WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION

Size: px
Start display at page:

Download "WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION"

Transcription

1 WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION This Connection Agreement ( Agreement ) is made and entered into this day of, 20, by Whitby Hydro ( the Distributor ) and ( the Customer ), each hereinafter sometimes referred to individually as Party or both referred to collectively as the Parties. RECITALS WHEREAS the Distributor is a distributor licensed by the Ontario Energy Board to provide distribution services in a service area in which the Customer s facilities are situated; AND WHEREAS the Customer owns and operates a generator for emergency power supply or load displacement and wishes to connect the generator to the Distributor s system through momentary closed transition operation to provide power to the Customer s internal load during Distributor supply interruptions, load displacement or periodic testing of the generator; AND WHEREAS the Distributor has offered and the Customer has accepted the offer to permit such momentary closed transition operation of the generator with the Distributor s system; NOW THEREFORE in consideration of the foregoing and the mutual covenant, terms and conditions contained in this Agreement, the Parties, intending to be legally bound, agree as follows: 1. Definitions Interconnection Facilities: The equipment and software, connected between the generator and the Customer s electrical system, necessary to ensure the Customer s generator operates in an islanded, stand-alone mode from the Distributor s distribution system, except for momentary closed transition operation. Momentary Closed Transition: The interconnection of the Customer s generator with the Distributor s distribution system for the duration of 100 ms or less, in order to transfer the Customer s load from the Distributor s distribution system to the generator or to transfer the Customer s load from the generator back to the Distributor s distribution system. Point of Interconnection: The point at which the Distributor s distribution system ends and the Customer s electrical system begins, as described in Exhibit A of this Agreement. Generator: An electricity generating device owned by the Customer and connected to the Customer s electrical system and not customarily connected to the Distributor s system and intended for intermittent use by the Customer to provide power to the Customer s internal load during Distributor supply interruptions, load displacement or periodic testing of the generator. All other terms in the Agreement that are not specifically defined shall have the same meanings ascribed to them in the Electricity Act 1998, the Ontario Energy Board Act 1998, or any regulations or codes made under those Acts.

2 2. Scope of Agreement This Agreement is applicable to conditions under which the Distributor and the Customer agree that one or more generators as described in Exhibit A, is interconnected to the Distributor s distribution system and operated through the interconnection facilities for the purpose of momentary closed transition of the Customer s load from the Distributor s distribution system to the generator and momentary closed transition of the Customer s load from the generator to the Distributor s distribution system to provide power to the Customer s internal load during Distributor supply interruptions, load displacement or periodic testing of the generator. 3. Establishment of Interconnection Facilities The Customer is solely responsible for the establishment of interconnection facilities that meet the requirements of the Distributor, at the sole and absolute discretion of the Distributor. The Customer shall design and construct the interconnection facilities in accordance with the Distributor s rules and regulations, the requirements of the Ontario Energy Board s Distribution System Code or other Ontario Energy Board requirements that may apply, the applicable latest versions of the Electrical Safety Authority (ESA) requirements, CSA Interconnection of Distributed Resources and Electrical Supply Systems, and IEEE 1547 Standard for Interconnecting Distributed Resources with Electric Power Systems (the Rules ) all of which are incorporated herein by reference. 4. Responsibilities of the Distributor and the Customer for Installation, Operation and Maintenance of Facilities The Customer will, at its own cost and expense, install, operate, maintain, repair, and inspect, and shall be fully responsible for, its facilities and interconnection facilities, unless otherwise specified in Exhibit A. The Customer shall conduct operations of its facilities and interconnection facilities in compliance with all aspects of the Rules and in accordance with industry standard prudent engineering practice. The Distributor shall conduct operations of its electric distribution facilities in compliance with all aspects of the Rules, or as further described and mutually agreed to in the applicable Facility Details attached hereto as Exhibit A. Maintenance of facilities and interconnection facilities shall be performed in accordance with the applicable manufacturers recommended maintenance schedule. The Customer agrees to cause its facilities and interconnection facilities to be constructed in accordance with the Rules and specifications equal to or better than those noted in item 3 above in effect at the time of construction. The Customer covenants and agrees to cause the design, installation, maintenance, and operation of, its facilities and interconnection facilities so as to reasonably minimize the likelihood of a malfunction or other disturbance damaging or otherwise affecting or impairing the Distributor s system. The Customer shall comply with all applicable laws, regulations, zoning codes, building codes, safety rules and environmental restrictions applicable to the design, installation, operation and maintenance of its facilities and interconnection facilities. The Customer will consult with the Distributor prior to undertaking any modifications to its facilities or interconnection facilities to ensure that no material adverse impact to the Distributor s system or to its other customers occurs. The Distributor will notify the Customer if there is evidence that the facilities or interconnection facilities operation causes disruption or deterioration of service to other customers served from the Distributor s system or if the facilities or interconnection facilities operation causes damage to the system. The Customer will notify the Distributor of any emergency or hazardous condition or occurrence with the Customer s facilities or interconnection facilities, which could affect safe operation of the Distributor s system. Rev 1 1Aug2017 Page 2 of 7

