1 DNV RESEARCH AND INNOVATION FORMAL SAFETY ASSESSMENT ON THE INSTALLATION OF INERT GAS SYSTEMS ON TANKERS <20,000DWT PROJECT NO REVISION NO. 4

2

3 EXECUTIVE SUMMARY This document details the work carried out to complete a Formal Safety Assessment (FSA) to assess the effectiveness of inert gas systems (IGS) in reducing the risk associated with cargo tank fire and explosions on chemical and oil tankers <20,000dwt. Two different IGSs are considered for two deadweight categories of 4,000-8,000 and 8,000-20,000; N 2 for chemical tankers and conventional oil burning type for oil tankers. These IGS systems are evaluated with Cost Benefit Assessments (CBA) to ascertain their economic viability with regards to reducing potential loss of life (PLL), potential loss of cargo (PLC) and potential loss of property (PLP). In this respect, the Gross Cost of Averting a Fatality (GCAF) and Net Cost of Averting a Fatality (NCAF) are calculated using the standard FSA method recognized by the International Maritime Organisation (IMO) [2]. Further, the Cost of Averting one Tonne of oil Spilled (CATS) proposed by Skjong et al. [3] is applied to understand the cost effectiveness of IGSs in preventing environmental pollution. From a GCAF point of view the results suggest that IGS would be cost effective only for oil tankers of 8,000-20,000dwt; from an NCAF perspective IGS is considered cost effective for chemical tankers 8,000-20,000dwt, although the NCAF for 4,000-8,000dwt tankers is not considered grossly disproportionate. However, there are concerns with regards to suspected under reporting in the casualty databases used, particularly with regards to tankers in the 4,000-8,000dwt category, which could significantly alter the PLL and individual risk scenarios, hence affecting the overall results. In this respect the final recommendation is for IGS to be implemented on all new build 4,000-20,000dwt chemical and product tankers. Page iv

4 CONTENTS 1. DEFINITION OF THE PROBLEM BACKGROUND INFORMATION METHOD OF WORK STEP 2 RISK ANALYSIS STEP 4 COST BENEFIT ASSESSMENT STEP 5 RECOMMENDATIONS FOR DECISION MAKING DESCRIPTION OF THE RESULTS ACHIEVED IN EACH STEP STEP 1 HAZARD IDENTIFICATION STEP 2 RISK ANALYSIS Shipyear and Accident Data Cargoes with a <60 C Flashpoint Risk Analysis for Chemical, Parcel, Chemical/Oil, Crude and Product Tankers STEP 3 RISK CONTROL OPTIONS STEP 4 COST BENEFIT ASSESSMENT CHEMICAL, PARCEL AND CHEMICAL/OIL TANKERS Risk Reduction of N 2 IGS Cost of Implementing N 2 IGS Economic Benefit of Implementing N 2 IGS on Chemical Tankers STEP 4 COST BENEFIT ASSESSMENT CRUDE AND PRODUCTS SHIPS Risk Reduction of Conventional IGS Cost of Implementing Conventional IGS Economic Benefit of Implementing Conventional IGS on Crude and Products Tankers INDIVIDUAL RISK STEP 5 - RECOMMENDATIONS FOR DECISION MAKING Under Reporting Root Cause of Reduction in Fire and Explosion Accidents Fatalities Due to Tank Entry Turnaround Time in Port FINAL RECOMMENDATIONS FOR DECISION MAKING REFERENCES ANNEX ACRONYMS EXPERTS CONSULTED INTERTANKO STATEMENT ON INERTING IN PORT...35 Page v

5 1. DEFINITION OF THE PROBLEM This Formal Safety Assessment addresses the potential of Inert Gas Systems (IGSs) to reduce the cargo tank fire and explosion risk on chemical, products, chemical/oil, crude and parcel tankers <20,000dwt carrying cargo with a flashpoint of <60 C. Cargoes with a flashpoint >60 C are not considered to benefit from IGSs with regards to reducing incidences of fires and explosions and thus are disregarded in the study. Currently tankers <20,000dwt, including those carrying volatile cargoes, that is with a flashpoint of <60 C (as identified in Chapter 17 of the International Code for the Construction and Equipment of Ships Carrying Dangerous Chemicals in Bulk & Index of Dangerous Chemicals Carried in Bulk (IBC Code)) [1], are exempted from having to operate with an IGS under SOLAS Chapter II-2. Moreover, under the same legislation (Paragraph 5.5.2) chemical tankers >20,000dwt with cargo tanks <3,000cbm are also exempted from having to operate an IGS (except in those cases when they are carrying MARPOL Annex I products). However, numerous fire and explosion events suspected of originating in the cargo hold have been recorded for tankers <20,000dwt over the last three decades, as noted by the Inter-Industry Working Group (IIWG) at MSC81. In this respect this FSA aims to quantify base risk and fatality (Potential Loss of Lives (PLL)) frequencies using the latest casualty data from Lloyd s Register FairPlay, and thereafter perform a cost/benefit analysis to ascertain if installation of IGSs on the above named tankers <20,000dwt may be considered cost effective. Page 6

6 2. BACKGROUND INFORMATION Following a series of fires and explosions on chemical and product tankers, ICS, IAPH, IACS, CEFIC, OCIMF, INTERTANKO and IPTA (see list of acronyms in 7.1) formed a steering committee in January 2005, which appointed a working group drawn from members of the individual organizations together with the International Group of P&I Clubs. The findings and recommendations of the Group have been submitted to MSC 81 as MSC 81/8/1 [8]. MSC 81 considered the reports on incidents of explosions on chemical and product tankers (MSC 81/8/1 and MSC 81/INF.8 [6]), which recommended that the Committee give consideration to amending the SOLAS Convention to provide for the application of Inert Gas Systems (IGSs) to new chemical tankers and new product tankers of less than 20,000dwt (MSC 81/25, paragraph 8.22) [7]. In this respect, MSC 81 resolved that a Formal Safety Assessment (FSA) should be carried out before decisions are made (MSC 81/25, paragraph 8.23) and agreed to refer the issues related to the proposals on IGSs to FP 51 and DE 50, for consideration under the agenda item dealing with casualty analysis, and reporting to MSC 83 (MSC 81/25, paragraph 8.30). Subsequently, at the fire protection sub-committee FP 51 Japan (FP51/10/1 and FP51/10/2) [16] presented a preliminary FSA on extending the requirement for IGSs to chemical, product, chemical/oil, crude, bitumen and asphalt tankers <20,000dwt. The FSA was 100% based on historical casualty data from Lloyds Register FairPlay (LRFP). For evaluating the effectiveness of installation of IGSs, comparison was made on risks resulting from accidents involving fire and/or explosion in the cargo tank of tankers of 20,000dwt and above for the period of , in which most such tankers were not provided with IGS; and for the period , in which all such tankers were provided with IGSs under the requirement of SOLAS Chapter II-2. The comparison showed that such risk for the latter period was 18.2% of that for the former period, that is, the risk reduction ratio between the periods is 81.8%. The words risk reduction here refer to the reduction of a Potential Loss of Lives (PLL) value. The PLL is defined as the expected loss of life and is usually quantified on an annual basis with unit per ship-year. The risk reduction potential for tankers <20,000dwt was calculated by multiplying the risk of cargo tank fire/explosion by Moreover, tankers <20,000dwt were split into two dwt categories, 4,000-8,000dwt and 8,000-20,000dwt, to provide a degree of sensitivity to the results. This FSA aims to undertake a comparable study to that of FP51/10/1 except that only those ships that carry cargoes with a <60 C flashpoint, that is chemical, parcel, products, chemical/oil and crude tankers of <20,000dwt, will be studied; bitumen and asphalt tankers will not be included as the cargoes they carry are not considered to have an autoignition temperature of less than 60 C. Page 7

7 3. METHOD OF WORK This study follows the standard reporting format for an FSA as detailed in the Guidelines for FSA in the IMO Rule Making Process. Figure 3.1 below shows the five main steps of the Formal Safety Assessment (FSA) approach, detailing what each step is comprised of and how the various steps are interrelated. The total risk, defined as the combination of frequency and severity summed up over all identified accident scenarios may be controlled by a number of well-known or newly identified risk control options. Finally, the objective of the cost benefit assessment step is to identify and rank the risk control options in order to determine the most cost efficient ones, i.e. those that provide most risk reduction in relation to cost. This study is concerned with steps 2, 4 and 5 described in Figure 3.1; a Hazard Identification (Step 1) and Risk Control Options (Step 3) are not required to be undertaken as these have already been identified as cargo hold fire/explosions and inert gas system respectively in MSC 81/INF.8 [6] and MSC 81/25 [7]. Figure 3.1: The five steps of a Formal Safety Assessment The following subsections describe the FSA Steps undertaken by this study in more detail and are based on the IMO FSA Guidelines [2]: 3.1 Step 2 Risk Analysis The purpose of the risk analysis in Step 2 is a detailed investigation of the causes and consequences of the more important scenarios identified in Step 1. This can be achieved by the use of suitable techniques that model the risk. This allows attention to be focused upon high risk areas and to identify and evaluate the factors which influence the level of risk. Page 8

8 Different types of risk (i.e. risks to people, the environment or property) should be addressed as appropriate to the problem under consideration. The construction and quantification of fault trees and event trees are standard risk assessment techniques that can be used to build a risk model. An example of a conceptual risk model is the Risk Contribution Tree. Whilst the example makes use of fault and event tree techniques, other established methods could be used if appropriate. Quantification makes use of accident and failure data and other sources of information as appropriate to the level of analysis. Where data is unavailable, calculation, simulation or the use of recognized techniques for expert judgement may be used. The output from Step 2 comprises the identification of the high risk areas which need to be addressed. 3.2 Step 4 Cost Benefit Assessment The purpose of Step 4 is to identify and compare benefits and costs associated with the implementation of each RCO identified and defined in Step 3. A cost benefit assessment may consist of the following stages: 1. Consider the risks assessed in Step 2, both in terms of frequency and consequence, in order to define the base case in terms of risk levels of the situation under consideration; 2. Arrange the RCOs, defined in Step 3, in a way to facilitate understanding of the costs and benefits resulting from the adoption of an RCO; 3. Estimate the pertinent costs and benefits for all RCOs; 4. Estimate and compare the cost effectiveness of each option, in terms of the cost per unit risk reduction by dividing the net cost by the risk reduction achieved as a result of implementing the option; and 5. Rank the RCOs from a cost-benefit perspective in order to facilitate the decision making recommendations in Step 5 (e.g. to screen those which are not cost effective or impractical). Costs should be expressed in terms of life cycle costs and may include initial, operating, training, inspection, certification, decommission etc. Benefits may include reductions in fatalities, injuries, casualties, environmental damage and clean-up, indemnity of third party liabilities, etc. and an increase in the average life of ships. There are several indices which express cost effectiveness in relation to safety of life such as Gross Cost of Averting a Fatality (GCAF) and Net Cost of Averting a Fatality (NCAF) as described below. Other indices based on damage to and affect on property and environment may be used for a cost benefit assessment relating to such matters. Comparisons of cost effectiveness for RCOs may be made by calculating such indices. For the purposes of this study the Gross Cost of Averting a Fatality (GCAF) (Equation 1), Gross Cost of Averting one Tonne of Oil Spilled (CATS) [9] (Equation 2) and Net Cost of Averting a Fatality (NCAF) (Equation 3) are used. The definitions of GCAF, CATS and NCAF are: Page 9

