agreement

APPENDIX B: Compression Services Agreement APPENDIX B: Compression Services Agreement COMPRESSION SERVICES AGREEMENT This Compression Services Agreement ("Agreement") is entered into as of, 20 ("Effective Date") by and between Southern California

More information

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16 Section 1. Availability: (A) Service hereunder is available at Delivery Points on or near the transmission facilities

More information

SECTION III: SAMPLE CONTRACT AGREEMENT FOR SERVICES

SECTION III: SAMPLE CONTRACT AGREEMENT FOR SERVICES SECTION III: SAMPLE CONTRACT AGREEMENT FOR SERVICES THIS AGREEMENT made and entered by and between the City of Placerville, a political subdivision of the State of California (hereinafter referred to as

More information

AUTOTOOL, INC. TERMS AND CONDITIONS OF SALE

AUTOTOOL, INC. TERMS AND CONDITIONS OF SALE AUTOTOOL, INC. TERMS AND CONDITIONS OF SALE The following terms and conditions of sale as they appear at www.autotoolinc.com at the time of sale (the Terms and Conditions ) govern the sale of all materials,

More information

FEDERAL RESOURCES SUPPLY COMPANY GENERAL TERMS AND CONDITIONS FOR THE PROVISION OF SERVICES

FEDERAL RESOURCES SUPPLY COMPANY GENERAL TERMS AND CONDITIONS FOR THE PROVISION OF SERVICES 1. Applicability. FEDERAL RESOURCES SUPPLY COMPANY GENERAL TERMS AND CONDITIONS FOR THE PROVISION OF SERVICES These terms and conditions for services (these Terms ) are the only terms and conditions which

More information

COMMUNITY SOLAR PARTICIPATION AGREEMENT

COMMUNITY SOLAR PARTICIPATION AGREEMENT COMMUNITY SOLAR PARTICIPATION AGREEMENT Thank you for your interest in Tacoma Power s Community Solar Program ( Program ). By completing this Agreement, you have an opportunity to participate in and facilitate

More information

CLAIMS ADMINISTRATION SERVICES AGREEMENT

CLAIMS ADMINISTRATION SERVICES AGREEMENT CLAIMS ADMINISTRATION SERVICES AGREEMENT This Claims Administration Services Agreement (the "Agreement") is made and entered into by and between XYZ School District ("Client") and Keenan & Associates ("Keenan").

More information

TERMS AND CONDITIONS OF SALE

TERMS AND CONDITIONS OF SALE TERMS AND CONDITIONS OF SALE WHEREAS, Cascade is a supplier of used and refurbished computer equipment; and WHEREAS, Purchaser desires to purchase from Cascade, and Cascade desires to sell to Purchaser,

More information

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview: SOUTH CAROLINA COOPERATIVES Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview: This Standard contains the requirements, in addition to applicable

More information

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES) Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES) 1. Overview: This Standard sets forth the requirements,

More information

Transmission Association, Inc. Fourth Revised Sheet No. 140

Transmission Association, Inc. Fourth Revised Sheet No. 140 Transmission Association, Inc. Fourth Revised Sheet No. 140 ATTACHMENT K GENERATOR INTERCONNECTION PROCEDURES (GIP) including GENERATOR INTERCONNECTION AGREEMENT (GIA) (Effective January 1, 2016) Effective

More information

KOOTENAI ELECTRIC COMMUNITY SOLAR PROGRAM APPLICATION & AGREEMENT

KOOTENAI ELECTRIC COMMUNITY SOLAR PROGRAM APPLICATION & AGREEMENT Thank you for your interest in the Kootenai Electric Community Solar Program (Program). By completing this Application (Application), you have an opportunity to participate in the Program. You agree to

More information

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES On this day of, 2017, the Board of Commissioners of the Port of New Orleans hereinafter sometimes

More information

Form No. 23 DECLARATIONS

Form No. 23 DECLARATIONS GOLDEN STATE WATER COMPANY Revised Cal. P.U.C. Sheet No. 1579-E SAN DIMAS, CALIFORNIA 91773-9016 Canceling Original Cal. P.U.C. Sheet No. 1506-E DECLARATIONS Page 1 This Interconnection Agreement ("Agreement")