3 5. Operator in Charge The Customer shall identify an individual (by name or title) who will perform as Operator in Charge of the facilities and the Customer portion of the interconnection facilities. This individual must be familiar with this Agreement as well as provisions of the Rules and any other agreements or regulations that may apply. 6. Power Sales to the Distributor Interconnection of the facilities with the Distributor s distribution system does not grant the Customer the right to export power nor does it constitute an agreement by the Distributor to purchase or wheel excess power. The Parties agree that because momentary closed transition operation of the generator with the Distributor s distribution system is intended to be both momentary and infrequent, no compensation for the value of power entering the Distributor s system from the generator will be made. 7. Limitation of Liability and Indemnification a. twithstanding any other provision in this Agreement, with respect to the Distributor s provision of electric service to the Customer and the services provided by the Distributor pursuant to this Agreement, the Distributor s liability to the Customer shall be limited as set forth in the Distributor s conditions for electric service and in the Distribution System code, which are incorporated herein by reference. b. For the purposes of this Agreement, a force majeure event is any event: (i) that is beyond the reasonable control of the affected Party; and (ii) that the affected Party is unable to prevent or provide against by exercising reasonable diligence, including the following events or circumstances, but only to the extent that they satisfy the preceding requirements: acts of war, public disorder, rebellion or insurrection; floods, hurricanes, earthquakes, lightning, storms or other natural calamities; explosions or fires; strikes, work stoppages or labour disputes; embargoes; and sabotage. If a force majeure event prevents a Party from fulfilling any obligations under this Agreement, such Party will promptly notify the other Party in writing and will keep the other Party informed on a continuing basis as to the scope and duration of the force majeure event. The affected Party will be entitled to suspend or modify its performance of obligations under this Agreement but will use reasonable efforts to resume its performance as soon as possible. The force majeure provisions of the Distribution System Code will apply to this Agreement. c. twithstanding paragraph 7. b. of this Agreement, the Customer shall assume liability for and shall indemnify the Distributor and its members, trustees, directors, officers, managers, employees, agents, representatives, affiliates, successors and assigns for and shall hold them harmless from and against any claims, losses, costs, and expenses of the kind or character as contemplated in Section 2.2 of the Ontario Energy Board Distribution System Code to the extent that they result from the Customer negligence or other wrongful conduct in connection with the design, construction, installation, operation or maintenance of the facilities or interconnection facilities. Such indemnity shall include, but is not limited to, financial responsibility for (i) monetary losses; (ii) reasonable costs and expenses of defending an action or claim; (iii) damages related to death or injury; (iv) damages to property. Rev 1 1Aug2017 Page 3 of 7

4 d. The Distributor and the Customer shall each be responsible for the safe installation, maintenance, repair and condition of their respective lines, wires, switches, or other equipment or property on their respective sides of the point of interconnection. The Distributor does not assume any duty of inspecting the Customer s lines, wires, switches, or other equipment or property and will not be responsible, therefore the Customer assumes all responsibility for the electric service supplied hereunder and the facilities used in connection therewith at or beyond the point of interconnection and hereby acknowledges that the Distributor relies upon the Customer carrying out its responsibilities under this section without further investigation or inspection by the Distributor. 8. Documentation, Testing, and Commissioning The applicable documentation, testing and commissioning shall be satisfactorily completed at the sole and absolute discretion of the Distributor prior to the generator being operated in momentary closed transition operation with the Distributor s system. The following documentation is to be provided by the Customer to the Distributor in regards to the generator and interconnection facilities: a) As built, single-line diagram; b) Protective device philosophy, settings and drawings; c) Independent Engineer s Compliance Report certifying compliance with the following: IEEE- 1547, CSA , and the latest versions of the Ontario Electrical Safety Code and the Ontario Energy Board Distribution System Code; d) Electrical Safety Authority (ESA) Authorization to Connect; e) Document outlining the detailed operating procedure of the generator and interconnection facilities with momentary closed transition operation during system disturbances and testing. te: Items a), b) and c), shall be signed and stamped by a Professional Engineer in the province of Ontario. The Customer shall provide to the Distributor, upon request, all records of testing associated with the generator and interconnection facilities. In the case of a factory test, the Customer shall provide a written description and certification by the factory of the test, the test results, and the qualification of any independent testing laboratory. The Distributor shall witness the commissioning of the generator and interconnection facilities. The Distributor shall be provided a minimum of five (5) business days notice of the commissioning of the generator and interconnection facilities. The Distributor shall witness the operation of the momentary closed transition operation of the generator and interconnection facilities to ensure, at the sole and absolute discretion of the Distributor, all technical requirements of this Connection Agreement are in compliance. The Distributor shall complete a witness testing report and provide a copy to the Customer. 9. Right of Access, Equipment Installation, Removal & Inspection The Distributor may send an employee, agent or contractor to the premises of the Customer at any time whether before, during or after the time the facilities first produce energy to inspect the facilities and interconnection facilities, and observe the facility s installation, commissioning (including any testing), start-up, operation, momentary closed transition timings and maintenance. Rev 1 1Aug2017 Page 4 of 7