9 Equation 1: Gross Cost of Averting a Fatality ΔC GCAF= Δ R S Equation 2: Cost of Averting a Tonne of oil Spilled ΔC CATS= Δ R E Equation 3: Net Cost of Averting a Fatality NCAF= ΔC - ΔB Δ R S Where: ΔC ΔB ΔR is the cost per ship of the risk control option during the lifetime of the vessel. is the economic benefit per ship resulting from the implementation of the risk control option during the lifetime of the vessel (includes environmental and property benefits). is the risk reduction per ship, either in terms of the number of fatalities averted ( R S ) or tonnes of oil spilled prevented ( R E ), implied by the risk control option during the lifetime of the vessel. The output from step 4 comprises: 1. Costs and benefits for each RCO identified in step 3 from an overview perspective; 2. Costs and benefits for those interested entities which are the most influenced by the problem in question; and 3. Cost effectiveness expressed in terms of suitable indices. For the purposes of this study only points 1 and 3 described above are addressed. 3.3 Step 5 Recommendations for Decision Making The purpose of Step 5 is to develop recommendations that can be presented to the relevant decision makers in an auditable and traceable manner. Those recommendations are based upon the comparison and ranking of all hazards and their underlying causes; the comparison and ranking of risk control options as a function of associated costs and benefits; and the identification of those risk control options which keep risks as low as reasonably practicable. There are several standards for risk acceptance criteria [3][4], however none are presently universally accepted. IMO has published criteria to be used in rule making for GCAF and NCAF [5] and to comply Page 10

10 with IMO s requirements these values have been used to assist judgements about the effectiveness of RCO s in this work. The output from Step 5 comprises: 1. An objective comparison of alternative options, based on the potential reduction of risks and cost effectiveness, in areas where legislation or rules should be reviewed or developed; and 2. Feedback information to review the results generated in the previous steps. Page 11

11 4. DESCRIPTION OF THE RESULTS ACHIEVED IN EACH STEP 4.1 Step 1 Hazard Identification As described in MSC 81/INF.8 [6] the majority of cargo tank fires and explosions on chemical and product tankers were caused by tank cleaning, venting and gas freeing, with static electricity and sparks/friction the most common ignition sources. It was found that the most significant contributory factor to the incident causes was a failure to follow or understand cargo operation guidelines and procedures. None of the incidents occurred during the use or operation of inert gas systems. 4.2 Step 2 Risk Analysis With regards to calculating risk of fire and explosion due to a lack of statistical data on specific ship types those vessels included within the study have been grouped together. In terms of calculating GCAF, NCAF and CATS the ships have been split into two categories based on the type of inert gas system required; thus, chemical, parcel and chemical/oil tankers, which require N 2 IGS, are included in a first analysis described in 4.4; while product and crude tankers, which require a conventional oil burning IGS, are included in a second analysis in Shipyear and Accident Data Shipyears are calculated using Lloyd s Register FairPlay database. The total number of ships scrapped per year was subtracted from those delivered per year for all ship types included in the study, giving total number of ships in operation for the periods and Ships operating per year were then multiplied by the number of years of operation in each time period, giving total number of shipyears. All accident data is sourced from the latest version of Lloyd s Register Fairplay (LRFP) casualty database (2008). The total number of fire and explosion accidents to be included within the study was selected from LRFP by studying the free text description of the accidents, and checking with other sources whenever possible. The results were than sent to two chemical/product tanker experts for validation 1 ; the rationale for counting accidents was those which could have conceivably been prevented by IGS technology Cargoes with a <60 C Flashpoint This study considers that cargoes with a flashpoint <60 C will principally benefit from IGS technology and thus only that portion of tankers that carry volatile products is considered. In this respect the base risk frequency and risk of fatality is multiplied by 0.53 to ensure that cargo tank fire/explosion accidents are only applied to those ships carrying cargoes with <60 C flashpoint; the figure of 0.53 was determined by studying recent annual voyage data, which included cargo type and associated flashpoint, provided by two global chemical carriers, Odfjell [11] and Stolt Nielsen [12], and then taking the mean between the two. This was considered representative of the world fleet. 1 Svend Foyn-Bruun (Odfjell) and Otto Nyquist (DNV) Page 12

12 4.2.3 Risk Analysis for Chemical, Parcel, Chemical/Oil, Crude and Product Tankers Table 4.1 shows the results of the risk analysis for chemical, parcel, chemical/oil, crude and products tankers in three size categories, 4,000-8,000dwt; 8,000-20,000dwt; and >20,000dwt, for two separate periods, and The >20,000dwt category was included to calculate the ratio of fire/explosions that could have been prevented by an IGS; to do this initially the PLL from fire/explosions for , when the majority of tankers did not have IGS technology, and when all >20,000dwt tankers carrying MARPOL Annex I products had IGS installed as per SOLAS Chapter II-2, was calculated. Thereafter, the risk reduction potential of installing an IGS can be calculated by dividing the PLL for by the PLL for The percentage difference between the PLL figures for the two periods is considered the potential risk reduction possible by using IGSs on tankers <20,000dwt. The decision on which accidents were counted in and was based on reviewing each accident by experts from Odfjell and DNV. It should be noted that reporting and recording of accidents has improved since the first period of , thus the accident frequencies, and hence PLL outcomes, used in this FSA are considered conservative. It is considered that if all accidents could be included from , the difference between >20,000dwt PLL for and , used for calculating risk reduction, would be even greater, leading to a higher potential risk reduction. Table 4.1: PLL Calculations for Chemical, Parcel, Chemical/Oil, Crude and Product Tankers % of cargoes Period dwt Shipyears No. of accidents <60 C flashpoint Acc frequency Lives lost PLL >20,000 12, E E-02 >8,000 1, E E-03 >4,000 1, E E-03 >20,000 53, E E-03 >8,000 12, E E-03 >4,000 16, E E Step 3 Risk Control Options The installation of N 2 IGSs on chemical, parcel and chemical/oil ships, and conventional oil burning IGSs for crude and products ships, are the only risk control measures to be considered in this study. 4.4 Step 4 Cost Benefit Assessment Chemical, Parcel and Chemical/Oil Tankers The risk control measures of N 2 and conventional oil burning IGSs are analysed in this chapter using the methods and criteria set out by the IMO [2][1] [5]. Page 13

13 Net Present Value (NPV) The cost and benefit of the Risk Control Options (RCOs) is spread over the lifetime of the vessel, which is considered to be 25 years for the purposes of this study. Some RCOs may involve costs annually while others only involve costs at given intervals. In order to be able to compare the costs and benefits and calculate the NCAF and GCAF, Net Present Value (NPV) calculations have been performed on applicable RCOs using Equation 4 as given below: Equation 4: Net Present Value T Xt t 1 ) NPV= A + t= ( 1 + r Where: X t = Cost or benefit of RCO for any given year A= Amount spent initially for implementation of RCO r = Discount rate T = 25 (years) A uniform discount rate of 5% has been used. (This is assumed to be a long term real (above inflation) risk free rate of return i.e. 3% inflation and 8% depreciation. The figure is used in most FSAs submitted to IMO) Risk Reduction of N 2 IGS As the quality of chemical cargoes is affected by non-nitrogen atmospheres, an N 2 IGS must be used. In this respect Table 4.2 below illustrates the potential risk reduction achievable (93%) with regards to cargo tank fire/explosion by installing an N 2 IGS on chemical, parcel and chemical/oil tankers <20,000dwt. The risk reduction potential is calculated by totalling all cargo tank fire/explosion events for tankers >20,000dwt in the period that could have been prevented by having an IGS this period was chosen as most tankers did not have IGS technology installed at the time; and then performing the same calculation for the period when all >20,000dwt tankers licensed to carry MARPOL Annex I cargoes had IGS installed as per SOLAS Chapter II-2. As explained in this exercise was undertaken by experts from Odfjell and DNV where every incident was reviewed while considering whether or not the accident could have been prevented by IGS. Table 4.2: Potential Risk Reduction of Cargo Tank Fires/Explosion Incidents for Chemical, Parcel and Chemical/Oil Tankers of <20,000dwt PLL (A) PLL (B) PLL reduction ratio (B/A) PLL reduction potential (1-B/A) 3.3E E-03 7% 93% The PLL reduction potential of 93% is translated into PLL/shipyear and PLL/ship lifetime, which is assumed to be 25 years, in Table 4.3 below. Therefore, an N 2 IGS is Page 14

14 expected to save one life every 920 years for ships >4,000dwt and <8,000dwt and one life every 215 years for ships >8,000dwt and <20,000dwt. Table 4.3: Estimated Reduction in PLL for Chemical, Parcel and Chemical/Oil, Crude Tankers of <20,000dwt Dwt PLL/shipyear PLL/ship lifetime* 8,000-20, E E-01 4,000-8, E E Cost of Implementing N 2 IGS The cost for installing an N 2 IGS at new build stage differs depending on the cbm/hr capacity required. Advice from Odfjell suggests that 1,000cbm/hr x 95% capacity is sufficient for chemical carriers <20,000dwt [10]; the required N 2 capacity for 4,000-8,000dwt carriers is likely to be less than for 8,000-20,000dwt ships, although no information could not be obtained for the cost of an N 2 IGS for the smaller sized ships. Thus, a single cost of $505,000 is assumed for all <20,000dwt chemical carriers, which represents the mean cost of N 2 IGS prices received from Daewoo Shipbuilding and Marine Engineering (DSME) in Korea [13] and tanker owner Kristen Navigation of Greece [14]. Lifetime maintenance costs, provided by chemical carrier Odfjell and based on operational experience, are estimated to be $102,000 or $4,080 a year [15]. The yearly cost of $4,080 is incurred over the lifetime of the ship, thus to determine the cost of maintenance in Present Value, NPV is calculated, giving a total maintenance cost of $57,503. Thus, the total cost associated with fitting N 2 IGS is $562, Economic Benefit of Implementing N 2 IGS on Chemical Tankers The economic benefit of introducing an N 2 IGS is in the reduction of cargo tank fires and explosions leading to fatal accidents, oil/chemical spills and property damage (i.e. to the ship), expressed as the Gross Cost of Averting a Fatality (GCAF), the Cost of Averting one Tonne of oil Spilled (CATS) and Net Cost of Averting a Fatality (NCAF). The limit cost of averting a fatality is currently agreed at $3 million, which is applicable for both GCAF and NCAF calculations; this is the standard value prescribed in the amendment to the IMO circulars MSC 1023 and MEPC 392, dated 16 October 2006 [5]. CATS was also used to assess the cost effectiveness of installing IGSs; from a CATS perspective a risk control measure is cost-effective if it is less than $60,000. This is the value proposed in SAFEDOR D4.5.2 Risk Evaluation Criteria [3] and is the implied intrinsic value of the environment and the cost that society is willing to pay to prevent an oil spill from occurring. Page 15