More information

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

Holden Municipal Light Department Interconnection Agreement for Net Metering Service This agreement dated the day of, 20, ( Agreement ) is by and between Holden Municipal Light Department ( Department ), and, ( Customer ) (Department and Customer referred to as Parties ). Whereas, Customer

More information

Up Front Incentive Renewable Energy Credit Purchase Agreement (Residential Solar Water Heating)

Up Front Incentive Renewable Energy Credit Purchase Agreement (Residential Solar Water Heating) Up Front Incentive Renewable Energy Credit Purchase Agreement (Residential Solar Water Heating) This Up Front Incentive Renewable Energy Credit Purchase Agreement ( Agreement ) is hereby made and entered

More information

July 30, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

July 30, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms. Regulation James A. Cuillier Director FERC Rates & Regulation July 30, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose:

More information

SA 2840 ENTERGY ARKANSAS-STUTTGART SOLAR GIA VERSION Project J348 GENERATOR INTERCONNECTION AGREEMENT. entered into by and between

SA 2840 ENTERGY ARKANSAS-STUTTGART SOLAR GIA VERSION Project J348 GENERATOR INTERCONNECTION AGREEMENT. entered into by and between SA 2840 ENTERGY ARKANSAS-STUTTGART SOLAR GIA VERSION 31.0.0 EFFECTIVE 09/29/2015 ORIGINAL SERVICE AGREEMENT NO. 2840 Project J348 GENERATOR INTERCONNECTION AGREEMENT entered into by and between Stuttgart

More information

REGULATED COMMERCE RETAILER ELECTRONIC SERVICES AGREEMENT

REGULATED COMMERCE RETAILER ELECTRONIC SERVICES AGREEMENT REGULATED COMMERCE RETAILER ELECTRONIC SERVICES AGREEMENT icontrol SERVICES icontrol Systems USA LLC ( icontrol or Company ) will provide electronic funds transfer (EFT) processing and electronic data

More information

AccessHosting.com TERMS OF SERVICE

AccessHosting.com TERMS OF SERVICE AccessHosting.com TERMS OF SERVICE 1. Legally binding agreement. By ordering and/or using any service offered or provided by Access Hosting LLC, dba AccessHosting.com ( AccessHosting.com), the individual

More information

Merchant Agreement for Cougar 1Card

Merchant Agreement for Cougar 1Card This Agreement is entered into and is effective as of ( Effective Date ), by and between the University of Houston on behalf of its Cougar 1Card Program ( Program ), which is administered by and through

More information

June 23,2006. Docket Nos. ER , ER , ER , E RO4-443-OO-.

June 23,2006. Docket Nos. ER , ER , ER , E RO4-443-OO-. The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-756-3300 Fax: 202-654-4872 Sean A. Atkins Direct Dial: 202-756-3072 June 23,2006 The Honorable Magalie Roman Salas Secretary Federal

More information

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH:

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH: PROFESSIONAL SERVICES AGREEMENT For On-Call Services THIS AGREEMENT is made and entered into this ENTER DAY of ENTER MONTH, ENTER YEAR, in the City of Pleasanton, County of Alameda, State of California,

More information

BZS TRANSPORT INC. BROKER-SHIPPER TERMS AND CONDITIONS

BZS TRANSPORT INC. BROKER-SHIPPER TERMS AND CONDITIONS 1. APPLICABILITY These Terms & Conditions and agreed upon pricing documents apply to all broker services (the Services ) provided by BZS Transport Inc. (hereafter BROKER ) to SHIPPER. These Terms & Conditions

More information

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES) 1. Overview: Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES) This Standard sets forth the requirements,

More information

Dear Oklahoma Electric Cooperative member:

Dear Oklahoma Electric Cooperative member: Dear Oklahoma Electric Cooperative member: Thank you for requesting information about interconnecting a small wind generator to OEC s system. To assist our members, we have developed a streamlined process

More information

State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power

State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power This Generating System Interconnection Agreement is entered

More information

Dayton Truck Meet 2019 Vendor Agreement

Dayton Truck Meet 2019 Vendor Agreement Dayton Truck Meet 2019 Vendor Agreement This Vendor Agreement is made effective as of, by and between Truck Fever LLC ("Truck Fever") of PO Box 62641, Fort Myers, Florida 33906, and ("Vendor")of,,. WHEREAS,