5 At any time, the Distributor shall have access to the Customer s premises for any reasonable purpose in connection with the interconnection described in this Agreement 10. Disconnection of Facilities The Customer shall disconnect facilities from the System upon the effective date of any termination resulting from and required by actions under Section 13. The Distributor shall have the right to refuse momentary closed transition operation of the generator when such operation may, in the Distributor s sole and absolute opinion, cause adverse impacts to the distribution system or any of the Distributor s other customers or may cause a safety concern for the Distributor s employees, customers or the public. 11. Metering The Distributor does not require generator metering for generators operating in momentary closed transition. 12. Insurance The Customer shall carry adequate insurance coverage that shall be acceptable to the Distributor. 13. Effective Term and Termination Rights This Agreement becomes effective when executed by both Parties and shall continue in effect until terminated. This Agreement may be terminated by either Party by giving the other Party at least thirty (30) days prior to written notice. 14. Compliance with Laws, Rules and Tariffs Both the Distributor and the Customer shall be responsible for complying with the laws of Ontario, and the Rules. The interconnection and services provided under this Agreement shall at all times be subject to the terms and conditions set forth in the Rules, which Rules are hereby incorporated into this Agreement by this reference. The Distributor shall have the right to publish changes in any of the Rules at any time. 15. Severability If any portion of provision of this Agreement is held or adjudged for any reason to be invalid or illegal or unenforceable by any court of competent jurisdiction, such portion shall be deemed separate and independent and the remainder of this Agreement shall remain in full force and effect. 16. Amendment This Agreement may be amended only upon mutual agreement of the Parties, which amendment will not be effective until produced in writing and executed by the Parties. 17. Entirety of Agreement and Prior Agreements Superseded This Agreement, including the Rules and all attached Exhibits and Facility Details, which are expressly made a part hereof for all purposes, constitutes the entire Agreement and understanding between the Parties with regard to the interconnection of the facilities of the Parties at the points of interconnection expressly provided for in this Agreement. The Parties are not bound by or liable for any statement, representation, promise, inducement, understanding, or undertaking of any kind or nature (whether written or oral) with regard to the subject matter hereof not set forth or provided for herein or in the Customer application, or other written information provided by the Customer in compliance with the Rules. It is expressly acknowledged that the Parties may have other agreements covering other services not expressly provided for herein, which agreements are unaffected by this Agreement. Rev 1 1Aug2017 Page 5 of 7

6 18. Assignment This Agreement may not be assigned by the Customer without the express written consent of the Distributor, such consent not to be unreasonably withheld. The company or individual to which this Agreement is assigned will be responsible for the proper operation and maintenance of the facilities, and must agree in writing to be subject to all provisions of this Agreement. The Distributor may also assign the Agreement to another entity with the written consent of the Customer. 19. tices tices given under this Agreement are deemed to have been duly delivered if hand delivered or sent by certified mail, return receipt requested, postage prepaid, to: Whitby Hydro (the Distributor) Attn: Manager of Engineering 100 Taunton Road East Whitby, ONT, L1N 5R8 Attn: (the Customer) The above-listed names and addresses of either party may be changed by written notification to the other. 20. Invoicing and Payment Invoicing and payment terms for services will be in accordance with the requirements of the Distributor. 21. Limitations ( Third-Party Beneficiaries, Waiver, etc.) This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties. The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement will not be considered to waive the obligations, rights, or duties imposed upon the Parties. 22. Headings The descriptive headings of the various articles and sections of this Agreement have been inserted for convenience of reference only and are to be afforded no significance in the interpretation or construction of this Agreement. 23. Multiple Counterparts This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument. IN WITNESS WHEREOF, the Parties have caused this Agreement to be signed by their respective duly authorized representatives. Whitby Hydro Company Name Signature Signature Print Name Print Name Date Date Rev 1 1Aug2017 Page 6 of 7

7 EXHIBIT A FACILITY DETAILS Location of Facility Name of Point of Intersection The following information is to be specified for each facility, if applicable: 1. Name: 2. Facility location: 3. Delivery voltage: 4. Metering (voltage, location, losses adjustment due to metering location and other): 5. rmal operation of interconnection: 6. One line diagram attached (check one): 7. Facilities to be furnished by the Distributor: 8. Facilities to be furnished by the Customer: 9. Cost responsibility: 10. Supplemental Terms and Conditions attached (check one): 11. Distributor rules and procedures for generator interconnection attached (check one): 12. Generator details attached (check one): 13. Momentary closed transition switch details attached (check one): Rev 1 1Aug2017 Page 7 of 7

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT APPENDIX A (insert date) MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT This Interconnection Agreement ( Agreement ) is

More information

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20, by Egyptian Electric Cooperative Association,

More information

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature APPLICATION FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION WITH THE UTILITY SYSTEM Return Completed Application to: Fannin County Electric Coop, INC. Attention: Colton Whisenhunt

More information

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20, by Kosciusko Rural Electric Membership Corporation,

More information

Distributed Generation Basic Interconnection Requirements and Conditions Effective April 1, 2006

Distributed Generation Basic Interconnection Requirements and Conditions Effective April 1, 2006 Distributed Generation Basic Interconnection Requirements and Conditions Effective April 1, 2006 These rules are intended to outline the requirements for interconnecting a Distributed Generation Facility