15 Gross Cost of Averting a Fatality (GCAF) The GCAF for 4,000-8,000dwt and 8,000-20,000dwt tankers is detailed in Table 4.4 below. Table 4.4: The Gross Cost of Averting a Fatality (GCAF) on Chemical, Parcel and Chemical/Oil Tankers <20,000dwt Dwt PLL/shipyear PLL/ship lifetime* Cost of N 2 IGS ($) GCAF ($) 8,000-20, E E ,503 4,843,000 4,000-8, E E ,503 20,725,000 * 25 years In addition to GCAF, the Cost of Averting a Tonne of oil Spilled (CATS) and Net Cost of Averting a Fatality (NCAF) is shown in the following tables. Cost of Averting a Tonne of oil Spilled (CATS) CATS is used to calculate whether a risk control measure is cost effective from an environmental point of view i.e. society puts an intrinsic worth on the environment, which is assumed to be $60,000/tonne of oil not spilled in the CATS formula (Equation 2). Thus, if the costs of implementing the risk control measure are less than $60,000 per tonne of spill averted, then the measure can be recommended from an environmental viewpoint. The potential environmental damage that crude and oil products can cause is well documented. For example, oil spills may seriously affect the visual appeal and use of coastal amenity areas; and may result in the widespread death of marine life through physical contact, ingestion and destruction of food resources, generating long-lasting indirect impacts on the complex inter-relationship of aquatic ecosystems. Although CATS has been developed to measure the cost effectiveness of a risk control measure in terms of avoiding an oil spill, in the absence of any other information it is argued that the formula is also appropriate for chemical pollution. Chemicals, such as organochlorides, are commonly shipped around the world and are widely recognised as highly toxic to aquatic organisms and the marine environment in general (e.g. MARPOL Annex II). Moreover, due to the diverse and complex nature of chemicals, the capacity to cause negative environmental consequences following a spill could be considered as significant as oil. Therefore, CATS is applied to chemical tankers as well as those carrying oil in this FSA. Table 4.5: The Cost of Averting a Tonne of oil Spilled (CATS) for Chemical, Parcel and Chemical/Oil Tankers 4,000-20,000dwt Size (dwt) PLC /lifetime* Value of oil not spilled($)** Cost of IGS ($) CATS ($) 8,000-20, E , ,503 59,000 4,000-8, E , ,503 94,000 * 25 years ** $60,000/tonne (based on value used in CATS) Page 16

16 Net Cost of Averting a Fatality (NCAF) The NCAF for 4,000-8,000dwt and 8,000-20,000dwt chemical tankers is calculated below with explanation of the methods used. Table 4.6: The Net Cost of Averting a Fatality (NCAF) on Chemical, Parcel and Chemical/Oil Tankers 4,000-8,000dwt Av dwt Av spill (t) Shipyears No. of acc PLC* (t) Risk Red PLC/lifetime# Value of oil not spilled#* Total benefit (PLC + PLP) E-01 93% 5.99E , E+05 NCAF ($) Av repair ($) Shipyears No. of acc PLP** ($) Risk Red PLP/lifetime# 5.83E E+03 93% 1.02E+05 * Potential Loss of Cargo ** Potential Loss of Property # 25 years #* $60,000/tonne (based on value used in CATS) 3,725,000 Table 4.7: The Net Cost of Averting a Fatality (NCAF) on Chemical, Parcel and Chemical/Oil Tankers 8,000-20,000dwt Av dwt Av spill (t) Shipyears No. of acc PLC* (t) Risk Red PLC/lifetime# Value of oil not spilled#* Total benefit (PLC + PLP) E-01 93% 9.46E , E+05 NCAF ($) Av repair ($) Shipyears No. of acc PLP** ($) Risk Red PLP/lifetime# E+03 93% 1.66E+05 * Potential Loss of Cargo ** Potential Loss of Property # 25 years #* $60,000/tonne (based on value used in CATS) With reference to Table 4.6 and Table 4.7 in the absence of any data the average spill is calculated by taking 5.7% of the average deadweight of (6,000 for 4,000-8,000dwt and 14,000 for 8,000-20,000dwt); this is based on Spouge [17], who based the result on historic data with regards to oil tanker mean spill sizes due to fire/explosion. Likewise, as there is very little information on repair costs for ships the average repair cost is based on using LRFP casualty data in terms of whether an accident is classed as serious or non-serious in conjunction with the two cost of repair formulas devised by Spouge [17] and detailed in Equation 5 and Equation 6 below. -1,473,000 Page 17

17 Equation 5: Cost of Repair for Serious Accidents GT CRsc= $58,000Tsc 75,000 Equation 6: Cost of Repair for Non-Serious Accidents GT CRnsi = $27,000Tnsi 75,000 Where: CRsc = repair cost in serious casualties ($) Crnsi = repair cost in non-serious incidents ($) GT = ship gross tonnage Tsc = mean time off-hire in serious casualties (days) Tnsi = mean time off-hire in non-serious incidents (days) Where a ship is recorded as a total loss in LRFP the value is estimated using further formulas from Spouge [17], which combined with the repair costs make up the average repair costs detailed in Table 4.6 and Table 4.7. The new building cost formulas are below: Where: N = new-building price ($) D = ship deadweight Equation 7: Oil Tanker New Building Cost N = $20 x $350 D Equation 8: Chemical Tanker New Building Cost N = $11 x $1900 D The factors in Equation 7 and Equation 8 are based on average new building costs from supplied by Clarkson s, which in the absence of accurate historical data are considered the best way of estimating costs. Once the new build cost of the ship has been calculated, the value is depreciated by 4% of the new build cost annually for every year of operation up until the date of terminal loss to give the approximate value when lost [17]. Using the method described above in combination with the risk reduction afforded by an N 2 IGS the PLC/lifetime and PLP/lifetime can be calculated, giving an average total economic benefit for 4,000-8,000dwt tankers of $461,000/lifetime. The total economic benefit is used to calculate the NCAF (Equation 3), which for 4,000-8,000dwt tankers is $3,725,000, 24% above the $3 million upper limit; this implies that the economic benefit of fitting an N 2 IGS does not outweigh the real cost of implementation due to lack of reduction in risk and associated reduction in PLC and PLP. Page 18

18 With respect to 8,000-20,000dwt chemical tankers the total economic benefit is $734,000/lifetime, giving an NCAF of -$1,473,000; as the NCAF is negative the economic benefit of installing an N 2 IGS on 8,000-20,000dwt tankers implies that the reduction in risk with regards to PLC and PLP outweighs the cost of the equipment. 4.5 Step 4 Cost Benefit Assessment Crude and Products Ships Risk Reduction of Conventional IGS Tankers transporting crude and hydrocarbon products do not need a high degree of nitrogen to maintain the quality of their cargoes, and as such can employ conventional oil burning IGSs. As with the N 2 IGS (4.4.1) the potential risk reduction of 93% in terms of cargo tank fire/explosion is used. As in Table 4.2, the risk reduction is calculated by totalling all cargo tank fire/explosion events for >20,000dwt crude and products tankers in the period that could have been prevented by having an IGS; and comparing the PPL frequency with that of the latter period of Table 4.8: Potential Risk Reduction of Cargo Tank Fires/Explosion Incidents for Crude and Products Tankers of <20,000dwt PLL (A) PLL (B) PLL reduction ratio (B/A) PLL reduction potential (1-B/A) 3.3E E-03 7% 93% As with the chemical carriers, the PLL reduction potential of 93% is translated into PLL/shipyear and PLL/ship lifetime, which is assumed to be 25 years, in Table 4.9 below. This translates into one life saved every 909 years for <4,000dwt tankers and one life very 217 years for <8,000dwt ships. Table 4.9: Estimated Reduction in PLL for Crude and Products Tankers of <20,000dwt Dwt PLL/shipyear PLL/ship lifetime* 8,000-20, E E-01 4,000-8, E E Cost of Implementing Conventional IGS Guidance from Odfjell suggests that for <20,000dwt tankers a conventional oil burning IGS with a capacity of 4,000cbm/hr will be sufficient to inert the cargo hold [10]. The tankers in size category 4,000-8,000dwt may be able to operate safely with an IGS capacity of >4,000cbm/hr, although no accurate installation prices could be obtained; in this respect a single cost of $215,000 for providing and fitting a conventional IGS is estimated, which represents the mean between prices received from DSME of Korea [13] and Kristen Navigation of Greece [14], which has several new builds on order with various yards. In the absence of accurate information, the maintenance cost is taken from Japanese study FP 52/INF.2 [16] and escalated using OECD CPI yearly percentage point increases, giving a total of $29,800 for the Page 19

19 lifetime of the ship with the NPV cost being $16,800. Thus, the total cost of fitting and maintaining a conventional IGS over the lifetime of a tanker is $231, Economic Benefit of Implementing Conventional IGS on Crude and Products Tankers The economic benefit of introducing a conventional IGS is in the reduction of cargo tank fires and explosions leading to fatal accidents, oil/chemical spills and property damage (i.e. to the ship), expressed as the Gross Cost of Averting a Fatality (GCAF), the Cost of Averting one Tonne of oil Spilled (CATS) and Net Cost of Averting a Fatality (NCAF). The upper limit cost of averting a fatality is currently agreed at $3 million, which is applicable for both GCAF and NCAF calculations; this is the standard value prescribed in the amendment to the IMO circulars MSC 1023 and MEPC 392, dated 16 October 2006 [5]. CATS was also used to assess the cost effectiveness of installing IGSs; from a CATS perspective an risk control measure is cost-effective if it is less than $60,000. This is the value proposed in SAFEDOR D Risk Evaluation Criteria [3] and is the implied intrinsic value of the environment and the cost that society is willing to pay to prevent an oil spill from occurring. Gross Cost of Averting a Fatality (GCAF) The GCAF for fitting a conventional IGS to 4,000-8,000dwt and 8,000-20,000dwt tankers is detailed in Table 4.10 below. Table 4.10: The Gross Cost of Averting a Fatality (GCAF) on Crude and Product Tankers <20,000dwt Dwt PLL/shipyear PLL/ship lifetime* Cost of IGS ($) GCAF ($) 8,000-20, E E ,800 1,996,000 4,000-8, E E ,800 8,541,000 * 25 years Further analyses, including the Cost of Averting a Tonne of oil Spilled (CATS) and Net Cost of Averting a Fatality (NCAF), are shown in the following tables. Cost of Averting a Tonne of oil Spilled (CATS) CATS is used to calculate whether a risk control measure is economically beneficial from a environmental point of view i.e. society puts an intrinsic worth on the environment, which is assumed to be $60,000/tonne of oil not spilled in the CATS formula (Equation 2). Thus, if the costs of implementing the risk control measure are less than $60,000, then the measure can be recommended from a CATS viewpoint. Page 20