More information

TRINITY UNIVERSITY CONSULTING SERVICES AGREEMENT

TRINITY UNIVERSITY CONSULTING SERVICES AGREEMENT TRINITY UNIVERSITY CONSULTING SERVICES AGREEMENT This CONSULTING SERVICES AGREEMENT (this Agreement ) is entered into effective as of, by and between Trinity University, an agency and institution of higher

More information

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,

More information

MASTER PURCHASE AGREEMENT (For Sale of Non-Potable Fresh or Salt Water)

MASTER PURCHASE AGREEMENT (For Sale of Non-Potable Fresh or Salt Water) MASTER PURCHASE AGREEMENT (For Sale of Non-Potable Fresh or Salt Water) THIS MASTER PURCHASE AGREEMENT (this Agreement ) is made and entered into this day of, 201 (the Effective Date ), by and between

More information

Title Page Southern California Edison Company Tariff Title: Rate Schedule Tariff Record Title: Rate Schedule FERC No. 425 FERC FPA Electric Tariff AMENDED AND RESTATED ELDORADO SYSTEM OPERATINGAGREEMENT

More information

STANDARD TRANSMISSION CONSTRUCTION AND INTERCONNECTION AGREEMENT BETWEEN TRES AMIGAS, LLC AND PUBLIC SERVICE COMPANY OF NEW MEXICO

STANDARD TRANSMISSION CONSTRUCTION AND INTERCONNECTION AGREEMENT BETWEEN TRES AMIGAS, LLC AND PUBLIC SERVICE COMPANY OF NEW MEXICO STANDARD TRANSMISSION CONSTRUCTION AND INTERCONNECTION AGREEMENT BETWEEN TRES AMIGAS, LLC AND PUBLIC SERVICE COMPANY OF NEW MEXICO TABLE OF CONTENTS RECITALS 1 ARTICLE 1. DEFINITIONS... 3 ARTICLE 2. EFFECTIVE

More information

Internet Services and Central Link Broadband Agreement

Internet Services and Central Link Broadband Agreement Central Link Broadband 155 N League Ranch RD Waco, TX 76705-4917 Internet Services and Central Link Broadband Agreement This Internet Services and Central Link Broadband Agreement (the Agreement ) is between

More information

General Purchase Order Terms and Conditions (Pro-buyer)

General Purchase Order Terms and Conditions (Pro-buyer) 1. Applicability. General Purchase Order Terms and Conditions (Pro-buyer) (a) This purchase order is an offer by GT Exhaust, Inc. (the "Buyer") for the purchase of the goods specified on the face of this

More information

ATTACHMENT C STANDARD TERMS AND CONDITIONS CONTRACT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF LONG BEACH AND NAME STREET AND P.O.

ATTACHMENT C STANDARD TERMS AND CONDITIONS CONTRACT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF LONG BEACH AND NAME STREET AND P.O. ATTACHMENT C STANDARD TERMS AND CONDITIONS CONTRACT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF LONG BEACH AND NAME STREET AND P.O. BOX ADDRESS CITY, STATE, ZIP TELEPHONE NO. FAX NO. THIS CONTRACT is

More information

G&D NORTH AMERICA, INC. 1. TERMS & CONDITIONS OF SALE

G&D NORTH AMERICA, INC. 1. TERMS & CONDITIONS OF SALE G&D NORTH AMERICA, INC. 1. TERMS & CONDITIONS OF SALE 2. General. These terms and conditions (the Terms ), together with those contained in any proposal or quotation (a Proposal ) of G&D North America,

More information

OH Frontier Online Premier-6 AEP Ohio Electric Supply Product Disclosure Summary Document Effective Date: 7/18/2017. Contract Term/Length 6 months

OH Frontier Online Premier-6 AEP Ohio Electric Supply Product Disclosure Summary Document Effective Date: 7/18/2017. Contract Term/Length 6 months Frontier Utilities Northeast, LLC 5161 San Felipe Suite 320 Houston, TX 77056 1-877-636-3450 www.frontierutilities.com Customer Service Hours: Monday Friday 7am 6pm CT, Saturday 8am 2pm CT OH Frontier

More information

Major Energy Terms and Conditions (MD BGE)

Major Energy Terms and Conditions (MD BGE) Major Energy Terms and Conditions (MD BGE) 1.Agreement to Sell and Purchase Energy. This is an agreement between Major Energy Services, LLC for natural gas and/or Major Energy Electric Services, LLC for

More information

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office and

More information