More information

Distributed Generation Procedures and Guidelines Manual for Members

Distributed Generation Procedures and Guidelines Manual for Members Page 15 KARNES ELECTRIC COOPERATIVE, INC. AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION SHORT FORM CONTRACT APPLICABLE FOR LOADS LESS THAN OR EQUAL TO 50 KW IN SIZE AND

More information

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION AVAILABILITY This rate schedule is applicable to Customers with facilities consisting of one or more on-site generating units operating in parallel with the Company s system (Distributed Generation) as

More information

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission This STANDARD INTERCONNECTION AGREEMENT, (the Agreement ), is entered into this day of, 20 by and between, hereinafter called Customer

More information

Town of Highlands Board Approved as of May 17, 2012

Town of Highlands Board Approved as of May 17, 2012 TOWN OF HIGHLANDS INTERCONNECTION AGREEMENT FOR SMALL PHOTOVOLTAIC GENERATION FACILITY OF 10 kw OR LESS This PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR SMALL GENERATION 10 kw or less (the Agreement ),

More information

Now, therefore, for and in consideration of the mutual covenants and agreements set forth herein, the Parties agree as follows:

Now, therefore, for and in consideration of the mutual covenants and agreements set forth herein, the Parties agree as follows: Columbia Power and Water Systems (CPWS) Interconnection and Parallel Operation Agreement for Renewable Generation Operating Under Green Power Providers Program This document is for review only by a potential

More information

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland;

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland; MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW FOR MARYLAND STATE AND LOCAL GOVERNMENT ENTITIES This Agreement

More information

APPENDIX A. Name: Address:

APPENDIX A. Name:   Address: Adopted from Appendix A of the New York State Standardized Interconnection Requirements and Application Process for New Distributed Generators 2 MW or Less Connected in Parallel with Utility Distribution

More information

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS BRIGHTRIDGE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS This Interconnection Agreement ( Agreement ) is made and entered into this day

More information

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less SALEM CITY NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Salem City ( Salem

More information

Consumer Requirements for Distributed Generation Installation and Interconnection

Consumer Requirements for Distributed Generation Installation and Interconnection Consumer Requirements for Distributed Generation Installation and Interconnection May 1, 2010 Rio Grande Electric Cooperative, Inc. US 90 & SH 131 Post Office Box 1509 Brackettville, TX 78832 (830) 563-2444

More information

NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. Distributed Generation Short Form Contract & DG Rider

NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. Distributed Generation Short Form Contract & DG Rider NAVARRO COUNTY ELECTRIC COOPERATIVE, INC. Distributed Generation Short Form Contract & DG Rider November 1, 2015 Page 1 COOPERATIVE AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION SHORT FORM CONTRACT

More information

Name: Niagara Mohawk Power Corporation d/b/a National Grid. Address: 1125 Broadway Albany, NY Telephone: Telephone: (518)

Name: Niagara Mohawk Power Corporation d/b/a National Grid. Address: 1125 Broadway Albany, NY Telephone: Telephone: (518) FORM K APPENDIX A NIAGARA MOHAWK POWER CORPORATION d/b/a NATIONAL GRID NEW YORK STATE STANDARDIZED CONTRACT FOR INTERCONNECTION OF NEW DISTRIBUTED GENERATION UNITS WITH CAPACITY OF 2 MW OR LESS CONNECTED

More information

INTERCONNECTION AND OPERATING AGREEMENT

INTERCONNECTION AND OPERATING AGREEMENT INTERCONNECTION AND OPERATING AGREEMENT This Interconnection and Operating Agreement ( Agreement ) for the facility located at, in the City of, Michigan, is entered into this day of, 200 by and between

More information

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW This Agreement is made and entered into this day of, by

More information

Dear Oklahoma Electric Cooperative member:

Dear Oklahoma Electric Cooperative member: Dear Oklahoma Electric Cooperative member: Thank you for requesting information about interconnecting a small wind generator to OEC s system. To assist our members, we have developed a streamlined process

More information

Renewable Generation (Category 1-20 kw and less):

Renewable Generation (Category 1-20 kw and less): Renewable Generation (Category 1-20 kw and less): Net Metering Program Interconnection Program Application Parallel Operating Agreement Net Metering Program What is net metering? Net metering is a tool

More information

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION This Agreement, effective the day of, 20 by and between PUBLIC UTILITY DISTRICT NO. 1 OF Chelan COUNTY, WASHINGTON, herein referred to as

More information

Renewable Generation (Category 1 20 kw and less):

Renewable Generation (Category 1 20 kw and less): Renewable Generation (Category 1 20 kw and less): Net Metering Program Interconnection Program Application Parallel Operating Agreement Net Metering Program What is net metering? Net metering is a tool

More information

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3 5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF GREATER THAN 150 kw BETWEEN CONSUMERS ENERGY COMPANY AND (PROJECT DEVELOPER NAME) GENERATOR

More information

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICE AGREEMENT NO.