20 Table 4.11: The Cost of Averting a Tonne of oil Spilled (CATS) for Crude and Product Tankers 4,000-20,000dwt Size (dwt) PLC /lifetime* Value of oil not spilled($)** Cost of IGS ($) CATS ($) 8,000-20, E , ,800 29,000 4,000-8, E , , ,000 * 25 years ** $60,000/tonne (based on value used in CATS) Net Cost of Averting a Fatality (NCAF) The NCAF for oil tankers is calculated below; the formulas used to calculate the average repair costs are those described above in Equation 5 Equation 8 above. As with chemical tanker NCAF calculations, in the absence of any data the average spill is calculated by taking 5.7% of the average deadweight of (6,000 for 4,000-8,000dwt and 14,000 for 8,000-20,000dwt); this is based on research of historical data undertaken by Spouge [17] with regards to oil tanker mean spill sizes due to fire/explosion. Av dwt Table 4.12: The Net Cost of Averting a Fatality (NCAF) on Crude and Product Tankers 4,000-8,000dwt Av spill (t) Shipyears No. of acc PLC* (t) Risk Red PLC /lifetime# Value of oil not spilled#* Total benefit (PLC + PLP) , E-02 93% 2.21E , E+05 NCAF ($) Av repair ($) Shipyears No. of acc PLP** ($) Risk Red PLP /lifetime# 1.60E+06 10, E+02 93% 1.03E+04 * Potential Loss of Cargo ** Potential Loss of Property # 25 years #* $60,000/tonne (based on value used in CATS) 3,276,000 Av dwt Table 4.13: The Net Cost of Averting a Fatality (NCAF) on Crude and Product Tankers 8,000-20,000dwt Av spill (t) Shipyears No. of acc PLC* (t) Risk Red PLC /lifetime# Value of oil not spilled#* Total benefit (PLC + PLP) , E-01 93% 8.05E , E+05 NCAF ($) Av repair ($) Shipyears No. of acc PLP** ($) Risk Red PLP /lifetime# 7.85E+06 6, E+03 93% 1.32E+05 * Potential Loss of Cargo ** Potential Loss of Property # 25 years #* $60,000/tonne (based on value used in CATS) Using the method described in in combination with the risk reduction afforded by a conventional IGS the PLC/lifetime and PLP/lifetime can be calculated, giving an average total economic benefit for 4,000-8,000dwt tankers of $143,000/lifetime -3,297,000 Page 21

21 (Table 4.12). The total economic benefit is used to calculate the NCAF (Equation 3), which for 4,000-8,000dwt tankers is $3,276,000, nine percent above the $3 million upper limit; this implies that the economic benefit of fitting a conventional IGS does not outweigh the real cost of implementation due to lack of reduction in risk and associated reduction in PLC and PLP. With respect to 8,000-20,000dwt oil tankers the total economic benefit is $615,000/lifetime, giving an NCAF of -$3,297,000, which is considerably below the $3 million upper limit; thus, the NCAF for 8,000-20,000dwt tankers implies that fitting a conventional IGS is beneficial from an economic viewpoint. Page 22

22 4.6 Individual Risk With regards to ascertaining if risk to personnel is within the ALARP region individual risk is calculated. The tables below are compared in Figure 4.2 below. It should be noted that the table only include the individual risk from ship accidents from LRFP data. To calculate the total individual risk the risk from personal accidents would need to be added. Table 4.14: Individual Risk Resulting from All Fire/Explosions (Excluding Cargo Tank Fire/Explosions) Period dwt Shipyears No. of acc Acc. Frequency Lives lost other fires PLL Individual risk Crew no >20,000 53, E E E >8,000 12, E E E >4,000 16, E E E Total 82, E E * * Weighted average Period dwt Shipyears No. of acc <60C cargoes Acc. Frequency Lives lost Lives lost all other acc PLL cargo FX >20,000 53, E E >8,000 12, E E >4,000 16, E E-03 Total 82, E-03 Table 4.15: Individual Risk Resulting from All Accidents (Excluding Fire/Explosions) Period dwt Shipyears No. of acc Acc. Frequency Lives lost not fire PLL Individual risk Crew no >20,000 53, E E E >8,000 12, E E E >4,000 16, E E E Total 82,264 7, E E * * Weighted average Table 4.16: Individual Risk Resulting from All Accidents inc. Fire/Explosions on Ship Carrying <60 C Cargoes PLL total Individual risk Cargo FX Individual risk total Crew no. 9.0E E E E E E E E E E E E * Weighted average Page 23

23 4.7 Step 5 - Recommendations for Decision Making Risk Reduction R S Cargo Spill Reduction R E Table 4.17: Results Cost Benefit C B ΔC GCAF= Δ R S ΔC CATS= Δ R E ΔC - ΔB NCAF= Δ Tonnes 1) Risk Control # of saved $ 1) 2) $ 1) 2) 3) $ $ $ Measure lives 1) N 2 IGS 4,000-8,000dwt 2.7E , ,000 20,725,000 94,000 3,725,000 chemical tankers N 2 IGS 8,000-20,000dwt 1.2E , ,000 4,843,000 59,000-1,473,000 chemical tankers Conventional IGS 4,000-8,000dwt oil 2.7E , ,000 8,541, ,000 3,276,000 tankers Conventional IGS 8,000-20,000dwt oil tankers 1.2E , ,000 1,996,000 29,000-3,297,000 1) Per ship lifetime, assumed to be 25 years 2) Includes NPV at 5% per year where relevant 3) Reduced PLC and PLP R S Figure 4.1: GCAF and NCAF for <20,000dwt Tankers Carrying <60 C Cargoes USD (millions) $3 million upper limit 0-5 Chemical tankers - >4,000dwt Chemical tankers - >8,000dwt Oil tankers - >4,000dwt Oil tankers - >8,000dwt GCAF 20,725,577 4,843,532 8,540,734 1,995,955 NCAF 3,725,019-1,473,403 3,276,174-3,296,969 The results displayed in Table 4.17 and Figure 4.1 above show that the conventional IGS on 8,000-20,000dwt oil tankers is cost effective both from a safety and Page 24

24 environmental perspective alone. From an NCAF standpoint fitting N 2 IGS to 8,000-20,000dwt chemical tankers is considered cost effective. However, NCAF for both 4,000-8,000dwt chemical and oil tankers is not grossly disproportionate to the value of life threshold of $3 million, being only 24% and 9% respectively above the upper limit. In this respect it should be considered that the individual risk may be close to or above the intolerable limit when personal accidents are included. The GCAF calculations show that the outcomes for the 4,000-8,000dwt category tankers are far higher than for the 8,000-20,000dwt tankers, particularly with regards to the >4,000dwt chemical tankers. This situation is suspected to be influenced by under-reporting of accidents in the smallest tanker category; this issue is discussed in more detail below Under Reporting There is the suggestion that under reporting is inherent in accident databases, such as LRFP, with the result that the results of this FSA may be underestimated. This viewpoint is based on an exercise undertaken where the fire and explosion incidents of Norwegian flagged vessels (NOR/NIS) recorded in LRFP, of which there were 26, were compared with fire and explosion events documented in the Marine Casualty Database (DAMA) maintained by the Norwegian Maritime Directorate, of which there were 50. Norwegian flagged vessels account for 107 ships of the type included within this FSA, which is the seventh largest fleet in the world (3% of world fleet). Therefore, the comparison between LRFP and DAMA fire and explosion accident reporting is significant. Of the total number of fire and explosion accidents in both databases (76) there was matching reporting in only 15 cases (30%). The following formula is used to estimate under reporting taking into account the probability of accident events not appearing in either database. The true number of accidents is represented by N. The probability of an accident being reported in LRFP is 26/N. The probability of an accident being reported in DAMA is 50/N. The probability of reporting in both databases is 15/N. Thus: 26/N*50/N = 15/N or N = 26*50/15 = 87 So the estimated number of accidents is 87. Therefore, overall LRFP contains only 26/87 or 30% of all fire and explosion accidents, suggesting an under reporting of 70%. Thus, the accident frequencies used in this study could potentially be increased by a factor of 3.3 to take account of underreporting if the NOR/NIS fleet was considered representative, although the fatalities associated with these accidents is an unknown. Page 25

25 Moreover, when individual risk is presented (Figure 4.2 and Figure 4.3) it is clear that there are far fewer accidents and associated lives lost in all accident categories for 4,000-8,000dwt tankers compared to the other tanker size categories, suggesting a certain degree of under reporting. The confidence intervals in Figure 4.2 indicate the statistical uncertainty (a confidence level of 0.9 was used), although this neither supports nor disproves the hypothesis of under reporting. However, the upper confidence level of the average total individual risk for 8,000-20,000dwt tankers is 8.6E-04, which is close to the intolerable threshold of 1.0E-03; it is presumed that when occupational risk is added it can not be concluded with confidence that the total individual risk is in the ALARP region, indicating that actions must be taken to reduce the risk irrespective of costs. Figure 4.2: Confidence Intervals and Individual Risk Comparison for All Accidents for Tankers Carrying <60 C Cargoes 1.0E E E-04 Individual Risk 7.0E E E E E E E E+00 >4,000dwt >8,000dwt >20,000dwt Average All cargo FX 6.5E E E E-04 All non cargo FX 1.6E E E E-04 All other Accidents 1.7E E E E-05 Total individual risk 2.4E E E E-04 Page 26

26 Figure 4.3: Confidence Intervals and Individual Risk Comparison for Cargo Tank Fire and Explosions for All Tankers Carrying <60 C Cargoes 4.0E E E-04 Individual Risk 2.5E E E E E E+00 >4,000dwt >8,000dwt >20,000dwt Average All cargo FX 6.5E E E E-04 Figure 4.3 above illustrates calculated individual risk and associated confidence intervals for cargo tank fire and explosions, all of which lie in the ALARP region; however, occupational accidents are not taken into account as this information is not included in the LRFP database. On the other hand, the GCAF and NCAF calculations in and illustrate that in the cases of 8,000-20,000dwt oil tankers and 8,000-20,000dwt chemical tankers the individual risk for these ship types displayed in Figure 4.3 may not be in the ALARP area. In support of the above argument on poor reporting the issue is also recognised by IIWG in MSC81/8/1, paragraph 3 [8]: A letter was sent on behalf of the IIWG to the owners and/or operators of the ships involved in the incidents identified, requesting that they provide any information they might have to the Group. Data provided on the various incidents was of variable quantity and quality, although the Group felt that some value was derived from all the data received. Despite the invitation made by MSC 80 to the relevant Administrations to provide further information on the findings of the investigations into recent casualties, little new information was provided to the IIWG. In addition, IACS suspects large under reporting for general cargo ships <20,000 gross tonnes and in MSC85/19/1 [18], paragraph 8, stated the following with regards to under reporting in general: The investigation of historical data on general cargo ships found in databases indicates that: 1. the issue of the completeness of incident reporting is unsolved and thus an unknown percentage of underreporting exists; Page 27