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICE AGREEMENT NO. PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICE AGREEMENT NO. STANDARD INTERCONNECTION AGREEMENT FOR GENERATING FACILITIES WITH A RATED CAPACITY NO GREATER THAN 10 MW AND NOT QUALIFIED FOR SIMPLIFIED

More information

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND This Standard Generation Interconnection Agreement ( Interconnection Agreement ), dated, for purposes of identification only, is

More information

MEMPHIS LIGHT, GAS AND WATER INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION

MEMPHIS LIGHT, GAS AND WATER INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION MEMPHIS LIGHT, GAS AND WATER INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION This Interconnection and Parallel Operation Agreement ( Agreement ) is made and entered into by

More information

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20,

More information

FIRSTENERGY INTERCONNECTION AGREEMENT

FIRSTENERGY INTERCONNECTION AGREEMENT FIRSTENERGY INTERCONNECTION AGREEMENT For a PA Level 2, 3 or 4 Interconnection Review Project This Interconnection Agreement ("Agreement") is made and entered into this day of, 20, by The West Penn Power

More information

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

Holden Municipal Light Department Interconnection Agreement for Net Metering Service This agreement dated the day of, 20, ( Agreement ) is by and between Holden Municipal Light Department ( Department ), and, ( Customer ) (Department and Customer referred to as Parties ). Whereas, Customer

More information

Public Utility District No. 1 Of Jefferson County

Public Utility District No. 1 Of Jefferson County Public Utility District No. 1 Of Jefferson County INTERCONNECTION & NET METERING AGREEMENT For Customer-Owned, Grid Connected Electric Generating Systems of 100kW or Less This INTERCONNECTION & NET METERING

More information

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM Taunton Municipal Lighting Plant INTERCONNECTION & NET METERING AGREEMENT For Customer-Owned, Grid-Connected Electric Generating Systems of 60kW or Less This INTERCONNECTION & NET METERING AGREEMENT (

More information

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 20 kw

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 20 kw MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 20 kw This Maryland Standard Agreement For Interconnection Of Small Generator Facilities With

More information

Clark Public Utilities

Clark Public Utilities Electric Generating Facilities of 100 Kilowatts or Less This ( Agreement ) is entered into by the undersigned customer ("Customer"), and, ( Utility ). Both parties, who may be herein further referred to

More information

Solar Generator Interconnection Agreement

Solar Generator Interconnection Agreement Solar Generator Interconnection Agreement THIS AGREEMENT is made and entered into as of the last date of signature provided below, by and between Fort Collins Utilities ( FCU ) and ( Generator ), an electric

More information

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES) Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES) 1. Overview: This Standard sets forth the requirements,

More information

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS PROCEDURES: I. Members Applying for New Interconnection/Submission

More information

Standard Form of CAWCD Wheeling Contract

Standard Form of CAWCD Wheeling Contract EXHIBIT B DRAFT 11/9/16 Standard Form of CAWCD Wheeling Contract WHEELING CONTRACT BETWEEN THE CENTRAL ARIZONA WATER CONSERVATION DISTRICT AND [ENTITY] This CAWCD Wheeling Contract ("Contract") is made

More information

CARROLL WHITE RURAL ELECTRIC MEMBERSHIP CORPORATION Monticello, Indiana

CARROLL WHITE RURAL ELECTRIC MEMBERSHIP CORPORATION Monticello, Indiana AVAILABILITY: NET METERING SINGLE PHASE RESIDENTIAL SCHEDULE NM Available in all territory served by the Corporation, in accordance with the Corporation s Service Rules and Regulations. This rate is available

More information

Standard Tariff for Electricity Purchases From And Sales to Qualifying Facilities. Applicant: Dated 20

Standard Tariff for Electricity Purchases From And Sales to Qualifying Facilities. Applicant: Dated 20 Applicant: Dated 20 Form of Standard Contract Standard Interconnection Agreement For Qualifying Facilities with a design Capacity of 25 Kilowatts or Less Preamble This Agreement is made as of the day of,

More information

UNIVERSITY - INDUSTRY SPONSORED RESEARCH AGREEMENT

UNIVERSITY - INDUSTRY SPONSORED RESEARCH AGREEMENT UNIVERSITY - INDUSTRY SPONSORED RESEARCH AGREEMENT THIS SPONSORED RESEARCH AGREEMENT (the Agreement ), effective this day of, 20 ( Effective Date ) is made by and between Northeastern University, a non-profit

More information

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

I. Members Applying for New Interconnection/Submission of Plans/Specifications. PLATTE-CLAY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF RENEWABLE ENERGY SYSTEMS WITH CAPACITY OF 100 kw OR LESS PROCEDURES: I. Members Applying for New Interconnection/Submission

More information

STANDARD AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES WITH A CAPACITY LESS THAN OR EQUAL TO 10 MW

STANDARD AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES WITH A CAPACITY LESS THAN OR EQUAL TO 10 MW STANDARD AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES WITH A CAPACITY LESS THAN OR EQUAL TO 10 MW This Agreement is made and entered into this day of, by and between, a organized

More information

FACILITY USE AGREEMENT FOR UNIVERSITY OF CINCINNATI S NOVEL DEVICES LABORATORY

FACILITY USE AGREEMENT FOR UNIVERSITY OF CINCINNATI S NOVEL DEVICES LABORATORY Novel Devices Laboratory University of Cincinnati 933 Rhodes Hall Cincinnati, OH 45221-0030 (513) 556-4990 FACILITY USE AGREEMENT FOR UNIVERSITY OF CINCINNATI S NOVEL DEVICES LABORATORY This facility use