27 2. when broken down to sub-categories (e.g., flag, classification society etc.), the results are dominated by uncertainties; and 3. in order to complete an FSA of high quality, it is essential to complement the available data sources with additional data, which needs to be provided by flag States and any other organizations which have relevant data to contribute Root Cause of Reduction in Fire and Explosion Accidents The rationale for judging the risk reduction potential of IGS is based on the assumption that reduced PLL on <20,000dwt tankers between the two periods of and is due to the introduction of IGS post However, studying the accident statistics in Table 4.1, it is clear that there is also a marked reduction in PLL between and for 4,000-8,000dwt tankers of 86%; the significant reduction in risk to life between and cannot be explained by the introduction of IGS as it is not required for these size tankers for either period. Therefore, either other aspects besides IGS have reduced the risk of cargo tank fire and explosion, such as improved safety management systems, or there is a considerable degree of under reporting in the smallest tanker category; the second supposition is supported by the apparent under reporting identified and explained in Fatalities Due to Tank Entry With the introduction of IGS on <20,000dwt tankers the associated risk of asphyxiation due to entry into inerted tanks must be considered. As LRFP does not record death due to tank entry several Intertanko members provided fatality information which suggests that the PLL due to inerted tank entry is 4.4E-03. However, this calculation was based on a small dataset containing relatively few shipyears; in this regard it is suspected that additional shipyears should be included in the evaluation to encompass the entire period of time when crew were at risk from death due to entry into inerted tanks, resulting in a more realistic PLL. Moreover, it should be recognised that the risk associated with tank entry can be significantly lowered with adequate training of suitably qualified and experienced personnel and ensuring the enforcement of strict safety procedures. For example, Odfjell s Safety and Quality Management System requires that personal oxygen meters or O 2 /LEL multi-meters are used when in enclosed spaces and cargo tanks [19]. On the other hand risk of fire and explosion in the cargo hold cannot be reduced to a commensurate degree through training alone; this can only be achieved through IGS. There is also reason to believe that the risk of fatality associated with tank entry will be reduced if the inert requirement was based on flashpoint alone, irrespective of cargo carried, ship deadweight and tank size (i.e. the same rule for low flash chemicals as is already the case for low flash petroleum products) [20]. In this respect the IG rule would be absolute, eliminating uncertainty in terms of whether the tanks are inerted or not. Page 28

FORMAL SAFETY ASSESSMENT, INCLUDING GENERAL CARGO SHIP SAFETY. Reporting of Accidents and Incidents

FORMAL SAFETY ASSESSMENT, INCLUDING GENERAL CARGO SHIP SAFETY. Reporting of Accidents and Incidents E MARITIME SAFETY COMMITTEE 93rd session Agenda item 15 MSC 93/15/2 11 February 2014 Original: ENGLISH FORMAL SAFETY ASSESSMENT, INCLUDING GENERAL CARGO SHIP SAFETY Reporting of Accidents and Incidents

More information

FORMAL SAFETY ASSESSMENT GENERAL CARGO SHIP SAFETY. Report of the FSA Experts Group

FORMAL SAFETY ASSESSMENT GENERAL CARGO SHIP SAFETY. Report of the FSA Experts Group E MARITIME SAFETY COMMITTEE 89th session Agenda items 16 and 17 MSC 89/WP.3 17 May 2011 Original: ENGLISH DISCLAIMER As at its date of issue, this document, in whole or in part, is subject to consideration

More information

MARITIME RISK. An Overview N E Rolf Skjong, Dr, Chief scientist Chalmers, April 21, 2009

MARITIME RISK. An Overview N E Rolf Skjong, Dr, Chief scientist Chalmers, April 21, 2009 MARITIME RISK An Overview Rolf Skjong, Dr, Chief scientist Chalmers, April 21, 2009 N62 30 12.83 E6 06 07.94 Contents 1. Introduction-Background 2. FSA Method 3. FSA, RBD, GBS -relations 4. FSA Results

More information

GENERAL CARGO SHIP SAFETY. IACS FSA study summary of results. Submitted by the International Association of Classification Societies (IACS) SUMMARY

GENERAL CARGO SHIP SAFETY. IACS FSA study summary of results. Submitted by the International Association of Classification Societies (IACS) SUMMARY E MARITIME SAFETY COMMITTEE 88th session Agenda item 19 MSC 88/INF.8 20 September 2010 ENGLISH ONLY GENERAL CARGO SHIP SAFETY IACS FSA study summary of results Submitted by the International Association

More information

IMO FORMAL SAFETY ASSESSMENT. Report of the FSA Experts Group

IMO FORMAL SAFETY ASSESSMENT. Report of the FSA Experts Group INTERNATIONAL MARITIME ORGANIZATION E IMO MARITIME SAFETY COMMITTEE 86th session Agenda item 17 MSC 86/WP.9 4 June 2009 Original: ENGLISH DISCLAIMER As at its date of issue, this document, in whole or

More information

ASSESSING ENVIRONMENTAL RISK: IS A SINGLE FIGURE REALISTIC AS AN ESTIMATE FOR THE COST OF AVERTING ONE TONNE OF SPILLED OIL?

ASSESSING ENVIRONMENTAL RISK: IS A SINGLE FIGURE REALISTIC AS AN ESTIMATE FOR THE COST OF AVERTING ONE TONNE OF SPILLED OIL? ASSESSING ENVIRONMENTAL RISK: IS A SINGLE FIGURE REALISTIC AS AN ESTIMATE FOR THE COST OF AVERTING ONE TONNE OF SPILLED OIL? Christos A. Kontovas 1 and Harilaos N. Psaraftis 2 Working Paper NTUA-MT-06-101

More information

Economic Activity and Societal Risk Acceptance

Economic Activity and Societal Risk Acceptance Economic Activity and Societal Risk Acceptance Rolf Skjong and Monika Eknes Det Norske Veritas, Strategic Research, NO-322 Høvik, Norway Rolf.Skjong@dnv.com/Monika.Eknes@dnv.com Decisions based on risk

More information

IMO WORK PROGRAMME. Damage stability verification of oil, chemical and gas tankers

IMO WORK PROGRAMME. Damage stability verification of oil, chemical and gas tankers INTERNATIONAL MARITIME ORGANIZATION E IMO MARITIME SAFETY COMMITTEE 83rd session Agenda item 25 MSC 83/25/14 3 July 2007 Original: ENGLISH Executive summary: WORK PROGRAMME Damage stability verification

More information

APPLICATION OF FORMAL SAFETY ASSESSMENT IN THE LEGAL ACTIVITY OF INTERNATIONAL MARITIME

APPLICATION OF FORMAL SAFETY ASSESSMENT IN THE LEGAL ACTIVITY OF INTERNATIONAL MARITIME Journal of KONES Powertrain and Transport, Vol. 21, No. 4 2014 ISSN: 1231-4005 e-issn: 2354-0133 ICID: 1130510 DOI: 10.5604/12314005.1130510 APPLICATION OF FORMAL SAFETY ASSESSMENT IN THE LEGAL ACTIVITY

More information

IMO REVIEW OF RESOLUTIONS A.744(18) AND A.746(18) Note by Norway

IMO REVIEW OF RESOLUTIONS A.744(18) AND A.746(18) Note by Norway INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON FLAG STATE IMPLEMENTATION 9th session Agenda item 12 FSI 9/12/2 21 November 2000 Original: ENGLISH REVIEW OF RESOLUTIONS A.744(18) AND A.746(18)

More information

Damage tability equirements for assenger hips Collision isk ased ost enefit ssessment

Damage tability equirements for assenger hips Collision isk ased ost enefit ssessment Damage tability equirements for assenger hips Collision isk ased ost enefit ssessment ABSTRACT Rainer Hamann, DNV GL Rainer.Hamann@dnvgl.com Odd Olufsen, DNV GL Odd.Olufsen@dnvgl.com Henning Luhmann, Meyer

More information

Setting Target Reliabilities by Marginal Safety Returns Rolf Skjong

Setting Target Reliabilities by Marginal Safety Returns Rolf Skjong Setting Target Reliabilities by Marginal Safety Returns Rolf Skjong Strategic Research Det Norske Veritas Rolf.Skjong @dnv.com JCSS Workshop on Code Calibration, March 21-22 2002 1 Traditional Approach

More information

SEAGOING VESSEL S ACCEPTANCE CRITERIA

SEAGOING VESSEL S ACCEPTANCE CRITERIA SEAGOING VESSEL S ACCEPTANCE v. 2016 www.cepsa.com SEAGOING GENERAL CEPSA (Compañía Española de Petróleos, S.A.U.) is an integrated energy company operating at every stage of the oil value chain, engaged

More information

Formal Safety Assessment

Formal Safety Assessment Formal Safety Assessment Overview and IACS Experience Presentation at MSC 75-16 May 2002 MSC 75-1/47 Contents FSA -Overview What it is and how it can be used Some FSA Criticism IACS and FSA Experiences

More information

Tangible Assets Threats and Hazards: Risk Assessment and Management in the Port Domain

Tangible Assets Threats and Hazards: Risk Assessment and Management in the Port Domain Journal of Traffic and Transportation Engineering 5 (2017) 271-278 doi: 10.17265/2328-2142/2017.05.004 D DAVID PUBLISHING Tangible Assets Threats and Hazards: Risk Assessment and Management in the Port

More information

Classification Based on Performance Criteria Determined from Risk Assessment Methodology

Classification Based on Performance Criteria Determined from Risk Assessment Methodology OFFSHORE SERVICE SPECIFICATION DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology OCTOBER 2008 This document has been amended since the main revision (October

More information

Comments on FSA studies by Denmark

Comments on FSA studies by Denmark MARITIME SAFETY COMMITTEE 86th session Agenda item 17 MSC 86/17/2 UNABRIDGED VERSION 27 May 2009 Original: ENGLISH FORMAL SAFETY ASSESSMENT FSA Group of Experts Comments on FSA studies by Denmark LNG carriers

More information

PANAMA MARITIME AUTHORITY

PANAMA MARITIME AUTHORITY PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-213 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5000 segumar@segumar.com To: Ship-owners/Operators, Company Security

More information

2: PROCEDURES CONCERNING REQUIREMENTS FOR MEMBERSHIP OF IACS

2: PROCEDURES CONCERNING REQUIREMENTS FOR MEMBERSHIP OF IACS IACS PROCEDURES Volume 2: PROCEDURES CONCERNING REQUIREMENTS FOR MEMBERSHIP OF IACS Volume 2: PROCEDURES CONCERNING REQUIREMENTS FOR MEMBERSHIP OF IACS 1 of 76 Adopted at C60, December 2009 Add 1, April

More information

THE HNS PROTOCOL. by Dr. Rosalie P. Balkin Director Legal Affairs and External Relations Division International Maritime Organization

THE HNS PROTOCOL. by Dr. Rosalie P. Balkin Director Legal Affairs and External Relations Division International Maritime Organization THE HNS PROTOCOL by Dr. Rosalie P. Balkin Director Legal Affairs and External Relations Division International Maritime Organization INTRODUCTION AND HISTORY In April this year, IMO played host to a Diplomatic

More information

Formal Safety Assessment: a critical review and ways to strengthen it and make it more transparent.