More information

INTERCONNECTION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF CERTIFIED INVERTER-BASED EQUIPMENT 10 kw OR SMALLER

INTERCONNECTION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF CERTIFIED INVERTER-BASED EQUIPMENT 10 kw OR SMALLER INTERCONNECTION AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF CERTIFIED INVERTER-BASED EQUIPMENT 10 kw OR SMALLER THIS INTERCONNECTION AGREEMENT ( Agreement ) is made and entered into this day

More information

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview: SOUTH CAROLINA COOPERATIVES Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview: This Standard contains the requirements, in addition to applicable

More information

SMALL RENEWABLE GENERATION INTERCONNECTION AGREEMENT BETWEEN

SMALL RENEWABLE GENERATION INTERCONNECTION AGREEMENT BETWEEN SAMPLE TEMPLATE December 3, 2014 SMALL RENEWABLE GENERATION INTERCONNECTION AGREEMENT BETWEEN PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY, WASHINGTON AND TABLE OF CONTENTS Article 1. Scope and Limitations

More information

2. IDENTITY AND LOCATION OF GC

2. IDENTITY AND LOCATION OF GC INTERCONNECTION AND NET ENERGY METERING AGREEMENT FOR LARGE COMMERCIAL CUSTOMERS OF A SOLAR, WIND OR HYBRID OF BOTH GENERATING FACILITY HAVING A CAPACITY OF 30 KW TO 1,000 KW DECLARATIONS This Interconnection

More information

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING ~A BARC ELECTRIC COOPERATIVE SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING A. APPLICABILITY This Schedule SGI is applicable to Interconnection Customers who own and operate, or

More information

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES) 1. Overview: Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES) This Standard sets forth the requirements,

More information

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH:

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH: PROFESSIONAL SERVICES AGREEMENT For On-Call Services THIS AGREEMENT is made and entered into this ENTER DAY of ENTER MONTH, ENTER YEAR, in the City of Pleasanton, County of Alameda, State of California,

More information

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES This application and interconnection agreement is for grid connected, customer owned generating facilities using certified inverters that

More information

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES On this day of, 2017, the Board of Commissioners of the Port of New Orleans hereinafter sometimes

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 63569-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63569-E 61960-E Sheet 1 VIRTUAL NET METERING FOR MULTIFAMILY AFFORDABLE

More information

PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT

PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT This Agreement is made and entered into as of, 20, by and between the PADRE DAM MUNICIPAL WATER DISTRICT (hereinafter referred to as the

More information

Solar*Rewards REC Purchase Contract Customer-Owned PV Systems Greater than 25 kw DC nameplate capacity

Solar*Rewards REC Purchase Contract Customer-Owned PV Systems Greater than 25 kw DC nameplate capacity Application ID: {Opportunity ID} Solar*Rewards REC Purchase Contract Customer-Owned PV Systems Greater than 25 kw DC nameplate capacity This Contract is made and entered into {Todays Date}, by and between

More information

STREAMGUYS, Inc. Authorized Streaming Agent Agreement Please complete and fax back entire agreement to us at

STREAMGUYS, Inc. Authorized Streaming Agent Agreement Please complete and fax back entire agreement to us at StreamGuys.com P.O. Box 828 Arcata California 95521 (707) 667-9479 Fax (707) 516-0009 info@streamguys.com STREAMGUYS, Inc. Authorized Streaming Agent Agreement Please complete and fax back entire agreement

More information

Now, therefore, in consideration of and subject to the mutual covenants contained herein, the Parties agree as follows:

Now, therefore, in consideration of and subject to the mutual covenants contained herein, the Parties agree as follows: Interconnection Agreement for Small Generator Facility Tier 1, Tier 2, Tier 3 or Tier 4 Interconnection (Small Generator Facilities with Electric Nameplate Capacities or 10 MW or smaller) Form 8 This Interconnection

More information

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS (Customer) and Roosevelt County Electric Cooperative, Inc. (Utility), referred to collectively as parties and individually

More information

State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power

State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power State of Minnesota Interconnection Agreement For the Interconnection of Extended Parallel Distributed Generation Systems With Minnesota Power This Generating System Interconnection Agreement is entered

More information

INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION Customer Information Package Updated 5/18/2016 1 Page TABLE OF CONTENTS Page Summary of the Process 3 Websites for additional information

More information

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,

More information

Form No. 23 DECLARATIONS

Form No. 23 DECLARATIONS GOLDEN STATE WATER COMPANY Revised Cal. P.U.C. Sheet No. 1579-E SAN DIMAS, CALIFORNIA 91773-9016 Canceling Original Cal. P.U.C. Sheet No. 1506-E DECLARATIONS Page 1 This Interconnection Agreement ("Agreement")

More information

RESEARCH AGREEMENT University of Hawai i

RESEARCH AGREEMENT University of Hawai i RESEARCH AGREEMENT This Research Agreement ( Agreement ) is made and entered into this day of, ( Effective Date ), by and between the whose address is, Office of Research Services, 2440 Campus Road, Box

More information

THIS LOCKBOX AND ACCOUNT CONTROL AGREEMENT (this Agreement ) is made as of, 200_, by and among ( Depositor ), ( Bank ) and ( Lender ).

THIS LOCKBOX AND ACCOUNT CONTROL AGREEMENT (this Agreement ) is made as of, 200_, by and among ( Depositor ), ( Bank ) and ( Lender ). FORM 18A.2 LOCKBOX AND ACCOUNT CONTROL AGREEMENT THIS LOCKBOX AND ACCOUNT CONTROL AGREEMENT (this Agreement ) is made as of, 200_, by and among _ ( Depositor ), ( Bank ) and ( Lender ). R E C I T A L S

More information

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement Mason County PUD No. 1 Net Energy Metering Interconnection Agreement Customer Owned Fuel Cell, Solar, Wind, Biogas, Combined Heat and Power or Hydropower Electric Generating Facilities of 100 Kilowatts

More information

ATTACHMENT AM METER AGENT SERVICES AGREEMENT FOR SPP MARKET BETWEEN CITY OF INDEPENDENCE, MISSOURI (MARKET PARTICIPANT) AND

ATTACHMENT AM METER AGENT SERVICES AGREEMENT FOR SPP MARKET BETWEEN CITY OF INDEPENDENCE, MISSOURI (MARKET PARTICIPANT) AND ATTACHMENT AM METER AGENT SERVICES AGREEMENT FOR SPP MARKET BETWEEN CITY OF INDEPENDENCE, MISSOURI (MARKET PARTICIPANT) AND WESTAR ENERGY, INC. (METER AGENT) OCTOBER 1, 2009 This Agreement made and entered

More information

Distributed Generation Procedures & Guidelines Manual for Members

Distributed Generation Procedures & Guidelines Manual for Members Distributed Generation Procedures & Guidelines Manual for Members October 2016 Page 2 GENERAL In order to receive service from the Cooperative, a customer must join or become a Member of the Cooperative.

More information

DELIVERY DRIVER INDEPENDENT CONTRACTOR AGREEMENT

DELIVERY DRIVER INDEPENDENT CONTRACTOR AGREEMENT DELIVERY DRIVER INDEPENDENT CONTRACTOR AGREEMENT This DELIVERY DRIVER INDEPENDENT CONTRACTOR AGREEMENT ( Agreement ) is made by and entered into between-, an individual residing at,-(the Contractor ) and

More information

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration APPLICATION FOR THE INTERCONNECTION OF A SOLAR OR WIND POWERED ELECTRICAL GENERATING FACILITY TO BE USED FOR NET ENERGY METERING SERVICE APPLICABILITY This application is for the interconnection of a solar,

More information

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less) INSTRUCTIONS: Enter information in the empty fields below and send this form to Entergy Mississippi, Inc. ( Entergy or the Company ). This Standard Interconnection Application and Agreement shall be completed,

More information

ITHACA COLLEGE EQUIPMENT LEASE MASTER AGREEMENT. 1. TERM: This Agreement is effective from (insert dates for a three year period).

ITHACA COLLEGE EQUIPMENT LEASE MASTER AGREEMENT. 1. TERM: This Agreement is effective from (insert dates for a three year period). ITHACA COLLEGE EQUIPMENT LEASE MASTER AGREEMENT This Master Agreement is hereby entered into between Ithaca College, a state of New York educational institution in Ithaca, New York, hereafter referred

More information

THIS OPERATING - CONNECTION AGREEMENT made as of ALECTRA UTILITIES CORORATION. ( Alectra Utilities ) - and - ( Customer )

THIS OPERATING - CONNECTION AGREEMENT made as of ALECTRA UTILITIES CORORATION. ( Alectra Utilities ) - and - ( Customer ) THIS OPERATING - CONNECTION AGREEMENT made as of B E T W E E N: ALECTRA UTILITIES CORORATION ( Alectra Utilities ) - and - ( Customer ) (Collectively, "the Parties"; individually, a "Party") RECITALS:

More information

SUPPLEMENTAL INTERCONNECTION APPLICATION INSTRUCTIONS. for COMMUNITY SOLAR ENERGY GENERATING SYSTEM ( CSEGS ) (Maryland s CSEGS Pilot Program)

SUPPLEMENTAL INTERCONNECTION APPLICATION INSTRUCTIONS. for COMMUNITY SOLAR ENERGY GENERATING SYSTEM ( CSEGS ) (Maryland s CSEGS Pilot Program) SUPPLEMENTAL INTERCONNECTION APPLICATION INSTRUCTIONS for COMMUNITY SOLAR ENERGY GENERATING SYSTEM ( CSEGS ) (Maryland s CSEGS Pilot Program) Pepco will accept Interconnection Applications for Community

More information

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw This Agreement is made and entered into this day of, 20, by and between, (hereinafter called "Customer"), located at

More information

Big Country Electric Cooperative, Inc. Big Country Development Corporation

Big Country Electric Cooperative, Inc. Big Country Development Corporation Big Country Electric Cooperative, Inc. Big Country Development Corporation Dear Member, We look forward to working with you and being of service as your residential scale memberowned generation project

More information

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS For Net Energy Metering of Residential, Commercial or Municipal Renewable Electrical Generation Facilities of 1 MW or Less These General