Formal Safety Assessment: a critical review and ways to strengthen it and make it more transparent. Formal Safety Assessment: a critical review and ways to strengthen it and make it more transparent. Christos A. Kontovas xkontovas@gmail.com and Harilaos N. Psaraftis hnpsar@deslab.ntua.gr School of Naval

More information

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND INTERNATIONAL OIL POLLUTION COMPENSATION FUNDS Agenda item: 3 IOPC/OCT15/3/7 Original: ENGLISH 25 August 2015 1992 Fund Assembly 92AES20 1992 Fund Executive Committee 92EC65 Supplementary Fund Assembly

More information

REGULATION ON IMPLEMENTATION OF INTERNATIONAL SAFETY MANAGEMENT CODE FOR TURKISH FLAGGED VESSELS AND THEIR MANAGEMENT COMPANIES PART ONE

REGULATION ON IMPLEMENTATION OF INTERNATIONAL SAFETY MANAGEMENT CODE FOR TURKISH FLAGGED VESSELS AND THEIR MANAGEMENT COMPANIES PART ONE Official Journal Date: 27.10.2009 Official Journal No: 27389 REGULATION ON IMPLEMENTATION OF INTERNATIONAL SAFETY MANAGEMENT CODE FOR TURKISH FLAGGED VESSELS AND THEIR MANAGEMENT COMPANIES PART ONE Objective,

More information

PROPOSAL FOR A DIRECTIVE OF THE EUROPEAN PARLIAMENT AND COUNCIL ON CIVIL LIABILITY AND FINANCIAL GUARANTEES OF SHIPOWNERS FREQUENTLY ASKED QUESTIONS

PROPOSAL FOR A DIRECTIVE OF THE EUROPEAN PARLIAMENT AND COUNCIL ON CIVIL LIABILITY AND FINANCIAL GUARANTEES OF SHIPOWNERS FREQUENTLY ASKED QUESTIONS PROPOSAL FOR A DIRECTIVE OF THE EUROPEAN PARLIAMENT AND COUNCIL ON CIVIL LIABILITY AND FINANCIAL GUARANTEES OF SHIPOWNERS FREQUENTLY ASKED QUESTIONS INTERNATIONAL GROUP OF P&I CLUBS Introduction The thirteen

More information

COMMENTS ON BILL C-64 (AN ACT RESPECTING WRECKS, ABANDONED, DILAPIDATED OR HAZARDOUS VESSELS AND SALVAGE OPERATIONS

COMMENTS ON BILL C-64 (AN ACT RESPECTING WRECKS, ABANDONED, DILAPIDATED OR HAZARDOUS VESSELS AND SALVAGE OPERATIONS COMMENTS ON BILL C-64 (AN ACT RESPECTING WRECKS, ABANDONED, DILAPIDATED OR HAZARDOUS VESSELS AND SALVAGE OPERATIONS Submitted to the House Standing Committee on Transport, Infrastructure and Communities

More information

NON-TECHNICAL MEASURES TO PROMOTE QUALITY SHIPPING FOR CARRIAGE OF OIL BY SEA

NON-TECHNICAL MEASURES TO PROMOTE QUALITY SHIPPING FOR CARRIAGE OF OIL BY SEA INTERNATIONAL OIL POLLUTION COMPENSATION FUND 1992 FOURTH INTERSESSIONAL 92FUND/WGR.4/2/3 WORKING GROUP 12 May 2006 Agenda item 3 Original: English NON-TECHNICAL MEASURES TO PROMOTE QUALITY SHIPPING FOR

More information

FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM. (Five Year Period: )

FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM. (Five Year Period: ) FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM (Five Year Period: 1995 1999) All questions relate to merchant ships flying the flag of the State concerned. GENERAL 1. Name of State/Associate Member List the

More information

Commonwealth of Dominica. Office of the Maritime Administrator ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS

Commonwealth of Dominica. Office of the Maritime Administrator ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS Commonwealth of Dominica Office of the Maritime Administrator TO: SUBJECT: REFERENCE: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS IMPLEMENTATION OF IMO UNIQUE COMPANY AND REGISTERED

More information

Main reasons for the changes introduced into the 1996 Convention by the 2010 Protocol

Main reasons for the changes introduced into the 1996 Convention by the 2010 Protocol AN OVERVIEW OF THE INTERNATIONAL CONVENTION ON LIABILITY AND COMPENSATION FOR DAMAGE IN CONNECTION WITH THE CARRIAGE OF HAZARDOUS AND NOXIOUS SUBSTANCES BY SEA, 2010 (THE 2010 HNS CONVENTION) Explanatory

More information

Maritime Rules Part 21: Safe Ship Management Systems

Maritime Rules Part 21: Safe Ship Management Systems Maritime Rules Part 21: Safe Ship Management Systems ISBN 978-0-478-44731-6 Published by Maritime New Zealand, PO Box 25620, Wellington 6146, New Zealand Maritime New Zealand Copyright 2015 Part 21: Safe

More information

Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances

Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances Marine Protection Rules Part 143 Shipboard Marine Pollution Emergency Plans for Noxious Liquid Substances ISBN 978-0-947527-51-8 Published by Maritime New Zealand, PO Box 25620, Wellington 6146, New Zealand

More information

Global Marine Insurance Casualty trends

Global Marine Insurance Casualty trends Global Marine Insurance Casualty trends ASTRID SELTMANN Vice chairman, IUMI Facts & Figures Committee Analyst/Actuary, The Nordic Association of Marine Insurers (Cefor) 2 CONTENTS The Global Marine Insurance

More information

Appendix FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM. (Five Year Period: )

Appendix FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM. (Five Year Period: ) Appendix FLAG STATE PERFORMANCE SELF-ASSESSMENT FORM (Five Year Period: 1996 2000) All questions relate to merchant ships flying the flag of the State concerned. GENERAL 1. Name of State/Associate Member

More information

D. (2009) : 36 (12-13) ISSN

D. (2009) : 36 (12-13) ISSN Guarin, L. and Konovessis, D. and Vassalos, D. (2009) Safety level of damaged RoPax ships : risk modelling and cost-effectiveness analysis. Ocean Engineering, 36 (12-13). pp. 941-951. ISSN 0029-8018, http://dx.doi.org/10.1016/j.oceaneng.2009.06.005

More information

Protection & Indemnity Insurance 2018/2019 Part 2

Protection & Indemnity Insurance 2018/2019 Part 2 Circular P&I 2629/2017 Protection & Indemnity Insurance 2018/2019 Part 2 Explanation of reinsurance and premium structure The Swedish Club provides P&I cover for its members for each and every accident

More information

IMO BULK CARRIER SAFETY. Report on FSA Study on Bulk Carrier Safety. Submitted by Japan

IMO BULK CARRIER SAFETY. Report on FSA Study on Bulk Carrier Safety. Submitted by Japan INTERNATIONAL MARITIME ORGANIZATION E IMO MARITIME SAFETY COMMITTEE 75th session Agenda item 5 MSC 75/5/2 12 February 2002 Original: ENGLISH BULK CARRIER SAFETY Report on FSA Study on Bulk Carrier Safety

More information

AN OVERVIEW OF THE HNS CONVENTION

AN OVERVIEW OF THE HNS CONVENTION Explanatory note AN OVERVIEW OF THE HNS CONVENTION 1 The need to monitor the implementation of the HNS Convention became an ongoing item in the agenda of the Legal Committee of the Organization. The Committee

More information

Vessel Risk Ratings Report Summary. February 2017

Vessel Risk Ratings Report Summary. February 2017 Vessel Risk Ratings Report Summary February 2017 About the International Marine Risk Rating Agency: IMRRA's vessel risk rating assessments identify high risk oil & gas vessel s, and compares the risk directly

More information

IMO PROVISION OF FINANCIAL SECURITY

IMO PROVISION OF FINANCIAL SECURITY INTERNATIONAL MARITIME ORGANIZATION E IMO LEGAL COMMITTEE 91st session Agenda item 4 LEG 91/4/4 24 March 2006 Original: ENGLISH PROVISION OF FINANCIAL SECURITY (ii) Follow up on resolutions adopted by

More information

MARITIME LABOUR CONVENTION 2006 AS AMENDED (MLC): FINANCIAL SECURITY REQUIREMENTS

MARITIME LABOUR CONVENTION 2006 AS AMENDED (MLC): FINANCIAL SECURITY REQUIREMENTS DECEMBER 19, 2016 TO ALL INSUREDS AND BROKERS Dear Sirs: MARITIME LABOUR CONVENTION 2006 AS AMENDED (MLC): FINANCIAL SECURITY REQUIREMENTS The amendment to the Maritime Labour Convention 2006 (MLC) will

More information

MARITIME LABOR CONVENTION 2006 AS AMENDED (MLC) FREQUENTLY ASKED QUESTIONS (FAQS) RECENT UPDATE

MARITIME LABOR CONVENTION 2006 AS AMENDED (MLC) FREQUENTLY ASKED QUESTIONS (FAQS) RECENT UPDATE AUGUST 10, 2018 CIRCULAR NO. 30/18 TO MEMBERS OF THE ASSOCIATION Dear Member: MARITIME LABOR CONVENTION 2006 AS AMENDED (MLC) FREQUENTLY ASKED QUESTIONS (FAQS) RECENT UPDATE Reference is made to previous

More information

RULES FOR CLASSIFICATION Ships. Part 1 General regulations Chapter 1 General regulations. Edition October 2015 Amended January 2016 DNV GL AS

RULES FOR CLASSIFICATION Ships. Part 1 General regulations Chapter 1 General regulations. Edition October 2015 Amended January 2016 DNV GL AS RULES FOR CLASSIFICATION Ships Edition October 2015 Amended January 2016 Part 1 Chapter 1 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The