More information

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT Net(B) Metering Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT 1. Cover Letter to Customers 2. What is Net(B)

More information

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS For Residential, Commercial, Municipal, or Federal Agency Eligible Renewable Electrical Generation Facilities These General Conditions

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 53906-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 45879-E Sheet 1 CUSTOMER PHYSICAL ASSURANCE AGREEMENT FORM 14-749 (To

More information

SUBCONTRACT AGREEMENT PROFESSIONAL SERVICES

SUBCONTRACT AGREEMENT PROFESSIONAL SERVICES SUBCONTRACT AGREEMENT PROFESSIONAL SERVICES This Subcontract Agreement (this Agreement ) is made this day of, 20, by and between LARON INCORPORATED, an Arizona corporation ( Contractor ), and ( Subcontractor

More information

United Silicon Carbide, inc. Standard Terms and Conditions of Sale

United Silicon Carbide, inc. Standard Terms and Conditions of Sale United Silicon Carbide, inc. Standard Terms and Conditions of Sale 1. APPLICABILITY. These terms and conditions (these Terms and Conditions ) shall apply to all sales by United Silicon Carbide, inc. (

More information

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s): Return to: Inland Power & Light Co. PO Box A Spokane, WA 99219-5000 Reference numbers of related documents: N/A Tier 1 Net Metering and Renewable Resource Interconnection Agreement Grantor: Inland Power

More information

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS TABLE OF CONTENTS SECTION TITLE PAGE 1. CUSTOMER-GENERATOR RENEWABLE ELECTRICAL GENERATING

More information

Instructions for Requesting a Custodial Letter of Credit

Instructions for Requesting a Custodial Letter of Credit Instructions for Requesting a Custodial Letter of Credit The forms in this document may be printed and completed, or you may complete them in Adobe Acrobat Reader: Select the hand tool. Position the pointer

More information

HAWAIIAN ELECTRIC COMPANY, INC.

HAWAIIAN ELECTRIC COMPANY, INC. SHEET NO. 49.15-A RULE NO. 27 Net Energy Metering Plus A. ELIGIBLE CUSTOMER-GENERATOR The Net Energy Metering Plus ( NEM+ ) Program is available to existing Eligible Customer- Generators under the Company

More information

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER 1. Name of Company, a [State] limited liability company, with address of [Street, City, ZIP], hereinafter called "Seller,"

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59895-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57290-E GENERATING FACILITY INTERCONNECTION AGREEMENT (Non-Exporting)

More information

Solar*Rewards REC Purchase Contract Customer-Site PV Systems For Third Party PV Developers

Solar*Rewards REC Purchase Contract Customer-Site PV Systems For Third Party PV Developers Application ID: 1. 2. 3. 4. Solar*Rewards REC Purchase Contract Customer-Site PV Systems For Third Party PV Developers This Contract is made and entered into, by and between Public Service Company of Colorado

More information

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16 Section 1. Availability: (A) Service hereunder is available at Delivery Points on or near the transmission facilities

More information

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems) INSTRUCTIONS: Enter information in the empty fields below and send this form to Entergy Mississippi, Inc. ( Entergy or the Company ). This Standard Interconnection Application and Agreement shall be completed,

More information

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows: LEE COUNTY ELECTRIC COOPERATIVE STANDARD INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS GREATER THAN 100 KW AND LESS THAN OR EQUAL TO 1 MW TIER 3 This Interconnection Agreement

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Revised Cal. P.U.C. Sheet No. 41147-E Cancelling Revised Cal. P.U.C. Sheet No. 40751-E U 39 San Francisco, California ELECTRIC SAMPLE FORM NO. 79-978 Sheet 1 Interconnection Agreement for Net Energy Metering

More information

Cogeneration and Small Power Production Parallel Operation, Power Sales and Interconnection Agreement

Cogeneration and Small Power Production Parallel Operation, Power Sales and Interconnection Agreement between and Lincoln Electric System This Power Sales and Interconnection, hereinafter called the, is made and entered into as of the day of, 20, by and between, hereinafter referred to as the Owner of

More information

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code:

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code: Maryland Level 1 Interconnection Request Application Form and Conditional Agreement to Interconnect (Lab Certified Inverter-based Small Generator Facilities Less than 10 kw) Interconnection Applicant Contact

More information

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES I. STANDARD INFORMATION Section 1. Customer Information Name: _Customer Name Here Mailing Address(Box#/Street): 2300 Jackson St. (City/State/Zip):_Conway,

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59898-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57292-E Sheet 1 GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY

More information

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System CITY OF MOUNT DORA, FLORIDA FIRST REVISED SHEET NO. 15.0 CANCELS ORIGINAL SHEET NO. 15.0 Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System This Agreement is made and

More information

DRY SWEEPING SERVICES AGREEMENT

DRY SWEEPING SERVICES AGREEMENT DRY SWEEPING SERVICES AGREEMENT This DRY SWEEPING SERVICES AGREEMENT (this Agreement ) is made and entered into this day of, 200_ (the Effective Date ), by and between STANDARD PARKING CORPORATION, a Delaware

More information

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM This Agreement is made and entered into this day of, 20, by and between, (hereinafter RGS Owner ), located at in, Florida, and Utility

More information