More information

OUTLINE FOR PRESENTATION

OUTLINE FOR PRESENTATION THE INTERNATIONAL REGIME FOR COMPENSATION FOR OIL POLLUTION DAMAGE and THE DRAFT PROTOCOL TO THE HNS CONVENTION NOBUHIRO TSUYUKI Legal Counsel International Oil Pollution Compensation Funds PAJ OIL SPILL

More information

Contact: Structural Policy Division, Mr. Danny Scorpecci. tel: ; fax: ; e- mail:

Contact: Structural Policy Division, Mr. Danny Scorpecci. tel: ; fax: ; e- mail: Unclassified C/WP6(2006)7 C/WP6(2006)7 Unclassified Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development 25-Oct-2006 English - Or. English

More information

Translation: Only the Danish document has legal validity Excerpts of Act no. 618 of 12 June 2013 issued by the Ministry of Business and Growth

Translation: Only the Danish document has legal validity Excerpts of Act no. 618 of 12 June 2013 issued by the Ministry of Business and Growth Translation: Only the Danish document has legal validity Excerpts of Act no. 618 of 12 June 2013 issued by the Ministry of Business and Growth Act amending the merchant shipping act and various other acts

More information

MARITIME LABOUR CONVENTION 2006 AS AMENDED (MLC): FINANCIAL SECURITY REQUIREMENTS

MARITIME LABOUR CONVENTION 2006 AS AMENDED (MLC): FINANCIAL SECURITY REQUIREMENTS OCTOBER 06, 2016 CIRCULAR NO. 34/16 TO MEMBERS OF THE ASSOCIATION Dear Member: MARITIME LABOUR CONVENTION 2006 AS AMENDED (MLC): FINANCIAL SECURITY REQUIREMENTS Reference is made to previous communications

More information

Formal Safety Assessment: an updated review. Harilaos N. Psaraftis

Formal Safety Assessment: an updated review. Harilaos N. Psaraftis Formal Safety Assessment: an updated review Harilaos N. Psaraftis Journal of Marine Science and Technology Official Journal of the Japan Society of Naval Architects and Ocean Engineers (JASNAOE) ISSN 0948-4280

More information

CASUALTY ANALYSIS OF TANKERS

CASUALTY ANALYSIS OF TANKERS CASUALTY ANALYSIS OF TANKERS A Papanikolaou and E Eliopoulou, Ship Design Laboratory-NTUA, Greece N Mikelis, INTERTANKO, UK S Aksu, Universities of Strathclyde and Glasgow, UK S Delautre, Bureau Veritas,

More information

P&I Circular. Part 2 Protection & Indemnity Insurance 2019/2020. No. 2641/2019. Gothenburg : 4 January 2019

P&I Circular. Part 2 Protection & Indemnity Insurance 2019/2020. No. 2641/2019. Gothenburg : 4 January 2019 P&I Circular No. 2641/2019 Gothenburg : 4 January 2019 Part 2 Protection & Indemnity Insurance 2019/2020 Protection & Indemnity Insurance 2019/2020 Part 2 Executive summary Explanation of reinsurance and

More information

HNS TANKER OWNER S DUTY IN JAPAN S INCE APRIL 1 ST, Maritime Disaster Prevention

HNS TANKER OWNER S DUTY IN JAPAN S INCE APRIL 1 ST, Maritime Disaster Prevention HNS TANKER OWNER S DUTY IN JAPAN S INCE APRIL 1 ST, 2008 Maritime Disaster Prevention Please note that the definition is arranged as follows. D EFINITIONS [In case of this brochure] * Oils: Acceding to

More information

THE HNS CONVENTION WHY IT IS NEEDED

THE HNS CONVENTION WHY IT IS NEEDED THE HNS CONVENTION WHY IT IS NEEDED Compensation for damage caused by hazardous and noxious substances transported by sea IOPC Funds INTRODUCTION: A GLOBAL TRADE The transport of hazardous and noxious

More information

Protection & Indemnity Insurance 2017/2018

Protection & Indemnity Insurance 2017/2018 Circular P&I 2622/2016 Protection & Indemnity Insurance 2017/2018 Part 2 Explanation of reinsurance and premium structure The Swedish Club provides P&I cover for its members for each and every accident

More information

REPORT On the public consultation on new initiative regarding dismantling of ships

REPORT On the public consultation on new initiative regarding dismantling of ships EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directorate G - Sustainable Development and Integration ENV.G.4 - Sustainable Production & Consumption REPORT On the public consultation on new initiative

More information

MARINE SALVAGE: REINFORCING POLLUTION DEFENCE IN EU WATERS

MARINE SALVAGE: REINFORCING POLLUTION DEFENCE IN EU WATERS MARINE SALVAGE: REINFORCING POLLUTION DEFENCE IN EU WATERS INTRODUCTION 1. This paper has been prepared by the International Salvage Union (ISU), an association of companies engaged in marine salvage.

More information

The Accident Investigation Act (1990:712)

The Accident Investigation Act (1990:712) This is a translation into English of the Swedish original text. In case of discrepancies between this translation and the Swedish text, the Swedish text shall prevail with respect to the meaning and interpretation

More information

ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS AND AUTHORIZED CLASSIFICATION SOCIETIES.

ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS AND AUTHORIZED CLASSIFICATION SOCIETIES. Marine Notice MLC2006-005 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS AND AUTHORIZED CLASSIFICATION SOCIETIES. Health and safety protection, accident prevention, medical

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 8.5.2015 COM(2015) 195 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of Regulation (EC) no 789/2004 on the transfer of

More information

Conditions of Use for LNG CARRIERS

Conditions of Use for LNG CARRIERS ANNEX FFF - CONDITIONS OF USE for LNG CARRIERS Conditions of Use for LNG CARRIERS Annex - FFF to ETKI LNG TERMINAL INFORMATION AND REGULATIONS for FSRU and LNGC 1 CONDITIONS OF USE All facilities and assistance

More information

On formal safety assessment (FSA) procedure

On formal safety assessment (FSA) procedure See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/44057113 On formal safety assessment (FSA) procedure Article January 2010 CITATION 1 READS

More information

HNS Response Resource Deployment and Emergency Response Service

HNS Response Resource Deployment and Emergency Response Service HNS Response Resource Deployment and Emergency Response Service Ship Owners of HNS Tankers have legal obligation to deploy materials and equipment and secure experts. mdpc search Application procedure

More information

Chinese Law on Protection of the Marine Environment Caused by Ship Oil Pollution - Lessons Learned for Vietnam

Chinese Law on Protection of the Marine Environment Caused by Ship Oil Pollution - Lessons Learned for Vietnam Chinese Law on Protection of the Marine Environment Caused by Ship Oil Pollution - Lessons Learned for Vietnam Pham Van Tan School of Law, Dalian Maritime University, No. LingHai Road, High-Tech Zone District,

More information

INTERNATIONAL SALVAGE UNION. Position Paper on the 1989 Salvage Convention

INTERNATIONAL SALVAGE UNION. Position Paper on the 1989 Salvage Convention ISU PROPOSAL INTERNATIONAL SALVAGE UNION Position Paper on the 1989 Salvage Convention The ISU is of the opinion that the 1989 Salvage Convention should be brought up to date by providing for the assessment

More information

APPLICATION OF LOPA AND SIL ASSESSMENT TO A NEW COMAH PLANT

APPLICATION OF LOPA AND SIL ASSESSMENT TO A NEW COMAH PLANT APPLICATION OF LOPA AND ASSESSMENT TO A NEW COMAH PLANT Jerry Mullins Principal Consultant, Abbott Risk Consulting, Manchester, UK High hazard industries such as those regulated by COMAH face a number

More information

MD s Update. Asian Panel Meeting. Conrad Hotel Hong Kong April International Association of Independent Tanker Owners

MD s Update. Asian Panel Meeting. Conrad Hotel Hong Kong April International Association of Independent Tanker Owners Asian Panel Meeting MD s Update Conrad Hotel Hong Kong April 2015 International Association of Independent Tanker Owners INTERTANKO in a nutshell International Association of Independent Tanker Owners

More information

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND Agenda Item 3 Date 16 March 2018 Original English 1992 Fund Assembly 92AES22 1992 Fund Executive Committee 92EC70 Supplementary Fund Assembly SAES6 INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND DOUBLE JOY

More information

SCOPE OF COMPENSATION FOR ENVIRONMENTAL DAMAGE UNDER THE 1992 CIVIL LIABILITY CONVENTION AND THE 1992 FUND CONVENTION

SCOPE OF COMPENSATION FOR ENVIRONMENTAL DAMAGE UNDER THE 1992 CIVIL LIABILITY CONVENTION AND THE 1992 FUND CONVENTION Interspill 2004 Presentation no. 456 SCOPE OF COMPENSATION FOR ENVIRONMENTAL DAMAGE UNDER THE 1992 CIVIL LIABILITY CONVENTION AND THE 1992 FUND CONVENTION Joe Nichols Deputy Director/Technical Adviser

More information

Basic theory The trade-off concept The risk aversion concept Economic theory The cost optimization concept 2013/1/18 2

Basic theory The trade-off concept The risk aversion concept Economic theory The cost optimization concept 2013/1/18 2 Maritime risk assessment- cost benefit assessment Shuen-Tai Ung Department of Merchant Marine National Taiwan Ocean University 2013/1/18 1 Basic theory The trade-off concept The risk aversion concept Economic

More information

QUALITY POLICY. All Company employees are responsible for implementing the Company s Quality Policy.

QUALITY POLICY. All Company employees are responsible for implementing the Company s Quality Policy. QUALITY POLICY The Company is committed to providing a Quality service, which consistently & continuously meets the requirements of its customers whilst protecting assets under its care, its employees

More information

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND Agenda Item 3 Date 26 July 2017 Original English 1992 Fund Assembly 92A22 1992 Fund Executive Committee 92EC69 Supplementary Fund Assembly SA14 INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND HAEKUP PACIFIC

More information

China s 2009 Regulation on the Prevention and

China s 2009 Regulation on the Prevention and China s 2009 Regulation on the Prevention and Control of Marine Pollution from Ships Nengye Liu * Introduction The People s Republic of China is a major coastal state with an eastern continental coastline

More information

IMO ANY OTHER BUSINESS. FSA Study on ECDIS/ENCs: Details on Risk Assessments and Cost Benefit Assessments. Submitted by Denmark and Norway

IMO ANY OTHER BUSINESS. FSA Study on ECDIS/ENCs: Details on Risk Assessments and Cost Benefit Assessments. Submitted by Denmark and Norway INTERNATIONAL MARITIME ORGANIZATION E IMO MARITIME SAFETY COMMITTEE 81st session Agenda item 24 MSC 81/INF.9 6 February 2006 ENGLISH ONLY ANY OTHER BUSINESS FSA Study on ECDIS/ENCs: Details on Risk Assessments

More information

Loss Prevention through Risk Management

Loss Prevention through Risk Management Loss Prevention through Risk Management Tang Sau Weng 8 Sept 2011 Agenda > Introductions > Present market conditions > Loss Prevention > Damages survey > Conclusions CSL - Global Services RISK CONTROL

More information

MARINE TECHNOLOGY. and SNAME news. See Page Four for Complete Coverage on SNAME s 2008 Annual Meeting in Houston Texas

MARINE TECHNOLOGY. and SNAME news. See Page Four for Complete Coverage on SNAME s 2008 Annual Meeting in Houston Texas January 2009 Volume 46, Number 1 (ISSN 0025-3316) MARINE TECHNOLOGY and SNAME news 1 Correlation of Prototype and Model-Scale Wave Wake Characteristics of a Catamaran by Gregor J. Macfarlane 16 Experimental

More information

MERCHANT SHIPPING ACT 1985

MERCHANT SHIPPING ACT 1985 Statutory Document 421/98 MERCHANT SHIPPING ACT 1985 MERCHANT SHIPPING (ISM CODE) REGULATIONS 1998 Coming into operation :1 st July 1998 In exercise of the powers conferred on the Department of Trade and

More information

UNITED STATE CONGRESS HOUSE OF REPRESENTATIVES COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

UNITED STATE CONGRESS HOUSE OF REPRESENTATIVES COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE THE INTERNATIONAL ASSOCIATION OF INDEPENDENT TANKER OWNERS -FOR SAFE TRANSPORT, CLEANER SEAS AND FREE COMPETITION- WWW.INTERTANKO.COM LONDON OFFICE ST. CLARE HOUSE 30-33 MINORIES LONDON EC3N 1DD, UK TEL:

More information

COMMITTEE IV.1 DESIGN PRINCIPLES AND CRITERIA

COMMITTEE IV.1 DESIGN PRINCIPLES AND CRITERIA 17th INTERNATIONAL SHIP AND OFFSHORE STRUCTURES CONGRESS 16-21 AUGUST 2009 SEOUL, KOREA VOLUME 1 COMMITTEE IV.1 DESIGN PRINCIPLES AND CRITERIA MANDATE Concern for the quantification of general economic,

More information

Marine Terrorism. A re-evaluation of the risks. Tim Allmark Engineering Manager ABS Consulting Europe & Middle East

Marine Terrorism. A re-evaluation of the risks. Tim Allmark Engineering Manager ABS Consulting Europe & Middle East Marine Terrorism A re-evaluation of the risks by Tim Allmark Engineering Manager ABS Consulting Europe & Middle East RUNNING ORDER Introduction ISPS Code Overview Understanding the Context Application

More information

Terms and Conditions for Bulk Shipments by Barge or Vessel

Terms and Conditions for Bulk Shipments by Barge or Vessel Shell Chemicals Terms and Conditions for Bulk Shipments by Barge or Vessel Where necessary, Seller will furnish Buyer with Safety Data Sheets ( SDS ), which include health, safety, security and environment

More information

PROTECTION AND PRESERVATION OF THE MARINE ENVIRONMENT

PROTECTION AND PRESERVATION OF THE MARINE ENVIRONMENT CSCAP Workshop UNCLOS & Maritime Security Manila, Philippines, 27 May 2014 PROTECTION AND PRESERVATION OF THE MARINE ENVIRONMENT Robert Beckman Director, Centre for International Law (CIL) National University

More information

Emerging Challenges and Recent Developments Affecting Transport and Trade Facilitation

Emerging Challenges and Recent Developments Affecting Transport and Trade Facilitation Multi-year Expert Meeting on Transport and Trade Facilitation: Emerging Challenges and Recent Developments Affecting Transport and Trade Facilitation Geneva, 8-10 December 2010 Liability and Compensation

More information

WC1H 0JL. Char te r e r s G ui de. The Charterer s Guide to Protection and Indemnity Insurance

WC1H 0JL. Char te r e r s G ui de. The Charterer s Guide to Protection and Indemnity Insurance WC1H 0JL Char te r e r s G ui de The Charterer s Guide to Protection and Indemnity Insurance INTRODUCTION THE UK CLUB OFFERS A DEDICATED TEAM AND SPECIALIST INSURANCE COVER FOR CHARTERERS AND TRADERS.

More information

P & I Clubs. Key Role In Maritime Industry. What are they? Cover

P & I Clubs. Key Role In Maritime Industry. What are they? Cover P & I Clubs What are they? Cover Key Role In Maritime Industry What are they? Mutual, Non profit Insurance Associations Insures particular marine risks Claims are funded by premium Mutuality share the

More information

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites.

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites. Table of Contents Table of Contents 1. Consequence Analysis & Risk Reduction Option Selection 1.1. A description of the techniques, including its purpose 1.1.0.. Introduction 1.1.0.3. Consequence Analysis

More information

PORT QASIM AUTHORITY. Condition of Use for LNG CARRIERS

PORT QASIM AUTHORITY. Condition of Use for LNG CARRIERS PORT QASIM AUTHORITY Condition of Use for LNG CARRIERS Dated 11 th April 2015 Annex 1 to Standard Operating Procedures for LNG Carriers in Port Qasim 1 CONDITIONS OF USE All facilities and assistance of

More information

Protection & Indemnity Insurance 2010/2011 Part 2 - final

Protection & Indemnity Insurance 2010/2011 Part 2 - final P&I 2493/2010 9 February 2010 Protection & Indemnity Insurance 2010/2011 Part 2 - final This is the second circular letter in respect of 2010/2011 policy year including updated information. The information

More information

Commonwealth of Dominica. Office of the Maritime Administrator. The amendments to the fee schedule include, but are not limited to:

Commonwealth of Dominica. Office of the Maritime Administrator. The amendments to the fee schedule include, but are not limited to: Commonwealth of Dominica Office of the Maritime Administrator Policy Letter: Applicability: 01-10. Vessel Fee Schedule All Commonwealth of Dominica Flagged Vessels, Vessel Owners and Vessel Operators.

More information

Policy and Procedures on Risk Management

Policy and Procedures on Risk Management Policy and Procedures on Risk Management 4 th January 2008 Policy... 1 Procedures... 1 Appointment of assessors and training... 2 Risk Assessment... 2 Health and Safety Action Plans... 4 Background information

More information

Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels

Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels Safety and Security Engineering V 341 Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels C. A. Andersen, K. C. Jørgensen & E. K. Lauritzen NIRAS A/S, Denmark

More information

P&I Circular. Protection & Indemnity Insurance 2019/2020. No. 2640/2018. Gothenburg : 10 December 2018

P&I Circular. Protection & Indemnity Insurance 2019/2020. No. 2640/2018. Gothenburg : 10 December 2018 P&I Circular No. 2640/2018 Gothenburg : 10 December 2018 Protection & Indemnity Insurance 2019/2020 Protection & Indemnity Insurance 2019/2020 The terms for Protection & Indemnity Insurance for the 2019/2020

More information

EMERGENCY RESPONSE TOWING VESSEL (ERTV) ENROLLMENT AGREEMENT. A. Background and Statement of Purpose

EMERGENCY RESPONSE TOWING VESSEL (ERTV) ENROLLMENT AGREEMENT. A. Background and Statement of Purpose EMERGENCY RESPONSE TOWING VESSEL (ERTV) ENROLLMENT AGREEMENT A. Background and Statement of Purpose In order to legally enter Washington State waters, certain cargo, passenger, commercial fish processing

More information

The Two C s of the Risk-Based Approach to Goal Based Standards: Challenges and Caveats

The Two C s of the Risk-Based Approach to Goal Based Standards: Challenges and Caveats The Two C s of the Risk-Based Approach to Goal Based Standards: Challenges and Caveats Christos A. Kontovas 1), Harilaos N. Psaraftis 2), Panos Zachariadis 3) 1) Laboratory for Maritime Transport, National

More information

Objective. Part 120. Part 121A

Objective. Part 120. Part 121A Objective The amendments to Parts 120, 121A, 123A and 170 of the marine protection rules bring those Parts in line with amendments to the International Convention for Prevention of Pollution from Ships

More information

Procedure and workbook for Norwegian Maritime Rules and Regulations Onboard Course

Procedure and workbook for Norwegian Maritime Rules and Regulations Onboard Course Procedure and workbook for Norwegian Maritime Rules and Regulations Onboard Course Department or author: Approved by: Torger Tau Vibeke Nordahl-Paulsen 2018 Seagull Maritime All rights reserved. No part

More information

Legal Briefing. Chinese marine pollution laws JULY 2010 MARINE POLLUTION

Legal Briefing. Chinese marine pollution laws JULY 2010 MARINE POLLUTION Legal Briefing JULY 2010 MARINE POLLUTION Chinese marine pollution laws About us This briefing is one of a continuing series which aims to share the legal expertise within the Club with our Members A significant

More information

Transport Canada Update. CBMU Fall Conference 2018

Transport Canada Update. CBMU Fall Conference 2018 Transport Canada Update CBMU Fall Conference 2018 OVERVIEW Bill C-64 and the Wreck Removal Convention Passenger Insurance Regulations Bill C-86 and Amendments to the Marine Liability Act 2010 HNS Convention

More information

NATIONAL INTEREST ANALYSIS

NATIONAL INTEREST ANALYSIS Attachment 2 NATIONAL INTEREST ANALYSIS International Convention on Civil Liability for Bunker Oil Pollution Damage (Bunkers Convention) Executive Summary 1. It is proposed that New Zealand become party

More information

UNMANNED VESSELS LEGAL ASPECTS TO

UNMANNED VESSELS LEGAL ASPECTS TO UNMANNED VESSELS LEGAL ASPECTS TO CONSIDER FROM AN INSURANCE PERSPECTIVE IUMI Webinar May 11 th, 2017 Dr. Maximilian Guth, LL.M. (Southampton) Rechtsanwalt and Solicitor of England & Wales Agenda I. Unmanned

More information

SMALL TANKER OIL POLLUTION INDEMNIFICATION AGREEMENT (STOPIA)

SMALL TANKER OIL POLLUTION INDEMNIFICATION AGREEMENT (STOPIA) The Shipowners Protection Limited St Clare House, 30-33 Minories London EC3N 1BP TO ALL MEMBERS Managers of The Shipowners Mutual Protection and Indemnity Association (Luxembourg) June 2005 Dear Sirs,

More information

Notice to Mariners No. 71

Notice to Mariners No. 71 Notice to Mariners No. 71 SUBJECT : FUJAIRAH OFFSHORE ANCHORAGE AREA CO-ORDINATES AMENDMENT & GENERAL INSTRUCTIONS I Amendment Further to our Notice to Mariners No. 53 dated 15/11/1998, Mariners are kindly

More information